Steel House Industrial Works Construction Engineering
Introduction
➢ We are a General Contracting company, who provides all services at all
Turn Key construction stages, from design to start-up phase for:
▪ Residential House Projects
▪ Industrial Plants and Warehouses
▪ Business Centers, Shopping Malls and Hotels
▪ Chemical Industrial Facilities
➢ OLIMPIK was established in 1985 in Istanbul.
In Y2000 converted as Group Companies and named as OLIMPIK
Company.
➢ After Y2004, as Company we have decided to expand our bussines and
experience to other countries.
➢ Also since Y1999 as OLIMPIK, we have completed many project as
Subcontractor
Introduction
➢ IN OFFICES: 62person working
➢ IN FACTORY: 110 person working
➢ IN CONSTRUCTION: according to size of project numbers are
changing ( Total # 655 person)
➢ Y2005 OLIMPIK UKRAINE established: for Epicenter shopping center
construction works in Kyiv , hospital prj 201 M usd
➢ Y2009 OLIMPIK LIBYA established: for general construction works in
Misurata city, Stadium project completed 60M usd.
➢ Y2011 OLIMPIK MACEDONİA established: for specific construction
works in Skopje city, completed projects total amount 100M usd.
➢ Y2013 OLIMPIK RUSSIA established: specific shopping mall and big
size residential project for in Min Vodny city. Total completed project
value is 300M usd.
➢ Y2015 OLIMPIK ROMANIA established: for specific residential project in
İasi city, 4 high raised floor building prj. / 52 floors , project value 139M
usd.
Introduction – Offices/Sales Agencies
➢ Y2014 = AGENT OFFICE in RAK / UAE
➢ 40M usd Sales – Villa Project
➢ Y2014 = AGENT OFFICE in STOCKHOLM / SWEDEN
➢ 66M usd Sales- Mall Project
➢ Y2015 = AGENT OFFICE in KUWAIT City
➢ Ongoing projects – KOC Housing Project 20M KWD (proccesing to
signature).
➢ Y2015 = AGENT OFFICE in RIYADH / SAUDI ARABIA
➢ Housing project 205M usd in Riyadh (proccesing to signature)
Headquarter Office Structure
Altan Kılıçarslan
CEO
Bussines Development /
Zafer K.
Russia / UkraineOffice
Osman B.
Europe / Macedonia Office
Mehmet A.
Other Office & Agents
Financial Manager
Levent Dalgıç
Technical Director
Fulya H.
Turkiye Organisation
Finance& Accounting Department
Project & SalesDepartment
OLIMPIK LIBYA
Mustafa Hareshi
Project Organization Chart
Structural Design
SUBCONTRACTOR
HSE
TECHNICIAN
CIVIL ENGINEER
TECHNICIANS
SURVEYORS
PROJECT
ENGINEER
Architectural Design
Mechanical Design
Electrical Design
LOGISTICS / CUSTOMS
DESIGN OFFICE CHIEF
ARCHITECT
DRAFTSMAN
SECURITY
WAREHOUSE
KEEPER
DRIVER
CLEANER
Civil Works
Mechanical
Piping
Instrumentation
Electrical
PLANNING
ENGINEERACCOUNTANT
PERSONNEL
PROJECT MANAGER
PROJECT ENGINEER PM ASSISTANT
PLAN. & COST CONTR.
MNGR.ENGINEERING MNGR
CONSTRUCTION
MNGR.
QA / QC
MNGR.
MECHANICAL
ENGINEER
TECHNICIAN
ELECTRICAL
ENGINEER
TECHNICIAN
HSE MNGR.ACCOUNT. & ADMIN.
MNGR.
PROC. & CONTR.
MNGR.
