4
Contact Muhammad Sajid D 11/4 SHEIKH ZAYED HOSPITAL COLONY LAHORE. PEC: Elect/36885 Profile Objective To seek a challenging long – term position in an organization which offers a competitive and challenging environment along with development and growth opportunities, where my knowledge, Skills and abilities could be best utilized. Work Experience Site Engineer ( Mobilink 2G swap Project) May 2015 to till now ZTE (Zhongxing Telecom Pvt Ltd) Pakistan. Expertise in verifying loop testing of media at BSC end. Ericsson and NEC Traffic Shifting execution to handle dependent sites. Swap RAN of ALCATEL and ERICSSON with ZTE solution. Indoor and outdoor alarms verification of Delta and Emerson. Installation and commissioning of ZTE SDR. To visible the site back in ZTE BSC, design DED as per site configuration. Good knowledge of ZXSDR R8863 installation and cascading. To coordinate with field team and give them proper instruction and training about the running project. To make sure that the activity will be closed within the given ECRF with standard quality. Troubleshooting and clearing on site issues. Good knowledge of RBS 6101,6201,6102,6301. Good knowledge of ericsson 2P,CN,6P,20p. BSS & TxN Implementation Engineer(Telenor 2G and 3G Swap Project, RO Project,CM pak 3G,4G swap ) : +92-345-4575446 : +92-345-6704184 : [email protected]

SAJID CV

Embed Size (px)

Citation preview

Page 1: SAJID CV

Contact

Muhammad SajidD 11/4 SHEIKH ZAYED HOSPITAL COLONY LAHORE.

PEC: Elect/36885

ProfileObjective To seek a challenging long – term position in an organization which offers a competitive

and challenging environment along with development and growth opportunities, where my knowledge, Skills and abilities could be best utilized.

Work ExperienceSite Engineer ( Mobilink 2G swap Project)

May 2015 to till now

ZTE (Zhongxing Telecom Pvt Ltd) Pakistan.

Expertise in verifying loop testing of media at BSC end. Ericsson and NEC Traffic Shifting execution to handle dependent sites. Swap RAN of ALCATEL and ERICSSON with ZTE solution. Indoor and outdoor alarms verification of Delta and Emerson. Installation and commissioning of ZTE SDR. To visible the site back in ZTE BSC, design DED as per site configuration. Good knowledge of ZXSDR R8863 installation and cascading. To coordinate with field team and give them proper instruction and training about the running project. To make sure that the activity will be closed within the given ECRF with standard quality. Troubleshooting and clearing on site issues. Good knowledge of RBS 6101,6201,6102,6301. Good knowledge of ericsson 2P,CN,6P,20p.

BSS & TxN Implementation Engineer(Telenor 2G and 3G Swap Project, RO Project,CM pak 3G,4G swap )

Feb 2013 to May 2015

WAJDA International (Pvt.) Ltd.

Expertise in SYNC alarms of Nokia flexi’s BTS with ZXSDR W301 and ZXSDR8700. Installation/enabling of LVLD relays in indoor and outdoor rectifiers(Delta,Eltec,W301) SWAP execution challenges and solutions. Good knowledge about LMT (ZTE SDR software). Good Knowledge about alarm patching of Eltec, Delta, Power one and W301. Installation and comissiong of ZXSDR 8900/8700 & W301.

: +92-345-4575446: +92-345-6704184 : [email protected]

Page 2: SAJID CV

W301 Rectifier software up gradation. Implementation and SWAP of BSS equipment according to site design and network requirement, keeping

in view the Quality standards. Checking VSWR using site master. Implementation of SDR BS8700 (RRU solution), BS8900 (RSU solution) & BS8800. Good knowledge of ZXSDR R8881,R8882 installation and cascading. Good knowledge of Nokia Flexi BTS. Responsible for complete sites documentation for smooth PAC of sites. Implementation of Transmission network with assurance of quality work delivery. Responsible for Installation of Single link, XPIC link, Hot –standby link, Space diversity link. Commissioning of NEC iPASOLINK series. Configure FE ports by using V-LAN & QOS services. Implementation and Configuration of NEC iPASOLINK series for all types of Microwave links. On site ATP of swap Sites & rollout sites, escalation of major issues, proper follow-up of snags. Traffic Shifting execution to handle dependent sites. Responsible for conducting Site PAT and documents processing. Team development by having continuous connection with team. Making assurance of HSSE compliance during activities. Formal meetings with Customer & other field team for the smooth execution of project. Supervising/on-air rollout sites within specified timelines, thus ensuring the quality standard of Telenor. Supervising OSS expansion sites. Troubleshooting and give guidance/solution to teams.

Nov 2012 to Jan 2013

Site Engineer in EES PVT LTD. Working on Huawei BTS. Working on RTN 905,950,980. Link (1+0,1+1). Space diversity link. Xpic link. Using Web LCT software.

Internee Engineer in PTCL Pvt Ltd.

Microwave link installation of Huawei. RRU installation. Cutover and Media shifting. LTE commissioning.

Final Year Project Single phase to three phase converter for driving and controlling three phase induction motor.

Key Skills

Proficient or familiar with a vast array of programming languages, concepts and technologies, including:

MS Word Windows XP ZTE SDR LMT, NEC iPaso,MS Excel

MS Power PointC++

Windows 7CCNA

Huawei BTS 3061E & 3061AE,Nokia Flexi BTS, ZTE swap

training, OSS (3G) training. BIRD and ANRITSU site master

Page 3: SAJID CV
Page 4: SAJID CV

Education

2008 to 2012 BS-Electrical Engineering(Electronics) University of Faisalabad, Faisalabad

2006 to 2008 Intermediate in Pre-Engineering

2004 to 2006 Matriculation in Sciences

Page 5: SAJID CV