Upload
others
View
6
Download
0
Embed Size (px)
Citation preview
SIP模块测试的整体解决方案 Total Solution for SIP Module Test
Ensure High Quality Electronics & Revolutionize Manufacturing Automation
2
Wireless Products Semiconductors Advanced Automation Printed Circuit Boards HDD, SSD, SLT
Chip Test Sub System Test
Final Product Test
Collaborative Robots
System Test Group 2016 Sales: $190M
• Circuit board, defense and aerospace and HDD/SSD test • Cost of test and time-to-market advantages
Revenue
2013 $1.43B
2014 $1.65B
2015 $1.64B
2016 $1.75B
Wireless Test 2016 Sales: $96M • Production optimized for best cost performance • Fast time-to-market for wireless products
Semiconductor Test 2016 Sales: $1.4B • Aligned to mobility (~50% of 2015 revenue) • Cost of test and time-to-market advantages • #1 with 48% market share; gained over 20 points of share since 2004
Industrial Automation 2016 Sales: $99M
• Easy to deploy, program and re-program • Safe, lightweight and economical • Fast ROI
Teradyne’s Four Operating Segments
3 (1) Non-GAAP
2016 Sales
78%
11%
6% 5%
Semi Test
System Test
Industrial Automation
Wireless Test
传统封装芯片ATE测试流程 Traditional ATE Test Flow
晶圆制造
Wafer Fab
晶圆测试
Wafer Test
封装
Assemble
封装测试
Final Test
系统级测试
SLT
系统级封装引入新的挑战 之一 : 从简单晶圆测试走向全面KGD测试 Challenge for SIP Testing – From Simple CP test to KGD Test
Cellular baseband SiP 6 dies including 2 stacked dies
DieNDieDieDieSIP 321
SIP
DieN
SIP合封芯片良率
第N颗Die的良率
SIP芯片将推动高质量 全面的晶圆级测试 SIP test will drive high quality/full coverage CP test
全面的晶圆测试覆盖: 数字测试+ 模拟测试 + 射频测试 Full Coverage CP Test : Digital + Mix Signal + RF
DC
Digital
DC
Digital Mix Signal
RF
模拟与射频测试比重增加 整体测试难度将显著提升 More Analog/RF test will increase the test complexity in CP
传统晶圆测试测试项比例 SIP所需晶圆测试测试项比例
传统晶圆测试硬件的挑战 Challenges from traditional CP test hardware
传统的CP测试机台接口 Traditional CP tester interface
信号经过长的传输通路 信号完整性无法保证 损耗过大 Signal quality will degrade though long trace 无法保证高质量的模拟/射频测试需求 Difficult to offer high quality analog/RF test
优化的基于晶圆模拟与射频测试的硬件方案 Optimized Hardware Solution for Analog and RF test in CP test
支持模拟射频测试的CP测试机台接口 New interface for analog/RF probe test
极大算短信号通路长度 达成高质量的模拟射频信号传输 Optimized signal delivery for better analog/RF signal transmission 配合最新的Probe Card技术 (比如Cascade Microtech’s Pyramid-MW Probe) New probe card technology ready for high performance 目前已经有方案支持未来5G毫米波的测试需求 Solution is ready for future 5G mmWave test needs
X X
系统级封装引入新的挑战 之二 : 从传统ATE测试走向全面SLT测试 Challenge for SIP Testing – From traditional ATE test to SLT Test
AP
DDR
WIFI SENSOR
PMIC
每个模块可能来自不同公司 Different die from different company 合封后模块可测性降低 Poor DFT support 缺乏ATE测试模式支持 No ATE test mode support
从原先基于模块的ATE测试转向系统级测试 Trend is from structure ATE test to SLT test
如何满足海量产品的SLT测试需求? How to fulfill high volume SLT test requirements?
> 100台
SLT测试时间5分钟 SLT Test time > 5 Mins 月出货1千万颗 10M parts per Month
> 10 人
> 500 平方米
泰瑞达创新的高产出SLT测试机 Teradyne offer innovated high throughput SLT tester
最高同测>400 颗 Test more than 400 DUT in parallel 占地小于8平方米 Test floor less than 8 mm 异步软件控制构架 Asynchronous software control
Pick DUT 1
Pick DUT 2
Pick DUT 3
Bin Out DUT 1
Bin Out DUT 2
Bin Out DUT 3
泰瑞达提供全面解决方案 确保总体测试成本最低 Teradyne offer turnkey solution for lowest test cost
CP测试覆盖
FT测试覆盖
SLT测试覆盖
需要综合考虑CP/FT/SLT测试覆盖与成本 Trade off CP/FT/SLT test coverage and cost 优化三道测试工序中重复覆盖部分 Optimize overlap in three test insertions
依赖大数据分析 Need big data support for analysis
4300个工程人员服务全球客户 4300 Employee support WW customers
Japan
•Design Center
•Applications Development
•Sales & Support
Korea
•Sales & Support
US •Headquarters
•Product Development
•Sales & Support
•New Product Introduction
Costa Rica
•Repair Center
Europe-
•UR HQ
•Sales and Support
Rest of Asia
•Applications Development
•Sales & Support
•Repair Center
•Global Sourcing Group
China
•Applications Development
•Sales & Support
•Production
13
合作共赢迎接新的机会…. Collaboration to win new business
Q1’17 Actual
现金及有价证券 15亿美金
半导体测试市场份额 48%
公司市值 71亿美金
2011 2015
$510M $285M
持续支持客户的成功
14
25% 22%
25% 24%
33% 37%
44%
36% 37%
44% 46% 47% 48%
-20%
0%
20%
40%
60%
0
1,500
3,000
4,500
6,000
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Tota
l ATE
Sh
ip S
har
e %
Tota
l ATE
Sh
ip T
AM
($M
)
SOC TAM($M) Memory TAM($M) TERADYNE
15
谢谢