Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Process Re-engineering
by Database Management
What can WNI do for Bulkers?環境運航を見据えた
Bulker運航の「見える化」のため
WNIの24X7による問題発見、対応策+
DBによる答え一発のシステム化で
WNIは海運界に貢献できるか?
3
RTA Optimization
Speed / RPM optimization to meet RTA
Route optimization
Speed / RPM allocation taking into account bad weather
expected
Does OSR for Bulkers/Tankers look different?
Gain Maximum &
Profit Maximum by Reducing Cost
Gain Maximum &
Profit Maximum by Reducing Cost
6
Optimum
Ship
Routeing
Performance
Status
Monitoring
(Measuring,
Problem Finding)
(Problem Solution)
Process
Re-engineering
(Analysis)
Process
Re-engineering
(Analysis)
Decision Making
Process &
CommunicationShip Performance ModelReporting
Process Re-engineering Period (PREP)
- Lay/Can and Discharging date/time set-up and update
- ETA at Max/Min RPM
- Business priority
Decision Making
Process &
Communication
Voyage Planning
Business Strategy
Instruction
Evaluation
En route Monitoring
Max RPM (95)
236 MT
Min RPM (85)
189 MT
1st March
Noon
2nd March
0400 LT
2nd March
1700 LT
10th March
Noon
Laytime Canceling
Max / Min RPM difference produces
14 hours time difference with 47MT FO consumption
discrepancy
in 10 days Lay/Can time window.
Process Re-engineering Period (PREP)
- Real ship speed & consumption performance for
accurate voyage estimate.
Ship Performance Model
13
RPM Speed [knots] FOC[rpm] Ballast Loaded [mt/24h]100 12.7 12.1 21.4105 13.3 12.7 24.8110 14.0 13.3 28.5115 14.6 13.9 32.6120 15.2 14.5 37.0
8
10
12
14
16
18
100 105 110 115 120
Ballast
Loaded
Ballast
Loaded
20
25
30
35
40
100 105 110 115 120
Ballast
Loaded
Model
RPM
Sp
ee
d [kn
ots
]
Daily
FO
C [
mt/
24
h]
RPM
Calm Sea Performance
Process Re-engineering Period (PREP)
Reporting
Received
raw data
Verified data
•Automatically picking up
missing or suspicious data
for data retrieval or
confirmation
•Data verified en route
•Utilized for ship-specific
OSR model enhancement &
ship performance analysis
Quick Report Templatefor ship performance analysis & OSR model
enhancement
OSR Model
Enhancement
Quick Report
Template
Performance
Analysis
Quick Report Template Input Screen
Ship Report Sample
4 hourly RPM, FO, Position
Performance
Status
Monitoring
(Measuring,
Problem Finding)
Business Target Management
Ship Performance Analysis & Update
Charter Party Compliance Audit
1 Jul 2010 – 31 Dec 2010
1 January 2011 – 3 June 2011
1 January 2011 –
3 June 2011
1 Jul 2010 –
31 Dec 2010
Red : Issues identified.Yellow : Potential business risk detected.
RPM
Inconsistent
Suspicious
Cost (Time, Bunker)
14.8 hrs lost
23
Ship Specific Performance History DB
Speed & Consumption PairsSlow-down instructed vessels may be claimed based on
multiple Speed & Consumption pairs
Over-consumption
BunkerSaving
25
Total Time Lost
Total FO Over-consumption
Fleet Asset Management
26
Time lost: 1,058.30 hrs
Fuel over: 464.98 MT
Damage during past 1 year
Optimum
Ship
Routeing
Performance
Status
Monitoring
(Measuring,
Problem Finding)(Problem Solution)
Process
Re-engineering
(Analysis)
What is ideal voyages on the following voyage charter?
• Contracts of Affreightment
• Consecutive Voyage Charters
• Spot Charter
?
Voyage Planning
Business Strategy
Instruction
Evaluation
En route Monitoring