5
LIST OF EXECUTED WORKS: ROADS & MOTORWAYS INTEGRAL INŽENJERING PLC Ordinal No. Internal No. Project name and location Value of Contract in KM Value of Contract in EUR Contracted commence- ment and completion date Name and address of the Employer Type and description of the works Contractor (C) Subcontractor (S) 136 277 Heavy maintenance (upgrading) of the state road IA3, section: Border CRO/SER (Batrovci) – Kuzmin 1, from km 0+554.86 to km 22+196.11 (left carriageway) and from km 0+564.64 to km 22+229.16 (right carriageway), Contract No. RRSP/RRW- IA3BK/2017-07 38727850,31 19801235,44 15.08.2018.- 31.05.2020. JP Putevi Srbije, Bulevar kralja Aleksandra 282 11050 Beograd tel: +381 11 30 37 433 gordana.suboticki-djordjevic@putevi- srbije.rs The project included upgrading (rehabilitation) of complete section of state road IA3 (motorway) in total length of 21.65 km. Works included preliminary works, works on road base and superstructure, rehabilitation works on bridges, works on improvement of drainage system, works on road belt and traffic signalization, and public lightning. Works on section with the biggest traffic load in Republic of Serbia as successfully completed under the traffic, i.e. without total stoppage. C 135 273 Corridor X Highway Project, Construction of Highway E 75, Section: CaričinaDolina – Vladičin Han, LOT 5: Road and bridges at sub-section CaričinaDolina – Tunnel Manajle, ICB br. CORRX.E75.EIB.PACK2-LOT5.ICB 224.407.629,56 114.737.799,07 September 2013 - June 2018 Koridori Srbije, d.o.o. (Serbia Corridors) Beograd, Kralja Petra 21 11000 Beograd phone 11 33 44 174 fax: +381 11 32 48 682 Construction of highway section in total length l= 6,75 km, with all structures, Construction of 7 bridges on highway section, one bridge on local road, one railway bridge, 3 RC grille structures with prestressed anchors for permanent protection of slopes, 28 culverts, relocation of 1 km of railway, relocation of 1,3 km of local roads, works on regulation of Južna Morava river, Sokolica river and Koznička river. project involve relocation of HV, MV and LV lines, construction of TC chanellization, PS, drainage works, supply and installation of traffic signalization and equipment, noise protection walls and landscaping. JV Integral-Inter- kop-Prijedorputevi (60-20-20) 134 272 Construction of the Main Road M-17.3 Neum –Stolac LOT 1 Pavement of road section Stari Neum – Babin Do L=5,3km Construction of road section Babin Do – Oštrovac L=1,7km and Construction of the tunnel Oštrovac L=190m1. 6.027.207,03 3.081.662,02 01.02.2018. - 24/04/2019 JP Ceste Federacije BiH d.o.o. Sarajevo Terazije 54 tel: +387 33 250 370 Project included construction of main road in total lenght of 7,00 km. Works includes construction of tunnel Oštrovac, in total lenght of 190 m1 and construction of underpass Oskrusnica. C 133 268 Design and construction of Banja Luka - Doboj Motorway, Section Banja Luka - Prnjavor (km 0+000 to km 35+300) Contract no. RS/EIB-2012/W 445.558.204,83 227.810.292,73 01 Sept 2014 - 30 Sept 2018 Public Company "Republic of Srpska Motorways" +387 51 233 670 Works on design and construction of full profile motorways section (l=35,300.00 m) with all belonging elements, two motorway intersections with toll plazas, traffic control and maintenance centre, rest and service area, structures at the motorway, of which the most important are viaducts with length l=449 m, and l=400 m, bridge with length l=340.00 m, and artificial tunnel. Project includes construction of total of 21,529.24 m local roads, geomechanical works, relocation of power installation, power supply installations of the toll plazas, rest and service area and artificial tunnel, works on illumination of interchanges, works on setting up traffic signalization and equipment, and noise protection. Project includes design and implementation of intelligent traffic systems, video surveillance and traffic management; works on dewatering of pavement, regulation of watercourses, installations of optical cables and emergency call system, and toll collection system. Pavement structure: driving and overtaking lane: SMA 4cm, binding bituminous course 6 cm, bituminous road base BNS 7 cm, cement stabilisation 20 cm, road base 25 cm stopping lane: asphalt concrete 7 cm, bituminous bearing course BNS 7 cm, road base 52 cm JV Integral-Granit (60-40) 132 265 Design and construction of Banja Luka - Doboj Motorway, Section Prnjavor - Doboj (km 35+300 to km 71+909.72) Contract no. RS/EBRD-2012/W of 24 August 2012 452.807.085,58 231.516.586,61 1272 calendar days after Commencement Date 09 November 2012 -10 September 2016 (Taking-over) DNP in duration of 730 days starts as from 11 September 2016, ends on 10 September 2018 Public Company "Republic of Srpska Motorways" +387 51 233 670 Design and construction of motorway section in total length l=36.609.72 m, with all structures, two motorway intersections with toll plazas, traffic control and maintenance centre, rest and service area, structures at the motorway, of which the most important are the Bosna bridge L=425.40 m, Ukrina bridge L=103.06 m, Slatinci artificial tunnel l=80.50m. Project includes construction of total of 21.422,48 m local roads, geomechanical works, relocation of power installation, power supply installations of the toll plazas, rest and service area and artificial tunnel, works on illumination of interchanges, works on setting up traffic signalization and equipment. Project shall include design and implementation of intelligent traffic systems, video surveillance and traffic management; works on dewatering of pavement, installations of optical cables and emergency call system, and noise protection. Pavement structure: driving and overtaking lane: SMA 4cm, binding bituminous course 6 cm, bituminous road base BNS 7 cm, cement stabilisation 20 cm, road base 25 cm; stopping lane: asphalt-concrete 7 cm, bituminous bearing course BNS 7 cm, road base 52 cm JV Integral-Granit (60-40) 131 260 Permanent solution for the landslide Čemerno at the trunk road M-20 Gacko-Foča 71.846.761,91 36.734.666,05 September 2008 - 06 August 2013 Public Company "Republic of Srpska Roads" +387 51 334 500 Project included construction of main road in total length of 8.9 km. Two tunnels constructed were: tunnel Čemerno and tunnel Surdup, in total length of l=2.305.00m. Tunnel Čemerno is 2,109.00 m long, and tunnel Surdup is 196.00m long. Both tunnels were constructed by applying the New Austrian construction method (NATM), including all electrical and mechanical installation. Clearance of each tunnel is 55sq.m, and excavation profile of both tunnels is 97.54sq.m each. Tunnel works included underground and open cut excavations. Rocky mass was secured by installation of SN anchors and reinforcing mesh at tunnel portals, and installation of SN and IBO anchors, steel reinforcing mesh and centerings in the other parts of the tunnel. Following installation of anchors, mesh and centerings, the tunnel surface was protected by sprayed concrete MB 30, waterproofing coat, and construction of the secondary tunnel lining. The project further included the structures: viaduct ''Trnova Luka'', length: L=408.00 (steel composite structure with columns of over 50m high), one viaduct length l=88.00m, the "Hrštica" Bridge l=37.36m and the bridge over the Ždralov potok l=12m. In order to secure stability of the road structure, total of 1,605.00m of reinforced-concrete walls were constructed. In addition, slope stabilisation in this geologically very complex terrain was obtained by installation of steel anchors and applying up-to-date geotehnical methods. JV Integral, CPM BH, REWEUS 130 254 Construction of intesection Šićki Brod (Lot 2) 6.466.914,00 3.306.480,62 March 2010 - 31- Dec-2011 Federation of B&H Road Directorate of FB&H Tel. +387 33 563 468 Construction of an intersection at the trunk road M4 Tuzla - Šićki Brod. The work encompasses construction of 5 bridges (l 1 =9,80m/P1= 88 m 2 ; l 2 =13,80m/P 2 =136,6 m 2 ; l 3 =18,40m/P 3 =184m 2 ; l 4 =42,50m/P 4 =415 m 2 ; l 5 =26,50m/P 5 =258 m 2 ), reconstruction of 4 bridges (P=185,4+187,41+184,00+388m 2 ), alignment works (reconstruction of existing and construction of a new pavement) works on intersection branches, drainage, lighting, traffic signalization and equipment. JV Integral, CPM BH, REWEUS 129 253 Rehabilitation of Kopači - Ustiprača (M20) BA-RISP-40381BA/RS-ICB-W-10-03 2.799.091,30 1.431.152,66 April - December 2011 Public Company "Republic of Srpska Roads" +387 51 334 500 Rehabilitation of the pavement structure in total length of l=8.13 km. Works include scraping and destroying of asphalt surfacing in total surface of approx. 53.000 m2, replacing of road base, pot holes patching, cracks sealing, construction of new bearing course BNS 22 in the sutface of approx. 4.450 m2, and wearing course AB 11ks in the surface of approx. 53.000m2. Besides the a/m, the works include: reconstruction and upgrade of existing retaining wall, cleaning of drainage system, construction of new drainage system, cleaning and reconstruction of gutters, cleaning and filling of shoulders and as well as works related to traffic signalization and equipment. C 128 252 Rehabilitation of road direction R15 Šipovo - Kupres in the length of 29,40 km EBRD/RS-10-03W 2.525.513,69 1.291.274,65 April - December 2011 Public Company "Republic of Srpska Roads" +387 51 334 500 Rehabilitation of the pavement structure in total length of l=29.40 km. Works include scraping and destroying of asphalt surfacing in total surface of approx. 145.000 m2, replacing of road base, pot holes patching, cracks sealing, construction of a wearing course AB 11ks in the surface of approx. 157.000m2. Besides the a/m, the works include: cleaning of drainage system, cleaning and reconstruction of gutters, cleaning and filling of shoulders and as well as works related to traffic signalization and equipment. C 127 251 Rehabilitation of road direction R14 Han Kola - Srpske Toplice EBRD/RS-10-02W 2.122.422,94 1.085.177,62 April - December 2011 Public Company "Republic of Srpska Roads +387 51 334 500 Rehabilitation of the pavement structure in total length of l=11.77 km. Works include scraping and destroying of asphalt surfacing in total surface of approx.87.000 m2, replacing of road base, pot holes patching, cracks sealing, construction of a new bearing layer BNS 22 in the surface of approx. 31.000 m2 and construction of wearing course AB 11ks in total surface of 82.000m2. Besides the a/m, the works include: cleaning of drainage system, construction of a new drainage, cleaning and reconstruction of gutters and cleaning and filling of shoulders and as well as works related to traffic signalization and equipment. c 126 250 Rehabilitation of road directions M5/M19.3 Rogatica - Sastavci - Ustiprača and M5/M19.3 Višegrad - Vardište EBRD/RS-10-01W 2.968.241,75 1.517.637,91 April - December 2011 Public Company "Republic of Srpska Roads" +387 51 334 500 Rehabilitation of the pavement structure in total length of l=36.39 km. The works include scraping and destroying of asphalt surfacing in total surface of approx. 90.000 m2, replacing of road base, pot holes patching, cracks sealing, construction of a new bearing layer BNS 22 in the surface of approx.2.000 m2 and construction of wearing course AB 11ks in total surface of 175.000m2. Besides the a/m, the works include: cleaning of drainage system and gutters, cleaning and filling of shoulders as well as works related to traffic signalization and equipment. 125 249 Construction of the highway Gradiška - Banja Luka (Mahovljani): Lot 3: km 30+000 to km 36+736 46.927.945,37 23.993.877,47 27-April-2011 - 24-Nov-2011 Public Company "Republic of Srpska Roads" Director: Nedeljko Knežević, B.Sc.Oec. +387 51 334 500 /Public Company "Republic of Srpska Motorways" +387 51 233 670 Execution of works at construction of motorway section (l=6.736 m) with all additional elements, earthmoving works, concrete and insulation works on two bridges of spans 28,80 m and 19,60m and three overbridges. Bridges are prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000, length 14,0m. C 124 248 Construction of the highway Gradiška - Banja Luka (Mahovljani): Lot 2: km 20+500 to km 30+000 including local roads 82.586.511,74 42.225.812,95 11-Dec-2007 - 24-Nov-2011 Public Company "Republic of Srpska Roads" Director: Nedeljko Knežević, B.Sc.Oec. +387 51 334 500 /Public Company "Republic of Srpska Motorways" Dušan Topić +387 51 233 670 Execution of works at construction of entire motorway (l=9,500 m) with all additional elements, four overbridges, three double bridges (spans 30m each) on the motorway and two bridges on local roads, and one underbridge Jazovac bridge - two bridges length 2x37.60 m, prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø800, length 14,0m Jurkovica II bridge - two bridges length 2x37.51 m, prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø800, length 14,0m Borna bridge - two bridges length 2x37.64 m, prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø800, length 12,0m Bridge at VL 27A - bridge length 53,84 m, bridge structure (2x20=40m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø800, length 12,0m Bridge on RAMP A- bridge length 53,84 m, bridge structure (2x20=40m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø800, length 13,0m Overbridges in length 54.04m each, overbridge structure (2x20=40m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000 Underbridge at km 29+515.000 - monolith RC structure, underbridge clear span 9.50 x 5.30m Pavement structure: driving lane: SMA 5cm, binding bituminous course 7 cm, bituminous road base BNS 10 cm, cement stabilisation 20 cm, road base 30 cm overtaking lane: SMA 5cm, binding bituminous course 7 cm, bituminous road base 10 cm, road base 35 cm stopping lane: bituminous bearing course BNS 5 cm, binding bituminous course 7 cm, road base 35 cm JV Konstruktor Inženjering - Integral Inženjering Execution of works at construction of entire motorway (l=10.755 m) with all additional elements, six 1

