Upload
rcurasma
View
26
Download
1
Embed Size (px)
DESCRIPTION
Valorizacion 01 Supervision
Citation preview
FICHA TECNICAFICHA TECNICA DE OBRAVALORIZACION DE OBRA N01SUPERVISION DE OBRA
1.00A.D.P. N:009-2012-CEP/MDC
2.00OBRA:"MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION DEL JR. SAN LORENZO, AV. HEROES SICAINOS Y AV. CEMENTERIO DISTRITO DE PUCARA-HUANCAYO-JUNIN"
3.00UBICACINDEPARTAMENTO:JUNINPROVINCIA:HUANCAYODISTRITO:PUCARALOCALIDAD :PUCARA
4.00ENTIDAD CONTRATANTE:MUNICIPALIDAD DISTRITAL DE PUCARA
5.00CONTRATISTA:CONSORCIO BOLOGNESI
6.00SUPERVISOR DE OBRA:ING. JOSE AGUILAR VILCAHUAMAN
7.00RESIDENTE DE OBRA:ING. ROLANDO PALACIOS CABELLO
8.00PROYECTISTA:ING. VLADIMIR ARCE RECUAY
9.00FINANCIA:CONVENIO MUNICIPALIDAD PROVINCIAL DE HUANCAYO
10.00VALOR REFERENCIAL:970000INC. IGV. Mes Base :SETIEMBRE - 2013
P.C /S/IGVIGV11.00PRESUPUESTO CONTRATADO (PC):970000INC. IGV. 822034+147966
12.00MODALIDAD:SUMA ALZADA
13.00No. DE CONTRATO:183-GM/MDC-2012
14.00FECHA DE FIRMA DE CONTRATO:12/28/12
15.00FECHA DE ENTREGA DE TERRENO:10/12/13
16.00ADELANTO DIRECTO SOLICITADO:0 INC. IGV
17.00ADELANTO DE MATERIALES SOLICITADO:0 INC. IGV
18.00FECHA DE INICIO DEL PLAZO CONTRACTUAL:10/14/13
19.00PLAZO DE EJECUCION:120DIAS CALENDARIO
20.00FECHA DE TERMINO DE PLAZO CONTRACTUAL:2/10/14
RESUMENRESUMEN DE VALORIZACION DE OBRA N 01Del 12 de Octubre al 31 de Octubre del 2013SUPERVISION DE OBRA
OBRA : MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION DEL JR. BOLOGNESI, JR SAN LORENZO, AV. HEROES SICAINOS Y AV. CEMENTEREO DISTRITO PUCARA-HUANCAYO-JUNINCONTRATISTA : CONSORCIO BOLOGNESISUPERVISOR : ING. JOSE AGULAR VILCAHUAMANFECHA : 31 DE OCTUBRE DEL 2013PRESUPUESTO OFERTADO SIN IGV822033.9PRESUPUESTO OFERTADO CON IGV970000
ITEMCONCEPTOAcumulado AnteriorPresente MesAcumulado Actual
I.AVANCE CONTRACTUAL DEL PRESENTE MESTotal I FORMULAS0.00132,041.32132,041.32
Avance Fisico de la Obra0.00%16.06%16.06%Avance Programado0.00%31.79%31.79%
II.REAJUSTES Y REINTEGROSReajuste del presente mes0.000.00Reintegro del mes anterior0.000.00Reintegro del penultimo mes0.000.00Total II0.000.000.00
III.DEDUCCIONESIII.1 Deduccion del reajuste por adelanto de efectivoDel presente mes0.000.00Mes anterior0.000.00Penultimo mes0.000.00Total III.10.000.000.00
III.2 Deduccion del reajuste por adelanto de materialesDel presente mes0.000.00Mes anterior0.000.00Penultimo mes0.000.00Total III.20.000.000.00
IV.MONTO BRUTO (I + II - III.1 - III.2)0.00132,041.32132,041.32
