41 ГОДИНА ГРАЂЕВИНСКОГ ФАКУЛТЕТА СУБОТИЦА
Међународна конференција
Савремена достигнућа у грађевинарству 24. април 2015. Суботица, СРБИЈА
125
REHABILITATION SOLUTIONS FOR EXISTING STRUCTURES IN ROMANIA
Sorin Dan 1 УДК: 69.059.25:631.24
DOI:10.14415/konferencijaGFS 2015.015 Summary: The paper deals with aspects regarding strengthening of reinforced concrete existing structures in seismic zones, like Romania. Some case study and the rehabilitation of characteristic structures are analysed. The rehabilitation solutions were chosen in accordance with the actual stage of building deterioration as well as function of the actions characteristics. Classic (reinforced concrete and/or steel) and modern (Carbon Fibre Reinforced Polymers) materials and technologies for strengthening have been used. Keywords: Existing reinforced concrete structures, seismic action; strengthening; classic rehabilitation solutions; modern rehabilitation techniques; carbon fibre reinforced polymers (CFRP)
1. INTRODUCTION Three strengthening solutions will be analyzed in the paper. The strengthened elements are existing reinforced concrete columns as vertical structure of different constructions. The rehabilitation solutions are: steel bracing with four angle steel shapes connected by flange plates; carbon fibre polymer composites (CFRP): longitudinal strips and transversal wraps; jacketing by reinforced concrete using longitudinal reinforcement bars and
transversal stirrups.
2. REHABILITATION OF REINFORCED CONCRETE SILOS The assessment and rehabilitation solutions for a group of silos owned by the SAB Miller Brewery Company “Timisoreana” are presented. The silos (Figure 1) were built 40 years ago and stand 28 m high and 7.30 m in diameter.
1 Sorin Dan, Lect.Dr.Civ.Eng., University Politehnica Timisoara, Department of Civil Engineering and Installations, Str. T. Lalescu, No. 2, Timisoara, Romania, tel: +40256403933, e – mail: [email protected]
41th ANNIVERSARY FACULTY OF CIVIL ENGINEERING SUBOTICA
International conference
Contemporary achievements in civil engineering 24. April 2015. Subotica, SERBIA
126
Figure 1. Reinforced concrete silos
Figure 2. Reinforcement corrosion of discharge funnel supporting
columns Initial silos inspection (1999) revealed large zones of circular cells with concrete cover dislocated and corrosion of circumferential steel reinforcement. Recent silos inspection and assessment (2004) emphasized other vulnerable parts: infrastructure and charging platform (gallery). The silos infrastructure consists of foundation raft, discharge funnel and its supporting columns and beams. The main damages are due to water infiltration and high humidity inside of each cell bottom part, which caused important dislocated concrete cover and corrosion of the columns steel reinforcement (Figure 2). The strengthening of supporting columns for the discharge funnel consists of steel profiles (Figure 3). This solution has a smaller cost than CFRP materials. On the other hand, steel profiles have a better buckling behaviour than CFRP strips. Conexpand
M12/120/30
L 6
0X
60
X6
L=
40
00
mm
L 80x80x8
L 80x80x8
40x5...295
40x5...295
Con
exp
an
dM
12
/12
0/3
0
Figure 3. Strengthening solution with steel
profiles
41 ГОДИНА ГРАЂЕВИНСКОГ ФАКУЛТЕТА СУБОТИЦА
Међународна конференција
Савремена достигнућа у грађевинарству 24. април 2015. Суботица, СРБИЈА
127
3. REHABILITATION OF A FRAMED BUILDING The Western University of Timisoara has many buildings, among them the Main Building (Figure 4 and 5) that is used as administrative part as well as classrooms for students, was built in 1962-1963. The RC structure consists of: transversal and longitudinal frames
with eight storeys and two spans of 5.6 m and eleven bays of 3.8 m;
floors with girder mesh in two directions and a slab of 10 cm;
foundation with a thick slab and deep beams in two directions.
