41
民航處 民航處 民航處 民航處 Civil Aviation Department 1 Captain Eric CHENG (FSO) RNP AR APCH in Hong Kong Hong Kong CAD Flight Standard & Airworthiness Division (FSAD)

RNP AR APCH in Hong Kong Hong Kong CAD Flight Standard ... The Grant of Approval for... · Hong Kong CAD Flight Standard & Airworthiness Division ... ICAO DOC 9613 FAA AC90-101, AC90

Embed Size (px)

Citation preview

民航處民航處民航處民航處 Civil Aviation Department1

Captain Eric CHENG (FSO)

RNP AR APCH in Hong Kong

Hong Kong CAD

Flight Standard & Airworthiness Division

(FSAD)

民航處民航處民航處民航處 Civil Aviation Department2

RNP AR APCH in Hong Kong

• Introduction of RNP AR APCH in Hong Kong

• Procedure for Grant of the Approval

• Case Highlight

• Foreign Operators approval

民航處民航處民航處民航處 Civil Aviation Department3

PBN Development

� 1990s – ICAO Special Committee on Future Air Navigation

Systems (FANS) developed the concept on RNP

Capability (RNPC) and later became RNP

� 2003 - Review RNP → PBN concept for global

harmonization

� Today - ICAO urged all states to implement RNAV

ATS route and approach procedures with PBN

concept:

• Complete the PBN plan by 2009

• Complete all the implementation by 2016

民航處民航處民航處民航處 Civil Aviation Department4

Introduction of RNP AR APCH in Hong Kong

To comply with the ICAO implementation

requirements,

Hong Kong CAD’s

Air Traffic Management Division (ATMD)

is going to

� Publish the RNP AR APCH procedures for HKIA

in FEB 2010

� Effective in APR 2010

民航處民航處民航處民航處 Civil Aviation Department

30 nm

from

ARP

FAF

MAP

IAF

1.0 NM

0.3 NM

1.0 NM

RNAV(GNSS)

RNAV

RNP APCH

1.0 NM

5

Initial Approach Segment

Intermediate Approach

Segment

Final Approach Segment

Missed Approach Segment

民航處民航處民航處民航處 Civil Aviation Department

FAF

MAP

IAF

1.0 NM

0.3 NM

1.0 NM

RNP AR APCHFAF

MAP

IAF

< 1.0 NM

≤ 0.3 NM

< 1.0 NM

FAF

MAP

IAF

0.3 NM

0.3 NM

0.3 NM

VHHH

RNP AR APCH

(no RF)

RNAV(GNSS)

RNAV

RNP APCH

6

1 NM

民航處民航處民航處民航處 Civil Aviation Department7

Introduction of RNP AR APCH in Hong Kong

• Due to airspace and obstacle limitations

- Intermediate Segment: RNP 0.3

- Missed Approach Segment: RNP 0.3

• The containments required are more restrictive than

the normal RNP APCH

• The Procedures are “AR” procedures

民航處民航處民航處民航處 Civil Aviation Department

Operational Trial Operational Trial Operational Trial Operational Trial Operational Trial Operational Trial Operational Trial Operational Trial –– 07L (ATMD)07L (ATMD)07L (ATMD)07L (ATMD)07L (ATMD)07L (ATMD)07L (ATMD)07L (ATMD)

LNAV /

VNAV

LNAV

VPA: 3.0o

Title:

RNAV(RNP)

2 procedures on the same chart:

(1) NPA: LNAV(No Vertical Path Reference)

(2) APV with Baro-VNAV: LNAV/VNAV(With Vertical Path Reference)

NOTE:

Reversion to DME/DME

is NOT permitted

8

民航處民航處民航處民航處 Civil Aviation Department

Operational Trial Operational Trial Operational Trial Operational Trial Operational Trial Operational Trial Operational Trial Operational Trial –– 25R (ATMD)25R (ATMD)25R (ATMD)25R (ATMD)25R (ATMD)25R (ATMD)25R (ATMD)25R (ATMD)

LNAV

LNAV /

VNAV

VPA: 3.0o

Title:

RNAV(RNP)

2 procedures on the same chart:

(1) NPA: LNAV (No Vertical Path Reference)

(2) APV with Baro-VNAV: LNAV/VNAV(With Vertical Path Reference)

NOTE:

Reversion to DME/DME

is NOT permitted

9

民航處民航處民航處民航處 Civil Aviation Department10

民航處民航處民航處民航處 Civil Aviation Department

Procedures Design –

Air Traffic Management Division (ATMD)

Operations Approval –

Flight Standard & Airworthiness Division

(FSAD):

Flight Standard Office (FSO)

Airworthiness Office (AWO)

11

Introduction of RNP AR APCH in Hong Kong

民航處民航處民航處民航處 Civil Aviation Department

How Hong Kong CAD

approve our Aircraft Operators

for

RNP AR APCH?