V.AMORTIZACIONESV.1 Amortizacion por adelanto en efectivo0.000.00V.2 Amortizacion por adelanto de materiales0.000.00Total V0.000.000.00
VI.MONTO BRUTO A PAGAR (IV - V)0.00132,041.32132,041.32VII.I.G.V. (18% (VI))0.0023,767.4423,767.44VIII.MONTO A FACTURAR (VI + VII)0.00155,808.76155,808.76IXGARANTIAS (FIEL CUMPLIMIENTO)10% MONTO TOTAL (DOS PARTES)0.0048,500.0048,500.00XMONTO LIQUIDO A COBRAR (VIII-IX)0.00107,308.76107,308.76
RESUMEN DE VALORIZACIONRESUMEN DE VALORIZACIONVALORIZACION DE OBRA N01SUPERVISION DE OBRA
OBRA :: MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION DEL JR. BOLOGNESI, JR. SAN LORENZO, AV. CEMENTEREO Y AV. HEROES SICAINOS DEL DISTRITO DE PUCARA-HUANCAYO-JUNIN
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE PUCARACONTRATISTA: CONSORCIO BOLOGNESISUPERVISION: ING. JOSE AGUILAR VILCAHUAMANFECHA: 31/10/2013
ItemDescripcinCosto DirectoValorizacinAnteriorPresente Mesmes 1mes 2mes 3totalAcumuladoSaldo1.00: MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION PUCARA747,303.540.00120,037.56212,627.87ERROR:#REF!6,000.00ERROR:#REF!120,037.56627,265.98
ATOTAL COSTO DIRECTO S/.747,303.540.00120,037.560.000.000.000.00212,627.87ERROR:#REF!6,000.00ERROR:#REF!120,037.56627,265.98GASTOS GENERALES 7.00%52,311.250.008,402.630.000.000.000.0014,883.95ERROR:#REF!420.00ERROR:#REF!8,402.6343,908.62UTILIDADES 3.00%22,419.110.003,601.130.000.000.000.006,378.84ERROR:#REF!180.00ERROR:#REF!3,601.1318,817.98BSUB TOTAL S/.822,033.900.00132,041.320.000.000.000.00233,890.66ERROR:#REF!6,600.00ERROR:#REF!132,041.32689,992.58FACTOR DE RELACION1.00CTOTAL VALORIZADO SIN IGV822,033.900.00132,041.320.000.000.000.00210,501.60ERROR:#REF!5,940.00ERROR:#REF!132,041.32689,992.58
DPORCENTAJE DE AVANCE 100.00%0.00%16.06%0.00%0.00%0.00%0.00%28.45%ERROR:#REF!0.80%ERROR:#REF!16.06%83.94%
MET. VAL 01METRADOS EJECUTADOSDel 12 de Octubre al 31 de Octubre del 2013VALORIZACION DE OBRA N01SUPERVISION DE OBRA
OBRA : "MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION DEL JR. BOLOGNESI, JR. SAN LORENZO, AV. CEMENTEREO Y AV. HEROES SICAINOS DEL DISTRITO DE PUCARA - HUANCAYO - JUNIN"
CONTRATISTA: CONSORCIO BOLOGNESIMODALIDAD: A Suma AlzadaMES: OctubrePROPIETARIO: MUNICIPALIDAD DISTRITAL DE PUCARAPERIODO: Del 14 al 31 de OctubreRESIDENTE: Ing. Rolando Silvio Palacios CabelloDIAS ACUMULADOS: 20 das calendarioSUPERVISOR: Ing. Jose Aguilar VilcahuamanFECHA DE VALORIZACIN: 31 - Octubre - 2013
