Page 1: Shaban Booklet 1-6-2016

SHABAN BOOLKET

1

Page 2: Shaban Booklet 1-6-2016

SHABAN BOOLKET

2

SHABAN

CIVIL

ENGINEERS BOOKLET

Prepared by Consultant Civil

Engineer:

Majed A. Shaban Akree Mobile No. for Viber and WhatsApp:

+964 770 446 1234

IRAQ - Erbil – 2016

Page 3: Shaban Booklet 1-6-2016

SHABAN BOOLKET

3

INDEX

Subject Page

1- GENERAL 5

2- STEEL 20

3- BUILDINGS 38

4- ROADS 63

5- SANITARY 98

6- CONCRETE 112

7- ESTIMATION 128

8- Electrical & Mechanical

139

9- Miscellaneous 149

Page 4: Shaban Booklet 1-6-2016

SHABAN BOOLKET

4

Page 5: Shaban Booklet 1-6-2016

SHABAN BOOLKET

5

1

GENERAL

Page 6: Shaban Booklet 1-6-2016

SHABAN BOOLKET

6

Conversions

1 mile 1.609 km

1 barrel 210 Liter

1 Inch 2.5 cm

1 kg. 2.204 lb.

1 horse Power

745.7 watt.

1 hector 10000 m2

1 acre 4046.86 m2

1 donam 2500 m2

1 Olk 100 m2

1 bar 1.019 kg/cm2

1 kg. 9.81 Newton

1 bar 105 Pascal

1 gallon 3.785 Liter

1 Psi 6.89 N/m2

Page 7: Shaban Booklet 1-6-2016

SHABAN BOOLKET

7

Densities

MATERIAL kg/m3 Concrete 2300

Asphalt Conc. 2400

Bricks 1900

Cement 1400

Clay(wet) 2080

Cement mortar 1440

Concrete (Reinforced )

2400

Gypsum 1200

Sand 1650

Concrete Blocks 1400

Gravel 1800

Steel 7850

Wood (average) 400-700 Water 1000

Page 8: Shaban Booklet 1-6-2016

SHABAN BOOLKET

8

ASTM Soil Classification Class % sand % silt % clay

sand 80-100 0-20 0-20

Sandy Loam 50-80 0-50 0-20

loam 30-50 30-50 0-20

Silty Loam 0-50 50-100 0-20

Sandy C.L. 50-80 0-30 20-30

clay L. 20-50 20-50 20-30

Silty C.L. 0-30 50-80 20-32

Sandy Clay 50-70 0-20 30-50

Clay 0-50 0-50 30-100

Silty Clay 0-20 50-70 30-50

S= sand passing (2- 0.05mm) L= loam passing ( 0.05-0.005 mm) C= clay passing(less than 0.005mm)

Page 9: Shaban Booklet 1-6-2016

SHABAN BOOLKET

9

Soils Bearing Capacity TYPE kg/cm2

Hard rock 30 - 40

Rock 10 - 20

Loose rock 8 -12

Gravel & sand

6 –10

Coarse sand

3 - 5

Hard dry clay

2 - 3

Clay & sand

1.5 - 2

Fine sand 1 - 2

Loose clay 0.5-0.75

Filling soils 0.25- 0.50

Page 10: Shaban Booklet 1-6-2016

SHABAN BOOLKET

10

Materials Tests -1

Item Important tests

Bitumen Penetration test every supplied Tanker .

Filler Gradation every day , or when source changed

Bricks Compressive strength & water absorption , specimen of 50 bricks every 20 000 unit .

Cement Compressive strength, fineness and chemical test for each 100 ton .

Gravel and Sand

Gradation test one sample for every 50 m3 of supplied material .

Sanitary pipes

Thickness, weight per unit length, and thickness of Galvanized layer for each supplied quantity.

Page 11: Shaban Booklet 1-6-2016

SHABAN BOOLKET

11

Materials Tests – 2

Item

Important tests

Mosaic Tiles

Modules of Rapture, absorption Mosaic thick for every (3000) unit .

Gypsum Compressive strength, color , and chemical tests for every (150) tom.

Building stones

Compressive strength and absorption test , for every (100) m3

Concrete blocks

Compressive strength and absorption , 20 sample for every 10 000 unit.

Steel bars

Tensile strength, Elongation for every (25) Ton.

Concrete Compressive strength for every (50)m3 , or per day work and slump test.

Page 12: Shaban Booklet 1-6-2016

SHABAN BOOLKET

12

Materials Tests – 3

Item Important tests

Paints Mineral content , coloring material , oil and Resin , one gallon as sample every 100 gallon .

Stinger Tiles

Modulus of Rupture , % of absorption , 6 samples for each 5000 unit .

Concrete Pipes

Nominal Internal Diameter with tolerance of + , - 10 % , Crushing test , absorption one sample for each 50 units

Damp proofing bitumen

Flexibility , Heat resistant , and Tensile resistant , one sample for each source .

Water for concrete

% of So4 , % of salt , Alkalinity or acidity , one sample for each source .

Page 13: Shaban Booklet 1-6-2016

SHABAN BOOLKET

13

Timber size for FORM WORKS

Part of form work

Timber thickness or size in mm

Sheeting’s 25 to 50 Beam& column side

25 to 50

Beam bottom

50

Ledgers 50 x 100 to 75 x 200 Posts 50 x 100 to 75 x 200

Joists 75 x 100 to 150 x

150 Column Yoke

50 x 100 to 100 x 100

Studs and walling

50 x 150 to 150 x 150

Page 14: Shaban Booklet 1-6-2016

SHABAN BOOLKET

14

Expansion joints

T = C x L x Co T = Total expansion joint width in (mm) C = coefficient of linear expansion L = length of structure in mm Co= change of temperature in centigrade.

Material C mm/mm/co

Structural steel

0.0000017

Concrete Masonry

0.0000094

Reinforced concrete

0.000013

NOTE: For concrete structure an expansion joint to be provided every (15-20)m interval, for fences (5-6)m, and for Retaining walls (8-10)m,this when it is not computed as above.

Page 15: Shaban Booklet 1-6-2016

SHABAN BOOLKET

15

LEVEL CHECKING

a1 b1 Level Instr. A p B Fig : 1 d1 d2

a2 b2 Fig : 2 A B Q

d1+d2 d3 Error(e) = ( a2 - b2 ) - ( a1 - b1 ) / ( d1 + d2) 1-At Fig 1 , Put level at point P and Take levels at A & B , read a1,b1 2-At Fig 2 , Take levels at A & B , while the level is at Q point, read a2 , b2 3-Calculate e, allowable error is equal +,- 0.5 mm per each 10 m length. 4- d1,d2,& d3 are about 25 m.l each . 5- C= 0.0675 k2

C= Leveling curvature correction in meters K= Leveled Distance in Kilometers

Page 16: Shaban Booklet 1-6-2016

SHABAN BOOLKET

16

Piles foundations Types of piles: 1- Timber piles , 2- Steel H-piles , 3- Steel pipe piles , 4- Precast concrete piles , 5- Concrete piles , 6- Composite piles of different materials . Main Purpose of using Piles: 1- High Structural Load compression or uplift pressure. 2- Weak Bearing of upper layer of soil . 3- High Lateral Pressure . For piles Load Carrying Capacity (Q)

Q = Q1 + 2 * π * r * f * D

where : Q1 = Base Resistance in Ton r = Circular Pile Radius in Meters f = skin Friction between Pile and soil which vary from 500-2000 ton/m2 D = Depth of the Foundation in meters .

Page 17: Shaban Booklet 1-6-2016

SHABAN BOOLKET

17

TOR = Terms of reference 1- All Project work items should be Implemented according to Contract required Technical Specifications . 2- All materials used in the project should be new , from required sources and approved by Site Engineer . 3- All construction materials should be tested according to Construction Works Specification in the Laboratory . 4- The contractor should check all Project designs before starting project including B.M.s, reference points, then re-fix and add any other necessary points for construction operation if needed . 5- The contractor should provide and install Suitable Sing Board For Buildings projects and station plates For Roads. 6- Any Discrepancies between Project Drawings and B.O.Q should be studied reviewed , and decided by Site engineer .

SITE ENGINEER TOR -1

Page 18: Shaban Booklet 1-6-2016

SHABAN BOOLKET

18

SITE ENGINEER TOR -2

7-Site Engineer should Supervise the contractors’ maintenance and running operation procedures. 8-Supervise all work being implemented during the defects liability period. 9-Monitor, assist and supervise performance tests and start-up of the project according to contract. 10-Carry out final works inspection and issue contractor’s release work final acceptance certificates. 11-Liaise, organize and chair regular progress site meetings. 12-Issuing the Project Progress reporting periodically with Project duration. 13-Organize and participate in all final acceptance tests, inspections, proceedings, and final Project handover proceedings to owners . 14-Issue the Certificate of Final Completion report and Final Handover Certificate to the Authorities or owners .

Page 19: Shaban Booklet 1-6-2016

SHABAN BOOLKET

19

Page 20: Shaban Booklet 1-6-2016

SHABAN BOOLKET

20

2

STEEL

Page 21: Shaban Booklet 1-6-2016

SHABAN BOOLKET

21

STEEL BARS WEIGHTS

Bar Dia. Inch

Bar Dia. mm

Kg/ml Area mm2

1 /4 6 0.222 28

1 /3 8 0.395 50

3 /8 10 0.617 79

1 /2 12 0.888 113

5 /8 16 1.580 201

3 /4 20 2.470 314

1.0 25 3.860 491

1 1/4 32 6.315 805

1 1/2 38 8.900 1134

1 5/8 40 9.865 1257 Steel Bars Density = 7850 kg/m3

General Equation :Steel Bar weight in kg/ml =

(BAR Diameter )2 / 1.62

Page 22: Shaban Booklet 1-6-2016

SHABAN BOOLKET

22

Steel sections weights

Section Kg

Angle 20mm x 3mm Thick 6.0

Angle 25mm x 3mm Thick 7.0

Angle 40mm x 4mm Thick 14.0

Angle 50mm x 5mm Thick 25.0

Channel 75 x 36 x 6 mm 47.0

Channel 100 x 50 x 6 mm 62.0

Channel 120 x 55 x 7 mm 75.0

I-section 100 mm Height 50.0

I-section 140 mm Height 82.0

I- section 160 mm Height 96.0

Flat steel 25mm x 3mm Thick

4.0

Flat steel 35mm x 6mm Thick

9.0

Note : All above weights are for 6.0 meter section length .

Page 23: Shaban Booklet 1-6-2016

SHABAN BOOLKET

23

BRC Reinforcing

Gage Bar Dia. Section Net weight

61 7.62 2.99 4.69

62 7.01 2.53 3.97

63 6.4 2.11 3.31

64 5.89 1.79 2.8

65 5.38 1.49 2.34

66 4.88 1.23 1.92

67 3.25 0.54 0.86

1- All bars spacing are 15.2X15.2 cm 2-Normally BRC nets are of 2X6 m diameter. 3- Bar Dia. In mm, section is steel bars cross section is in cm2 per meter length. 4 - weight of the Net is in kg / m2.

