  • Service International / hc / 08.10.2012 / 1

    Service training

    TB commercial vehicle wash

  • Service International / hc / 08.10.2012 / 2

    Service training

    TB

    TB 46

    Wash height, for example: 4,6 m

    Brush

    Truck

    TB 36 => 3,6 m wash height

    TB 42 => 4,25 m wash height

    TB 46 => 4,6 m wash height

    TB 50 => 5,05 m wash height

    Wash width = 2,9 m for all wash height

  • Service International / hc / 08.10.2012 / 3

    TB overview gantry

    - Steel frame hot-dip

    galvanized

    - Powder coating optional,

    for intensive pre spraying

    necessary

    - TB36 has smaller profile for

    support column

    Steel frame

    Service training

  • Service International / hc / 08.10.2012 / 4

    TB measurements

    - Longer brush hair with roof and side brush possible, maximum diameter 1165mm

    - Splash guard side brushes adjustable

    Service training

    Gantry without HP60 Gantry with HP60

  • Service International / hc / 08.10.2012 / 5

    TB Video

    Video

    Service training

  • Service International / hc / 08.10.2012 / 6

    TB standard equipment

    2 plastic cabinets

    Side 1: main cabinet

    2 x frequency converter ATV12

    Side 2: water cabinet

    Solenoid valves / compresser air /

    dosing pumps / chemicals

    Service training

  • Service International / hc / 08.10.2012 / 7

    TB standard equipment

    Spraying arch A and B

    Service training

  • Service International / hc / 08.10.2012 / 8

    TB standard equipment

    Distance counter:

    - Lifting roof brush

    - Side brush 1 and 2 drive system

    - Gantry drive system

    Service training

  • Service International / hc / 08.10.2012 / 9

    TB standard equipment

    Top position of roof brush can be lowered during installation:

    - The roof brush can be lowered in 3 steps, 10 cm each

    - Also the roof brush splash guard (optional) can be lowered

    Service training

  • Service International / hc / 08.10.2012 / 10

    TB standard equipment

    Side brush proximity switches are movable:

    - The inner and outer proximity switches can be mounted in 3 different positions. This

    can be used for longer brushes or narrow wash bays.

    - Different level of proximity switches of side brush 1 and 2

    Service training

  • Service International / hc / 08.10.2012 / 11

    TB standard equipment Service training

    2 Light barriers / 3 Light barriers position 2

    - For front / gap / rear-end detection

    - 2 light barriers standard position 2 top and position 2 bottom

    - Option (starting with new PLC): position 2 middle (yellow), necessary with: HP 60 bar, articulated transporter, special vehicle with low bed, => necessary for contract cleaners

  • Service International / hc / 08.10.2012 / 12

    TB standard equipment

    Light barrier clamp adjustable

    - Each light barrier clamp can be moved 80mm towards the center of the wash bay,

    this is helpfull in narrow wash bays

    Service training

  • Service International / hc / 08.10.2012 / 13

    TB necessary add-on kits

    Brushes

    - Round shafts like CB-Line

    - Colours grey and black

    - PE-brushes

    - Carlite brushes for busses only

    - Carlite with HP prewash only

    Service training

  • Service International / hc / 08.10.2012 / 14

    TB necessary add-on kits Service training

    Water distributor

    100 (without CAN-bus)

    Options:

    - Used water

    - Flow switch

    - Drying aid

    100 C / 100 S / 100 CS

    (with CAN-bus)

    Options:

    - Used water

    - Flow switch

    - Drying aid

    - Arch C - Foam

    - Intensive pre spraying

    - Chemical dry run signals

    - Counter cycle wash

    85/15 S / 85/15 CS

    (with CAN-bus)

    Used water standard

    Options:

    - Flow switch

    - Drying aid

    - Arch C - Foam

    - Intensive pre spraying

    - Chemical dry run signals

    - Counter cycle wash

    Compressed air always

    necessary !