ITEMDENOMINACIONUND VECESLARGOANCHOALTOPARCIALSUB-TOTAL01.00 OBRAS PROVISIONALES 01.01 CARTEL DE OBRA DE 8.60 X 3.50m UNA CARAUND 0.000.000.0002.00 TRABAJOS PRELIMINARES 02.01 LIMPIEZA DE TERRENO MANUALM215,352.10 JR. BOLOGNESI 1.00446.508.003,572.00 JR. SAN LORENZO AV. CEMENTERIO 1.00840.0012.0010,080.00 AV. HEROES SICAINOS 1.00283.356.001,700.10
02.02 DESVIO DE TRANSITO Y SEALIZACION DURANTE LA CONSTRUCCIONM290.00 3.0010.003.0090.00
02.03 TRAZO, NIVELES Y REPLANTEO DE VIASM211,992.10 JR. BOLOGNESI 1.00446.508.003,572.00 JR. SAN LORENZO AV. CEMENTERIO 1.00840.008.006,720.00 AV. HEROES SICAINOS 1.00283.356.001,700.10
02.04 MOVILIZACION DE MAQUINARIASGLB0.500.500.5003.00 MOVIMIENTO DE TIERRAS 03.01 EXCAVACION A NIVEL DE SUB RASANTEM34,967.83 JR. BOLOGNESI 1.002,199.362,199.36 JR. SAN LORENZO AV. CEMENTERIO 1.002,187.272,187.27 AV. HEROES SICAINOS 1.00581.20581.20
03.02 PERFILADO Y COMPACTADO DE LA SUB RAZANTEM27,038.90 JR. BOLOGNESI 1.00446.506.602,946.90 JR. SAN LORENZO AV. CEMENTERIO 1.00620.006.604,092.00 AV. HEROES SICAINOS 1.000.003.600.00
03.03 SUB BASE GRANULAR H=0.20 M.M24,092.00 JR. BOLOGNESI 1.000.006.600.00 JR. SAN LORENZO AV. CEMENTERIO 1.00620.006.604,092.00 AV. HEROES SICAINOS 1.000.003.600.00
03.04 BASE AFIRMADO E=0.20 M.M20.00 JR. BOLOGNESI 1.000.006.600.00 JR. SAN LORENZO AV. CEMENTERIO 1.000.006.600.00 AV. HEROES SICAINOS 1.000.003.600.00
03.05 CARGUIO Y TRANSPORTE BASE Y SUB BASEM30.00 JR. BOLOGNESI 2.000.006.600.200.00 JR. SAN LORENZO AV. CEMENTERIO 2.000.006.600.200.00 AV. HEROES SICAINOS 2.000.003.600.200.00
03.06 ELIMINACION DE MATERIAL EXCEDENTEM34,196.48 GENERAL 1.004,196.484,196.48
04.00 PAVIMENTOS FLEXIBLES 04.01 IMPRIMACION ASFALTICAM20.00 JR. BOLOGNESI 1.000.006.600.00 JR. SAN LORENZO AV. CEMENTERIO 1.000.006.600.00 AV. HEROES SICAINOS 1.000.003.600.00
04.02 CARPETA ASFALTICA EN CALIENTE E=2"M20.00 JR. BOLOGNESI 1.000.006.000.00 JR. SAN LORENZO AV. CEMENTERIO 1.000.006.000.00 AV. HEROES SICAINOS 1.000.003.000.00
04.03 SELLADO ASFALTICOM20.00 JR. BOLOGNESI 1.000.006.000.00 JR. SAN LORENZO AV. CEMENTERIO 1.000.006.000.00 AV. HEROES SICAINOS 1.000.003.000.00
05.00 SARDINEL 05.01 SARDINEL ENCOFRADO Y DESENCOFRADOM20.00 JR. BOLOGNESI 2.000.000.400.00 JR. SAN LORENZO 0.40 AV. CEMENTERIO 2.000.000.400.00 AV. HEROES SICAINOS 2.000.000.400.00
05.02 SARDINEL CONCRETO F'C=175 KG/CMM30.00 JR. BOLOGNESI 2.000.000.150.500.00 JR. SAN LORENZO AV. CEMENTERIO 2.000.000.150.500.00 AV. HEROES SICAINOS 2.000.000.150.500.00
06.00 DRENAJE PLUVIAL 06.01 CUNETA ENCOFRADO Y DESENCOFRADOM20.00 JR. BOLOGNESI 2.000.000.150.00 JR. SAN LORENZO AV. CEMENTERIO 2.000.000.150.00 AV. HEROES SICAINOS 2.000.000.150.00
