10
PUBLIC SUMMARY REPORT NAME OF CLIENT : LADANG BUKIT BUJANG, SEGAMAT LADANG USAHASAMA PPNJ/PKAYIS LADANG KAHANG 1 LADANG KAHANG 2 STANDARD : MS 2530-4:2013 DATE OF - INITIAL AUDIT STAGE 1 : 20-21 AUGUST 2019 INITIAL AUDIT STAGE 2 : 2-3 OKTOBER 2019 – (SEGAMAT) 7-8 OKTOBER 2019 – (KAHANG) MS 2530- 4 : 2013 Malaysian Sustainable Palm Oil (MSPO) Part 2: General Principles For Independent Smallholders/ Part 3: General Principles for oil palm plantations and organised smallholders Part 4: General Principles for palm oil mills

PUBLIC SUMMARY REPORT - Shauffmantz Summary/PUBLIC SUMMAR… · LADANG USAHASAMA PPNJ/PKAYIS 6107.00 mt (Estimated til 31.08. 2019) 5880.15 mt (Actual till 31.08.2019) 435.413 HA

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • PUBLIC SUMMARY REPORT

    NAME OF CLIENT : LADANG BUKIT BUJANG, SEGAMAT

    LADANG USAHASAMA PPNJ/PKAYIS

    LADANG KAHANG 1

    LADANG KAHANG 2

    STANDARD : MS 2530-4:2013

    DATE OF -

    INITIAL AUDIT STAGE 1 : 20-21 AUGUST 2019

    INITIAL AUDIT STAGE 2 : 2-3 OKTOBER 2019 – (SEGAMAT)

    7-8 OKTOBER 2019 – (KAHANG)

    MS 2530-4: 2013 Malaysian Sustainable Palm Oil (MSPO)

    Part 2: General Principles For Independent Smallholders/

    Part 3: General Principles for oil palm plantations and organised smallholders

    Part 4: General Principles for palm oil mills

  • PLATINUM SHAUFFMANTZ VERITAS Management System Certification

    Public Summary Report

    Standard:

    MS 2530-2/3/4:2013

    File No.:

    MASMSPO 101018

    Client: PPNJ - Estate

    Page

    1

    Table of Contents Page

    1.0 Detail of Certification Assessment

    1.1 Type of certification assessment 2

    1.2 Scope of MSPO certification 2

    1.3 MSPO Standards used for the assessment 2

    1.4 Map showing geographical location, with close-up of the certified entity. 2

    2.0 Details of the Certified Entity

    2.1 Name of certified entity 3

    2.2 Main address of the certified entity 3

    2.3 Management and contact person’s details 3

    2.4 MPOB License number, Scope of activity, Expiry Date 3

    2.5 Certified Area & Planted Area 3

    2.6 Estate / SPOC / Smallholding - Estimated tonnages of annual FFB Production 3

    2.7 Mill - Estimated certified palm oil (CSPO) and certified palm kernel (CSPK), and processing capacity.

    3

    2.8 Date of certificate issued and validity 4

    2.9 Other sustainability certifications 4

    3.0 Assessment Process

    3.1 Certification body

    3.1.1 Audit team members 4

    3.2 Audit Plan

    3.2.1 Audit dates, site (s) visited, total number of man-days spent on site (s) based on sampling

    formula (for group certification) 4

    3.3 Proposed dates of next surveillance audit and information on certified entities to be audited in

    five years cycle. 4

    4.0 Summary of Audit Results

    4.1 Lead Auditor’s summary and recommendation for certification 5

    4.2 Total number of: 5

    4.2.1 non-conformities and status 5

    4.2.2 corrective action 6

    4.2.3 Opportunities for Improvement 6

    4.2.4 issues raised during stakeholder consultation

    4.2.5 responses by certified entities

    5.0 Official Sign-off of the assessment findings

    6.0 Recommendation 7

    7.0 References (List of Attachments)

    8.0 Distribution / Confidentiality / Rights of ownership / Limitations / Responsibilities

  • PLATINUM SHAUFFMANTZ VERITAS Management System Certification

    Public Summary Report

    Standard:

    MS 2530-2/3/4:2013

    File No.:

    MASMSPO 101018

    Client: PPNJ - Estate

    Page

    2

    1.0 Detail of Certification Assessment

    1.1 Type of certification assessment

    Main Audit

    Annual surveillance audit

    Re-certification audit

    1.2 Scope of Certification

    The Provision of Fresh Fruit Bunches (FFB) Processing.

