Rampion Offshore Wind Farm Offshore Balance of Plant Meet the Buyer Naren Mistry, Engineering Manager 26 th Feb 2014

Rampion Offshore Wind Farm...Rampion Met Mast – Pile float-out from Newhaven !!!!! Rampion Met Mast – Monopile offshore lift !!!!! Jacket Foundations Main Contracts ! Design, fabrication

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • Rampion Offshore Wind Farm Offshore Balance of Plant

    Meet the Buyer Naren Mistry, Engineering Manager 26th Feb 2014

  • Agenda

    2

      Offshore  Contrac.ng  Strategy   Monopile  Founda.on  Contracts    Jacket  Founda.on  Contracts   Wind  Turbine  Installa.on    Offshore  Substa.on  Contracts    Export  Cable  Contracts      Array  Cables  Contracts    Other  direct  procured  Contracts    Services  to  support  Main  Contracts    Supplier  Database    Ques.ons  

       

       

  • Offshore Balance of Plant – Contracting Strategy

    3

    Foundations

    Up to 177No Monopiles & Jackets

    Export Cables

    4No. 150kv up to 92km

    Offshore Substations

    2No. Topsides structures

    Array Cables

    33kV cable Up to 230km

    Offshore Construction

    Jul 2015 – mid 2018

    Vessel hire UXO Surveys

    Scour Protection Navigation aids

    Construction Base

    Debris clearance Storage/Holding

    HSE Equipment

    Major “Tier 1” contracts planned for award Q4 /14 to Q1 /15

  • Monopile Foundations

    Main Contracts   Fabrication of Monopiles &

    Transition Pieces   Transportation Barge & Tug

    charters   Foundation Installation vessel

    charter   Pile hammer & drill   Intermediate storage facilities

    Start of installation   July 2015

    4

  • Rampion Met Mast – Monopile transportation

                 

  • Rampion Met Mast – Pile float-out from Newhaven

                 

  • Rampion Met Mast – Monopile offshore lift

                 

  • Jacket Foundations

    Main Contracts   Design, fabrication of jackets and

    pin piles   Transportation barge & tug

    charters   Foundation Installation vessel

    charter   Pile hammer & drill   jack-up charter for pin piles

    Mobilisation for installation   July 2016

    8

  • Wind turbine Installation

    Main Contracts   EON long-term Charter of MPI Discovery for transportation &

    Installation of turbines   Pre-assembly facility

    Mobilisation for turbine installation   Sept 2016

    9

  • 10

    Wind turbine installation

  • Offshore Substations

    Main Contracts  Design, fabrication and transportation of offshore substations and assoc’ foundations  Shear leg crane vessel charter for Topsides Installation   HV Electrical equipment supply, hook-up and commission

    Installation of 1st substation  July 2016

    11

  • 12

    Load out of offshore substation transition pieces

  • 13

    Installation of offshore substation foundations

  • 14

    Load out of offshore substation topsides

  • 15

    Installation of offshore substation topsides

  • 16

    Installation of offshore substation topsides

  • Subsea Export Cables

    Main Contracts   Design & supply of 150kV cables   Transportation barge & tug charters   Cable lay & bury Installation   Intermediate storage facilities

    Mobilisation for installation   July 2016

    17

  • 18

    Installation of export cable

  • 19

    Export cable installation

  • Inter Array Cables

    Main Contracts   Design & supply of 33kV cables   Transportation barge & tug charters   Cable lay, pull-in & termination   Cable burial contracts   Local cable storage facilities

    Mobilisation for installation   Sept 2015

    20

  • Other Contracts

    Construction Base facilities   Temporary Offices for EON Project Management

    & Marine Coordination   Laydown and storage facilities   Crew Transfer Vessel mooring/pontoons   Site Services

    UXO & Seabed debris survey & clearance   Geophysical surveys   ROV & Diver surveys   UXO & boulder/debris removal

    Vessel hire/charters   Crew Transfer Vessels   Guard boats   Workboats/Multicats   Dive & ROV spreads

    21

  • Other Contracts (continued)

    Scour Protection   Supplies of stone/rock   Rock dump vessels & barges   Specialist vessels, e.g. fall-pipe   Alternative scour protection materials

    Laydown and Storage facilities   Pre-assembly areas   Intermediate storage   Maintenance facilities

    Plant & Equipment   Davit cranes   Navigation aids   Offshore & Working at height PPE

    22

  • Typical services required by Offshore Main Contractors

    Installation Vessel Support   Guard boats   Crew transfer vessels   Workboats/Multicats   Divers and Dive spreads   ROV services   Stevedore services   Chandler services   Bunkering   Food & other provisions Onshore Support   Port/harbour repair & maintenance   Temporary office & storage facilities   Temporary living accomodation   Cleaning & Waste management   Security services

      Rock dump vessels & barges   Specialist vessels, e.g. fall-pipe   Alternative scour protection materials

    Laydown and Storage facilities   Pre-assembly areas   Intermediate storage

    Miscellaneous essel hire/charters   Crew Transfer Vessels   Guard boats   Workboats/Multicats   Dive spreads

    23

  • Supplier Database

    Key local suppliers are requested to register on database at; www.susseswindenergy.org.uk   Intended as supplier “search portal” for the project and contractors   Actively used by E.ON for procurement of services during pre-consents

    activities (onshore site investigation, guard vessels, etc.)   Details of supplier database to be provided in all tender documentation

    Effectiveness of supplier database is dependent on quality of data input   If you’re not on it – register as soon as possible   If you are – check data is up-to-date and focuses on your area of business

  • 25

    Questions?