06.02 CUNETA CONCRETO F'C=175 KG/CMM30.00 JR. BOLOGNESI 2.000.000.300.100.00 JR. SAN LORENZO AV. CEMENTERIO 2.000.000.300.100.00 AV. HEROES SICAINOS 2.000.000.300.100.00
09.00 SEALIZACION HORIZONTAL 09.01 PINTURA ZONAL CRUCE PEATONALM20.00 JR. BOLOGNESI 1.000.000.00 JR. SAN LORENZO AV. CEMENTERIO 1.000.000.00 AV. HEROES SICAINOS 1.000.000.00
09.02 PINTURA INTERM. DISCONT.-CENTRO DE VIAML0.00 JR. BOLOGNESI 1.000.000.00 JR. SAN LORENZO AV. CEMENTERIO 1.000.000.00 AV. HEROES SICAINOS 1.000.000.00
09.03 PINTURA DE SIMBOLOS - FLECHASM20.00 JR. BOLOGNESI 1.000.000.00 JR. SAN LORENZO AV. CEMENTERIO 1.000.000.00 AV. HEROES SICAINOS 1.000.000.00
PAVVALORIZACION DE OBRA N01SUPERVISON DE OBRA
OBRA : MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION DEL JR. BOLOGNESI, JR. SAN LORENZO, AV. CEMENTEREO Y AV. HEROES SICAINOS DEL DISTRITO DE PUCARA-HUANCAYO-JUNINFORMULA: MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION PUCARAPROPIETARIO : MUNICIPALIDAD DISTRITAL DE PUCARACONTRATISTA: CONSORCIO BOLOGNESISUPERVISION: ING. JOSE AGUILAR VILCAHUAMANFECHA: 31 DE OCTUBRE DEL 2013
ITEMDESCRIPCIONPRESUPUESTO CONTRACTUALAVANCE ANTERIORAVANCE ACTUALAVANCE ACUMULADOSALDO A EJECUTAR
UND.METRADOP.U.PARCIALMETRADOVALORIZADO%METRADOVALORIZADO%METRADOVALORIZADO%METRADOVALORIZADO%I: MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION PUCARA747,303.541OBRAS PROVISIONALES1CARTEL DE OBRA DE 8.60 X 3.50m UNA CARAUND1.00945.87945.870.000.00.00%0.000.00.00%0.00.00.00%1.00945.87100.00%2TRABAJOS PRELIMINARES 0.00.02LIMPIEZA DE TERRENO MANUALM2 17,138.100.467,883.530.000.00.00%15,352.107,061.9789.58%15,352.107,061.9789.58%1,786.00821.5610.42%2DESVIO DE TRANSITO Y SEALIZACION DURANTE LA CONSTRUCCIONM2180.005.16928.800.000.00.00%90.00464.4050.00%90.00464.4050.00%90.00464.4050.00%2TRAZO, NIVELES Y REPLANTEO DE VIASM217,138.100.7713,196.340.000.00.00%11,992.109,233.9269.97%11,992.109,233.9269.97%5,146.003,962.4230.03%2MOVILIZACION DE MAQUINARIASGLB1.005,000.005,000.000.000.00.00%0.502,500.0050.00%0.502,500.0050.00%0.502,500.0050.00%3MOVIMIENTO DE TIERRAS 0.03EXCAVACION A NIVEL DE SUB RASANTEM35,743.962.4213,900.380.000.00.00%4,967.8312,022.1586.49%4,967.8312,022.1586.49%776.131,878.2313.51%3PERFILADO Y COMPACTADO DE LA SUB RASANTEM29,510.961.5414,646.880.000.00.00%7,038.9010,839.9174.01%7,038.9010,839.9174.01%2,472.063,806.9725.99%3SUB BASE GRANULAR H=0.20 M.M29,510.965.3550,883.640.000.00.00%4,092.0021,892.2043.02%4,092.0021,892.2043.02%5,418.9628,991.4456.98%3BASE AFIRMADO E=0.20 