14
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PAKET KEGIATAN : REHABILITASI GEDUNG KOPERASI PDAM LOKASI : KOTA TARAKAN TAHUN : 2015 No. URAIAN PEKERJAAN JUMLAH BIAYA ( Rp. ) I PEKERJAAN PERSIAPAN 2,750,000.00 II PEKERJAAN TANAH 522,923.40 III PEKERJAAN BETON 3,183,693.47 IV PEKERJAAN PASANGAN 10,286,561.96 V PEKERJAAN KAYU 4,821,450.00 VI PEKERJAAN PLAFOND 14,194,771.18 VII PEKERJAAN PENGECATAN 4,478,751.67 VIII PEKERJAAN BESI ALUMINIUM & KACA 96,556,447.81 IX PEKERJAAN PENGANTUNG & PENGUNCI 2,098,531.09 X PEKERJAAN MEKANIKAL ELEKTRIKAL 5,840,000.00 XI PEKERJAAN SANITAIR 1,077,943.01 XII PEKERJAAN LAIN-LAIN 21,980,000.00 JUM LAH 167,791,073.59 PPn 10% 16,779,107.36 TOTAL KESELURUHAN 184,570,180.95 DIBULATKAN 184,570,000.00 Terbilang : SERATUS DELAPAN PULUH EMPAT JUTA LIMA RATUS TUJUH PULUH RIBU RUPIAH Tarakan, .....................2015

rab mini market pdam.xlsx

Embed Size (px)

Citation preview

Page 1: rab mini market pdam.xlsx

REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

PAKET KEGIATAN : REHABILITASI GEDUNG KOPERASI PDAM

LOKASI : KOTA TARAKAN TAHUN : 2015

No. URAIAN PEKERJAANJUMLAH BIAYA

( Rp. )

I PEKERJAAN PERSIAPAN 2,750,000.00

II PEKERJAAN TANAH 522,923.40

III PEKERJAAN BETON 3,183,693.47

IV PEKERJAAN PASANGAN 10,286,561.96

V PEKERJAAN KAYU 4,821,450.00

VI PEKERJAAN PLAFOND 14,194,771.18

VII PEKERJAAN PENGECATAN 4,478,751.67

VIII PEKERJAAN BESI ALUMINIUM & KACA 96,556,447.81

IX PEKERJAAN PENGANTUNG & PENGUNCI 2,098,531.09

X PEKERJAAN MEKANIKAL ELEKTRIKAL 5,840,000.00

XI PEKERJAAN SANITAIR 1,077,943.01

XII PEKERJAAN LAIN-LAIN 21,980,000.00

JUM LAH 167,791,073.59

PPn 10% 16,779,107.36

TOTAL KESELURUHAN 184,570,180.95

DIBULATKAN 184,570,000.00

Terbilang :

SERATUS DELAPAN PULUH EMPAT JUTA LIMA RATUS TUJUH PULUH RIBU RUPIAH

Tarakan, .....................2015

Page 2: rab mini market pdam.xlsx

RENCANA ANGGARAN BIAYA (RAB)

PAKET KEGIATAN : REHABILITASI GEDUNG KOPERASI PDAM

LOKASI : KOTA TARAKAN

TAHUN : 2015

No. URAIAN PEKERJAAN VOLUME SATUANHARGA SATUAN JUMLAH

( Rp.) ( Rp.)

I PEKERJAAN PERSIAPAN

1 Pembongkaran & Pembersihan Lokasi 1.00 Ls 2,500,000.00 2,500,000.00 2 Plank Nama Proyek (Digital Printing) 1.00 Ls 150,000.00 150,000.00

3 Dokumentasi 1.00 Ls 100,000.00 100,000.00

Sub Total I 2,750,000.00

II PEKERJAAN TANAH

1 Urugan Pasir Dibawah Lantai, T = 10 Cm 3.40 M3 153,801.00 522,923.40

Sub Total II 522,923.40

III PEKERJAAN BETON

1 Cor Lantai, t = 10 Cm K-175 0.88 M3 1,217,883.72 1,065,648.26 2 Cor Plat Meja Pantry, t = 8 Cm K-175 0.22 M3 9,455,558.99 2,118,045.21

