Upload
others
View
12
Download
0
Embed Size (px)
Citation preview
7FTD CO Ltd7FTD CO.,Ltd
FOUNDATIONFOUNDATION
PILESPILESPILESPILES
77FTD CO., LtdFTD CO., Ltd
‘Building a foundation ‘Building a foundation forfor Cambodia’Cambodia’
មតកមតក: INDEX: INDEX
1) COMPANY PROFILE 3) CERTIFICATES INTRODUCTION
HUMAN RESOURCES
MANAGEMENT TRANSFER
TECHNOLOGY TRANSFER
PRODUCTION ABILITY
MACHINE & CAPACITY
SOCIAL CERTIFICATE
QUALITY MANAGEMENT
2) FOUNDATION PILES
4) NETWORK & CLIENTS
2) FOUNDATION PILES PRODUCT OVERVIEW
ADVANTAGES (OF 7FTD PILES)
7FTD STANDARD
4/08/2012 Product Presentation –Foundation Piles 2
េសចកតេផតើមេសចកតេផតើម: INTRODUCTION: INTRODUCTIONត តត ត7FTD CO., LTD = expert @រកមហន៧េអហវធឌខអលធឌ
manufacturing electrical poles
manufacturing foundation piles
ឯកេទសកនងករផលតៈបេងគ លេភលើងសសររគះ manufacturing foundation piles
following the European standard.
សសររគះ េគរព មបទ ឋ នអរ ប។
(Drawing view of factory) (View of factory)(Drawing view of factory) (View of factory)
4/08/2012 Product Presentation –Foundation Piles 4
េសចកតេផតើមេសចកតេផតើម: INTRODUCTION: INTRODUCTION
Joint Venture partners:
ត តត ត
p SOKCHOEURN DEVELOPMENT CO., Ltd
FLANDERS CONCRETE NV
THU DUC LONG AN CENTRIFUGAL JOINT STOCK COMPANY( The Signing Ceremony of Joint
V A )Venture Agreement)
Why investing?y gDevelop & improve infrastructure of
Cambodia
Positive outsourcing for foreign investors
A k t illi t d !
4/08/2012 Product Presentation –Foundation Piles 5
A market willing to upgrade!
េសចកតេផតើមេសចកតេផតើម: INTRODUCTION: INTRODUCTION
ធនធនមនសគជគនលះេឆព ះេទកនភពេជគជយ
ត តត ត
ល ពបេងកើនសមតថភពបគគលកកមពជ មរយៈករេផទរចេនះដងែផនករគបរគង ( មែបបអរ ប)
ករេផរចេនះដងែផកផលតកម ( មបទ ន
(Cylinder & Cube Sample)
ករេផទរចេនះដងែផនកផលតកមម ( មបទ ឋ ន
េវៀត ម & អរ ប)ករេផទរចេនះដងែផនករបតបតតរបកបេ យរបសទភព Human resources
= KEY to successl b d ff
របសទធភព
Develop Cambodian staff: Management knowledge transfer =
Europe
Production knowledge transfer = Vietnam & Europe
Optimization knowledge transfer = &Vietnam & Europe(Product controlling)
19/12/2011 Product Presentation – Foundation Piles 6
សមតថភពផលតកមមសមតថភពផលតកមម: : PRODUCTION ABILITYPRODUCTION ABILITYPRODUCTION ABILITYPRODUCTION ABILITY
C bilit t d f d ti ilCapability to produce foundation piles:
The maximum ‘average’ = 170 products/day.
Quality of foundation piles’ production
Requirements according to JIS standards (JIS A5335-1987)
OROR
Requirements according to CLIENT
4/08/2012 Product Presentation –Foundation Piles 7
q g
េរគ ងចរកេរគ ងចរក & & សមតថភពសមតថភពMACHINE & CAPACITYMACHINE & CAPACITYMACHINE & CAPACITYMACHINE & CAPACITY
Batching Plant (1) Mobile crane on rail (1)
Steel cutting & Heading machine(2) Steel cage making machine(1) Steel tension machine (2)
4/08/2012 Product Presentation –Foundation Piles 8
េរគ ងចរកេរគ ងចរក & & សមតថភពសមតថភពMACHINE & CAPACITYMACHINE & CAPACITYMACHINE & CAPACITYMACHINE & CAPACITY
Spinning Systems (6)
Over head crane (7)
4/08/2012 Product Presentation –Foundation Piles 9
Spinning Systems(6)
កររគបរគងគណភពកររគបរគងគណភពQUALITY MANAGEMENTQUALITY MANAGEMENT
“Everything is based “Everything is based on quality in order to on quality in order to q yq ykeep our customers keep our customers
forever”forever”foreverforeverSand Sieving Machine (1)
“Excellent quality is “Excellent quality is q yq your commitment”our commitment”
4/08/2012 Product Presentation –Foundation Piles 10
Gravel Cleaning (1)
កររគបរគងគណភពកររគបរគងគណភព
How to obtain ‘QUALITY’?
