80
WISCONSIN DEPARTMENT OF TRANSPORTATION AVERAGE UNIT PRICE LIST 7/17/2017 ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 108.3100.S Inc/Dis for Interim Completion of Work CD $7,173.91 $1.21 108.4300 RBC Progress Schedule EACH $521.05 $1,000.00 108.4400 CPM Progress Schedule EACH $4,041.45 $1,239.82 $1,781.54 201.0105 Clearing STA $376.14 $367.88 $262.16 201.0110 Clearing SY $1.34 $1.66 $3.52 201.0115 Clearing ACRE $2,807.02 $3,033.20 $1,983.58 201.0120 Clearing ID $14.09 $21.93 $15.39 201.0205 Grubbing STA $257.55 $185.64 $206.48 201.0210 Grubbing SY $1.01 $1.53 $3.96 201.0215 Grubbing ACRE $1,232.40 $2,948.30 $1,788.18 201.0220 Grubbing ID $9.83 $10.12 $10.20 202.0105 Roadside Clearing STA $255.20 $510.79 $698.55 202.0110 Roadside Clearing SY $2.00 202.0115 Roadside Clearing ACRE 203.0100 Removing Small Pipe Culverts EACH $390.33 $303.93 $364.39 203.0200 Removing Old Structure (station) LS $70,278.52 $120,415.63 $35,477.10 203.0210.S Abatement Asbestos Material (structure) LS $3,403.23 $3,041.43 $4,776.29 203.0225.S Debris Containment (structure) LS $3,313.27 $3,438.04 $4,654.90 203.0500.S Rem Old Struct Over Waterway (station) LS $9,521.57 $28,410.09 $41,083.77 203.0600.S Rem Old Str Ovr Water Min Debris (sta) LS $53,976.30 $58,269.75 $106,551.10 203.0700.S Rem Old Str Ovr Water W Capture Sys (sta LS $23,850.00 $324,676.88 $107,822.22 204.0100 Removing Pavement SY $3.61 $3.77 $4.70 204.0105 Removing Pavement Butt Joints SY $9.36 $15.25 $11.03 204.0109.S Removing Conc Surface Partial Depth SF $0.44 $0.69 $0.53 204.0110 Removing Asphaltic Surface SY $2.84 $2.36 $2.13 204.0115 Removing Asphaltic Surface Butt Joints SY $10.79 $9.44 $8.77 204.0120 Removing Asphaltic Surface Milling SY $1.64 $1.57 $1.26 204.0125 Removing Asphaltic Surface Milling TON $14.22 $15.45 $8.97 204.0130 Removing Curb LF $5.72 $4.17 $4.59 204.0140 Removing Gutter LF $2.00 $5.78 204.0150 Removing Curb & Gutter LF $3.34 $3.28 $2.89 204.0155 Removing Concrete Sidewalk SY $5.03 $4.29 $4.24 Page 1

WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

  • Upload
    leanh

  • View
    223

  • Download
    4

Embed Size (px)

Citation preview

Page 1: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                              

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 108.3100.S Inc/Dis for Interim Completion of Work CD $7,173.91 $1.21 108.4300 RBC Progress Schedule EACH $521.05 $1,000.00 108.4400 CPM Progress Schedule EACH $4,041.45 $1,239.82 $1,781.54 201.0105 Clearing STA $376.14 $367.88 $262.16 201.0110 Clearing SY $1.34 $1.66 $3.52 201.0115 Clearing ACRE $2,807.02 $3,033.20 $1,983.58 201.0120 Clearing ID $14.09 $21.93 $15.39 201.0205 Grubbing STA $257.55 $185.64 $206.48 201.0210 Grubbing SY $1.01 $1.53 $3.96 201.0215 Grubbing ACRE $1,232.40 $2,948.30 $1,788.18 201.0220 Grubbing ID $9.83 $10.12 $10.20 202.0105 Roadside Clearing STA $255.20 $510.79 $698.55 202.0110 Roadside Clearing SY $2.00 202.0115 Roadside Clearing ACRE 203.0100 Removing Small Pipe Culverts EACH $390.33 $303.93 $364.39 203.0200 Removing Old Structure (station) LS $70,278.52 $120,415.63 $35,477.10 203.0210.S Abatement Asbestos Material (structure) LS $3,403.23 $3,041.43 $4,776.29 203.0225.S Debris Containment (structure) LS $3,313.27 $3,438.04 $4,654.90 203.0500.S Rem Old Struct Over Waterway (station) LS $9,521.57 $28,410.09 $41,083.77 203.0600.S Rem Old Str Ovr Water Min Debris (sta) LS $53,976.30 $58,269.75 $106,551.10 203.0700.S Rem Old Str Ovr Water W Capture Sys (sta LS $23,850.00 $324,676.88 $107,822.22 204.0100 Removing Pavement SY $3.61 $3.77 $4.70 204.0105 Removing Pavement Butt Joints SY $9.36 $15.25 $11.03 204.0109.S Removing Conc Surface Partial Depth SF $0.44 $0.69 $0.53 204.0110 Removing Asphaltic Surface SY $2.84 $2.36 $2.13 204.0115 Removing Asphaltic Surface Butt Joints SY $10.79 $9.44 $8.77 204.0120 Removing Asphaltic Surface Milling SY $1.64 $1.57 $1.26 204.0125 Removing Asphaltic Surface Milling TON $14.22 $15.45 $8.97 204.0130 Removing Curb LF $5.72 $4.17 $4.59 204.0140 Removing Gutter LF $2.00 $5.78 204.0150 Removing Curb & Gutter LF $3.34 $3.28 $2.89 204.0155 Removing Concrete Sidewalk SY $5.03 $4.29 $4.24

Page 1

Page 2: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 204.0157 Removing Concrete Barrier LF $8.42 $9.75 $9.94 204.0160 Removing Lip Curb LF $4.00 $10.25 204.0165 Removing Guardrail LF $1.73 $1.81 $1.64 204.0170 Removing Fence LF $1.71 $2.06 $1.22 204.0175 Removing Concrete Slope Paving SY $10.29 $7.43 $8.65 204.0180 Removing Delineators and Markers EACH $11.56 $11.85 $13.04 204.0185 Removing Masonry CY $30.84 $81.14 $105.84 204.0190 Removing Surface Drains EACH $293.61 $368.59 $260.34 204.0195 Removing Concrete Bases EACH $172.48 $154.31 $151.85 204.0200 Removing Railroad Track LF $22.76 $71.03 204.0205 Removing Utility Poles EACH $440.00 $110.44 $129.56 204.0210 Removing Manholes EACH $431.59 $455.60 $404.28 204.0215 Removing Catch Basins EACH $476.67 $391.73 $350.64 204.0220 Removing Inlets EACH $297.29 $273.19 $249.17 204.0225 Removing Septic Tanks EACH $1,250.00 $1,400.00 $10.00 204.0230 Removing Building (station) LS $9,128.02 $11,683.33 $5,110.38 204.0235 Removing Buildings (parcel) LS $40,926.96 $27,960.00 $21,165.05 204.0240 Site Clearance (parcel) LS $9,458.33 $10,328.57 $1,813.00 204.0245 Removing Storm Sewer (size) LF $20.79 $18.21 $12.45 204.0250 Abandoning Manholes EACH $417.24 $354.05 $825.52 204.0255 Abandoning Catch Basins EACH $537.50 $294.29 $400.00 204.0260 Abandoning Inlets EACH $291.50 $282.10 $690.05 204.0265 Abandoning Wells EACH $1,223.33 $1,937.50 $1,500.00 204.0270 Abandoning Culvert Pipes EACH $1,476.98 $757.48 $1,066.16 204.0275 Closing Culvert Pipes EACH $506.64 $500.00 204.0280 Sealing Pipes EACH $556.63 $503.45 $378.14 204.0291.S Abandoning Sewer CY $158.46 $155.22 $165.29 204.9001.S Remov Adv Flasher Assemblies Type 1 EACH 204.9002.S Remov Adv Flasher Assemblies Type 2 EACH 204.9025.S Removing (item description) CF $5,000.00 204.9035.S Removing (item description) CY $25.25 $200.00 204.9060.S Removing (item description) EACH $215.17 $86.61 $101.93

Page 2

Page 3: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                            

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 204.9070.S Removing (item description) GAL 204.9090.S Removing (item description) LF $2.02 $8.84 $4.00 204.9105.S Removing (item description) LS $2,184.76 $2,037.50 $1,516.37 204.9125.S Removing (item description) MI 204.9165.S Removing (item description) SF $4.42 $2.13 $0.84 204.9170.S Removing (item description) STA 204.9180.S Removing (item description) SY $8.12 $4.91 $15.00 204.9195.S Removing (item description) TON 205.0100 Excavation Common CY $5.70 $7.47 $5.10 205.0200 Excavation Rock CY $4.65 $2.75 $9.08 205.0300 Excavation Stone Piles and Stone Fences CY $16.98 $11.46 205.0400 Excavation Marsh CY $1.96 $5.11 $2.89 205.0500.S Exc & Hauling Petroleum Cont Soil CY 205.0501.S Excavat, Haul, Dispos Petrl Contamd Soil TON $47.57 $34.05 $34.32 205.1300 Presplitting Rock LF $26.30 205.2000.S Settlement Gauges EACH $1,000.00 205.3000.S Temporary Emergency Pullouts EACH 205.9006.S Grding Shping Finish Barrier Terminals EACH 205.9010.S Grading & Shaping Intersection (location LS $1,542.86 $11,998.50 205.9015.S Grading Shaping & Finishing Intersection LS $3,138.33 $3,536.00 $2,430.42 206.1000 Exc for Structure Bridges (structure) LS $52,597.64 $41,823.50 $52,867.33 206.1050.S Underwater Foundation Inspection EACH 206.2000 Exc for Structures Culverts (structure) LS $27,398.55 $22,439.87 $13,975.03 206.3000 Exc for Struct Retaining Walls (struct) LS $27,543.96 $52,124.81 $57,146.40 206.4000 Exc for Struct Structal Plt Pipe or Arch LS 206.5000 Cofferdams (structure) LS $615,903.33 $136,667.86 $40,308.91 208.0100 Borrow CY $4.34 $3.99 $4.86 208.1100 Select Borrow CY $10.34 $12.48 $5.12 208.2100.S Fly Ash for Subgr Stabil Furn TON 208.2110.S Fly Ash Subgrade Stabilization SY 209.0200.S Backfill Controlled Low Strength CY $98.14 $7.32 $125.98 209.0300.S Backfill Coarse Aggregate (size) CY $26.39 $40.44 $25.43

