7FTD CO Ltd7FTD CO.,Ltd

FOUNDATIONFOUNDATION

PILESPILESPILESPILES

77FTD CO., LtdFTD CO., Ltd

‘Building a foundation ‘Building a foundation forfor Cambodia’Cambodia’

មតកមតក: INDEX: INDEX

1) COMPANY PROFILE 3) CERTIFICATES INTRODUCTION

HUMAN RESOURCES

MANAGEMENT TRANSFER

TECHNOLOGY TRANSFER

PRODUCTION ABILITY

MACHINE & CAPACITY

SOCIAL CERTIFICATE

QUALITY MANAGEMENT

2) FOUNDATION PILES

4) NETWORK & CLIENTS

2) FOUNDATION PILES PRODUCT OVERVIEW

ADVANTAGES (OF 7FTD PILES)

7FTD STANDARD

4/08/2012 Product Presentation –Foundation Piles 2

េសចកតេផតើមេសចកតេផតើម: INTRODUCTION: INTRODUCTIONត តត ត7FTD CO., LTD = expert @រកមហន៧េអហវធឌខអលធឌ

manufacturing electrical poles

manufacturing foundation piles

ឯកេទសកនងករផលតៈបេងគ លេភលើងសសររគះ manufacturing foundation piles

following the European standard.

សសររគះ េគរព មបទ ឋ នអរ ប។

(Drawing view of factory) (View of factory)(Drawing view of factory) (View of factory)

4/08/2012 Product Presentation –Foundation Piles 4

េសចកតេផតើមេសចកតេផតើម: INTRODUCTION: INTRODUCTION

Joint Venture partners:

ត តត ត

p SOKCHOEURN DEVELOPMENT CO., Ltd

FLANDERS CONCRETE NV

THU DUC LONG AN CENTRIFUGAL JOINT STOCK COMPANY(   The Signing Ceremony of Joint

V A )Venture Agreement)

Why investing?y gDevelop & improve infrastructure of

Cambodia

Positive outsourcing for foreign investors

A k t illi t d !

4/08/2012 Product Presentation –Foundation Piles 5

A market willing to upgrade!

េសចកតេផតើមេសចកតេផតើម: INTRODUCTION: INTRODUCTION

ធនធនមនសគជគនលះេឆព ះេទកនភពេជគជយ

ត តត ត

ល ពបេងកើនសមតថភពបគគលកកមពជ មរយៈករេផទរចេនះដងែផនករគបរគង ( មែបបអរ ប)

ករេផរចេនះដងែផកផលតកម ( មបទ ន

(Cylinder & Cube Sample)

ករេផទរចេនះដងែផនកផលតកមម ( មបទ ឋ ន

េវៀត ម & អរ ប)ករេផទរចេនះដងែផនករបតបតតរបកបេ យរបសទភព Human resources

= KEY to successl b d ff

របសទធភព

Develop Cambodian staff: Management knowledge transfer =

Europe

Production knowledge transfer = Vietnam & Europe

Optimization knowledge transfer = &Vietnam & Europe(Product controlling)

19/12/2011 Product Presentation – Foundation Piles 6

សមតថភពផលតកមមសមតថភពផលតកមម: : PRODUCTION ABILITYPRODUCTION ABILITYPRODUCTION ABILITYPRODUCTION ABILITY

C bilit t d f d ti ilCapability to produce foundation piles:

The maximum ‘average’ = 170 products/day.

Quality of foundation piles’ production

Requirements according to JIS standards (JIS A5335-1987)

OROR

Requirements according to CLIENT

4/08/2012 Product Presentation –Foundation Piles 7

q g

េរគ ងចរកេរគ ងចរក & & សមតថភពសមតថភពMACHINE & CAPACITYMACHINE & CAPACITYMACHINE & CAPACITYMACHINE & CAPACITY

Batching Plant (1) Mobile crane on rail (1)

Steel cutting & Heading machine(2) Steel cage making machine(1) Steel tension machine (2)

4/08/2012 Product Presentation –Foundation Piles 8

េរគ ងចរកេរគ ងចរក & & សមតថភពសមតថភពMACHINE & CAPACITYMACHINE & CAPACITYMACHINE & CAPACITYMACHINE & CAPACITY

Spinning Systems (6)

Over head crane (7)

4/08/2012 Product Presentation –Foundation Piles 9

Spinning Systems(6)

កររគបរគងគណភពកររគបរគងគណភពQUALITY MANAGEMENTQUALITY MANAGEMENT

“Everything is based “Everything is based on quality in order to on quality in order to q yq ykeep our customers keep our customers

forever”forever”foreverforeverSand Sieving Machine (1)

“Excellent quality is “Excellent quality is q yq your commitment”our commitment”

4/08/2012 Product Presentation –Foundation Piles 10

Gravel Cleaning (1)

កររគបរគងគណភពកររគបរគងគណភព

How to obtain ‘QUALITY’?