QUALITY MANAGEMENTQUALITY MANAGEMENT
How to obtain QUALITY ?
Modern machines and devicesModern machines and devices.
Rigorously checked input materials.
4/08/2012 Product Presentation –Foundation Piles 11
កររគបរគងគណភពកររគបរគងគណភព
High tech laboratory + All necessary
QUALITY MANAGEMENTQUALITY MANAGEMENT
High tech laboratory + All necessary equipment and instruments
Investigating materials and examining product quality.
4/08/2012 Product Presentation –Foundation Piles 12
កររគបរគងគណភពកររគបរគងគណភព
Testing the end-product:ករេធើពេ ធន
QUALITY MANAGEMENTQUALITY MANAGEMENT
g pPut pile on test platformCheck the visual crackTesting variety loading levels
ករេធវពេ ធន
Testing variety loading levels
4/08/2012 Product Presentation –Foundation Piles 13
ពតមនអពផលតផលពតមនអពផលតផលPRODUCT OVERVIEWPRODUCT OVERVIEW
4/08/2012 Product Presentation –Foundation Piles 15
ពតមនអពផលតផលពតមនអពផលតផលPRODUCT OVERVIEWPRODUCT OVERVIEW
4/08/2012 Product Presentation –Foundation Piles 16
គណរបេយជនៈគណរបេយជនៈ ADVANTAGESADVANTAGESគណរបេយជនៈ គណរបេយជនៈ ADVANTAGESADVANTAGES
High loading capacity per pileg oad g capac ty pe p e A wide range of applications Adaptable to ground condition Ease of transportation Rapid construction, high efficiency◦ Driving by hammeringDriving by hammering
◦ Static pressing
◦ Using a bored hole
4/08/2012 Product Presentation –Foundation Piles 17
គណរបេយជនៈគណរបេយជនៈ ADVANTAGESADVANTAGESគណរបេយជនៈ គណរបេយជនៈ ADVANTAGESADVANTAGES
Clean and tidy working environmentC ea a d t dy wo g e v o e t
High strength, good penetration power
Reliable quality
Ease of inspection and testing
Wide range of installation methods
4/08/2012 Product Presentation –Foundation Piles 18
បទ ឋ នរកមហនបទ ឋ នរកមហន៧៧េអហវធឌេអហវធឌ77FTD STANDARDFTD STANDARD
Why use 7FTD-standard?Why use 7FTD standard?
Round prestressed foundation piles (JIS-A5335-1987)
Centrifugal technology makes concrete become solid and firm:
increases concrete resistance against corrosion and erosion from the environment increases concrete resistance against corrosion and erosion from the environment
Products life cycle is longer
Industrial production conditions: Industrial production conditions:
Stable quality
Save on materials: Save on materials:
light structure
R d d i h
4/08/2012 Product Presentation –Foundation Piles 19
Reduced weight
BORED PILESBORED PILES
Can not control 100% of
BORED PILESBORED PILES
មន ចរគបរគងគណភព Can not control 100% of quality
◦ Waisting or necking
រ រ បន១០០%
◦ ងយបក ឬ េរគច◦ Waisting or necking.
◦ Concrete cannot be subsequently inspected
ប ឬ រ◦ មន ចរតតពនតយបន េរកយេពលចកេបតងរច។subsequently inspected.
◦ Water and mud washing out cement
រ
◦ ទកនងភក យចលេបតង េធវើរឲ ថយ គណភពេបតង
out cement.
◦ Can not be formed in cohesionless materials
◦ ភពសអតរ ងេបតង នង សភរៈមនបនលអ។ៃ ៃ ង cohesionless materials.
High price and vast time Low capacity
តៃលៃថល នងច យេពលេរចើន
សមភពទបLow capacity សមថភពទប
4/08/2012 Product Presentation –Foundation Piles 21
SQUARE PILESSQUARE PILES
Can not control 100% of
SQUARE PILESSQUARE PILES
មន ចរគបរគងគណភពCan not control 100% of quality◦ Temperature
រ រ បន១០០%◦ មន ចកនតសតណហ ភពបន◦ Feeding water
High price and vast time
បន◦ មន ចផគតផគងទកបនលអ
តៃលខស នងេរបើេពលេរចើន High price with transportation
L it
តៃលខពស នងេរបេពលេរចន ពបកដកជញជ ន នងមនត
ៃលៃថ Low capacity
Can not produce big di t
ៃលៃថល សមតថភពេខ យ
diamenter
Pile joint connection is poor មន ចផលតមខកតធ តណតភបមនធនបននវ
4/08/2012 Product Presentation –Foundation Piles 22
តណតភជ បមនធនបននវគណ
HH-- PILESPILES
The tendency to bend on the
HH-- PILESPILES
របឈមនងករេកងេពលThe tendency to bend on the weak axis during driving.