Page 3

Page 4: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                            

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 209.1100 Backfill Granular Grade 1 CY $19.24 209.1500 Backfill Granular Grade 1 TON $17.96 209.2100 Backfill Granular Grade 2 CY $11.76 209.2500 Backfill Granular Grade 2 TON $12.14 210.1100 Backfill Structure Type A CY $21.28 210.1500 Backfill Structure Type A TON $17.36 210.2100 Backfill Structure Type B CY $23.76 210.2500 Backfill Structure Type B TON $15.42 211.0100 Prepare Foundation for Asphaltic Paving LS $6,219.70 $8,392.74 $25,619.90 211.0200 Prepare Foundation for Conc Pvt (proj) LS $1,552.47 $3,900.00 $6,443.00 211.0300 Prepare Foundation for Conc Base (proj) LS $1,000.00 $500.00 211.0400 Prepare Foundation for Aspht Shlders STA $39.84 $28.49 $28.13 211.0500 Prepare Foundation for Base Aggregate STA $60.97 $104.13 $194.67 213.0100 Finishing Roadway (project) EACH $2,292.66 $1,962.93 $1,833.93 214.0100 Obliterating Old Road STA $540.65 $328.17 $347.31 305.0110 Base Aggregate Dense 3/4‐Inch TON $14.41 $16.46 $16.28 305.0115 Base Aggregate Dense 3/4‐Inch CY $33.80 $46.00 $28.00 305.0120 Base Aggregate Dense 1 1/4‐Inch TON $10.45 $9.80 $8.67 305.0125 Base Aggregate Dense 1 1/4‐Inch CY $24.99 $36.78 305.0130 Base Aggregate Dense 3‐Inch TON $9.94 $10.97 $11.30 305.0135 Base Aggregate Dense 3‐Inch CY $49.50 305.0410 Aggregate Detours TON $8.00 $18.44 $18.00 305.0415 Aggregate Detours CY 305.0500 Shaping Shoulders STA $23.87 $22.93 $18.05 305.0502.S Shaping Roadway STA $435.00 $1,880.00 $23.64 305.0504.S Hauling Excess Shoulder Material CY $30.00 $33.31 $9.00 310.0110 Base Aggregate Open‐Graded TON $18.76 $19.63 $16.46 310.0115 Base Aggregate Open‐Graded CY $34.49 $34.04 $32.03 311.0110 Breaker Run TON $8.11 $10.96 $11.26 311.0115 Breaker Run CY $28.45 $22.69 $21.50 312.0110 Select Crushed Material TON $8.34 $9.67 $8.25 312.0115 Select Crushed Material CY $26.95 $19.58 $15.61

Page 4

Page 5: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                    

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 313.0110 Pit Run TON $4.33 $8.90 313.0115 Pit Run CY $11.95 315.0100 Asphaltic Base TON $64.74 $74.46 315.0200 Asphaltic Base Widening TON $133.05 $84.50 320.0105 Concrete Base 4‐Inch SY $36.00 $39.86 $34.00 320.0110 Concrete Base 4 1/2‐Inch SY 320.0115 Concrete Base 5‐Inch SY 320.0120 Concrete Base 5 1/2‐Inch SY 320.0125 Concrete Base 6‐Inch SY $30.78 $58.04 $40.54 320.0130 Concrete Base 6 1/2‐Inch SY 320.0135 Concrete Base 7‐Inch SY $40.00 $40.00 $39.91 320.0140 Concrete Base 7 1/2‐Inch SY $46.00 $34.58 320.0145 Concrete Base 8‐Inch SY $51.03 $31.91 $41.13 320.0150 Concrete Base 8 1/2‐Inch SY $36.50 $55.00 320.0155 Concrete Base 9‐Inch SY $36.36 $44.39 $39.72 320.0160 Concrete Base 9 1/2‐Inch SY 320.0165 Concrete Base 10‐Inch SY 320.0170 Concrete Base 10 1/2‐Inch SY 320.0305 Concrete Base HES 4‐Inch SY 320.0310 Concrete Base HES 4 1/2‐Inch SY 320.0315 Concrete Base HES 5‐Inch SY 320.0320 Concrete Base HES 5 1/2‐Inch SY 320.0325 Concrete Base HES 6‐Inch SY 320.0330 Concrete Base HES 6 1/2‐Inch SY 320.0335 Concrete Base HES 7‐Inch SY 320.0340 Concrete Base HES 7 1/2‐Inch SY $38.00 320.0345 Concrete Base HES 8‐Inch SY $44.87 $50.00 320.0350 Concrete Base HES 8 1/2‐Inch SY $60.00 320.0355 Concrete Base HES 9‐Inch SY $70.62 320.0360 Concrete Base HES 9 1/2‐Inch SY 320.0365 Concrete Base HES 10‐Inch SY 320.0370 Concrete Base HES 10 1/2‐Inch SY

Page 5

Page 6: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                            

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 325.0100 Pulverize and Relay SY $0.54 $1.14 $1.01 330.0100 Mill and Relay SY $2.10 $2.48 $2.75 335.0100 Rubblizing SY $3.50 $1.60 340.0100 Cracking and Seating SY $0.90 $5.00 350.0102 Subbase CY $23.66 $22.50 350.0104 Subbase TON $15.26 350.0115 Subbase 6‐Inch SY 350.0120 Subbase 7‐Inch SY 350.0125 Subbase 8‐Inch SY $1.80 350.0130 Subbase 9‐Inch SY 350.0135 Subbase 10‐Inch SY 350.0140 Subbase 11‐Inch SY 350.0145 Subbase 12‐Inch SY $7.66 $7.25 $3.35 371.1000.S QMP Base Agg Dense 1 1/4‐Inch Compaction TON $0.18 $0.41 374.1010.S QMP Mill and Relay Compaction SY $0.25 $0.10 374.1020.S QMP Pulverize and Relay Compaction SY $0.13 $0.22 390.0103 Base Patching SY $85.56 390.0201 Base Patching Asphaltic TON $113.02 $140.84 $89.21 390.0203 Base Patching Asphaltic SY $74.10 $94.50 $29.20 390.0303 Base Patching Concrete SY $50.83 $52.73 $52.85 390.0403 Base Patching Concrete Shes SY $97.69 $97.59 $95.91 405.0100 Coloring Concrete WisDOT Red CY $61.25 $69.34 $58.20 405.0200 Coloring Concrete Custom CY $64.72 405.1000 Stamping Colored Concrete CY $98.06 415.0060 Concrete Pavement 6‐Inch SY $55.00 $39.53 $51.33 415.0065 Concrete Pavement 6 1/2‐Inch SY 415.0070 Concrete Pavement 7‐Inch SY $32.24 $32.39 $30.96 415.0075 Concrete Pavement 7 1/2‐Inch SY $36.63 $40.00 415.0080 Concrete Pavement 8‐Inch SY $33.72 $34.98 $30.07 415.0085 Concrete Pavement 8 1/2‐Inch SY $40.39 $34.77 $36.40 415.0090 Concrete Pavement 9‐Inch SY $37.83 $38.13 $36.69 415.0095 Concrete Pavement 9 1/2‐Inch SY $40.42 $36.12 $40.11

Page 6

Page 7: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                      

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 415.0100 Concrete Pavement 10‐Inch SY $42.40 $45.40 $36.49 415.0105 Concrete Pavement 10 1/2‐Inch SY $34.85 $39.78 415.0110 Concrete Pavement 11‐Inch SY $44.26 $44.71 415.0115 Concrete Pavement 11 1/2‐Inch SY $55.17 415.0120 Concrete Pavement 12‐Inch SY $45.70 $43.13 $37.46 415.0125 Concrete Pavement 12 1/2‐Inch SY $40.34 $41.56 $51.23 415.0130 Concrete Pavement 13‐Inch SY 415.0135 Concrete Pavement 13 1/2‐Inch SY 415.0210 Concrete Pavement Gaps EACH $738.45 $813.60 $829.45 415.0310 Concrete Alley SY $48.55 $42.94 415.0410 Concrete Pavement Approach Slab SY $134.92 $141.85 $142.02 415.1080 Concrete Pavement HES 8‐Inch SY $38.95 $36.03 $42.14 415.1085 Concrete Pavement HES 8 1/2‐Inch SY $55.99 $46.14 $38.94 415.1090 Concrete Pavement HES 9‐Inch SY $46.28 $40.92 $71.83 415.1095 Concrete Pavement HES 9 1/2‐Inch SY $56.25 $44.33 $50.00 415.1100 Concrete Pavement HES 10‐Inch SY $48.22 $60.94 415.1105 Concrete Pavement HES 10 1/2‐Inch SY $76.69 415.1110 Concrete Pavement HES 11‐Inch SY $50.00 $80.65 415.1115 Concrete Pavement HES 11 1/2‐Inch SY 415.1120 Concrete Pavement HES 12‐Inch SY $41.68 415.1125 Concrete Pavement HES 12 1/2‐Inch SY $83.50 415.1130 Concrete Pavement HES 13‐Inch SY 415.1135 Concrete Pavement HES 13 1/2‐Inch SY 415.1150.S Concrete Pavement Fast Track (inch) SY $39.34 $89.55 415.1310 Concrete Alley HES SY 415.1410 Concrete Pavement Approach Slab HES SY $151.56 $160.52 $140.04 415.4100 Concrete Pavement Approach Joint Filling SY 415.5110.S Concrete Pavement Joint Layout LS 415.6000.S Rout and Seal LF $0.90 $0.76 $0.80 416.0160 Concrete Driveway 6‐Inch SY $41.25 $41.00 $43.85 416.0170 Concrete Driveway 7‐Inch SY $40.50 $44.41 $46.67 416.0180 Concrete Driveway 8‐Inch SY $46.52 $46.22 $44.99

