1. Bahan
a) Nota NN 26/06/2013Rp 153.500b) Nota PD Sampurna Jaya 26/06/2013Rp 55.500c) Nota Semen Roda 26/06/2013Rp 5.000d) Nota Avian 27/06/2013Rp 176.800e) Nota Sampurna Jaya 01/07/2013Rp 39.500TotalRp 430.3002. Upah Kerja Borong
a) Tukang Kayu 6 bh @ Rp 50.000Rp 300.000 b) Tukang Finishing 6 bh @Rp 50.000 Rp 300.000c) Tukang Jok 6 bh @Rp 75.000Rp 450.000 Total Rp 1.050.000
Total Keseluruhan Rp 1.480.300
Budi (no rek bca 8320036462)
RINCIAN PEKERJAAN LEMARI BAJU ( TAKONSIT )
1. Lemari ukuran 150 x 2,44 = 3.66 mtr 3,66 x Rp 1.200.000 = Rp 4.392.0002. Lemari kamar (hpl) 220 x 2,10 = Rp 4,62 mtr 4,62 x Rp 1.600.000 = Rp 7.392.0003. Bon Parquete Rp 123.000
Total Pekerjaan Rp 11.907.000
Kasbon via BCA Rp 9.000.000Sisa Pembayaran Rp 11.907.000 Rp 9.000.000 = Rp 2.907.000