ROADS & MOTORWAYSintegralinzenjering.com/projekti/putevi_i_autoputevi_(EN...Koridori Srbije, d.o.o. (Serbia Corridors) Beograd, Kralja Petra 21 11000 Beograd +381 11 33 44 174 Construction

  • Upload
    others

  • View
    24

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ROADS & MOTORWAYSintegralinzenjering.com/projekti/putevi_i_autoputevi_(EN...Koridori Srbije, d.o.o. (Serbia Corridors) Beograd, Kralja Petra 21 11000 Beograd +381 11 33 44 174 Construction

LIST OF EXECUTED WORKS: ROADS & MOTORWAYS

INTEGRAL INŽENJERING PLC

Ordinal No.

Internal No. Project name and location Value of

Contract in KM

Value ofContract in

EUR

Contracted commence-

ment and completion

date

Name and address of the Employer Type and description of the works Contractor (C) Subcontractor (S)

136 277

Heavy maintenance (upgrading) of the state road IA3, section: Border CRO/SER (Batrovci) – Kuzmin 1, from km 0+554.86 to km 22+196.11 (left carriageway) and from km 0+564.64 to km 22+229.16 (right carriageway), Contract No. RRSP/RRW-IA3BK/2017-07

38727850,31 19801235,44 15.08.2018.- 31.05.2020.

JP Putevi Srbije,Bulevar kralja Aleksandra 282

11050 Beogradtel: +381 11 30 37 433

[email protected]

The project included upgrading (rehabilitation) of complete section of state road IA3 (motorway) in total length of 21.65 km.Works included preliminary works, works on road base and superstructure, rehabilitation works on bridges, works on improvement of drainage system, works on road belt and traffic signalization, and public lightning.Works on section with the biggest traffic load in Republic of Serbia as successfully completed under the traffic, i.e. without total stoppage.

C

135 273

Corridor X Highway Project, Construction of Highway E 75, Section: CaričinaDolina – Vladičin Han, LOT 5: Road and bridges at sub-section CaričinaDolina – Tunnel Manajle, ICB br. CORRX.E75.EIB.PACK2-LOT5.ICB

224.407.629,56 114.737.799,07September 2013

- June 2018

Koridori Srbije, d.o.o. (Serbia Corridors) Beograd,Kralja Petra 21 11000 Beogradphone 11 33 44 174fax: +381 11 32 48 682

Construction of highway section in total length l= 6,75 km, with all structures, Construction of 7 bridges on highway section, one bridge on local road, one railway bridge, 3 RC grille structures with prestressed anchors for permanent protection of slopes, 28 culverts, relocation of 1 km of railway, relocation of 1,3 km of local roads, works on regulation of Južna Morava river, Sokolica river and Koznička river.project involve relocation of HV, MV and LV lines, construction of TC chanellization, PS, drainage works, supply and installation of traffic signalization and equipment, noise protection walls and landscaping.

JV Integral-Inter-kop-Prijedorputevi (60-20-20)

134 272

Construction of the Main Road M-17.3 Neum –Stolac LOT 1Pavement of road section Stari Neum – Babin Do L=5,3kmConstruction of road section Babin Do – Oštrovac L=1,7km andConstruction of the tunnel Oštrovac L=190m1.

6.027.207,03 3.081.662,02 01.02.2018. - 24/04/2019

JP Ceste Federacije BiH d.o.o. SarajevoTerazije 54

tel: +387 33 250 370 Project included construction of main road in total lenght of 7,00 km. Works includes construction of tunnel Oštrovac, in total lenght of 190 m1 and construction of underpass Oskrusnica. C

133 268

Design and construction of Banja Luka - Doboj Motorway, Section Banja Luka - Prnjavor (km 0+000 to km 35+300) Contract no. RS/EIB-2012/W

445.558.204,83 227.810.292,73 01 Sept 2014 - 30 Sept 2018

Public Company "Republic of Srpska Motorways"

+387 51 233 670

Works on design and construction of full profile motorways section (l=35,300.00 m) with all belonging elements, two motorway intersections with toll plazas, traffic control and maintenance centre, rest and service area, structures at the motorway, of which the most important are viaducts with length l=449 m, and l=400 m, bridge with length l=340.00 m, and artificial tunnel.Project includes construction of total of 21,529.24 m local roads, geomechanical works, relocation of power installation, power supply installations of the toll plazas, rest and service area and artificial tunnel, works on illumination of interchanges, works on setting up traffic signalization and equipment, and noise protection.Project includes design and implementation of intelligent traffic systems, video surveillance and traffic management; works on dewatering of pavement, regulation of watercourses, installations of optical cables and emergency call system, and toll collection system.Pavement structure:driving and overtaking lane: SMA 4cm, binding bituminous course 6 cm, bituminous road base BNS 7 cm, cement stabilisation 20 cm, road base 25 cmstopping lane: asphalt concrete 7 cm, bituminous bearing course BNS 7 cm, road base 52 cm

JV Integral-Granit (60-40)

132 265Design and construction of Banja Luka - Doboj Motorway, Section Prnjavor - Doboj (km 35+300 to km 71+909.72) Contract no. RS/EBRD-2012/W of 24 August 2012

452.807.085,58 231.516.586,61

1272 calendar days after

Commencement Date

09 November 2012 -10

September 2016 (Taking-over)

DNP in duration of 730 days

starts as from 11 September

2016, ends on 10 September

2018

Public Company "Republic of Srpska Motorways"

+387 51 233 670

Design and construction of motorway section in total length l=36.609.72 m, with all structures, two motorway intersections with toll plazas, traffic control and maintenance centre, rest and service area, structures at the motorway, of which the most important are the Bosna bridge L=425.40 m, Ukrina bridge L=103.06 m, Slatinci artificial tunnel l=80.50m.Project includes construction of total of 21.422,48 m local roads, geomechanical works, relocation of power installation, power supply installations of the toll plazas, rest and service area and artificial tunnel, works on illumination of interchanges, works on setting up traffic signalization and equipment.Project shall include design and implementation of intelligent traffic systems, video surveillance and traffic management; works on dewatering of pavement, installations of optical cables and emergency call system, and noise protection.Pavement structure:driving and overtaking lane: SMA 4cm, binding bituminous course 6 cm, bituminous road base BNS 7 cm, cement stabilisation 20 cm, road base 25 cm;stopping lane: asphalt-concrete 7 cm, bituminous bearing course BNS 7 cm, road base 52 cm

JV Integral-Granit (60-40)

131 260 Permanent solution for the landslide Čemerno at the trunk road M-20 Gacko-Foča 71.846.761,91 36.734.666,05 September 2008

- 06 August 2013Public Company

"Republic of Srpska Roads"+387 51 334 500

Project included construction of main road in total length of 8.9 km. Two tunnels constructed were: tunnel Čemerno and tunnel Surdup, in total length of l=2.305.00m. Tunnel Čemerno is 2,109.00 m long, and tunnel Surdup is 196.00m long. Both tunnels were constructed by applying the New Austrian construction method (NATM), including all electrical and mechanical installation. Clearance of each tunnel is 55sq.m, and excavation profile of both tunnels is 97.54sq.m each. Tunnel works included underground and open cut excavations. Rocky mass was secured by installation of SN anchors and reinforcing mesh at tunnel portals, and installation of SN and IBO anchors, steel reinforcing mesh and centerings in the other parts of the tunnel. Following installation of anchors, mesh and centerings, the tunnel surface was protected by sprayed concrete MB 30, waterproofing coat, and construction of the secondary tunnel lining.The project further included the structures: viaduct ''Trnova Luka'', length: L=408.00 (steel composite structure with columns of over 50m high), one viaduct length l=88.00m, the "Hrštica" Bridge l=37.36m and the bridge over the Ždralov potok l=12m. In order to secure stability of the road structure, total of 1,605.00m of reinforced-concrete walls were constructed. In addition, slope stabilisation in this geologically very complex terrain was obtained by installation of steel anchors and applying up-to-date geotehnical methods.

