57
SDR Configuration )

SDR Configure and Debug Guide(3)_2

Embed Size (px)

Citation preview

Page 1: SDR Configure and Debug Guide(3)_2

SDR Configuration

)

Page 2: SDR Configure and Debug Guide(3)_2

SDR Configuration

Version Date Author Approved By Remarks

Page 3: SDR Configure and Debug Guide(3)_2

SDR Configuration

             CONTENTS1 TOPLOGY.......................................................................................................................................3

2 CONFIGURE TRANSMITION BY LMT....................................................................................4

2.1 INSTALL LMT SOFTWARE..........................................................................................................42.2 START LMT...............................................................................................................................42.3 MAKE OFLINE CONFIGURATION.................................................................................................4

2.3.1 Define template by BTS type.................................................................................................52.3.2 Basic attribute.......................................................................................................................62.3.3 Rack configuration................................................................................................................82.3.4 E1 Link................................................................................................................................102.3.5 HDLC..................................................................................................................................102.3.6 PPP or ML-PPP..................................................................................................................102.3.7 Global Port..........................................................................................................................112.3.8 IP.........................................................................................................................................122.3.9 SCTP...................................................................................................................................122.3.10 OMCB Link.....................................................................................................................132.3.11 RRU Common Parameters.............................................................................................142.3.12 Toplogy............................................................................................................................152.3.13 GSM Sector.....................................................................................................................152.3.14 GSM RU..........................................................................................................................152.3.15 GSM Carries...................................................................................................................162.3.16 Save the configuration....................................................................................................17

2.4 DOWNLOAD CONFIGURATION TO SDR....................................................................................182.4.1 LMT connect.......................................................................................................................182.4.2 Connect to master CC board by LMT and import configuration........................................19

3 CONFIGURATION IN OMCR...................................................................................................20

3.1 TRANSMITION CONFIGURATION...............................................................................................203.1.1 Configure PCM link in DTB for Layer 1(physical layer)...................................................203.1.2 Configure HDLC link in EUIP for Layer 2(HDLC layer)..................................................213.1.3 RPU IP of EUIP..................................................................................................................213.1.4 Configure PPP link for Layer 3 (PPP layer)......................................................................223.1.5 IP Abis Bandwith Resource Pool........................................................................................23

3.2 SITE CONFIGURATION..............................................................................................................243.2.1 Creat Site.............................................................................................................................243.2.2 Creat Cell............................................................................................................................273.2.3 Creat TRX...........................................................................................................................29

4 CONFIGURATION IN OMCB....................................................................................................30

4.1 CREAT BASE STATION MANAGEMENT FOR SDR......................................................................304.2 UPLOAD CONFIGURATION FROM SDR BY ONLINE...................................................................31

1

Page 4: SDR Configure and Debug Guide(3)_2

SDR Configuration

4.3 BASE STATION EQUIPMENT RESOURCE MANAGEMENT..........................................................314.3.1 Rack configuration..............................................................................................................324.3.2 Transmition.........................................................................................................................35

4.4 BASE SATION RADIO RESOURCE MANAGEMENT.....................................................................384.4.1 RRU Common parameters..................................................................................................384.4.2 Toplogy................................................................................................................................394.4.3 GSM RU parameters...........................................................................................................404.4.4 GSM Sector.........................................................................................................................424.4.5 GSM Carrier.......................................................................................................................44

5 SDR DEBUG PROCESS..............................................................................................................45

5.1 STEP 1: CHECK TRANSMITION.................................................................................................455.1.1 Check E1 link status............................................................................................................455.1.2 Check transmition quality (after OMCB link connected)...................................................475.1.3 Check HDLC link................................................................................................................485.1.4 Check PPP link...................................................................................................................495.1.5 Check SCTP link.................................................................................................................495.1.6 Check OMCB link...............................................................................................................49

5.2 STEP 2: CHECK SOFTWARE (BY OMCR FOR BSC ENGINEER,BY LMT FOR BTS ENGINEER). 515.3 STEP 3: CHECK BORAD STATUS IN BBU..................................................................................51

5.3.1 CC board.............................................................................................................................515.3.2 FS board..............................................................................................................................515.3.3 UPBG board.......................................................................................................................525.3.4 FCE bord.............................................................................................................................52

5.4 Step 4: Check RRU status.......................................................................................................52

