56
we construct your wealthy future Karawaci Office Park Blok G-1 Karawaci – Tangerang, Banten 021-5583888 [email protected] [email protected] 테크니코 인도네시아 OFFICIAL BUILDING

we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 2: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt
Page 3: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

we construct your wealthy future

Page 4: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

◼ SK Engineering & Construction - Lube Base Oil Project◼ Doosan HI - Cirebon 1; 1x660MW Coal Fired Power Plant◼ Hyundai E&C - Cirebon 2; 1x1000MW Coal Fired Power Plant◼ Krakatau Posco - Integrated Steel Mill; ISM Gas Power Plant◼ Rajamandala HEPP 47 MW, West Java◼ Samsung C&T- Jawa 1 Power, Combined Cycle PP 1600MW

CLIENTS& Partnership

EQUIPMENTSConstruction List

TABLE OF CONTENTS

We ConstructYOUR WEALTHY FUTURE

COMPANYIntroduction

◼ Introduction◼ Company History◼ Address & Contact◼ Target Goal in The Future

◼ Structure Organization ◼ Manpower Status◼ Business Plan Status 2018◼ Financial Status (Consolidated)

CERTIFICATIONof Registration

◼ Business Entity Certificate◼ Certificate of Competency◼ ISO 9001, ISO 14001, OHSAS 18001

PROJECTExperience List

◼ Mechanical & Electrical◼ Civil & Architecture

PHOTOGRAPHSof Major Project

FACTORY& Facilites

◼ Location◼ Factory Layout◼ Photograph◼ Facilities◼ Machinery

Page 5: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

COMPANY INTRODUCTION

Page 6: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

President Director Nam Seok Ho

Introduction

Number One Construction Company in Indonesia

Tekniko Indonesia has extended construction & equipment lease in its bussines line at 1999 to meetclient's demand. Reliability is our top priority so that we offer our clients the best products & servicesavailable. We also commit to prevent accident, occupational illness & environmental pollution withinour organization. Our work has received the praise of customers around the world.

Tekniko Indonesia is capable of organizing and carrying out construction work and steel fabricationwork for any kind of project that require the highest level of sophisticated technology. As a result, weare ready to satisfy client need. We continue to aggressively invest in new technology developmentand human resource training. Through trust & technology, we will do our best to provide our clientsdemand with high quality, competitive quotation price and within completion limits.

I believe that Tekniko Indonesia will grow bigger & bigger. Our company is equipped with strategic,equipment and employee, which carry company vision in their personal vision. One of our major targetis to become Number One Construction company in Indonesia within next 10 years

Page 7: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

7

Lampung Factory

Steel Fabrication

Workshop

(1998)

(2000)

Extended Business to

EPC Project for :

Oil & Gas Project,

Power Plant Project

(1997)

Established

as PMA

1st Factory

Extension

Str. Capacity

15,000T/Year

(2006)

(2007)

Completed Dumai

SK – Pertamina

USD 15 Millions

Soil Improvement

Cirebon Coal Fired

Power Plant

Soil Improvement

Seawater Intake

Building Works

Ashpond

Doosan HI – Cirebon

Investment :

PT. Asia Rubberindo

(Sister Company)

(2008)

Jetty 13,000DWT,

Seawater Intake,

Building Structure,

Electrical Work for

Cirebon CFPP

Power Plant

Investment :

32.5 Dwt Bulk Carrier

(Sister Company)

(2009)

(2011)

Krakatau-Posco

Steel Mill Plant

1st SMP&CCP

Civil Work

Krakatau Posco SMP/BF

Road & Drainage Work

Krakatau-Posco

Steel Mill Plant 2nd

SMP&CCP Civil Work

Posco Power Water

Intake On/Offshore

Posco-Krakatau Plate

Mill Machiney install

PT. Cikarang Listrindo

Civil, Mechanical, Electrical

MM2100 Industrial Estate

(2012)

(2013)

Alindo – KK3

Civil Work

Dong Suh Chemical

PNS Project

Krakatau Posco

Plate Mill Shipping

Yard RC Work

Clyde Bergemann

Mong Duong

GS E&C AEON Mall

Piling Work&RC Work

(2014)

Cikarang Listrindo,

Babelan CFPP

IP & Kansai,

Rajamandala HEP

GS E&C Aeon Mall

Wet Trade Work

HDEC,

Sarulla Geothermal

Earthwork/ Site Preparation

Piling Work &

Soil Investigation

HDEC,

Shangri La Residence

(2015)

Posco E&C

Semangka HEPP 2x27.5 MW

(2016)

Cirebon 2 CFPP 1000 MW

Jetty 15,000 DWT

Soil Supply

IP Suralaya CFPP

Cover Hopper

(2017)

ABS Palembang, Tank 4000T

Krakatau Engineering HSM #2

WTP and Scale Pit

(2018)

Jawa 1 CCPP 1600 MW

Site Preparation

(2019)

Amman Mineral Nusa Teng.

Dynamometer Facility

(2010)

Asphalt Bulk

ABS – Medan

Daewo Eng.