Page 7

Page 8: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 416.0190 Concrete Driveway 9‐Inch SY $51.62 $49.58 $54.31 416.0260 Concrete Driveway HES 6‐Inch SY $45.83 $42.66 $47.87 416.0270 Concrete Driveway HES 7‐Inch SY $43.41 $47.51 $46.75 416.0280 Concrete Driveway HES 8‐Inch SY $56.01 $44.23 416.0290 Concrete Driveway HES 9‐Inch SY $49.25 $55.22 416.0512 Concrete Truck Apron 12‐Inch SY $51.48 $57.23 $56.58 416.0610 Drilled Tie Bars EACH $5.79 $6.98 $7.58 416.0620 Drilled Dowel Bars EACH $13.00 $11.68 $11.87 416.0623.S Pavement Dowel Bars Retrofit Warranted EACH 416.0750.S Conc Pvt Ptl Depth Repair Joint Repair LF $20.57 $15.62 $21.96 416.0752.S Conc Pvt Ptl Depth Repair Crack Repair LF $20.54 $14.94 $28.40 416.0754.S Conc Pvt Ptl Depth Repair Surface Repair SF $15.45 416.0756.S Conc Pvt Ptl Depth Repair Edge Repair LF $15.65 416.0758.S Conc Pvt Ptl Depth Repair Full Depth SF $36.47 $50.00 416.1010 Concrete Surface Drains CY $414.64 $517.67 $494.88 416.1015 Concrete Surface Drains HES CY $481.34 $450.00 $614.14 416.1110 Conc Shoulder Rumble Strips LF $0.35 $0.41 $0.32 416.1180 Conc Intersection Rumble Strips SY 416.1710 Concrete Pavement Repair SY $52.05 $61.18 $75.64 416.1715 Concrete Pavement Repair SHES SY $100.45 $108.69 $115.03 416.1720 Concrete Pavement Replacement SY $53.19 $68.27 $71.54 416.1725 Concrete Pavement Replacement SHES SY $96.88 $108.36 $97.73 420.1000 Continuous Diamond Grind Concrete Pvmnt SY $4.48 $4.70 440.4410 Incentive IRI Ride DOL $1.00 $1.00 440.5020 Incentive IRI Ride Bridge DOL $1.00 $1.00 450.1100.S Asphaltic Mixture For Extreme Conditions TON $8.00 450.4000 HMA Cold Weather Paving TON $2.08 $1.98 455.0500 Asphaltic Material Seal Coat TON 455.0505 Asphaltic Material Seal Coat GAL $4.33 455.0600 Tack Coat TON $0.01 455.0605 Tack Coat GAL $2.60 $2.52 $2.35 460.2000 Incentive Density HMA Pavement DOL $1.00 $1.00 $1.00

Page 8

Page 9: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 460.2005 Incentive Density PWL HMA Pavement DOL $1.00 460.2007 Incntve Density HMA Pvmt Longitudinal Jt DOL 460.2010 Incentive Air Voids HMA Pavement DOL $1.00 $1.00 460.4110.S Reheating HMA Pvmt Longitudinal Joints LF $0.18 $0.24 $0.18 460.5223 HMA Pavement 3 LT 58‐28 S TON $48.18 $51.30 460.5224 HMA Pavement 4 LT 58‐28 S TON $49.82 $51.06 460.5225 HMA Pavement 5 LT 58‐28 S TON $59.20 460.5243 HMA Pavement 3 LT 58‐34 S TON $172.00 460.5244 HMA Pavement 4 LT 58‐34 S TON $56.66 $55.82 460.5245 HMA Pavement 5 LT 58‐34 S TON 460.5424 HMA Pavement 4 LT 58‐28 H TON $74.29 460.5444 HMA Pavement 4 LT 58‐34 H TON 460.6222 HMA Pavement 2 MT 58‐28 S TON 460.6223 HMA Pavement 3 MT 58‐28 S TON $51.88 $53.10 460.6224 HMA Pavement 4 MT 58‐28 S TON $54.67 $55.72 460.6225 HMA Pavement 5 MT 58‐28 S TON $68.00 460.6242 HMA Pavement 2 MT 58‐34 S TON 460.6243 HMA Pavement 3 MT 58‐34 S TON $63.68 $65.46 460.6244 HMA Pavement 4 MT 58‐34 S TON $53.16 460.6245 HMA Pavement 5 MT 58‐34 S TON 460.6424 HMA Pavement 4 MT 58‐28 H TON $63.29 $65.39 460.6425 HMA Pavement 5 MT 58‐28 H TON $99.06 460.6443 HMA Pavement 3 MT 58‐34 H TON $85.59 460.6444 HMA Pavement 4 MT 58‐34 H TON $72.01 $62.60 460.6445 HMA Pavement 5 MT 58‐34 H TON $74.62 460.7222 HMA Pavement 2 HT 58‐28 S TON $53.69 $50.86 460.7223 HMA Pavement 3 HT 58‐28 S TON $60.20 $50.18 460.7224 HMA Pavement 4 HT 58‐28 S TON $123.35 $54.83 460.7225 HMA Pavement 5 HT 58‐28 S TON 460.7242 HMA Pavement 2 HT 58‐34 S TON 460.7243 HMA Pavement 3 HT 58‐34 S TON 460.7244 HMA Pavement 4 HT 58‐34 S TON

Page 9

Page 10: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 460.7245 HMA Pavement 5 HT 58‐34 S TON 460.7422 HMA Pavement 2 HT 58‐28 H TON 460.7423 HMA Pavement 3 HT 58‐28 H TON $77.60 $83.35 460.7424 HMA Pavement 4 HT 58‐28 H TON $64.05 $58.72 460.7425 HMA Pavement 5 HT 58‐28 H TON 460.7442 HMA Pavement 2 HT 58‐34 H TON 460.7443 HMA Pavement 3 HT 58‐34 H TON $87.25 460.7444 HMA Pavement 4 HT 58‐34 H TON $91.25 460.7445 HMA Pavement 5 HT 58‐34 H TON $63.23 460.7624 HMA Pavement 4 HT 58‐28 V TON $80.30 460.7625 HMA Pavement 5 HT 58‐28 V TON 460.7644 HMA Pavement 4 HT 58‐34 V TON $96.44 460.7645 HMA Pavement 5 HT 58‐34 V TON 460.8424 HMA Pavement 4 SMA 58‐28 H TON $93.90 $57.30 460.8425 HMA Pavement 5 SMA 58‐28 H TON 460.8444 HMA Pavement 4 SMA 58‐34 H TON $78.49 460.8445 HMA Pavement 5 SMA 58‐34 H TON 460.8624 HMA Pavement 4 SMA 58‐28 V TON $85.00 460.8625 HMA Pavement 5 SMA 58‐28 V TON 460.8644 HMA Pavement 4 SMA 58‐34 V TON 460.8645 HMA Pavement 5 SMA 58‐34 V TON 465.0105 Asphaltic Surface TON $85.39 $86.34 $80.39 465.0110 Asphaltic Surface Patching TON $91.49 $113.57 $100.51 465.0115 Asphaltic Surface Detours TON $97.19 $135.13 $66.91 465.0120 Asph Surface Driveways & Field Entrances TON $112.87 $113.53 $109.35 465.0125 Asphaltic Surface Temporary TON $76.37 $67.54 $61.94 465.0305 Asphaltic Surface Safety Islands TON $140.99 $112.68 $188.03 465.0310 Asphaltic Curb LF $12.26 $10.82 $7.50 465.0315 Asphaltic Flumes SY $47.06 $57.29 $50.74 465.0400 Asphaltic Shoulder Rumble Strips LF $0.18 $0.17 $0.18 465.0425 Asphalt Shoulder Rmble Strp 2‐Lane Rural LF $0.13 $0.23 $0.18 465.0450 Asphaltic Intersection Rumble Strips SY $57.11 $68.00 $60.20