Figure 4. The Western University of Timisoara
3.90
Strengthened columns at the first storey
Legend:
5.6
0
1
5.6
0
Stairs
3.80 3.80 3.80 4.00 3.80 3.80 3.80 3.80 3.80 3.90
2 123 4 5 6 7 8 9 10 11
A
B
C
SC 1 SC 2 SC 3 SC 4 SC 5 SC 6 SC 7 SC 8 SC 9 SC 10 SC 11 SC 12
SB 1 SB 2 SB 3 SB 4 SB 5 SB 6 SB 7 SB 8 SB 9 SB 10 SB 11 SB 12
SA 1 SA 2 SA 3 SA 4 SA 5 SA 6 SA 7 SA 8 SA 9 SA 10 SA 11 SA 12
Figure 5. Framing plan – ground storey
On examination of the building and from non-destructive measurements no important damages of the RC structure were noticed. Some local damage due to incipient reinforcement corrosion was detected at the columns of the ground storey. The analysis of the structure has been performed at both combinations of actions: fundamental combinations and special combinations including seismic action at present-day level. From the analysis it was noticed: weakness of reinforcement and insufficient anchorage of beam-positive
reinforcement at the beam-column joint, especially in the longitudinal direction; the drift limitation conditions are not within the admissible limits at the ground
storey. Rehabilitation solution consists in strengthening of the columns located at the ground storey (Figure 6 and 7): some columns were strengthened in 1999 to prevent the local damages due to reinforcement corrosion; the other columns were rehabilitated in 2004
41th ANNIVERSARY FACULTY OF CIVIL ENGINEERING SUBOTICA
International conference
Contemporary achievements in civil engineering 24. April 2015. Subotica, SERBIA
128
for decreasing the lateral displacements (drift limitation conditions) and for a homogeneous columns stiffness at the ground storey.
SB
1, 12
550
900
100x10...900
100x10...550
100x10...550L100x100x10...5130
100x10...900
Figure 6. Strengthening solution with steel profiles
Figure 7. Rehabilitation solution of columns
4. REHABILITATION OF A MASONRY BUILDING The "Palace" structure (Figure 8) is a huge building (underground floor, ground floor - restaurant, 3 storeys - apartments, timber roof), built before 1900's with a composite structure: masonry and reinforced concrete framed structure (Figure 9).
Figure 8. The "Palace" building
Figure 9. Longitudinal reinforced concrete frames
Initially it was an entire masonry structure, but later the ground floor was changed: some resistance brick walls were cut and two longitudinal RC frames were erected to sustain all the vertical loads. Due to this architectural operation the structure became more vulnerable at seismic actions: by the transversal direction main part of the ground floor became unstable at horizontal actions because of some erected columns with hinge
41 ГОДИНА ГРАЂЕВИНСКОГ ФАКУЛТЕТА СУБОТИЦА
Међународна конференција
Савремена достигнућа у грађевинарству 24. април 2015. Суботица, СРБИЈА
129
connection at both ends (masonry wall supports from the underground floor and ground storey). Other vulnerabilities of the building consist of: overall lateral stiffness values along the two main axes are different; lack of seismic joints to divide building parts having different dynamic characteristics; lack of straps at each floor. The building assessment emphasized some aspects: concrete quality is very variable in structural elements, having different classes (C8/10 - C16/20); some cracks in longitudinal beams; corrosion of the slab reinforcement; etc. From the static and dynamic analysis a very important conclusion could be drawn: the earthquake capacity ratios R between the actual values of ultimate bending moment (Mcap) and the necessary bending moment (Mnec), given by the present-day seismic action level, were very low for columns. That meant that the building was characterized by a high risk of collapse at seismic actions. It resulted the necessity of structural rehabilitation. In accordance to the structural analysis, the strengthening of the ground floor was chosen in order to obtain technical and economical advantages: safe behaviour at seismic actions; slight change of the overall structural stiffness; easy strengthening technology and short period of refurbishment (December 2004 - June 2006). The strengthening have been made on the following structural elements: strengthening by RC coating (7 cm on
each side) of masonry walls from the underground floor of the building;
new reinforced concrete floor with embedded steel profiles (HEB 220) in two directions, which stands as beams for the new structure;
Figure 10. Strengthening of columns
strengthening of half from the existing columns (60x60m coated by RC to become 90x90cm – Figure 10) and erecting of new transversal RC beams in order to create new transversal frames (Figure 11);
strengthening by RC coating of existing longitudinal beams; rehabilitation of some structural elements having corroded reinforcement.