Merak Port

ISO 9001:2008

ISO 14001

OHSAS 18001

Certified

Investment :

PT. MKE

(Sister Company)

Alstom Power

Steel Str. Fabrication

(2007)

(2008)

Asphalt Bulk Terminal

ABS - Aceh

Asphalt Bulk Terminal

WBG – Palembang

we construct your wealthy future

In 1997, with initial capital investment of USD $ 0.1 M, PT. TEKNIKO INDONESIA was established as PMACompany for simple Steel Fabrication. In 2000, PT. TEKNIKO was able to extend the business to EPCcontractor for Oil & Gas Power Plant. In 2000, PT. TEKNIKO INDONESIA acquired ISO 90001.

In 2006, PT.TEKNIKO INDONESIA extended the capacity of Steel Fabrication production work shop to 15.000ton/year resulting able to open an opportunity to contract for Doosan Cirebon Plant Project regarding Civil /Architect Work with Total value of USD $ 75 M.

In 2014, PT. Tekniko Indonesia established a contract under PT. Cikarang Listrindo, which is an IndependentPower Producer located in Jababeka Industrial Estate for Babelan Coal Fired Power Plant, 3x140 MW. PT.Tekniko Indonesia was awarded for 3,000 m of belt conveyor, 2 units of stacker reclaimer of capacity 800/600ton per hour, 2 units of grab type ship unloader 800 ton per hour, and 2 sets of limestone handling systemwith total project amount USD 81,000,000.

In 2014, PT. Tekniko Indonesia formed a JO cooperation with Hyundai Engineering Co., Ltd for the developmentof Rajamandala Hydro Electric Power Plant 1x47 MW, where Tekniko was for the onshore part, and Hyundaiwas for the offshore part (major mechanical imports). For this project, Tekniko conducted the civil work,building, inlet and water gate, tunnel dia. 9m and length 1,100 m, and the civil for switch yard. The total amountfor Tekniko portion is USD 52,000,000

Established in 1997 Registered ISO ISO 9001:2015ISO 14001OHSAS 18001

Major Business Line

EPC Contractor for Oil & Gas,

Power Plant Civil, Architecture, Mechanical

S/Structure, Tank, Piping, Electrical & Instrument

® 2019 TEKNIKO INDONESIA Company Profile

Company History

Page 8: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Jl. P. Tirtayasa No.88 Campang Raya

Bandar Lampung, Lampung

Indonesia

Tlp. 0721-351177/88Fax. 0721-351222

Head OfficeTangerang, Banten

Fabrication FactoryBandar Lampung

Karawaci Office Park, Blok G-1

Lippo Karawaci, Tangerang Indonesia Tlp. 021-5583888Fax. 021-5518855

Address and Contact

INTRODUCTION TO BUILDING WORKS

we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile8

Page 9: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Target Goal in The Future

GOAL

PUBLIC LISTED COMPANY WITHIN 3 YEARS

MISSION

ACHIEVING THE 3RD CONST. COMPANY

IN INDONESIA

SYSTEM

EXCELLENT INTERNAL MGT

WITH ISO 9001:2015 ISO 14001

OHSAS 18001

MANPOWER

HIGH PERFORMANCE PERSONALITY

9we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 10: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Structure Organization

◼ EPC TEAM

• Plant Engineering

• Plant Procurement

• Project Management

◼ PROJECT SITE

•Construction Management

•Project Progress Control

•Quality & Safety Control

• Reduce & Improvement

◼ HEAD OFFICE

• Project Financing

• Administration

• Business and Proposal

◼ FACTORY

• Steel Fabrication

• Material Handling

• Site Work Support

TEKNIKOCOMPANY

ORGANIZATION

10

Ongoing Project : CL Babelan, Cirebon 2 Jetty, Jawa 1 Cilamaya, AMNT Batu Hijau, RDMP Balikpapan

we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile

Page 11: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

◼ Site Contract Worker = ~ 1500 persons

Engineering Career

58 %

25

12%

5

23 %

12

7 %

3

Over 15 Years

Below 5 Years

5-10 Years

10-15 Years

Manpower Status

26 %

45

14%

24

30 %

52

14 %

24

6 %

1010 %

20

Skill Labor Supervisor

Inspector

Common Labor

Engineer

Commercial

Manpower Status

11we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 12: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

SALES520

CONTRACT950

PROFIT35

2018PERIODE(BILLION IDR)

Business Plan Status in 2018 (1/2)

12 we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile

Page 13: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Business Plan Status in 2018 (2/2)

200

400

600

1,200

BILLION IDR

+ 2017

811

70

+ 2012

39

239

+ 2013

28

389

+ 2016

924

110

+ 2014

80

732

113

1093

+ 2015 + 2018

520

35

800

1,000

13

* Indonesian Rupiah

we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 14: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

BALANCE SHEET (30 April 2019, Billion IDR)

EQUITY 530

LONG TERM LIABILITIES 0

SHORT TERM LIABILITIES 0

FIXED ASSET 142INVESTMENT

CASH & OTHER 170

ACCOUNT 230RECEIVABLE

ACCOUNT PAYABLE 12

542 542

Financial Status (Consolidated)

PT TEKNIKO INDONESIA, PT TEKNIKO E&C, TEKNIKO SINGAPORE PTE LTD.