Page 24: Shaban Booklet 1-6-2016

SHABAN BOOLKET

24

Mineral Plate weights

mm Inch Iron Steel copper

1.1 1/24 8.13 8.3 9.3

1.2 1/22 8.9 9.1 10.2

1.3 1/20 9.8 10 11.2

1.4 1/18 10.8 11.1 12.4

1.6 1/16 12.2 12.5 14.0

3.2 1/8 24.4 24.9 27.6

6.4 1/4 48.8 49.8 55.8

10 3/8 71.1 74.7 83.8

NOTES: 1- All weights in kg / m2

1- 2 - 1 / 24 inch means gage. 2- 3- mm & Inch are Thicknesses

Page 25: Shaban Booklet 1-6-2016

SHABAN BOOLKET

25

I - Sections for Roofs

Span in meters

Cross section

(mm) width x height

Weight kg /ml

1.5 -2.0 55 x 100 8.1

2.0 -3.0 64 x 120 10.4

3.0 -3.5 73 x 140 12.9

3.5 -4.0 82 x 160 15.8

4.5 -5.0 100 x 200 22.4

5.0 -5.5 110 x 120 26.2

5.5 -6.0 120 x 240 30.7

6.0 -7.0 135 x 270 36.1 :Note

)2( Maximum Distance between I -sections is( 80) cm, and Min. wall bearings in (cm) is =

Span in (cm) / 20

Page 26: Shaban Booklet 1-6-2016

SHABAN BOOLKET

26

Standard cutoff Reinforced steel bend point

Min. length= 12 bar x Diameter Wall

L / 7 L/5 Span = L L/4 L/5 Wall

l/4 l/3

Span = l L= Span of edge panel l = Span of intermediate panel

No

te : T

his

valu

es u

sed

fo

r s

lab

or

b

eam

on

ord

inary

Beari

ng

wall

s .

Th

is v

alu

se

use

d for

sla

b o

r b

ea

m o

n w

alls

Page 27: Shaban Booklet 1-6-2016

SHABAN BOOLKET

27

TYPICAL REINFORCEMENT needed For ordinary works

Kg /m3 TYPE

70 1 -Slabs and stair cases (Tension loads)

120 2 -Beams (stirrups, Transverse, & Shear Reinforcement.)

150 3- Columns and concrete walls.

130 4 -Concrete Foundations

50 5- Doors and windows lintels

NOTE: For (12- 18) cm thick slabs assume approx. (10) kg/m2

Page 28: Shaban Booklet 1-6-2016

SHABAN BOOLKET

28

TYPICAL ( 2 ) Story House

Reinforcing Part- 1

Dimension Reinforcement

Steel Bars Type

Width x Depth

80*30cm 60*25cm

3 - 16 mm Top, 4 - 16 mm

Bottom, stirrups 10 mm @ 20cm

Continuous

Foundation For walls

Beam Height x Beam width

40*30cm 45 *35cm

3 – 16 mm top, 5-16 mm

bottom , with stirrups 10 mm ,

@ 20cm.

Rectangular T

Beams , (4 – 5 ) m

span

30*30 cm 40*40cm

4 – 20 mm or 6 - 16 mm , with stirrups 10 mm

@ 20cm spacing.

Square Columns up to (4 )m

height

Thickness = 12 to 18

cm

12 mm @ 20* 20 cm or 10 mm

@ 15/15cm spacing.

Slabs , stairs up to (4) m span

Page 29: Shaban Booklet 1-6-2016

SHABAN BOOLKET

29

TYPICAL ( 2 )Story House

Reinforcing Part- 2

Dimension Reinforcement

Steel Bars Type

Slab 20 cm thick on wall

,10 cm at end ,

bearing 40 cm on wall

Top tensile bars 12 mm @ 10 cm

c/c Distribution steel 8 mm @12 cm

Cantilever, slab up to

2:0 m width , live load

400 kg / m2

10 – 12 cm thickness

Use 12 mm steel bars @ 15

cm c-c , both direction

Parapet 80 cm height

25 * 30 cm 30 * 40 cm 40 * 50 cm

At top 4 - 16 mm , bottom 2 - 16

mm , stirrups 10 mm @ 15 cm

Cantilever, T - beams up to 2.0

length

12 to 15 cm thickness

12 mm @ 15 cm both direction

Stair case 3.0 m height

Page 30: Shaban Booklet 1-6-2016

SHABAN BOOLKET

30

Steel Bars & Tests

1- Steel bars used for reinforced concrete should have maximum carbon content not more that 2%

2- Min. lap distances for splices in tension steel bars is ( 40 * bar diameter) but not less than 12 inch (30) cm

3- For compression bars minimum splices = (26*bar diameter ).

4- Minim positive steel reinforced required for Flexural members in concrete is 200/fy. ( psi)

5- Minim laboratory Test specimen required is 3 for each 25 tons , for steel bars Dia . 3/8” , each 35 Ton for bars 3/8” to 5/8” , and each 45 Ton for bars > 5/8” .

6- Minim Concrete cover for steel bars is equal to (1. 5) cm .

Page 31: Shaban Booklet 1-6-2016

SHABAN BOOLKET

31

Recommended Steel Bars

Spacing 1-For slabs Min. clear distance between parallel bars = 25 mm up to 25 mm bar Dia. , and equal to nominal bar Dia. For bigger sizes. 2-For Columns Min. spacing between longitudinal bars is = 40 mm, up to 25 mm bars diameters , and equal to 1,5 x bar dia. For bigger sizes . 3-For beams and girders , the clear distance between multiple reinforced layers should be at least 25 mm . 4-For bridges = 1.5 x bar diameter , or 1.5 x Max. size of aggregate . 5-For walls , slabs Max. spacing of principle reinforcement should be 450 mm , or 3 x wall or slab thickness, whichever is smaller.

Page 32: Shaban Booklet 1-6-2016

SHABAN BOOLKET

32

Dia

.

mm

1

No

.

2

No

.

3

No

.

4

No

.

5

No

.

6

No

1-

) Part

2

ps o

f ste

el b

ars

are

a (m

mG

rou

10

79

15

7

23

6

31

4

39

3

47

1

12

11

3

22

6

34

0

45

3

56

6

67

9

16

20

1

40

2

60

4

80

5 1

006

12

07

18

25

5

50

9

76

4 1

018

12

73

15

27

22

38

0

76

0 1

140

15

20

19

01

22

81

25

49

1

98

2 1

473

19

64

24

55

29

46

28

61

6 1

232

18

48

24

64

30

80

36

96

32

80

5 1

609

24

13

32

17

40

21

48

26

36

10

18

20

36

30

54

40

72

50

90

61

08

38

11

34

22

68

34

02

45

36

56

71

68

05

Page 33: Shaban Booklet 1-6-2016

SHABAN BOOLKET

33

Dia

.

mm

7 N

o.

8 N

o.

9

No

.

10

No

.

11

No

.

12

No

.

2 -

Part

) 2

G

rou

ps o

f ste

el b

ars

are

a (m

m

10

55

0

62

8

70

7

78

5

86

4

94

2

12

79

2

90

5 1

018

11

31

12

44

13

57

16

14

08

16

09

18

10

20

11

22

12

24

13

18

17

82

20

36

22

91

25

45

28

00

30

54

22

2

2 2

661

30

41

34

21

38

01

41

81

45

61

25

34

37

39

28

44

19

49

10

54

01

58

92

28

43

12

49

28

55

44

61

60

67

76

73

92

32

56

30

64

34

72

38

80

43

88

47

96

51

36

71

26

81

44

91

62

10

18

0

11

19

8

12

21

6

38

79

39

90

73

10

20

7

11

34

1

12

47

5

13

60

9

Page 34: Shaban Booklet 1-6-2016

SHABAN BOOLKET

34

.D

ia

7.5

cm

10

cm

12

.5

cm

15

c

m 1

7.5

cm

20

cm

1 -

part

le

ng

th s

pa

cin

g)

/m.

2G

rou

ps o

f ste

el b

ars

are

a (c

m

10

10

.47

7.8

5

6.2

8

5.2

4

4.4

9

3.9

3

12

15

.08

11

.31

9.0

5

7.5

4

6.4

6

5.6

5

16

26

.81

20

.17

16

.08

13

.40

11

.49

10

.05

18

33

.87

25

.40

20

.32

16

.93

14

.51

12

.70

22

50

.67

38

.00

30

.40

25

.33

21

.71

19

.00

25

65.4

5

49.0

9

38.2

7

32.7

2

28.0

5

24.5

4

28

82.1

3

61.6

0

44.2

6

41.0

7

35.2

0

30.8

0

32

107

.2

80.4

3

64.3

4

53.6

2

45.9

6

40.2

1

36

135

.7

101

.8

81.4

4

67.8

7

58.1

7

50.9

0

38

151

.2

113

.4

90.7

3

75.6

1

64.8

1

56.7

1

Page 35: Shaban Booklet 1-6-2016

SHABAN BOOLKET

35

dia

22

.5

cm

25

cm

27

.5

cm

30

cm

35

cm

40

cm

2

–S

pacin

g p

art

/m

. len

gth

2

G

rou

ps o

f ste

el b

ars

are

a (c

m

10

3.4

9

3.1

4

2.8

6

2.6

2

2.2

3

1.9

5

12

5.0

3

4.5

2

4.1

1

3.7

7

3.2

3

2.8

3

16

8.9

4

8.0

4

7.3

1

6.7

0

5.7

4

5.0

3

18

11

.29

10

.16

9.2

4

8.4

7

7.2

6

6.3

5

22

16

.89

15

.20

13

.82

12

.67

10

.86

9.5

0

25

21

.82

19

.63

17

.85

16

.36

14

.03

12

.28

28

27

.38

24

.64

22

.40

20

.54

17

.60

15

.40

32

35

.75

32

.17

29

.25

26

.81

22

.98

20

.11

36

45

.25

40

.72

37

.02

33

.44

29

.09

25

.45

38

50

.41

45

.73

41

.24

37

.81

32

.41

28

.36

Page 36: Shaban Booklet 1-6-2016

SHABAN BOOLKET

36

Typical Steel Frames Sections D

H

S

30 –

40

20 –

30

15 - 2

0

10 - 1

5

S

sp

an

In (m

)

10 –

12

8 –

10

6 –

8

5 - 6

H

heig

ht

(m)

2.5

– 3

.5

2.5

– 3

2 –

2.5

1.5

- 2

D

In (m

)

IPE

- 360

IPE

- 400

IPE

- 300

IPE

- 360

IPE

- 240

IPE

- 300

IPE

- 200

IPE

- 240

Co

lum

n

S

ec

tion

DIN

IPE

- 400

IPE

- 360

IPE

- 300

IPE

- 240

Gird

er

S

ec

tion

DIN

Page 37: Shaban Booklet 1-6-2016

SHABAN BOOLKET

37

Page 38: Shaban Booklet 1-6-2016

SHABAN BOOLKET

38

3

___________

BUILDINGS

Page 39: Shaban Booklet 1-6-2016

SHABAN BOOLKET

39

Buildings Requirements-1 Designing Buildings Requirements used normally in IRAQ :

Application of Loading: IBC Code 2006 or newest.

