22
R E K A P I T U L A S I A K H I R PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN SMK NEGERI TANDIA LOKASI : KABUPATEN TELUK WONDAMA - PROV. PAPUA BARAT T.A : 2015 N O . U R A I A N P E K E R J A A N J U M L A H H A R G A I. PEKERJAAN PERSIAPAN Rp 12,156,280.00 II. PEKERJAAN TANAH DAN PONDASI Rp 53,238,275.32 III. PEKERJAAN BETON Rp 69,729,253.54 IV. PEKERJAAN DINDING Rp 62,416,682.48 V PEKERJAAN KAYU DAN ATAP Rp 59,740,755.31 VI PEKERJAAN LANTAI DAN KERAMIK Rp 75,575,150.80 VII PEKERJAAN PLAFOND Rp 23,490,971.25 VIII PEKERJAAN KUSEN, PINTU DAN JENDELA Rp 22,883,844.00 IX PEKERJAAN KUNCI DAN PENGGANTUNG Rp 10,486,475.00 X PEKERJAAN PENGECATAN Rp 16,950,852.61 XI PEKERJAAN LISTRIK Rp 7,201,671.25 XII PEKERJAAN FINISHING Rp 1,500,000.00 REAL COST Rp 415,370,211.55 PPN ( 10 % ) Rp 41,537,021.15 JUMLAH Rp 456,907,232.70 DIBULATKAN Rp 456,907,000.00 TERBILANG : EMPAT RATUS LIMA PULUH ENAM JUTA SEMBILAN RATUS TUJUH RIBU RUPIAH Dibuat / Disusun Oleh : CV. ANGGRIS AGUSTINA TANGKE LAYUK DIREKTRIS NIP : 19601111 199303 2 001

rab kont

  • Upload
    xp

  • View
    11

  • Download
    2

Embed Size (px)

DESCRIPTION

RAB

Citation preview

Page 1: rab kont

R E K A P I T U L A S I A K H I R

PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN SMK NEGERI TANDIA

LOKASI : KABUPATEN TELUK WONDAMA - PROV. PAPUA BARAT

T.A : 2015

N O . U R A I A N P E K E R J A A N J U M L A H H A R G A

I. PEKERJAAN PERSIAPAN Rp 12,156,280.00

II. PEKERJAAN TANAH DAN PONDASI Rp 53,238,275.32

III. PEKERJAAN BETON Rp 69,729,253.54

IV. PEKERJAAN DINDING Rp 62,416,682.48

V PEKERJAAN KAYU DAN ATAP Rp 59,740,755.31

VI PEKERJAAN LANTAI DAN KERAMIK Rp 75,575,150.80

VII PEKERJAAN PLAFOND Rp 23,490,971.25

VIII PEKERJAAN KUSEN, PINTU DAN JENDELA Rp 22,883,844.00

IX PEKERJAAN KUNCI DAN PENGGANTUNG Rp 10,486,475.00

X PEKERJAAN PENGECATAN Rp 16,950,852.61

XI PEKERJAAN LISTRIK Rp 7,201,671.25

XII PEKERJAAN FINISHING Rp 1,500,000.00

REAL COST Rp 415,370,211.55

PPN ( 10 % ) Rp 41,537,021.15

JUMLAH Rp 456,907,232.70

DIBULATKAN Rp 456,907,000.00

TERBILANG : EMPAT RATUS LIMA PULUH ENAM JUTA SEMBILAN RATUS TUJUH RIBU RUPIAH

Dibuat / Disusun Oleh :

CV. ANGGRIS

AGUSTINA TANGKE LAYUK

DIREKTRIS

NIP : 19601111 199303 2 001

Page 2: rab kont

RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN SMK NEGERI TANDIA

LOKASI : KABUPATEN TELUK WONDAMA - PROV. PAPUA BARAT

T.A : 2015

NO J E N I S P E K E R J A A N VOLUME SAT. HARGA SATUAN JUMLAH HARGA

(Rp) (Rp)1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi 205.000 Ls 17,500.00 3,587,500.00