Sub Total III 3,183,693.47

IV PEKERJAAN PASANGAN

1 Pas. 1/2 Batu Bata, Camp 1 : 4 20.64 M2 156,118.25 3,222,280.68

2 Plesteran Dinding, Camp 1 : 4 41.28 M2 60,345.33 2,491,055.22

3 Pasangan Lantai Keramik 30/30 17.00 M2 247,037.25 4,199,633.25

4 Pasangan Keramik 20/20 1.54 M2 242,592.73 373,592.80

Sub Total IV 10,286,561.96

V PEKERJAAN KAYU

1 Pemasangan Meja Lapis HPL 2.78 M2 475,000.00 1,321,450.00 2 Pemasangan Kusen Pintu 1.00 Bh 500,000.00 500,000.00 3 Pemasangan Kusen Jendela 1.00 Bh 700,000.00 700,000.00 4 Pemasangan Daun Pintu 1.00 Bh 1,300,000.00 1,300,000.00 5 Pemasangan Daun Jendela + Kaca Ribben 5 mm 2.00 Bh 500,000.00 1,000,000.00

Sub Total V 4,821,450.00

VI PEKERJAAN PLAFOND

1 Pemasangan Rangka Plafond 79.49 M2 116,874.50 9,290,587.75 2 Pemasangan Gypsum Board 9 mm 79.49 M2 61,694.05 4,904,183.42

Sub Total VI 14,194,771.18

VII PEKERJAAN PENGECATAN

1 Pengecatan Dinding 73.12 M2 29,347.31 2,145,875.31 1 Pengecatan Plafond Gypsum 79.49 M2 29,347.31 2,332,876.37

Sub Total VII 4,478,751.67

VIII PEKERJAAN BESI ALUMINIUM & KACA

1 Pemasangan Rangka Partisi Aluminium Coklat 233.60 M' 219,863.67 51,360,153.31

2 Pemasangan Rangka Dinding GRC 10.92 M2 344,513.55 3,762,087.97

3 Pemasangan Dinding GRC 21.84 M2 97,698.83 2,133,742.34

4 Pemasangan Pintu Aluminium Coklat 25.40 M' 219,863.67 5,584,537.22

5 Pemasangan Kaca bening 5 mm 57.26 M2 588,842.21 33,715,926.97

Sub Total VIII 96,556,447.81

Page 3: rab mini market pdam.xlsx

No. URAIAN PEKERJAAN VOLUME SATUANHARGA SATUAN JUMLAH

( Rp.) ( Rp.)

IX PEKERJAAN PENGANTUNG & PENGUNCI

1 Pemasangan Kunci Tanam 2 x Putar, Yale 4.00 Bh 309,028.00 1,236,112.00

2 Pemasangan Engsel Pintu Ukuran 4", Ex Hona 4.00 Psg 63,867.20 255,468.82

3 Pemasangan Engsel Jendela Ukuran 3", Ex Hona 2.00 Psg 52,157.68 104,315.35

4 Pemasangan Hak Angin 4.00 Bh 52,367.20 209,468.82

5 Pemasangan Grendel 2.00 Bh 46,583.05 93,166.10

3 Pemasangan Espagnolet 1.00 Bh 200,000.00 200,000.00

Sub Total IX 2,098,531.09

X PEKERJAAN MEKANIKAL ELEKTRIKAL

1 Pemasangan Instalasi Lampu 9.00 Ttk 350,000.00 3,150,000.00

2 Pemasangan Lampu TL 2 x 18 Watt 9.00 Bh 250,000.00 2,250,000.00

3 Pemasangan Saklar 4.00 Bh 55,000.00 220,000.00

4 Pemasangan Stop Kontak 4.00 Bh 55,000.00 220,000.00

Sub Total X 5,840,000.00

XI PEKERJAAN SANITAIR

1 Pemasangan Kran Air 1.00 Bh 64,227.50 64,227.50 2 Pemasangan Pipa Air PVC 1/2'' 12.00 M' 20,807.76 249,693.06 3 Pemasangan Pipa Air PVC 2,5" 12.00 M' 26,168.54 314,022.45 4 Pemasangan Bak Cuci Piring Aluminium 1.00 Bh 450,000.00 450,000.00

