25
The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Embed Size (px)

Citation preview

Page 1: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

The Experimental Hall Layout

2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011

Hie-Isolde

Erwin Siesling

Page 2: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 2

Abstract

• Hie-Isolde Experimental hall– Layout– Future– User requirements

• Radio Protection issues– Different solutions– Studies and collaborations

• User facilities– Changes and improvements

Page 3: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 3

Hie-IsoldeHie-Isolde experimental hall

Page 4: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 4

Hie-Isolde SC Linac

5.5MeV/u by the autumn of 2014

First 10MeV/u by April 2016

Hie-Isolde SC Linac:

Page 5: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 5

Beam Transfer Line

Page 6: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 6

Experimental Hall Lay-out

Straight line with 2 branches – July 2013 - April 2014 Miniball move: Oct 2013 – April 2014

Miniball

Actar / HeliosMiniball

Beam diagnostics

Stage 1:

Page 7: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 7

The bend

Spectrometer installation and 2nd Miniball move

MiniballSpectrometer Actar / HeliosMiniball

Stage 2:

TSR

TSR and beyond.. Stage 3:

Experimental Hall Lay-out

Page 8: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 8

TSR @ Hie-Isolde

Possible TSR installation above the CERN cable-tunnel. Tilted beamline coming up from the machine.

TSR Max Planck Institut für Kernphysik Heidelberg

TSR@HIE-ISOLDELOI endorsed Jan 2011 (K. Blaum, Y. Litvinov)

Page 9: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 9

User Requirements

Requirements for the HIE-experimentsInfo needed on:

• Power consumption• Cooling & ventilation• Cryogenics• Alignment & spacing (nr of racks)• Sensitivity to radiation, temp & vibrations• Transport requirements

Page 10: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 10

Radio Protection issues

MiniballSpectrometer Actar / HeliosMiniball

10MeV/c

Page 11: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 11

Radio Protection issues

MiniballSpectrometer Actar / HeliosMiniball

10MeV/c

Controlled access

Controlled accessOptions under study:

• Close the hall

• Restricted area• Controlled access• Beam interlock

Page 12: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 12

Radio Protection issues

MiniballSpectrometer Actar / HeliosMiniball

Options under study:

• Close the hall• Shielding

• For each experiment Allowing access to others during a run• Individual beams interlocked

Beam interlocked access

10MeV/c

Page 13: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 13

Radio Protection issues

MiniballSpectrometer Actar / HeliosMiniball

Options under study:

• Close the hall• Shielding • Limited intensity

• To stay within RP restrictions• many elements will be produced at low intensity anyway..

Limited beam intensity

10MeV/c

Page 14: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 14

Radio Protection issues

MiniballSpectrometer Actar / HeliosMiniball

Options under study:

• Close the hall• Shielding • Limited intensity• Open access

• If studies prove safe levels• No restricted access

10MeV/c

Page 15: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 15

Studies

Existing models to calculate neutron and gamma doses from low energy heavy ions:

-NEUGAM code

-PHITS calculations

-FLUKA calculations

: conservative code, no expertise at CERN

: suitable for HIE-Isolde but not validated (nothing to compare to)

: expertise at CERN

Courtesy: Ana-Paula Bernardes EN/STI, Joachim Vollaire DGS/RP

Page 16: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 16

Studies & collaborations

CEA-CERN collaboration - Thanks to Y.KadiPHITS Calculation on neutron and gamma production from low energy heavy ions - Meeting was held on the 13th of April with DSM/IRFU/SENAC to define potential collaboration

Fellow Marie-CurieNEUGAM, PHITS, FLUKA Calculation comparaison on neutron and gamma production from low energy heavy ion - Advertisement for a fellow position went out for an experienced candidate to perform all the detailed calculations

ANL-CERN collaboration - Thanks to M.HuyseNEUGAM code to calculate neutron and gamma dose, courtesy of B. Back (ANL)- Typical beam species intensity/energy to be defined for RP analysis

Courtesy: Ana-Paula Bernardes EN/STI, Joachim Vollaire DGS/RP

Page 17: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 17

User Facilities1. Increasing the surface of the Solid State Lab in building B.115:

For RP safety reasons all solid state activities will be moved from B.275 to B.115This will suppress the existing workshop in B.115 and courtyard between B.115 and B.601

 

2. Replace the existing building 507 by a new building :Ground floor (only accessible from within the surveyed area):

- Labs and workshopFirst floor (accessible from outside the surveyed area):

- Data Acquisition rooms- Meeting room/Visitors Center - Kitchen

Cost study ongoing:Eliseo Perez-Duenas GS/SE

under discussion

Page 18: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 18

Present situation (ground floor Jura side):

Control room

User Facilities

Page 19: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 19

Solid State Lab 115

1. Increasing the surface of the Solid State Lab in B.115:

Control room

Page 20: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 20

Replace building 507

Control room

2. Replacing the existing building 507 by a new building - Ground floor (only accessible from within the surveyed area):

Page 21: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 21

Control room

2. Replacing the existing building 507 by a new building - First floor (accessible from outside the surveyed area):

Replace building 507

Page 22: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 22

Cost studies new B 507Cost studies and civil engineering plans by Eliseo Perez-Duenas GS/SE

No signs of asbestos found in the existing building

Phase 1: estimate 120kChf- dismounting the present building- construction permit- adapting the concrete foundation

Phase 2: estimate 1.8MChf 1MChf- construction of the new concrete building- total surface 780 m2 460 m2

- not taken in account electrical installations, CV, Labo’s, etc.

Construction during long shutdown 2013?

Page 23: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 23

Cost studies new B 507

Study on the use of modular cabins instead of a full concrete building

Phase 1: estimate 120kChf- dismounting the present building- construction permit- adapting the concrete foundation

Phase 2: estimate 520kChf- installation of modular cabins, interconnected and on 2 floors - total surface 460 m2

- not taken in account electrical installations, CV, Labo’s, etc.

Advantages: - lower costs- fast construction- flexible work floor

Page 24: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 24

Cost studies new B 507

Example modular cabins at the AD at CERN:

DAQ and experiment control rooms moved outside the AD hall for RP reasons

- First 6 cabins, more to add- Second floor foreseen- Inside configuration flexible

Courtesy Eliseo Perez-Duenas GS/SE

Page 25: The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling

Hie-Isolde layout, 2nd PCG meeting, 6 May 2011 E. Siesling 25

Acknowledgement

• EN/HDO: YACINE KADI,• BE/RF : MATTEO PASINI• BE/ABP : FREDERIK WENANDER • GS/SE : DANIEL PARCHET, ELISEO PEREZ-DUENAS• EN/CV : PAUL PEPINSTER, BENOIT BELLIN-CROYAT• EN/EL : RENE NECCA• TE/CRG : NICOLAS DELRUELLE, JOS METSELAAR• EN/STI : RICHARD CATHERALL, ANA-PAULA BERNARDES• EN/MEF : STEPHANE MARIDOR• GS/DI : CYRILLE BEDEL• TE/MSC : YANN LECLERCQ, ARNAUD BOUZOUD• PH/SME : MAGDA KOWALSKA • DGS/RP : JOACHIM VOLLAIRE, ALEXANDRE DORSIVAL