  • Service International / hc / 08.10.2012 / 15

    TB necessary add-on kits

    Operating panel Basic - Mounting at gantry or external

    - Wash program and options

    combined

    - Suitable for small bus

    companies or for manual

    functions at gantry

    Comfort

    - Mounting external

    - Wall or table mounting

    - Wash program and options

    seperated

    - Necessary for contract cleaners

    Service training

  • Service International / hc / 08.10.2012 / 16

    TB necessary add-on kits Service training

    Wash program

  • Service International / hc / 08.10.2012 / 17

    TB necessary add-on kits Service training

    Wash program

  • Service International / hc / 08.10.2012 / 18

    TB necessary add-on kits Service training

    Option buttons

    Foam

    Intensive

    pre spraying

    High pressure

    Single wash

    Overlapping

    Without roof brush

    Europe cabin

    Truck - mirror

    Spoiler

    BUS - mirror

    USA - cabin

    Lift gate

  • Service International / hc / 08.10.2012 / 19

    TB necessary add-on kits

    Gantry drive rails

    - Rail distance 3700 mm like RBE4 / RBE6 / RBG6 / RB6

    - Standard length 18 m, 24 m, 31 m

    - 24m => maximum vehicle length18,75 m with positioning

    - 1 m extension recommended, with 60 bar HP necessary

    - Maximum rail length 32m

    Service training

  • Service International / hc / 08.10.2012 / 20

    TB necessary add-on kits

    Energy chain

    - Narrow version for gantries without high pressure

    - Wide version for gantries with high pressure

    - Improved channel

    - Backward bend chain links

    - Up to 19m drive rail lenght

    - Up to 25m drive rail lenght

    - Up to 32m drive rail length

    Service training

  • Service International / hc / 08.10.2012 / 21

    TB necessary add-on kits

    Energy chain

    - Wall mounting

    - Stand mounting

    - Floor mounting (with special arm)

    Service training

  • Service International / hc / 08.10.2012 / 22

    TB necessary add-on kits

    Festooned system

    - Up to 19m drive rail length

    - Up to 25m drive rail length

    - One high pressure hose for one pair of 60 bar spinner possible

    - Opposit mounting of festooned system with special carrier arm possible (optional)

    Service training

  • Service International / hc / 08.10.2012 / 23

    TB necessary add-on kits

    Main switch or main switch distributor

    Main switch:

    - For TB with operating panel at the

    gantry

    - The only possible external option is

    manual frost protection.

    Main switch disributor:

    - With PLC (since new PLC system)

    Service training

  • Service International / hc / 08.10.2012 / 24

    TB necessary add-on kits

    Interface PCB A26

    - Necessary for:

    Card reader connection, autostart-program, operating time input

    - Will be mounted in main switch distributor

    Main switch distributor:

    Service training

    100 %

    adjustable

  • Service International / hc / 08.10.2012 / 25

    TB options

    Splash guard side brushes

    Different part number for:

    TB 36, TB 42, TB 46, TB 50

    Service training

  • Service International / hc / 08.10.2012 / 26

    TB options

    Splash guard roof brush

    - Can be used for all different wash heights

    - No special splash guard for lowered wash height necessary

    Service training

  • Service International / hc / 08.10.2012 / 27

    TB options

    Switches short- / narrow wash bay + light barrier position 1 - Maximum 4 switches short- / narrow wash bay can be mounted

    - Switches at front can be used for light barrier position 1

    - Proximity switches are normaly open

    Service training

    LS Pos. 1

    Only bracket for light barrier position 1 Front switch with light barrier position 1

  • Service International / hc / 08.10.2012 / 28

    TB options

    Switches short- / narrow wash bay

    Service training

    - Maximum 4 switches short- / narrow wash bay can be mounted - Different brackets for 60 bar high pressure

    - Proximity switches are normaly open

    Rear end without 60 bar high pressure

    Rear end with 60 bar high pressure

  • Service International / hc / 08.10.2012 / 29

    TB options

    Spraying arch C

    - Necessary for single wash, short move

    wash, drive through wash, counter wash...

    Service training

  • Service International / hc / 08.10.2012 / 30

    TB options

    Used water connection

    - Necessary for water disributor 100, 100C,

    100S and 100CS

    - Will be mounted at water manifold in factory

    Service training

  • Service International / hc / 08.10.2012 / 31

    TB options

    Foam

    - Possible with water distributor 100S, 100CS,

    85/15S and 85/15CS

    - Will be applied with standard arch B - Will be mounted at water distributor in factory