Sub Total XI 1,077,943.01

XII PEKERJAAN LAIN-LAIN

1 Pemasangan Kanopy Atap Spandek 18.32 M2 1,000,000.00 18,320,000.00 2 Pemasangan Stiker Kaca / Sun Blass 24.40 M' 150,000.00 3,660,000.00

Sub Total XII 21,980,000.00

Page 4: rab mini market pdam.xlsx

DAFTAR ANALISA HARGA SATUAN

HARGA J U M L A H

No. URAIAN PEKERJAAN SATUAN

( Rp ) ( Rp ) 1 2 3 4

I PEKERJAAN TANAH

2 Pengurugan 1 m3 dengan pasir urug

a. Tenaga Kerja

0.300 oh Pekerja 82,500.00 24,750.00

0.010 oh Mandor 99,000.00 990.00

Jumlah Harga Tenaga Kerja 25,740.00

b. Bahan

1.20 m3 Pasir urug 90,000.00 108,000.00

Jumlah Harga Bahan 108,000.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 133,740.00

e. Overhead + Profit (15% x d) 20,061.00

f. Harga Satuan Pekerjaan (d+e) 153,801.00

II PEKERJAAN BETON

1 Pembesian 1 kg dengan besi polos

a. Tenaga Kerja

0.700 oh Pekerja 82,500.00 57,750.00

0.700 oh Tukang 86,000.00 60,200.00

0.070 oh Kepala tukang 88,000.00 6,160.00

0.070 oh Mandor 99,000.00 6,930.00

Jumlah Harga Tenaga Kerja 131,040.00

b. Bahan

105.00 kg Besi beton (polos) 17,500.00 1,837,500.00

1.50 kg Kawat ikat 18,000.00 27,000.00

Jumlah Harga Bahan 1,864,500.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c)/100 19,955.40

e. Overhead + Profit (15% x d) 2,993.31

f. Harga Satuan Pekerjaan (d+e) 22,948.71

2

a. Tenaga Kerja

1.650 oh Pekerja 82,500.00 136,125.00

0.275 oh Tukang 86,000.00 23,650.00

0.028 oh Kepala tukang 88,000.00 2,464.00

0.165 oh Mandor 99,000.00 16,335.00

Jumlah Harga Tenaga Kerja 178,574.00

b. Bahan

326.00 kg Semen Portland 1,580.00 515,080.00

0.54 m3 Pasir beton 90,000.00 48,857.14

0.76 m3 Batu Pecah 405,000.00 308,700.00

215.00 liter Air 36.36 7,818.18

Jumlah Harga Bahan 880,455.32

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 1,059,029.32

e. Overhead + Profit (15% x d) 158,854.40

f. Harga Satuan Pekerjaan (d+e) 1,217,883.72

Membuat 1 M3 beton mutu f'c=14.5 MPa (K 175), Slump(12±2) cm, w/c=0.66

Page 5: rab mini market pdam.xlsx

HARGA J U M L A H

No. URAIAN PEKERJAAN SATUAN

( Rp ) ( Rp )