14 we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile

Page 15: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

CERTIFICATION OF REGISTRATION

Page 16: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Certificate of Organization (1/5)

BUSINESS ENTITY CERTIFICATE

◼ IZIN USAHA

Izin Usaha Jasa Penunjang Listrik (IUJPTL)No. Induk Berusaha : 8120213201085KLBI Code : 35104Date of Certificate : 08th May, 2019

◼ SUPPORTING DOCUMENT FOR IZIN USAHA

Evaluasi Kelengkapan Dokumen Persyaratan PemenuhanKomitmen IUJPTLCertificate No. : 13/IUJPTL/OSS/2019Instance : Direktorat Jendral KelistrikanDate of Certificate : 08th May, 2019

16 we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile

Page 17: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

17

Certificate of Organization (2/5)

BUSINESS ENTITY CERTIFICATE

◼ CONSTRUCTION CERTIFICATE

Sertifikat Badan Usaha Jasa Konstruksi Terintegrasi

Registration No. : 5-1871-11-003-2-08-349644

Type of Business : Integrated Construction Services

Kind of Business : General (Umum)

Date of Certificate : 21th May, 2019

Expired Date : 20th May, 2022

Association : GAPENRI

PJBU : Nam Seok Ho

NPWP : 01.824.553.0-055.000

Net Worth : Rp 345,106,907,000

we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 18: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Certificate of Organization (3/5)

CERTIFICATE OF COMPETENCY

◼ CERTIFICATE OF COMPETENCY

Sertifikat IATKI Team Pembangkit & TransmisiAgency : PT Eleska IATKIType of Certificate : Certification of Electrical ProfessionalDate of Certificate : 28th February 2019

18 we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile

Page 19: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

19

Certificate of Organization (4/5)

CERTIFICATE OF COMPETENCY

◼ CERTIFICATE OF COMPETENCY

Sertifikat IATKI Team Pembangkit & TransmisiAgency : PT Eleska IATKIType of Certificate : Certification of Electrical ProfessionalDate of Certificate : 28th February 2019

we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 20: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

ISO 9001, ISO 14001, OHSAS 18001

Certificate of Organization (5/5)

20 we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile

Page 21: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

PROJECT EXPERIENCE LIST

Page 22: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

S. Structure(ton)

Mechanical(ton)

Piping (Dia-Inch)

Portek S&E Pte., Ltd.Banten Port Pelindo II - Multi Purpose Quay Crane for Container & Bulk 575PC – 1998

PT. Hanjung Indonesia Al-Taeweelah Project - Fabrication Work Sandblasting 750And PaintingPC – 1999

PT. Hanjung Indonesia Hoping CFPP 1,320 MW Taiwan - ESP Internal Part 1,750Steel Structure Fab., Sand Blasting & PaintingPC – 1999

PT. Hanjung IndonesiaHanjung's Furnace Facilities - Building, Fabrication, 520 3,500Installation, Piping & EquipmentEPC – 2000

PT. Hanjung Indonesia JNPT Project,India - Rail Mounted Quayside Crane, 1,350Fabrication Work, & SandblastingPC – 2000

PT. Hanjung IndonesiaSAGT Project Srilanka - Rubber Tyred Gantry Crane, 850and Fabrication Work SandblastingPC – 2000

PT. Bumi Tapioka JayaSprinkle System - Water Pump, Pipe Line & Sprinkle 2,500EPC - 2001

PT. Doosan Indonesia/HanjungBlasting & Painting Shop (2nd) - Civil, Steel Structure, 750 350 500Elect. , Rail Transporter Car & Air Pipe LineEPC - 2001

SW. Multitech Starch Co, LtdTapioka Starch Processing Plant - Fabrication of Steel 250Structure Agitator Tank Cushion TankPC - 2001

Portek Hongkong. LtdHitachi RMQC - Banten Port Ciwandan – Modif. of RMQC, 1,250and Fabrication of MoveablePC- 2001

Mechanical & Electrical (1/5)

1998

2000

1999

2001

we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile22

Page 23: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

S. Structure(ton)

Mechanical(ton)

Piping (Dia-Inch)

Portek System & Energy Pte, Ltd SingaporeBanten Port Ciwandan - Fab. Jacking Tower & New Leg Stay of Hitachi RMQC Banten Port 950 155PC – 2001

PT. Indo Miwon Citra IntiIMCI – Lampung - Fabrication & Installation of Mobile Deck 125PC - 2002

Portek S & E Pte Ltd SingaporeDoosan RMQC Batam Port - Fabrication and Erection 260Modification of RMQCPC – 2002

Portek S & E, Pte. Ltd. SingaporeHitachi RMQC Semarang Port - Fabrication and Erection 520Modification of RMQCPC - 2002

Portek S & E Pte Ltd SingaporeHitachi RMQC Makassar Port - Fabrication and Modification 270RMQCPC - 2003