    Service training

  • Service International / hc / 08.10.2012 / 32

    TB options

    Flow switch

    - Possible with all water distributor

    - Monitors water flow for arch B during brush wash

    - Will be mounted at water distributor in factory

    Service training

  • Service International / hc / 08.10.2012 / 33

    TB options

    Dosing pump drying aid / liquid leather

    - Possible with all water distributor

    - Will be mounted at water manifold in factory

    Turn over valve dosing pump arch A / C - Only at water distributor 100C, 100CS, and 85/15CS

    possible

    - Will be mounted at water manifold in factory

    Service training

  • Service International / hc / 08.10.2012 / 34

    TB options

    Traffic light left or right

    - Only one traffic light at gantry possible

    - CAN-bus PCB is located in door side 1

    Service training

  • Service International / hc / 08.10.2012 / 35

    TB options

    Gantry feet for lowered drive rails

    - Must be ordered together with gantry - Different gantry feed

    - Different gantry drive motors

    - Different drive rollers

    - Different flange bearings

    - Different settings frequency transformer gantry drive system

    Service training

  • Service International / hc / 08.10.2012 / 36

    TB options

    Intensive pre spraying

    - Side only, or

    - Side and roof with HP roof beam

    - Concentration up to 5 % with Dosatron

    Service training

  • Service International / hc / 08.10.2012 / 37

    TB options

    Intensive pre spraying

    Service training

    With compressed air

    With HP roof beam

  • Service International / hc / 08.10.2012 / 38

    TB options

    High pressure 20 bar - 15 KW centrifugal pump

    - 3 HP hoses to gantry

    - Side pipes + roof pipe

    - Can work in same step with brushes

    Service training

  • Service International / hc / 08.10.2012 / 39

    TB options Service training

    High pressure 60 bar

    Roof: Power nozzles Side: Spinner

  • Service International / hc / 08.10.2012 / 40

    TB options Service training

    High pressure 60 bar

    - 3 x HD 60 / 6 K2 pump module

    - max. 3 HP hoses for gantry supply

    - HP needs to be separate from brush wash step

    - Roof and side HP separate wash step

    - Traffic light positioning for HP roof beam

    necessary

    - Roof beam +/- 90 swivelling

    - 4 light barriers and safety ring

    - Intensive pre spraying roof is option

    - Intensive pre spraying roof sprays through

    HP roof nozzles

  • Service International / hc / 08.10.2012 / 41

    TB options Service training

    High pressure 60 bar

    Changeover

    roof / side

  • Service International / hc / 08.10.2012 / 42

    TB options Service training

    High pressure 60 bar

    Standard versions:

    TB 36:

    - 1 spinner pair 1 x HD60/6K2

    - 2 spinner pairs 2 x HD60/6K2

    TB 42 / TB 46 / TB 50

    - 1 spinner pair 1 x HD60/6K2

    - 2 spinner pairs 2 x HD60/6K2

    - 3 spinner pairs 3 x HD60/6K2

    - 3 spinner p. + roof 3 x HD60/6K2

    Wide energy chain for 2 or 3 HP hoses

    necessary

    Festooned system can be equipped with

    one HP hose for one spinner pair

    For gantries with HP 60 bar more travel

    rail and wash bay length in necessary

    Gantry with HP60

  • Service International / hc / 08.10.2012 / 43

    TB options

    Undercarriage wash 20 bar

    - Changeover function with 2 3-way ball valve - Light barrier wall- or stand mounting

    - Amplifier for light barriers in main switch distributor

    - Frost protection with drainage hole at undercarriage wash

    Service training

  • Service International / hc / 08.10.2012 / 44

    TB options Service training

    Undercarriage wash 60 bar

    - Supplied with 2 x HD60/6K2 with two 3-way ball valves

    - Light barrier wall- or stand mounting

    - Amplifier for light barriers in main switch distributor

    Video

  • Service International / hc / 08.10.2012 / 45

    TB options Service training

    Undercarriage wash 60 bar

    - Supplied with 2 HP hoses

    - Frost protection with compressed air

    - New nozzle covers

  • Service International / hc / 08.10.2012 / 46

    TB options

    Operating panels under chassis wash 20 bar / 60 bar

    Operating panel 1 Operating panel 2 (additional)