3 Pemasangan 1 m2 bekisting untuk lantai/plat

a. Tenaga Kerja

0.660 oh Pekerja 82,500.00 54,450.00

0.330 oh Tukang kayu 86,000.00 28,380.00

0.033 oh Kepala tukang 88,000.00 2,904.00

0.033 oh Mandor 99,000.00 3,267.00

Jumlah Harga Tenaga Kerja 89,001.00

b. Bahan

0.040 m3 Kayu kelas III 3,200,000.00 128,000.00

0.400 kg Paku 5 cm – 12 cm 18,000.00 7,200.00

0.200 Liter Minyak bekisting 9,000.00 1,800.00

0.015 m3 Balok kayu kelas II 3,800,000.00 57,000.00

0.350 Lbr Plywood tebal 9 mm 135,000.00 47,250.00

6.000 Btg Dolken kayu galam, Ö (8 - 10) cm, panjang 4 m 45,000.00 270,000.00

Jumlah Harga Bahan 511,250.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 600,251.00

e. Overhead + Profit (15% x d) 90,037.65

f. Harga Satuan Pekerjaan (d+e) 690,288.65

4 1 M3 Cor Plat Dak

1.00 m3 Beton K - 175 1,217,883.72 1,217,883.72

58.16 kg Bahan dan upah besi Beton polos 22,948.71 1,334,788.77

10.00 m2 bahan dan upah kayu begisting 690,288.65 6,902,886.50

9,455,558.99 9,455,558.99

III PEKERJAAN PASANGAN

1 Pemasangan 1 m2 dinding bata merah ukuran (8 x 8 x 17.5) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP

a. Tenaga Kerja

0.300 oh Pekerja 82,500.00 24,750.00

0.100 oh Tukang 86,000.00 8,600.00

0.010 oh Kepala tukang 88,000.00 880.00

0.015 oh Mandor 99,000.00 1,485.00

Jumlah Harga Tenaga Kerja 35,715.00

b. Bahan

52.000 Buah Bata merah 1,500.00 78,000.00

11.500 kg Portland Cement 1,580.00 18,170.00

0.043 m3 Pasir Pasang 90,000.00 3,870.00

Jumlah Harga Bahan 100,040.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 135,755.00

e. Overhead + Profit (15% x d) 20,363.25

f. Harga Satuan Pekerjaan (d+e) 156,118.25

2 Memasang 1 m2 plesteran 1 SP : 4 PP, tebal 15 mm

a. Tenaga Kerja

0.300 oh Pekerja 82,500.00 24,750.00

0.150 oh Tukang 86,000.00 12,900.00

0.015 oh Kepala tukang 88,000.00 1,320.00

0.015 oh Mandor 99,000.00 1,485.00

Jumlah Harga Tenaga Kerja 40,455.00

b. Bahan

6.240 kg Portland Cement 1,580.00 9,859.20

0.024 m3 Pasir Pasang 90,000.00 2,160.00

Jumlah Harga Bahan 12,019.20

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 52,474.20

e. Overhead + Profit (15% x d) 7,871.13

f. Harga Satuan Pekerjaan (d+e) 60,345.33

Page 6: rab mini market pdam.xlsx

HARGA J U M L A H

No. URAIAN PEKERJAAN SATUAN

( Rp ) ( Rp )

IV PEKERJAAN PENUTUP LANTAI & DINDING

1 Memasang 1 m2 lantai Keramik (30 x 30) cm

a. Tenaga Kerja

0.700 oh Pekerja 82,500.00 57,750.00

0.350 oh Tukang 86,000.00 30,100.00

0.035 oh Kepala tukang 88,000.00 3,080.00

0.035 oh Mandor 99,000.00 3,465.00

Jumlah Harga Tenaga Kerja 94,395.00

b. Bahan

1.000 KotakKeramik 90,000.00 90,000.00

10.000 kg Portland Cement 2,040.00 20,400.00

0.045 m3 Pasir Pasang 134,000.00 6,030.00

1.500 kg Semen warna 2,660.00 3,990.00

Jumlah Harga Bahan 120,420.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 214,815.00

