SELIPANUS I 111 00 41 No. Urut Absen 27_No. Soal 27_SELIPANUS_I 111 00 41_Struktur Gempa REKAYASA GEMPA PERHITUNGAN GAYA GEMPA STATIK EQUIVALEN Disusun Oleh: SELIPANUS I 111 00 41 PROGRAM STUDI S1 TEKNIK SIPIL NON REGULER JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS SEBELAS MARET SURAKARTA 2011/2012

Tugas Rekayasa Gempa

Embed Size (px)

DESCRIPTION

rekayasa gempa (gaya statistik aquivalent)

Citation preview

  • SELIPANUS I 111 00 41

    No. Urut Absen 27_No. Soal 27_SELIPANUS_I 111 00 41_Struktur Gempa

    REKAYASA GEMPA

    PERHITUNGAN

    GAYA GEMPA STATIK EQUIVALEN

    Disusun Oleh:

    SELIPANUS

    I 111 00 41

    PROGRAM STUDI S1 TEKNIK SIPIL NON REGULER JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK

    UNIVERSITAS SEBELAS MARET

    SURAKARTA 2011/2012

  • SELIPANUS I 111 00 41

    No. Urut Absen 27_No. Soal 27_SELIPANUS_I 111 00 41_Struktur Gempa

    TUGAS STRUKTUR GEMPA

    MENGHITUNG GAYA GEMPA STATIK EQUIVALEN

    Denah Bangunan (soal)

    No. Urut Absen = 27 No. Urut Soal = 27, dengan data soal : a = 5 m b = 7 m Wilayah Gempa VI Jenis Tanah Dasar adalah Tanah Sedang

    Denah Bangunan

    b

    b

    4@a

    Shear Wall

    Shear Wall

    U

    Shear Wall

    U5.0 5.0 5.0 5.0

    7.0

    7.0

    Shear Wall

  • SELIPANUS I 111 00 41

    No. Urut Absen 27_No. Soal 27_SELIPANUS_I 111 00 41_Struktur Gempa

    DATA MENGENAI GEDUNG

    Material Beton bertulang

    o Kuat Tekan (fc) = 30 Mpa o Kuat Tarik Baja (fy) = 400 Mpa

    Tinggi lantai dasar (antara dasar dan LT-2) = 4.5 meter

    Tinggi antar lantai diatasnya = 4 meter

    Dimensi Kolom

    o Tinggi (h) = 60 cm o Lebar (b) = 60 cm

    Dimensi Balok

    o Tinggi (h) = 40 cm o Lebar (b) = 70 cm

    Tebal plat lantai = 12 cm

    Dinding geser (Shear wall) dengan tebal = 40 cm, menerus setinggi gedung. Detail

    shear wall dapat dilihat pada gambar denah.

    Beban Hidup (LL)

    o LL pada lantai = 2.5 KN/m2 o LL Pada atap = 1.5 KN/m2

    Beban Mati (DL) o DL pada lantai (Partition weight, Ceramic, Screed, mechanical, etc..= 4.5 KN/m2 o DL Pada atap (Plafond, Mechanical, electrical, etc.. = 0.6 KN/m2

    SEISMIC DESIGN DATA

    Fungsi Gedung = Gedung Perkantoran Faktor keutamaan Struktur (I) = 1.0

    Lokasi gedung di wilayah = Zona Gempa VI

    Kondisi tanah dilokasi gedung termasuk dalam kategori Tanah Sedang

    Dengan data sebagai berikut:

    o Percapatan puncak batuan dasar = 0.3 KN/m2 o Percepatan puncak muka tanah (Ao) = 0.36 KN/m2

    (Tabel 5, Pasal 4.7.2 SNI 1726-2002)

    o Tc = 0.6 g o Am = 2.5 Ao = 0.9 g

  • SELIPANUS I 111 00 41

    No. Urut Absen 27_No. Soal 27_SELIPANUS_I 111 00 41_Struktur Gempa

    o Ar = Am . Tc =0.54 g (Tabel 6, Pasal 4.7.6 SNI 1726-2002)