    1.3 MSPO Standards used for the assessment

    General Principles for Independent Smallholders – MS2530-2:2013 General Principle for Oil Palm Plantation and Organised Smallholders – MS2530-3:2013 General Principle for Palm Oil Mills – MS2530-4:2013

    1.4 Maps of Company Location, Plantations and Organised Smallholders

    Geographical coordinate.

    LADANG BUKIT BUJANG SEGAMAT

    Latitude: N 2.725503

    Longitude: E 102.775202

    x

    X

  • PLATINUM SHAUFFMANTZ VERITAS Management System Certification

    Public Summary Report

    Standard:

    MS 2530-2/3/4:2013

    File No.:

    MASMSPO 101018

    Client: PPNJ - Estate

    Page

    3

    LADANG KAHANG 1

    LADANG KAHANG 2

  • PLATINUM SHAUFFMANTZ VERITAS Management System Certification

    Public Summary Report

    Standard:

    MS 2530-2/3/4:2013

    File No.:

    MASMSPO 101018

    Client: PPNJ - Estate

    Page

    4

    LADANG USAHASAMA PPNJ/PKAYIS

    Latitude: N 2,4610

    Longitude: E 102,4826

    2.0 Details of the certified entity (mill / estate / SPOC / Smallholding)

    2.1 Name of certified entity

    Name of Mill/Estate/SPOC/Smallholding GPS Coordinate

    Ladang Bukit Bujang , Segamat

    Ladang Kahang 1

    Ladang Kahang 2

    Ladang Usahasama PPNJ/PKAYIS

    Latitude: N 2.725503

    Longitude: E 102.775202

    2o15’37.3” N 103o30’11.2” E

    2o19’36.5” N 106o23’07.8” E

    Latitude: N 2,4610

    Longitude: E 102,4826

    2.2 Main address of the certified entity

    Address

    LBB - PETI SURAT 60, LADANG BUKIT BUJANG 85000 SEGAMAT, JOHOR DARUL TAKZIM

    LDG. KAHANG - Ladang Kahang, Peti Surat 12, 86700 Kahang, Johor Darul Takzim

    LDG. PKAYIS - PETI SURAT 69, LADANG USAHASAMA PPNJ/PKAYIS 85000 SEGAMAT, JOHOR DARUL TAKZIM

  • PLATINUM SHAUFFMANTZ VERITAS Management System Certification

    Public Summary Report

    Standard:

    MS 2530-2/3/4:2013

    File No.:

    MASMSPO 101018

    Client: PPNJ - Estate

    Page

    5

    2.3 Management and contact person’s details;

    Name Designation Telephone Number Email Address

    HJ ZAINI BIN SUMANDI

    KHAIRUL NAZAR BIN OTHMAN

    MOHAMAD HANIFF BIN OMAR

    PENGURUS KANAN

    PENGURUS

    PENGURUS

    016-3435577

    079-7891571

    019-7256535

    [email protected]

    [email protected]

    [email protected]

    [email protected]

    2.4 MPOB information;

    MPOB License

    License Number District (Mukim) Scope of Activity License Expiry

    LBB - 501276002000

    Ladang Kahang 1

    Ladang Kahang 2

    LADANG USAHASAMA PPNJ/PKAYIS - 503796702000

    SEGAMAT

    Kahang

    Paloh

    SEGAMAT

    OIL PALM

    Oil palm plantation

    Oil palm plantation

    OIL PALM

    31.03.2020

    31/10/2019

    30.11.2019

    2.5 Certified & Planted Area;

    Name of Estate/SPOC/Smallholding Certified Area Planted Area

    LADANG BUKIT BUJANG 3674.95 HA 3568.00 HA

    Ladang Kahang 1 758.4 Ha 703.53 Ha

    Ladang Kahang 2 1456.88 Ha 1457.81 Ha

    LADANG USAHASAMA PPNJ/PKAYIS 435.413 HA 435.413 HA

    2.6 Estate / SPOC / Smallholding – Estimated tonnages of annual FFB production:

    Name of Estate/SPOC/Smallholding Total FFB Production (mt/year) Total Area (Ha)