e. Overhead + Profit (15% x d) 32,222.25

f. Harga Satuan Pekerjaan (d+e) 247,037.25

2 Pemasangan 1 m2 lantai Keramik (20x20) cm

a. Tenaga Kerja

0.700 oh Pekerja 82,500.00 57,750.00

0.350 oh Tukang 86,000.00 30,100.00

0.035 oh Kepala tukang 88,000.00 3,080.00

0.035 oh Mandor 99,000.00 3,465.00

Jumlah Harga Tenaga Kerja 94,395.00

b. Bahan

1.000 KotakKeramik 85,000.00 85,000.00

10.400 kg Portland Cement 2,040.00 21,216.00

0.045 m3 Pasir Pasang 134,000.00 6,030.00

1.620 kg Semen warna 2,660.00 4,309.20

Jumlah Harga Bahan 116,555.20

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 210,950.20

e. Overhead + Profit (15% x d) 31,642.53

f. Harga Satuan Pekerjaan (d+e) 242,592.73

V PEKERJAAN KACA

1 Pemasangan 1 m2 kaca tebal 8 mm

a. Tenaga Kerja

0.015 oh Pekerja 82,500.00 1,237.50

0.150 oh Tukang 86,000.00 12,900.00

0.015 oh Kepala tukang 88,000.00 1,320.00

0.001 oh Mandor 99,000.00 79.20

Jumlah Harga Tenaga Kerja 15,536.70

b. Bahan

1.100 m2 Kaca Polos 450,000.00 495,000.00

0.050 tube Sealant 30,000.00 1,500.00

Jumlah Harga Bahan 496,500.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 512,036.70

e. Overhead + Profit (15% x d) 76,805.51

f. Harga Satuan Pekerjaan (d+e) 588,842.21

Page 7: rab mini market pdam.xlsx

HARGA J U M L A H

No. URAIAN PEKERJAAN SATUAN

( Rp ) ( Rp )

VI PEKERJAAN PENGGANTUNG & PENGUNCI

1 Pemasangan 1 buah kunci tanam biasa

a. Tenaga Kerja

0.010 oh Pekerja 82,500.00 825.00

0.500 oh Tukang 86,000.00 43,000.00

0.050 oh Kepala tukang 88,000.00 4,400.00

0.005 oh Mandor 99,000.00 495.00

Jumlah Harga Tenaga Kerja 48,720.00

b. Bahan

1.000 bh kunci Tanam Biasa 220,000.00 220,000.00

Jumlah Harga Bahan 220,000.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 268,720.00

e. Overhead + Profit (15% x d) 40,308.00

f. Harga Satuan Pekerjaan (d+e) 309,028.00

2 Pemasangan 1 buah engsel pintu

a. Tenaga Kerja

0.015 oh Pekerja 82,500.00 1,237.50

0.150 oh Tukang 86,000.00 12,900.00

0.015 oh Kepala tukang 88,000.00 1,320.00

0.001 oh Mandor 99,000.00 79.20

Jumlah Harga Tenaga Kerja 15,536.70

b. Bahan

1.000 bh Engsel Pintu 40,000.00 40,000.00

Jumlah Harga Bahan 40,000.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 55,536.70

e. Overhead + Profit (15% x d) 8,330.51

f. Harga Satuan Pekerjaan (d+e) 63,867.20

3 Pemasangan 1 buah engsel jendela kupu-kupu

a. Tenaga Kerja

0.010 oh Pekerja 82,500.00 825.00

0.100 oh Tukang 86,000.00 8,600.00

0.010 oh Kepala tukang 88,000.00 880.00

0.001 oh Mandor 99,000.00 49.50

Jumlah Harga Tenaga Kerja 10,354.50

b. Bahan

1.000 bh Engsel Jendela 35,000.00 35,000.00

Jumlah Harga Bahan 35,000.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 45,354.50

e. Overhead + Profit (15% x d) 6,803.18

f. Harga Satuan Pekerjaan (d+e) 52,157.68

4 Pemasangan 1 buah kait angin

a. Tenaga Kerja

0.015 oh Pekerja 82,500.00 1,237.50

0.150 oh Tukang 86,000.00 12,900.00

0.015 oh Kepala tukang 88,000.00 1,320.00

0.001 oh Mandor 99,000.00 79.20

Jumlah Harga Tenaga Kerja 15,536.70

b. Bahan

1.000 bh Kait Angin 30,000.00 30,000.00

Jumlah Harga Bahan 30,000.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 45,536.70