    Untuk rangka penikul momen khusus menggunakan rangka beton pada arah Utara-

    Selatan, Faktor Reduksi Gempanya adalah = 8.5

    Untuk gedung dengan tipe dual system (shear wall yang dipasang pada struktur

    rangka pemikul momen khusus pada arah Barat-Timur, Faktor Reduksi Gempanya

    adalah = 8.5 (Tabel 3, Pasal 4.3.6 SNI 1726-2002)

  • SELIPANUS I 111 00 41

    PENYELESAIAN PERHITUNGAN

    A. PERHITUNGAN BERAT SENDIRI STRUKTUR BANGUNAN

    Gambar keterangan elemen struktur yang masuk dalam perhitungan berat lantai dasar, lantai tipikal dan lantai atap

    Shear Wall

    U5.0 5.0 5.0 5.0

    7.0

    7.0

    Shear Wall

    A B C D E

    3

    2

    1

  • SELIPANUS I 111 00 41

    No. Urut Absen 27_No. Soal 27_SELIPANUS_I 111 00 41_Struktur Gempa

    1. Berat Struktur Pada Lantai Dasar dan Lantai 2 Berat kolom = ((0.6 m x 0.6 m x 4.5 m) x 24 KN/m3 x 15 kolom) + ((0.6 m x

    0.6 m x (4 m / 2)) x 24 KN/m3 x 15 kolom) = 842.40 KN

    Berat Balok = ((0.4 m x 0.7 m x 4.4 m) x 24 KN/m3 x 12 balok datar) +

    ((0.4 m x 0.7 m x 6.4 m ) x 24 KN/m3 x 10 balok tegak) = 430.08 KN

    Berat Lantai = ((20 m x 14 m ) x 0.12 m x 24 KN/m3) = 806.40 KN

    Berat Shear Wall = ((10 m x 0.4 m x (4.5 m - 0.7 m )) x 24 KN/m3 x 2 shear

    wall) + ((10 m x 0.4 m x (4 m / 2)) x 24 KN/m3 x 2 shear wall = 1113.60 KN

    2. Berat Struktur Pada Lantai 3 = 4 = 5 = 6 = 7 = 8

    Berat kolom = ((0.6 m x 0.6 m x (4 m / 2)) x 24 KN/m3 x 15 buah) + ((0.6 m x 0.6 m x (4 m / 2)) x 24 KN/m3 x 15 kolom)

    = 518.40 KN

    Berat Balok = ((0.4 m x 0.7 m x 4.4 m) x 24 KN/m3 x 12 balok datar) + ((0.4 m x 0.7 m x 6.4 m) x 24 KN/m3 x 10 balok tegak) = 430.08 KN

    Berat Lantai = ((20 m x 14 m ) x 0.12 m x 24 KN/m3) = 806.40 KN

    Berat Shear Wall = ((10 m x 0.4 m x (4 m /2)) x 24 KN/m3 x 2 shear wall) + ((10 m x 0.4 m x (4 m / 2)) x 24 KN/m3 x 2 shear wall)

    = 768.00 KN

    3. Berat Struktur Pada Lantai Atap

    Berat kolom = ((0.6 m x 0.6 m x (4 m / 2)) x 24 KN/m3 x 15 kolom) = 259.20 KN

  • SELIPANUS I 111 00 41

    No. Urut Absen 27_No. Soal 27_SELIPANUS_I 111 00 41_Struktur Gempa

    Berat Balok = ((0.4 m x 0.7 m x 4.4 m) x 24 KN/m3 x 12 balok datar) + ((0.4 m x 0.7 m x 6.4 m) x 24 KN/m3 x 10 balok tegak) = 430.08 KN

    Berat Lantai = ((20 m x 14 m ) x 0.12 m x 24 KN/m3) = 806.40 KN

    Berat Shear Wall = ((10 m x 0.4 m x ((4 m / 2) - 0.7 m)*24 24 KN/m3 x 2 shear wall)