Portek S & E Pte LtdHitachi RMQC Semarang Port - Fabrication and Modification RMQC 560PC - 2003

PT. Indomiwon Citra IntiIMCI – Lampung - Fabrication and Erection Work for 150 75Molasses B TankPC – 2003

Portek S & E Pte Ltd SingaporeIHI RMQC JICT Tj. Priok Port, Jakarta - Fabrication and 720ModificationPC - 2003

PT. SMART, Tbk.Dumai Bulking Station, Dumai , Riau - Tank Farm Facilities 3,300 3,200120,000 M3PC - 2004

PT. Tunas MekarPT. Petromindo - Asphalt Plant - Fabrication and Erection 350 120 1,500Smeltertank, Storage Tank & Dosage TankPC - 2004

23we construct your wealthy future

Mechanical & Electrical (2/5)

2001

2002

2004

2003

® 2019 TEKNIKO INDONESIA Company Profile

Page 24: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

S. Structure(ton)

Mechanical(ton)

Piping (Dia-Inch)

2004

2005

2006

Mechanical & Electrical (3/5)

PT. Pemuda Prima UsahaAsphalt Storage Tank of PT. Jaya Trade, Tbk. - Storage Tank, 380 130 1,200Piping & ShelterPC - 2004

PT. SMART, Tbk.KSB Extention 2 of PT. Sumber Indah Perkasa - Steel Structure 120Hopper & RoofingPC - 2004

Portek S & E, Pte Ltd SingaporeBitung RMQC North Sulawesi - New Leg Structure System 280PC - 2004

Kingsway Shipping Korea MV. Dongjin Unloader - Converyor Belt Line and Ship Unloader 850 350EPC - 2004

PT. SMART, Tbk. Belitung Bulking Station, Bangka Belitung - Storage Tank 35K M3 750 1,100PC - 2005

PT. SMART, Tbk.Sungai Merah Mill Lampung - Storage Tank 1000 MT x 5 Unit 220 500PC - 2005

PT. Portek IndonesiaJICT - RTGC Tanjung Priok - New Leg Fabrication & Supply 530PC - 2005

PT. Portek Indonesia JICT – RTGC Tanjung Priok - Fuel Tank & Genset Support Strc. 250PC - 2005

Alstom Power ServiceTarahan CFSPP Unit 3 & 4 - Fabric Filler S/Structure, Hopper 1,780 570& Internal PartsPC - 2005

PT. Kirin Miwon FoodsKirin Miwon Factory Lampung – Building & Equip. Dismantling, 580GAC Plant, Moving & Re-InstallationPC - 2006

IMPSA Port SystemIMPSA RMQC - 653 TPS Surabaya - Lower Structure & Access 1,350PC - 2006

we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile24

Page 25: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

S. Structure(ton)

Mechanical(ton)

Piping (Dia-Inch)

Mechanical & Electrical (4/5)

2006

2008

2007

2009

2011

2010

25we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

PT. Pemuda Prima UsahaAneka Kimia Raya Ciwandan Terminal - Steel Storage Tank 730 45070,000 M3 & StructurePC - 2006

Hyundai ShippingMV. Li Ding - Gas Piping Repair & Support 120PC - 2006

PT. Metito IndonesiaPelindo 1 - Dumai Riau - Piping, Fabrication & Install System, 5,500Pipe Support & Ducting WorkPC - 2006

Doosan Heavy Industry Tarahan CFSPPUnit 3 & 4 - Conveyor Structure & Ash Silo 350 350PC - 2006

Alstom Power AustraliaMaryvel Power Plant Australia - ESP Steel Strc. Fabrication 1,250PC - 2007

PT. Wahyu Bitumen GrahaPalembang, South Sumatra - Asphalt Bulk Terminal 865 750(Civil, Storage Tank, Piping, Electrical)EPC - 2008

PT. Asphalt Bangun SaranaMalahayati Port, Aceh - Asphalt Bulk Terminal 950 1,250(Civil, Mechanical, Electrical & Instrument Work)EPC - 2008

Doosan Heavy Industry Cirebon Coal Fired Power Plant; 660MW - Electrical and InstrumentPC - 2009

Doosan Heavy IndustryCirebon Coal Fired Power Plant; 660MW - 2 Unit GTSU Erection 1,850C - 2010

PT. Asphalt Bangun SaranaAsphalt Bulk Terminal Medan- Civil, Mechanical, Electrical 850 950& Instrument WorkEPC – 2010

Posco E & CKrakatau Steel Plant, Cilegon – Electr. Work for Temp. Facilities PC - 2011

Page 26: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

S. Structure(ton)

Mechanical(ton)

Piping (Dia-Inch)

2012

2014

2013

2015

2017

2019

we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile26

18,985 47,080 122,980

Mechanical & Electrical (5/5)

PT. Asphalt Bangun SaranaBanten Port Ciwandan - Emulsion Asphalt and PMB Plant 1,250 1,100EPC - 2012

Posco E & CKrakatau Posco – Coke Plant - Mechanical Installation 17,500 85,000(17,500 tons)PC - 2012

