Upload
shamal-salih
View
215
Download
1
Embed Size (px)
Citation preview
The second project is consist of three complex building (5 storeis,9 stories and one tower 12 stories)
Sulaimaniyah 3000 Project
نوسينطةى شةماَل بَو د يزاين و ِراوَيذكارى ئةندازيارى
22
Sulaimaniyah
3000 Project
During
Construction
نوسينطةى شةماَل بَو د يزاين و ِراوَيذكارى ئةندازيارى
33
The Project consists of 6 concrete & one steel complex building structure
Sarchinar Tourism Project
Sarchinar Tourism Project
نوسينطةى شةماَل بَو د يزاين و ِراوَيذكارى ئةندازيارى
44
Sarchinar Tourism Project During Construction-City Cenama
نوسينطةى شةماَل بَو د يزاين و ِراوَيذكارى ئةندازيارى
55
Sarchinar Tourism Project
During Construction
نوسينطةى شةماَل بَو د يزاين و ِراوَيذكارى ئةندازيارى
66
Sarchinar Tourism Project During Construction
نوسينطةى شةماَل بَو د يزاين و ِراوَيذكارى ئةندازيارى
77
Design of Kunjreen Dam
نوسينطةى شةماَل بَو د يزاين و ِراوَيذكارى ئةندازيارى
88
-Design all components of Garmian Industrial City-Kalar -Engineering Survey of 3500 Donums
-Making GIS works for all networks details
نوسينطةى شةماَل بَو د يزاين و ِراوَيذكارى ئةندازيارى
99
Kalar Court Building
نوسينطةى شةماَل بَو د يزاين و ِراوَيذكارى ئةندازيارى
1010
-Detail Design for Qaladze Master Plan (all networks) -Engineering Survey of 6500 Donums -Making GIS work for all details of the city
نوسينطةى شةماَل بَو د يزاين و ِراوَيذكارى ئةندازيارى