JV Integral, CPM BH, REWEUS

130 254 Construction of intesection Šićki Brod (Lot 2) 6.466.914,00 3.306.480,62 March 2010 - 31-Dec-2011

Federation of B&HRoad Directorate of FB&H

Tel. +387 33 563 468

Construction of an intersection at the trunk road M4 Tuzla - Šićki Brod. The work encompasses construction of 5 bridges (l1=9,80m/P1= 88 m2; l2=13,80m/P2=136,6 m2; l3=18,40m/P3=184m2; l4=42,50m/P4=415 m2; l5=26,50m/P5=258 m2), reconstruction of 4 bridges (P=185,4+187,41+184,00+388m2), alignment works (reconstruction of existing and construction of a new pavement) works on intersection branches, drainage, lighting, traffic signalization and equipment.

JV Integral, CPM BH, REWEUS

129 253 Rehabilitation of Kopači - Ustiprača (M20) BA-RISP-40381BA/RS-ICB-W-10-03 2.799.091,30 1.431.152,66 April - December

2011

Public Company "Republic of Srpska Roads"

+387 51 334 500

Rehabilitation of the pavement structure in total length of l=8.13 km. Works include scraping and destroying of asphalt surfacing in total surface of approx. 53.000 m2, replacing of road base, pot holes patching, cracks sealing, construction of new bearing course BNS 22 in the sutface of approx. 4.450 m2, and wearing course AB 11ks in the surface of approx. 53.000m2. Besides the a/m, the works include: reconstruction and upgrade of existing retaining wall, cleaning of drainage system, construction of new drainage system, cleaning and reconstruction of gutters, cleaning and filling of shoulders and as well as works related to traffic signalization and equipment.

C

128 252Rehabilitation of road direction R15 Šipovo - Kupres in the length of 29,40 kmEBRD/RS-10-03W

2.525.513,69 1.291.274,65 April - December 2011

Public Company "Republic of Srpska Roads"

+387 51 334 500

Rehabilitation of the pavement structure in total length of l=29.40 km. Works include scraping and destroying of asphalt surfacing in total surface of approx. 145.000 m2, replacing of road base, pot holes patching, cracks sealing, construction of a wearing course AB 11ks in the surface of approx. 157.000m2. Besides the a/m, the works include: cleaning of drainage system, cleaning and reconstruction of gutters, cleaning and filling of shoulders and as well as works related to traffic signalization and equipment.

C

127 251Rehabilitation of road direction R14 Han Kola - Srpske TopliceEBRD/RS-10-02W

2.122.422,94 1.085.177,62 April - December 2011

Public Company "Republic of Srpska Roads

+387 51 334 500

Rehabilitation of the pavement structure in total length of l=11.77 km. Works include scraping and destroying of asphalt surfacing in total surface of approx.87.000 m2, replacing of road base, pot holes patching, cracks sealing, construction of a new bearing layer BNS 22 in the surface of approx. 31.000 m2 and construction of wearing course AB 11ks in total surface of 82.000m2. Besides the a/m, the works include: cleaning of drainage system, construction of a new drainage, cleaning and reconstruction of gutters and cleaning and filling of shoulders and as well as works related to traffic signalization and equipment.

c

126 250

Rehabilitation of road directions M5/M19.3 Rogatica - Sastavci - Ustiprača and M5/M19.3 Višegrad - VardišteEBRD/RS-10-01W

2.968.241,75 1.517.637,91 April - December 2011

Public Company "Republic of Srpska Roads"

+387 51 334 500

Rehabilitation of the pavement structure in total length of l=36.39 km. The works include scraping and destroying of asphalt surfacing in total surface of approx. 90.000 m2, replacing of road base, pot holes patching, cracks sealing, construction of a new bearing layer BNS 22 in the surface of approx.2.000 m2 and construction of wearing course AB 11ks in total surface of 175.000m2. Besides the a/m, the works include: cleaning of drainage system and gutters, cleaning and filling of shoulders as well as works related to traffic signalization and equipment.

125 249Construction of the highway Gradiška - Banja Luka (Mahovljani):Lot 3: km 30+000 to km 36+736

46.927.945,37 23.993.877,47 27-April-2011 - 24-Nov-2011

Public Company "Republic of Srpska Roads"

Director: Nedeljko Knežević, B.Sc.Oec.+387 51 334 500

/Public Company "Republic of Srpska Motorways"

+387 51 233 670

Execution of works at construction of motorway section (l=6.736 m) with all additional elements, earthmoving works, concrete and insulation works on two bridges of spans 28,80 m and 19,60m and three overbridges.Bridges are prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000, length 14,0m.

C

124 248

Construction of the highway Gradiška - Banja Luka (Mahovljani):Lot 2: km 20+500 to km 30+000 including local roads

82.586.511,74 42.225.812,9511-Dec-2007 - 24-Nov-2011

Public Company "Republic of Srpska Roads"

Director: Nedeljko Knežević, B.Sc.Oec.+387 51 334 500

/Public Company "Republic of Srpska Motorways"Dušan Topić

+387 51 233 670

Execution of works at construction of entire motorway (l=9,500 m) with all additional elements, four overbridges, three double bridges (spans 30m each) on the motorway and two bridges on local roads, and one underbridgeJazovac bridge - two bridges length 2x37.60 m, prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø800, length 14,0m Jurkovica II bridge - two bridges length 2x37.51 m, prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø800, length 14,0m Borna bridge - two bridges length 2x37.64 m, prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø800, length 12,0m Bridge at VL 27A - bridge length 53,84 m, bridge structure (2x20=40m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø800, length 12,0m Bridge on RAMP A- bridge length 53,84 m, bridge structure (2x20=40m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø800, length 13,0m Overbridges in length 54.04m each, overbridge structure (2x20=40m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000Underbridge at km 29+515.000 - monolith RC structure, underbridge clear span 9.50 x 5.30mPavement structure:driving lane: SMA 5cm, binding bituminous course 7 cm, bituminous road base BNS 10 cm, cement stabilisation 20 cm, road base 30 cmovertaking lane: SMA 5cm, binding bituminous course 7 cm, bituminous road base 10 cm, road base 35 cmstopping lane: bituminous bearing course BNS 5 cm, binding bituminous course 7 cm, road base 35 cm

JV Konstruktor Inženjering - Integral Inženjering

Execution of works at construction of entire motorway (l=10.755 m) with all additional elements, six

1

Page 2: ROADS & MOTORWAYSintegralinzenjering.com/projekti/putevi_i_autoputevi_(EN...Koridori Srbije, d.o.o. (Serbia Corridors) Beograd, Kralja Petra 21 11000 Beograd +381 11 33 44 174 Construction

123 247Construction of the highway Gradiška - Banja Luka (Mahovljani):Lot 1: km 10+254,59 to km 20+500

97.663.418,74 49.934.513,09 11-Dec-2007 - 24-Nov-2011

Public Company "Republic of Srpska Roads"

+387 51 334 500/Public Company "Republic of Srpska

Motorways+387 51 233 670

Execution of works at construction of entire motorway (l=10.755 m) with all additional elements, six overbridges and one double carriageway bridge (span 40m)Jurkovica Bridge - two bridges in the length 2x53.29m, bridge structure (2x20=40m) prefabricated monolith structure, prestressed prefabricated concrete girders MB45, M150, V8, structure funded on bored HW piles Ø1000, length 14.0m.Overbridge at km 13+688.902 - length 113.84m, Overbridge structure (4x25=100m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000 for middle piers Ø800. Abutments funded on 5 piles each, length 18m, that is 22m. Foundation of the middle pier is funded on 6 piles.Overbridge at km 11+662.045 - length 54.04m, Overbridge structure (2x20=40m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000Overbridge at km 12+348.955 - length 54.04m, Overbridge structure (2x20=40m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000Overbridge at km 14+910.00 - length 54.04m, Overbridge structure (2x20=40m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure fundd on bored HW piles Ø1000Overbridge at km 17+550.00 - length 54.04m, Overbridge structure (2x20=40m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000Overbridge at km 20+252.50 - length 54.04m, Overbridge structure (2x20=40m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000Pavement structure:driving lane: SMA 5cm, binding bito course 7 cm, Bituminous road base BNS 10 cm, cement stabilisation 20 cm, road base 30 cmovertaking lane: SMA 5cm, binding bito course 7 cm, Bituminous road base BNS 10 cm, road base 35 cmstopping lane: Bituminous road base BNS 5 cm, binding bituminous course 7 cm, road base 35 cm

JV Konstruktor Inženjering - Integral Inženjering

122 245 Works on asphalting of local road network in Municipality Kupres 72.421,24 37.028,39 December 2010

- July 2011Municipality Kupres+ 387 50 480 077

Works on construction and asphalting of local road network in Municipality Kupres: construction and asphalting of the road to Milišići and construction and asphalting of the road to Matići c

121 244 Works on asphalting and furnishing of football ground in Municipality Kupres 48.385,35 24.739,04 December 2010

- July 2011Municipality Kupres+ 387 50 480 077

Works on subgrade, construction of stabilized roadabse, construction of wearing course AB 11, illumination of the playground and furnishing of the football ground. C

120 243

Execution of works and interventions at streets and local road directions within regular maintenance in 2010 at the territory of Berane Municipality

391.166,00 200.000,00 May - December 2010

Agency for Construction and Development of Berane

Ul. IV Crnogorske br. 4; BeraneTel: + 382 51 230 574

Earth works (earth traffic lanes planning, rolling and compacting of a new road alignment), concrete works (construction of asphalt-concrete wearing course, equilizing bed, upper bearing layer, mechanical milling of asphalt wearing course, mechanical cutting of asphalt) transport of debris, mechanical and manual removal of existing asphalt layer, delivery of asphalt mixture AB-11 andBNS-22).