PT. IPCRPCR Factory, Cilegon - Mechanical and Electrical Work 730EPC - 2012

Clyde Bergemann Mong Duong Power Plant, Vietnam - Stair Tower , Spiral Stair , 230and Pipe Racks FabricationPC - 2013

Dongsuh ChemicalPNS Project Site, Cikande, West Java - Office Building, 930 12,500Piping & Insulation, Elec. & Instr. WorksPC - 2013

PT. Mitra Energi BatamBatam, 2x225 MW Combine Cycle Power Plant - HRSG, 1,650 1,200Condenser, Cooling Tower, Turbine, Generator ErectionPC - 2013

PT. Cikarang ListrindoBabelan, 3x140 MW Coal Fired PP - GTSU, S/ Reclaimer 6,700 3,650Belt Conveyor, Limestone HandlingEPC - 2014

PT. Cikarang ListrindoBabelan, 3x140 MW Coal Fired Power Plant - Limestone Dryer 890 350EPC - 2015

PT. Asphalt Bangun SaranaBoom Baru, Palembang - Asphalt Storage Tank 4000 ton 600 280including FacilitiesEPC – 2017

Amman Mineral Nusa TenggaraBatu Hijau, Nusa Tenggara Barat - Dynamometer and 180Test Bench FacilityEPC - 2019

Page 27: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

PT. Gunung Madu PlantationPT. Pemuka Sakti Manis Indah - Sugar Warehouse Steel StructurePC – 1999

PT. Hanjung IndonesiaHanjung's Ware House Building - Civil Work, General S/ Structure, & Other Facilities of BuildingEPC - 2000

PT. Dwi Daya Sentra PrakarsaWorkshop & Roadway - Civil Work & General Steel ConstructionEPC - 2000

PT. Hanjung IndonesiaOpen Bay House - Civil Work & General Steel ConstructionPC - 2001

PT. Wisco Kayu IndonesiaWhole Factory - Civil, Steel Structure & ElectricalEPC - 2001

PT. Portindo DinamikaBanten Port Ciwandan – Warehouse - Civil, Steel Structure & ElectricalEPC – 2001

PT. Indo Miwon Citra IntiIMCI, Lampung - Fabrication & Installation of PlatformPC - 2001

PT. Hanjung IndonesiaGulf Resources Plant, Sumsel - Steel Structure of Pipe RackPC - 2002

PT. Indomiwon CitraIMCI Lampung - Civil Work of Press Filter RoomEPC - 2003

PT. Portindo DinamikaContainer Stacking Yard 2A, Ciwandan - Civil, Steel Structure & ElectricalEPC - 2003

PT. Smart, TbkKSB Sungai Buaya Mill - Fabrication & Erection of workshopPC - 2003

PT. Indomiwon Citra IntiTransformer Room IMCI, Lampung - Civil Work of Transformer RoomPC - 2003

Civil & Architecture (1/4)

1999

2001

2000

2002

2003

27we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 28: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

PT. Portindo DinamikaContainer Stacking Yard 3A, Ciwandan - Civil, Steel Structure & ElectricalPC – 2003

PT. Indo Miwon Citra IntiIMCI Lampung - Fabrication & Installation LinePC – 2003

PT. SMART, Tbk.Kasuari & Mambruk Estate, Papua - Steel Bridge FabricationPC - 2004

PT. SMART, Tbk.Dumai Bulking Station Dumai, Riau - Civil & Electrical WorkPC - 2005

Daewoo E & CUIC Revamping Merak Banten - Civil Foundation, Bore Pilling & Steel StructurePC - 2005

SK Engineering & ConstructionPatra SK, Dumai , Sumatera - Civil Work, S/Structure, Elect. & Instrument Work for Lube Base Oil PC - 2007

Doosan Heavy IndustriesCirebon Coal Fired Power Plant; 660MW - Soil Improvement WorkPC – 2007

Doosan Heavy IndustryCirebon Coal Fired Power Plant; 660MW - Jetty 13,000 DWT, 2 km Trestle / incl. Sea Water IntakeEPC - 2009

Doosan Heavy Industry Cirebon Coal Fired Power Plant; 660MW - 8 Building Structures / WTP, Transfer Towers & etc.PC - 2009

Doosan Heavy IndustryCirebon Coal Fired Power Plant; 660MW - Coal Yard & Ash Pond Soil ImprovementPC - 2010

Daewoo EngineeringMerak Banten - Merak Power Plant (Temporary Facilities Work)EPC - 2010

Doosan Heavy IndustryCirebon Coal Fired Power Plant; 660MW - Windbreak & LandscapingPC - 2011

Civil & Architecture (2/4)

2003

2005

2004

2009

2010

2007

2011

we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile28

Page 29: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Posco E & C Krakatau – Posco; Integrated Steel Mill - Reinforced Concrete (SMP & CCP) Work 95,000m3PC - 2011

PT. IPCRIPCR Factory, Cilegon - Material Stock YardEPC - 2012

PT. IPCRIPCR Factory, Cilegon - Material Stock Temporary Work ShopEPC - 2012

Posco E & CKrakatau Posco, Cilegon - Steel Structure SMP / CCP, Plate Mill (1500 tons) PC - 2012