Page 10

Page 11: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                       

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 465.0475 Asphalt Ctr Line Rmble Strp 2‐Lane Rural LF $0.27 $0.31 $0.26 475.0100 Seal Coat CY 475.0105 Seal Coat TON $47.32 492.2010.S Seal Cracks Joints with Hot Sealant GAL $190.47 $45.87 $700.00 495.0100.S Warranted HMA Pvt Overlay Mainline TON 495.0200.S Warranted HMA Pvt Ovrlay Ancillary TON 495.1000.S Cold Patch TON $312.00 501.1000.S Ice Hot Weather Concreting LB $0.75 $0.77 $0.17 502.0100 Concrete Masonry Bridges CY $571.24 $559.24 $562.72 502.0110.S Concrete Masonry Soldier Pile Footings CY 502.0120.S Non‐Shrink Grout CF 502.0200 Concrete Masonry Bridges HES CY $400.00 502.0717.S Crack Sealing Epoxy LF $3.89 $1.03 $10.28 502.1100 Concrete Masonry Seal CY $391.88 $371.01 $264.75 502.2000 Comp Joint Sealer Preformed Elastomeric LF $41.64 $51.82 $38.98 502.3100 Expansion Device (structure) LS $21,710.32 $24,256.60 $18,686.03 502.3110.S Expansion Device Modular (structure) LS $137,551.81 $104,300.00 $238,000.00 502.3200 Protective Surface Treatment SY $2.31 $2.88 $2.39 502.3210 Pigmented Surface Sealer SY $4.71 $4.96 502.3215.S Protective Surface Treatment Reseal SY $1.79 $1.95 $1.37 502.4104 Adhesive Anchors 1/2‐inch EACH 502.4105 Adhesive Anchors 5/8‐inch EACH $25.00 502.4106 Adhesive Anchors 3/4‐inch EACH $24.85 502.4107 Adhesive Anchors 7/8‐inch EACH 502.4108 Adhesive Anchors 1‐inch EACH $115.00 502.4109 Adhesive Anchors 1 1/8‐inch EACH 502.4110 Adhesive Anchors 1 1/4‐inch EACH 502.4111 Adhesive Anchors 1 3/8‐inch EACH 502.4112 Adhesive Anchors 1 1/2‐inch EACH 502.4200.S Ruptured Void Repair SY $250.00 502.4204 Adhesive Anchors No. 4 Bar EACH $33.47 502.4205 Adhesive Anchors No. 5 Bar EACH $15.53

Page 11

Page 12: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 502.4206 Adhesive Anchors No. 6 Bar EACH $23.99 502.4207 Adhesive Anchors No. 7 Bar EACH $28.95 502.4208 Adhesive Anchors No. 8 Bar EACH $26.22 502.4209 Adhesive Anchors No. 9 Bar EACH $30.63 502.4210 Adhesive Anchors No. 10 Bar EACH $62.00 502.6500 Protective Coating Clear GAL $150.45 $662.50 $475.00 503.0128 Prestressed Girder Type I 28‐Inch LF $130.59 $168.96 $138.53 503.0136 Prestressed Girder Type I 36‐Inch LF $193.52 $165.00 $158.24 503.0137 Prestressed Girder Type I 36W‐Inch LF $171.66 $158.21 $197.35 503.0145 Prestressed Girder Type I 45‐Inch LF $184.33 $174.30 503.0146 Prestressed Girder Type I 45W‐Inch LF $158.01 $165.02 $155.49 503.0154 Prestressed Girder Type I 54‐Inch LF 503.0155 Prestressed Girder Type I 54W‐Inch LF $159.14 $173.15 $161.81 503.0170 Prestressed Girder Type I 70‐Inch LF 503.0172 Prestressed Girder Type I 72W‐Inch LF $158.62 $206.10 $165.00 503.0182 Prestressed Girder Type I 82W‐Inch LF 503.0200.S Prestressed Girders Box (type) LF 503.0217 Prestressed Girder Box Type 17‐Inch LF 503.0221 Prestressed Girder Box Type 21‐Inch LF 503.0227 Prestressed Girder Box Type 27‐Inch LF 503.0233 Prestressed Girder Box Type 33‐Inch LF 503.0242 Prestressed Girder Box Type 42‐Inch LF 503.0312 Prestressed Girder Slab Type 12‐Inch LF 503.0400.S Precst Prestrss Concret Deck Pnl (struc) SF 503.1005.S Remov & Reset Prestrssd Girder (struct) LS 504.0100 Concrete Masonry Culverts CY $655.38 $476.89 $634.31 504.0200 Concrete Masonry Culverts HES CY $1,125.00 504.0500 Concrete Masonry Retaining Walls CY $643.90 $717.42 $444.01 504.0600 Concrete Masonry Retaining Walls HES CY 504.0900 Concrete Masonry Endwalls CY $853.29 $852.65 $934.29 504.1000.S Precast Conc Wingwalls (structure) LS $24,500.00 504.2000.S Precast Conc Box Culvert (ft X ft) LF $748.03 $1,617.66

Page 12

Page 13: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                    

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 505.0100 Bar Steel Reinforcement Structures LB $2.40 $0.84 505.0400 Bar Steel Reinforcement HS Structures LB $0.90 $0.88 505.0600 Bar Steel Reinforcemnt HS Coated Strctrs LB $0.96 $0.93 505.0800.S Bar Steel Reinf HS Stainless Structures LB $3.00 $2.55 $3.21 505.0904 Bar Couplers No. 4 EACH $27.16 $19.46 $34.39 505.0905 Bar Couplers No. 5 EACH $24.87 $15.54 $21.41 505.0906 Bar Couplers No. 6 EACH $38.22 $37.23 $37.83 505.0907 Bar Couplers No. 7 EACH $46.25 $47.06 $32.94 505.0908 Bar Couplers No. 8 EACH $55.71 $54.47 $59.33 505.0909 Bar Couplers No. 9 EACH $70.00 $72.42 505.0910 Bar Couplers No. 10 EACH $113.20 505.0911 Bar Couplers No. 11 EACH $91.30 505.0984.S Bar Couplers Stainless No. 4 EACH 505.0985.S Bar Couplers Stainless No. 5 EACH 505.0986.S Bar Couplers Stainless No. 6 EACH 505.0987.S Bar Couplers Stainless No. 7 EACH 505.0988.S Bar Couplers Stainless No. 8 EACH 505.0989.S Bar Couplers Stainless No. 9 EACH 505.0990.S Bar Couplers Stainless No. 10 EACH 505.0991.S Bar Couplers Stainless No. 11 EACH 505.1000.S Grouted Bar Couplers EACH 506.0105 Structural Steel Carbon LB $4.13 $5.79 $3.01 506.0605 Structural Steel HS LB $1.16 $2.12 $1.19 506.1005 Castings Steel LB 506.1010 Castings Bronze LB 506.1105 Forgings Steel Carbon LB 506.1405 Lubricated Plates Bronze LB 506.1505 Sheet Copper LB 506.1510 Sheet Zinc LB 506.2105 Bearing Pads SF 506.2605 Bearing Pads Elastomeric Non‐Laminated EACH $73.18 $84.24 $91.10 506.2610 Bearing Pads Elastomeric Laminated EACH $1,050.92 $997.48 $869.44

Page 13

Page 14: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 506.3003 Welded Stud Shear Connectors 5/8x4‐Inch EACH 506.3004 Welded Stud Shear Connectors 3/4x4‐Inch EACH $20.00 506.3005 Welded Stud Shear Connectors 7/8x4‐Inch EACH $41.50 506.3008 Welded Stud Shear Connectors 5/8x5‐Inch EACH $6.33 506.3009 Welded Stud Shear Connectors 3/4x5‐Inch EACH 506.3010 Welded Stud Shear Connectors 7/8x5‐Inch EACH $3.10 $9.32 506.3013 Welded Stud Shear Connectors 5/8x6‐Inch EACH 506.3014 Welded Stud Shear Connectors 3/4x6‐Inch EACH $11.00 506.3015 Welded Stud Shear Connectors 7/8x6‐Inch EACH $5.73 $3.67 $4.08 506.3018 Welded Stud Shear Connectors 5/8x7‐Inch EACH 506.3019 Welded Stud Shear Connectors 3/4x7‐Inch EACH 506.3020 Welded Stud Shear Connectors 7/8x7‐Inch EACH $3.58 $3.51 $3.75 506.3023 Welded Stud Shear Connectors 5/8x8‐Inch EACH 506.3024 Welded Stud Shear Connectors 3/4x8‐Inch EACH 506.3025 Welded Stud Shear Connectors 7/8x8‐Inch EACH $11.75 $3.51 $3.80 506.3030 Welded Stud Shear Connectors 7/8x9‐Inch EACH $3.51 506.3035 Welded Stud Shear Connectors 7/8x10‐Inch EACH 506.4000 Steel Diaphragms (structure) EACH $725.14 $854.86 $834.33 506.5000 Bearing Assemblies Fixed (structure) EACH $2,079.17 $2,123.74 $1,150.74 506.6000 Bearing Assemblies Expansion (structure) EACH $1,361.17 $1,671.80 $1,300.55 506.7000.S Bearing Replacement (structure) EACH $1,800.00 506.7050.S Removing Bearings (structure) EACH $665.35 $956.36 $1,146.99 506.7060.S Bridge Jacking (structure) LS $15,000.01 $35,000.00 506.7070.S Hinge Replacement EACH 506.8005.S Prefab Steel Truss Ped Brdge LRFD (strc) LS $531,000.00 $941,307.50 $300,000.00 507.0200 Treated Lumber and Timber MBM $8,428.01 $2,732.07 $3,507.50 509.0200 Preparation Approaches SY $217.39 509.0301 Preparation Decks Type 1 SY $127.26 $110.27 $123.41 509.0302 Preparation Decks Type 2 SY $148.89 $131.87 $130.56 509.0400.S Cleaning Concrete Surfaces SY 509.0500 Cleaning Decks SY $13.66 $12.63 $11.38 509.0600 Cleaning Approaches SY $12.93 $25.00