Concrete Structure: ACI Code 318-08 Metric version or newest.

Seismicity: IRAQI seismic Code for buildings Code2/1997(English version) It can be designed in accordance to the ACI code by applying this requirement

Wind Load: Applying 160 km/hr , Consider IBC code for the rest of the regulation.

Designing Methods: Allowable Stress Design Method for steel structure and Ultimate Strength Design for Concrete structures.

Reinforcement details: Should be according to ACI Detailing Manual, New Version.

Page 40: Shaban Booklet 1-6-2016

SHABAN BOOLKET

40

Buildings Requirements-2 Steel Structure: AISC Code.

Reinforced Bars: Required strength is 420 Mpa.(Grade 60) Dia. Ø16 mm dia. Or more, and 350 Mpa (Grade 50) for others.

Steel Material: Strength of steel materials used in IRAQ: apply the criteria according to AISC Code ( A36 , A50).

Soil Investigation: soil investigation is required for Soil capacity, Soil layer and Underground Water Level test data on soil conditions of the site

Footings: Between pile-footing and soil strengthening, pile-footing is mostly used in IRAQ.

Structural Analysis Software: ETABS and STAAD programs are

usually used in IRAQ.

Page 41: Shaban Booklet 1-6-2016

SHABAN BOOLKET

41

BUILDINGS BYELAWS

Min

.

wid

th

m

2.4

0

2.5

0

2.0

0

2.5

0

1.5

0

0.8

0

1.2

0

Min

.

are

a m

2

9.5

0

3.5

0m

2

per

bed

6.0

0

10.0

0

1.8

0

1.1

0

2.8

0

Ty

pe

Liv

ing

ro

om

.

Bed

Ro

om

.

Kit

ch

en

.

Kit

ch

en

+

din

ing

.

Bath

ro

om

.

W.C

.

Bath

. +

W.C

.

Page 42: Shaban Booklet 1-6-2016

SHABAN BOOLKET

42

Buildings Minm Required

1- Minimum Height of Living, bed rooms and Kitchen =2.75 m.

2- Minimum Height of Bath Room and W.C = 2.4 m.

3- Minim stair case width = 0.8 m.

4- Min. Ventilators Area = 2100 cm2 for every 140 m3 of rooms volume .

5- Minim glass thickness for 0.2 m2 area is 3 mm, for 0.3 m2 is 4 mm , for 0.4 m2 is 5mm , and for 0.7 m2 is 6 mm.

6- The horizontal distance between

any two openings in building walls should be more than ( 4 x wall thickness) as minimum. 7-The Min. internal dimensions of WC is 120 x 85 cm , and for Baths is 120 x 180 cm.

Page 43: Shaban Booklet 1-6-2016

SHABAN BOOLKET

43

Buildings Allowed Tolerances

1- Max. decreasing in footing Thick for concrete casting

5%

2- Footing displacement or eccentricity of footing width

2%

3- Variations for stairs RISE + or - 3 mm 4 - For stair TREAD + or - 6.5 mm 5 - For Lintels, parapets, Horizontal grooves, etc..

6.5 mm

6 - Variations in column and Walls shuttering of total length

12.5 mm

7 -Variations for Slabs, beams Shuttering for 3 Meters length

6.5 mm

Page 44: Shaban Booklet 1-6-2016

SHABAN BOOLKET

44

Buildings Doors and Windows

ROOM DOORS Height X

width WINDOWS

1- Dining rooms

(2.10 – 2.30)m x

( 4.20 x1.10)m

(10 – 20 ) % of floor area

2- Bed room

(2.0 – 2.10) x (1.0 – 1.10) m

(1/15) of walls area.

3- W.C.& Baths

(1.90 – 2.0) x (0.75-1.5)

m

Minim =(0.3)m2

4-Kitchens

(2.0-2.10) x (1.0-1.20) m

(15-30) %of floor area.

NOTE: These Standards are useful for Residential Normal houses.

Page 45: Shaban Booklet 1-6-2016

SHABAN BOOLKET

45

LINTLELS d Surrounded wall

b L b

Lintel Span (L) m

Concrete Beam

Depth(d)cm

Bottom Reinforce

ment

Lintel Bearing walls = (b) cm

Up - 1.2 15 3 - 8 mm 20

1. 2 -2.0 25 3 - 10 mm 25

2.0 -3.0 30 3 – 12 mm

30

NOTES : 1- Use 8 mm stirrups @ 20 cm. 2- For top bars reinforcing use 2 of 8 mm. diameter . 3-Minimum overlap = 40 bar diameter 4-Beam width is same wall width .

Page 46: Shaban Booklet 1-6-2016

SHABAN BOOLKET

46

Min. Slabs & beams Thickness

Members

Type Beams One way

slab

L / 16 L / 20 1-Simply supported

L / 17 L / 24 2- One end continuous

L / 21 L / 28 3- Both end continuous

L / 8 L / 10 4-Cantiliver

Notes: 1- These limits should be changed when deflection is computed.

2- L=clear distance between the two supports.

Page 47: Shaban Booklet 1-6-2016

SHABAN BOOLKET

47

Minim Walls Bearings

Type Distant (b)

Slabs on walls 15 cm

Lintels 20 cm

Beams

Spans up to 3.5 m Spans up to 5.5 m Spans up to 7.5 m

20 cm 30 cm 40 cm

Note: Beams bottom width is between 2 / 3 to ½ of its depth (D) but not less than 1/3 of its D , and normally 3 / 5. b= Bearing sitting distance of slab or beam on walls .

Slab or beam

D span b

Page 48: Shaban Booklet 1-6-2016

SHABAN BOOLKET

48

PLASTERING Plastering material required on masonry , blocks walls , (2)cm thickness , and per (100)m2 area .

TYPE M3 Mix

1-Cement Mortar= (Cement +Sand)

3.00 1:3

2-White Lime (Gypsum)= (Loose powder)

6.00 With water

3-Pointing = (Cement+ Sand).

0.35 1:3

4- Rendering = (white cement +filler)

0.25 1:2

NOTE: (220kg)of cement to be added for 100m2 plastering if smooth surfaces are required.

Page 49: Shaban Booklet 1-6-2016

SHABAN BOOLKET

49

WALLS SMALL FOUNDATION

wall 2 T ////////////// ////////////////Ground level T D d = Depth of Plain Conc.

45 o Inclined I I p= Clear leave

D= Depth of back distance Foundation

Plain concrete Foundations. 1:2:4 with Masonry walls For Normal houses and buildings. NOTES: 1- Minim d = 20 cm , OR 3P/2 minim p = 15 cm . minim D = 60 cm 2 -Load angle projection is 45 Degree in both sides.

3- T = Building wall Thickness .

Page 50: Shaban Booklet 1-6-2016

SHABAN BOOLKET

50

45 º Crack Pattern in wall Due to

foundation Failure

Page 51: Shaban Booklet 1-6-2016

SHABAN BOOLKET

51

STAIRS

T R H= Stair Height w = Stair Width q = Stair slope angle

W = width H = height

T = Tread R= Rise RULES :

1- 2R + T = 584 to 610 mm

2- H / R = No. of stairs.

3- W = (T x No. of stairs )

4- Min m T = 216 mm Max m R = 203 mm Max m q = 42 o

Min m q = 20 o

Page 52: Shaban Booklet 1-6-2016

SHABAN BOOLKET

52

Step Foundations

Top Reinforcing Mesh X Bottom Mesh A level

T= Thickness Y B level

Z – shape reinforcing

Recommendations : 1- Continuous Foundation thickness = T 2- Minim Y = T , No. of steps not limited . 3- Minim X= 2Y but not less than 30 cm 4- Use inclined Z – shape steel connection between the foundation levels A & B and use the same reinforcement type used in the foundation Bottom Mesh . 5- Min overlap of z-shape with original foundation reinforcement is 40 reinforcing bar diameter .

Page 53: Shaban Booklet 1-6-2016

SHABAN BOOLKET

53

Typical Basement Drainage

This for Typical Basement excavated in soil

30 cm Min . Filter 12 cm Min.

Reinforced concrete

Wall , 2500 psi min. water proofing

;;;;;;;;;;;;;;;;;;; layer.

;;;;;;;;;;;;;;;;;;;;;

;;;; Natural ;;;; Proofed Flooring

Non excavated;

;;;;;; soil ;;;;;;;;;;;;;

;;;;;;;;;;;;;;;;;;;;;;;;;;;,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, NGL

;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;

Footing Tamped Earth Back filling 15 – 20 cm Diameter Filter layer from Slotted pipe on hard Coarse graded agg. Base , with slope Or stone backfilling For draining seepage For water draining water outside plot .

Page 54: Shaban Booklet 1-6-2016

SHABAN BOOLKET

54

FORMS OPENING

TYPE DAYS

( Beams + Lintels

+Footing ) Sides.

2

Column without loads.

3

(Slabs + Lintels + Under. Beams base ).

2 X small dimension (m) +2 days

m = meter

NOTE: This recommendation are for ordinary concrete works, with air temperature above 5o C.

Page 55: Shaban Booklet 1-6-2016

SHABAN BOOLKET

55

Typical Roofing Detail

Page 56: Shaban Booklet 1-6-2016

SHABAN BOOLKET

56

Form Work Sizes

Type Millimeter

1-Decking timber for slabs bottom ,columns and beams , thickness:

25 to 50

2- Vertical posts section:

75x100 to 150x150

3-Joists and ledgers Supporting

sheeting’s of slabs .

50x100 to 75x200

4-Studs and wailings supporting vertical walls sheeting’s .

50x100 to 150x150

5-Column yokes, horizontal cross pieces supporting vertical sheeting .

50x100 to 100x100

Page 57: Shaban Booklet 1-6-2016

SHABAN BOOLKET

57

Paints Paint type Quantity Area

Oil on plastered surfaces and iron.

1 gallon 30-35

m2

Emulation on walls and roofs.

1 gallon 20-25

m2

Varnish on Wood surface .

1 gallon 30 m2

Bitumen for Roofs isolation .

10 kg 5

m2

Snowcem on walls. (powder )

50 kg 100 m2

Distemper for external surface.

12 kg 100 m2

Notes : 1- The covered area is changed according to surface smoothness. 2- Painter can cover (45-65) m2/day.

Page 58: Shaban Booklet 1-6-2016

SHABAN BOOLKET

58

Column Requirements - 1 1- Columns are considered short or small when the ratio of column effective Length (L) to its least lateral dimension(d) exceed (15)

Slenderness ratio SR = L / d 2- Max SR for column so that it not subject to buckling should not exceed (45) for Axially loaded columns, & (20) for columns which subjected to Bending moments.

3- Reduction load factor for long column with (21) SR is 0.8, (30) SR is 0.5, And (42) when SR is 0.1 .

4- Recommended min. least lateral dimension or diameter for 4.5 m long column is 45 cm, for 3.5 m is 35 cm and for 3.0 m is 23 cm.