C

119 242Reconstruction-investment maintenance of trunk and pincipal roads in MontenegroLot 16: R-8 Rožaje - Kula

233.351,37 119.310,66 May -June 2010

Traffic Directorate19 IV proleterske Street, Podgorica, Crna

GoraTel: +382 20 655 052

Construction of wearing course AB 11s, levelling of existing asphalt layer, construction of equilizing bed C

118 241Reconstruction-investment maintenance of trunk and pincipal roads in MontenegroLot 15: R-9 Murino-Plav-Gusinje

60.811,57 31.092,46 May -June 2010

Traffic Directorate19 IV proleterske Street, Podgorica, Crna

GoraTel: +382 20 655 052

Construction of wearing course AB 11s, levelling of existing asphalt layer, construction of equilizing bed C

117 240

Reconstruction-investment maintenance of trunk and pincipal roads in MontenegroLot 14: M-9 Kolašin-Mateševo-Andrijevica-Bjeluha

185.467,66 94.828,11 May -June 2010

Traffic Directorate19 IV proleterske Street, Podgorica, Crna

GoraTel: +382 20 655 052

Construction of wearing course AB 11s, levelling of existing asphalt layer, construction of equilizing bed C

116 239Reconstruction-investment maintenance of trunk and pincipal roads in MontenegroLot 13: M-21 Barski Most-Ribarevina

325.418,86 166.384,02 May -June 2010

Traffic Directorate19 IV proleterske Street, Podgorica, Crna

GoraTel: +382 20 655 052

Construction of wearing course AB 11s, levelling of existing asphalt layer, construction of equilizing bed C

115 238Reconstruction-investment maintenance of trunk and pincipal roads in Montenegro, Lot 12: M-2 Ribarevine-Špiljani

610.049,88 311.913,55 May -June 2010

Traffic Directorate19 IV proleterske Street, Podgorica, Crna

GoraTel: +382 20 655 052

Construction of wearing course AB 11s, levelling of existing asphalt layer, construction of equilizing bed C

114 237 Improvement of local roads in the length of 3km in the Berane Municipality 256.545,22 131.169,49 May -

June 2010

Public Works Directorate18 Novaka Miloševa Street, Podgorica,

Crna GoraTel: +382 20 230 207

Levelling of existing road, scraping of asphalt pavement, construction of mechanically stabilized road bed, construction of shoulders C

113 236 Improvement of local roads in the length of 3km in the Andrijevica Municipality 244.146,42 124.830,08 May -

June 2010

Public Works Directorate18 Novaka Miloševa Street, Podgorica,

Crna GoraTel: +382 20 230 207

Levelling of existing road, scraping of asphalt pavement, construction of mechanically stabilized road bed, construction of shoulders C

112 230

Execution of works and interventions at local roads, as well as maintenance of roads and streets at the territory of Berane Municipality in 2009 (regular maintenance)

2.967.084,06 1.517.045,99 April - December 2009

Agency for Investments and Construction Berana

IV Crnogorske 4; BeraneTel: + 382 51 230 574

Earth works (planning earth lanes, rolling and compaction, excavation and spreading on the new road section), concrete works (material purchase, construction of wearing coarse made of asphalt concrete, construction of levelling coarse, construction of upper bering layer, mechanict removal of wearing asphalt coarse, mechanic asphalt cutting)transport of debris, mechanical and manual removal of existing asphalt, delivery of asphalt mixture AB-11 and BNS-22.

C

111 227

Execution of street asphalt works works in Plav and Gusinje and reconstruction of damaged asphalt pavement at streets and local roads (patching of damaged pavement)

171.360,89 87.615,43 May - September 2009

Plav MunicipalityDirectorate for Space Designing and

investmentsČaršijska bb

Execution of street asphalt works works in Plav and Gusinje and reconstruction of damaged asphalt pavement at streets and local roads (patching of damaged pavement) C

110 225 Improvement (asphalt works) of local road Trešnjevik-Štavna, in the length of 4.433,98m 449.192,85 229.668,66 July - August

2009

Andrijevica MunicipalityB. Deletića bb

84 320 AndrijevicaTel. 087/243-161

Mechanical excavation, construction of culverts, construction of bearing road base, construction of BNS. Total lenght of the section is 4.4 km C

109 224

Reconstruction works - capital maintenance of trunk and principal roads in Montenegro – Lot 18.R-20 Berane-Trpezi-Kalače, in total length of 950 m

97.253,64 49.725,00 May 2009 - June 2009

Government of MontenegroTraffic Directorate4. Proleterske 19

PodgoricaTel: + 382 20 655 052

The works include asphalt scraping to the level of blanket course, rehabliatation of asphalt paving, repair and cleaning of dewatering system, procurement and installation of traffic signalization. Works on this project are performed without complete road closure.

C

108 223

Reconstruction works - capital maintenance of trunk and principal roads in Montenegro – Lot 17.R-9 Murino-Plav-Gusinje, in total length of 1400 m

181.578,28 92.839,50 May 2009 - June 2009

Government of MontenegroTraffic Directorate4. Proleterske 19

PodgoricaTel: + 382 20 655 052

Removal of asphalt till the road base level, works on rehabliatation of asphalt paving, repair and cleaning of dewatering system, procurement and installation of traffic signalization. Works on this project are performed without complete road closure.

C

107 218Execution of works and interventions at streets and road directions within regular maintenance in 2008

3.932.830,31 2.010.824,21 April - December 2008

Agency for Construction and Development of Berane

Earth works (planning of earth carriageway, rolling and compacting, excavation and spreading in new road route), concrete works, (purchase of material, construction of asphalt-concrete wearing course, construction of equalizing bed, construction of upper bearing base, mechanical removing of wearing asphalt course, mechanical cutting of asphalt), transport of debris, mechanical and manual removing of existing asphalt, delivery of asphalt mixture AB-11 and BNS-22.

C

106 217 Street pavement in the settlement Burak-Voćnjak in Gacko 813.274,54 415.820,67 July - September

2008

Municipality GackoTel: 059/464-430 Construction of roadbase, placement of curbstones and pavement on street, with construction of drainage

system and concrete manholes. Total lenght of the section is 1.2 km C

105 216Construction of Obalska Street in Berane and construction of Bridge over the Bistrica RiverContract no. 07/08 from 03 April 2008

6.586.161,24 3.367.450,77 April - December 2008

Government of Montenegro; Traffic Directorate, Novaka Miloševa St, 18,

PodgoricaTel: +381 81 230 133

Construction of the Obalska Street in Berane, length 3117,36m: construction of 3 sections and main road in the widening zone, construction of sidewalks and pedestrian passes, construction of vertical and horizontal signallization, and precipitation sewerage.Construction of prestressed RC bridge over the Bistrica river and preparation of design documentation; including the construction of access road to the new bridge, mechanical excavation and contact concreting of drilled piles Ø 880 mm that the bridge is based upon. Piers have been casted at situ in metal formwork

C

104 215

Rehabilitation of the road M4 Banja Luka (Rebrovac)-Čelinac andM4 Čelinac-Kotor Varoš, tender no. EIB/RS-08-01W

6.641.323,02 3.395.654,54 October 2008 - December 2008

Public Company "Republic of Srpska Roads"

+387 51 309 129

The Project includes reconstruction of the trunk road M-4 in the length of 32,2 km. The works include asphalt scraping to the level of blanket course, excavation and replacement of the poor-quality blanket course, works on rehabilitation of the asphalt overlay, repair and cleaning of the drainage system, supply and installation of traffic signalization. Works on this project are executed without total stoppage of traffic

C

103 214 Reconstruction of roads in Trešnjevo, Andrijevica Municipality 114.508,56 58.547,30 September 2008

- October 2008Fondation CARITAS Luxembourg,

Berane OfficeReconstruction of roads in Trešnjevo local community, in the lenght of 2 km. The works include (pavement) asphalt scraping and construction of new BNS layer.

JV Konstruktor - Integral

102 213 Reconstruction of the road M2 Mioska-Kolašin 21.453.471,88 10.968.986,72 Sept 2007/

Oct 2008Road Directorate Republic of

Montenegro +38281244662

Reconstruction of 6km long road including construction of 1 km long additional lane for slow traffic; reconstruction of the tunnel, underground excavation, protection of rocks by SN anchors, protection by grouting with CC 30, new linings, new impregnation, new portal of total length of approximately 1.000,00 m; stabilization of 5 slopes - 30 and 50 m high

C

101 209Execution of works on highway E661, section Gradiška - Banja Luka, section Banja Luka Airport - Glamočani

109.995.198,57 56.239.652,00September 2004

- September 2009

Public Company "Republic of Srpska Roads"

+387 51 334 500

Construction of section of Gradiška – Banja Luka motorway in the toatl length of 5700 m with four traffic lanes, 3.75 m wide, two stopping lanes, 2.50 m wide, two marginal strips along verge 0.50 m wide, two marginal strips along central reserve, 0.20 m wide, two shoulders, 1.50 m wide, central reserve of app. width of 4.00 m between lanes.Beside the construction of the whole highway profile, the project included:Bridge veza 5: the structure constructivelly, rigid RC carcass with three spans and surfacing, two bridges of the total length of L=9+12+9m= 30 m;Bridge veza 4: constructivelly, rigid RC carcass with three spans and surfacing, two bridges of the total length of L=9+12+9m= 30 m;Bridge veza 3: overpass L=2x25=50 m, continuous plate with T-section;Viaduct veza 2: two viaducts of the total length of L=7x35=245 m m, precast prestressed main girders;Bridge veza 1: two bridges of the total length of L=10 m, constructive solution is precast plate made of two types of prestressed elements and elements of which work in-situ.Construction of 4 tunnels of the total length of 1673 m (391+389+477+416) with complete lightning and ventilation installation. The tunnels are constructed with the new Austrian method of constructing (NATM). The area of the tunnel profile is 55 m2. The works on construction of tunnels meant the underground and wide excavation (open cut). Protection of slopes is done by placing of SN anchors and reinforcement on the outlets and inlets from the tunnel and placing of SN and IBO anchors, reinforcement and centres in the other part of the tunnel. After the placing of anchors, mesh and centres, the protection of sprayed concrete MB 30, the waterproofing layer and construction of secondary concrete tunnel lining. Construction of service communications of the total length of 2700 m. Construction of motorway drainage system with PP pipes, DN 250-500, the total length of 7330 m, installation of system for atmpsheric water treatment - 15 pieces of separators.