e. Overhead + Profit (15% x d) 6,830.50

Page 8: rab mini market pdam.xlsx

HARGA J U M L A H

No. URAIAN PEKERJAAN SATUAN

( Rp ) ( Rp )

f. Harga Satuan Pekerjaan (d+e) 52,367.20

Page 9: rab mini market pdam.xlsx

HARGA J U M L A H

No. URAIAN PEKERJAAN SATUAN

( Rp ) ( Rp )

5 Pemasangan 1 buah handle / grandle

a. Tenaga Kerja

0.015 oh Pekerja 82,500.00 1,237.50

0.150 oh Tukang 86,000.00 12,900.00

0.015 oh Kepala tukang 88,000.00 1,320.00

0.001 oh Mandor 99,000.00 49.50

Jumlah Harga Tenaga Kerja 15,507.00

b. Bahan

1.000 bh Handle 25,000.00 25,000.00

Jumlah Harga Bahan 25,000.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 40,507.00

e. Overhead + Profit (15% x d) 6,076.05

f. Harga Satuan Pekerjaan (d+e) 46,583.05

VII PEKERJAAN PLAFOND

1 Pemasangan 1 m2 rangka langit-langit (50x60) cm, kayu kelas II atau III

a. Tenaga Kerja

0.200 oh Pekerja 82,500.00 16,500.00

0.300 oh Tukang 86,000.00 25,800.00

0.030 oh Kepala tukang 88,000.00 2,640.00

0.010 oh Mandor 99,000.00 990.00

Jumlah Harga Tenaga Kerja 45,930.00

b. Bahan

0.016 m3 Kaso-kaso (5 x 7) cm 3,200,000.00 51,200.00

0.250 kg Paku 7 cm – 10 cm 18,000.00 4,500.00

Jumlah Harga Bahan 55,700.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 101,630.00

e. Overhead + Profit (15% x d) 15,244.50

f. Harga Satuan Pekerjaan (d+e) 116,874.50

2 Pemasangan 1 m2 langit-langit Gypsum Board ukuran (120 x 240 x 0,9) cm,

a. Tenaga Kerja

0.100 oh Pekerja 82,500.00 8,250.00

0.100 oh Tukang 86,000.00 8,600.00

0.050 oh Kepala tukang 88,000.00 4,400.00

0.005 oh Mandor 99,000.00 495.00

Jumlah Harga Tenaga Kerja 21,745.00

b. Bahan

0.364 lbr Gypsum board 68,000.00 24,752.00

0.110 kg Paku Sekrup 65,000.00 7,150.00

Jumlah Harga Bahan 31,902.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 53,647.00

e. Overhead + Profit (15% x d) 8,047.05

f. Harga Satuan Pekerjaan (d+e) 61,694.05

Page 10: rab mini market pdam.xlsx

HARGA J U M L A H

No. URAIAN PEKERJAAN SATUAN

( Rp ) ( Rp )

VIII PEKERJAAN PENGECATAN

1 Pengecatan 1 m2 Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )

a. Tenaga Kerja

0.020 oh Pekerja 82,500.00 1,650.00

0.063 oh Tukang 86,000.00 5,418.00

0.006 oh Kepala tukang 88,000.00 554.40

0.003 oh Mandor 99,000.00 297.00

Jumlah Harga Tenaga Kerja 7,919.40

b. Bahan

0.100 kg Plamir 50,000.00 5,000.00

0.100 kg Cat dasar 35,000.00 3,500.00

0.260 kg Cat penutup 35,000.00 9,100.00

Jumlah Harga Bahan 17,600.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 25,519.40