12

Procedure for Grant of the Approval

民航處民航處民航處民航處 Civil Aviation Department

Reference Documents

� ICAO DOC 9613

� FAA AC90-101, AC90-105

� EASA AMC20-26, AMC20-27

� +++

13

Procedure for Grant of the Approval

民航處民航處民航處民航處 Civil Aviation Department

ICAO South American (SAM) Office

PBN/ATFM Workshop: SAM/IG/4

From 19 To 23 October 2009

After the meeting, a Working Paper WP/11 was published

and available for download.

Hong Kong CAD adapts the SAM/IG/4-WP/11 to be our

Job Aid for the RNP AR APCH approval.

14

Procedure for Grant of the Approval

民航處民航處民航處民航處 Civil Aviation Department

Flight Standard & Airworthiness Division (FSAD)

� Aircraft qualification – Airworthiness Office of FSAD

� Ops approval – Flight Standard Office of FSAD

15

Procedure for Grant of the Approval

民航處民航處民航處民航處 Civil Aviation Department

Based on SAM/IG/4-WP/11, two Job Aids have been formulated for

Application

� Job Aid 1: Approach with Vertical Guidance (APV) / Baro-VNAV

� Job Aid 2: RNP AR APCH

16

� PART 1: Information on the Identification of Aircraft and Operations

� PART 2: Guide for Determining APV/Baro-VNAV Aircraft Eligibility

� PART 3: Basic Pilot Procedures for APV/Baro-VNAV Operations

� PART 1: Information on the Identification of Aircraft and Operations

� PART 2: Operator Application (Items and Documents)

� PART 3: Guide for Determining RNP AR APCH Aircraft Eligibility

� PART 4: Basic Pilot Procedures for RNP AR APCH Operations

Procedure for Grant of the Approval

民航處民航處民航處民航處 Civil Aviation Department17

Airworthiness Requirements for Hong Kong Operators Applying for APV/Baro-VNAV Approval

PART 2 – GUIDE FOR DETERMINING APV/Baro-VNAV AIRCRAFT ELIGIBILITY

(Based on SAM/IG/4-WP/11)

# Topics Reference paragraphsICAO Doc

9613

Location in the Documents

of the operator

Comments

1 Aircraft eligibility

a) For new aircraft.- the aircraft qualification documentation can be

approved by the CAA as part of an aircraft certification project, and will be reflected in the AFM and related documents.

b) For aircraft in use.- Documentation produced by the manufacturer.

2 Aircraft qualification

a) The AFM or other aircraft qualification evidence shall indicate the

normal and abnormal flight crew procedures, failure alerting

responses, and any other limitation, including information related to

the operating modes required for flying an RNP AR APCH procedure.3 Navigation sensors.- On the horizontal plane, the RNP equipment will

use data input from the following types of position sensors, but with the

GNSS as primary positioning basis:

a) Global navigation satellite system (GNSS).

b) Inertial navigation system (INS) or inertial reference system (IRS), with automatic position updating from suitable radio-based navigation

equipment.

c) Distance-measuring equipment (DME) that provides measurements

from two or more ground stations (DME/DME)

(AMC 20-26,

par )

民航處民航處民航處民航處 Civil Aviation Department18

OPS Requirements for Hong Kong Operators Applying for RNP AR APCH Approval

PART 3 – GUIDE FOR DETERMINING RNP AR APCH AIRCRAFT ELIGIBILITY

(Based on SAM/IG/4-WP/11)

# Topics

Operating Procedures

Reference

paragraphs

ICAO Doc 9613

Location in the

Documents

of the operator

Comments

民航處民航處民航處民航處 Civil Aviation Department19

Airworthiness Requirements for Hong Kong Operators Applying for APV/Baro-VNAV Approval

PART 2 – GUIDE FOR DETERMINING APV/Baro-VNAV AIRCRAFT ELIGIBILITY

(Based on SAM/IG/4-WP/11)

# Topics

1 APV/baro-VNAV equipment requirements:What kinds of RNAV/RNP equipment installed?

2 Equipment whose input is used by RNAV/RNP systems The compliance of: Air Data Computer, Air Data System, Pressure Altimeter System etc.