2 Pengukuran dan Pasang Bouwplank 82.000 M' 72,790.00 5,968,780.00

3 Penyiapan Air Kerja 1.000 Ls 2,000,000.00 2,000,000.00

4 Foto Dokumentasi 2.000 Set 300,000.00 600,000.00

12,156,280.00

II. PEKERJAAN TANAH DAN PASIR

1 Galian Tanah Pondasi 45.920 M3 42,800.00 1,965,376.00

2 Urugan tanah kembali 11.480 M3 20,544.00 235,845.12

3 Urugan Pasir di bawah pondasi 3.280 M3 522,500.00 1,713,800.00

4 Pasanagan batu kosong 9.840 M3 765,480.00 7,532,323.20

5 Pondasi Batu Kali 28.70 M3 1,456,130.00 41,790,931.00

53,238,275.32

III. PEKERJAAN BETON

1 Sloof 15/20 Beton Camp. 1 : 2 : 3 82.000 M' 267,688.36 21,950,445.52

2 Kolom 15/15 Beton Camp. 1 : 2 : 3 32.850 M' 242,042.20 7,951,086.39

3 Ringbalk 15/15 Beton Camp. 1 : 2 : 3 82.000 M' 274,435.14 22,503,681.65

4 Kolom Praktis 12/12 camp. 1:2:3 29.200 M' 196,348.91 5,733,388.04

5 Kolom Teras 20/20 Camp. 1:2:3 29.200 M' 294,200.41 8,590,651.94

6 Profil + List Kolom Teras 2.000 Bh 1,500,000.00 3,000,000.00

69,729,253.54

IV PEKERJAAN DINDING

1 Pas. Dinding Batu Camp. 1 : 4 159.450 M2 167,324.04 26,679,818.18

2 Plesteran Dinding 407.000 M2 62,580.00 25,470,060.00

3 Acian 407.000 M2 11,412.08 4,644,716.56

4 Pas. Batu Keliling Teras Camp. 1:4 ( tinggi = 60 cm) 33.600 M2 167,324.04 5,622,087.74

62,416,682.48

V PEKERJAAN KAYU DAN ATAP

1 Konstruksi Kuda-kuda Kayu Besi 3.400 M3 5,477,000.00 18,621,800.00

1 Kaso dan Reng kayu Matoa 120.000 M2 71,536.00 8,584,320.00

2 Listplank Papan Kayu Besi 56.000 M' 32,528.69 1,821,606.53

3 Pasang Atap Sakura Roof 189.390 M2 137,310.20 26,005,178.78

4 Pasng Bubungan Sakura Roof 35.000 M' 124,622.00 4,361,770.00

5 Pasang Talang Seng 6.00 M' 57,680.00 346,080.00

59,740,755.31

VI PEKERJAAN LANTAI DAN KERAMIK

1 Urugan Tanah Peninggi Lantai 54.70 M3 505,000.00 27,625,835.63

2 Pembuatan Lantai Kerja 11.02 M3 1,251,640.00 13,793,072.80

3 Pekerjaan Keramik DN 30x30 113.63 M2 256,546.00 29,150,039.25

4 Urugan Pasir d Bawah Lantai 9.58 M3 522,500.00 5,006,203.13

75,575,150.80

Page 3: rab kont

NO J E N I S P E K E R J A A N VOLUME SAT. HARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

1 2 3 4 5 6

VII PEKERJAAN PLAFOND

1 Pasangan Rangkah dan Plafon Triplex 3 mm 165.63 M2 125,570.00 20,797,531.25

2 Pekerjaan List Plafond 152.00 M' 17,720.00 2,693,440.00

23,490,971.25

VIII PEKERJAAN KUSEN, PINTU DAN JENDELA

1 Pekerjaan Kusen Pintu & Jendela 0.572 M3 7,227,000.00 4,133,844.00

2 Pekerjaan daun Pintu 5.000 Bh 1,500,000.00 7,500,000.00

3 Pekerjaan daun jendela 21.000 Bh 350,000.00 7,350,000.00

4 Pekerjaan ventilasi udara 26.000 Bh 150,000.00 3,900,000.00

22,883,844.00

IX PEKERJAAN KUNCI DAN PENGGANTUNG

1 Pasang Kunci Pintu Tanam Yale 2 Slaag 4.00 Bh 96,225.00 384,900.00

2 Pasang Engsel pintu H 140x60 15.00 Bh 69,530.00 1,042,950.00

4 Pasang Grendel Jendela & ventilasi (Klip) 41.00 Bh 38,485.00 1,577,885.00

5 Pasang Engsel Jendela &Ventilasi 82.00 Bh 50,485.00 4,139,770.00

5 Pasang Hak Angin 61.00 Bh 54,770.00 3,340,970.00

10,486,475.00

X PEKERJAAN PENGECATAN

1 Pek. Cat Dinding 407.000 M2 22,940.00 9,336,580.00

2 Pek. Cat Kusen & Pintu 18.092 M2 58,280.46 1,054,410.06

3 Pek. Cat Listplank 16.956 M2 58,280.46 988,203.46

5 Pek. Cat Plafond 165.625 M2 33,640.21 5,571,659.09

16,950,852.61

XI PEKERJAAN LISTRIK

1 Pasang Lampu Pijar 60 Watt 9.000 Titik 259,618.75 2,336,568.75

2 Pasang Saklar Ganda 7.000 Titik 81,470.00 570,290.00

3 Pasang stop Kontak 5.000 Titik 306,388.50 1,531,942.50

4 Pasang Lampu SL 14 Watt 7.000 Titik 321,088.75 2,247,621.25

5 Pasang Box Sekring + MBC 1.000 Titik 515,248.75 515,248.75

7,201,671.25

XII PEKERJAAN FINISHING

Pembersihan Akhir Pekerjaan 1.000 Ls 1,500,000.00 1,500,000.00

1,500,000.00

Total 415,370,211.55

Dibuat / Disusun Oleh :

CV. ANGGRIS

AGUSTINA TANGKE LAYUK

DIREKTRIS

Page 4: rab kont

ANALISIS HARGA SATUAN( STANDAR SNI )

PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN SMK NEGERI TANDIA

LOKASI : KABUPATEN TELUK WONDAMA - PROV. PAPUA BARAT

T.A : 2015

NO U R A I A N P E K E R J A A N HARGA SATUAN JUMLAH HARGA

( Rp ) ( Rp )