M.M29,510.966.0657,636.420.000.00.00%0.000.00.00%0.00.00%9,510.9657,636.42100.00%3CARGIO Y TRANSPORTE BASE Y SUB BASEM33,804.386.6025,108.910.000.00.00%0.000.00.00%0.00.00.00%3,804.3825,108.91100.00%3ELIMINACION DE MATERIAL EXCEDENTEM34,536.7413.3560,565.540.000.00.00%4,196.4856,023.0192.50%4,196.4856,023.0192.50%340.264,542.537.50%4PAVIMENTOS FLEXIBLES 0.00.04IMPRIMACION ASFALTICAM29,510.965.1148,601.010.000.00.00%0.000.00.00%0.00.00.00%9,510.9648,601.01100.00%4CARPETA ASFALTICA EN CALIENTE E=2"M2 8,569.0531.96273,866.840.000.00.00%0.000.00.00%0.00.00.00%8,569.05273,866.84100.00%4SELLADO ASFALTICOM28,569.056.0651,928.440.000.00.00%0.000.00.00%0.00.00.00%8,569.0551,928.44100.00%5SARDINEL 0.00.05SARDINEL ENCOFRADO Y DESENCOFRADOM21,255.4820.6625,938.220.000.00.00%0.000.00.00%0.00.00.00%1,255.4825,938.22100.00%5SARDINEL CONCRETO F'C=175 KG/CMM3235.40246.2357,962.540.000.00.00%0.000.00.00%0.00.00.00%235.4057,962.54100.00%6DRENAJE PLUVIAL 0.00.06CUNETA ENCOFRADO Y DESENCOFRADOM2470.8120.669,726.930.000.00.00%0.000.00.00%0.00.00.00%470.819,726.93100.00%6CUNETA CONCRETO F'C=175 KG/CMM394.16260.6624,543.750.000.00.00%0.000.00.00%0.00.00.00%94.1624,543.75100.00%9SEALIZACION HORIZONTAL 0.00.09PINTURA ZONAL CRUCE PEATONALM290.0021.321,918.800.000.00.00%0.000.00.00%0.00.00.00%90.001,918.80100.00%9PINTURA INTERM. DISCONT.-CENTRO DE VIAML525.002.741,438.500.000.00.00%0.000.00.00%0.00.00.00%525.001,438.50100.00%9PINTURA DE SIMBOLOS - FLECHASM245.0015.16682.200.000.00.00%0.000.00.00%0.00.00.00%45.00682.20100.00%
1COSTO DIRECTO 747,303.540.0120,037.56120,037.56627,265.982GASTOS GENERALES 7.00%52,311.250.08,402.638,402.6343,908.623UTILIDADES 3.00%22,419.110.03,601.133,601.1318,817.984TOTAL PRESUPUESTO 822,033.900.0132,041.32132,041.32689,992.585FACTOR DE RELACION (1,00)1.001.001.001.001.001.006TOTAL VALORIZADO SIN IGV822,033.900.0132,041.32132,041.32689,992.587PORCENTAJE DE AVANCE100%0.00%16.06%16.06%83.94%
% DE AVANCE MENSUAL A EJECUTADO16.06%% DE AVANCE ACUMULADO16.06%
CRONOGRAMASCRONOGRAMA VALORIZADO DE OBRAPROYECTO : MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION DEL JR. BOLOGNESI, JR. SAN LORENZO, AV. HEROES SICAINOS, AV. CEMENTERIO Y JR. ALEJANDRO O DEUSTUA, DISTRITO DE PUCARA- HUANCAYO-JUNIN
UBICACIN : PUCARA - HUANCAYO - JUNINFECHA : OCTUBRE DEL 2013