Page 14

Page 15: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                       

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 509.1000 Joint Repair SY $980.81 $950.76 $930.09 509.1200 Curb Repair LF $42.65 $60.50 $69.07 509.1500 Concrete Surface Repair SF $114.58 $112.58 $105.32 509.2000 Full‐Depth Deck Repair SY $253.98 $289.63 $233.84 509.2100.S Concrete Masonry Deck Repair SY 509.2500 Concrete Masonry Overlay Decks CY $625.31 $620.57 $595.01 509.2600 Concrete Masonry Overlay Approaches CY $650.00 $783.95 $638.00 509.3500.S HMA Overlay Polymer‐Modified TON $440.00 $688.98 $978.46 509.5100.S Polymer Overlay SY $32.94 $35.94 $28.17 509.9005.S Remov Concret Masnry Deck Ovrlay (struc) SY $13.66 $20.18 $15.17 509.9010.S Remov Asphalt Concret Dck Ovrlay (struc) SY $10.34 $10.05 $6.74 509.9020.S Epoxy Crack Sealing LF $111.82 $76.33 $27.15 509.9025.S Epoxy Injection Crack Repair LF $200.00 $78.05 509.9026.S Cored Holes 2‐Inch Diameter EACH $500.00 $365.71 509.9050.S Cleaning Parapets LF $12.24 $8.48 $6.68 511.1100 Temporary Shoring SF $16.59 $16.27 $21.44 511.1200 Temporary Shoring (structure) SF $30.50 $27.25 $30.58 511.1300 Temporary Shoring (location) SF $6.12 $4.53 $0.01 511.2200 Temp Shoring Left in Place (structure) SF $37.36 $27.81 $50.00 511.2300 Temp Shoring Left in Place (location) SF $0.52 $35.25 512.0500 Piling Steel Sheet Permanent Delivered SF $29.65 $20.03 $19.88 512.0600 Piling Steel Sheet Permanent Driven SF $2.52 $4.59 $2.97 512.1000 Piling Steel Sheet Temporary SF $15.47 $8.47 $20.00 513.2001 Railing Pipe (structure) LF $110.00 $121.25 513.2050.S Railing Pipe LF $144.41 $96.37 $115.70 513.4051 Railing Tubular Type F (structure) LF 513.4056 Railing Tubular Type H (structure) LF $107.01 $260.00 513.4061 Railing Tubular Type M (structure) LF $227.28 $203.16 513.4066 Railing Tubular Type PF (structure) LF 513.4091 Railing Tubular Screening (structure) LF $143.63 $137.12 513.7006 Railing Steel Type C1 (structure) LF $41,000.00 $180.00 513.7011 Railing Steel Type C2 (structure) LF $150.00 $119.62

Page 15

Page 16: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 513.7016 Railing Steel Type C3 (structure) LF $139.44 $162.04 513.7021 Railing Steel Type C4 (structure) LF 513.7026 Railing Steel Type C5 (structure) LF 513.7031 Railing Steel Type C6 (structure) LF $160.00 513.7051 Railing Steel Type W (structure) LF $72.97 513.7083 Railing Steel Type NY3 (structure) LF $330.00 513.7084 Railing Steel Type NY4 (structure) LF $183.59 513.8006 Railing Steel Pedestrian Type C1 (struc) LF $127.27 513.8011 Railing Steel Pedestrian Type C2 (struc) LF $214.07 513.8016 Railing Steel Pedestrian Type C3 (struc) LF $250.00 $171.81 513.8021 Railing Steel Pedestrian Type C4 (struc) LF 513.8026 Railing Steel Pedestrian Type C5 (struc) LF 513.8031 Railing Steel Pedestrian Type C6 (struc) LF 513.9005.S Remov & Reset Tubular Railng (structure) LS $15,500.00 $10,975.00 $5,000.00 514.0445 Floor Drains Type GC EACH $1,690.00 $1,100.00 $1,270.91 514.0450 Floor Drains Type WF EACH $2,091.67 $1,677.72 $1,752.00 514.0460 Floor Drains Type H EACH $2,000.00 $1,800.00 514.0900 Adjusting Floor Drains EACH $350.00 $657.29 514.1000 RR Deck Drains System (rr structure) LS 514.2608 Downspout 8‐Inch LF $202.21 $160.58 $192.74 514.2625 Downspout 6‐Inch LF $167.42 $171.52 $163.78 515.4000 Steel Grid Floor Open (inch) SF 515.5000 Steel Grid Floor Concrete Filled (inch) SF 516.0100 Dampproofing SY $10.82 $11.34 $11.70 516.0500 Rubberized Membrane Waterproofing SY $25.98 $28.92 $31.53 516.0600.S Sheet Membrane Waterproofing SY $35.00 516.0610.S Sheet Membrane Waterproof Top Slab (str) SY $48.53 $41.35 $54.00 517.0600 Painting Epoxy System (structure) LS $79,362.13 $44,112.61 $60,521.88 517.0650.S Painting Polysiloxane System (structure) LS $177,578.75 517.0700.S Painting Vinyl System (structure) LS 517.0900.S Prep and Coat of Top Flanges (structure) LS $6,310.00 $8,732.08 $10,990.29 517.1000 Paint Epoxy Sys Steel Truss (structure) LS $16,000.00

Page 16

Page 17: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                             

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 517.1000.S Struct Repaint Organic Zinc Rich System LS $47,000.00 517.1010.S Concrete Staining (structure) SF $1.09 $1.28 $1.08 517.1015.S Concrete Staining Multi‐Color (structur) SF $3.14 $2.87 $2.59 517.1050.S Architecturl Surfce Treatmnt (structure) SF $4.44 $3.35 $2.98 517.1800.S Struct Repaint Recycld Abrasive (struct) LS $188,083.57 $152,500.31 $221,864.56 517.2000.S Painting Warranted (structure) LS 517.3000.S Struct Overcoating Cleaning and Priming LS $44,397.50 $32,656.67 $34,356.15 517.4000.S Containment&Collection Waste Materials LS $28,603.00 $9,991.25 $6,025.00 517.4500.S Neg Pres Contain&Collect Waste Matrials LS $48,085.00 $74,267.94 $84,760.90 517.6001.S Portable Decontamination Facility EACH $1,611.11 $2,283.33 $1,540.54 520.1012 Apron Endwalls for Culvert Pipe 12‐Inch EACH $249.88 $169.10 $512.17 520.1015 Apron Endwalls for Culvert Pipe 15‐Inch EACH $257.67 $264.18 $569.76 520.1018 Apron Endwalls for Culvert Pipe 18‐Inch EACH $370.96 $278.45 $281.53 520.1021 Apron Endwalls for Culvert Pipe 21‐Inch EACH $292.72 520.1024 Apron Endwalls for Culvert Pipe 24‐Inch EACH $368.96 $281.50 $539.88 520.1030 Apron Endwalls for Culvert Pipe 30‐Inch EACH $322.79 $554.87 $557.03 520.1036 Apron Endwalls for Culvert Pipe 36‐Inch EACH $531.25 $784.52 $743.34 520.1042 Apron Endwalls for Culvert Pipe 42‐Inch EACH $1,039.87 $838.50 520.1048 Apron Endwalls for Culvert Pipe 48‐Inch EACH $1,214.10 $898.28 520.1054 Apron Endwalls for Culvert Pipe 54‐Inch EACH $1,076.00 520.1060 Apron Endwalls for Culvert Pipe 60‐Inch EACH $1,600.00 520.1072 Apron Endwalls for Culvert Pipe 72‐Inch EACH 520.1084 Apron Endwalls for Culvert Pipe 84‐Inch EACH 520.2012 Culvert Pipe Temporary 12‐Inch LF $24.56 $35.32 520.2015 Culvert Pipe Temporary 15‐Inch LF $31.29 520.2018 Culvert Pipe Temporary 18‐Inch LF $51.29 $29.55 520.2021 Culvert Pipe Temporary 21‐Inch LF 520.2024 Culvert Pipe Temporary 24‐Inch LF $50.24 $37.59 520.2030 Culvert Pipe Temporary 30‐Inch LF $51.00 520.2036 Culvert Pipe Temporary 36‐Inch LF $76.64 520.2042 Culvert Pipe Temporary 42‐Inch LF 520.2048 Culvert Pipe Temporary 48‐Inch LF

Page 17

Page 18: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 520.2054 Culvert Pipe Temporary 54‐Inch LF 520.2060 Culvert Pipe Temporary 60‐Inch LF $120.00 520.2072 Culvert Pipe Temporary 72‐Inch LF 520.2084 Culvert Pipe Temporary 84‐Inch LF 520.3142 Culvert Pipe Class III 42‐Inch LF $83.75 520.3148 Culvert Pipe Class III 48‐Inch LF $118.31 $107.00 520.3154 Culvert Pipe Class III 54‐Inch LF $109.00 520.3160 Culvert Pipe Class III 60‐Inch LF 520.3172 Culvert Pipe Class III 72‐Inch LF 520.3184 Culvert Pipe Class III 84‐Inch LF 520.3312 Culvert Pipe Class III‐A 12‐Inch LF $31.75 $36.16 520.3315 Culvert Pipe Class III‐A 15‐Inch LF $30.56 $50.45 520.3318 Culvert Pipe Class III‐A 18‐Inch LF $37.16 $41.46 520.3321 Culvert Pipe Class III‐A 21‐Inch LF 520.3324 Culvert Pipe Class III‐A 24‐Inch LF $65.55 $53.36 520.3327 Culvert Pipe Class III‐A 27‐Inch LF 520.3330 Culvert Pipe Class III‐A 30‐Inch LF $86.08 $61.35 520.3336 Culvert Pipe Class III‐A 36‐Inch LF $110.00 $108.99 520.3412 Culvert Pipe Class III‐A Non‐metal 12‐In LF $23.05 $25.00 520.3415 Culvert Pipe Class III‐A Non‐metal 15‐In LF $25.50 520.3418 Culvert Pipe Class III‐A Non‐metal 18‐In LF $30.00 $28.00 520.3421 Culvert Pipe Class III‐A Non‐metal 21‐In LF 520.3424 Culvert Pipe Class III‐A Non‐metal 24‐In LF $118.64 520.3427 Culvert Pipe Class III‐A Non‐metal 27‐In LF 520.3430 Culvert Pipe Class III‐A Non‐metal 30‐In LF $104.39 520.3436 Culvert Pipe Class III‐A Non‐metal 36‐In LF $214.50 520.3512 Culvert Pipe Class III‐B 12‐Inch LF $26.00 520.3515 Culvert Pipe Class III‐B 15‐Inch LF $28.00 520.3518 Culvert Pipe Class III‐B 18‐Inch LF $33.94 520.3521 Culvert Pipe Class III‐B 21‐Inch LF 520.3524 Culvert Pipe Class III‐B 24‐Inch LF $38.14 $38.13 520.3527 Culvert Pipe Class III‐B 27‐Inch LF