Page 59: Shaban Booklet 1-6-2016

SHABAN BOOLKET

59

Column Requirements- 2 1- Un supported column length should not be greater than (10) times of the least lateral dimension or Diameter of the cross section, other wise it should be considered as long column and braced for lateral support. 2- Minim column dimension, diameter or thickness, should not be less than (15) cm , and maxim length to width percentage should not exceed 3:1 for the rectangular cross sections. 3- Maxim steel reinforcement for a column cross section is 8% and minim is 1% as percentage of the total column cross section area. 4- Minim steel bars used ½ inch, and maxim 2 inch, for stirrups minim is ¼ inch and maxim spacing is(25) cm.

Page 60: Shaban Booklet 1-6-2016

SHABAN BOOLKET

60

Tests For RequiredMin. BuildingsNormal

1-Min. Concrete Cube compressive

strength fc’ should be at least 25 MPa , which is equivalent to 21 MPa for standard Cylinder strength 2-Min. Yield strength fy for steel bars should not be less than 420 MPa , equivalent to Grade (60). 3-Allowable Soil Bearing capacity for Normal foundations = 8.0 – 10 Ton/m2., Unless Tested. 4-In case of fail of (7) days cubes , we should wait for (28) days test , if it fail again , below tests should be hold so that we can decide finally: A-Core test for failed members . B-Onsite Design loading test . C-Ultrasonic OR Hammer test . Then Consultant Engineer Decide.

Page 61: Shaban Booklet 1-6-2016

SHABAN BOOLKET

61

Concrete Slab Humidity

Whenever there is humidity appears in the bottom of concrete slab it can be treated according to the sketch shown below, but no more extra live or dead loads are allowed to be hold on it , the max. live loads allowed are not more than 2 KN/m2 .

Page 62: Shaban Booklet 1-6-2016

SHABAN BOOLKET

62

Page 63: Shaban Booklet 1-6-2016

SHABAN BOOLKET

63

4

ROADS

Page 64: Shaban Booklet 1-6-2016

SHABAN BOOLKET

64

GENERAL ROADS -1

1- For small blasting in rocks , (1.0) kg of explosive materials is needed for every (4.0) m 3 , and in huge blasting, half of this quantity is required. 2-Soils expand after excavation about 25% of its original volume , subbase 10%,sand 20%, and chalk soils 30% . 3- Max. Allowable Soluble salts in road embankments is 10 % , and Max allowable organic materials is 5 - 10 % .

One test sample required for every 3000 m 3 of soil.

4- Maximum allowable longitudinal grade is (6-9%) for a (50km/hr) design speed road , and (3-5%) for a (110 km/hr) design speed .

Page 65: Shaban Booklet 1-6-2016

SHABAN BOOLKET

65

GENERAL ROADS - 2

1-Standard roads lane width is (3.7m) but not less than 5.5 m for 2 lanes , with median width from ( 1 to 4) m between lanes . 2- Roads Shoulder Minimum width is 1.25 m and Max. 3.6 m , with transverse slope between 2% and 5 % for water draining.

3-Absolute Maxm grades for highways is 12% , and for urban streets is 30 %

4-Required Widening width ( w ) for horizontal curves up to Radius ( R ) = 60 m is 1.2 m , for R= 150 m , w = 0.9 m and for R = 300 m , w = 0.3 m , No (w) widening is required for more than R = 900 m .

Page 66: Shaban Booklet 1-6-2016

SHABAN BOOLKET

66

5- Suitable side slope for 1.0 m

Embankments height is 1:6 and for 3.0 is 1:4 & for 6:0 m is 1:3 .

Roads Suitable Cases 1- Unsuitable materials for roads Embankment are Soils containing 12% or more organic materials , Salty soils containing 10% of total salts or more, Clay of liquid limit more than (55),

and /or Plasticity index >30. 2- Min. suitable road grade for soil side ditch = 0.5 %, max.= 3%.

3- Min. suitable (R) of circular curve for (50) km/hr. design speed is (150) m with 5%super elevation, and R = ( 600 ) m for 100 km/hr . 4 4- Max. suitable longitudinal grade

for rural roads = 5% for 7km/hr, and 8%, for 50 km/hr. speed.

Page 67: Shaban Booklet 1-6-2016

SHABAN BOOLKET

67

Airports 1- Airports are classified according to its usage , aircraft type and Runway code letter from ( A to F ) according to ICAO international standards. 2- Airports are Mainly composed of Main Runway, taxiways, aprons , terminal building for passengers, VIP , tower , cargo , and other service buildings , communications and roads. 3-Main Runway rigid pavements typical layers are Concrete 40 cm thickness + 15 cm Dry lean concrete + 35cm stone base + 30 cm sub base ). 4-Flexibale pavement is consist of 4 cm wearing + 6 cm Binder + 15cm MBC Macadam base course + 50 cm stone base + 30cm subcase). 5-Minm clear distance between runway and any parallel taxiway is 200 m , for safety issues .

Page 68: Shaban Booklet 1-6-2016

SHABAN BOOLKET

68

Airports Classification

Airports are classified according to its runway characteristics as below : Type Runway Runway Max. Length width Grade

Secondary 500-900 25 2.0% Domestic 1250 30 1.5% Sub-maim 1800 45 1.5% Main 2250 45 1.5% International 3150 & 45 & 1.25% More 60 Airports also are classified with its annual passenger capacity ( Mppa) , for example 2.5 Million passenger (Arrivals + Departures) per year. Notes :

1- All dimensions are in meters 2- Maximum grade is for runway

centerline profile . 3- These physical characteristics are

according to FAA standards .

Page 69: Shaban Booklet 1-6-2016

SHABAN BOOLKET

69

Page 70: Shaban Booklet 1-6-2016

SHABAN BOOLKET

70

High Way Grades

Type of Terrain

Express way

Rural way

Urban High way

Level 3% 4% 6%

Rolling 4% 5% 7%

Mountain 6% 7% 9%

NOTES: 1- Min longitudinal grade 0.5% in snowy countries, and 0.3% at other locations. 2- Max. Ramp grades 8 %. 3- Level longitudinal grade is accepted in flat only where side fill slope 1:4 or flatter .

Page 71: Shaban Booklet 1-6-2016

SHABAN BOOLKET

71

Asphalt Pavements Layer Description

1-Wearing layer

Bitumen 6% , thickness (4 - 5) cm , Min. compaction 98%.

2- Binder layer

Bitumen 5% , thickness (6-7) cm, compaction 98%.

3-Stablizer Layer

Bitumen (3 - 4)%,thickness (8-10)cm , compaction 98%.

4 - Base course

Crushed lime stone layer , Min. Compaction 98% , Min. CBR 10%,thick (20-30) cm

5 - Sub- Base

Sand and Gravel Mixture compacted up to 95% Min. CBR 10% ,Thick (20-40)cm.

6 – Filling and Sub - grade

Compacted filling soil layers (30)cm thickness up to 92%, Last 2 m 95%,Sub grade 95%

7- Prime + Tack coat

Applied between sub-base and asphalt layers.

8- Shoulders

Sand & Gravel Mixtures Type (B) thick ( 20)cm , CBR 10%

Page 72: Shaban Booklet 1-6-2016

SHABAN BOOLKET

72

Asphalt job mix Tolerance These are allowed Tolerances for any asphalt layer equation deviations 1- % of aggregate passing sieve No. 4 and larger +,- 6 %

2-% of aggregate passing Sieve No. 4 and smaller. +,- 4 %

3- % of passing sieve No. 200 (Filler).

+,-1.5 %

4- % of asphalt by weight of Total mixture.

+,-0.3 %

5- Spreading temperature for asphalt mix. In (degree) +,- 15 %

compaction imMin -6temperature . 85 C°

air temp. allowed imMin -7 For laying asphalt mix.

5 C°1

Page 73: Shaban Booklet 1-6-2016

SHABAN BOOLKET

73

Asphalt Pavement Tolerances

Surface or Course

Level Tolerance in millimeter

Wearing course asphalt

+ 3 to - 3

Binder and stabilizer asphalt courses

+ 3 to - 6

Crushed stone course

+ 6 to - 15

Sub base course mixed granular

+ 10 to - 30

Sub grade or Formation level layer

+ 15 to - 30

Above tolerances may change Note :

slightly according to pavement type .

Page 74: Shaban Booklet 1-6-2016

SHABAN BOOLKET

74

Right Of the Road

2:3

A

B R

3.0 1.5 1.0

R =

Rig

ht

of th

e r

oad is a

ll w

idth

of

the

allo

cate

d land for

constr

uctin

g t

he r

oad

str

uctu

res a

nd s

afe

ty a

rea o

n b

oth

sid

es ,

and it is

equa

l to

:

R=

B +

2 (

A x

3/2

+ 3

+ 1

.5 +

1 )

mete

rs

Page 75: Shaban Booklet 1-6-2016

SHABAN BOOLKET

75

Asphalt Pavement Deviation After completing asphalt pavement laying on ground any deviation of the laid layer from the mixing equation should be treated as below A- Deviations Bitumen percentage: 1-Any Deviation of Bitumen percentage by (0.3 to 0.5) for binder course, and (0.5 to 0.7) for wearing course, from the max and min limits of the total mix design equation it should be treated by adding new (2) cm layer for binder course and (3) cm for wearing course for all layer . 2-But if deviations are less than above limits price deduction should be applied as new price = contract price x ( 1- 0.6 x deviation percentage). 3 - Any deviations more than above limits , the complete layer should be removed and replaced by new layer.

Page 76: Shaban Booklet 1-6-2016

SHABAN BOOLKET

76

Asphalt Pavement Deviations Part-2

B- Deviations in Stability and Flow : 1-Deviations from vMin required limit of stability by (68 to 100)Kg for wearing course, and ( 100 to 150) kg for Binder course , and also deviation from Min and Max required limits of Flow by 7.62 mm , should be treated by increasing the next layer by 3 cm 2-But if Deviations are more than upper mentioned limits for stability or flow limits by more than 7.62 mm, should be treated according to item (A-2 ) in part 1 3 - Any deviations more than above limits , the complete layer should be removed and replaced by new one without any compensations and according to required specifications.

Page 77: Shaban Booklet 1-6-2016

SHABAN BOOLKET

77

Roads Material Tests Item Important tests

Road Embankment layers

Compaction every 200 ml., C.B.R, soluble salts , organic content , each 1500 m3 , or soil changing.

Road Sub- grade layer

Compaction every 200 ml ,C.B.R 5% Min. , Gradation , LL Max . 25% , PI Max . 6% , each 400 m3

Sub base & Stone Base

Gradation , L.L . P.I , CBR , and Field density each 400 m3 , Min. 98 %or Each lane .

Prime Coat Density as kg/m2 for each lane About 1.0 kg / cm2 .

Asphalt Layers

Bitumen Penetration, Asphalt Mix Temperature. Each train, Extraction & Gradation test ,Compaction Min. 98%, layer Thickness ,and surface accuracy each 2000 m2 or one day work.