C

100 207 Construction of the rotary intersection near "Energomont" building 892.030,08 456.087,33 July - September

2008Public Company

"Republic of Srpska Roads"+387 51 334 500

Construction of rotary intersection at the west transit road in Banja Luka. Besides works on construction of the communication, the project also includes works on cable sewage, street-lights and rainfall sewage. The works on construction of pavement structure included the removal of the existing layers of pavement structure, excavation of material, construction of embankment till the designed level, construction of upper bearing layer of crushed stones, construction of BNS bearing layer and wearing asphalt concrete layer. The project has been completed without complete road closure.

C

2

Page 3: ROADS & MOTORWAYSintegralinzenjering.com/projekti/putevi_i_autoputevi_(EN...Koridori Srbije, d.o.o. (Serbia Corridors) Beograd, Kralja Petra 21 11000 Beograd +381 11 33 44 174 Construction

99 206 Construction of south bypass around TrebinjeTrebinje 819.923,36 419.220,16

November 2007 - September

2008

Public Company "Republic of Srpska Roads"

+387 51 334 500

The project included: construction of complete section of urban road in total length of 1,4 km. The works included: works on excavations and embankments construction, protection of embankment slopes, construction of roadbase and bitumenous layer BNS and asphalt concrete layer; installation of traffic signalization. Beside these works, the project included: excavation of bridge foundations, concrete works on abutment and middle bridge piers, coupling beams of bridge structure, span and road structure and placing of bridge lighting.The span structure of bridge is constructed in the matal formwork in-situ.

C

98 205 Rehabilitation of the road M-14, section Otoka - Novi Grad 2.002.724,79 1.023.976,93 April - June 2008

Public Company "Republic of Srpska Roads"

+387 51 334 500

The Project includes reconstruction of the main road M-14, section Otoka - Novi Grad in total length app. 17,7 km. The works include asphalt scraping to the level of blanket course, excavation and replacement of the poor-quality blanket course, works on rehabilitation of the asphalt overlay, repair and cleaning of the drainage system, supply and installation of traffic signalization. Works on this project are executed without total stoppage of traffic.

C

97 204Asphalting of local macadam road in the settlement Vukosavci - Ćatinovača,Municipality of Lopare

130.000,00 66.468,00 October 2007-November 2007.

Municipality of Lopare, Local community Vukosavci,

065 658 135Execution of earthworks, civil engineering works, installation of enbankment, roadbase, asphalting C

96 203Asphalting of local macadam road in the settlement Kozjak,Municipality of Lopare

96.996,00 49.593,26 October 2007-November 2007

Municipality of Lopare, Local community Vukosavci,

065 658 135Execution of earthworks, civil engineering works, installation of enbankment, roadbase, asphalting C

95 202 Asphalting of streets in Lopare 48.558,40 24.827,40 October 2007-November 2007

Municipality of Lopare, Local community Lopare

065 658 135Execution of earthworks, civil engineering works, installation of enbankment, roadbase, asphalting C

94 201Rehabilitation and reconstruction of roads in Županija PosavskaMunicipalities Odžak, Domaljevac and Orašje

1.579.268,89 807.467,36 October 2007-November 2007

BiH Federation,Ministry of Traffic, Communications,

Trade and Entrepreneurship of Županija Posavska

Construction of sidewalks, access roads, roadbase, asphalting of roads, installation of shoulders, drainage, installation of traffic signalization C

93 200

Reconstruction of city communication Bulevar Cara Dušana with complete infrastructure in the section between streets Krajiških brigada and Kralja Petra I Karađorđevića in Banja Luka

1.023.471,18 523.292,50 October 2007December 2007

Banja Luka City viaConstruction Establishment

Banja Lukatel: 051 225 900 051 225 904

Reconstruction of city communication with total length of approx. 550 m with reconstruction of vertical and horizontal traffic signalization .Infrastructural reconstruction: reconstruction of water system network in total length of 470 m (PEHD DN 225); reconstruction of street lights; construction of energy and PTT pipelines (PVC DN 110).

C

92 199 Rehabilitation of the existing streets in the Local Community Pešca, Municipality Berane 111.437,36 56.977,02 September-

November 2007

"Fondation CARITAS Luxembourg", office in Berane Office of CARITAS in

Berane

Construction and other works, mechanical asphalt cutting, manual removal of existing asphalt, edge preparation and transport of debris to the disposal site, provision of materials and asphalt creation, kerbs and channels creation

C

91 198Construction of pipe culverts and embankments at local road for Lake Hrid in the length of 2.5 km, Plav Municipality

58.947,15 30.139,20 August 2007-September 2007

Government of Montenegro Directorate of Public Works

PodgoricaNovaka Miloševa 18

+ 382 20 230 207

Construction of embankment out of material from local borrow pit, thickness 20 cm.Construction of prefabricated or semi-prefabricated culverts with ends, total construction, DN 600 mm

C

90 197Rehabilitation of asphalt road surface damages (pot holes) on streets in Plav and Gusinje

56.141,38 28.704,63 July-August 2007

Municipality Plav; Directorate for space designing and investments, Čaršijska

b.b., Plav

Rehabilitation of asphalt road surface damages (pot holes) on streets; mechanical asphalt cutting, manual removal of existing asphalt, edge preparation and transport of debris to the disposal site, provision of materials and asphalt Asphalt-concrete-11 creation for levelling holes 5 cm average depth, with emulsion spraying and compaction by rolling. Total lenght of the rehabilitated road is 12 km.

C

89 196Works on rehabilitation and asphalt laying on the existing town streets and local roads in the territory of Municipality Berane

988.831,62 505.581,58 May 2007 -December 2007

Agency for Construction and Development of Berane

Earthworks (planning earth lanes, rolling and compaction, excavation and spreading on the existing road section), concrete works, works on pavement structure (mechanical removal of wearing coarse, mechanic asphalt cutting, construction of upper bering layer out of crushed stones, construction of BNS levelling coarse and wearing coarse out of asphalt concrete 11. Total lenght of the road section is 15 km.

C

88 195Modernization (aphalt work) of road infrastructure on the territory of Municipality Andrijevica

999.676,19 511.126,32 June 2007 -September 2007 Municipality Andrijevica

The project encompassed preliminary and earth works, as well as works on pavement construction (roadbase, BNS and asphalt-concrete layer), installation of horizontal and vertical signalisation on the following sections of traffic network) 1. Andrijevica -Seoce, 4.50km long; 2. Trepča 2.00km long; 3. Trešnjevo 1.00 km long; 4. Kralje - Oblo Brdo 1.00 km long; 5.Konjuhe - Jošanica 3.20 km long, according to adopted offer No. 1858 dated June 4, 2007.

JV GP Put Sarajevo, Asfaltgradnja Visoko, Integral inženjering, BBM Amfibolit

87 194Construction of motorway Zenica - Sarajevo, section Kakanj - Visoko, subsection II: Dobrinje - Visoko, in length 7.6 km,LOT A1 section works

30.983.704,13 15.841.716,37 February - November 2007

Federation of Bosnia and Herzegovina, FBiH Road Directorate,Tel: +387 33 563 468

Construction of new motorway lane, reconstruction and expansion of the existing motorway lane to solid profile. Section is 7.6 km long. Profile of one lane of the motorway is two traffic lanes (driving and overtaking lanes 3.75 m wide), stopping lane 2.5 m wide, marginal strip 0.50 m wide. Verge is 4.00 m wide. Within the project, there are three concrete retaining “L” walls, 350 m long, and three concrete gravity retaining walls 280 m long. Construction of atmospheric sewage with PEHD corrugated pipes SN 8, DN 315-630, 7000 m long in total, construction of drainage system of the road with PEHD perforated corrugated pipes SN8, DN 315-500, 6150 m long in total.Pavement structure consist of BNS22A layer (6-7cm thick) wearing coarse; SMA 16 (5cm) and asphalt-concrete 16s layer (5cm)

C

86 189 Reconstruction of regional road R-10, Slijepač Most - Tomaševo 3.047.357,60 1.558.089,20 May -

December 2007

Government of Montenegro; Traffic Directorate, Novaka Miloševa St, 18,

PodgoricaTel: +381 81 230 133

The project included: execution of preliminary and earth works, works on construction of new and rehabilitation of existing culverts, construction of new retaining walls, works on construction of road base (roadbase made of crushed stone aggregate, bitumenous layer BNS and asphalt concrete layer), placing of vertical and horizontal signalization and installation of guard-rails.The total length of reconstructed road is 5 km.

C

85 188

Construction of streets in Rožaje - "Jaha Kurtagića" Street, "Novopazarska" Street and reconstruction of "Hivzije Ćatovića" Street in Rožaje

1.886.571,09 964.588,48 April -October 2007

Municipality of RožajeAddress: M. Tita bb

Phone: +381 69 620 186

The project included: execution of earth works, civil engineering and craftsman works, works on construction of road base (roadbase made of crushed stone aggregate, bitumenous layer BNS and asphalt concrete layer), placing of vertical and horizontal signalization, public lighting (electriacal installations). The total length of constructed and reconstructed street is 3 km.

C

84 186 Rehabilitation of Dobrinja - Bogatići Road (M 18) 1.711.453,32 875.052,19

September 2006 - November

2006

Public Company "Republic of Srpska Roads"

+387 51 334 500

The proiject of Rehabilitation of Dobrinja - Bogatići Road included: route cleaning, removing of topsoil, road bed-bulk excavation, excavation, construction of embankment, road darinage. Works on superstructure included: filling of alligator cracks by liquid bitumen mass and mixture of bitumen and filler, milling of asphalt and placement of bitumenous layer and layer of asphalt concrete, placing of horizontal and vertical signalization, installation of guard-rail on the section of app. 20 km.

C

83 183

Construction of the access road to new bridges and belonging structures, and crossroads (connection) to the existing roads in Modriča and Vukosavlje over the Bosna River, on the new route M17-1

1.556.310,42 795.728,88 January 2005 - December 2006

Public Company "Republic of Srpska Roads"

+387 51 334 500

Construction of the access road to the new bridge in Modriča.The project included the works on construction of complete section of the main road in the toatl length of 1,8 km with the construction of junction on the existing crossroads and the construction of new junction. The works included the earth works: excavation, construction of embankment and drainage; works on construction of superstructure: construction of roadbase made of crushed stone aggregate, construction of bearing layer BNS d=8cm and asphalt-concrete d=5cm; construction of vertical and horizontal signalization and illumination of the access to the underpass and placing of guard-rail.On the crossing on the new road acrosss the stream Jakešnica is constructed the RC bridge, span l=11m, which is executed monolithly in-situ.