Page 18

Page 19: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 520.3530 Culvert Pipe Class III‐B 30‐Inch LF $50.00 520.3536 Culvert Pipe Class III‐B 36‐Inch LF $86.44 $61.60 520.3612 Culvert Pipe Class III‐B Non‐metal 12‐In LF 520.3615 Culvert Pipe Class III‐B Non‐metal 15‐In LF 520.3618 Culvert Pipe Class III‐B Non‐metal 18‐In LF 520.3621 Culvert Pipe Class III‐B Non‐metal 21‐In LF 520.3624 Culvert Pipe Class III‐B Non‐metal 24‐In LF 520.3627 Culvert Pipe Class III‐B Non‐metal 27‐In LF 520.3630 Culvert Pipe Class III‐B Non‐metal 30‐In LF 520.3636 Culvert Pipe Class III‐B Non‐metal 36‐In LF 520.4012 Culvert Pipe Temporary 12‐Inch LF $33.99 $23.92 520.4015 Culvert Pipe Temporary 15‐Inch LF $33.98 $82.50 520.4018 Culvert Pipe Temporary 18‐Inch LF $42.73 $42.72 $45.80 520.4021 Culvert Pipe Temporary 21‐Inch LF 520.4024 Culvert Pipe Temporary 24‐Inch LF $39.72 $53.61 $39.00 520.4030 Culvert Pipe Temporary 30‐Inch LF $56.63 $69.49 $62.94 520.4036 Culvert Pipe Temporary 36‐Inch LF $112.89 $73.00 520.4042 Culvert Pipe Temporary 42‐Inch LF $234.49 520.4048 Culvert Pipe Temporary 48‐Inch LF $137.71 $83.25 520.4054 Culvert Pipe Temporary 54‐Inch LF 520.4060 Culvert Pipe Temporary 60‐Inch LF 520.4072 Culvert Pipe Temporary 72‐Inch LF 520.4084 Culvert Pipe Temporary 84‐Inch LF 520.4112 Culvert Pipe Class IV 12‐Inch LF $41.46 520.4115 Culvert Pipe Class IV 15‐Inch LF $20.00 $43.26 520.4118 Culvert Pipe Class IV 18‐Inch LF $47.72 520.4121 Culvert Pipe Class IV 21‐Inch LF 520.4124 Culvert Pipe Class IV 24‐Inch LF $30.00 $58.10 520.4130 Culvert Pipe Class IV 30‐Inch LF $71.40 520.4136 Culvert Pipe Class IV 36‐Inch LF 520.4142 Culvert Pipe Class IV 42‐Inch LF 520.4148 Culvert Pipe Class IV 48‐Inch LF

Page 19

Page 20: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 520.4154 Culvert Pipe Class IV 54‐Inch LF 520.4160 Culvert Pipe Class IV 60‐Inch LF 520.4172 Culvert Pipe Class IV 72‐Inch LF 520.4184 Culvert Pipe Class IV 84‐Inch LF 520.5112 Culvert Pipe Class V 12‐Inch LF 520.5115 Culvert Pipe Class V 15‐Inch LF $54.82 520.5118 Culvert Pipe Class V 18‐Inch LF 520.5121 Culvert Pipe Class V 21‐Inch LF 520.5124 Culvert Pipe Class V 24‐Inch LF 520.5130 Culvert Pipe Class V 30‐Inch LF 520.5136 Culvert Pipe Class V 36‐Inch LF 520.5142 Culvert Pipe Class V 42‐Inch LF 520.5148 Culvert Pipe Class V 48‐Inch LF 520.5154 Culvert Pipe Class V 54‐Inch LF 520.5160 Culvert Pipe Class V 60‐Inch LF 520.5172 Culvert Pipe Class V 72‐Inch LF 520.5184 Culvert Pipe Class V 84‐Inch LF 520.8000 Concrete Collars for Pipe EACH $507.69 $416.32 $488.00 520.8500 Pipe Cattle Pass LF $160.65 $242.00 520.8700 Cleaning Culvert Pipes EACH $392.92 $781.63 520.9700.S Culvert Pipe Liners (size) LF $152.72 $119.49 $140.81 520.9750.S Clean Culvrt Pipe for Liner Verification EACH $534.60 $385.79 $655.13 521.0112 Culvert Pipe Corrugated Steel 12‐Inch LF 521.0115 Culvert Pipe Corrugated Steel 15‐Inch LF 521.0118 Culvert Pipe Corrugated Steel 18‐Inch LF 521.0121 Culvert Pipe Corrugated Steel 21‐Inch LF 521.0124 Culvert Pipe Corrugated Steel 24‐Inch LF 521.0130 Culvert Pipe Corrugated Steel 30‐Inch LF 521.0136 Culvert Pipe Corrugated Steel 36‐Inch LF 521.0142 Culvert Pipe Corrugated Steel 42‐Inch LF 521.0148 Culvert Pipe Corrugated Steel 48‐Inch LF 521.0154 Culvert Pipe Corrugated Steel 54‐Inch LF

Page 20

Page 21: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 521.0160 Culvert Pipe Corrugated Steel 60‐Inch LF 521.0172 Culvert Pipe Corrugated Steel 72‐Inch LF 521.0184 Culvert Pipe Corrugated Steel 84‐Inch LF 521.0196 Culvert Pipe Corrugated Steel 96‐Inch LF 521.0336 Apr Endwls Slpd Cross Drn St 36in 4 to 1 EACH $2,618.00 $2,421.72 $2,190.00 521.0342 Apr Endwls Slpd Cross Drn St 42in 4 to 1 EACH $2,300.00 $2,936.37 521.0348 Apr Endwls Slpd Cross Drn St 48in 4 to 1 EACH $2,800.00 $4,132.73 521.0354 Apr Endwls Slpd Cross Drn St 54in 4 to 1 EACH 521.0360 Apr Endwls Slpd Cross Drn St 60in 4 to 1 EACH 521.0436 Aprn End Culv Pipe Slpd X‐Drn 36‐In 6‐1 EACH 521.0442 Aprn End Culv Pipe Slpd X‐Drn 42‐In 6‐1 EACH $3,865.45 521.0448 Aprn End Culv Pipe Slpd X‐Drn 48‐In 6‐1 EACH $5,790.21 521.0454 Aprn End Culv Pipe Slpd X‐Drn 54‐In 6‐1 EACH 521.0460 Aprn End Culv Pipe Slpd X‐Drn 60‐In 6‐1 EACH 521.0535 Apr End Pipe Arc Slp X‐Drn Stl 35x24 4‐1 EACH 521.0542 Apr End Pipe Arc Slp X‐Drn Stl 42x29 4‐1 EACH $2,532.63 521.0549 Apr End Pipe Arc Slp X‐Drn Stl 49x33 4‐1 EACH 521.0557 Apr End Pipe Arc Slp X‐Drn Stl 57x38 4‐1 EACH 521.0564 Apr End Pipe Arc Slp X‐Drn Stl 64x43 4‐1 EACH $5,164.00 521.0571 Apr End Pipe Arc Slp X‐Drn Stl 71x47 4‐1 EACH 521.0635 Apr End Pipe Arc Slp X‐Drn St 35x24" 6‐1 EACH 521.0642 Apr End Pipe Arc Slp X‐Drn St 42x29" 6‐1 EACH 521.0649 Apr End Pipe Arc Slp X‐Drn St 49x33" 6‐1 EACH 521.0657 Apr End Pipe Arc Slp X‐Drn St 57x38" 6‐1 EACH 521.0664 Apr End Pipe Arc Slp X‐Drn St 64x43" 6‐1 EACH 521.0671 Apr End Pipe Arc Slp X‐Drn St 71x47" 6‐1 EACH 521.0717 Pipe Arch Corrugated Steel 17x13‐Inch LF 521.0721 Pipe Arch Corrugated Steel 21x15‐Inch LF 521.0724 Pipe Arch Corrugated Steel 24x18‐Inch LF 521.0728 Pipe Arch Corrugated Steel 28x20‐Inch LF 521.0735 Pipe Arch Corrugated Steel 35x24‐Inch LF 521.0742 Pipe Arch Corrugated Steel 42x29‐Inch LF