OLIMPIK Staff
➢ OLIMPIK Europe / Macedonia : current total 39 only for
office➢ In previous projects:
➢ 16 Engineer + 5Architect + 11Administrative +13 Technician
➢ Rest are workers (109 persons)
➢OLIMPIK Istanbul: current total 98➢ Engineer + Architect + Administrative – 62 person
➢ Factory - 31 person – other 79
➢ Istanbul head office group mainly gives financial and logistics
support to sites
➢OLIMPIK RUSSIA: 130 person
➢OLIMPIK UKRAINE: 136 person
➢OLIMPIK LIBYA : 24 person
➢OLIMPIK ROMANIA . 78 person
Scope of Services
• Conceptual Design
• Soil Investigation (Geotechnical)
• Topographic Survey
• Preparation of Design Basis
• Design & Engineering works (preliminary, basic & detail)
• Apostollization (if needed)
• Preparation of Bidding Documents
• Permit Applications
• Civil + Architectural + Electrical + Mechanical Construction +
Equipment Installation
• Implementation of large Construction Projects
Health, Safety & Environment
➢ OLIMPIK initiated implementation of OHSAS 18001
➢ Always a full time HSE Engineer reporting to Head Office
➢ As needed HSE Technicians
➢ Reward & Fines system in place
➢ HSE Policy and Manual
➢ Sequential responsibility of all level people
Health, Safety & Environment Overall
Performance
as of Today
• 8,186,000 Working Hours
• 4 LWDC (Lost Work Days Case)
• 0 Environmental issue
• According to US Occupational Safety and
Health Administration criteria
FR = 0.25
FR (frequency rate) = # injuries/illnesses × 200,000 / total hours worked
Quality Assurance
➢ We have obtained ISO Certificate for ISO 9001
➢ QA/QC Manager reporting to Head Office
➢ As needed QA/QC Engineers / Technicians
➢ Always to use materials manufactured as per applicable
standards and regulations
➢ QC Check Lists are prepared according to valid EU & Mk
Standards at the beginning of the job
➢ Hiring Third Party for tests and controls of special manufacturing
(SS, welds, etc.)
➢ Quality Policy and Manual are customized according to the
needs of each project
➢ All Our Construction Materials are certified w ANAB-CE-TSE-ISO
Project Management & Reporting
➢ We believe in that the most important tool of PM is REPORTING
➢ Coordination Procedure
➢ Daily Site Reports
➢ Work Schedule, revised weekly according to developments at works
➢ Financial reporting as per actual status at site, including forecasts
➢ Cost Control Reports, showing cost trends of the project
➢ Procurement Schedule and Follow-up Report
➢ Document Follow-up Report
➢ HSE Report
➢ NCR Follow-up Report
➢ Monthly Project Report
➢ Cost saving studies for alternatives & Value Engineering
Contracts
➢We are working generally with FIDIC* Contracts
➢ Unit Price Basis
➢ Open book as Cost+Fee
➢ Lump-sum
➢Take all responsibility of the Project as “General Contractor”
➢ Selection of major sub-contractors together with our Client
* Federation Internationale Des Ingenieurs Conseils
International Federation of Consulting Engineers
RESIDENTAL PROJECT
&
REFERANCES
VILLA PROJECTs in 5 yrs
TURKEY – over 600 Villas- 45.6 M usd
HOUSING PROJECT LAGUN
Istanbul – 650 House- 120.000m2
86 M usd Project Cost
UAE PALACE PROJECT
8.000m2- 10M usd
RUSSİA CITY COMPLEX
Vodny – 900 house – 43.2M usd
LABOR CAMP PROJECT
Turkey – 600workers- 4,2M usd
LIFE CONTAINERs for REFUGEEs
Turkey – 650 cont. 3,6M usd
HOTEL PROJECT
Misurata – 60 rooms 4.4M usd
OLIMPIK STEEL FACTORY
PROJECT’s
&
REFERANCES
Colgate Palmolive Relocation Project
6,4M USD
Project Duration: 12 months (2004)
Client: Colgate-Palmolive Consultant: Foster Wheeler
Type of Contract: General Contractor for structural, architectural,
mechanical, electrical, process, instrumentation and
infrastructural works
Type of Construction: Columns- Precast Walls- Precast
Roof decking Coil coated galvanized sandwich steel panels
Construction Area: 26,000 m2, Under Roof Area: 11,000 m2
PROJECT REFERENCES
Colgate-Palmolive Factory / Turkey
15M USD
Project Duration: 22 months (2006)
Client: Colgate Palmolive Temizlik Urunleri San. ve Tic. A.S.
Consultant: Or Yapı Denetim Ltd. Sti.
Type of Contract: Lump-sum for Civil, Mech. and Partly Elec.