1 2 3 4

I PEKERJAAN PERSIAPAN

1 Pekerjaan Pembersihan Lokasi / M2

A. Tenaga

0.1000 Oh Pekerja 90,000 9,000

0.0500 Oh Mandor 170,000 8,500

17,500

2 Ukur dan Pasang Papan Bouwplank / M'

A. Bahan

0.0070 M³ Papan Matoa 3/20 2,620,000.00 18,340.00

0.0120 M³ Balok Matoa 5/7 2,550,000.00 30,600.00

0.0200 Kg Paku campuran 25,000.00 500.00

B. Tenaga

0.1000 Oh Tukang kayu 120,000.00 12,000.00

0.0100 Oh Kepala Tukang kayu 150,000.00 1,500.00

0.1000 Oh Pekerja 90,000.00 9,000.00

0.0050 Oh Mandor 170,000.00 850.00

72,790.00

II PEKERJAAN TANAH DAN PONDASI

1 Galian Tanah Biasa / M3

A. Tenaga

0.4000 Oh Pekerja 90,000.00 36,000.00

0.0400 Oh Mandor 170,000.00 6,800.00

42,800.00

2 Urugan Tanah Kembali / M3

A. Tenaga

0.1920 Oh Pekerja 90,000.00 17,280.00

0.0192 Oh Mandor 170,000.00 3,264.00

20,544.00

3 Urugan Pasir di bawah pondasi

A. Bahan

1.2000 M³ Pasir urug 411,500.00 493,800.00

B. Tenaga

0.3000 Oh Pekerja 90,000.00 27,000.00

0.0100 Oh Mandor 170,000.00 1,700.00

522,500.00

4 Pasangan Batu Kosong / M3

A. Bahan

1.2000 M3 Batu Kali 530,000.00 636,000.00

B. Tenaga -

0.7800 Oh Pekerja 90,000.00 70,200.00

0.3900 Oh Tukang Batu 120,000.00 46,800.00

0.0390 Oh Kepala Tukang 150,000.00 5,850.00

0.0390 Oh Mandor 170,000.00 6,630.00

765,480.00

Page 5: rab kont

5 Pondasi Batu Kali 1 Pc : 4 Ps / M3

A. Bahan

1.1000 M3 Batu Kali 530,000.00 583,000.00

163.0000 Kg Semen Porland (PC) 50 Kg 2,500.00 407,500.00

0.5200 M3 Pasir Pasang 481,500.00 250,380.00

B. Tenaga -

0.5000 Ho Tukang Batu 120,000.00 60,000.00

0.0500 Ho Kep.Tukang Batu 150,000.00 7,500.00

1.5000 Ho Pekerja 90,000.00 135,000.00

0.0750 Ho Mandor 170,000.00 12,750.00

1,456,130.00

III PEKERJAAN STRUKTUR DAN BETON

1 Slof Beton 15/20 Cam. 1 : 2 : 3 / M'

A. Bahan

9.0000 Kg Semen Porland (PC) 50 Kg 2,500.00 22,500.00

0.0180 M3 Pasir Beton 481,500.00 8,667.00

0.0300 M3 Batu Pecah u/. 2 cm - 3 cm 992,000.00 29,760.00

2.7944 Kg Besi Beton d 8 mm 22,650.00 63,293.16

3.5520 Kg besi beton d 12 mm 25,600.00 90,931.20

0.2000 Kg Kawat Ikat 27,000.00 5,400.00

0.0030 M3 Papan Kayu Matoa 2,620,000.00 7,860.00

0.0020 M3 Kayu Bekisting 2,288,500.00 4,577.00

B. Tenaga

0.0500 Ho Tukang Batu 120,000.00 6,000.00

0.0500 Ho Tukang Besi 120,000.00 6,000.00

0.0200 Ho Kepala Tukang 150,000.00 3,000.00

0.2000 Ho Pekerja 90,000.00 18,000.00

0.0100 Ho Mandor 170,000.00 1,700.00

267,688.36

2 Kolom Beton 15/15 Camp 1:2:3 /M'

A. Bahan

6.0000 Kg Semen Porland (PC) 50 Kg 2,615.10 15,690.60

0.0120 M3 Pasir Beton 482,250.00 5,787.00

0.0180 M3 Batu Pecah u/. 2 cm - 3 cm 994,916.67 17,908.50

2.3952 Kg Besi Beton d 8 mm 22,946.99 54,962.63

3.5520 Kg besi beton d 12 mm 26,198.81 93,058.17

0.2000 Kg Kawat Ikat 27,784.00 5,556.80

0.0020 M3 Papan Kayu Matoa 2,668,000.00 5,336.00

0.0050 M3 Kayu Bekisting 2,288,500.00 11,442.50

-

B. Tenaga -

0.0400 Oh Tukang Batu 120,000.00 4,800.00

0.0400 Oh Tukang Besi 120,000.00 4,800.00

0.0200 Oh Kepala Tukang 150,000.00 3,000.00

0.2000 Oh Pekerja 90,000.00 18,000.00

0.0100 Oh Mandor 170,000.00 1,700.00

242,042.20

Page 6: rab kont

3 Ringbalk Beton 15/15 Camp 1 : 2 : 3 / M'

A. Bahan

6.0000 Kg Semen Porland (PC) 50 Kg 2,615.10 15,690.60

0.0180 M3 Pasir Beton 482,250.00 8,680.50

0.0300 M3 Batu Pecah u/. 2 cm - 3 cm 994,916.67 29,847.50

2.7944 Kg Besi Beton d 8 mm 22,946.99 64,123.07

3.5520 Kg besi beton d 12 mm 26,198.81 93,058.17

0.2000 Kg Kawat Ikat 27,784.00 5,556.80

0.0020 M3 Papan Kayu Matoa 2,668,000.00 5,336.00

0.0050 M3 Kayu Bekisting 2,288,500.00 11,442.50

-

B Tenaga

0.0500 Oh Tukang Batu 120,000.00 6,000.00

0.0500 Oh Tukang Besi 120,000.00 6,000.00

0.0500 Oh Tukang Kayu 120,000.00 6,000.00

0.0200 Oh Kepala Tukang 150,000.00 3,000.00

0.2000 Oh Pekerja 90,000.00 18,000.00

0.0100 Oh Mandor 170,000.00 1,700.00

274,435.14

4 Kolom Praktis 12/12 Camp. 1:2:3 /M'