e. Overhead + Profit (15% x d) 3,827.91

f. Harga Satuan Pekerjaan (d+e) 29,347.31

IX PEKERJAAN SANITAIR

1 Pemasangan 1 bh Kran Ø ¾" atau ½"

a. Tenaga Kerja

0.010 oh Pekerja 82,500.00 825.00

0.100 oh Tukang 86,000.00 8,600.00

0.010 oh Kepala tukang 88,000.00 880.00

0.005 oh Mandor 99,000.00 495.00

Jumlah Harga Tenaga Kerja 10,800.00

b. Bahan

1.000 bh Kran Air 45,000.00 45,000.00

0.025 bh Seal tape 2,000.00 50.00

Jumlah Harga Bahan 45,050.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 55,850.00

e. Overhead + Profit (15% x d) 8,377.50

f. Harga Satuan Pekerjaan (d+e) 64,227.50

2 Pemasangan 1 m'Pipa PVC tipe AW Ø ½"

a. Tenaga Kerja

0.036 oh Pekerja 82,500.00 2,970.00

0.060 oh Tukang 86,000.00 5,160.00

0.006 oh Kepala tukang 88,000.00 528.00

0.002 oh Mandor 99,000.00 178.20

Jumlah Harga Tenaga Kerja 8,836.20

b. Bahan

1.200 M' Pipa PVC D 1/2" 7,000.00 8,400.00

35.000 % Perlengkapan 2,450.00 857.50

Jumlah Harga Bahan 9,257.50

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 18,093.70

e. Overhead + Profit (15% x d) 2,714.06

f. Harga Satuan Pekerjaan (d+e) 20,807.76

Page 11: rab mini market pdam.xlsx

HARGA J U M L A H

No. URAIAN PEKERJAAN SATUAN

( Rp ) ( Rp )

3 Pemasangan 1 m'Pipa PVC tipe AW Ø 2 1/2"

a. Tenaga Kerja

0.081 oh Pekerja 82,500.00 6,682.50

0.135 oh Tukang 86,000.00 11,610.00

0.014 oh Kepala tukang 88,000.00 1,188.00

0.004 oh Mandor 99,000.00 396.00

Jumlah Harga Tenaga Kerja 19,876.50

b. Bahan

1.200 M' Pipa PVC D 2 1/2" 23,500.00

35.000 % Perlengkapan 8,225.00 2,878.75

Jumlah Harga Bahan 2,878.75

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 22,755.25

e. Overhead + Profit (15% x d) 3,413.29

f. Harga Satuan Pekerjaan (d+e) 26,168.54

X PEKERJAAN BESI DAN ALUMINIUM

1 Pemasangan 1 m2 Dinding Pemisah Rangkap, Rangka Baja ringan

a. Tenaga Kerja

0.150 oh Pekerja 82,500.00 12,375.00

0.450 oh Tukang 86,000.00 38,700.00

0.045 oh Kepala tukang 88,000.00 3,960.00

0.008 oh Mandor 99,000.00 792.00

Jumlah Harga Tenaga Kerja 55,827.00

b. Bahan

4.700 M' Zincalume 51,000.00 239,700.00

0.150 Kg Sekrup 27,000.00 4,050.00

Jumlah Harga Bahan 243,750.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 299,577.00

e. Overhead + Profit (15% x d) 44,936.55

f. Harga Satuan Pekerjaan (d+e) 344,513.55

2 Pemasangan 1 m2 dinding GRC

a. Tenaga Kerja

0.025 oh Pekerja 82,500.00 2,062.50

0.075 oh Tukang 86,000.00 6,450.00

0.008 oh Kepala tukang 88,000.00 704.00

0.001 oh Mandor 99,000.00 99.00

Jumlah Harga Tenaga Kerja 9,315.50

b. Bahan

0.400 Lbr GRC 185,725.00 74,290.00

0.050 Kg Sekrup 27,000.00 1,350.00

Jumlah Harga Bahan 75,640.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 84,955.50

e. Overhead + Profit (15% x d) 12,743.32

f. Harga Satuan Pekerjaan (d+e) 97,698.83

Page 12: rab mini market pdam.xlsx

HARGA J U M L A H

No. URAIAN PEKERJAAN SATUAN

( Rp ) ( Rp )