2

Page 5: SDR Configure and Debug Guide(3)_2

SDR Configuration

1 Toplogy

Figure 1 Toplogy of Site 67 in TINDOUF

Table 1 Intergrated parameters

Parameters Configuration of BTS Side Configuration of BSC Side Notes

GSM Site ID 67 67 Same in BTS and BSC

Site IP 116.18.67.100 116.18.67.100

RPU IP of Abis 116.18.1.1 116.18.1.1 Vitual IP of CMP

Local port of SDR 67 Same as Site ID is recomend

Remote port of SDR 14596 414592+CMP module Nuble

Defined in Ste configuration

OMCB IP 116.18.1.1 116.18.1.1 Can be same as RPU IP of Abis

BTS Type ZXSDR BS8800 GU360 ZXSDR BS8800 GU360

Case S4/4/4 3/3/3 GSM900M & GSM1800M

BCCH 85,87,89 & 756,766,761

E1 cable Link0 & Link1PCM13 of 211 & PCM 14 of

711Multiframe

HDLC TS 1-31 TS 1-31

ML-PPP Yes Yes

Port of ML-PPP 192

Page 6: SDR Configure and Debug Guide(3)_2

SDR Configuration

2 Configure transmition by LMT2.1 Install LMT software

2.2 Start LMT

2.3 Make ofline configuration

We can make ofline configuration at home for a lot of SDR sites, and save the configration. Connect PC with BBU for import configuration when SWAP

4

Page 7: SDR Configure and Debug Guide(3)_2

SDR Configuration

2.3.1 Define template by BTS type

Select template by reference BTS type (BS8700, BS8800, BS8900)

Notes:BS8700: BS8700_template_2uBS8800: BS8800_GU360_template_2u

5

Page 8: SDR Configure and Debug Guide(3)_2

SDR Configuration

BS8900: BS8900_GU360_template_2u

2.3.2 Basic attribute

Notes: NodeB ID is not allowed to configure for 2G.

6

Page 9: SDR Configure and Debug Guide(3)_2

SDR Configuration

Notes: Configure Transmission Mode to ‘IP’ for IPOE

Notes:

7

Page 10: SDR Configure and Debug Guide(3)_2

SDR Configuration

Radio Mode : Set ‘GSM’ for 2GGSM Station NO: same as ‘SITE ID’ given by BSC engineerE1/T1 Medium :Set ‘E1’ for IPOE

Notes: ATM is used for 3G

2.3.3 Rack configuration

2.3.3.1 BBU Rack

8

Page 11: SDR Configure and Debug Guide(3)_2

SDR Configuration

2.3.3.2 RRU Racke

2.3.3.3 Antenna

9

Page 12: SDR Configure and Debug Guide(3)_2

SDR Configuration

2.3.3.4 FCE & PDM

2.3.4 E1 Link

2.3.5 HDLC

2.3.6 PPP or ML-PPP

ML-PPP is used in this case, it includes 2 HDLC links (E1 calble)

10

Page 13: SDR Configure and Debug Guide(3)_2

SDR Configuration

2.3.7 Global Port

11

Page 14: SDR Configure and Debug Guide(3)_2

SDR Configuration

2.3.8 IP

2.3.9 SCTP

12

Page 15: SDR Configure and Debug Guide(3)_2

SDR Configuration

Notes:Local Port ID: Site ID Remote port: 14592+CMP Module NO.

2.3.10 OMCB Link

13

Page 16: SDR Configure and Debug Guide(3)_2

SDR Configuration

2.3.11 RRU Common Parameters

Creat commom parameters for RRU1~RRU6

14

Page 17: SDR Configure and Debug Guide(3)_2

SDR Configuration

2.3.12 Toplogy

2.3.13 GSM Sector

2.3.14 GSM RU

15

Page 18: SDR Configure and Debug Guide(3)_2

SDR Configuration

2.3.15 GSM Carries

16

Page 19: SDR Configure and Debug Guide(3)_2

SDR Configuration

2.3.16 Save the configuration

17

Page 20: SDR Configure and Debug Guide(3)_2

SDR Configuration

2.4 Download configuration to SDR

2.4.1 LMT connect

Connect PC to BBU at ETH1 of CC board by internet cable (direction cable almost)The master CC is in solot 1, and its mantaince IP is 192.254.1.16 by default difination .Set the PC and CC in same gateway and do ping test.

18

Page 21: SDR Configure and Debug Guide(3)_2

SDR Configuration

2.4.2 Connect to master CC board by LMT and import configuration

19

Page 22: SDR Configure and Debug Guide(3)_2

SDR Configuration

After import configuration,BBU will restart automatically3 Configuration in OMCR3.1 Transmition Configuration

3.1.1 Configure PCM link in DTB for Layer 1(physical layer)

20

Page 23: SDR Configure and Debug Guide(3)_2

SDR Configuration

3.1.2 Configure HDLC link in EUIP for Layer 2(HDLC layer)

HDLC NO: number of HDLC, defined by userEUIP 2MHW NO: number of EUIP 2MHW, defined by userNotes: DTB and EUIP shoulde be in the same shelf