    Service training

  • Service International / hc / 08.10.2012 / 47

    TB options

    External traffic light - 2 x external traffic lights possible

    - Wall or stand mounting possible

    - Amplifier for light barriers in electrical cabinet

    of external traffic light no. 1

    - Wall or stand mounting possible

    Service training

    External postioning light barriers

  • Service International / hc / 08.10.2012 / 48

    TB options Service training

    Park position

    - Without traffic light possible

    or

    - With external traffic light no.1 and external

    positioning light barriers possible

  • Service International / hc / 08.10.2012 / 49

    TB options

    Short move wash

    - Internal or external positioning light barriers

    necessary

    - 2 traffic lights necessary

    - Guide rails necessary

    - At least 10m drive rails necessary

    - Roof brush possible

    - Only for buses

    Service training

    Video

  • Service International / hc / 08.10.2012 / 50

    TB options

    Drive through wash

    - Positioning light barriers necessary (internal or external)

    - One traffic light necessary

    - Guide rails necessary

    - Only with side brushes

    - Only for buses

    - Gantry doesnt drive - No front- and rear end wash

    Service training

    Video

  • Service International / hc / 08.10.2012 / 51

    TB options

    - Light barrier position 3 necessary - External positioning light barriers necesarry

    - One external traffic light necessary

    - Spraying arch C necessary - Possibly change over valve drying aid necessary

    - Not possible with water distributor 100

    - Used water only with 85/15CS valve block possible

    - Guide rails necessary

    Service training

    Counter cycle wash

    Video =>

  • Service International / hc / 08.10.2012 / 52

    TB options Service training

    Wireless remote control

    - Manual functions and manual functions during wash

    (no wash start)

    - With second rechargeable battery

    - Connection to PLC with A39 CAN-bus PCB

  • Service International / hc / 08.10.2012 / 53

    TB options

    Guide rails

    - Universal guide rail

    Service training

  • Service International / hc / 08.10.2012 / 54

    TB options

    Manual frost protection

    FW, UW, HP-20bar, intensive-side, (mounting plate optional)

    Service training

  • Service International / hc / 08.10.2012 / 55

    TB options

    Automatic frost protection

    - FW, UW, HP-20bar, intensive-side, intensive-roof, (mounting plate optional)

    - CAN-bus PCB A21

    Service training

  • Service International / hc / 08.10.2012 / 56

    TB options

    Fresh water pump

    - Possible with or without cabinet

    - If it is without cabinet the electrical components can be mounted in the 20 bar

    cabinet or in the cabinet of the first 60 bar Pump

    - 1000 liter tank (optional)

    - Second and third tank optional

    Service training

  • Service International / hc / 08.10.2012 / 57

    TB options Service training

    Signal box for existing components

    - Fresh water

    - Used water

    - 3 x high pressure with bypass

    - Under chassis wash

    - Intensive pre spraying

    - Treadle

    - Traffic light

    - Demand spot free water

    - Frost protection A21 (optional)

  • Service International / hc / 08.10.2012 / 58

    TB options Service training

    Storm clamp

    1 x at gantry foot side 1

  • Service International / hc / 08.10.2012 / 59

    TB options

    External emergency stop

    Service training

  • Service International / hc / 08.10.2012 / 60

    TB options Service training

    WRP 8000/ 16000

    Eltectrical cabinet

    for controlling

    Control valve

    for filter +

    backwash +

    rinsing

    Input waste water from

    immersion pump

    Output waste water for

    backwash in sludge trap +

    backwash regulator

    Output recycling water

    in recycling water tank +

    shut off valve

    Sand filter

  • Service International / hc / 08.10.2012 / 61

    TB options Service training

    1 2 3

    4

    5

    6

    8 7 9 10

    11

    12

    (1) WRP 16000 with drain / 3000L

    (2) Add-on-kit recycling water tank

    (3) Add-on-kit fresh water supply

    (4) Add-on-kit tank add-on

    (5) Add-on-kit medium pressure pump 50/3

    (6) Add-on-kit stand conrol cabinet

    (7) Add-on-kit immersion pump

    (8) Add-on-kit air supply

    (9) Float switch S15

    (10) Add-on-kit conductivity + S14

    (11) Circulation pump

    (12) Add-on-kit overflow

    WRP 8000/ 16000

  • Service International / hc / 08.10.2012 / 62

    TB options

    Additional options which are not available yet:

    Release 08.10.2012, changes reserved

    Service training

    - Door control (not for Easy 238 processor)

    - Convoy wash

    - Drive through rinsing

    - Teach in