3 Pemasangan 1 m kusen aluminium

a. Tenaga Kerja

0.043 oh Pekerja 82,500.00 3,547.50

0.043 oh Tukang 86,000.00 3,698.00

0.004 oh Kepala tukang 88,000.00 378.40

0.002 oh Mandor 99,000.00 207.90

Jumlah Harga Tenaga Kerja 7,831.80

b. Bahan

1.100 m Profil Aluminium 165,000.00 181,500.00

2.000 Bh Sekrup 27.00 54.00

0.060 Tube Sealant 30,000.00 1,800.00

Jumlah Harga Bahan 183,354.00

c. Peralatan

- - - -

Jumlah Harga Peralatan -

d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 191,185.80

e. Overhead + Profit (15% x d) 28,677.87

f. Harga Satuan Pekerjaan (d+e) 219,863.67

Page 13: rab mini market pdam.xlsx

DAFTAR HARGA SATUAN

PAKET KEGIATAN : REHABILITASI GEDUNG KOPERASI PDAM LOKASI : KOTA TARAKAN TARAKAN : 2015

No Uraian Bahan Harga Satuan (Rp) Satuan

1 2 3 4

I SATUAN UPAH

1 Pekerja 82,500.00 / Hari

2 Tukang 86,000.00 / Hari

3 Kepala Tukang 88,000.00 / Hari

4 Mandor 99,000.00 / Hari

II SATUAN BAHAN

1 Semen ( 50 ) 79,000.00 / Zak

1,580.00 / Kg

2 Pasir Pasangan 90,000.00 / M3

3 Besi Beton Polos 17,500.00 / Kg

4 Batu Pecah / Agregat Kasar 405,000.00 / M3

5 Batu Bata Merah 1,500.00 / Bh

6 Kawat Ikat 18,000.00 / Kg

7 Kayu Meranti 3,200,000.00 / M3

8 Paku Biasa 18,000.00 / Kg

9 Paku Sekrup 65,000.00 / Kg

10 Plywood Tebal 9 mm 135,000.00 / Lbr

11 Plywood Tebal 6 mm 82,000.00 / Lbr

12 Plywood Tebal 4 mm 65,000.00 / Lbr

13 Gypsum Board 9 mm 68,000.00 / Lbr

14 Dempul / plamir 50,000.00 / Kg

15 Cat Air Metrolite 35,000.00 / Kg

16 Minyak Begesting 9,000.00 / Ltr

17 Meni 50,000.00 / Kg

18 Dolken kayu galam, Ö (8 - 10) cm, panjang 4 m 45,000.00 / Btg

19 Pipa PVC 1/2" 28,000.00 / Btg

20 Pipa PVC 3/4" 32,000.00 / Btg

21 Pipa PVC 2,5" 94,000.00 / Btg

22 Kran Air 45,000.00 / Bh

23 Seal Tape 2,000.00 / Bh

24 Kusen Aluminium Coklat 165,000.00 / M

25 Paku Sekrup 27.00 / Bh

Page 14: rab mini market pdam.xlsx

No Uraian Bahan Harga Satuan (Rp) Satuan

1 2 3 4

26 Sekrup 27,000.00 / Kg

27 Sealant 30,000.00 / tube

28 Baja ringan (Zincalume) 51,000.00 / M

29 GRC t. 9 mm 185,725.00 / Lbr

30 Kunci Tanam Union 220,000.00 / Bh

31 Engsel Kupu-Kupu 4" 40,000.00 / psg

32 Engsel Kupu-Kupu 3" 35,000.00 / psg

33 Kait Angin 30,000.00 / bh

34 Grendel 25,000.00 / bh

35 Kaca Bening 8 mm 450,000.00 / M2

36 Keramik 30/30 90,000.00 / Kotak

37 Keramik 20/20 85,000.00 / Kotak