Structure (Culverts, Curbs & Bridges)

Cement physical & chemical properties, Concrete Slump, strength and temp.,Steel Tensile , with sand &gravel gradation.

Page 78: Shaban Booklet 1-6-2016

SHABAN BOOLKET

78

ASPHALT LAYERS GRADING

Sieve Stabilizer Binder Wearing

1.5" 100

1.0" 90-100 100

3/4" 75-91 90-100 100

1/2" 56-80 70-90 90-100

3/8" 50-74 56-80 77-93

No. 4 29-59 35-65 44-74

No. 8 19-45 23-49 28-58

No. 50 5-17 5-19 5-21

No. 200 2-8 3-10 3-10

% of bitumen. 3.0- 5.5 3.5-6.0 4.0-6.0

Marshal >= 5 KN >=7 KN >= 8 KN

Notes: 1- Required Flow is from (2 - 4mm) 2- Required air voids (>=70%) for all asphalt types as Typical. 3- Bitumen Grade 40/50 to used for upper layers Binder and Wearing 4- Bitumen Grade 60/70 to used for lower layer Stabilizer .

Page 79: Shaban Booklet 1-6-2016

SHABAN BOOLKET

79

Bridge Collapse due to Piers foundation failure

Page 80: Shaban Booklet 1-6-2016

SHABAN BOOLKET

80

BRIDGES JOINTS

Joint Type

Total Longitudinal Movement

Maximum Acceptable

Vertical Movement Between

Two Sides of Joint mm

Min.mm

Max.mm

1.

Buried joint under continuous surfacing

5 20 0· 5

2. Gap joint with poured sealant

5 12 3

3. Gap joint with flexible membrane

5 50 3

4. Open gap joint 5 60 3

5. Fully cantilevered toothed plates

50 - 3

6. specially designed joints

100 - 3

Page 81: Shaban Booklet 1-6-2016

SHABAN BOOLKET

81

Asphalt Properties

Property Base

Course Binder Course

Surface Course

Marshall Stability

(KN), min 5 7 8

Marshall Flow (mm)

2-4

2-4

2-4

Voids in Marshall specimen (%)

3-6 3-5 3-5

Voids in mineral aggregate (%),

mm. 12 13 14

Immersion-Compression

Index of Retained

Strength (%), min.

70 70 70

Page 82: Shaban Booklet 1-6-2016

SHABAN BOOLKET

82

Prime Coat spraying

___________________________________________________________________

1-Checking Subbase layer final levels

to be with in accepted tolerances 2- All subbase Tests should be

passed according to required Specifications and standards.

3- Prime coat. spraying Temperature should between (60-85) ° C

4- Testing spraying Quantities between (0.45 – 1.5) kg/m2

5- In case there is any segregation in subbase layer it should be treated before spraying prime coat layer.

6- Prime coat layer wide and length should be always more that asphalt

7- It is not allowed to spraying Prime coat layer if there is any free water or powder or it is raining on subbase layer, it should be dry.

8- It is recommended to spraying a quick water then wait till the surface dried, before spraying Prime coat.

Page 83: Shaban Booklet 1-6-2016

SHABAN BOOLKET

83

Asphalt Placing Notes ____________________________________________________________________

1- Prime Coat layer tests should be checked And Any surface excess Bitumen quantities should be removed and treated by clean sand. 2-Asphalt Mixture Temperature spraying on site to be tested and it should between (120 - 170) ˚ C. 3- No mixture placing is accepted in Rainy days, or below 15 ˚ C temp. 4- Allowable compactor speed on hot Mixture is (4 - 6) km /hr. 5- Maximum allowable surface layer irregularity Tolerance under4 m length aluminum roller, is 3 mm for wearing course layer, and 6 mm for binder course layer. 6-To prevent cold joint occurring between two spraying asphalt lanes one after other, second lane should be applied before first longitudinal joint temperature full below 60˚ C.

Page 84: Shaban Booklet 1-6-2016

SHABAN BOOLKET

84

Asphalt spraying Tests ____________________________________________________________________ 1-Testing Asphalt Mixture temp .

should be between (120-170) ° C inside trucks before spreading on site. 2-A sample of( 30x30 ) cm area of spreading asphalt mixture layer , Min. (12) kg , should be taken after finisher directly for Extraction , Marshal and Specific Gravity Tests

3- Cutting Cores from spreading asphalt layer next day for layer thickness and compaction test which should be Min. 95 % . 4-Thicknesss checking control of spreading layer which should be according to drawings & Tolerances 5-Vidual checking for spreading layer after finisher directly and treating any segregation immediately 6-No spreading allowed below 4°C. 7-Compaction Temp. ( 80 - 90 )°C .

Page 85: Shaban Booklet 1-6-2016

SHABAN BOOLKET

85

Typical Road Slopes 1 m Berm each 3 m height of side shoulders slope 4 % Pavement slope 2 % Each side ///////////////////////////////////// Cut slopes Fill slopes 1-Rocky Layers 1: 1.75 to 3:1 to 10 :1 1: 4 Depending 2- Soils Minim 1:2 on soil type ..

Note : Minim Excavation for Removing Top-soil under pavement ,“Original sub soil” , is (15)cm, with Minim required CBR = 5 %.

Page 86: Shaban Booklet 1-6-2016

SHABAN BOOLKET

86

Road Creep Failure due to non-sufficient compaction and wall

Page 87: Shaban Booklet 1-6-2016

SHABAN BOOLKET

87

STONE BASE GRADING

As % Passing

Sieve No.

% Pass

Sieve No.

% Pass

1.5" 100 No. 4 30-60

1.0" 80- 100 No.40 10-30

1/2" 50 - 80 No.200 5-15

Notes: 1- Liquid limit = (25) % as upper limit for Materials Passing sieve No. 4 . 2- plasticity Index= (4) % as upper limit for Materials Passing sieve No. 4 . 3- Abrasion loss is 45 % as upper limit . 4- Soaked CBR = or more than 80% at 95% modified maxim density. 5 – All material should be crushed with Aggregate crushing value of less than 30 , BS 812 .

Page 88: Shaban Booklet 1-6-2016

SHABAN BOOLKET

88

SUB-BASE GRADING

As % Passing

Sieve Grade

A Grade

B Grade C

2.0" 100 100

1.0" 60-90 75-95 100

3/8" 30-65 40-75 50-85

No. 4 25-55 30-60 35-65

No.10 15-40 20-45 25-50

No.40 8-20 15-30 15-30

No.200 2- 8 5 - 15 5 -15

Notes: 1-Liquid limit not more than (35) 2- required plasticity Index not more than (6). 3- Soaked CBR = or more than 60 % at 95% modified maxim density.

Page 89: Shaban Booklet 1-6-2016

SHABAN BOOLKET

89

F’ R E’

D C

E F

R=

Radiu

s,

EF

= D

C/4

, D

C=

(A

B)2

/8R

1 –

Info

rmation;

poin

ts A

, B

and R

.

2 -

Dra

w lin

e A

B.

3-

Fin

d D

C a

nd E

F, E

F e

qu

ation

sam

e a

s D

C

4-

Locate

poin

ts (

E,F

,D).

5-D

raw

curv

e (A

,F,D

,F’ a

nd

B)

Small horizontal curve Setting

AC = (0.5) AB DE = (0.5) DB DC , EF are perpendicular on AB , AD , DB .

Page 90: Shaban Booklet 1-6-2016

SHABAN BOOLKET

90

SIGHT DISTANCE

E .

A B CL

Q

R

S = 2R Arc Cos. (R - E ) / R S = sight distance in meters measured along CL line of inside lane (dotted) R = Radius of the center line of the inside lane in meters ( dotted ) . Arc Cos. is expressed in radians E = Distance from CL of inner lane . A = Driver eye , B= Object on road Height of the Object = 15 cm Height of the driver eye = 1.15 m Line of the sight AB is(76)cm above GL Q= Any obstruction ( building or tree…etc ….)

Page 91: Shaban Booklet 1-6-2016

SHABAN BOOLKET

91

Culverts Length Min. culvert length L is calculated as : L= SW + 2*SH + 4*FH SW =sub base width SH = shoulder width FH = filling height on top of The culvert slab to the bottom of the pavement NOTES : 1- The Culverts side slopes are assumed 1:2 for fill. 9- Min. Culvert bed slope for suitable

flow is 0.5% and max. is 5% . 3- For low water discharges, use pipe

culverts till 1.0 meter diameter size , for 3.0 meter river water flow span , Box culverts preferable .

4- Bridges are recommended for bigger Discharges, and rivers with more higher spans .

Page 92: Shaban Booklet 1-6-2016

SHABAN BOOLKET

92

Culverts Size

Culverts size are calculated according to formula :

A = ( i * a * f ) / ( 36 * v ) A = culvert cross section in m2 i = Intensity of max. rain full in the Region in cm/ hour. Use 100-120 cm/hr in north of Iraq. a = Catchments area in Hectares. f = factor of soil impervious Depending on type of soil, from (0.9) for Rocks , (0.75) for normal soils to (0.6) for sandy soils. v = allowable velocity inside culverts in cm/sec, which is about 0.5 Cm/sec. Note: Free board of minimum (15) cm is recommended under bottom of culvert slab to surface of water flow.

Page 93: Shaban Booklet 1-6-2016

SHABAN BOOLKET

93

RETAINING WALLS Masonry wall with plain Concrete Footing , the section is Economical up to (3)m (H) = Height . H/7 . /////////// H/3 H H/3 H/5 f H/3 D //////////// H/3

d 7 / 16 H

NOTES : 1- Min m Footings Excavation, D = 80 cm , 2- Min m Footing Thickness, d = 50 cm . 3- Min m f = 20 cm .

4-Inside Wall casting Concrete can be filled with 30 % stones. 5-Drain PVC (4)” pipes to be inserted each 1 by 1 m .

Page 94: Shaban Booklet 1-6-2016

SHABAN BOOLKET

94

Rigid Pavement Design

Olders Formula: D = 3WC/S D = plain slab thickness in cm. W= moving wheel load in Kg which may varies from 2260 to 5440 , add 10 % to 20% for Impact load. C= Coefficient of sub grade which varies from 6.89 for clays , 5.44 for sand mixtures ,and 4.81 for gravel hard mixtures. S= allowable flexural unit stress for concrete in Kg /cm2 , normally taken as 22 to 25kg/cm2 , with ( 2 ) as factor of safety.