QUALITY MANAGEMENTQUALITY MANAGEMENT

How to obtain QUALITY ?

Modern machines and devicesModern machines and devices.

Rigorously checked input materials.

4/08/2012 Product Presentation –Foundation Piles 11

កររគបរគងគណភពកររគបរគងគណភព

High tech laboratory + All necessary

QUALITY MANAGEMENTQUALITY MANAGEMENT

High tech laboratory + All necessary equipment and instruments

Investigating materials and examining product quality.

4/08/2012 Product Presentation –Foundation Piles 12

កររគបរគងគណភពកររគបរគងគណភព

Testing the end-product:ករេធើពេ ធន

QUALITY MANAGEMENTQUALITY MANAGEMENT

g pPut pile on test platformCheck the visual crackTesting variety loading levels

ករេធវពេ ធន

Testing variety loading levels

4/08/2012 Product Presentation –Foundation Piles 13

ពតមនអពផលតផលពតមនអពផលតផលPRODUCT OVERVIEWPRODUCT OVERVIEW

4/08/2012 Product Presentation –Foundation Piles 15

ពតមនអពផលតផលពតមនអពផលតផលPRODUCT OVERVIEWPRODUCT OVERVIEW

4/08/2012 Product Presentation –Foundation Piles 16

គណរបេយជនៈគណរបេយជនៈ ADVANTAGESADVANTAGESគណរបេយជនៈ គណរបេយជនៈ ADVANTAGESADVANTAGES

High loading capacity per pileg oad g capac ty pe p e A wide range of applications Adaptable to ground condition Ease of transportation Rapid construction, high efficiency◦ Driving by hammeringDriving by hammering

◦ Static pressing

◦ Using a bored hole

4/08/2012 Product Presentation –Foundation Piles 17

គណរបេយជនៈគណរបេយជនៈ ADVANTAGESADVANTAGESគណរបេយជនៈ គណរបេយជនៈ ADVANTAGESADVANTAGES

Clean and tidy working environmentC ea a d t dy wo g e v o e t

High strength, good penetration power

Reliable quality

Ease of inspection and testing

Wide range of installation methods

4/08/2012 Product Presentation –Foundation Piles 18

បទ ឋ នរកមហនបទ ឋ នរកមហន៧៧េអហវធឌេអហវធឌ77FTD STANDARDFTD STANDARD

Why use 7FTD-standard?Why use 7FTD standard?

Round prestressed foundation piles (JIS-A5335-1987)

Centrifugal technology makes concrete become solid and firm:

increases concrete resistance against corrosion and erosion from the environment increases concrete resistance against corrosion and erosion from the environment

Products life cycle is longer

Industrial production conditions: Industrial production conditions:

Stable quality

Save on materials: Save on materials:

light structure

R d d i h

4/08/2012 Product Presentation –Foundation Piles 19

Reduced weight

BORED PILESBORED PILES

Can not control 100% of

BORED PILESBORED PILES

មន ចរគបរគងគណភព Can not control 100% of quality

◦ Waisting or necking

រ រ បន១០០%

◦ ងយបក ឬ េរគច◦ Waisting or necking.

◦ Concrete cannot be subsequently inspected

ប ឬ រ◦ មន ចរតតពនតយបន េរកយេពលចកេបតងរច។subsequently inspected.

◦ Water and mud washing out cement

◦ ទកនងភក យចលេបតង េធវើរឲ ថយ គណភពេបតង

out cement.

◦ Can not be formed in cohesionless materials

◦ ភពសអតរ ងេបតង នង សភរៈមនបនលអ។ៃ ៃ ង cohesionless materials.

High price and vast time Low capacity

តៃលៃថល នងច យេពលេរចើន

សមភពទបLow capacity សមថភពទប

4/08/2012 Product Presentation –Foundation Piles 21

SQUARE PILESSQUARE PILES

Can not control 100% of

SQUARE PILESSQUARE PILES

មន ចរគបរគងគណភពCan not control 100% of quality◦ Temperature

រ រ បន១០០%◦ មន ចកនតសតណហ ភពបន◦ Feeding water

High price and vast time

បន◦ មន ចផគតផគងទកបនលអ

តៃលខស នងេរបើេពលេរចើន High price with transportation

L it

តៃលខពស នងេរបេពលេរចន ពបកដកជញជ ន នងមនត

ៃលៃថ Low capacity

Can not produce big di t

ៃលៃថល សមតថភពេខ យ

diamenter

Pile joint connection is poor មន ចផលតមខកតធ តណតភបមនធនបននវ

4/08/2012 Product Presentation –Foundation Piles 22

តណតភជ បមនធនបននវគណ

HH-- PILESPILES

The tendency to bend on the

HH-- PILESPILES

របឈមនងករេកងេពលThe tendency to bend on the weak axis during driving.