C

82 182

Construction of the access road to new bridges and belonging structures, and crossroads (connection) to the existing roads in Doboj over the Bosna River, on the new route M4-3

1.925.296,66 984.388,55 October 2004 - December 2006

Public Company "Republic of Srpska Roads"

+387 51 334 500

Construction of the access road to the new bridge in Doboj.The project included the works on construction of complete section of the main road in the total length of 2,4 km with the construction of junction on the existing crossroads and the construction of new junction. The works included the earth works: excavation, construction of embankment and drainage; works on construction of superstructure: construction of roadbase made of crushed stone aggregate, construction of bearing layer BNS d=8cm and asphalt-concrete d=5cm; construction of vertical and horizontal signalization and illumination of the access to the underpass and placing of guard-rail.The project also included the construction of undrepass below the railway, span l=14m, made of pre-stressed RC girders, funded on piles.

S

81 176 Improvement of local roads in the area of Banja Luka 2.783.450,50 1.423.155,64

December 2003 -

July 2006City of Banja Luka

051/216 688

Route cleaning, removing of topsoil, road bed-bulk excavation, construction of embankment, embankment facing and shoulders, road structures and superstructure out of asphalt mass, horizontal and vertical signalization, installation of guard-rail.

C

80 171Rehabilitation of Novi Grad - Prijedor RoadContract: RS-WB/04-6W, Subcontractor's Contract: 1251/04 dtd 14/09/2004

1.545.139,41 790.017,24September 2004

- November 2005

Asfaltgradnja d.d. VisokoTel: +387.32.740.126

Earth works, construction of the carriageway, patching, overlaying, construction of gullies, traffic marking and road equipment C

79 170

Reconstruction, modernization and construction of the primary route M-8 Foča/Srbinje - Pljevlja, section Foča/Srbinje - Duhovna Akademija from km 22+576,64 - 24+726,64 in the length l=2,15km

1.812.473,11 926.702,78September 2004

- November 2005

Public Company "Republic of Srpska Roads"

+387 51 334 500Reconstruction and widening in the length of 2,15km, including excavation, construction of embankments, road drainage, retainment walls, carriageway and road signallization C

78 169Reconstruction of Banja Luka West Transit Road (EIB/RS-15)RS, B&H

2.680.315,72 1.370.423,67 August 2005 - November 2005

Public Company "Republic of Srpska Roads"

+387 51 334 500

Road reconstruction works, construction of second traffic lane with pedestrian pathway and service facilities. The Works include: regulation of Postranac creek, construction of water and sewerage pipeline, as well as main sewer, electro-energetic and telecommunication sewage, vertical, horizontal and traffic signalization, public lighting and landscaping.

S

77 166 Rehabilitation of Trnovo - Dobro Polje Road, Contract EIB/RS-09 2.820.837,35 1.442.271,24 April - August

2005

Public Company "Republic of Srpska Roads"

+387 51 334 500Construction of road bed and superstructure of AB 16, upgrading of the wearing course, filling cracks, eliminating ruts and patching potholes; placement of new kerbs; traffic signalization and equipment C

76 163Rehabilitation of Doboj - Petrovo RoadContract: RS-WB/04-7W, Subcontractor's Contract: 1250/04 dtd 14/09/2004

1.748.269,35 893.875,92 September 2004 - July 2005

Asfaltgradnja d.d. VisokoTel: +387.32.740.126

Earth works, construction of the carriageway, patching, overlaying, construction of gutters, traffic marking and road equipment C

75 161

Main road M2, Podgorica - KolašinSection Bogutovski potok: reconstruction of road and tunnel No:13 with galleriesSection Subadanj: reconstruction of road

2.210.767,86 1.130.347,66 September 2003 - May 2005

Government of MontenegroMinistry of Maritime Affairs and Transport

Tel: +381 81 230 133

Earth works, structures, road superstructure, traffic signalization and road equipment, reinforcing works, reconstruction of the tunnel No:13, galleries C

74 153 Installation of the rock fall prevention structure on the road M-16, Jajce -B.Luka; 707.546,50 361.762,78 August -

September 2004Asfaltgradnja dd Visoko

032.740.126Reconstruction of slopes on the road by containment net, anchors and sprayed concrete. Slope decreasing with slope digging and wedging. Construction of protective gabions. C

73 152 Section Construction of East Trunk Road, Section on km 0+000 to 0+177.60, Annex 413.810,22 211.577,81 August -

September 2004

Ministry of Transport and Communications of RS,Road directorate of RS

Banja LukaTel. 051 309 128

Construction of city communication of four lane (2+2) cariage drive, total length 177.60m. C

72 150Improvement of Road Conditions on Main Road M-14.1 S. Brod-Derventa (MSR New Jersey) Sijekovac - SFOR/46A-2002

927.383,07 474.163,43 June - August 2004

Public Company "Republic of Srpska Roads"

+387 51 334 500

Excavation and construction of embankments out of natural gravel, construction of mechanically stabilized bearing structure, construction of upper bearing structure (BNS), as well as asphalt wearing course. Soiling and vegetative protection of the slopes.

C

71 149 Rehabilitation of the road section Lapišnica - Podromanija - Vardište 7.199.933,31 3.681.267,45 October 2003-

September 2004

Ministry of Transport and Communications of RS

PID TransportPublic Company

"Republic of Srpska Roads"+387 51 334 500

Reconstruction works on ditches, gutters, berms, cleaning of culverts and drainages, reconstruction of potholes, ruts, longitudinal and transversal cracks, gabions, pavement reconstruction, reconstruction of shoulders, placing of new guard rail, guard posts, containment nets, and traffic signalization

C

70 145Installation of rock fall prevention structures on the road Gornji Vakuf-Prozor-Jablanica (Gračanica)

206.648,23 105.657,56 April-June 2004

TACOSarajevo

SFOR+387 33 495 723

Reconstruction of slopes on the road by containment net, anchors and sprayed concrete. Slope decreasing with slope digging and wedging. Construction of protective gabions. C

3

Page 4: ROADS & MOTORWAYSintegralinzenjering.com/projekti/putevi_i_autoputevi_(EN...Koridori Srbije, d.o.o. (Serbia Corridors) Beograd, Kralja Petra 21 11000 Beograd +381 11 33 44 174 Construction

69 144 Installation of rock fall prevention structures on the road Gornji Vakuf-Makljen-Prozor 127.632,87 65.257,65 April-June 2004

TACOSarajevo

SFOR+387 33 495 723

Reconstruction of slopes on the road by containment net, anchors and sprayed concrete. Slope decreasing with slope digging and wedging. Construction of protective gabions. C

68 143 Rehabilitation of the road section Šešlije - Doboj Contract No. EIB/RS/07 3.100.000,33 1.585.005,00 October 2003-

May 2004

Ministry of Transport and Communications of RS

PID TransportPublic Company

"Republic of Srpska Roads"+387 51 334 500

Reconstruction works on ditches, gutters, berms, cleaning of culverts and drainages, reconstruction of potholes, ruts, longitudinal and transversal cracks, pavement reconstruction, reconstruction of shoulders, placing of new guard rail, guard posts, and traffic signalization

C

67 142Installation of Road Safety Structures (Guardrails) SA-03-C-1069, NJ 03 09 B, Doboj - Šićki Brod

119.967,10 61.338,20 March -April 2004

SFOR / TACO + 387 35 254 170 Replacement of old and installing of new guardrails, as well as metal supports JV "Tuzlaputevi -

Integral"

66 140

Reconstruction, construction and modernization of the road R-476 A Šnjegotina – Klupe, road section from km 2+979,98 to km 4+578,61, in length l =1.598,63 m, Contract No. 03-345-1742/02RS, Bosnia and Herzegovina

725.724,90 371.057,25 May 2002 - September 2003

Ministry of Transport and Communications of RS,Road Directorate of RS

Banja LukaPublic Company

"Republic of Srpska Roads"+387 51 334 500

Cleaning of the route, removal of topsoil, road bed – wide excavation, excavation for stairs and ditches, construction of embankment, embankment facing and shoulder, structures and superstructure are made of asphalt, traffic signalization and placing of guard rail

S

65 139Rehabilitation of M-18 Šićki Brod - Krivajevići, Contract No. BA/RMSP/FBHRD/ICB/13/W/03/IN

2.794.256,96 1.428.680,90September 2003

- December 2003

FBH Road Directorate2 Put života, krilo A/III

71000 SarajevoCleaning and routine maintenance of drainage; patching of asphalt constructions; overlaying of asphalt-concrete course; reconstruction of existing road; horizontal road markings; supported signs. C

64 132 Road reconstruction Kozarac - Trnopolje, Contract No. 739387-30281 886.228,80 453.121,59 April 2003-

August 2003PARSONS DELAWARE INC.

035/253 161

Road reconstruction, in length 5400 m. Removal of old asphalt layer, culvert construction and construction of access roads. Channel cleaning, construction of base layer, asphalt placing. Placing of vertical and horizontal road signalization.