Page 95: Shaban Booklet 1-6-2016

SHABAN BOOLKET

95

Treated Ground

Normal Concrete Joints on ground

a- Crack Control joint :

groove= T/4 T Crack //////////////////////////// T=thickness b- Expansion joint :

Isolation filter ////////////////////////////

concrete

c- Construction joint: formed edge

with key 1st cast 2nd cast

////////////////////////////

Page 96: Shaban Booklet 1-6-2016

SHABAN BOOLKET

96

Internal City Roads Layers R

oa

d

Ty

pe

Su

b

Gra

de

Su

b

Ba

se

B

as

e

As

ph

alt

10

,12

,15

M w

idth

insid

e c

ity

Min

. CB

R

4 %

Th

ick

30

cm

Typ

e A T

hic

k

20

cm

Cru

sh

ed

Lim

e

Sto

ne

Th

ick

20

Cm

Bin

de

r

6 C

m

20

, 30

M w

idth

City

Roa

ds

Min

. CB

R

5 %

Th

ick

50

cm

Typ

e A T

hic

k

30

cm

Cru

sh

ed

lime

sto

ne T

hic

k

25

cm

Bin

de

r

7 C

m

40

, 60

, 10

0 , 1

20

M w

idth

Ma

in c

ity R

oad

s

Min

. CB

R

6 %

T

hic

k 6

0 c

m

Typ

e

A T

hic

k

40

cm

Cru

sh

ed

lime

Sto

ne

thic

k

30

cm

(2) la

ye

rs

Bin

de

r 6

Cm

+ W

ea

ring

5 c

m

Page 97: Shaban Booklet 1-6-2016

SHABAN BOOLKET

97

Page 98: Shaban Booklet 1-6-2016

SHABAN BOOLKET

98

5

SANITARY

Page 99: Shaban Booklet 1-6-2016

SHABAN BOOLKET

99

SANITARY CONSTANTS 1- Water supply Consumption requirements as liter /capita /day

a- For Each Person at Home as average is about (200) L / C / D

b- For Schools (100) per Student c- For Hospitals (400) per Bed d- For Offices (80) per Employer e- For hotels (500) per person f- For Restaurants (5) per Meal

2- Recommended water supplying pipe size for ordinary house is ½ inch , and for distributing net from tank and ventilation pips is ¾ inch 3- Min. water velocity in pipes (0.7) m /sec. and max. is ( 3.0 ) m /sec. 4- For sewerage flow, best design Velocity between ( 0.4 - 0.9) m/sec , which provide best self-cleaning without erosion or sedimentation. 5- Minimum Longitudinal slope for sanitary pipes ( 4 to 6)” is (1.0) cm/ per meter length of the pipe .

Page 100: Shaban Booklet 1-6-2016

SHABAN BOOLKET

100

Typical Deep Filtration

NGL Compacted clay /////////// ///////////// 20 cm ;;;;;;;;;;; ;;;;;;;;;;; 30 cm mixed sand & gravel layer 1.0 m graded Boulders max. size 3” 60 – 80 cm width Slotted drain pipe NOTE : This typical deep filter can be used for Both Roads and buildings Surroundings .

Page 101: Shaban Booklet 1-6-2016

SHABAN BOOLKET

101

Domestic septic

Tanks Number of users

Length(m) x width(m) x Depth (m) .

5 2.0x1.0x1.0

10 2.5X1.3x1.0

15 2.5x1.5x1.3

20 2.8x1.5x1.3

50 4.5x2.0x1.4

Notes:

1- Use ventilation pipe( 2.0") diameter

for the septic tank .

2- Use Manhole cover (50x50)cm.

3- A wall to be constructed for dividing

the septic tank to two parts with one

small opening on the top of wall .

4-Free board 30cm required over

depth.

Page 102: Shaban Booklet 1-6-2016

SHABAN BOOLKET

102

Galvanized pipes Normally used in water and gas supply installations .

Pipe Dia. inch

Pipe Dia. mm

weight kg/m.l

Thick-ness mm

1/ 2 12 1.26 2.76

3/4 19 1.68 2.87

1.0 25 2.50 3.37

2.0 50 5.43 3.91

2.5 65 6.49 3.65

3.0 75 8.00 3.80

4.0 100 12.00 4.50

Note :

The Tolerance is = +,- 10 % in Pipe weight, for testing purpose

Page 103: Shaban Booklet 1-6-2016

SHABAN BOOLKET

103

Deep well discharge G. L///////////////// ///////////////////////////// water table well ------------------------------------------------------ …….. H …….. …….. R depression cone

R = \ 2Q / π

R= radius of depression cone in ft

Q = discharge in galloons / day h = depression of water in well during pumping in ( ft )

Page 104: Shaban Booklet 1-6-2016

SHABAN BOOLKET

104

Pipes size used for Water supply and sewerage

Inch mm Inch mm 3/8” 8 3.0” 80

½” 10 4.0” 100

5/8” 15 5.0” 125

¾” 20 10.0” 250

1.0” 25 16.0” 400

1 ¼” 32 20.0” 500

1 ½” 40 24.0” 600

Types: Ductile, Galvanized, Steel, plastic (PVC) , high pressure pipes , and High Density pipes

Page 105: Shaban Booklet 1-6-2016

SHABAN BOOLKET

105

PVC high pressure

pipes

Diameter mm

Weight kg/m.l

Thickness mm

63 0.562 1.9

75 0.766 2.2

90 1.12 2.7

110 1.62 3.2

140 2.62 4.1

160 3.43 4.7

200 5.37 5.9

Note : 1-Pipes type are Series 3 and 6 atmosphere water pressure. 1- Tolerance is = +,- 10 % in

Pipe weight for lab. Testing .

Page 106: Shaban Booklet 1-6-2016

SHABAN BOOLKET

106

Typical Cesspool

TOP steel cover 40 cm Diameter GL //////////////////// ////////////////// sewerage Brick Masonry Surrounding (1m ) Gravel (15) Humus height Cm thick ( ½ to 1” ) grading open joint ( 30 ) cm Masonry crushed stone layer Notes: 1- Min. cesspool total Depth 7.0 m 2- Min cesspool Diameter clear 90 cm 3- Usage for normal houses , buildings and industries.

Page 107: Shaban Booklet 1-6-2016

SHABAN BOOLKET

107

Typical sewer Pipe cross

section

NGL ///////////////;;;;;;;;;;;;;/////////////////////////////// ;;;;;;;;;;;;; Compacted back filing soil Min. …… depth 50 cm sewer .… pipe ;;;;;;;;;;;;; surrounding 0000000 concrete 1:2:4 Min. 15 cm lean concrete Base 20 cm Crushed stone 10 cm Sewer width = Pipe Diam. + 30 cm Note : In weak soils use reinforced concrete base.

Page 108: Shaban Booklet 1-6-2016

SHABAN BOOLKET

108

Weirs

H Q Q //////////////////////////// //////////////////////// 4H

Q = 1. 84 B H 3/2

Q = discharge in m3 /sec. B = weir width in (m) H = height of water flow in (m) Notes: 1 -Basin formula is recommended for rectangular weirs. 2 - Above formula is useful for water, c = 0.62 and g = 9.81.

Page 109: Shaban Booklet 1-6-2016

SHABAN BOOLKET

109

STORM WATER FLOW Sewers must handle storm water flows during, and after, rain storms, snow and ice-melting events. The rational formula for peak storm-water runoff is:

Q = C*R*A

where: Q =peak runoff, in ft3 / s A = drainage area, acres C = coefficient of runoff of area R =average rainfall rate, inch /hours of rain producing runoff . In urban areas C = from 0.70 to 0.90. Residential areas C = from 0.30 to 0.40. according to surface type.

Page 110: Shaban Booklet 1-6-2016

SHABAN BOOLKET

110

Flow in Pipes & Channels

V = 0.85 C R 0.63 S 0. 54 V = flow velocity in m / sec . C = co – efficient of roughness , Normally = 100 for most type of Pipes and channels. R = d / 4 for Pipes , d = pipe diameter in (m) , or channel cross section divided by Wetted perimeter in (m) units. S = Sine the flow slope (as %). Accordingly: Pipe diameter :

D= 7.45 Q2 C / S Q = discharge in liter per sec.

Page 111: Shaban Booklet 1-6-2016

SHABAN BOOLKET

111

Page 112: Shaban Booklet 1-6-2016

SHABAN BOOLKET

112

6 CONCRETE

Page 113: Shaban Booklet 1-6-2016

SHABAN BOOLKET

113

.

Note : Above safe loads used for designing Purpose, but suitable factor of safety should be calculated.

SAFE LOADS

Materials Kg/cm2

Concrete. 1:1:2 (Cubes)

320

Concrete 1:2:4 (Cubes)

210

Concrete 1:3:6 (Cubes)

110

Brick work in cement Mortar 1:3

20

Stone masonry in cement mortar 1:3

15

Concrete Blocks in cement Mortar 1:3

12

Page 114: Shaban Booklet 1-6-2016

SHABAN BOOLKET

114

Recommended Slump

Concrete construction

slump cm

Max. Min.

Reinforce. Foundations footings and walls

7.5

2.5

Plain footings and sub-walls .

7.5

2.5

Beams and reinforced slabs

10

2.5

building columns

10 2.5

Pavements and slabs

7.5

2.5

Mass concrete

5 2.5

Page 115: Shaban Booklet 1-6-2016

SHABAN BOOLKET

115

Fo

r (O

NE

) M

3

CO

NC

RE

TE

Concrete Mix

ON

E c

em

ent b

ag =

50 k

g., F

or

wet

sand

use

mo

re q

uantitie

s o

f it in the m

ix .

Gra

vel

G/ M

3

0.8

0.8

1

0.9

0.9

2

0.9

4

Dry

sand

S/ M

3

0.4

0.5

4

0.4

5

0.4

6

0.4

7

Cem

ent

C/ kg.

57

0

37

0

30

0

20

0

15

0

MIX

C/S

/G

1:1

:2

1:2

:3

1:2

:4

1:3

:6

1:4

:8

Page 116: Shaban Booklet 1-6-2016

SHABAN BOOLKET

116

Concrete Strength

Age % of Max m strength 3 days 40 %

7 days 65 %

14 days 90 %

28 days 99 %

Notes :

1-Maxm Air Temperature allowed For concreting casting is in Hot weather is 40o,and 32o for the concrete mix . Minim is Freezing water degree. (0o c) without any precautions.

2-Recommended Slump test for plain concrete is (25 -75) mm and for Reinforced concrete is ( 50-100) mm , depending on structure type and location .

Page 117: Shaban Booklet 1-6-2016

SHABAN BOOLKET

117

CEMENT MORTARS

1-Mortar = Cement( C )+ Sand ( S ) 2- One bag of cement = (50) kg. and volume =0.035 m3 . 3- For 1 M3 cement mortar volume : V= 0.75 ( C+ S )

Mix (Cemen

t + sand)

Cement kg

Sand m3

1:1 1020 0.71

1:3 510 1.05

1:5 310 1.05

1:7 220 1.05

Page 118: Shaban Booklet 1-6-2016

SHABAN BOOLKET

118

Concrete Cubes Strength

MIX 7- days 28days

1: 1: 2 210 310

1: 1.5:3 175 260

1: 2: 4 140 210

1: 3: 6 - 115 NOTES : 1- For core test the height of the core is equal = 2 x diameter 2- Strength units are in kg/cm2

3- Concrete cubes (15x15x15)cm 4- In case of using (15x30)cm Cylinder instead of cubes, the Strength should be 80% of above Results For normal

concrete.