របញច ះរគះ

ង ង Little end bearing stress.

L f i i

ក ងរទចងសសរេខ យ

ក ងកកតេខ យ: Low friction: ◦ Lower resistance.

◦ Need to be driven to a dense

ក ងកកតេខ យ: ◦ ភពធនសសរមនរគបរគន◦ រតវករបញជ នដលរសទបNeed to be driven to a dense

sand or resistant layers.រ ជ ររង

4/08/2012 Product Presentation –Foundation Piles 23

TRANSFERING FROM TRANSFERING FROM FLANDERS FLANDERS CO C CCO C C O GO GCONCRETE & THU DUCCONCRETE & THU DUC--LONG ANLONG AN

4/08/2012 Product Presentation –Foundation Piles 25

Management Transfer – Flanders Concrete NV Technology Transfer – THU DUC LONG AN

SOCIAL CERTIFICATESOCIAL CERTIFICATESOCIAL CERTIFICATESOCIAL CERTIFICATE

4/08/2012 Product Presentation –Foundation Piles 26

7FTD has got certificate of appreciation from Ministry of interior for flood donation.

FOUNDATION PILES REFERENCESFOUNDATION PILES REFERENCES

7NG Group Co., Ltd NURI D&C T-RO ConstructionBorey Sen Sok

IBC Project

EVERGREEN Consotium Co., Ltd

VVF Development Co., ltd RUNSANDWALKMekong View Tower

Product Presentation –Foundation Piles 1

HOTEL 15 Floors K.Cham Grand Phnom PenhGrand Phnom Penh CRYSTAL RICE Residential Projects

PROJECT REFERENCE (1)PROJECT REFERENCE (1)PROJECT REFERENCE (1)PROJECT REFERENCE (1)

Af d

Start pile driving

After driving

Welding joint Painting after welding joint Pile driving process

Product Presentation –Foundation Piles 2

Customer : NURI D&CCustomer : NURI D&CStart date : 28/11/2011Start date : 28/11/2011

Product :PC D300Product :PC D300Depth : 22m (10+12)m Depth : 22m (10+12)m

Project: Find Art School (9 Floors)Project: Find Art School (9 Floors)Address: Behind Address: Behind WatWat Lanka, PPLanka, PP

PROJECT REFERENCE (2)PROJECT REFERENCE (2)PROJECT REFERENCE (2)PROJECT REFERENCE (2)

Pile driving process Pile driving process

Welding joint Position measurementPile driving process

Product Presentation –Foundation Piles 3

Customer : EVERGREENCustomer : EVERGREENStart date : 30/11/2011Start date : 30/11/2011

Product :PC D400 & D500Product :PC D400 & D500Depth : 32m (10+10+12)m Depth : 32m (10+10+12)m

Project: CondominiumProject: CondominiumAddress: Address: ChakChak AngreAngre KromKrom, PP, PP

PROJECT REFERENCE (3)PROJECT REFERENCE (3)PROJECT REFERENCE (3)PROJECT REFERENCE (3)

Pile driving processSetting point for pile driving Pile driving process

After driving After drivingPile driving process

Product Presentation –Foundation Piles 4

Customer : VVFCustomer : VVFStart date : 04/01/2012Start date : 04/01/2012

Product :PC D300Product :PC D300Depth : 22m (10+12)m Depth : 22m (10+12)m

Project: Rice WarehouseProject: Rice WarehouseAddress: Address: KampotKampot, Cambodia, Cambodia

PROJECT REFERENCE (4)PROJECT REFERENCE (4)PROJECT REFERENCE (4)PROJECT REFERENCE (4)

Pile drilling & driving process Pile shoe connection

Pile driving process Welding joint After driving

Product Presentation –Foundation Piles 5

Customer : Mekong ViewCustomer : Mekong ViewStart date : 01/05/2012Start date : 01/05/2012

Product :PC D400Product :PC D400Depth : 24m (12+12)m Depth : 24m (12+12)m

Project: Condominium (15 Floors )Project: Condominium (15 Floors )Address: Address: ChroyChroy Chang Chang VarVar, PP, PP

PROJECT REFERENCE (5)PROJECT REFERENCE (5)PROJECT REFERENCE (5)PROJECT REFERENCE (5)

Pile driving process Pile driving processPile driving process

Pile driving process Control compression After driving

Product Presentation –Foundation Piles 6

Customer : RCustomer : R--ConstructionConstructionStart date : 12/05/2012Start date : 12/05/2012