    LADANG BUKIT BUJANG 32453.00 mt (Estimated til 31.08. 2019)

    29946.73 mt (Actual till 31.08.2019)

    3674.95 HA

    TOTAL

    Ladang Kahang 1

    Ladang Kahang 2

    12 580

    28 940

    703.53

    1457.81

    TOTAL 41520 2161.34

    LADANG USAHASAMA PPNJ/PKAYIS 6107.00 mt (Estimated til 31.08. 2019)

    5880.15 mt (Actual till 31.08.2019)

    435.413 HA

    mailto:[email protected]:[email protected]:[email protected]

  • PLATINUM SHAUFFMANTZ VERITAS Management System Certification

    Public Summary Report

    Standard:

    MS 2530-2/3/4:2013

    File No.:

    MASMSPO 101018

    Client: PPNJ - Estate

    Page

    6

    2.7 Mill – Estimated certified palm oil (CSPO) and certified palm kernel (CSPK), and processing capacity – Part 3 only

    Name of Mill FFB Process

    (Mt/year)

    Certified Palm Oil

    (Mt)

    Oil Extraction Rate

    (OER %)

    Certified Palm Kernel

    Palm Kernal Rate

    (PK %)

    Processing Capacity

    (Mt/Hour)

    KILANG SAWIT BUKIT BUJANG

    86860.84 (Till Aug 2019)

    2334.57 mt 19.86 % 573.75 4.88 % 30.00 mt

    KILANG SAWIT BUKIT BUJANG

    86860.84 (Till Aug 2019)

    2334.57 mt 19.86 % 573.75 4.88 % 30.00 mt

    2.8 Date of certificate issued and validity:

    Name of MSPO Certificate Date of Certificate issued Certificate Number Validity Certificate

    2.9 Other sustainability certification:

    Name of Others Sustainability Certificate

    Date of Certificate Issued Certificate Number Validity Certificate

    Nil Nil Nil Nil

    3.0 Assessment Process

    3.1 Certification body

    3.1.1 Audit team members:

    No. Member of Audit Team Role / area of MSPO Requirements Qualification

    1 Badrul Hisham Hj Baharin Lead Auditor Attended MSPO Auditor Course

    Attended Integrated

    Management System Course

    Qualified MSPO Auditor

    14-year experience in Plantation

    Industry.

    3.2 Audit Plan

    3.2.1

    Audit dates

    Site(s) visited 1

    Total number of man-days spent on site (s) based on sampling formula

    On site duration identified in this document are appropriate size of oil palm premises (OPP), accessibility and number of audit sites within the premises where oil palm operations are conducted.

    Sample size = risk factor√number/size of site

    S = r√n

  • PLATINUM SHAUFFMANTZ VERITAS Management System Certification

    Public Summary Report

    Standard:

    MS 2530-2/3/4:2013

    File No.:

    MASMSPO 101018

    Client: PPNJ - Estate

    Page

    7

    3.3 Proposed dates of next surveillance audit and information on certified entities to be audited in five years cycle.

    Year Of Audit Date Proposed for Surveillance Audit

    2nd Year November 2020

    3rd Year November 2021

    4th year November 2022

    5th year November 2023

    4.0 Summary of Audit Results

    4.1 Lead auditor’s summary and recommendation for certification

    4.2 Total number of:-

    Detail of Audit Findings Identified During This Audit

    Audit Outcome

    Major NCR NIL

    Minor NCR

    Area of Concern (AOC) NIL

    Opportunity for Improvement (OFI)

    Observation (OBS) NIL

    The management system demonstrated conformity with the requirements of the audit standard and been provided with sufficient structure to support implementation and maintenance of the management system. Therefore, Lead Auditor has recommends for certification granted based on the results of this audit and the system’s demonstrated state of development and maturity.