3.1.3 RPU IP of EUIP

21

Page 24: SDR Configure and Debug Guide(3)_2

SDR Configuration

Notes:Port NO: defined by BSC engineer ,1-190 for PPP,191-254 for ML-PPP

3.1.4 Configure PPP link for Layer 3 (PPP layer)

3.1.4.1 IP Over E1 Configuration

Notes:Port NO: defined by BSC engineer,but the number shoul be uniqueHDLC NO: use ‘HDLC NO’ defined in EUIP

22

Page 25: SDR Configure and Debug Guide(3)_2

SDR Configuration

3.1.4.2 PPP Configuration

Notes:MP NO.Sign: valid for ML-PPP, invalid for PPPPeer IP: IP address of SITEMP No: used ‘Port NO’ defined in EUIP_RPU

3.1.5 IP Abis Bandwith Resource Pool

23

Page 26: SDR Configure and Debug Guide(3)_2

SDR Configuration

Notes: Mode NO: used CMP modue NOUplink/Down link bandwith : decied by case,for 1 E1 is 2048 ,for 20480 for 10 E13.2 Site Configuration

3.2.1 Creat Site

24

Page 27: SDR Configure and Debug Guide(3)_2

SDR Configuration

25

Page 28: SDR Configure and Debug Guide(3)_2

SDR Configuration

Notes: Site ID: Defined by BSC engineerModule NO: use the CMP module defined in Rack

26

Page 29: SDR Configure and Debug Guide(3)_2

SDR Configuration

Notes:Site IP address: IP address of SDR

3.2.2 Creat Cell

27

Page 30: SDR Configure and Debug Guide(3)_2

SDR Configuration

28

Page 31: SDR Configure and Debug Guide(3)_2

SDR Configuration

3.2.3 Creat TRX

29

Page 32: SDR Configure and Debug Guide(3)_2

SDR Configuration

Notes:Port NO: defined by BSC engineer,a connection informationTRX Group NO: define the TRX to access the DSP of BIPB (IP support) , it is safe that difen different TRX in different DSP

4 Configuration in OMCB4.1 Creat Base Station management for SDR

30

Page 33: SDR Configure and Debug Guide(3)_2

SDR Configuration

4.2 Upload configuration from SDR by online

31

Page 34: SDR Configure and Debug Guide(3)_2

SDR Configuration

4.3 Base Station Equipment Resource Management

4.3.1 Rack configuration

32

Page 35: SDR Configure and Debug Guide(3)_2

SDR Configuration

4.3.1.1 BBU rack

33

Page 36: SDR Configure and Debug Guide(3)_2

SDR Configuration

4.3.1.2 RRU rack

4.3.1.3 FCE and PDM

34

Page 37: SDR Configure and Debug Guide(3)_2

SDR Configuration

4.3.1.4 Antenna

4.3.2 Transmition

4.3.2.1 E1 link

35

Page 38: SDR Configure and Debug Guide(3)_2

SDR Configuration

4.3.2.2 HDLC link

4.3.2.3 PPP

36

Page 39: SDR Configure and Debug Guide(3)_2

SDR Configuration

4.3.2.4 Global Port

4.3.2.5 IP parameter

37

Page 40: SDR Configure and Debug Guide(3)_2

SDR Configuration

4.3.2.6 SCTP

4.3.2.7 OMCB link

4.4 Base Sation Radio Resource Management

4.4.1 RRU Common parameters

38

Page 41: SDR Configure and Debug Guide(3)_2

SDR Configuration

4.4.2 Toplogy

39

Page 42: SDR Configure and Debug Guide(3)_2

SDR Configuration

4.4.3 GSM RU parameters

40

Page 43: SDR Configure and Debug Guide(3)_2

SDR Configuration

41

Page 44: SDR Configure and Debug Guide(3)_2

SDR Configuration

4.4.4 GSM Sector

42

Page 45: SDR Configure and Debug Guide(3)_2

SDR Configuration

43

Page 46: SDR Configure and Debug Guide(3)_2

SDR Configuration

4.4.5 GSM Carrier

44

Page 47: SDR Configure and Debug Guide(3)_2

SDR Configuration

5 SDR Debug Process5.1 Step 1: Check transmition

Check connection and quality

5.1.1 Check E1 link status

5.1.1.1 Check E1 link status at BBU by LMT (BTS engineer)

45

Page 48: SDR Configure and Debug Guide(3)_2

SDR Configuration

5.1.1.2 Check E1 link status at OMCR (BSC engineer)

46

Page 49: SDR Configure and Debug Guide(3)_2

SDR Configuration

5.1.2 Check transmition quality (after OMCB link connected)

5.1.2.1 Check E1 link quality at BBU (BTS engineer)

Check the quality of E1 link by telnet command when OMCB link is connectedtelnet 192.254.1.16 ;telnet to CC in solot 1CC->ping 116.18.1.1 ;ping RPU of Abis,and check whether there is lost packetCC->BspE1T1ErrPerformStart ;This command is to start check tranmistion qualityCC->E1ErrInfo ;After each 400 second,input this command for view the result. Do this check for