ItemDescripcinUndMetradoP.UParcial (S/.)Mes 1Mes 2Mes 3Mes 401.00 OBRAS PROVISIONALES 945.87945.870.000.000.0001.01 CARTEL DE OBRA DE 8.60 X 3.50m UNA CARAUND 1.00945.87945.87945.8702.00 TRABAJOS PRELIMINARES 27,008.6713,914.823,531.293,531.296,031.2902.01 LIMPIEZA DE TERRENO MANUALM2 17,138.100.467,883.537,883.5302.02 DESVIO DE TRANSITO Y SEALIZACION DURANTE LA CONSTRUCCIONM2 180.005.16928.80232.20232.20232.20232.2002.03 TRAZO, NIVELES Y REPLANTEO DE VIASM2 17,138.100.7713,196.343,299.093,299.093,299.093,299.0902.04 MOVILIZACION DE MAQUINARIASGLB 1.005,000.005,000.002,500.002,500.0003.00 MOVIMIENTO DE TIERRAS 222,741.77222,741.770.000.000.0003.01 EXCAVACION A NIVEL DE SUB RASANTEM3 5,743.962.4213,900.3813,900.3803.02 PERFILADO Y COMPACTADO DE LA SUB RAZANTEM2 9,510.961.5414,646.8814,646.8803.03 SUB BASE GRANULAR H=0.20 M.M2 9,510.965.3550,883.6450,883.6403.04 BASE AFIRMADO E=0.20 M.M2 9,510.966.0657,636.4257,636.4203.05 CARGIO Y TRANSPORTE BASE Y SUB BASEM3 3,804.386.6025,108.9125,108.9103.06 ELIMINACION DE MATERIAL EXCEDENTEM3 4,536.7413.3560,565.5460,565.5404.00 PAVIMENTOS FLEXIBLES 374,396.290.0024,300.5124,300.51325,795.2804.01 IMPRIMACION ASFALTICAM2 9,510.965.1148,601.0124,300.5124300.5104.02 CARPETA ASFALTICA EN CALIENTE E=2"M2 8,569.0531.96273,866.84273,866.8404.03 SELLADO ASFALTICOM2 8,569.056.0651,928.4451,928.4405.00 SARDINEL 83,900.760.0083,900.760.000.0005.01 SARDINEL ENCOFRADO Y DESENCOFRADOM2 1,255.4820.6625,938.2225,938.2205.02 SARDINEL CONCRETO F'C=175 KG/CMM3 235.40246.2357,962.5457,962.5406.00 DRENAJE PLUVIAL 34,270.680.000.0034,270.680.0006.01 CUNETA ENCOFRADO Y DESENCOFRADOM2 470.8120.669,726.939,726.9306.02 CUNETA CONCRETO F'C=175 KG/CMM3 94.16260.6624,543.7524,543.7507.00 SEALIZACION HORIZONTAL 4,039.500.000.000.004,039.5007.01 PINTURA ZONAL CRUCE PEATONALM2 90.0021.321,918.801,918.8007.02 PINTURA INTERM. DISCONT.-CENTRO DE VIAML 525.002.741,438.501,438.5007.03 PINTURA DE SIMBOLOS - FLECHASM2 45.0015.16682.20682.20COSTO DIRECTO747,303.54237,602.46111,732.5562,102.47335,866.07GASTOS GENERALES7.00%52,311.2516,632.177,821.284,347.1723,510.62UTILIDAD3.00%22,419.117,128.073,351.981,863.0710,075.98SUBTOTAL822,033.90261,362.70122,905.8168,312.71369,452.67IGV (18%)18.00%147,966.1047,045.2922,123.0512,296.2966,501.49TOTAL PRESUPUESTO970,000.00308,407.99145,028.8680,609.00435,954.16
PORCENTAJE MENSUAL%31.79%14.95%8.31%44.94%PORCENTAJE ACUMULADO%31.79%46.75%55.06%100.00%
CURVA DE AVANCE DE OBRACONTROL DE AVANCE DE OBRAVALORIZACION DE OBRA N01SUPERVISION DE OBRA
OBRA : MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION DEL JR. BOLOGNESI, JR. SAN LORENZO, AV. CEMENTEREO Y AV. HEROES SICAINOS DEL DISTRITO DE PUCARA-HUANCAYO-JUNIN