C

63 128

Construction of reinforced concrete wall km 119+200 to 119+230 in order to secure earth roadway Dobrinj-Banja Luka-Doboj-Zvornik from undercutting

68.900,00 35.228,01 April 2003 -June 2003

Republic of Srpska RailwaysDoboj

053 / 223 - 012

Watercourse regulation, mechanical excavations, making of drainage layer behind retaining wall, concreting of reinforced concrete retaining wall, preparation of design documentation C

62 127Construction of Marija Dimić Street (Petrićevački put) in Banja Luka, Contract No.05-370-2822/02

852.955,75 436.109,35 October 2002 - 2003 City of Banja Luka

Tel. 051 216 688

Reconstruction of communication, execution of earth works, RC works, works on construction of new atmospheric sewage system with appropriate infrastructure, execution of works on establishing of communication and placing traffic equipment

C

61 125 Access communications to Primary school " Zlatica " Podgorica 243.650,53 124.576,54 February 2003 -

Maj 2003

Europen Agency for Reconstruction, Podgorica

Tel. 081 231 741Construction of communications with accompanying infrastructure.Primarily electrical cables are to be laid illumination, horizontal and vertical signalization C

60 123Construction of communication with related infrastructure - Stevana Markovića Street, Banja Luka

101.793,60 52.046,24 January - May 2003

City of Banja LukaDragoljub Davidović

Tel. 051 216 688

Staking of route, cleaning of terrain, construction of whole communication, construction of water supply, precipitation and foul drainage, installation of street lighting and distribution of power supply network for street lighting

C

59 122

Reconstruction and construction of the part of Njegoševa Street, as well as construction of atmospheric and foul water sewage in Banja Luka, Contract No. 05-370-2447/02

960.449,91 491.070,24 August 2002 - December 2002 City of Banja Luka

Tel. 051 216 688

Route cleaning, removal of the humus layer, road bed-wide excavation, excavations for stairs and excavation of ditches, construction of embankment, embankment facing and shoulder, structure and superstructure will be made of asphalt, traffic signalisation and placing of guard rails, construction of atmospheric and foul water sewage

C

58 120 Rehabilitation of landslide Stupari (near Tuzla) by retaining wall construction 124.321,36 63.564,50 Octobar 2002 -

January 2003

SFORSarajevo Office

Tel. 033 495 000

Earth excavation and terrain drainage by concrete walls, making of shoulder drainage channels, making a roadbase, asphalt road surface and structures, concreting of foundations and walls, construction of stone lining, replacement of surfacing and guard rail

C

57 117Construction of the forest truck road Šipašno-Zlatac (Forest reserve "Botin",Nevesinje),RS, Bosnia & Herzegovina

401.289,06 205.175,84 May 2002 - November 2002

Forestry Project Implementation Unit (PIU)

Tel. 055 220 940

Cleaning of the route, removal of topsoil, road bed-wide excavation for stairs and ditches, construction of embankment, embankment facing and shoulder, structures and superstructure are made of broken stone, traffic signalisation

C

56 116Construction of the forest truck road Livade-Bač (Forest reserve "Maglić",Srbinje),RS, Bosnia & Herzegovina

350.120,44 179.013,74 May 2002 - November 2002

Forestry Project Implementation Unit (PIU)

Tel. 055 220 940

Cleaning of the route, removal of topsoil, road bed-wide excavation for stairs and ditches, construction of embankment, embankment facing and shoulder, structures and superstructure are made of broken stone, traffic signalisation

S

55 115 Upgrading of Road Safety Equipment in Southern Montenegro 3.207.123,33 1.639.776,12 April 2002 -

May 2003European Agency for Reconstruction

Tel. + 381 81 406 600Repair of asphalt layer on four sections of the road, placing of the horizontal and vertical signalization, construction of new guardrail on seven sections of the road

JV Integral, Put E.Sarajevo and Primorje

54 113 Bratunac - Hrnčići Road Reconstruction 187.923,10 96.083,56 May 2002 - October 2002

PARSONS DELAWARE INC.Sarajevo Office

Tel. 033 220 948Making of the Main/construction Design, cleaning of the route, machine removal of topsoil, construction of sub-base of the road with necessary compacting, construction of the road base and road fittings C

53 111

Project of Reconstruction Pavement rehabilitation of the road KULA - ROŽAJE RK 1 and RK2Montenegro

2.943.804,91 1.505.143,55 August 2001 - October 2002

Government of Montenegro,Ministry of Maritame Trade and Transport

Tel. + 381 81 230 133

Removal of the existing bituminous layers, construction of new roadway, drainage works and placing of traffic sign work C

52 110Reconstruction and rehabilitation of the part of Milana Radmana Street and extension of the Drage Vasića Street in Banja Luka

260.848,45 133.369,69 August2002-May 2003

City of Banja LukaTel. 051 216 688

Reconstruction of the communication, execution of earth works, RC works, works on construction of new atmospheric water intellation, with appropriate infrastructure, execution of works on communication construction and placing of traffic equipment

C

51 106Reconstruction, rehabilitation and modernization of the road R-429 Trebinje - Herceg Novi, section Tuli - Grab RS, Bosnia & Herzegovina

2.956.510,83 1.511.639,98September 2001

- September 2002

Ministry of Transport and Communications of RS,Road Directorate of RS

Banja LukaPublic Company

"Republic of Srpska Roads".+387 51 334 500

Reconstruction, rehabilitation and modernization of the regional road section, lenght 7.120,31 m C

50 103 Temporary roads for the Western main road in Banja Luka (P-12 to P-18 i P-20 to P-34) 213.254,20 109.035,14

December 2001 -

July 2002

Ministry of Transport and Communications of RS,Road Directorate of RS

Banja LukaPublic Company

"Republic of Srpska Roads"+387 51 334 500

Preparatory works, machine excavation of the soil, panning of road bed, construction of road base, new layers of the roadway, drainage works and construction of vertical and horizontal signalisation C

49 102 Temporary roads for the Western main road in Banja Luka (P-12 to P-18 i P-20 to P-34) 197.002,01 100.725,53

December 2001 -

July 2002

Ministry of Transport and Communications of RS,Road Directorate of RS

Banja LukaPublic Company

"Republic of Srpska Roads"+387 51 334 500

Works on the construction of the temporary roads, rain-water drainage and retaining wall C

48 92Supply and installation of guardrails on the main road M 17,section Doboj - Bos.BrodBosnia & Herzegovina

43.336,24 22.157,47 May - June2002

SFORSarajevo Office

Tel. 033 495 000Supply and installation of traffic safety equipment that consists of guardrail sements-panels normal, long, short, steel poles made of I profiles and catadiopters C

47 91

Landscaping of bussines premises at crossroads of Njegoševa Street - Kupreška Street in Banja LukaBosnia & Herzegovina

33.047,39 16.896,86 March - June2002

" Maxmara " Banja LukaTel. 051 358 940

Works on landscaping consist of excavation and construction of road bed for the new roadway surfaces, construction of roadbase, placing of asphalt, construction of precipitation and atmospheric drainage C

46 90Construction of the retaining wall on the road M-15, BaraćiBosnia & Herzegovina

51.969,75 26.571,71 March - May2002

SFORSarajevo Office

Tel. 033 495 000Chase cutting of the damages on the existing retaining wall, cleaning of the weakened parts of the wall, construction of the concrete counterforts, placing of the safety fence of the new RC slab C

45 83 Reconstruction of the section of Kralja Alfonsa XIII Street 66.118,10 33.805,65

October - December

2001

City of Banja Luka viaConstruction Establishment

Banja Luka.Tel. 051 216 662

Stripping of the existing pavement and the construction of the new one, in the lenght of 120 m C

44 76Road Rehabilitation and Reparation Banja Luka - TeslićSection Maslovare - Hrastova KosaBosnia & Herzegovina

1.443.980,97 738.295,75 January 2001 - September 2001

Ministry of Transport and Communications of RS,Road Directorate of RS

Banja LukaPublic Company

"Republic of Srpska Roads"+387 51 334 500

Ground levelling, horizontal and vertical signalisation, channel making C

43 75Road Construction Banja Luka - TeslićSection Hrastova Kosa - village Bebe, Bosnia & Herzegovina

9.849.670,80 5.036.056,71 October 2000 - September 2001

PID Transport of RS Banja LukaPublic Company

"Republic of Srpska Roads"+387 51 334 500

Construction of new road, soil repair, system of drainage of surface and riparian water and slope landscaping. C

42 74Construction, econstruction and modernization of the Eastern Motorway, Banja Luka

2.071.361,77 1.059.070,46November 2000

- September 2001

Ministry of Transport and Communications of RS,Road directorate of RS

Banja LukaTel. 051 309 128

Construction of another road surface lane with associate junctions, bicycle and pedestrian paths, lighting and horizontal and vertical signalisation C

41 67 Derventa - Klašnice RoadBosnia & Herzegovina

35.214,00 18.004,63 March2001

SFORTel. 033 495 000 Installation of the containment nets, road barriers and road marking C

40 66Reconstruction of local roadOmarska - Marićka Bosnia & Herzegovina

310.620,00 158.817,48 December2000

ODP "PRIJEDORPUTEVI"Prijedor

Tel. 052 233 117Construction of base layer, cleaning of structures, development of opened channels C

39 65Reconstruction of local road Bistrica - Lamovita VrijesakBosnia & Herzegovina

333.420,00 170.474,94June -

September2000

ODP "PRIJEDORPUTEVI"Prijedor

Tel. 052 233 117Construction of base layer, cleaning of structures, development of opened channels C

38 64Reconstruction of local road M-4Srednja LamovitaBosnia & Herzegovina

383.980,00 196.325,86September - December

2000

ODP "PRIJEDORPUTEVI"Prijedor

Tel. 052 233 117Construction of base layer, cleaning of structures, development of opened channels C

37 63Reconstruction of local roadDubovik - Novi Grad Bosnia & Herzegovina

225.063,00 115.072,88October - November

2000

ODP "PRIJEDORPUTEVI"Prijedor

Tel. 052 233 117Construction of base layer, cleaning of structures, development of opened channels C

36 62Road reconstructionK.Dubica - Prijedor Bosnia & Herzegovina

636.300,00 325.335,02September - December

2000

ODP "PRIJEDORPUTEVI"Prijedor

Tel. 052 233 117

Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of steel nets to the asphalt structure

C

4

Page 5: ROADS & MOTORWAYSintegralinzenjering.com/projekti/putevi_i_autoputevi_(EN...Koridori Srbije, d.o.o. (Serbia Corridors) Beograd, Kralja Petra 21 11000 Beograd +381 11 33 44 174 Construction

35 61Rehabilitation of road surface on road B.Luka - KlašniceBosnia & Herzegovina

408.211,00 208.714,97September - November

2000

Road Directorate of RSBanja Luka

Public Company "Republic of Srpska Roads"

+387 51 334 500

Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of steel nets to the asphalt structure

C

34 60 Construction of road Kotor Varoš - TeslićBosnia & Herzegovina 143.196,67 73.215,29

November - December

2000

Road Directorate of RSBanja Luka

Public Company "Republic of Srpska Roads"

+387 51 334 500

New route cutting, construction of bed, carrying layer and asphalt structure with road structures (culverts, opened channels, etc) C

33 59Rehabilitation of road surface on road M 16 Banja Luka - JajceBosnia & Herzegovina

150.016,68 76.702,31October - December

2000

Road Directorate of RSBanja Luka

Public Company "Republic of Srpska Roads".