3 Aircraft eligibility: AFM – AC 20-129 or AC 20-138 compliance

4 Any Modification of the Baro-VNAV systems must be approvedApproval Documents must be presented

5 Functional requirements:(a)Required Functions: e.g. Vertical Deviation Display, Navigation Database requirements etc.

(b)Recommended Functions: Temperature Compensation.

6 Maintenance requirementsThe procedure to remove and restore the APV/Baro-VNAV operational capacity of the aircraft.

民航處民航處民航處民航處 Civil Aviation Department20

# Topics1 Aircraft eligibility

New aircraft or Aircraft modified to meet RNP AR APCH Standard

2 Aircraft qualificationThe AFM or other aircraft qualification evidence

3 Navigation sensors.-a) Global navigation satellite system (GNSS).

b) Inertial navigation system (INS) or inertial reference system (IRS)

c) (DME/DME)And Others

4 Performance and Functional Requirements of RNP AR systems

Airworthiness Requirements for Hong Kong Operators Applying for RNP AR APCH Approval

PART 3 – GUIDE FOR DETERMINING RNP AR APCH AIRCRAFT ELIGIBILITY (Based on SAM/IG/4-WP/11)

5 Navigation databaseDetails of the navigation data validation program

民航處民航處民航處民航處 Civil Aviation Department21

OPS Requirements for Hong Kong Operators Applying for APV/Baro-VNAV Approval

PART 3 – GUIDE FOR DETERMINING APV/Baro-VNAV AIRCRAFT ELIGIBILITY

(Based on SAM/IG/4-WP/11)

# Topics

Operating Procedures

Location in the

Documents

of the operator

Comments

1 Cold temperature corrections:-

Pilots are responsible for cold temperature correction for min altitude:

a)Initial and Intermediate Segments

b)DA/H

c)Missed Approach Segment

2 Altimeter setting.-

APV/Baro-VNAV operations will only be conducted when:

a)Current and Local QNH is available

b)QNH is properly selected.

民航處民航處民航處民航處 Civil Aviation Department22

OPS Requirements for Hong Kong Operators Applying for APV/Baro-VNAV Approval

PART 3 – GUIDE FOR DETERMINING APV/Baro-VNAV AIRCRAFT ELIGIBILITY

(Based on SAM/IG/4-WP/11)

# Topics

Operating Procedures

Location in the

Documents

of the operator

Comments

3 Action to be taken at the DA.-Visual or Missed Approach

4 Temperature limitation.-

The temperature limitation will be shown through a note in the

instrument approach procedure. If the aircraft system is capable of

temperature compensation, the crew must follow the operator procedures

based on the manufacturer instructions.

5 VNAV Path Mode Selection.-Correct Selection of the Vertical mode(s).

民航處民航處民航處民航處 Civil Aviation Department23

Topics Operating Procedures (Highlighted Points)

MEL:-E.g. EGPWS/TAWS is required for all RNP AR APCH

Autopilot (AP) and flight director (FD).-For procedures with a navigation precision of less than RNP 0.3 or with RF legs.

NAVAID Exclusion.-

By using NOTAM information.

Validation of Navigation Database.-

Pilots must confirm the NAV Database is valid.

OPS Requirements for Hong Kong Operators Applying for RNP AR APCH Approval

PART 4 - BASIC PILOT PROCEDURES FOR RNP AR APCH OPERATIONS

(Based on SAM/IG/4-WP/11)

民航處民航處民航處民航處 Civil Aviation Department24

Topics Operating Procedures (Highlighted Points)

Track deviation monitoring.-Pilots must use a lateral deviation indicator, an FD and/or an AP in lateral navigation mode

during RNP AR APCH procedures

Procedures with RF legs.-

An RNP AR APCH procedure may require aircraft to have the capability of executing an RF leg

to avoid terrain and obstacles. Since not all aircraft have this capability, flight crews must

know if they can or cannot carry out these procedures.

Altimeter cross-check.-

Prior to the FAF, but not before the IAF, the flight crew must carry out a cross-check of both

pilot altimeters to make sure they agree within 100 ft.

Engine Out Procedure.-

Aircraft may demonstrate the Flight Technical Error (FTE) and other required performance

within limit. It may continue the RNP AR APCH.

OPS Requirements for Hong Kong Operators Applying for RNP AR APCH Approval

PART 4 - BASIC PILOT PROCEDURES FOR RNP AR APCH OPERATIONS

(Based on SAM/IG/4-WP/11)

民航處民航處民航處民航處 Civil Aviation Department

When the two Job Aids are filled and returned to

FSAD (AWO & FSO) together with the required

documents, they will be examined by CAD

inspectors.

If they are all satisfied, the next phase will be

Ground & Flight Validation.