Posco E & CKrakatau Posco, Cilegon - Road, Drainage for Blast Furnace, SMP & CCPPC - 2012

PT. Seohee IndonesiaKrakatau Posco, Cilegon - ISM Gas Power Plant Seawater IntakePC - 2012

PT. Cikarang ListrindoCikarang – MM2100 Industrial Estate - Civil, M&E Works for Switch Yard & Switch Gear BuildingEPC - 2012

SAMSUNG C&TIFC 2 and Keppel Tower - Sheet Pilling, Concrete Demolition and King PostPC - 2012

Air Liquide HangzhouAlindo; KK3 Cilegon - Civil Work PackagePC - 2013

Dongsuh ChemicalPNS Project Site, Cikande, West Java - Piling, Civil and Steel Structure WorkPC - 2013

PT. Posco E&C IndonesiaKrakatau Posco. Cilegon - Plate Mill – Civil and Architectural WorkPC - 2013

GS Engineering & ConstructionAEON Mall; BSD - Piling, RC Work, Wet Work and Landscape Work PC - 2014

Civil & Architecture (3/4)

2011

2012

2013

2014

29we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 30: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Hyundai Engineering Rajamandala HEPP 47 MW, West Java - Civil, Architectural, Tunnel WorkEPC - 2014

Hyundai E&C Sarulla Geothermal, North Sumatera - Earthwork / Site PreparationEPC - 2014

Hyundai E&C Sarulla Geothermal, North Sumatera - Soil Investigation EPC - 2014

Hyundai E&C Jakarta, Shangri La Residence - Shangri La Residence, GCNM Apartment, RC WorkPC – 2014

Hyundai E&C Sarulla Geothermal, North Sumatera - Piling WorkEPC - 2014

PT. Indonesia PowerCilegon, Suralaya CFPP - Construction for Cover Hopper StructureEPC - 2016

PT. Posco E&CLampung, Semangka HEPP - Fabrication and Installation of Main Water Gate and PenstockPC - 2017

PT. Krakatau EngineeringKrakatau Industrial Estate, Cilegon - Scale Pit and Water Treatment Plant for Hot Mill Strip #2PC - 2017

Hyundai E&CCirebon 2 Coal Fired Power Plant 1000MW - Coal Jetty 15,000 DWT, Trestle 2700m, Sea Water IntakeEPC - 2017

Samsung C&TJawa Satu Power, Combined Cycle 1600 MW - Site Preparation and FencePC - 2018

AMNTAMNT Lunyuk, Batu Hijau - Civil Work for Dynamo Meter & Transmission FacilityEPC – 2019

RDMP (Refinery Development Master Plan)- BalikpapanJO. HEC-Rekind-PP – Temporary Facility #9, Warehouse & Disposal AreaEPC - 2020

Civil & Architecture (4/4)

2014

2016

2018

2019

2017

we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile30

2020

Page 31: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

PHOTOGRAPH OF MAJOR PROJECT

Page 32: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Major Project Photograph (1/13)

◼ Project Work- Intake- Spillway & Open Channel- Power House- Headrace Tunnel

◼ Service

Civil Work◼ Period

2014

Rajamandala HEPPHyundai Engineering

RAJAMANDALA HEPP 47 MW, WEST JAVACIVIL, ARCHITECTURAL, TUNNEL WORK

32we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile32

Page 33: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Major Project Photograph (2/13)

◼ Project Work- GTSU- Stacker Reclaimer- Belt Conveyor

◼ Service

Civil Work◼ Period

2017

Babelan 3x140 MWPT Cikarang Listrindo

BABELAN, 3X140 MW COAL FIRED POWER PLANT GTSU, STACKER RECLAIMER, BELT CONVEYOR, LIMESTONE HANDLING

33we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 34: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Major Project Photograph (3/13)

◼ Project Work- Piling- RC- Wetworks- Landscape

◼ Service

Civil Work◼ Period

2014

AEON MallGS Engineering & Construction

AEON MALL BSD PILING, RC WORK, WET WORK AND LANDSCAPE WORK

34we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile34

Page 35: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Major Project Photograph (4/13)

◼ Project WorkISM Gas Power Plant SWI

◼ Service

Civil Work◼ Period

2012

Sea Water IntakePT Krakatau Posco

KRAKATAU POSCO, CILEGONISM GAS POWER PLANT SEAWATER INTAKE

35we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 36: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Major Project Photograph (5/13)

◼ Project WorkT/G System Erection

◼ Location

Tembesi, Batam◼ Period

2013

MEB CCPP 2x225 MWPT Mitra Energi Batam

COMBINE CYCLE POWER PLANT HRSG, CONDENSER, COOLING TOWER, TURBINE, GEN. ERECTION

36we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile36

Page 37: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Major Project Photograph (6/13)