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE PUCARACONTRATISTA: CONSORCIO BOLOGNESISUPERVISION: ING. JOSE AGUILAR VILCAHUAMANFECHA: 31/10/2013
InicioMES 1MES 2MES 3MES 40.00%31.79%-16.84%-6.64%36.63%-44.94%0.00%0.00%PROGRAMADO0.00%31.79%14.95%8.31%44.94%REALIZADO MENSUAL0.00%1.96%ACUMULADO0.00%31.79%46.75%55.06%100.00%
EJECUTADO0.00%16.06%ACUMULADO0.00%16.06%
PRESUPUESTOPRESUPUESTO DE OBRAVALORIZACION DE OBRA N01SUPERVISION DE OBRAOBRA : MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION DEL JR. BOLOGNESI, JR. SAN LORENZO, AV. CEMENTEREO Y AV. HEROES SICAINOS DEL DISTRITO DE PUCARA-HUANCAYO-JUNIN
FORMULA: MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION PUCARAPROPIETARIO : MUNICIPALIDAD DISTRITAL DE PUCARACONTRATISTA: CONSORCIO BOLOGNESISUPERVISION: ING. JOSE AGUILAR VILCAHUAMANFECHA: 31 DE OCTUBRE DEL 2013
ITEMDESCRIPCIONPRESUPUESTO CONTRACTUAL
UND.METRADOP.U.PARCIAL
I: MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION PUCARA747,303.541OBRAS PROVISIONALES 945.871CARTEL DE OBRA DE 8.60 X 3.50m UNA CARAUND 1.00945.87945.872TRABAJOS PRELIMINARES 27,008.672LIMPIEZA DE TERRENO MANUALM2 17,138.100.467,883.532DESVIO DE TRANSITO Y SEALIZACION DURANTE LA CONSTRUCCIONM2180.005.16928.802TRAZO, NIVELES Y REPLANTEO DE VIASM217,138.100.7713,196.342MOVILIZACION DE MAQUINARIASGLB1.005,000.005,000.003MOVIMIENTO DE TIERRAS 222,741.773EXCAVACION A NIVEL DE SUB RASANTEM35,743.962.4213,900.383PERFILADO Y COMPACTADO DE LA SUB RAZANTEM29,510.961.5414,646.883SUB BASE GRANULAR H=0.20 M.M29,510.965.3550,883.643BASE AFIRMADO E=0.20 M.M29,510.966.0657,636.423CARGIO Y TRANSPORTE BASE Y SUB BASEM33,804.386.6025,108.913ELIMINACION DE MATERIAL EXCEDENTEM34,536.7413.3560,565.544PAVIMENTOS FLEXIBLES 374,396.294IMPRIMACION ASFALTICAM29,510.965.1148,601.014CARPETA ASFALTICA EN CALIENTE E=2"M28,569.0531.96273,866.844SELLADO ASFALTICOM28,569.056.0651,928.445SARDINEL 83,900.765SARDINEL ENCOFRADO Y DESENCOFRADOM21,255.4820.6625,938.225SARDINEL CONCRETO F'C=175 KG/CMM3235.40246.2357,962.546DRENAJE PLUVIAL 34,270.686CUNETA ENCOFRADO Y DESENCOFRADOM2470.8120.669,726.936CUNETA CONCRETO F'C=175 KG/CMM394.16260.6624,543.759SEALIZACION HORIZONTAL 4,039.509PINTURA ZONAL CRUCE PEATONALM290.0021.321,918.809PINTURA INTERM. DISCONT.-CENTRO DE VIAML525.002.741,438.509PINTURA DE SIMBOLOS - FLECHASM245.0015.16682.201COSTO DIRECTO 747,303.542GASTOS GENERALES 7.00%52,311.253UTILIDADES 3.00%22,419.114TOTAL PRESUPUESTO SIN IGV822,033.905IMPUESTO GENERAL A LA VENTA IGV18.00%147,966.106TOTAL VALORIZADO CON IGV970,000.00