25

Procedure for Grant of the Approval

民航處民航處民航處民航處 Civil Aviation Department

Ground & Flight Validation

Required by PBN Manual Vol II Part C para 6.2.4.4

In accordance with:

PANS-OPS Vol II Part I Section 2 Chapter 4 para 4.6

26

Procedure for Grant of the Approval

民航處民航處民航處民航處 Civil Aviation Department27

Ground Validation (1)

民航處民航處民航處民航處 Civil Aviation Department28

Ground Validation (2)

民航處民航處民航處民航處 Civil Aviation Department29

Flight Validation

民航處民航處民航處民航處 Civil Aviation Department

There are some extra items to be fulfilled:

� RNP Monitoring Program (Vol II Part C para 6.3.7)

� Flight Operational Safety Assessment (FOSA) (Vol II Part C para 6.4)

30

Procedure for Grant of the Approval

民航處民航處民航處民航處 Civil Aviation Department

APPROVAL Contents SummaryComment

1) Job Aid 1: RNP AR APCH Application SAT

2) Job Aid 2: Approach with Vertical Guidance (APV) / Baro-VNAV SAT

3) MEL Revision (as required) SAT

4) Initial and Recurrent Training Program (e.g., flight crew/dispatch) SAT

5) Operational Procedures Requirements SAT

6) Navigation Data Validation (Simulator Evaluation) Program SAT

7) Flight Validation successfully completed (as required) SAT

8) RNP monitoring program SAT

9) FOSA SAT

31

Hong Kong CAD Letter of Authorization (LOA) will be issued.

Ops Specification will be amended.

民航處民航處民航處民航處 Civil Aviation Department

Case Highlight (1)

� Aircraft Qualification on Display requirements

� Display Modification to satisfy the requirements

32

民航處民航處民航處民航處 Civil Aviation Department

ICAO DOC 9613 Vol II Part C para 6.3.3.3.1.3

a) The navigation system must provide the capability to

continuously display to the pilot flying, on the primary

flight instruments for navigation of the aircraft, the aircraft

position relative to the RNP defined path (both lateral and

vertical deviation).

m) The navigation system must provide a numeric display

of the vertical deviation with a resolution of 3m (10 ft) or

less, and the lateral deviation with a resolution of 0.01 NM

or less.

33

Case Highlight (1)

民航處民航處民航處民航處 Civil Aviation Department

Navigation Display

34

Display Modification

Not Required

Case Highlight (1)

民航處民航處民航處民航處 Civil Aviation Department

ICAO DOC 9613 Vol II Part C para 6.3.3.3.1.3

Some of the existing Aircraft without modification cannot

comply with the Display Requirement.

35

Case Highlight (1)

民航處民航處民航處民航處 Civil Aviation Department

New Lateral Deviation Indication

• L/DEV displayed on PFD

• Position of the computed flight

plan

• Full scale: 2 dots = +/- 0.2 NM

• Same symbol as the V/DEV

Improved XTK Error resolution on ND:

• 2 digits after the dot

• When 0.02 ≤ XTK ≤ 0.29

RNP Push Button enables the

LATDEV display

Such Aircraft AFTER Modification

36

民航處民航處民航處民航處 Civil Aviation Department

Approval for the RNP AR APCH

will be granted

On Each Approach?

Aircraft Type/Fleet basis?

Local Operators RNP AR APCH

Approval

37

Case Highlight (2)

民航處民航處民航處民航處 Civil Aviation Department

Letter of Authorization (LOA) Contents

38

LOA:

•Name of Operator

•Navigation Accuracy

•With/without RF

•APV/Baro VNAV system

•Ops Procedures & Crew

qualification

•Equipment requirement

Appendix 1

•Qualified Aircraft or Aircraft

type

•Installed FM System

•Specific Airfield

•Specific Approach

Case Highlight (3)

民航處民航處民航處民航處 Civil Aviation Department

ICAO DOC 9613 Vol II Part C para 6.3.2.8.4

Once approval is received from the State of Registry

(Hong Kong CAD), operators desiring to perform RNP AR

APCH operations in other States (e.g. China, United States

etc.) will require authorization from that State Authority.

39

Foreign Operators approval

民航處民航處民航處民航處 Civil Aviation Department

In Hong Kong, CAD is considering to develop procedures &

requirements to accept approval granted by other state

authority of foreign operators to conduct RNP AR APCH at

Hong Kong.

As a minimum:

• State Approval

• Fleet / Aircraft Specific

• Documentary Evidence

40

Foreign Operators approval

民航處民航處民航處民航處 Civil Aviation Department

Thank You

41