A Bahan

2.8800 Kg Semen Porland (PC) 50 Kg 2,615.10 7,531.49

0.0058 M3 Pasir Beton 482,250.00 2,777.76

0.0086 M3 Batu Pecah u/. 2 cm - 3 cm 994,916.67 8,596.08

1.9162 Kg Besi Beton d 8 mm 22,946.99 43,970.10

3.5520 Kg besi beton d 12 mm 26,198.81 93,058.17

0.2000 Kg Kawat Ikat 27,784.00 5,556.80

0.0020 M3 Papan Kayu Matoa 2,668,000.00 5,336.00

0.0050 M3 Kayu Bekisting 2,288,500.00 11,442.50

B Tenaga

0.0300 Oh Tukang Batu 120,000.00 3,600.00

0.0300 Oh Tukang Besi 120,000.00 3,600.00

0.0080 Oh Kepala Tukang 150,000.00 1,200.00

0.1000 Oh Pekerja 90,000.00 9,000.00

0.0040 Oh Mandor 170,000.00 680.00

196,348.91

5 Kolom Teras 20/20 Camp.1:2:3

A Bahan

12.0000 Kg Semen Porland (PC) 50 Kg 2,615.10 31,381.20

0.0200 M3 Pasir Beton 482,250.00 9,645.00

0.0280 M3 Batu Pecah u/. 2 cm - 3 cm 994,916.67 27,857.67

2.7944 Kg Besi Beton d 8 mm 22,946.99 64,123.07

3.5520 Kg besi beton d 12 mm 26,198.81 93,058.17

0.2000 Kg Kawat Ikat 27,784.00 5,556.80

0.0020 M3 Papan Kayu Matoa 2,668,000.00 5,336.00

0.0050 M3 Kayu Bekisting 2,288,500.00 11,442.50

-

B Tenaga

0.0600 Oh Tukang Batu 120,000.00 7,200.00

0.0600 Oh Tukang Besi 120,000.00 7,200.00

0.0600 Oh Tukang Kayu 120,000.00 7,200.00

0.0300 Oh Kepala Tukang 150,000.00 4,500.00

0.2000 Oh Pekerja 90,000.00 18,000.00

0.0100 Oh Mandor 170,000.00 1,700.00

294,200.41

Page 7: rab kont

IV PEKERJAAN DINDING

1 Pekerjaan Pasangan Batu Tela

A. Bahan

21.0000 Bh Batu Tela 4,880.00 102,480.00

4.4000 Kg Semen Porland (PC) 50 Kg 2,615.10 11,506.44

0.0176 M3 Pasir Pasang 482,250.00 8,487.60

B. Tenaga -

0.1000 Oh Tukang Batu 120,000.00 12,000.00

0.0100 Oh Kep. Tukang Batu 150,000.00 1,500.00

0.3200 Oh Pekerja 90,000.00 28,800.00

0.0150 Oh Mandor 170,000.00 2,550.00

167,324.04

2 Pekerjaan Plesteran

Plesteran Biasa 1 Pc : 4 Ps, tebal 15 mm / M2

A. Bahan

5.2000 Kg Semen Porland (PC) 50 Kg 2,500.00 13,000.00

0.0200 M3 Pasir pasang 481,500.00 9,630.00

B. Tenaga -

0.1500 Oh Tukang batu 120,000.00 18,000.00

0.0150 Oh Kepala tukang 150,000.00 2,250.00

0.2000 Oh Pekerja 90,000.00 18,000.00

0.0100 Oh Mandor 170,000.00 1,700.00

62,580.00

3 Pekerjaan Acian/M2

A Bahan

0.8000 Kg Semen Porland (PC) 50 Kg 2,615.10 2,092.08

-

B Tenaga

0.010 Oh Tukang batu 120,000.00 1,200.00

0.005 Oh Kepala Tukang 150,000.00 750.00

0.080 Oh Pekerja 90,000.00 7,200.00

0.001 Oh Mandor 170,000.00 170.00

11,412.08

V PKERJAAN ATAP

1 Pekerjaan Konstrusi Kuda-kuda kayu Besi /M3

A Bahan

1.1000 M3 Kayu Besi 3,130,000 3,443,000

0.8000 Kg Paku 25,000 20,000

B Tenaga

12.0000 Oh Tukang Kayu 120,000 1,440,000

1.2000 Oh Kepal Tukang 150,000 180,000

4.0000 Oh Pekerja 90,000 360,000

0.2000 Oh Mandor 170,000 34,000

5,477,000

2 Pekerjaan Kasau & Reng Kayu Matoa / M2

A. B Bahan

0.0140 M3 Kayu Matoa 3,174,000 44,436.00

0.1500 Kg Paku 25,000 3,750.00

-

B. T Tenaga

0.1000 Oh Tukang Kayu 120,000 12,000.00

0.0100 Oh Kepala Tukang 150,000 1,500.00

0.1000 Oh Pekerja 90,000 9,000.00

0.0050 Oh Mandor 170,000 850.00

71,536.00

Page 8: rab kont

3 Pekerjaan listplank kayu besi /M'

A. B Bahan

0.0088 M3 Kayu besi 2 x 2/20 3,260 28.69

0.0600 Kg Paku campuran 25,000 1,500.00

-

B. T Tenaga

0.1000 Oh Tukang Kayu 120,000 12,000.00

0.0100 Oh Kepala Tukang 150,000 1,500.00

0.1000 Oh Pekerja 90,000 9,000.00

0.0500 Oh Mandor 170,000 8,500.00

32,528.69

4 Pekerjaan Penutup Atap

A. Bahan

1.6200 Lbr Atap Sakura Roof 63,710 103,210.20

0.0200 Kg Paku Sakura 45,000 900.00

B. Tenaga

0.1000 Oh Tukang Kayu 120,000 12,000.00

0.0100 Oh Kep. Tukang Kayu 150,000 1,500.00

0.2000 Oh Pekerja 90,000 18,000.00

0.0100 Oh Mandor 170,000 1,700.00

137,310.20

5 Pasang Bubungan Metal / M'

A. Bahan

1.2000 Lbr Nok atap metal 88,435.00 106,122.00

0.0200 Kg Paku Sakura 45,000.00 900.00

B. Tenaga -

0.1000 Oh Tukang Kayu 120,000.00 12,000.00