◼ Project WorkJetty Work

◼ Location

Cirebon, West Java◼ Period

2018

Cirebon2 ;1x1000MW CFPPHyundai E & C

CIREBON 2 COAL FIRED POWER PLANT 1000MW COAL JETTY 15,000 DWT, TRESTLE 2700M, SEA WATER INTAKE

37we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 38: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Major Project Photograph (7/13)

◼ Project WorkCoke OpenSMPP-CPPPlate Mill

◼ Location

Krakatau Posco, Cilegon◼ Period

2012

Krakatau Posco Integrated Steel MillPT Krakatau Posco

KRAKATAU POSCOCOKE PLANT STEEL STRUCTURE SMP / CCP, PLATE MILL,

ROAD & DRAINAGE FOR BLAST FURNACE

38we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile38

Page 39: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Major Project Photograph (8/13)

◼ Project Work- Civil (EPC)- Mechanical (EPC)

◼ Location

Malahayati Port, Aceh (2008)Belawan Port, North Sumatera (2010)

Asphalt Bulk TerminalPT Asphalt Bangun Sarana

ASPHALT BULK TERMINAL – MEDAN & ACEHCIVIL, MECHANICAL, ELECTRICAL & INSTRUMENT WORK

39we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 40: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Major Project Photograph (9/13)

◼ Project WorkP-C Civil Work

◼ Location

Dumai, Riau◼ Period

2007

Lube Base OilPatra-SK Group

CIVIL WORK, STEEL STRUCTUREELECTRICAL & INSTRUMENT WORK FOR LUBE BASE OIL

40we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile40

Page 41: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Major Project Photograph (10/13)

◼ Project Work- Jetty Work, SWI & GTSU- Soil Improvement- Steel Structure Building- Landscape

◼ Location

Cirebon, West Java◼ Period

2009

Cirebon 660MW CFPPPT Doosan Heavy Industries

CIREBON COAL FIRED POWER PLANT ; 660MWSOIL IMPROVEMENT, PVD WORK, JETTY 13,000 DWT, SWI, GTSU

BUILDING STRUCTURES / WTP, TRANSFER TOWERS, LANDSCAPE, ETC.

41we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 42: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

◼ Project WorkSite PreparationFence Work

◼ Location

Cilamaya, Karawang – West Java◼ Period

2018

Jawa 1 ; CCPP 1600MWSamsung C & T

Major Project Photograph (11/13)

JAWA 1 COMBINE CYCLE POWER PLANT 1,600 MWSITE PREPARATION & FENCE

42we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile42

Page 43: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

GENERAL PHOTOS

Major Project Photograph (12/13)

Building, Equipment & GAC PlantPT Kirin Miwon Foods

Service : EPCLocation : Chemical Plant LampungPeriod : 2006

CPO Bulking StationPT Smart Tbk

Service : PCLocation : Dumai, RiauPeriod : 2005

PPU AKR Fuel Storage TankPT Aneka Kimia Raya

Service : PCLocation : Banten Port, CiwandanPeriod : 2006

43we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 44: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Major Project Photograph (13/13)

GENERAL PHOTOS

RMQC-653 Lower STR & AccessIMPSA Port System

Service : PCLocation : Tps Surabaya, East JavaPeriod : 2005

Steel Structure Work Daewoo Engineering

Service : PCLocation : UIC Merak, BantenPeriod : 2005

Unloaded SRT System HopperKingsway Shipping Korea

Service : EPCLocation : MV Dongjin UnloaderPeriod : 2004

44we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile44

Page 45: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

FACTORY & FACILITIES

Page 46: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Location

Bandar Lampung

Indonesia

LAMPUNG

SUNDA STRAIT

PT TEKNIKO INDONESIAWorkshop

we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile46

Jl. P. Tirtayasa No. 88, Campang Raya, Kec. Tanjung Karang TimurKota Bandar Lampung, Lampung 35244

www.tekniko.co.id

(0721) 35177

Page 47: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

LAMPUNG FACTORY CONDITION

Total Area 22,000 M2

Indoor Fabrication 5,000 M2

Outdoor Fabrication 1,800 M2

Shot Blasting & Painting 900 M2

Material Storage 2,700 M2

Packing & Finish Goods 1,500 M2

Land Extension Plan 30,000 M2

Steel Fab. Product 15,000 ton/year

Shot Blasting & Painting 380,000 M2/year

Fa

cto

ry 1

Fa

cto

ry 2

Existing Land (2.2 Ha)

Extension of Land (3 Ha)

Existing Building (7,100 M2)

Pa

ckin

g &

Pro

du

cts

Are

a

Blasting & Painting Shop

Warehouse

Extension of Land

Office

Security Office

Jl. P. Tirtayasa No. 88

Factory Layout

47we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 48: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

STEEL FABRICATIONFactory # 2

STEEL FABRICATIONFactory # 1

Factory Photograph

Factory of PT Tekniko IndonesiaBandar Lampung

we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile48

Tekniko Indonesia started its operation in steel fabricationwork business for various industrial plant in Lampung, Indonesia

“ “

Page 49: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

CRANE( Over Head )

MACHINERYUtilities

BLASTINGShop

SHOT ROOMfor Blasting & Painting

Facilities

49we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 50: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