41th ANNIVERSARY FACULTY OF CIVIL ENGINEERING SUBOTICA
International conference
Contemporary achievements in civil engineering 24. April 2015. Subotica, SERBIA
130
GLC 90x90GLC 90x90
GLB 90x90GLB 90x90
GLA 75x90 GLA 75x90
1,92
3,39
3,5
0,47 3,18 0,63,470,9
3,490,9 0,48
1,46
3,0
60
,39
1,741,61 3,2
0,6
3,35
0,61
0,46 3,57
5,9
3
5,9
3
5,9
3
3,390,94,720,644,840,9
4,124,15
0,6
0,6 0,38 1,5 0,4 0,63 3,51
4,71
0,8
4
4,66
0,6
5,1
20,6
0,9
4,9
40,6
0,62
1,9
4
0,9
1
1,86
0,6
0,6
5
2,7
9
11,5
3
3,57
1,4
40
,4
3,26
0,7
1,4
4
S290x9090x90
S2 S290x90
90x90 S1 S1
90x90 S190x90
S190x90strengthened at 90x90cm
Existent longitudinal beam 60x80cm
GT
3 -
90
x8
0
GT
2 -
90
x8
0
NE
W B
EA
M
GT
1 -
90
x8
0
NE
W B
EA
M
NE
W B
EA
M
GT
3 -
90x8
0
NE
W B
EA
M
GT
2 -
90
x8
0
NE
W B
EA
M
GT
1 -
90
x80
S190x90
S190x90
str
en
gth
en
ed
at
90
x80
cm
Exis
ten
t b
eam
60
x4
5cm
strengthened at 90x90cmExistent longitudinal beam 60x80cm
strengthened at 75x90cmExistent longitudinal beam 60x60cm
Figure 11. Ground floor rehabilitation
5. CONCLUSIONS The main ideas which may emerge from these studies are: a) As structural rehabilitation for existing reinforced concrete structures several
strengthening solutions may be used: steel bracing; carbon fibre polymer composites (CFRP); jacketing by reinforced concrete.
b) The manufacture time is shorter in case of using CFRP in comparison to classic strengthening solutions (steel bracing or reinforced concrete jacketing).
c) The cost of CFRP solutions for strengthening is higher than other solutions. d) Using of CFRP solution for strengthening of columns may be inadequate in case of
structural stiffness increase demands.
REFERENCES [1] fib Bulletin 14, Externally Bonded FRP Reinforcement for RC Structures, fib,
Lausanne, 2001. [2] Ghobarah, A.: Seismic assessment of existing RC structures. Progress in Structural
Engineering and Materials, 2000, Vol. 2, No. 1. [3] Bob, C., Dan, S.: Analysis, Redesign and Rehabilitation of Reinforced Concrete
Framed Structures in Seismic Regions, fib Symposium: Concrete Structures in Seismic Regions, Athens, 2003.
[4] Bob, C., Dan, S., Badea, C., Iures, L.: Classic and Modern Rehabilitation Techniques in Seismic Zones, IABSE Symposium: Structures and Extreme Events, Lisbon, 2005.
[5] Dan, S., Bob, C., Gruin, A.: Analysis of Reinforced Concrete Existing Structures in Seismic Regions, WSEAS International Conference: Engineering Mechanics, Structures, Engineering Geology EMESEG’08, Heraklion, Greece, 2008.
41 ГОДИНА ГРАЂЕВИНСКОГ ФАКУЛТЕТА СУБОТИЦА
Међународна конференција
Савремена достигнућа у грађевинарству 24. април 2015. Суботица, СРБИЈА
131
[6] Bob, C., Bob, L.: Sustainability of New and Strengthened Buildings, WSEAS International Conference on Sustainability in Civil Engineering SSE’09, Timisoara, Romania, 2009.
НЕКА РЕШЕЊА ЗА РЕХАБИЛИТАЦИЈУ ПОСТОЈЕЋИХ КОНСТРУКЦИЈА У РУМУНИЈИ
Резиме: Овај рад се бави ојачавањем армиранобетонских конструкција унутар сејзмичких зона у Румунији. Анализирају се неки примери рехабилитације карактеристичних конструкција. Примери су бирани имајући у виду тренутно стање објекта и њихову функцију. При рехабилитацији конструкција су коришћени класични (бетон и/или челик) и модерни (полимери ојачани карбонским влакнима) материјали и технологије. Кључне речи: Постојеће армиранобетонске конструкције; сејзмички утицаји; ојачавање; класичне методе рехабилитације; модерне методе рехабилитације; полимери ојачани карбонским влакнима