RANCANGANKERMA PERTAMBANGAN “ U ”
DENGAN PIHAK SWASTAUNTUK MENDUKUNGLANDMARK ENERGI
“ Tersedianya Data Cadangan Uranium
Kategori Terukur Yang Signifikan, 2015 ”
PUSBANG GEOLOGI NUKLIR (PPGN)-BATAN
Februari 2007
1.LATAR BELAKANG
ADANYA KESULITAN PENDANAAN GUNA MEMBIAYAI KEGIATAN EKSPLORASI
MANAJEMEN ULARMANAJEMEN ULARMANAJEMEN ULARMANAJEMEN ULAR
1.LATAR BELAKANG
ADANYA KESULITAN PENDANAAN GUNA MEMBIAYAI KEGIATAN EKSPLORASI
MANAJEMEN ULAR
2005
2006 2007 2008 2009
R E N C A N A
2005
2006 2007 2008 2009
REALISASI 2005
2005
2006 2007 2008 2009
REALISASI 2006
2005
2006 2007 2008 2009
REALISASI 2007
• Dispo Menteri Ristek tgl 29 Nov 2005 kepada Kepala BATAN• Dispo Ka. BATAN kepada Deputi PTDBR tgl 30 Nov 2005• Dispo Deputi PTDBR kepada Ka. P2BGGN tgl 6 Des 2005
Untuk tindak lanjut atas surat dari PT. Nusa Galih Nusantara tgl 24 Nov 2005, yang berisikan bahwa Perusahaan dari Australia: Aust-Pac Capital Pty Ltd dan Mulpa Ltd berminat untuk melakukan eksplorasi dan eksploitasi uranium yang selanjutnya sanggup untuk menginvestasikan dananya hingga mencapai 1 milyar USD
1.LATAR BELAKANG (lanjutan)
2. TINDAK LANJUT (1)
• Dasar Hukum :
UU No. 10/1997 tentang Ketenaganukliran Keppres No. 103/2001 jo. Perpres 64/2005
tentang LPND
• Tusinang BATAN a.l. :
melaksanakan penyelidikan umum, eksplorasi, eksploitasi bahan galian nuklir dan produksi bahan baku (yellow cake)
• Inventarisasi potensi U Indonesia• Produksi yellow cake
AMANAT UU 10/1997 MASALAH & SOLUSI KEBIJAKAN
P
A
S
A
L
9
(1) Penyelidikan umum, eksplorasi, dan eksploitasi bahan galian nuklir hanya dilaksanakan oleh Badan Pelaksana.
• Perlu biaya besar, • BATAN pelaksana satu-
satunya• Kemampuan pendanaan
BATAN sangat terbatas
• Uranium DN belum akan di-manfaatkan saat ini
• BATAN sebagai Badan Pelaksana bekerjasama dgn Investor sebagai Badan Usaha
• Hasil inventarisasi sebagian diserah-kan kpd negara dalam bentuk cad. U Nasional alami (in-situ) kategori terukur
• Selebihnya ditam-bang dan dijual dalam bentuk yellow cake untuk mengganti biaya inventarisasi U
(2) Badan Pelaksana sebagai-mana dimaksud pada ayat (1) dapat bekerja sama dengan Badan Usaha Milik Negara, koperasi, badan swasta, dan/atau badan lain.
Mencari investor yang berminat u/. kerma: - invent. potensi U, - upaya penguasaan
teknologi produksi yellow cake
P
A
S
A
L
10
(1) Produksi dan/atau pengadaan bahan baku untuk pembuatan bahan bakar nuklir hanya dilaksanakan oleh Badan Pelaksana.
Perlu biaya besar u/. Per-tambangan U dan pro-duksi bahan baku (yellow cake)
(2) Badan Pelaksana sebagai-mana dimaksud pada ayat (1) dapat bekerja sama dengan Badan Usaha Milik Negara, koperasi, dan/atau badan swasta.