    = 249.60 KN

    4. Beban Tambahan pada lantai dan atap Beban mati pada tiap lantai = (4.5 KN/m2 x (20 m x 14 m))

    = 1260.00 KN

    Beban mati pada Atap = (0.6 KN/m2 x (20 m x 14 m)) = 168.00 KN

    Beban hidup pada tiap lantai = (2.2 KN/m2 x (20 m x 14 m)) = 616.00 KN

    beban direduksi sebesar 30 % = 184.80 KN

    Beban Hidup pada Atap = (1.5 KN/m2 x (20 m x 14 m)) = 420.00 KN

    beban direduksi sebesar 30 % = 126.00 KN

    B. PERHITUNGAN BERAT TOTAL STRUKTUR PERLANTAI 1. Berat lantai dasar dan lantai 2

    W LT dasar & LT-2 = (Berat kolom + Berat Balok + Berat Lantai + Shear wall) + DL + LL

    W LT dasar & LT-2 = (842.40 KN + 430.08 KN + 806.40 KN + 1113.60 KN) + 1260.00 KN

    + 184.80 KN

    = 4637.28 kN.

    2. Berat lantai 3 = 4 = 5 = 6 = 7 = 8 (Tipical) W LT 3 LT - 8 = (Berat kolom + Berat Balok + Berat Lantai + Shear wall) + DL + LL W LT 3 LT - 8 = (518.40 KN + 430.08 KN + 806.40 KN + 768.00 KN) + 1260.00 KN

    + 184.80 KN = 3967.68 KN.

  • SELIPANUS I 111 00 41

    3. Berat lantai Atap

    W LT ATAP = (Berat kolom + Berat Balok + Berat Lantai + Shear wall) + DL + LL W LT ATAP = (259.20 KN + 430.08 KN + 806.40 KN + 249.60 KN) + 168.00 KN

    + 126.00 KN = 2039.28 KN.

    Tabel Berat Struktur Perlantai

    Lantai Tinggi (hx) Berat Lantai

    (Wx) Wx * hx (m) (Wx)

    Atap 32.50 4637.28 150711.6 8 28.50 3967.68 113078.88 7 24.50 3967.68 97208.16 6 20.50 3967.68 81337.44 5 16.50 3967.68 65466.72 4 12.50 3967.68 49596.00 3 8.50 3967.68 33725.28

    LT Dasar & LT2 4.50 2039.28 9176.76 S 30482.64 600300.84

    C. PERHITUNGAN PERIODE NATURAL 1. Arah Utara - Selatan

    Struktur arah utara-selatan merupakan SRPM beton

    T = 0,0731 H3/4

    T = 0,0731 x 32.53/4 = 0,995 1.00 g

    T > Tc, (1.00 > 0.6 ), sehingga Faktor Respons Gempa :

    Ar = Am x Tc = 0.9 x 0,6 = 0.54 g

    =

    = .. = .

    SNI 1726-2002 Pasal 4.7.6

    Untuk T Tc C = Am.

    Untuk T > Tc C = Ar / T, dimana Ar = Am x Tc.

    0.950.90

    0.83

    0.380.360.33

    0 0.5 1.0 2.0 3.00.60.2

    (Tanah lunak)T

    0.95C

    (Tanah sedang)T

    0.54C

    (Tanah keras)T

    0.42C

    T

    Wilayah Gempa 6

    C

    Ct untuk arah utara-selatan

    0.54

  • SELIPANUS I 111 00 41

    2. Arah Utara - Selatan

    Struktur arah utara-selatan merupakan SRPM beton

    T = 0,0488 H3/4

    T = 0,0488 x 32.53/4 = 0,66 g

    T > Tc, (0.66 > 0.6 ), sehingga Faktor Respons Gempa :

    Ar = Am x Tc = 0.9 x 0,6 = 0.54 g

    =

    = .. = .

    SNI 1726-2002 Pasal 4.7.6

    Untuk T Tc C = Am.

    Untuk T > Tc C = Ar / T, dimana Ar = Am x Tc.

    D. BASE SHEAR

    Rasio tinggi struktur dengan panjang denah pada arah pembebanan gempa, adalah:

    Arah Utara-Selatan = 32.50m /14 m = 2.321 < 3

    Arah Barat-Timur = 32.50m / 20 m = 1.625 < 3 Apabila rasio tinggi struktur dan ukuran denah dalam arah pembebanan gempa , maka 0.1 V harus dianggap sebagai beban horizontal terpusat yang bekerja pada pusat masa lantai paling atas, sisanya dibagi dengan Fi (SNI 1726-2003 Pasal 6.1.4)

    Karena perbandingan tinggi dengan panjang denah dalam arah pembebanan gempa

    utara-selatan dan juga dalam arah pembebanan gempa barat-timur,

    perbandingannya kurang dari 3, sehingga tidak perlu ada beban horizontal terpusat

    sebesar 0,1 Vb di lantai tingkat paling atas.

