Upload
alesha-odonnell
View
216
Download
0
Embed Size (px)
Citation preview
8/10/2019 Resume Rishi Sethi
1/3
8/10/2019 Resume Rishi Sethi
2/3
Pre an Post Drive test or the 'l"sters6
!amiliar ith the la"n%h strateg# o 2nan 3r%arriers or -'D&6 lso or;e on +&S at
B55 &hz 8an6 rai% 8alan%ing ith h#8ri te%hnologies an ierent %arriers6 Prepare presentations or %lient regaring site ith the help o post pro%essing tools6
Parameters relate to Poer %ontrol, mission 'ontrol, 0oa %ontrol, Sot/Soter hanover6
Drive test ata post>pro%essing, map plots an report generation, re:"en%# planning an
intereren%e anal#sis, an site ata8ase maintenan%e6 5e$'#$m de&in $ie$ia &%&em dimen&i#nin and $a''i anal%&i& ($#!" and $endin)*
&a;ing raio netor; parameters ret"ning in orer to improve ma$or *PI perorman%e
(asi% parameters, hanover parameters, ile moe parameters an raio %hannelmanagement)6
Netor; a"it or sites in %apital an s"rro"ning areas s"%h that to "ni# the antenna height,
Orientation an tilt on the 8asis o real %overage or ea%h %ells a%%oring to (sites s"rve#, rive test an
timing avan%e meas"rement) in orer to have %onsistent ata8ase 6
Anal%;e la%e$ 3 me&&ae deail& and all $ae& and $ae& '#$ 'iin 'a,l l,i#n&*
'on"%ting Drive tests s"%h as .' Drive , R Drive, Single site verii%ation , en%hmar;ing Drive,
&igration Drive(S'/ RN' &igration), 'l"ster Drive, 'it# Drive, igha# Drive, S/- +p graation Drive,Raila# ro"te rive or optimization o eAisting reso"r%es6
l%atel 0"%ent &anage Sol"tions Pvt 0tDesignation1 > R! .ngineer
0o%ation1> &"m8aiPro$e%t Details1 > Relian%e 3G &S (Can?3> pril ?3)
"aei ele%omm"ni%ation Inia 'o Pvt 0t6Designation1 > R! .ngineer0o%ation1 > angalore/ Caip"r6Pro$e%t Details1 > irtel (3G)/"aei ata (3G) &S/ Relian%e Pro$e%t 3G6 (!e8 ??>Can ?3)
,$$enl% !#$.in #nNetor; Optimization o 3G/ 2G te%hnolog#b% anal#zing *PI@s Drive
est ph#si%al optimization li;e antenna tilt, antenna azim"th %hanges %he%;ing an%hanging the 'ell R! Parameters6
RN' Parameter "it, 'ell Parameter "it, Data8ase an Neigh8or planning or the
netor;, testing ne eat"res or latest RN versions* nal#ze Drive est log or signal strength, pilot poll"tion, intereren%e, %overage la%;ing,
hanover einition, neigh8or %ell relation, %ell sele%tion/resele%tion6 ei"b#$ plannin (ei"b#$ addii#n delei#n) ei"b#$ ,nin # #ve$#me #ve$&"##in
p$#blem& in "e ne!#$.* Anal%;in "e !#$& pe$'#$min ell& ba&ed #n PDP %onteAt a%tivation time (i6e6 ping test), %all
rop rate, Poor 'S = PS anover s"%%ess rate, an igh %%ess ail"re rate, 0o %all set "ps"%%ess rate, Poor "plin; an onlin;s pro%essing, map plots an report generation, re:"en%# planning an
intereren%e anal#sis, an site ata8ase maintenan%e6
G0 0imite/ r#a%omm"ni%ation an .le%troni%s Servi%es Pvt 0t
Designation1 > R! .ngineer/ .ngineer60o%ation1 > *erala6
Pro$e%t Details1 > "aei ir%el Pro$e%t (Septem8er 5>!e8 ??)
T# anal%;e &ai&ial $end #' 5I
8/10/2019 Resume Rishi Sethi
3/3
Anal%;e and ivin $e#mmendai#n '#$ $iial 5I& li.e& =>= ? T"$#,"p, a$d #'
l#.in and Abi& All#ai#n ,e&& /ae
Ne re:"en%# planning or the netor; or '', SI', SN, &IO an & 0IS (to improve raio