របញច ះរគះ
ង ង Little end bearing stress.
L f i i
ក ងរទចងសសរេខ យ
ក ងកកតេខ យ: Low friction: ◦ Lower resistance.
◦ Need to be driven to a dense
ក ងកកតេខ យ: ◦ ភពធនសសរមនរគបរគន◦ រតវករបញជ នដលរសទបNeed to be driven to a dense
sand or resistant layers.រ ជ ររង
4/08/2012 Product Presentation –Foundation Piles 23
TRANSFERING FROM TRANSFERING FROM FLANDERS FLANDERS CO C CCO C C O GO GCONCRETE & THU DUCCONCRETE & THU DUC--LONG ANLONG AN
4/08/2012 Product Presentation –Foundation Piles 25
Management Transfer – Flanders Concrete NV Technology Transfer – THU DUC LONG AN
SOCIAL CERTIFICATESOCIAL CERTIFICATESOCIAL CERTIFICATESOCIAL CERTIFICATE
4/08/2012 Product Presentation –Foundation Piles 26
7FTD has got certificate of appreciation from Ministry of interior for flood donation.
FOUNDATION PILES REFERENCESFOUNDATION PILES REFERENCES
7NG Group Co., Ltd NURI D&C T-RO ConstructionBorey Sen Sok
IBC Project
EVERGREEN Consotium Co., Ltd
VVF Development Co., ltd RUNSANDWALKMekong View Tower
Product Presentation –Foundation Piles 1
HOTEL 15 Floors K.Cham Grand Phnom PenhGrand Phnom Penh CRYSTAL RICE Residential Projects
PROJECT REFERENCE (1)PROJECT REFERENCE (1)PROJECT REFERENCE (1)PROJECT REFERENCE (1)
Af d
Start pile driving
After driving
Welding joint Painting after welding joint Pile driving process
Product Presentation –Foundation Piles 2
Customer : NURI D&CCustomer : NURI D&CStart date : 28/11/2011Start date : 28/11/2011
Product :PC D300Product :PC D300Depth : 22m (10+12)m Depth : 22m (10+12)m
Project: Find Art School (9 Floors)Project: Find Art School (9 Floors)Address: Behind Address: Behind WatWat Lanka, PPLanka, PP
PROJECT REFERENCE (2)PROJECT REFERENCE (2)PROJECT REFERENCE (2)PROJECT REFERENCE (2)
Pile driving process Pile driving process
Welding joint Position measurementPile driving process
Product Presentation –Foundation Piles 3
Customer : EVERGREENCustomer : EVERGREENStart date : 30/11/2011Start date : 30/11/2011
Product :PC D400 & D500Product :PC D400 & D500Depth : 32m (10+10+12)m Depth : 32m (10+10+12)m
Project: CondominiumProject: CondominiumAddress: Address: ChakChak AngreAngre KromKrom, PP, PP
PROJECT REFERENCE (3)PROJECT REFERENCE (3)PROJECT REFERENCE (3)PROJECT REFERENCE (3)
Pile driving processSetting point for pile driving Pile driving process
After driving After drivingPile driving process
Product Presentation –Foundation Piles 4
Customer : VVFCustomer : VVFStart date : 04/01/2012Start date : 04/01/2012
Product :PC D300Product :PC D300Depth : 22m (10+12)m Depth : 22m (10+12)m
Project: Rice WarehouseProject: Rice WarehouseAddress: Address: KampotKampot, Cambodia, Cambodia
PROJECT REFERENCE (4)PROJECT REFERENCE (4)PROJECT REFERENCE (4)PROJECT REFERENCE (4)
Pile drilling & driving process Pile shoe connection
Pile driving process Welding joint After driving
Product Presentation –Foundation Piles 5
Customer : Mekong ViewCustomer : Mekong ViewStart date : 01/05/2012Start date : 01/05/2012
Product :PC D400Product :PC D400Depth : 24m (12+12)m Depth : 24m (12+12)m
Project: Condominium (15 Floors )Project: Condominium (15 Floors )Address: Address: ChroyChroy Chang Chang VarVar, PP, PP
PROJECT REFERENCE (5)PROJECT REFERENCE (5)PROJECT REFERENCE (5)PROJECT REFERENCE (5)
Pile driving process Pile driving processPile driving process
Pile driving process Control compression After driving
Product Presentation –Foundation Piles 6
Customer : RCustomer : R--ConstructionConstructionStart date : 12/05/2012Start date : 12/05/2012
Product :PC/PHC D400Product :PC/PHC D400Depth : 12m Depth : 12m
Project: Ford Show RoomProject: Ford Show RoomAddress: Address: NorodomNorodom Blvd, PPBlvd, PP