+387 51 334 500

Scraping of delevelled surfaces, cutting and patching of pot holes, construction of asphalt structure C

32 58Rehabilitation of road surface on road M 19 Šepak - VlasenicaBosnia & Herzegovina

101.043,72 51.662,83November - December

2000

Road Directorate of RSBanja Luka

Public Company "Republic of Srpska Roads"

+387 51 334 500

Scraping of delevelled surfaces, cutting and patching of pot holes, construction of asphalt structure C

31 56Lighting and traffic lighting works on the road M16Bosnia & Herzegovina

1.733.647,40 886.399,84September - December

2000

Road Directorate of RSBanja Luka

Public Company "Republic of Srpska Roads"

+387 51 334 500

Installation of galvanized chandeillier, height of 10 m, installation of lighting signalisation at portals and consoles C

30 53 Reconstruction of the road Tjentište - Gacko Bosnia & Herzegovina 3.620.152,00 1.850.954,33

September - November

2000

PID Transport of RS Banja LukaPublic Company

"Republic of Srpska Roads"+387 51 334 500

Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new asphalt surface,horizontal and vertical signalisation, cleaning of structures C

29 52Rehabilitation of road surface on road Banja Luka - Klašnice and SratinskaBosnia & Herzegovina

933.670,52 477.378,16October - November

2000

Road Directorate of RSBanja Luka

Public Company "Republic of Srpska Roads"

+387 51 334 500

Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of steel nets to the asphalt structure. Construction of base layer, cleaning of structures, development of opened channels

C

28 51Rehabilitation of the pavement on the road M 16 Banja Luka - Klašnice, section 380+450-40+080Bosnia & Herzegovina

408.211,00 208.714,97September -

October2000

Ministry of Transport and Communications of RS,Road Directorate of RS

Banja LukaTel. 051 309 128

Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of steel nets to the asphalt structure

C

27 50Rehabilitation of the road M16, Banja Luka - Jajce, km 26-27Bosnia & Herzegovina

649.935,90 332.306,95October - November

2000

Republička Direkcija za puteveBanja Luka

Tel. 051 309 128Repair of landslide, construction of pavement structure and culverts, installation of drainage and their dewatering, horizontal and vertical signalisation C

26 49Rehabilitation of the landslide at the road M19, Šepak - Vlasenica km 43 - 44Bosnia & Herzegovina

466.641,92 238.590,23September - November

2000

Road directorate of RSBanja Luka

Tel. 051 309 128Repair of landslide by counterforts, with cushion beams and retaining wall from the both sides of the landslide,construction of pavement structure and culverts C

25 47Rehabilitation of the Motor Way,Banja Luka - KlašniceBosnia & Herzegovina

1.017.465,03 520.221,61 2000 PID Transport of RS Banja LukaTel. 051 308 172

Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of steel nets to the asphalt structure

C

24 45Rehabilitation of the Motor WayBrod na Drini - Tjentište Bosnia & Herzegovina

506.563,00 259.001,55 May - October2000

PID Transport of RS Banja LukaPublic Company

"Republic of Srpska Roads"+387 51 334 500

Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new asphalt surface,horizontal and vertical signalisation, cleaning of structures and shoulders and development of road area

C

23 44Improvement of traffic safety, SA-00-C-202,TCR PELICANBosnia & Herzegovina

60.627,50 30.998,35 2000 SFORTel. 033 495 000 Installation of safety fences, road barriers and road marking C

22 43Improvement of traffic safety, SA-00-C-202,TCR PELICANBosnia & Herzegovina

67.582,70 34.554,49 March - August2000

SFORTel. 033 495 000 Installation of safety fences, road barriers and road marking C

21 42Improvement of traffic safety, SA-00-C-0204,TCR GULLBosnia & Herzegovina

123.572,00 63.181,36 March - August2000

SFORTel. 033 495 000 Installation of safety fences, road barriers and road marking C

20 41Improvement of traffic safety, SA-00-C-1617,TCR BLUEBIRDBosnia & Herzegovina

17.372,00 8.882,16 July 2000 SFORTel. 033 495 000 Installation of safety fences, road barriers and road marking C

19 40Installing of safety fences and containing nets, SA-00-C-203,TCR HORNBLOWERBosnia & Herzegovina

53.112,00 27.155,73 March - August2000

SFORTel. 033 495 00 Installation of safety fences, road barriers and road marking C

18 39

Installing of safety fences and improvement of traffic safety, SA-00-C-1648,TCR HORNBLOWERBosnia & Herzegovina

70.370,00 35.979,61 July - August2000

SFORTel. 011 650 522 Installation of safety fences, road barriers and road marking C

17 36Rehabilitation of the Motor Way,Banja Luka-KlašniceBosnia & Herzegovina

2.193.924,18 1.121.735,62 June 2000

PID Transport of RS Banja LukaPublic Company

"Republic of Srpska Roads"+387 51 334 500

Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of steel nets to the asphalt structure

C

16 33

Reparation of the access road and left river dyke, downstream Hydro Power Plant - BOČACBosnia & Herzegovina

1.247.663,02 637.919,97June -

December2000

ELEKTROPRIVREDA RSH.E. BOČAC

Tel. 051 215 915

Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new asphalt surface,horizontal and vertical signalisation, cleaning of structures, bank protection C

15 32Rehabilitation of the local road at km 26 Goleši, local community BorkovićiBosnia & Herzegovina

17.614,33 9.006,06 April - May2000

Road Directorate of Banja Luka CityTel. 051 309 128

Construction of base layer, cleaning of structures, development of opened channels C

14 29

Installing of the containment nets on the road directions Banja Luka - Jajce - Mrkonjić Grad - GlamočBosnia & Herzegovina

250.000,00 127.822,97 March - May2000

SFOR - RACO, SarajevoTel. 033 495 000 Installation of the containment nets, road barriers and road marking C

13 28Rehabilitation of the langslide at the road M15 Banja Luka - Jajce (GULL)Bosnia & Herzegovina

506.629,00 259.035,29December 1999

- April 2000

Republička Direkcija za puteveRS / SFOR - RACO Sarajevo

Tel. 051 309 128Construction of concrete foundations of retaining wall, replacement of pavement structure C

12 24

Boulevard Cara Dušana, Construction new roadways/extension including construction of new square,arches over the river and four smaller bridges and dislocation of water supply networkBosnia & Herzegovina

3.734.662,75 1.909.502,74

September - December

1999/ September -

December 2006

Banja Luka City, Fund for construction land planning and Road Directorate of

RS Banja Luka

Tel. 051 308 172

Concrete works at bridges, construction of new pavement structure, construction of new asphalt surface, horizontal and vertical signalization, cleaning of structures, reconstruction of water supply network - pipeline PHDE 100 DN 400, PN 10, L=460 m, construction of sewage system Ø 350 - Ø 1000, concrete and PVC pipes - total length 620 m.

C

11 21 Road Reconstruction / Bijeljina - Banj BrdoBosnia & Herzegovina 4.395.194,00 2.247.227,01

June - December

1999Parsons Delaware / Tuzla

Tel. 035 282 200Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new asphalt surface,horizontal and vertical signalisation, cleaning of structures C

10 20 Road Reconstruction / Novi Grad - K.DubicaBosnia & Herzegovina 1.190.271,25 608.576,03 April - October

1999

PID Transport of RS Banja LukaPublic Company

"Republic of Srpska Roads"+387 51 334 500

Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new asphalt surface,horizontal and vertical signalisation, cleaning of structures C

9 19 Road Reconstruction / Brod on/D - TjentisteBosnia & Herzegovina 2.482.247,98 1.269.153,24 March - July

1999

PID Transport of RS Banja LukaPublic Company

"Republic of Srpska Roads".+387 51 334 500

Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new asphalt surface,horizontal and vertical signalisation, cleaning of structures C

8 14Reconstruction of the bridge/road Modriča - GradačacBosnia & Herzegovina

196.000,00 100.213,21 April - June1999

Parsons Delaware / TuzlaTel. 035 282 200 Scraping of delevelled surfaces, construction of new asphalt surface, horizontal and vertical signalisation C

7 13 Road Reconstruction / Johova - K.DubicaBosnia & Herzegovina 400.000,00 204.516,75 Oktober 1998 -

March 1999

PID Transport of RS Banja LukaPublic Company

"Republic of Srpska Roads"+387 51 334 500

Concrete works on bridges,cutting of pot holes,hole patching,scraping of delevelled surfaces,construction of new asphalt surface,horizontal and vertical signalisation,cleaning of structure C

6 12Bridges and road reparations/ road Derventa - BrodBosnia & Herzegovina

815.823,00 417.123,68September 1998

- April 1999

Parsons Delaware / TuzlaTel. 035 282 200

Concrete works on bridges,cutting of pot holes,hole patching,scraping of delevelled surfaces,construction of new asphalt surface,horizontal and vertical signalisation,cleaning of structure C

5 11 Road reparation / Doboj-Crkvine-ŠamacBosnia & Herzegovina 750.000,00 383.468,91 July - October

1998

PID Transport of RS Banja LukaPublic Company

"Republic of Srpska Roads"+387 51 334 500

Ctting of pot holes,hole patching,scraping of delevelled surfaces,construction of new asphalt surface,horizontal and vertical signalisation C

4 10Construction of the road,bridge and River Dike/Road Kostajnica-K.DubicaBosnia & Herzegovina

337.626,00 172.625,43 July 1998 - May 1999

PID Transport of RS Banja LukaPublic Company

"Republic of Srpska Roads"+387 51 334 500

Embankment construction, pavement structure construction, paving of access places, construction of asphalt structure, concrete works at bridges and road structures C

3 9Construction of the road,bridge and River Dike/Road Kostajnica-K.DubicaBosnia & Herzegovina

318.594,00 162.894,53 July 1998 - May 1999

Parsons Delaware / Banja LukaTel. 035 282 200

Concrete works on bridges,cutting of pot holes,hole patching,scraping of delevelled surfaces,construction of new asphalt surface,horizontal and vertical signalisation,cleaning of structure,river bank protection C

2 6Rehabilitation of the Motor Way,Banja Luka-KlašniceBosnia & Herzegovina

2.709.050,00 1.385.115,27 May - October1998

JEDINSTVO - GradiškaTel. 051 813 297

Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of steel nets to the asphalt structure

1 4Construction of the roads and River Ferry Dock on the Sava river Municipality SrbacBosnia & Herzegovina

560.000,00 286.323,45 April - October1998

World Vision - Banja LukaTel. 051 464 490 Embankment construction, pavement structure construction, paving of access places, construction of

asphalt structure, concrete works at bridges and road structures

5