    Non-conformities (NCR) and Status

    LADANG KAHANG 1

    MIN NCR-01-LK2-NHA

    Schedule waste not dispose as Environment Quality Regulations (Schedule Waste) 2005, Environment Quality Act, 1974. During document checking, it was found that schedule waste was store more than 180 days. Refer evidence CRD40 dated 7.4.2019 and Hydraulic 68 Oil dated 1.2.2019 for Ladang Kahang 1 and SAE 40 dated 28.2.2019 and Ken Up container dated 1.3.2019 for Ladang Kahang 2

    MIN NCR-02-LK1-BHB

    SOP-During field observation, sighted the cutter named Hemli (TKI) was not wearing his safety glasses while harvest the crop.

    MIN NCR-03-LK1-BHB

    SOP-During site visit to Block C4, A4, D5 and D3, sighted the rejected crop was not placed at the frond stacking. The rejected bunches left under the palm trees.

  • PLATINUM SHAUFFMANTZ VERITAS Management System Certification

    Public Summary Report

    Standard:

    MS 2530-2/3/4:2013

    File No.:

    MASMSPO 101018

    Client: PPNJ - Estate

    Page

    8

    Corrective action

    LADANG KAHANG 1

    MIN NCR-01-LK2-NHA

    1. Register Pentas Flora Sdn Bhd as contractor to manage and dispose the estate schedule waste.

    2. Send the TWG form to DOE for diapose approval.

    3. Complete the ESWISS registration.

    4. Make sure the schedule waste will be dispose before 180 days in the future.

    MIN NCR-02-LK1-BHB

    1. A warning letter for the cutter name Hemli for not wearing his safety glass while harvesting.

    2. In house training for all harvester on safety procedure while harvesting the crop.

    3. Mandore and field staff must ensure all wokers wearing their PPE.

    4. A warning memo for field staff to ensure all wokers wearing their PPE.

    MIN NCR-03-LK1-BHB

    1. Set up 1 team consist 3 workers (Suyono, Elvin, Zahrou) to place all rejected bunches from under palm

    trees to the frond staking.

    2. In house training for mandore and bunch checker on SOP to eliminate the rejected crop.

    A warning memeo for field staff, mandore and checker to make sure all rejected crop placed at the frond stacking.

    Opportunities for Improvement (OFI)

    LADANG KAHANG 1

    OFI – 01 (Clause 4.4.5.11) Ladang Kahang 1

    Site visit to Ladang Kahang 1 workers quarters, observed the surrounding area was clean. Sighted the fire extinguisher was provided at each block and rubbish bin in good condition.

    However, there were a few chickens and swans meandered behind the block. This situation will create a negative social impact to the communities.

    OFI – 02 (Clause 4.5.3.1) Ladang Kahang 1

    During site visit to diesel skid tank, sighted the warning signage’s was properly installed and fire extinguisher was available.

    However, the gun nozzle was leaking and seen the diesel spillage under the diesel pump machine.

    OFI – 03 (Clause 5.3.5) Ladang Kahang 2

    During site visit to landfill, it was found landfill was open on 20.9.2019. there are round with sandbag to avoid erosion.

    However, it was found there is no barricade due to the landfill was deep that can be hazardous places.

    OFI – 04 (Clause 4.6.1.1) Ladang Kahang 1

    Observation to field A4, circle raking was not implemented as a Good Agriculture Practices in this estate. Thick debris under palm trees and uncollected loose fruits was everywhere.

    4.2.4 Issues raised during stakeholder consultation

    4.2.5 Response by certified entities

    Nil

  • PLATINUM SHAUFFMANTZ VERITAS Management System Certification

    Public Summary Report

    Standard:

    MS 2530-2/3/4:2013

    File No.:

    MASMSPO 101018

    Client: PPNJ - Estate

    Page

    9

    5 Official Sign-Off of the Assessment Findings

    Prepared by

    Lead Auditor :

    Date: