Page 1: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Session 4: Potential & Lucrative Investment Opportunities

فرص متاحة وواعدة: اإلستثمار: الجلسة الرابعة

Eng. Mahmoud Khaled Karam

Head Engineer

Sanitary Engineering, Ministry of Public Works

Page 2: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

June

2015

STATE OF KUWAIT

MINISTRY OF PUBLIC WORKS

MAHMOUD KARAM

CHIEF ENGINEER OF THE SANITARY SECTOR

MPW

Page 3: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

SUMMARY ABOUT

STATE OF KUWAIT

Page 4: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

In Kuwait

Page 5: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

SANITARY

ENGINEERING

SECTOR

Page 6: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

In Kuwait

The Sanitary Engineering Sector in the Ministry of Public Works is in charge of:

• Achieving our vision to maintain a healthy and good environment for citizens and residents of Kuwait by promoting Sustainability in Environmental conservation

• Constraction, maintaining and enhancing the sewage networks and water treatment facility capacity to meet the increase in population growth

• Wastewater Management

• Preparation of technical assistance studies to construct new facilities and upgrading existing ones

SANITARY ENGINEERING SECTOR

Page 7: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further
Page 8: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

The Sewage System In Kuwait

Page 9: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

EXISTING

SEWAGE SYSTEM

IN KUWAIT

Page 10: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

The Sewage System In

Kuwait

Total Gravity lines 8000 Km

Total pressurized line 200 Km

Diameter:

from 0.150 m to 2.250 m

Page 11: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

DEEP SEWERS AND PUMPING STATIONS

Four main sub-catchments will be served by the new system

1.Mishref PS – Serves areas to the south and east of Kuwait

Metropolitan Area (KMA) and transfers sewage to Ardiya PS and

on to Sulaibiya Sewage Treatment Plant (STP)

2.Riggae PS – Serves areas in the north and east of KMA and

transfers to the Ardiya PS

3.Egaila PS – Serves the south of KMA and transfers sewage to the

Riqqa STP.

4.Jahra PS – Serves the north and Jahra catchment area and

transfer sewage to Kabd STP

Page 12: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Jahra WWTP

Um Al-hayman WWTP

Kabbed WWTP

Egalia P.S

Mishref P.S

Sulaybia WWTP

Riqqea P.S

Ardiya P.S

middle Area

North Area

South Area

DEEP SEWERS AND PUMPING STATIONS

Page 13: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

EXISTING

TREATMENT

PLANTS

Page 14: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Sulaibiya is the largest STP in

the world that uses Reverse

Osmosis (RO) technology as an

advanced treatment for

wastewater . It was established

in 2004

Treated wastewater produced

is potable water quality

standard and it treats 425,000

m3/day. The plant could be

further expanded to treat a

maximum of 600,000 m3/day

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Ja

n

Fe

b

Ma

r

Ap

r

Ma

y

Ju

n

Ju

l

Au

g

Se

p

Oc

t

No

v

De

c

Millio

ns Inflow m^3 TSE m^3

Total inflow and treated

wastewater for Sulaibiya STP

2013

Month Inflow m^3 TSE m^3

Jan 14,192,738 10,789,078

Feb 12,779,254 9,692,332

Mar 13,887,844 10,843,902

Apr 13,632,462 10,501,119

May 14,175,125 10,860,848

Jun 13,797,345 10,432,020

Jul 14,434,667 10,885,778

Aug 14,391,274 10,897,749

Sep 13,953,634 10,613,199

Oct 14,246,765 10,875,803

Nov 13,880,596 10,458,123

Dec 14,231,798 10,893,199

SULAIBIYA STP, REVERSE OSMOSIS

Page 15: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

The plant was started on 2011

with designed capacity of

180,000 m3/day Tertiary treated

product

KABED W.W.T.P

2,050.00

2,100.00

2,150.00

2,200.00

2,250.00

2,300.00

2,350.00

2,400.00

2,450.00

2,500.00

2,550.00

Ja

n

Fe

b

Ma

r

Ap

r

M…

Ju

n

Ju

l

A…

Se

p

Oc

t

No

v D…

Tho

usa

nd

s Total inflow and treated wastewater for Kabd STP 2014

Month Inflow m^3 TSE m^3

Jan 2,523,488 2,477,655

Feb 2,296,600 2,258,677

Mar 2,278,710 2,237,397

Apr 2,361,701 2,314,213

May 2,436,773 2,391,664

Jun 2,350,421 2,298,574

Jul 2,421,441 2,362,902

Aug 2,432,457 2,384,660

Sep 2,370,288 2,321,651

Oct 2,494,911 2,463,175

Nov 2,434,827 2,407,582

Dec 2,483,760 2,451,423

Page 16: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

The plant was started on 1982

with capacity of 85,000 m3/day

then it has expanded on 1999

with designed capacity of

180,000 m3/day. It receive

currently 220,000 m3/day(2015)

Tertiary treated product

REQQA W.W.T.P

0

1

2

3

4

5

6

7

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Millio

ns

Inflow m^3 TSE m^3

Total inflow and treated wastewater for Al

Reqqa STP 2014

Month Inflow m^3 TSE m^3

Jan 6,580,500 5,880,500

Feb 6,067,200 5,567,000

Mar 6,602,722 5,752,989

Apr 6,491,135 5,677,382

May 6,682,638 5,829,355

Jun 6,445,141 5,602,875

Jul 6,550,749 5,700,503

Aug 6,342,483 5,729,531

Sep 6,409,897 5,855,618

Oct 6,578,782 6,008,798

Nov 6,723,015 6,168,005

Dec 6,923,015 6,368,015

Page 17: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

The plant was started on 2001

with designed capacity of 27,000

m3/day , it receive now 22,000

m3/day.It produce Tertiary Water

Um-Alhyman W.W.T.P

Total inflow and treated wastewater forr Um Al hiyman STP 2014

Month Inflow m^3 TSE m^3

Jan 636,210 635,954

Feb 577,016 575,473

Mar 679,246 677,637

Apr 659,561 658,359

May 680,306 678,917

Jun 565,762 564,259

Jul 575,970 566,227

Aug 541,998 540,433

Sep 582,112 580,682

Oct 615,134 613,575

Nov 664,614 663,296

Dec 742,298 741,466

0

100

200

300

400

500

600

700

800

Tho

usa

nd

s

Inflow m^3

TSE m^3

Page 18: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Quantity of Treated Wastewater 2015

STP Site Wastewater Received

TSE produced RO Product Water

produced

Wastewater converted to re- usable product

m3/d (avg.) m3/d (avg.) m3/d (avg.) %

Sulaibiya 565,000 - 452,000 80

Umm Al Hayman

26,000 26,000 - 100

Riqqa 230,000 230,000 - 100

Jahra 156,000 156,000 - 100

Al Khiran 400 400 - 100

TOTAL 977,400 412,400 452,000 88,4

Page 19: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

In Kuwait

Per capita consumption of water in the State

of Kuwait, compared with some of the world

Wa

ter

use

in

ga

llo

ns p

er

ca

pit

a p

er

da

y

Page 20: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Continued growing demand for fresh water

will double production in 2030 to 4 times

the current production

0

500

1000

1500

2000

2500

million c

ubic

metr

es p

er

year

Page 21: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

In Kuwait

TOTAL INFLOW OF WASTEWATER

2013 2015 2020 2030

907,000 السعةالتصميمية 907,000 1,360,000 1,960,000

914,000 الكمية 988,982 1,117,480 1,374,476

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000M

^3/D

AY

Page 22: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

In Kuwait

Page 23: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

REUSE OF

TREATED

WASTEWATER

Page 24: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

In Kuwait

Treated wastewater (TSE) provides both moisture and nutrients for the growth of plants and other vegetation

Reuse of treated wastewater for irrigation and landscaping has proved to be an important and alternate source for irrigation and other uses in Kuwait

The volume of wastewater is estimated to be 70 to 80 % of the potable water consumption by the population.