0.0200 Oh Kep. Tukang 150,000.00 3,000.00

0.0100 Oh Pekerja 90,000.00 900.00

0.0100 Oh Mandor 170,000.00 1,700.00

124,622.00

6 Pasang Talang Seng (0,3 x 45 cm ) / M'

A. Bahan

1.2000 Lbr Seng Talang 32,775.00 39,330.00

0.0200 Kg Paku Seng 37,500.00 750.00

B. Tenaga -

0.1000 Oh Tukang Kayu 120,000.00 12,000.00

0.0200 Oh Kep. Tukang 150,000.00 3,000.00

0.0100 Oh Pekerja 90,000.00 900.00

0.0100 Oh Mandor 170,000.00 1,700.00

57,680.00

VI PEKERJAAN LANTAI DAN KERAMIK

1 Urugan Tanah Peinggi Lantai/M3

A Bahan

1.2000 M3 Tanah Timbunan 403,000 483,600.00

-

B Tenaga

0.2000 Oh Pekerja 90,000 18,000.00

0.0200 Oh Mandor 170,000 3,400.00

505,000.00

2 Pekerjaan Lantai Kerja Camp. 1:3:5 /M3

A Bahan

120.0000 Kg Semen 2,500 300,000.00

0.3600 M3 Pasir 481,500 173,340.00

0.6000 M3 Kerikil 992,000 595,200.00

B Tenaga

1.6500 Oh Pekerja 90,000 148,500.00

0.2500 Oh Tukang Batu 120,000 30,000.00

0.0250 Oh Kepala Tukang 150,000 3,750.00

0.0050 Oh Mandor 170,000 850.00

1,251,640.00

Page 9: rab kont
Page 10: rab kont

3 Pekerjaan Keramik / M2

A Bahan

11.0000 Bh Keramik DN 30 x 30 15,387 169,257.00

0.0120 M3 Pasir Urug 411,500 4,938.00

7.0000 Kg Semen Portland 2,500 17,500.00

0.5000 Kg Semen Warna 2,002 1,001.00

B Tenaga

0.4000 Oh Pekerja 90,000 36,000.00

0.2000 Oh Tukang Batu 120,000 24,000.00

0.0200 Oh Kepala Tukang 150,000 3,000.00

0.0050 Oh Mandor 170,000 850.00

256,546.00

VII PEKERJAAN PLAFOND

1 Pasangan Rangka & Tripleks plafond / M2

A. Bahan

0.3650 Lbr Tripleks 4 mm 98,000.00 35,770.00

0.0050 M3 Balok kayu Matoa 2,550,000.00 12,750.00

0.1000 Kg Paku 25,000.00 2,500.00

B. Tenaga

0.4000 Oh Tukang Kayu 120,000.00 48,000.00

0.0400 Oh Kep.Tukang Kayu 150,000.00 6,000.00

0.2000 Oh Pekerja 90,000.00 18,000.00

0.0150 Oh Mandor 170,000.00 2,550.00

125,570.00

2 Pasangan List Plafond /M'

A Bahan

1.0000 M' List Kayu 10,000.00 10,000.00

0.0500 kg Paku 25,000.00 1,250.00

B Tenaga

0.0400 Oh Tukang Kayu 120,000.00 4,800.00

0.0040 Oh Kep.Tukang Kayu 150,000.00 600.00

0.0100 Oh Pekerja 90,000.00 900.00

0.0010 Oh Mandor 170,000.00 170.00

17,720.00

VIII PEKERJAAN KUSEN, PINTU & JENDELA

1 Pekerjaan Kusen Pintu dan jendela / M3

A Bahan

1.2000 m3 Kayu Besi 3,130,000.00 3,756,000.00

-

B Tenaga

9.0000 Oh Pekerja 90,000.00 810,000.00

18.0000 Oh Tukang Kayu 120,000.00 2,160,000.00

3.0000 Oh Kepala Tukang 150,000.00 450,000.00

0.3000 Oh Mandor 170,000.00 51,000.00

7,227,000.00

2 Pekerjaan Pintu dan Jendela /M2

A Bahan

0.0350 M3 Kayu Besi 3,260.00 114.10

B Tenaga

0.8000 Oh Pekerja 90,000.00 72,000.00

2.0000 Oh Tukang Kayu 120,000.00 240,000.00

0.2000 Oh Kepala Tukang Kayu 150,000.00 30,000.00

0.0400 Oh Mandor 170,000.00 6,800.00

348,914.10

Page 11: rab kont

3 Pasang Kaca Bening Tebal 3 mm /M2

A. Bahan 1.1000 Set Kaca Bening 3mm 144,653.57 159,118.93

B. Tenaga -

0.0150 Oh Pekerja 90,000.00 1,350.00

0.1500 Oh Tukang Kayu 120,000.00 18,000.00

0.0150 Oh Kepala Tukang 150,000.00 2,250.00

0.0001 Oh Mandor 170,000.00 17.00

180,735.93

IX PEKERJAAN KUNCI DAN PENGGANTUNG

1 Pasang kunci pintu tanam 2 slaag / Bh

A. Bahan

1.0000 Bh Kunci tanam 2 slaag 96,225.00 96,225.00

B. Tenaga

0.5000 Oh Tukang Kayu 120,000.00 60,000.00

0.0100 Oh Kep. Tukang 150,000.00 1,500.00

0.0100 Oh Pekerja 90,000.00 900.00

0.0050 Oh Mandor 170,000.00 850.00

159,475.00

2 Pas. Engsel H Pintu 140x60

A. Bahan

1.0000 Bh Engsel Pintu H 140x 60 46,655.00 46,655.00

B. Tenaga

0.1500 Oh Tukang Kayu 120,000.00 18,000.00

0.0150 Oh Kep. Tukang 150,000.00 2,250.00

0.0150 Oh Pekerja 90,000.00 1,350.00

0.0075 Oh Mandor 170,000.00 1,275.00

69,530.00

3 Pasang Eengsel jendela / Bh

A. Bahan

1.0000 Bh Engsel Jendela 36,000.00 36,000.00

B. Tenaga

0.1000 Oh Tukang Kayu 120,000.00 12,000.00

0.0100 Oh Kep. Tukang 150,000.00 1,500.00

0.0100 Oh Pekerja 90,000.00 900.00

0.0005 Oh Mandor 170,000.00 85.00