Product :PC/PHC D400Product :PC/PHC D400Depth : 12m Depth : 12m

Project: Ford Show RoomProject: Ford Show RoomAddress: Address: NorodomNorodom Blvd, PPBlvd, PP

PROJECT REFERENCE (6)PROJECT REFERENCE (6)PROJECT REFERENCE (6)PROJECT REFERENCE (6)

Pile pressing process Pile pressing processInfront of IBC construction

Pile pressing process Pile pressing process After pressing

Product Presentation –Foundation Piles 7

Customer : Customer : BoreyBorey SenSen SokSokStart date : 15/05/2012Start date : 15/05/2012

Product :PC/PHC D350Product :PC/PHC D350Depth : 24m (12+12)mDepth : 24m (12+12)m

Project: IBC (3 Floors)Project: IBC (3 Floors)Address: Address: SihaknouSihaknou Blvd, PPBlvd, PP

PROJECT REFERENCE (7)PROJECT REFERENCE (7)PROJECT REFERENCE (7)PROJECT REFERENCE (7)

Pile delevery process Pile for pressing

Pile pressing process Pile for pressingPile delevery process

Product Presentation –Foundation Piles 8

Customer : Mr. TO Customer : Mr. TO SochanthySochanthyStart date : 15/06/2012Start date : 15/06/2012

Product :PC D300Product :PC D300Depth : 21m (10+11)mDepth : 21m (10+11)m

Project: Flat House (9 Floors)Project: Flat House (9 Floors)Address: Address: B.KengB.Keng Kang I, PPKang I, PP

PROJECT REFERENCE (8)PROJECT REFERENCE (8)

Site Area Piles after pressing

Load Test Verification Pile after pressingPile after pressing

Product Presentation –Foundation Piles 9

Customer : Mr. Mol DinaCustomer : Mr. Mol DinaStart date : 22/06/2012Start date : 22/06/2012

Product :PHC D300Product :PHC D300Depth : 26m (10+10+6)Depth : 26m (10+10+6)

Project: Hotel (15 Floors)Project: Hotel (15 Floors)Address: River site, Address: River site, KampongchamKampongcham

PROJECT REFERENCE (9)PROJECT REFERENCE (9)

Site Area Piling process

Infront of construciton site Finishing workPiling process

Product Presentation –Foundation Piles 10

Customer : Mr. Customer : Mr. ChanladetChanladetStart date : 18/07/2012Start date : 18/07/2012

Product :PC D300Product :PC D300Depth : 12mDepth : 12m

Project: Flat (5 Floors)Project: Flat (5 Floors)Address: #87A, Address: #87A, St.SothearuosSt.Sothearuos, PP, PP

PROJECT REFERENCE (10)PROJECT REFERENCE (10)

After piling

After piling Piling processTransport processing

Product Presentation –Foundation Piles 11

Customer : Mr. Sin Kim Customer : Mr. Sin Kim HengHengStart date : 20/07/2012Start date : 20/07/2012

Product :PC D300Product :PC D300Depth : Depth : 24m 24m (6+9+9)(6+9+9)

Project: Project: AppartmentAppartment (10 Floors)(10 Floors)Address: Address: DounpenhDounpenh, , PnomPnom PenhPenh

PROJECT REFERENCE (11)PROJECT REFERENCE (11)

Transport processing Piling Processing After piling

Product Presentation –Foundation Piles 12

Customer : Grand PPCustomer : Grand PPStart date : 13/08/2012Start date : 13/08/2012

Product :PC D300Product :PC D300Depth : 11mDepth : 11m

Project: VillaProject: VillaAddress: Grand Address: Grand PnomPnom PenhPenh

PROJECT REFERENCE (12)PROJECT REFERENCE (12)

Piles at site

After piling Site areaPiling proces

Product Presentation –Foundation Piles 13

Customer : RUNSANDWALKCustomer : RUNSANDWALKStart date : 30/08/2012Start date : 30/08/2012

Product :PHC D350Product :PHC D350Depth : 22m (12+10)mDepth : 22m (12+10)m

Project: Hotel (8 Floors)Project: Hotel (8 Floors)Address: #190, Address: #190, BoengBoeng KengKeng Kong, PPKong, PP

PROJECT REFERENCE (13)PROJECT REFERENCE (13)

Transport process

Piling process Piling process Site area

Product Presentation –Foundation Piles 14

Customer : Mr. Customer : Mr. OukOuk MoninMoninStart date : 20/09/2012Start date : 20/09/2012

Product :PC D300Product :PC D300Depth : 18m (9+9)mDepth : 18m (9+9)m

Project: Villa Project: Villa Address: Address: ChrouyChrouy ChangvaChangva, PP, PP