Treated wastewater is available to different standards in Kuwait; Tertiary & RO Product Water

REUSE OF TREATED WASTEWATER

Page 25: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Parameter UNIT INFLOW Tertiary R.O

الرباعي

Irrigation مواصفات

مياه الري

MEW Drinking

water

PH 7.5 – 6.8 8 – 6.5 8-6 7.5 -6.5 8 -6.5 ـــــ

Conductivity µs/cm 1200- 3000 1100- 2200 42 1500 515

T.S.S. mg/L 100- 500 < 10 < 1 15 _

V.S.S. mg/L 70- 350 < 7.0 < 1 _ _

C.O.D. mg/L 250- 750 < 40 0 100 _

B.O.D 5 mg/L 100- 400 < 10 < 1 20 _

Grease & Oil mg/L 10- 50 NIL < 0.05 5 _

T.D.S. mg/L 700- 1800 800- 1500 < 100 _ 400

Chloride mg/L 200- 400 200- 400 12 _ 103

Ammonia mg/L 15- 50 1- 5 < 1 15 _

Nitrite mg/L 0.04- 0.7 0.1- 1.5 < 1 _ _

Total Count colony/100mL 2.40E+09 2.2E+04 NIL _ NIL

T.Coli colony/100mL 3.20E+08 400 NIL 400 NIL

F.Coli colony/100mL 4.10E+07 0 - 10 NIL 20 NIL

Salmonella colony/100mL 4.50E+06 NIL NIL _ NIL

Streptococci colony/100mL 1.40E+07 NIL NIL _ NIL

Fungi colony/100mL 2.10E+05 2- 100 NIL _ NIL

Page 26: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Laboratory quality control

Page 27: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Evolution of Wastewater Reuse

Page 28: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Kuwait

Border

Bubiyan

Island

Failaka Island

N

Project C: 16 MIGD

40 MIGD

40 MIGD

Project D: 25 MIGD

20 MIGD: Z Farms

0.5 MIGD scientific club

1.1 MIGD Hunting & Chivalry Club

1 MIGD Civil Aviation Kuwait

Airport

1.5 MIGD Alshohada Farm

2 MIGD West Fintas

3.6 MIGD Umm Al Hayman

0.1 MIGD Omari & Rabiya Farm Future Projects :

Different Projects : Ongoing Projects :

Project A:8 MIGD

Project B: 26 MIGD (B1&B2) DM•

C

Abdally

Farms

Wafra

Farms

Um-al Ramam Lake

Page 29: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

شبكات الري بالمياه المعالجة في مناطق الكويت المختلفة

29

Page 30: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Golf course

Page 31: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Golf course/Race track

Page 32: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Alfalfa Farms

Page 33: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Agriculture Project

Page 34: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

بحيرة أم الرمم

34

Page 35: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further
Page 36: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further
Page 37: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

FUTUER SEWAGE NETWORK

Page 38: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

In Kuwait

FUTUER SEWAGE NETWORK

MAIN GRAVITY LINES 100 Km

MAIN PRESSURE LINES 120 Km

NORTH

A7

Mishref

Egaila

Ardiya

JAHRA

PUMP

Sulaibiya

WWTP- 600,000

M3/D

Kabed WWTP- 250,000 M3/D

&

North Kabed WWTP- 600,000

M3/D

Um Hyman

WWTP- 700,000 M3/D

MAIN PUMPING STATIOS (5)

Al-Mutlaa

WWTP- 400,000

M3/D

Page 39: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Scheme Dates Total Sewer

Renovation / Upgrade (km)

2015 – 2020 213.2

2021 – 2030 220.4

2031 – 2045 595.2

TOTAL 1,028.8

PLANNED NETWORK SCHEMES

Page 40: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Sludge treatment

Page 41: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further
Page 42: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Aerobic digestion

Page 43: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

Anaerobic digestion

Page 44: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further
Page 45: Session 4: Potential & Lucrative Investment Opportunities ......Treated wastewater produced is potable water quality standard and it treats 425,000 m3/day. The plant could be further

In Kuwait Thank You