Type of Construction: Precast and In-situ Reinforced
Concrete, Steel Structure Columns, Beams, Trusses, Purlins
Walls: Sandwich Steel Panels, Precast Reinforced Concrete
Panels, Decorative Concrete Blocks
Roof Decking: Trapezoidal Composite Panel and PVC Membr,
Total Construction Area: 16,480 m2
Total Under Roof Area: 7,470 m2
PROJECT REFERENCES
Ramstore Shopping Mall Macedonia
19.2 M Euro Project Cost
Project Duration: 10,5 months (2007 - 2008)
Client: Ramstore Macedonia DOO
Type of Contract: Turn key
Type of Construction: Reinforced Concrete
Columns: Reinforced Concrete
Walls: Sandwich steel panels, Aluminum Curtain Walls
Roof decking: Trapezoidal steel sheet, RW
Total Construction Area: 17,487 m2
Total Closed Area: 25,086 m2
FAST-TRACK Project,
where opening date was announced
Before construction
PROJECT REFERENCES
Kurtkoy Manufacturing Plant Turkey
5.9 M USD Project Cost
Project Duration: 10 months (2009) Client: BASF – ELASTOGRAN
Type of Contract: Turn key (including strengthening of the current facility)
Type of Construction: Demolition of the existing structure, Production
Building: Prefabricated Columns & Beams, Polyurethane Sandwich Panel
Facade & Roof, Other structures: Reinforced Concrete
Total Construction Area: 11,130 m2 Total Closed Area: 6,000 m2
Project Value: 5,900,000 USD
Previously PERA has
successfully completed 1st phase
contract of the project which is
“Infrastructural works” with the
same client
BASF - ELASTOGRAN
PROJECT REFERENCES
Johnson Matthey Auto-Catalyst Plant Macedonia
25 M Euro Project Cost
Project Duration: 15 months (started in June ‘11) Client: Johnson Matthey-UK Type of Contract: Turn key
Type of Construction: Steel + Reinforced Concrete Structure, Steel:S400 (euro code)
Project Value: 25,000,000 Euro Total Construction Area: 20,000 m2
PROJECT REFERENCES
TAV - Alexander the Great Airport Macedonia – 27.5 M Euro
Project Duration: 10 months (2012) Type of Contract: Unit Price
Type of Construction: Reinforced Concrete Structure, Facade & Roof Covers: Rockwool sandwich panels
Project Value: 27,500,000 Euro Total Construction Area: 40,000 m2
PROJECT REFERENCES
Kromberg & Schubert
Automotive Cable Harness Manufacturing Plant
Bitola
13.3 M EuroProject Duration: 11 months (started in Aug ‘13) Client: Kromberg & Schubert Macedonia Type of Contract: Turn key
Type of Construction: Reinforced Concrete Columns + Space Frame Roof, Hardened surface floor
Project Value: 13,300,000 Euro Total Construction Area: 23,000 m2
PROJECT REFERENCES
KEMET Electronics Corporation LCE Plant SCOPJE
19.2 M Euro Project Cost
Project Duration: 11 months (started in Aug ‘14) Client: KEMET Electronics Skopje Type of Contract: Turn key
Type of Construction: Reinforced Concrete Columns + Space Frame Roof, Hardened surface floor
Project Value: 19,200,000 Euro Total Construction Area: 12,000 m2
PROJECT REFERENCES
Johnson Matthey Auto-Catalyst Plant / Macedonia
17.5 M Euro
Project Duration: 15 months (2015) Client: Johnson Matthey-UK Type of Contract: Turn key
Type of Construction: Steel + Reinforced Concrete Structure, Steel:S400 (euro code)
Project Value: 17,500,000 Euro Total Construction Area: 13,500 m2
PROJECT REFERENCES
INFRASTRUCTURE
PROJECTs
Anadolu Viyadüğü – 1.050 meters
13.000Tons Iron Bar
54.000m3 Concrete
PROJECT REFERENCES
TCDD Railway Bridge– 42 meters
8.500Tons Iron Bar
32.000m3 Concrete
PROJECT REFERENCES
Istanbul HW Bridge– 480 meters
180.000Tons Concrete
17.000m3 Beam
PROJECT REFERENCES
Black Sea R. Asphalt Works– 63.000 meters
PROJECT REFERENCES
Black Sea R. Asphalt Works -
63.000metre
➢2010 – 86M usd
➢2011 – 92M usd
➢2012 – 113M usd
➢2013 – 118M usd
➢2014 – 126M usd
➢2015 – 133M usd
➢2016 – 196M usd
Yearly Turnovers ( profit)
* All figures are taken from 3rd party Audit Company report given to Tax Office
Ongoing Projects
➢ Russia Vodny Project – 2nd. Phase 300 Villas
➢ Romania Housing Complex – 260.000 m2 construction
➢ Local projects in Turkey – 2 Apartment – 12 floors- 56 Flat
➢ Duzce Municipality New Building Project
➢ Local Projects in Istanbul -
Our Approach
➢ OUR MISSION
Our mission is to provide our customers with quality products and meet their needs
by using the cutting edge technology in the steel and engineering sector, with our
well trained, young and dynamic staff.
➢ OUR VISION
We tolerate no fault in the production so that we apply the quality management
at every single stage of the production and assembly. Our vision is to meet the
needs of our customers in the steel construction sector, improve our competitive
power, enlarge our customer portfolio and expand our activities abroad.