PROJECT REFERENCE (6)PROJECT REFERENCE (6)PROJECT REFERENCE (6)PROJECT REFERENCE (6)
Pile pressing process Pile pressing processInfront of IBC construction
Pile pressing process Pile pressing process After pressing
Product Presentation –Foundation Piles 7
Customer : Customer : BoreyBorey SenSen SokSokStart date : 15/05/2012Start date : 15/05/2012
Product :PC/PHC D350Product :PC/PHC D350Depth : 24m (12+12)mDepth : 24m (12+12)m
Project: IBC (3 Floors)Project: IBC (3 Floors)Address: Address: SihaknouSihaknou Blvd, PPBlvd, PP
PROJECT REFERENCE (7)PROJECT REFERENCE (7)PROJECT REFERENCE (7)PROJECT REFERENCE (7)
Pile delevery process Pile for pressing
Pile pressing process Pile for pressingPile delevery process
Product Presentation –Foundation Piles 8
Customer : Mr. TO Customer : Mr. TO SochanthySochanthyStart date : 15/06/2012Start date : 15/06/2012
Product :PC D300Product :PC D300Depth : 21m (10+11)mDepth : 21m (10+11)m
Project: Flat House (9 Floors)Project: Flat House (9 Floors)Address: Address: B.KengB.Keng Kang I, PPKang I, PP
PROJECT REFERENCE (8)PROJECT REFERENCE (8)
Site Area Piles after pressing
Load Test Verification Pile after pressingPile after pressing
Product Presentation –Foundation Piles 9
Customer : Mr. Mol DinaCustomer : Mr. Mol DinaStart date : 22/06/2012Start date : 22/06/2012
Product :PHC D300Product :PHC D300Depth : 26m (10+10+6)Depth : 26m (10+10+6)
Project: Hotel (15 Floors)Project: Hotel (15 Floors)Address: River site, Address: River site, KampongchamKampongcham
PROJECT REFERENCE (9)PROJECT REFERENCE (9)
Site Area Piling process
Infront of construciton site Finishing workPiling process
Product Presentation –Foundation Piles 10
Customer : Mr. Customer : Mr. ChanladetChanladetStart date : 18/07/2012Start date : 18/07/2012
Product :PC D300Product :PC D300Depth : 12mDepth : 12m
Project: Flat (5 Floors)Project: Flat (5 Floors)Address: #87A, Address: #87A, St.SothearuosSt.Sothearuos, PP, PP
PROJECT REFERENCE (10)PROJECT REFERENCE (10)
After piling
After piling Piling processTransport processing
Product Presentation –Foundation Piles 11
Customer : Mr. Sin Kim Customer : Mr. Sin Kim HengHengStart date : 20/07/2012Start date : 20/07/2012
Product :PC D300Product :PC D300Depth : Depth : 24m 24m (6+9+9)(6+9+9)
Project: Project: AppartmentAppartment (10 Floors)(10 Floors)Address: Address: DounpenhDounpenh, , PnomPnom PenhPenh
PROJECT REFERENCE (11)PROJECT REFERENCE (11)
Transport processing Piling Processing After piling
Product Presentation –Foundation Piles 12
Customer : Grand PPCustomer : Grand PPStart date : 13/08/2012Start date : 13/08/2012
Product :PC D300Product :PC D300Depth : 11mDepth : 11m
Project: VillaProject: VillaAddress: Grand Address: Grand PnomPnom PenhPenh
PROJECT REFERENCE (12)PROJECT REFERENCE (12)
Piles at site
After piling Site areaPiling proces
Product Presentation –Foundation Piles 13
Customer : RUNSANDWALKCustomer : RUNSANDWALKStart date : 30/08/2012Start date : 30/08/2012
Product :PHC D350Product :PHC D350Depth : 22m (12+10)mDepth : 22m (12+10)m
Project: Hotel (8 Floors)Project: Hotel (8 Floors)Address: #190, Address: #190, BoengBoeng KengKeng Kong, PPKong, PP
PROJECT REFERENCE (13)PROJECT REFERENCE (13)
Transport process
Piling process Piling process Site area
Product Presentation –Foundation Piles 14
Customer : Mr. Customer : Mr. OukOuk MoninMoninStart date : 20/09/2012Start date : 20/09/2012
Product :PC D300Product :PC D300Depth : 18m (9+9)mDepth : 18m (9+9)m
Project: Villa Project: Villa Address: Address: ChrouyChrouy ChangvaChangva, PP, PP