    Arah Utara-Selatan

    KN

    xxV

    RWICV

    TU

    tTU

    245.19465.8

    64.3048200.154.0

    1

    0.950.90

    0.83

    0.380.360.33

    0 0.5 1.0 2.0 3.00.60.2

    (Tanah lunak)T

    0.95C

    (Tanah sedang)T

    0.54C

    (Tanah keras)T

    0.42C

    T

    Wilayah Gempa 6

    C

    Ct untuk arah utara-selatan

    0.81

    0.66

  • SELIPANUS I 111 00 41

    No. Urut Absen 27_No. Soal 27_SELIPANUS_I 111 00 41_Struktur Gempa

    Arah Barat-Timur

    KN

    xxV

    RWICV

    TU

    tTU

    379.29155.8

    64.3048200.181.0

    2

    E. GAYA EQUIVALEN LATERAL

    ii

    B

    zW

    hxWxVFx

    )(

    Gaya yang bekerja pada tiap lantai adalah, dalam perhitungan ini diambil contoh perhitungan pada

    lantai Atap.

    Arah Utara-Selatan

    84.6003006.150711)245.1946( xF SUAtap

    = 488.625 KN Arah Barat-Timur

    84.6003006.150711)379.2915( xF TBAtap

    = 731.935 KN

    Untuk perhitungan gaya lateral pada lantai lainnya disajikan dalam tabel berikut:

    Tabel Perhitungan Gaya Lateral Equivalen dan Geser per Story arah Utara-Selatan

    Lantai hx Wx Wx.hx F Lateral V story

    Fx Vx (m) (KN) (KN) (KN) (KN)

    Atap 32.50 4637.28 150711.60 488.625 488.625 8 28.50 3967.68 113078.88 366.615 855.239 7 24.50 3967.68 97208.16 315.160 1170.400 6 20.50 3967.68 81337.44 263.705 1434.105 5 16.50 3967.68 65466.72 212.251 1646.356 4 12.50 3967.68 49596.00 160.796 1807.152 3 8.50 3967.68 33725.28 109.341 1916.493

    Dasar dan LT-2 4.50 2039.28 9176.76 29.752 1946.245

    30482.64 600300.84

  • SELIPANUS I 111 00 41

    No. Urut Absen 27_No. Soal 27_SELIPANUS_I 111 00 41_Struktur Gempa

    Dalam denah perhitungan ini ada lima (5) portal dalam arah utara selatan, sehingga gaya gempa

    equivalent yang bekerja pada masing-masing joint di lantai Atap adalah 488.625 kN / 5 portal = 97.725 KN/join

    Tabel Perhitungan Gaya Lateral Equivalen dan Geser per Story arah Barat-Timur

    Lantai hx Wx Wx.hx

    F Lateral V story Fx Vx

    (m) (KN) (KN) (KN) (KN) Atap 32.50 4637.28 150711.60 731.935 731.935

    8 28.50 3967.68 113078.88 549.171 1281.107 7 24.50 3967.68 97208.16 472.094 1753.201 6 20.50 3967.68 81337.44 395.018 2148.219 5 16.50 3967.68 65466.72 317.941 2466.160 4 12.50 3967.68 49596.00 240.864 2707.024 3 8.50 3967.68 33725.28 163.788 2870.812

    Dasar dan LT-2 4.50 2039.28 9176.76 44.567 2915.379

    30482.64 600300.84

    Dalam denah perhitungan ini ada tiga (3) portal dalam arah utara selatan, sehingga gaya gempa equivalent yang bekerja pada masing-masing joint di lantai Atap adalah 731.935 kN / 3 portal = 243.978 KN/join

  • SELIPANUS I 111 00 41

    Gaya Lateral Equivalent Tiap Lantai

    Ar

    ah B

    arat

    -Tim

    ur

    Arah

    Uta

    ra-S

    elat

    an