Page 21

Page 22: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 521.0749 Pipe Arch Corrugated Steel 49x33‐Inch LF 521.0757 Pipe Arch Corrugated Steel 57x38‐Inch LF 521.0764 Pipe Arch Corrugated Steel 64x43‐Inch LF 521.0771 Pipe Arch Corrugated Steel 71x47‐Inch LF 521.0777 Pipe Arch Corrugated Steel 77x52‐Inch LF 521.0783 Pipe Arch Corrugated Steel 83x57‐Inch LF 521.1012 Apr Endwls for Culvert Pipe Steel 12‐In EACH $185.15 $196.27 $154.49 521.1015 Apr Endwls for Culvert Pipe Steel 15‐In EACH $198.27 $177.89 $184.64 521.1018 Apr Endwls for Culvert Pipe Steel 18‐In EACH $247.61 $213.17 $174.81 521.1021 Apr Endwls for Culvert Pipe Steel 21‐In EACH $197.20 521.1024 Apr Endwls for Culvert Pipe Steel 24‐In EACH $249.17 $256.48 $262.78 521.1030 Apr Endwls for Culvert Pipe Steel 30‐In EACH $396.09 $354.76 $449.28 521.1036 Apr Endwls for Culvert Pipe Steel 36‐In EACH $556.39 $509.35 $586.91 521.1042 Apr Endwls for Culvert Pipe Steel 42‐In EACH $883.00 $901.96 $982.86 521.1048 Apr Endwls for Culvert Pipe Steel 48‐In EACH $941.67 $937.28 $1,043.56 521.1054 Apr Endwls for Culvert Pipe Steel 54‐In EACH $1,219.00 $1,150.00 521.1060 Apr Endwls for Culvert Pipe Steel 60‐In EACH $1,463.06 $1,555.00 $1,620.50 521.1072 Apr Endwls for Culvert Pipe Steel 72‐In EACH $2,328.00 $1,750.00 521.1084 Apr Endwls for Culvert Pipe Steel 84‐In EACH 521.1217 Apr Endwls for Pipe Arch Steel 17x13‐In EACH $253.00 521.1221 Apr Endwls for Pipe Arch Steel 21x15‐In EACH $287.15 $215.00 $533.25 521.1224 Apr Endwls for Pipe Arch Steel 24x18‐In EACH $345.00 $236.00 521.1228 Apr Endwls for Pipe Arch Steel 28x20‐In EACH $242.60 $377.92 $369.86 521.1235 Apr Endwls for Pipe Arch Steel 35x24‐In EACH $349.92 $385.77 $650.00 521.1242 Apr Endwls for Pipe Arch Steel 42x29‐In EACH $556.98 $355.84 521.1249 Apr Endwls for Pipe Arch Steel 49x33‐In EACH $764.00 $720.14 $660.00 521.1257 Apr Endwls for Pipe Arch Steel 57x38‐In EACH $750.00 $739.33 $735.37 521.1264 Apr Endwls for Pipe Arch Steel 64x43‐In EACH $962.50 $1,135.00 521.1271 Apr Endwls for Pipe Arch Steel 71x47‐In EACH $2,884.00 521.1277 Apr Endwls for Pipe Arch Steel 77x52‐In EACH $1,837.88 521.1283 Apr Endwls for Pipe Arch Steel 83x57‐In EACH $1,350.00 $2,309.98 521.1502 Aprn End Cul Pipe Slp Side Drn 15‐In 4‐1 EACH $555.69 $456.82

Page 22

Page 23: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 521.1503 Aprn End Cul Pip Slp Side Dran 18‐In 4‐1 EACH $369.23 $590.53 $392.50 521.1504 Aprn End Cul Pipe Slp Side Drn 21‐In 4‐1 EACH 521.1505 Aprn End Cul Pipe Slp Side Drn 24‐In 4‐1 EACH $805.38 $662.82 521.1506 Aprn End Cul Pipe Slp Side Drn 30‐In 4‐1 EACH $1,557.94 521.1507 Aprn End Cul Pipe Slp Side Drn 36‐In 4‐1 EACH $1,853.63 521.1508 Aprn End Cul Pipe Slp Side Drn 42‐In 4‐1 EACH 521.1509 Aprn End Cul Pipe Slp Side Drn 48‐In 4‐1 EACH 521.1510 Aprn End Cul Pipe Slp Side Drn 54‐In 4‐1 EACH 521.1511 Aprn End Cul Pipe Slp Side Drn 60‐In 4‐1 EACH 521.1515 Aprn End Cul Pipe Slp Side Drn 15‐In 6‐1 EACH $385.00 $330.17 $586.41 521.1518 Aprn End Cul Pipe Slp Side Drn 18‐In 6‐1 EACH $497.07 $419.96 $401.99 521.1521 Aprn End Cul Pipe Slp Side Drn 21‐In 6‐1 EACH $602.15 521.1524 Aprn End Cul Pipe Slp Side Drn 24‐In 6‐1 EACH $704.97 $701.65 $613.17 521.1530 Aprn End Cul Pipe Slp Side Drn 30‐In 6‐1 EACH $1,813.33 $2,088.68 521.1536 Aprn End Cul Pipe Slp Side Drn 36‐In 6‐1 EACH $2,561.89 $2,625.00 521.1542 Aprn End Cul Pipe Slp Side Drn 42‐In 6‐1 EACH $2,800.00 521.1548 Aprn End Cul Pipe Slp Side Drn 48‐In 6‐1 EACH $4,925.00 521.1554 Aprn End Cul Pipe Slp Side Drn 54‐In 6‐1 EACH 521.1560 Aprn End Cul Pipe Slp Side Drn 60‐In 6‐1 EACH 521.1615 Aprn End Cul Pipe Slp Side Drn 15in 10‐1 EACH $1,111.00 521.1618 Aprn End Cul Pipe Slp Side Drn 18in 10‐1 EACH $1,122.53 $300.00 $1,155.00 521.1621 Aprn End Cul Pipe Slp Side Drn 21in 10‐1 EACH 521.1624 Aprn End Cul Pipe Slp Side Drn 24in 10‐1 EACH $1,633.32 $2,200.00 521.1630 Aprn End Cul Pipe Slp Side Drn 30in 10‐1 EACH $3,110.00 521.1636 Aprn End Cul Pipe Slp Side Drn 36in 10‐1 EACH $600.00 521.1704 Aprn End Pipe Arc Slp Side Drn 17x13 4‐1 EACH 521.1705 Aprn End Pipe Arc Slp Side Drn 21x15 4‐1 EACH 521.1706 Aprn End Pipe Arc Slp Side Drn 24x18 4‐1 EACH 521.1707 Aprn End Pipe Arc Slp Side Drn 28x20 4‐1 EACH 521.1708 Aprn End Pipe Arc Slp Side Drn 35x24 4‐1 EACH $1,325.00 521.1709 Aprn End Pipe Arc Slp Side Drn 42x29 4‐1 EACH 521.1710 Aprn End Pipe Arc Slp Side Drn 49x33 4‐1 EACH

Page 23

Page 24: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 521.1711 Aprn End Pipe Arc Slp Side Drn 57x38 4‐1 EACH 521.1712 Aprn End Pipe Arc Slp Side Drn 64x43 4‐1 EACH 521.1717 Apr End Pipe Arc Slp Side Drn 17x13" 6‐1 EACH 521.1721 Apr End Pipe Arc Slp Side Drn 21x15" 6‐1 EACH $769.46 521.1724 Apr End Pipe Arc Slp Side Drn 24x18" 6‐1 EACH 521.1728 Apr End Pipe Arc Slp Side Drn 28x20" 6‐1 EACH $855.20 $666.50 521.1735 Apr End Pipe Arc Slp Side Drn 35x24" 6‐1 EACH $1,317.00 521.1742 Apr End Pipe Arc Slp Side Drn 42x29" 6‐1 EACH 521.1749 Apr End Pipe Arc Slp Side Drn 49x33" 6‐1 EACH 521.1757 Apr End Pipe Arc Slp Side Drn 57x38" 6‐1 EACH $4,200.00 $4,345.00 521.1764 Apr End Pipe Arc Slp Side Drn 64x43" 6‐1 EACH 521.1817 Apr End Pipe Arc Slp Side Drn 17x13 10‐1 EACH 521.1821 Apr End Pipe Arc Slp Side Drn 21x15 10‐1 EACH 521.1824 Apr End Pipe Arc Slp Side Drn 24x18 10‐1 EACH 521.1828 Apr End Pipe Arc Slp Side Drn 28x20 10‐1 EACH 521.1835 Apr End Pipe Arc Slp Side Drn 35x24 10‐1 EACH 521.1842 Apr End Pipe Arc Slp Side Drn 42x29 10‐1 EACH 521.1900 Pipe Cattle Pass Corrugated Steel LF $190.00 $141.90 521.2005.S Surface Drain Pipe Corr Metal Slotted LF $85.11 $101.26 $88.89 521.3112 Culvert Pipe Corrugated Steel 12‐Inch LF $28.11 $32.14 $33.73 521.3115 Culvert Pipe Corrugated Steel 15‐Inch LF $30.30 $28.14 $30.53 521.3118 Culvert Pipe Corrugated Steel 18‐Inch LF $35.79 $36.80 $33.76 521.3121 Culvert Pipe Corrugated Steel 21‐Inch LF $38.36 521.3124 Culvert Pipe Corrugated Steel 24‐Inch LF $36.96 $41.62 $48.41 521.3130 Culvert Pipe Corrugated Steel 30‐Inch LF $58.84 $55.65 $58.51 521.3136 Culvert Pipe Corrugated Steel 36‐Inch LF $65.21 $66.45 $84.80 521.3142 Culvert Pipe Corrugated Steel 42‐Inch LF $89.14 $102.33 521.3148 Culvert Pipe Corrugated Steel 48‐Inch LF $105.70 $235.78 $90.12 521.3154 Culvert Pipe Corrugated Steel 54‐Inch LF $102.00 $194.27 521.3160 Culvert Pipe Corrugated Steel 60‐Inch LF $89.49 $110.00 $179.12 521.3172 Culvert Pipe Corrugated Steel 72‐Inch LF $900.00 521.3184 Culvert Pipe Corrugated Steel 84‐Inch LF