Mencari investor yang berminat u/. Kerma Per-tambangan U dan pro-duksi yellow cake
2. TINDAK LANJUT (2) : Perumusan Kebijakan
Inventarisasi potensi U akan dilakukan melalui kerjasama dengan investor yang bersedia membiayai
Cebakan yang ditemukan dari hasil kerma, sebagian akan tetap disimpan dalam bumi sebagai cadangan alami dan selebihnya ditambang sebagai pengganti biaya yang telah dikeluarkan investor dengan tetap memenuhi kewajiban-kewajiban sesuai peraturan yang berlaku
KEBIJAKAN
syarat
2. TINDAK LANJUT (3)
EXPLORATION
FEASIBILITYSTUDY
for remaining deposit
TERMINATE 1No
> DUNSC
Yes
TERMINATE 2No
Feasible
Yes
CONSTRUCTION PRODUCTIONProduct
(Yellow Cake)
Additional to In-Situ U National Stock
of Measured Reserve Category
COOPERATION SCHEME
GENERAL SURVEY
Agreement tipe A : For General SurveyAgreement tipe B : for Exploration - Production> DUNSC : greater than Determined Uranium National Stock Contribution Terminate 2 : the remaining deposits as an addition to U National Stock
Agreement type A Agreement type B
2. TINDAK LANJUT (4)
Gross Sales
Profit
Total Sale of Yellow Cake
(Non-Tax Government Income/PNBP)- Exploitation Fee* 2%- Landrent
Recovery of Exploration,
Construction and Production Cost **)
Taxes* and Levies
*) Should be consulted with Department of Finance**) Cost recovery shall be less than 80% of Gross Sales
Subtraction
Note :
Investor Gov.
Investor Gov.
85% 15%
Gov.Investor
Gov. : Government
Community Development1 ‰ (?)
Scheme of Profit Sharing
2. TINDAK LANJUT (5)
PERUSAHAANBusiness Entity
BATANBadan Pelaksana(Executing Body)
KERJASAMA PERTAMBANGAN
2. TINDAK LANJUT (6)
3. PELUANG (1)
• Produksi di Kanada sebagai produser terbesar terganggu untuk beberapa tahun karena Cigar Lake Mine kebanjiran
• Peningkatan permintaan uranium dari hasil tambang, karena HEU → LEU menipis
• Peningkatan drastis permintaan uranium di Cina dan India
• Minat investor positif, sudah ada beberapa calon, hal ini didukung oleh perkembangan situasi pasar U3O8 (Yellow Cake)
Perkembangan
Harga U3O8
s/d
5 Februari 2007
3. PELUANG (2)
1988 2007
4. HAMBATAN (WEAKNESS AND THREAT)
1. PP No. 77 Th. 2005 tentang Jenis dan Tarif Atas Jenis PNBP BATAN perlu direvisi
2. Keppres No. 96 Th. 2000 tentang Bidang Usaha Yang Tertutup dan Bidang Usaha Yang Terbuka dengan Persyaratan Tertentu Bagi Penanaman Modal
Lampiran 1. Bidang Usaha Yang Tertutup Mutlak Bagi
Penanaman Modal
11. Penambangan Mineral Radioaktif
3. Perubahan Kebijakan Uranium di LN a.l. diijinkannya pembukaan tambang baru di Australia
11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6
1 Pernyataan Kesanggupan Investor √ 18 Nov 2005
Disposisi Menristek √ 29 Nov 2005
→ tinjut, BATAN sbg “VOCAL POINT”
3 Perumusan Kebijakan √ √
4 Pembentukan Tim Kerma √ 24 Feb 2006
Penandatanganan MOU √ 15 Mei 2006
BATAN – Calon INVESTOR
Pembent. Kel. Kerja Inter Dept. dan Profesional √ √
(BATAN, DESDM, Setneg, Menko Ekuin, Praktisi Pertambangan)
7 Negosiasi dgn Investor √ √ √
8 Penyusunan Draft Kerma U (Agreement) √ √ √ √ √ √
9 Perubahan PP tarif PNBP 21 Des 2006 √ √ √ √ ?
10 Perubahan Keppres ttg Negative List Investasi 10 Jan 2007 √ √ ?
11 Penandatangan Agreement ?
2006 2007NO KEGIATAN
6
2
5
2005
13 Feb 2007
Draft Final
STATUS PERANCANGAN KERMA U
5. PENUTUP1. Tugas BATAN untuk melaksanakan penyelidikan
umum, dan eksplorasi BGN sangat sulit dilaksanakan jika hanya menggunakan dana APBN-BATAN yang besarnya sangat terbatas
2. Kesulitan tersebut akan dapat diatasi dengan kerma eksplorasi U antara BATAN dan investor.
3. Dengan Kerma U diharapkan LANDMARK Bidang Energi :
dapat terwujud.
4. Perlu dukungan dan kekompakan seluruh komponen serta komitmen institusi BATAN dalam mewujudkan Kerma U ini.
“Tersedianya Data Cadangan Uranium
Kategori Terukur Yang Signifikan, 2015”
Mohon doa restu