BENDING PLATEMachine

500 TON PRESSMachine

LATHE Machine

ROLLINGMachine

RADIAL DRILLMachine

MILLING Machine

Machinery

MACHINERYASSETS

we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile50

Page 51: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

51we construct your wealthy future

Equipments Construction List

No. Description Capacity Qty

Equipment1 Excavator Bucket Capa 0,8 m3 - 2.4 m3 292 Mini Excavator 0,3 m3 13 Wheel Loader Bucket Capa 3 m3 24 Forklift 5 Ton 25 Forklift 7 Ton 16 Bulldozer 19,1 Ton 57 Dump Truck 20 Ton 168 Hydraulic Breaker 125TR-F Vertical Type 39 Foco Crane 1.5 ton + 25 ton Trans 210 Vibro Roller 20 Ton 411 Mini Roller 0.6 Ton 212 Rough Terrain Cranes 35 ton & 55 ton 413 Jumbo Drill Boomer 352-1238 114 Auto Shotcrete Machine CIFA 115 Shotcrete Machine Ariba 216 Electric Compressor 10 bar 117 Multiple Grouting System 118 Crawler Drill Kwangsung 119 Leg Drill 1520 Blower for Tunnel 60 HP 321 Air Compressor 275 CFM, 1200 CFM, 1800 CFM 522 Concrete Vibrator Converter FU 1/200 2523 Concrete Mixer 1.2m, 7PK, 2200rpm 524 Concrete Cutter EY-28D 125 Concrete Breaker Hyd. 5 ton 626 Concrete Trowel TKT 36 A 1027 Taping Ramer MT 75 DH 528 Semi-Auto Stamper AVP 2910 Frog 1529 Bar Bender Dia. 32mm - 42mm 1030 Submersible Pump 3” – 8” 1631 Sheet Pile Vibrator 60 KVA 132 Container 20’ – 40 1533 Floor Grinding M/C Samich - Legend 950/850 2Measuring Tools1 Auto Level C 32 - D10343 232 Theodolite + Stand TM 20 E 113 Total Station Set Sokkia 550X 94 Noise Vibration Test 1Temporary Facility1 Hollow Form 0,6 x 3,2 m 7,0002 Scaffolding 1,7m 16,0003 Scaffolding 0,9 m 8,0004 Supporting Pipe 6 m 5,0005 U-Head / Jackbase @ 60 cm 35,000

® 2019 TEKNIKO INDONESIA Company Profile

Page 52: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

Clients & Partneship

Our major clients are mainly from

Power Plant, Industries, Oil & Gas.

we construct your wealthy future ® 2019 TEKNIKO INDONESIA Company Profile52

Page 53: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

We ConstructYOUR WEALTHY FUTURE

WHAT IS THE MERIT TOBUSINESS WITH

PT TEKNIKO INDONESIA

1. EPC Main-Con J.O Partner for “Civil, Cargo Handling, Jetty, Mech. Installation”

2. No. 1 “Korean & Indonesia Expert” construction company.

3. GAPENRI member (association for EPC contractor) & IUJPTL permit for Hydro and

Coal Fired Power Plant

4. Owned steel fabrication workshop 15,000 ton/year more than 100 heavy

equipment for construction

5. “ZERO” debit

6. Construction project value up to “USD 200 million”

53we construct your wealthy future® 2019 TEKNIKO INDONESIA Company Profile

Page 54: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

KEEPING COST

Our price has always been competitive through better administrations, maximizing the

use local content and company resources and selection of competitive material

suppliers.

DELIVERY SCHEDULE

We are keeping our delivery schedule based on the contract requirement through well

prepared plan, highly discipline keeping time and anticipation on project obstacle.

QUALITY CONTROL

By using our expertise of standard codes and our experience, and our careful selection

of vendors, we are able to control our quality as required in the contracts.

TECHNICAL INNOVATION

We observe results of each project completion in order to innovate and deliver technical

for the next projects.

Our Commitment

By keeping ALL FOUR we are determined to deliver

progressive constructions in Power Plant, Cargo Handling,

Fuel Handling, Limestone Handling, Harbor and Jetty

Construction, Oil & Gas, and other Industrial Sectors

Page 55: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

HEAD OFFICE

Karawaci Office Park

Blok G-1

Karawaci – Tangerang,

BANTEN

021-5583888

021-55818855

WORKSHOP

Jl. P. Tirtayasa No. 88

Campang Jaya Bandar Lampung

LAMPUNG

0721-351177 / 88

0721-351222

Contact Us :

www.tekniko.co.idPT TEKNIKO INDONESIA

For Marketing [email protected]@[email protected]@gmail.com

For Vendor [email protected]@gmail.com

For [email protected]@[email protected]

Page 56: we construct your wealthy future - PT. Tekniko Indonesiatekniko.co.id/pdf/569849_261951_592306.pdf · PT. MKE (Sister Company) Alstom Power Steel Str. Fabrication (2007) (2008) Asphalt

WE CONSTRUCT YOUR WEALTHY FUTURE

® Version: 20191022 Tekniko Privacy Policy