50,485.00

4 Pasang Gerendel Jendela / Bh

A. Bahan

1.0000 Bh Grendel Jendela (Klip) 24,000.00 24,000.00

B. Tenaga -

0.1000 Oh Tukang Kayu 120,000.00 12,000.00

0.0100 Oh Kep. Tukang 150,000.00 1,500.00

0.0100 Oh Pekerja 90,000.00 900.00

0.0005 Oh Mandor 170,000.00 85.00

38,485.00

5 Pasang Hak Angin / Bh

A. Bahan

1.0000 Bh Hak Angin biasa 33,000.00 33,000.00

B. Tenaga

0.1500 Oh Tukang Kayu 120,000.00 18,000.00

0.0150 Oh Kep. Tukang 150,000.00 2,250.00

0.0150 Oh Pekerja 90,000.00 1,350.00

0.0010 Oh Mandor 170,000.00 170.00

54,770.00

Page 12: rab kont

6 Pasang handel jendela / bh

A. Bahan

1.0000 Bh Handel Jendela 10,000.00 10,000.00

B. Tenaga

0.1000 Oh Tukang Kayu 120,000.00 12,000.00

0.0150 Oh Mandor 170,000.00 2,550.00

24,550.00

X PEKERJAAN PENGECATAN

1 Cat Dinding/ tembok / M2

A. Bahan

0.2600 Kg Cat Tembok 20 kg 46,000.00 11,960.00

0.0100 Bh Kuas Roll 25,000.00 250.00

B. Tenaga

0.0630 Oh Tukang Cat 120,000.00 7,560.00

0.0063 Oh Kep. Tukang Cat 150,000.00 945.00

0.0200 Oh Pekerja 90,000.00 1,800.00

0.0025 Oh Mandor 170,000.00 425.00

22,940.00

2 Cat plafond / M2

A. Bahan

0.2600 Kg Cat Kayu 95,212.33 24,755.21

0.0200 Bh Kuas Plat 9,000.00 180.00

B. Tenaga

0.0090 Oh Tukang Cat 120,000.00 1,080.00

0.0060 Oh Kep.Tukang Cat 150,000.00 900.00

0.0700 Oh Pekerja 90,000.00 6,300.00

0.0025 Oh Mandor 170,000.00 425.00

33,640.21

3 Cat Listplank/M2

A. Bahan

0.2600 Kg Cat Kayu 95,212.33 24,755.21

0.0200 Bh Kuas Plat 9,000.00 180.00

B. Tenaga -

0.0090 Oh Tukang Cat 120,000.00 1,080.00

0.0060 Oh Kep.Tukang Cat 150,000.00 900.00

0.0700 Oh Pekerja 90,000.00 6,300.00

0.0025 Oh Mandor 170,000.00 425.00

33,640.21

4 Cat kilap kayu / M2

A. Bahan

0.3600 Kg Cat Kilap Kayu 95,212.33 34,276.44

0.0200 Ltr Minyak Cat 44,551.00 891.02

2.0000 Lbr Amplas 6,601.00 13,202.00

0.1000 Bh Kuas Plat 9,000.00 900.00

B. Tenaga

0.0600 Oh Tukang Cat 120,000.00 7,200.00

0.0060 Oh Kep. Tukang Cat 150,000.00 900.00

0.0054 Oh Pekerja 90,000.00 486.00

0.0025 Oh Mandor 170,000.00 425.00

58,280.46

5 Cat Residu / M2

A. Bahan

0.1200 Kg Cat Residu / Teer 19,312.33 2,317.48

0.0100 Ltr Minyak Cat 44,551.00 445.51

0.0600 Bh Kuas Plat 9,000.00 540.00

B. Tenaga

0.1000 Oh Tukang Cat 120,000.00 12,000.00

0.0100 Oh Kep. Tukang Cat 150,000.00 1,500.00

0.1471 Oh Pekerja 90,000.00 13,242.86

0.0075 Oh Mandor 170,000.00 1,275.00

31,320.85

Page 13: rab kont

XII PEKERJAAN INSTALASI LISTRIK

1 Pas. Stop Kontak / Titik

A. Bahan

18.0000 M' Kabel NYA 6,733.25 121,198.50

1.0000 Bh Stop Kontak 29,440.00 29,440.00

4.0000 M' Pipa PVC 5/8" 18,000.00 72,000.00

B. Alat

1.0000 Set Alat Bantu 20,000.00 20,000.00

C. Tenaga

0.1500 Oh Tukang 120,000.00 18,000.00

0.0150 Oh Kep. Tukang 150,000.00 2,250.00

0.2000 Oh Pekerja 90,000.00 18,000.00

0.1500 Oh Mandor 170,000.00 25,500.00

306,388.50

2 Pasang Saklar Tunggal / bh

A. Bahan

1.0000 Bh Saklar Tunggal 29,440.00 29,440.00

B. Tenaga

0.2000 Oh Tukang Listrik 120,000.00 24,000.00

0.1500 Oh Mandor 170,000.00 25,500.00

78,940.00

3 Pasang Saklar Ganda / bh

A. Bahan

1.0000 Bh Saklar Ganda 31,970.00 31,970.00

B. Tenaga

0.2000 Oh Tukang Listrik 120,000.00 24,000.00

0.1500 Oh Mandor 170,000.00 25,500.00

81,470.00

4 Pas. Lampu Pijar 60 Watt / Titik

A. Bahan

1.0000 Set Lampu Pijar 40 Watt 13,225.00 13,225.00

15.0000 M' Kabel NYM 1 x 2,5mm 6,733.25 100,998.75

2.0000 M' Pipa Union untuk Kabel 18,000.00 36,000.00

1.0000 Bh Fitting Lampu 25,645.00 25,645.00

B. Alat

1.0000 Set Alat Bantu Listrik 20,000.00 20,000.00

C. Tenaga

0.1500 Oh Tukang 120,000.00 18,000.00

0.0150 Oh Kep. Tukang 150,000.00 2,250.00

0.2000 Oh Pekerja 90,000.00 18,000.00

0.1500 Oh Mandor 170,000.00 25,500.00

259,618.75

5 Pas. Lampu Pijar 100 Watt / Titik

A. Bahan

1.0000 Set Lampu Pijar 100 Watt 15,525.00 15,525.00

