18
1 Devil Devil s Slide Tunnels s Slide Tunnels The 20th ICTPA Annual Meeting The 20th ICTPA Annual Meeting Creating New Era for Transportation Creating New Era for Transportation” May 26 May 26 - 28 , 2007 28 , 2007 王永 Yung-Nien (Nien) Wang, HNTB Corporation 王永年 Along Route 1 in San Mateo County, from Half Moon Bay Airport to Linda Mar Blvd. Project Location Project Location

The 20th ICTPA Annual Meeting “Creating New Era …€¦ · The 20th ICTPA Annual Meeting “Creating New Era for Transportation ... Sample of NATM Tunnel Construction ... “Creating

Embed Size (px)

Citation preview

  • 1

    DevilDevils Slide Tunnelss Slide Tunnels

    The 20th ICTPA Annual MeetingThe 20th ICTPA Annual Meeting

    Creating New Era for TransportationCreating New Era for Transportation

    May 26 May 26 -- 28 , 200728 , 2007

    Yung-Nien (Nien) Wang, HNTB Corporation

    Along Route 1 in San Mateo County, from Half Moon Bay Airport to Linda

    Mar Blvd.

    Project Location

    ProjectLocation

  • 2

    Project Site

    NORTH PORTAL

    SOUTH PORTAL

    Double-bore, 4000 feet each in length, 30 feet in diameter

    Tunnels will cut through San Pedro Mountain

    Rejoins Route 1, north of Devils Slide

    Devils Slide Potential Problem

  • 3

    BEFOREBEFORE AFTER

    March 16, 1995 June 30, 1995

    Devils Slide Restoration - 1995

    CALTRANS Blasted the Loose Rocks

    April 2, 2006 - Road Closed again

  • 4

    Devil`s Slide Tunnels Project Elements

    Local Fault Map

  • 5

    Project Plan

    Core storage

    2130 m in length

    Tunnel Segment, North & South Portals, South Rock Cut

    17 borings, 3 m to 350 m in length

    Inclinations from vertical ranges from 0 to 90+ degrees

    Helicopter Access

    Geological Investigation Program

    California Red-Legged Frog

    Frog Pond Peregrine Falcon

    Aesthetics Portal features Retaining wall OMC site and disposal area Air quality

    Natural Environment California red-legged frog Peregrine falcon

    Environmental Issues

  • 6

    Portal Alternatives Ballot

    Segmental cast-in place box girder bridge type

    Curved alignment

    No falsework required

    Keeping out of environmentally sensitive area

    Bridge width 7800 mm

    Traffic lane width 2400 mm

    Bridge length 300 m SB, 275 m NB

    Devils Slide Bridge

  • 7

    Looking west, toward the North Portal area

    Minimal excavation

    Located in area of existing small slide masses

    Requires additional support

    Tunnel portal is skewed relative to the existing ridge

    North Portal

    NORTH PORTAL

    North Portal Remove Vegetation

    NORTH PORTAL

  • 8

    North Portal- Side View

    North Portal Close up View

  • 9

    North Portal Design & Textures

    South Bound North Bound

    Tunnel Typical Cross Section

    Traffic lane widths 3600 mm

    Shoulders 2,400 mm and 600 mm wide

    Sidewalk 1,200 mm wide (each side)

    Vertical clearance envelope 4,750 mm

    Cross passages -total 10

    Tunnel Layout

    Tunnels

  • 10

    3-D Analysis

    The NATM Sequence

  • 11

    Sample of NATM Tunnel Construction

    8 pairs of jet fans per tunnel bore = 32 fans total

    Reversible type jet fans

    1250mm in diameter

    Each row of fans will be spaced approximately 135m

    Ventilation System

  • 12

    South Portal Top View

    South Portal Front View

  • 13

    South Portal - Overview

    South Portal Design & Textures

  • 14

    Early Contract Construction Overview

    DISPOSAL AREA

    OMC SITE

    SOUTH PORTAL

    Early Contract Construction

    SOUTH PORTAL

  • 15

    SRC Wall Texture

    Proposed OMC Site

  • 16

    Tunnel construction method (NATM, TBM, etc.) Hauling / disposal Environment ( Red-Legged Frog) Traffic maintenance

    Tunnel Construction Consideration

    2001 2002 2006 2011

    ROD

    Construction

    Overall Project Schedule

    Final PS&E Design

    Preliminary

    Early Contract(June 2005 to April 2006)

    South Rock Cut OMC building Area

    Bridge Contract(September 2006 to December

    2007)

    Tunnel & OMC Building Contract(September 2006 to December

    2011) North and South Portal

    structures Equipment Chambers

    between Portals NATM tunnel Tunnel operation systems

  • 17

    Tunnel w/ north and south portal structures Power supply Lighting Tunnel systems OMC building Others

    Low Bid Low Bid 11/14/06 (Kiewit Pacific)11/14/06 (Kiewit Pacific)A. A. $ 272.366 Million$ 272.366 MillionB. 1,500 day x $16,900B. 1,500 day x $16,900

    Total = $ 297,716,000Total = $ 297,716,000

    Second Low Bid = $ 353,204,075Second Low Bid = $ 353,204,075

    Estimated Major Cost Elements

    The 20The 20thth ICTPA Annual MeetingICTPA Annual Meeting

    Creating New Era for TransportationCreating New Era for Transportation

    May 26 May 26 -- 28 , 200728 , 2007

    Questions !!!

    DevilDevils Slide Tunnelss Slide Tunnels

    Yung-Nien (Nien) Wang, HNTB Corporation

  • 18

    Community involvement

    Stay on schedule

    Keep within budget $$$

    Safety

    Final Product = DevilFinal Product = Devils Slide Tunnelss Slide Tunnels

    Success in Our Goal