Page 119: Shaban Booklet 1-6-2016

SHABAN BOOLKET

119

Water for Concrete

Mix. Water Liter

Sand Liter

Gravel Liter

1:1:2 25 35 70

1:2:4 32 70 140

1:3:6 35 105 210

1:4:8 46 140 280

NOTES : 1-This table for dry materials 2-This quantities per (50kg) 1- one bag cement. 3-For wet sand and gravel 2- use less water quantities. 4-Use mechanical vibrators.

Page 120: Shaban Booklet 1-6-2016

SHABAN BOOLKET

120

Flooring Expansion Joints and Reinforcing

Flooring Concrete

slab Thickness

Weight of BRC Reinfor-cement

Maxim spacing

between 2 joints

10 cm 2.7

kg/cm2 12.5 m

15 cm 3.8

kg/cm2 25 m

20 cm 5.5

kg/cm2 37 m

Note: Normally Width of expansion joint in all above Cases is between (1 - 2) cm.

Page 121: Shaban Booklet 1-6-2016

SHABAN BOOLKET

121

Typical Concrete Retaining Wall

20 //////////////////////////// TOP FILL 400 1:12 slope A- 25 mm @ 40 cm c-c B- 12 mm @ 60 cm c-c Dowels 25 mm @ 40 cm C & D 12 mm @ 30 cm NGL 60 //////////////// 45 Key 45 145 35 250 Notes : 1- This section is suitable for Maxm 4.0 m wall height . 2- Distribution steel 12 mm @ 30 cm for all layers A , B , C , D & dowels . 3- All dimensions are in centimeters .

Page 122: Shaban Booklet 1-6-2016

SHABAN BOOLKET

122

Recommended Maxm Size of aggregate

Member section

Dimension cm . Min.

For Reinforced Concrete

inch

For Un - Reinforced. Concrete

inch

12.5 or

less

¾

¾ - 1 ½

12.5 to 28

¾ - 1 ½

1 ½ - 3

28 to 74

½ - 3

3 – 6

74 or more

1 ½ - 3

6 Minimum Concrete cover: 1- For slabs & walls = 1.5 cm 2- Beams & T-beams = 2.5 cm

3- 3- foundations & columns = 4.0 cm

4-

Page 123: Shaban Booklet 1-6-2016

SHABAN BOOLKET

123

Concrete Admixtures Formulated products Usually in liquid form

Added to concrete at a dosage of less than

5% by weight of cement content to modify

and improve the properties of concrete in

the wet and/or hardened state.

:Main Types of Concrete Admixtures ASTM C 494 ( B.S 5075 )

1-Waterproofing& Water Reducing (Type A) 2-Retarding) Type B ) 3-Accelerator (Type C ) 4-Water Reducing And Retarding (Type D ) 5-Water Reducing And Accelerator (Type E) 6-High Range Water Reducing (Type F) 7-High Range Water Reducing and Regarding (Type G). 8-Self Compacting (Type G & F) 9-Corrosion protection.

Page 124: Shaban Booklet 1-6-2016

SHABAN BOOLKET

124

Guides to Depth(d)of

Reinforced Concrete Beam

Member d

Roof and floor slabs L /25

Light beams L/15

Heavy beams and girders L/12 - L/10

NOTE : 1- L is the span of the beam or slab in millimeters. 2- The width of a beam should be at least L / 32 . 3- d = Beam Depth

Page 125: Shaban Booklet 1-6-2016

SHABAN BOOLKET

125

Concrete Grades

F Cube F Cylinder Grade MPa

15 12 = C Cylinder

/ Cube For Example

: C20/25

20 16

25 20

30 25

37 30

45 35

60 50

:NOTE 1.25 F ( cu /cylinder ) = F ( cu / cube ) For Designing in Elastic:

fc` = 0.85 ( F cu )

Page 126: Shaban Booklet 1-6-2016

SHABAN BOOLKET

126

NDT Concrete Tests If we found any failure in normal tests for concrete ( cubes or cylinders) , Popular NDT ( Non Destructive Tests ) can be hold in field to re-check the results as below :

1. Rebound Hammer Test- RH Test 2. Ultrasonic Pulse Velocity- UPV Test 3. Combined Method UPV & RH Test 4. Core Extraction for Compressive

Strength Test. 5. Ingredient Analysis of Concrete Core 6. Echo Scan or X-ray for steel

reinforcement. If Still we don’t get satisfied results still we can do :

1- Load test for the failed part. 2- Redesigning the frame.

Still failed , then our last Decision will be demolition the failed concrete part .

Page 127: Shaban Booklet 1-6-2016

SHABAN BOOLKET

127

Page 128: Shaban Booklet 1-6-2016

SHABAN BOOLKET

128

7

ESTIMATION

Page 129: Shaban Booklet 1-6-2016

SHABAN BOOLKET

129

Buildings Design Steps

1-Preparing complete Building site surveying and plot layout with countor map topography each 5 m 2- land Investigation by soil tests for the building foundation type , including bore holes ,Min. (3) with 15 m Depth according to geology . 3-Architectural designing for the building with owner apparoval . 4-Structural , electrical and Mechanical desinging for the Building and preparing complete set with Bill of quatities for items. 5-Adding emergincy stairs ( scape away exit ) , Firelarm system , fire fighting , ( CCTV ) monitering cameras , and spare electrical lift . 6-Preparing Requried standards.

Page 130: Shaban Booklet 1-6-2016

SHABAN BOOLKET

130

AREAS 1-Sector of Circle :

A= (q / 360) x π R2 q

q = Angle in degree q R = radius R 2- Ellipse :

A=1/4 x D x d x π

D , d = The two diameters . 3- Parabola : A = 2/3 x B x H H B = base H= Height. A= area. 4-Tripozoidal: B A= (L1 +L2) /2 H L= Bases width 5- Circle :

A = π r2

r = Radius

Page 131: Shaban Booklet 1-6-2016

SHABAN BOOLKET

131

VOLUMES 1-Cone ,and Pyramid. V = 1/3 (H) (A) V= Volume , A = Base area H = Height

2-Frusta of Pyramid.

V= H / 3 ( A1 +A2 + A1 A2 )

A2 H A1

3-Spherical segment:

V= ╥ h2 (r-h/3)

r = radius h=height of segment.

╥ = 3.14 h

4- Ball:Volume = 4/3 ╥ r3 r

5- Cylinder: Volume =(A)(H).

5-

Page 132: Shaban Booklet 1-6-2016

SHABAN BOOLKET

132

EQUATIONS

1-TEMP:

Co = 5 / 9 (F o – 32 )

C = centigrade = Fahrenheit. 3- ESTIMATION: Concrete works V= 0.67 * (C+S +G) Cement Mortar works = 0. 75 (C+S) Stone Masonry Vm = 0.30( V ). Bricks Mortar Vm = 0.23 (V ) Concrete Blocks Vm = 0.13 (V ) V =Total Volume, Vm= Mortar vol. C,S,G = cement ,sand & gravel vol. 4- SIMPSON RULE : Volume = 1/3d ((A1+An+2(sum of odd Areas – No. of ordinates)+4 (sum of even Areas – No. of ordinates )) d = distance between strips.

Page 133: Shaban Booklet 1-6-2016

SHABAN BOOLKET

133

Typical Buildings Items Costs

1-Preparation and excavation

1%

2-Foundations 3%

3-Masonry up to DPC

5%

4-Masonry above DPC

22%

5-Roofing and curtains

15%

6-Flooring and tiles

9%

7-Doors and windows

10%

8-Internal finishing 14%

9-External finishing

5%

10-Water supply 5%

11-sanitary works 8%

12-Electrification 3%

Page 134: Shaban Booklet 1-6-2016

SHABAN BOOLKET

134

For (1) Meter Need Type Un

it Forma

n Worker

Soil Excavation

M3 - 1

Hard Soil Excavation

M3 - 2

Ordinary Concrete

M3 - 1 /2

Reinforced Concrete

M3 1/8 1

Stone Masonry

M3 4/7 1.25

Cement Plastering

M3 1/15 1/8

Gypsum Plastering

M3 1/40 1/8

Mosaic Tiles

M3 1/30 1/8

Page 135: Shaban Booklet 1-6-2016

SHABAN BOOLKET

135

MATERIALS NEEDED

MATERIAL No. / M 3 No. / M 2

1- Bricks (7x11x23)cm with cement mortar1:3

450 -

2- Concrete. Blocks (15x20x40) cm.

73 -

3- Sand bricks (20x10x5)cm.

410 -

4- Concrete. Blocks (20)cm. Wall thick

- 16

5- Tiles (25 x 25)cm

- 16

6- Tiles (15 x 15)cm - 45

7- Tiles (20 x 20)cm

- 25

8- Tiles (30 x 30)cm

- 12

Page 136: Shaban Booklet 1-6-2016

SHABAN BOOLKET

136

New Machines Production

Type m3/hr Remarks Big

Bulldozer 200 For soils + Sub

base

Grader 125 For soils

Grader

175

For Road sub base

Roller (Smooth)

175 For sub- base works

Roller(Sheep)

150 For soils

Rubber –Tire Shovel

160 For Truck Loading

Excavator 70 In Medium Materials

Crawler Shovel

120 Sub-base + soils

Scrapers 90 For soils works

Page 137: Shaban Booklet 1-6-2016

SHABAN BOOLKET

137

Bucket Fill Factor

Material Fill factor Range

Sand and gravel

0.90 – 1.00

Common earth

0.80 – 0.90

Hard Clay

0.65 – 0.75

Wet Clay 0.50 – 0.60

Rock well blasted

0.60 – 0.75

Rock poor

blasted 0.40 – 0.50 Source : Caterpillar Tractor Comp.

Page 138: Shaban Booklet 1-6-2016

SHABAN BOOLKET

138

Page 139: Shaban Booklet 1-6-2016

SHABAN BOOLKET

139

8 _____________________________________

Electrical & Mechanical

Page 140: Shaban Booklet 1-6-2016

SHABAN BOOLKET

140

Water Pumps Power Q H P = -------- x ---------- 102 q P = Power in ( kw ) H = Head in meter ( Total ) Q = discharge in Liter/sec. q = efficiency ( output ) factor for piston pumps between (0.8 – 0.95) centrifugal pumps from (0.4 – 0.75)

H= Hw + Hst .(in m) Hw=Total suction and pushing head Hst= Extra head losses in ( m )Due to pipes friction and values according to pipe diameter, length and discharge in side it , which calculated from special Empirical tables. NOTE: This Equation is used to find the required pump power in (kw), if you know the total Head, efficiency and required discharge for pump.

Page 141: Shaban Booklet 1-6-2016

SHABAN BOOLKET

141

Electrical Information-1 1- Installation wires required cross section is :

a = ( 2 K L I ) / Vd a is in mm2

K= 0.02 for copper , & 0.03 for Aluminum wires , I = amperes . L = wire length in meter

Vd= voltage drop from 3 – 5 %. 2- One KVA = 4.5 Amperes for 220-volt system generators. 3- Every 1000 current amp. Needs 1.0 in2 bus – bar connection. 4- E= I * R , W=I*E , W= I2* R E= VOLTS, I = AMPERES R= OHMS, W= WATTS

Page 142: Shaban Booklet 1-6-2016

SHABAN BOOLKET

142

Electrical Information-2

1-All (13 ) Amp Switched Plug Socket should be placed at height of (40-50) cm from house floor level , but for bath rooms and kitchens on (120 ) cm level .