15.0000 M' Kabel NYM 1 x 2,5mm 6,733.25 100,998.75

3.0000 M' Pipa Union untuk Kabel 18,000.00 54,000.00

1.0000 Bh Fitting Lampu 25,645.00 25,645.00

B. Alat

1.0000 Set Alat Bantu Listrik 20,000.00 20,000.00

C. Tenaga

0.1500 Oh Tukang 120,000.00 18,000.00

0.0150 Oh Kep. Tukang 150,000.00 2,250.00

0.2000 Oh Pekerja 90,000.00 18,000.00

0.1500 Oh Mandor 170,000.00 25,500.00

279,918.75

Page 14: rab kont

6 Pas. Lampu SL 14 Watt

A. Bahan

1.0000 Bh Lampu SL 14 Watt 56,695.00 56,695.00

15.0000 M' Kabel NYM 1 x 2,5mm 6,733.25 100,998.75

3.0000 M' Pipa Union untuk Kabel 18,000.00 54,000.00

1.0000 Bh Fitting Lampu 25,645.00 25,645.00

B. Alat

1.0000 Set Alat Bantu Listrik 20,000.00 20,000.00

C. Tenaga

0.1500 Oh Tukang 120,000.00 18,000.00

0.0150 Oh Kep. Tukang 150,000.00 2,250.00

0.2000 Oh Pekerja 90,000.00 18,000.00

0.1500 Oh Mandor 170,000.00 25,500.00

321,088.75

7 Pas. Box Sekring + MBC

A. Bahan

1.0000 Bh Box Sekring + MBC 290,000.00 290,000.00

15.0000 M' Kabel NYM 1 x 2,5mm 6,733.25 100,998.75

2.5000 M' Pipa Union untuk Kabel 18,000.00 45,000.00

B. Alat

1.0000 Set Alat Bantu Listrik 20,000.00 20,000.00

C. Tenaga

0.1500 Oh Tukang 120,000.00 18,000.00

0.0150 Oh Kep. Tukang 150,000.00 2,250.00

0.1500 Oh Pekerja 90,000.00 13,500.00

0.1500 Oh Mandor 170,000.00 25,500.00

515,248.75

Page 15: rab kont

11 1 M2 ATAP SENG GELOMBANG BJLS 20 0.8598 Lbr Atas seng 60,000.00 51,588.00 0.2000 Kg Paku seng 17,250.00 3,450.00 0.2000 Ho Tukang kayu 70,000.00 14,000.00 0.0200 Ho Kepala Tukang Kayu 90,000.00 1,800.00 0.1000 Ho Pekerja 50,000.00 5,000.00 0.0050 Ho Mandor 100,000.00 500.00

76,338.0012 10 M' BUBUNGAN SENG PLAT BJLS 20

6.0000 Lbr Seng plat 45,000.00 270,000.00 0.0660 M3 Papan klas II 1,523,750.00 100,567.50 0.1000 Kg Paku 17,250.00 1,725.00 0.2500 Ho Tukang kayu 70,000.00 17,500.00 0.0250 Ho Kepala Tukang Kayu 90,000.00 2,250.00 0.2500 Ho Pekerja 50,000.00 12,500.00

404,542.501 M' BUBUNGAN SENG PLAT 40,454.25

13 1 M2 DINDING PAPAN KAYU KLAS-II SUSUN SIRIH DIKETAM/DISEKAP/DISERUT SEMUA SISI 0.0220 M3 Kayu klas-II 1,523,750.00 33,522.50 0.2000 Kg Paku 12,000.00 2,400.00 0.6000 Ho Tukang Kayu 70,000.00 42,000.00 0.0600 Ho Kepala Tukang Kayu 90,000.00 5,400.00 0.2100 Ho Pekerja 50,000.00 10,500.00 0.0105 Ho Mandor 100,000.00 1,050.00

94,872.5014 1 M2 PAPAN TRITIS (JALUSI/LISTPLANK) KAYU KLAS-II DLL DIKETAM HALUS

0.0220 M3 Kayu klas-II 900,000.00 19,800.00 0.2000 Kg Paku 12,000.00 2,400.00 0.8000 Ho Tukang Kayu 70,000.00 56,000.00 0.0800 Ho Kepala Tukang Kayu 90,000.00 7,200.00 0.2800 Ho Pekerja 50,000.00 14,000.00 0.0140 Ho Mandor 100,000.00 1,400.00

100,800.0015 1 M3 TIANG, RANGKA DINDING DAN KOSEN PINTU/JENDELA RUMAH SEDERHANA KAYU KLAS-I

1.1000 M3 Kayu Klas-I 1,500,000.00 1,650,000.00 0.2500 Kg Paku 12,000.00 3,000.00

18.0000 Ho Tukang Kayu 70,000.00 1,260,000.00 1.8000 Ho Kepala Tukang 90,000.00 162,000.00 5.3000 Ho Pekerja 50,000.00 265,000.00 0.2650 Ho Mandor 100,000.00 26,500.00

3,366,500.00 16 1 M3 BETON COR CAMP. 1:3:5

0.9100 M3 Kerikil 300,000.00 273,000.00 0.5400 M3 Pasir beton 85,000.00 45,900.00 3.8590 Zak PC 80,000.00 308,720.00 6.0000 Ho Pekerja 50,000.00 300,000.00 0.3000 Ho Mandor 100,000.00 30,000.00 0.5000 Ho Tukang batu 70,000.00 35,000.00 0.0500 Ho Kepala Tukang batu 90,000.00 4,500.00

997,120.00 17 1 M2 PINTU DOUBLE TRIPLEKS

0.0250 M3 Kayu Klas-I 1,500,000.00 37,500.00 2.0000 Lbr Tripleks 80,000.00 160,000.00 0.2000 Kg Paku campuran 12,000.00 2,400.00 4.0000 Ho Tukang 70,000.00 280,000.00 0.4000 Ho Kepala tukang 90,000.00 36,000.00 1.3000 Ho Pekerja 50,000.00 65,000.00 0.0650 Ho Mandor 100,000.00 6,500.00

587,400.00 18 1 M2 PINTU/JENDELA PANIL KAYU KLAS-I

0.0440 M3 Kayu Klas-I 1,500,000.00 66,000.00 7.5000 Ho Tukang 70,000.00 525,000.00 0.7500 Ho Kepala tukang 90,000.00 67,500.00 2.5000 Ho Pekerja 50,000.00 125,000.00 0.1250 Ho Mandor 100,000.00 12,500.00