5-7 times, and save the results for report.tatistic Time:402slink ES SES BBE UAS FAS CRC Slip CV Ebit-------------------------------total stats:0 10 c 375 182 8367 20d85 0 244e2 4a

value = 86 = 0x56 = 'V'CC->E1ErrInfoStatistic Time:420slink ES SES BBE UAS FAS CRC Slip CV Ebit-------------------------------total stats:0 10 c 375 194 882a 221ef 0 25cba 4a

value = 86 = 0x56 = 'V'

Table 1 defination of “E1ErrInfo”

47

Page 50: SDR Configure and Debug Guide(3)_2

SDR Configuration

link ES SES BBE UAS FAS CRCSlip

CVEbi

t

E1 link

number

Error code

time(second)

Error code

check

time(second)

Error code

background

block

number

Link

unavailable

time

(second)

Frame

asynchronize

times

CRC

check

error

number

Slip

times

Codec

abnormal

times

Error

bits

number

CC->BspE1T1ErrPerformStop ;To stop the check process because this will affect CPU so much.

5.1.2.2 Check E1 link quality at OMCR (BSC engineer)

48

Page 51: SDR Configure and Debug Guide(3)_2

SDR Configuration

5.1.3 Check HDLC link

Only error configuration will lead to HDLC link work abnormally when E1 link is work normally

49

Page 52: SDR Configure and Debug Guide(3)_2

SDR Configuration

5.1.3.1 Check HDLC link status by LMT (BTS engineer)

Check alarm the same as E1link in CC board5.1.3.2 Check HDLC link status by OMCR (BSC engineer)

Check alarm the same as E1 link in EUIP board

5.1.4 Check PPP link

Only error configuration will lead to PPP link work abnormally when HDLC link is work normally5.1.4.1 Check PPP link status by LMT (BTS engineer)

Check alarm the same as HDLC link in CC board5.1.4.2 Check PPP link status by OMCR (BSC engineer)

Check alarm the same as HDLC link in EUIP and CMP board

5.1.5 Check SCTP link

Only error configuration will lead to SCTP link work abnormally when PPP link is work normallyCheck IP address, CMP module number, local port,remote port5.1.5.1 Check SCTP link status by LMT (BTS engineer)

Check alarm the same as PPP link in CC board5.1.5.2 Check SCTP link status by OMCR (BSC engineer)

Check alarm the same as PPP link in CMP board

5.1.6 Check OMCB link

Only error configuration will lead to OMCB link work abnormally when PPP link is work normally

50

Page 53: SDR Configure and Debug Guide(3)_2

SDR Configuration

5.1.6.1 Check OMCB link status by LMT (BTS engineer)

5.1.6.2 Check OMCB link status by OMCR (BSC engineer)

Check SDR’s IP address

51

Page 54: SDR Configure and Debug Guide(3)_2

SDR Configuration

5.2 Step 2: Check Software (by OMCR for BSC engineer,by LMT for BTS engineer)

After download the software by OMCR, BSC engineer shoul check the download result and make sure thar no software lostThen, active software for SDR

5.3 Step 3: Check Borad status in BBU

5.3.1 CC board

It will work normally almost, but we can check the tansmition alarm at this board.between BBU and BSC, between CC and other boards in BBU

5.3.2 FS board

Alarm Code solution notesBoard initial FS board is downloading software,just waitFS port ID Alarm Maybe RRU is starting,just wait;

Maybe RRU is power off;Maybe error connection between FS and RRU;

52

Page 55: SDR Configure and Debug Guide(3)_2

SDR Configuration

Maybe Fiber cable is broken;

5.3.3 UPBG board

Alarm Code solution notesBoard initial UPBG board is downloading software,just waitAttenna link error Maybe some RRU is working abnormally

5.3.4 FCE bord

Alarm Code solution notesBoard initial FCE board is downloading software,just waitControl link broken Maybe ,No air condition,high temprature

5.4 Step 4: Check RRU status

Alarm Code solution notesBoard initial RRU board is downloading software,just waitControl link broken between FS and RRU

Maybe , RRU is power off;Maybe , RRU is starting;Maybe, RRU is working with wrong software,reset RRU and downloadMaybe, RRU connect with wrong port of FS boardMaybe ,RRU is broken

VSWR Alarm Check antenna

5.5 Check Voice service

53

Page 56: SDR Configure and Debug Guide(3)_2

SDR Configuration

54