Amp. All should be )20-15(For -2.floorfrom cm Height )120(on

All electrical installations should -3be extended above false ceiling level and then dropped directly to

.the points All electrical installations levels -4

tary should be above sani. installations levels

for All electrical installations-5should be connected to sockets

. house Earthing system

Page 143: Shaban Booklet 1-6-2016

SHABAN BOOLKET

143

Air conditioning

1- For Cooling : chiller used , and split units , every 35 m3 of the room space volume required 1 Ton , which is equal to 12000 BTU (BTU = British thermal unit )

1 Ton cooling = 2900 kcal /h Every Kw = TON * 3. 5 2- For Heating : boiler used . 1 Ton heating = 3050 kcal / h Every Kw = 870 kcal / h 3- Air coolers use CFM = cubic foot per minute, 2500,3500,…. 4- Pumps discharge unit m3 / hr usually use the units of ; 1 Kw = 1.33 hp ( Normal head ) 1 hp = 2. 25 – 3 m3 / hr discharge 1 hp = Horse power unit .

Page 144: Shaban Booklet 1-6-2016

SHABAN BOOLKET

144

Single phase cable 200LP A = ---------------- x (1000) dqv2 A = Area of cable cross section in (mm2 ) P = Power in Kilo watts L = distance in (m) d = for copper (cu)=56, and different for other materials. q = voltage drop in percentage, for example (2.4 ) v = voltage in volts . Note: This equation is used to find a required area (cross section ) for a single phase cable, between (2) points, when you know the distance between them, required power to be transferred and acceptable

drop in voltage between the (2) points.

Page 145: Shaban Booklet 1-6-2016

SHABAN BOOLKET

145

Electrical Cable Trenches 1-The depth of the Earth

excavation for cable trenches shall be min. 90cm with the width according to the number of cables (under sidewalk 70cm, under median 90cm).

2- Before laying the cables the trenches shall be filled with a layer of earth free of stones, or clean sand having a thickness of 15cm. The cables shall be covered by another layer of the same material and thickness.

3- The polyethylene sheet shall be laid over this second layer to protect the cable against damaging. The sheet shall be marked continuously with the word "DANGER" .

Page 146: Shaban Booklet 1-6-2016

SHABAN BOOLKET

146

Sound Transition Loss

TL = 20 log f + 20 log D – C

TL = Transition loss of sound f = Sound frequency 125 – 4000 ( Hz) D = Partition Surface Density (kg/m2cm) C= 33 for Metric Units. For f = 1000 Hz :

Material D Avg. TL

Bricks 21 50

Concrete 23 55

Wood 6 42

Glass 29 56

Gypsum 10 45

Lead 125 65

Sound Levels in dB

Source Decibel dB

Wisper 30

Rain fall 50

Conservation 60 – Normal Level

Factory 80

Jet Engine 130

Page 147: Shaban Booklet 1-6-2016

SHABAN BOOLKET

147

Thermal Conductivity

__________________________________________________________

H = K*A *(T1-T2) / t H= Thermal conductivity in watt .

K= The material thermal conductivity A= Total cross section area of conducting surface in m2 T1 & T2 = Outside and inside

temperatures in centigrade cº t = Thickness of the conducting surface in meters Material K in Watt / m cº

Bricks 1 Concrete 2 Plastering 0.5 Glass 1 Stone 1.7 Wood 0.04 – 0.4 Polystyrene 0.05 Air 0.025 Soil 1.5

Page 148: Shaban Booklet 1-6-2016

SHABAN BOOLKET

148

Page 149: Shaban Booklet 1-6-2016

SHABAN BOOLKET

149

9 _____________________________________

Miscellaneous

Page 150: Shaban Booklet 1-6-2016

SHABAN BOOLKET

150

Investigation Boreholes The Spacing and Depth of Boreholes for any structures may viried cosiderably in the light of local foundation conditions and the size and loads of the structure . The grid of Borehles location is usually decided by the Geologistik Engineer according to his accumilated Experience . Normally Boreholes spacing are :

1- For buildings 10 – 30 m apart . 2- Roads and brudges 30 -300 m. 3- Landslides At least 5 in line of profile .

And Depth is : 1- 1.5 x Foundatioin depth , below

foundation depth + one or two contrle hole to Min. (10) m depth , unless rock ahead found .

2- Then (3)m. below Roackhead to prove sound rock .

3- Probes to 3 -10 m to locate rock cavities as rough estimation.

Page 151: Shaban Booklet 1-6-2016

SHABAN BOOLKET

151

Int. StandardsDesigning Architectural Standards : 1-Neufurt Architects data 2-Time saver Standards 3-AIA - American Institute of Architects Civil Engineering Standards : 1-ACI - American Concrete Institute 2-IBC - international buildings code 3-ASCE - American Society of Civil Engineers 4-AASTHO - American Association of State Highway ,Transportation Officials 5-ASTM - American Association of State Highway and Transportation Officials Mechanical Standards : 1- ASME - American Society of Mechanical Engineers 2- B.S. – British Standards . 3- ASHRAE: American Society of Heating, Refrigerating& Air-Conditioning Engineers.

Electrical standards :

1-IEC -International Electrical Commission

2-NEC - National elec. code

3-IEEE - Institute of Electrical and Electronics Engineers .

Page 152: Shaban Booklet 1-6-2016

SHABAN BOOLKET

152

1-ElementsEngineering Design

In the Design set Process of any Buildings project it is normally that below Typical elements are required

: Parts for the Complete Design set A- Architectural :

1- Buildings Plot with infrastructure

services & Site Plan Drawing.

2- Foundations , Basement and all

Floors plans with penthouse

details furniture and Dimensions .

3- Two Horizontal and vertical

Sections for complete structure.

4- All required Elevations.

5- Details for Main and Emergency

Stair case and other structures .

6- 3D Views of the Buildings and

may be also animation.

7- Doors and windows Details .

8- Legend For all Parts& finishing’s.

Page 153: Shaban Booklet 1-6-2016

SHABAN BOOLKET

153

2-Engineering Design Elements B- Structural :

1-Foundation plans , details , reinforcement , And Retaining walls with cut and fill works. 2- All slabs Reinforcement’s and detailed Plans & sections . 3- Beams and columns details. 4- Lifts and Stair case sections , reinforcement and details. 5- Required Standards ,Design

codes and General notes. C- Electrical :

1- Lightening for main site plan .

2- Power distribution with main

boards and Transformers.

3- CCTV Security camera Net .

4- Fire Alarm & Anti-lighting system.

5- Other Nets and TV cables.

6- Building Earthling system.

Page 154: Shaban Booklet 1-6-2016

SHABAN BOOLKET

154

3-Engineering Design Elements D- Mechanical :

1- Water supply, Boilers and

Reservoirs tanks systems.

2- Sanitary, rain , floor drain

system and station treatments .

3- Gas and Fire-fighting systems.

4- Split units, VRV or Chillers

air-conditioning and ventilation.

5- Split units water draining net.

6- Lift , and Pumps details .

E- B.O.Q : For all above Branches

Bill of Quantities is required as

excel sheet with Estimated prices

, Printed on A4 Paper Size.

F- Printing : Complete Project

Drawings and Documents to be

printed on A2 Paper Size , And

3 CD soft Copy with PDF Format.

Page 155: Shaban Booklet 1-6-2016

SHABAN BOOLKET

155

4-Engineering Design Elements

G- ROADS: For Roads and highway projects below typical elements are required for complete Design Set:

1- General Road site plan and alignment on digitized satellite map with kilometer stations.

2- Typical road cross section and material layers with slopes details

3- Road alignment plan each certain stations and profile section with Natural ground , Subgrade and final road levels.

4- All road structures like culverts, bridges , over & underpasses , intersections , parking ,Guard rails, Signs …etc should be shown on alignment and profile.

5- Complete BOQ for all cut and fill quantities, materials used with total lengths of culverts & Bridges

Page 156: Shaban Booklet 1-6-2016

SHABAN BOOLKET

156

Multistory building collapse due to Wrong Design

Page 157: Shaban Booklet 1-6-2016

SHABAN BOOLKET

157

PHYSICS CONSTANTS 1- Light Velocity(c) =

299,000 km/s 2- One light year = 9.5x1012 km . 3- Gravity acceleration=9.81 m/s2 4- Avogadro No.(NA)=

6.x1023 mol-1 5- Plank constant (h)=6.6x10-34 j.s 6- Gravity Constant (G)=

6.7x10-11 m2/kg2 7- Earth Radius = 6,370,000 km . 8- Average distance between

earth and sun = 1.5x108 km. 9- Sun Radius = 7x105 km . 10- Sound velocity = 343 m/s 11- Standard. Air Pressure =

100,000 Pascal OR N/m2 12- Uniform Atomic Mass Unit ( u) = 1.66x10-27 kg.

Page 158: Shaban Booklet 1-6-2016

SHABAN BOOLKET

158

SOME REFFERENCES 1- Standard Hand book for civil

engineers , Merritt , 2002 . 2- Highway Design manual – State

organization of roads and bridge , Baghdad , Iraq , SORB-2003 .

3- A Dictionary of civil engineering, GHOSE, Delhi , 2004 .

4- Waste water engineering, METCALF & EDDY, 1991

5- Indian Practical civil engineers Hand book , KHANA , 1985 .

6- Buildings Construction, Principles’ , and practice , Denis Walton , 1995 .

7- Iraqi Technical Specifications For buildings, Baghdad, 1993.

8- Al - MANSOOR company practical handbook ( IRAQ).

9- Building Materials , 2009,Jordan 10- ACI code , AASHTO 2010,etc …

Page 159: Shaban Booklet 1-6-2016

SHABAN BOOLKET

159

NOTES: 1-Please Inform me for any Mistakes modifications, suggestions or corrections on below Addresses. so that to be edited in next edition. 2-All information here are practical , empirical enough for ordinary, and collected from general resources of civil engineering. 3-Please Note that for structures Which may you need more and accurate details you are strongly advised to review basic & detailed Civil engineering standards & not depending on this booklet only. E-mail : [email protected] Mobile No. for Viber and WhatsApp:

+964 770 446 1234

Page 160: Shaban Booklet 1-6-2016

SHABAN BOOLKET

160

@SadaEngineering

www.sadaconsult.com

Page 161: Shaban Booklet 1-6-2016

SHABAN BOOLKET

161

Facebook عنوان الفيس بوكShaban civil engineers Booklet

هذا او اقتباس اي جزء مناستنساخ طبع او يمنع :مالحظة

.دون اخذ موافقة المعد الكتيب

ئةندازياري شاريستا ني ناميلكةي

http://www.facebook.com/Shaban Civil Engineers Booklet

لة بةرَيوةبةرايةتى طشتى كان ذمارةى كتَيبحانة طشتيية

سالي لة 104سثاردنى -ثَيى دراوة ( ى 2008)

هةولَير