796,000.00 19 1 M2 PINTU PANIL KAYU KLAS-I DALAM LAPIS SENG PLAT

0.0440 M3 Kayu Klas-I 1,500,000.00 66,000.00 1.0000 Lbr Seng plat BJLS 0,20 45,000.00 45,000.00 0.1000 Kg Paku 12,000.00 1,200.00 7.5000 Ho Tukang 70,000.00 525,000.00 0.7500 Ho Kepala tukang 90,000.00 67,500.00 2.5000 Ho Pekerja 50,000.00 125,000.00 0.1250 Ho Mandor 100,000.00 12,500.00

842,200.00 20 1 SET PASANG KACA NAKO 8 KLIP + TRALIS

1.0000 Set Kaca nako 8 klip + tralis 225,000.00 225,000.00 0.5000 Ho Tukang Kayu 70,000.00 35,000.00 0.0250 Ho Kepala Tukang Kayu 90,000.00 2,250.00

262,250.0021 1 BH PASANG KUNCI TANAM 1 SLAAG

1.0000 Bh Kunci pintu Union 1 slaag 75,000.00 75,000.00 0.0500 Ho Kepala tukang kayu 90,000.00 4,500.00 0.5000 Ho Tukang kayu 70,000.00 35,000.00

110,000.00 22 1 BH PASANG ENGSEL PINTU

1.0000 Bh Engsel pintu 9,775.00 9,775.00 0.0500 Ho Kepala tukang kayu 90,000.00 4,500.00 0.5000 Ho Tukang kayu 70,000.00 35,000.00

49,275.00

Page 16: rab kont

1 2 3 4

42 Kuas Roll 8' 25,000.00 Bh

43 Kuas Plat 9,000.00 Bh

44 List Plafond Kayu Profil ( 1,5 x 4 cm2 ) 25,000.00 M'

45 Kunci Tanam 2 Slaag Yale 96,225.00 Set

46 Engsel Pintu H 140x60 46,655.00 Bh

47 Kaca Bening 3mm 144,653.57 Set

48 Engsel Jendela 110 x 50 36,000.00 Bh

49 Grendel Jendela / Spring Knive 24,000.00 Bh

50 Hak Angin Biasa 33,000.00 Bh

51 Handel Jendela 10,000.00 Bh

52 Expanyolette 97,500.00 Bh

53 Lampu Pijar 100 Watt 15,525.00 Bh

54 Lampu Pijar 60 Watt 13,225.00 Bh

55 Saklar Tunggal 29,440.00 Bh

56 Saklar Ganda 31,970.00 Bh

57 Stop Kontak 29,440.00 Bh

58 Fitting Lampu 31,970.00 Bh

59 Kabel NYM 1 x 2,5mm 6,733.25 M'

60 Pipa Union untuk Kabel 18,000.00 Btg

61 Pipa PVC dia 3/4" 14,403.75 Btg

62 Pipa PVC dia 2" 28,909.72 Btg

63 Pipa PVC dia 4" 59,225.00 Btg

64 Seal Tape 20,000.00 Roll

65 Alat Bantu Listrik 20,000.00 Set

68 Fitting Lampu 25,645.00 Bh

69 Lampu SL 14 Watt 56,695.00 Bh

70 Box Sekring + MBC 290,000.00 Bh

Page 17: rab kont

NO NILAI TERBILANG1 Rp 456,907,000.00 EMPAT RATUS LIMA PULUH ENAM JUTA SEMB 92 Rp - RUPIAH 13 Rp - RUPIAH 14 RUPIAH 05 RUPIAH 06 RUPIAH 07 RUPIAH 08 RUPIAH 09 RUPIAH 0

10 RUPIAH 011 RUPIAH 012 RUPIAH 013 RUPIAH 014 RUPIAH 015 RUPIAH 016 RUPIAH 017 RUPIAH 018 RUPIAH 019 RUPIAH 0

1 2SATU DUASEBELDUA

Page 18: rab kont

456 EMPALIMA ENAM907 SEMB TUJU 000 EMPAT00

3 4 5 6 7 8 9TIGA EMPAT LIMA ENAMTUJU DELA SEMBILANTIGA EMPAT LIMA ENAMTUJU DELA SEMBILAN BELAS

Page 19: rab kont

EMPATSEMBI SEMBI

000

Page 20: rab kont

Pekerjaan Pembangunan perpustakaan SMA/SMK Kab. Teluk Wondama

no item pekerjaan p l t

1 pengukuran2 galian tanah 82 0.8 0.73 urugan pasir 82 0.8 0.053 pas. batu kosng 82 0.8 0.154 pas. Batu kali 82 0.5 0.75 urugan tanah kembali 82 0.2 0.76 urugan tanah peninggi lantai 11 15 0.357 sloef 85 0.15 0.28 kolom utama 72.2 1 0.15 0.159 balok 63.5 0.15 0.2

10 dinding 54 1 3.811 lantai kerja 149 0.0712 keramik ruang + selasar 13 9 113 kermik teras 2 3 114151617

urugan tanah peninggi lantai RUANG 6.85 12.55 0.35TERAS 52 1 0.32SELASAR 24.925 1 0.32

lantai kerja RUANG+SELAS 139.625 0.07SELASAR 24.925 0.05

Page 21: rab kont

Pekerjaan Pembangunan perpustakaan SMA/SMK Kab. Teluk Wondama

volume sat. tinggi kolom

96.00 m' 4,5 m

45.92 m3 39 20 6 39+21+12+6+7

3.28 m3 85

9.84 m3 50

28.70 m3

11.48 m3 0.44

57.75 m3 0.4

2.55 m3 0.16

0.02 m3 130.5 0.56

1.91 m3 63.5

205.20 m2 21+39

10.43 m3

117.00 39

6.00 p.kolom t jumlah Jumlah total 28

123.00 3.8 19 72.2 3

0.00 12

0.00 82

0.00

30.09 0.0144 143

16.64 6

7.98 149

54.70

9.77 149

1.25 139.62511.02 9.375

Page 22: rab kont

39+21+12+6+7