Page 24

Page 25: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 521.3196 Culvert Pipe Corrugated Steel 96‐Inch LF 521.3717 Pipe Arch Corrugated Steel 17x13‐Inch LF $43.00 521.3721 Pipe Arch Corrugated Steel 21x15‐Inch LF $46.56 $46.63 $50.86 521.3724 Pipe Arch Corrugated Steel 24x18‐Inch LF $78.00 $147.00 521.3728 Pipe Arch Corrugated Steel 28x20‐Inch LF $42.43 $40.00 $53.30 521.3735 Pipe Arch Corrugated Steel 35x24‐Inch LF $49.45 $35.87 521.3742 Pipe Arch Corrugated Steel 42x29‐Inch LF $74.92 $56.00 521.3749 Pipe Arch Corrugated Steel 49x33‐Inch LF $133.50 521.3757 Pipe Arch Corrugated Steel 57x38‐Inch LF $84.00 $83.25 $87.51 521.3764 Pipe Arch Corrugated Steel 64x43‐Inch LF $95.92 $103.95 521.3771 Pipe Arch Corrugated Steel 71x47‐Inch LF $151.25 521.3777 Pipe Arch Corrugated Steel 77x52‐Inch LF 521.3783 Pipe Arch Corrugated Steel 83x57‐Inch LF $119.00 521.5112 Culv Pipe Corr Stl Polymer Coated 12‐In LF $60.00 521.5115 Culv Pipe Corr Stl Polymer Coated 15‐In LF $40.61 521.5118 Culv Pipe Corr Stl Polymer Coated 18‐In LF $37.00 $40.25 521.5121 Culv Pipe Corr Stl Polymer Coated 21‐In LF 521.5124 Culv Pipe Corr Stl Polymer Coated 24‐In LF $71.64 $58.59 521.5130 Culv Pipe Corr Stl Polymer Coated 30‐In LF $187.67 521.5136 Culv Pipe Corr Stl Polymer Coated 36‐In LF $99.00 521.5142 Culv Pipe Corr Stl Polymer Coated 42‐In LF 521.5148 Culv Pipe Corr Stl Polymer Coated 48‐In LF 521.5154 Culv Pipe Corr Stl Polymer Coated 54‐In LF 521.5160 Culv Pipe Corr Stl Polymer Coated 60‐In LF 521.5172 Culv Pipe Corr Stl Polymer Coated 72‐In LF 521.5184 Culv Pipe Corr Stl Polymer Coated 84‐In LF 521.5196 Culv Pipe Corr Stl Polymer Coated 96‐In LF $272.00 521.5717 Pipe Arch Polymer Coated Corr Stl 17x13 LF 521.5721 Pipe Arch Polymer Coated Corr Stl 21x15 LF 521.5724 Pipe Arch Polymer Coated Corr Stl 24x18 LF 521.5728 Pipe Arch Polymer Coated Corr Stl 28x20 LF $57.95 521.5735 Pipe Arch Polymer Coated Corr Stl 35x24 LF $93.64

Page 25

Page 26: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 521.5742 Pipe Arch Polymer Coated Corr Stl 42x29 LF 521.5749 Pipe Arch Polymer Coated Corr Stl 49x33 LF $196.17 521.5757 Pipe Arch Polymer Coated Corr Stl 57x38 LF 521.5764 Pipe Arch Polymer Coated Corr Stl 64x43 LF 521.5771 Pipe Arch Polymer Coated Corr Stl 71x47 LF 521.5777 Pipe Arch Polymer Coated Corr Stl 77x52 LF $241.94 521.5783 Pipe Arch Polymer Coated Corr Stl 83x57 LF 521.6112 Cul Pipe Corr Stl Aluminum Coated 12‐In LF 521.6115 Cul Pipe Corr Stl Aluminum Coated 15‐In LF 521.6118 Cul Pipe Corr Stl Aluminum Coated 18‐In LF $30.29 $75.00 521.6121 Cul Pipe Corr Stl Aluminum Coated 21‐In LF 521.6124 Cul Pipe Corr Stl Aluminum Coated 24‐In LF $37.26 $46.46 521.6130 Cul Pipe Corr Stl Aluminum Coated 30‐In LF $95.99 521.6136 Cul Pipe Corr Stl Aluminum Coated 36‐In LF $54.00 521.6142 Cul Pipe Corr Stl Aluminum Coated 42‐In LF $78.00 $160.00 521.6148 Cul Pipe Corr Stl Aluminum Coated 48‐In LF 521.6154 Cul Pipe Corr Stl Aluminum Coated 54‐In LF 521.6160 Cul Pipe Corr Stl Aluminum Coated 60‐In LF $123.00 521.6172 Cul Pipe Corr Stl Aluminum Coated 72‐In LF 521.6184 Cul Pipe Corr Stl Aluminum Coated 84‐In LF 521.6196 Cul Pipe Corr Stl Aluminum Coated 96‐In LF 521.6717 Pipe Arch Corr Stl Aluminum Coated 17x13 LF 521.6721 Pipe Arch Corr Stl Aluminum Coated 21x15 LF 521.6724 Pipe Arch Corr Stl Aluminum Coated 24x18 LF 521.6728 Pipe Arch Corr Stl Aluminum Coated 28x20 LF $48.00 521.6735 Pipe Arch Corr Stl Aluminum Coated 35x24 LF $68.00 $63.06 521.6742 Pipe Arch Corr Stl Aluminum Coated 42x29 LF 521.6749 Pipe Arch Corr Stl Aluminum Coated 49x33 LF $170.00 521.6757 Pipe Arch Corr Stl Aluminum Coated 57x38 LF $193.00 521.6764 Pipe Arch Corr Stl Aluminum Coated 64x43 LF $84.30 $220.00 521.6771 Pipe Arch Corr Stl Aluminum Coated 71x47 LF 521.6777 Pipe Arch Corr Stl Aluminum Coated 77x52 LF

Page 26

Page 27: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 521.6783 Pipe Arch Corr Stl Aluminum Coated 83x57 LF $375.68 522.0112 Culv Pipe Reinf Concrete Class III 12‐In LF $31.35 $38.60 $40.45 522.0115 Culv Pipe Reinf Concrete Class III 15‐In LF $37.12 $43.91 $50.72 522.0118 Culv Pipe Reinf Concrete Class III 18‐In LF $46.08 $59.65 $43.81 522.0121 Culv Pipe Reinf Concrete Class III 21‐In LF $90.00 522.0124 Culv Pipe Reinf Concrete Class III 24‐In LF $69.72 $58.76 $64.44 522.0127 Culv Pipe Reinf Concrete Class III 27‐In LF 522.0130 Culv Pipe Reinf Concrete Class III 30‐In LF $95.93 $85.76 $83.48 522.0136 Culv Pipe Reinf Concrete Class III 36‐In LF $109.99 $98.00 $100.49 522.0142 Culv Pipe Reinf Concrete Class III 42‐In LF $100.51 $152.32 $104.43 522.0148 Culv Pipe Reinf Concrete Class III 48‐In LF $128.27 $120.15 $160.47 522.0154 Culv Pipe Reinf Concrete Class III 54‐In LF $154.34 $221.00 $282.25 522.0160 Culv Pipe Reinf Concrete Class III 60‐In LF $196.91 $175.19 $252.28 522.0166 Culv Pipe Reinf Concrete Class III 66‐In LF $196.52 522.0172 Culv Pipe Reinf Concrete Class III 72‐In LF $299.93 $239.13 $312.56 522.0178 Culv Pipe Reinf Concrete Class III 78‐In LF $475.00 522.0184 Culv Pipe Reinf Concrete Class III 84‐In LF $486.55 $340.00 522.0190 Culv Pipe Reinf Concrete Class III 90‐In LF 522.0196 Culv Pipe Reinf Concrete Class III 96‐In LF $570.00 522.0202 Culv Pipe Reinf Conc Class III 102‐In LF 522.0208 Culv Pipe Reinf Conc Class III 108‐In LF 522.0312 Culv Pipe Reinf Concrete Class IV 12‐In LF 522.0315 Culv Pipe Reinf Concrete Class IV 15‐In LF 522.0318 Culv Pipe Reinf Concrete Class IV 18‐In LF 522.0321 Culv Pipe Reinf Concrete Class IV 21‐In LF 522.0324 Culv Pipe Reinf Concrete Class IV 24‐In LF 522.0327 Culv Pipe Reinf Concrete Class IV 27‐In LF 522.0330 Culv Pipe Reinf Concrete Class IV 30‐In LF 522.0336 Culv Pipe Reinf Concrete Class IV 36‐In LF 522.0342 Culv Pipe Reinf Concrete Class IV 42‐In LF 522.0348 Culv Pipe Reinf Concrete Class IV 48‐In LF 522.0354 Culv Pipe Reinf Concrete Class IV 54‐In LF

Page 27

Page 28: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 522.0360 Culv Pipe Reinf Concrete Class IV 60‐In LF 522.0366 Culv Pipe Reinf Concrete Class IV 66‐In LF 522.0372 Culv Pipe Reinf Concrete Class IV 72‐In LF 522.0378 Culv Pipe Reinf Concrete Class IV 78‐In LF 522.0384 Culv Pipe Reinf Concrete Class IV 84‐In LF 522.0412 Culv Pipe Reinf Concrete Class IV 12‐In LF $47.65 $64.17 $46.83 522.0415 Culv Pipe Reinf Concrete Class IV 15‐In LF $39.99 $63.28 $65.39 522.0418 Culv Pipe Reinf Concrete Class IV 18‐In LF $67.61 $54.00 $55.75 522.0421 Culv Pipe Reinf Concrete Class IV 21‐In LF $84.00 522.0424 Culv Pipe Reinf Concrete Class IV 24‐In LF $54.82 $72.72 $92.27 522.0427 Culv Pipe Reinf Concrete Class IV 27‐In LF $91.00 522.0430 Culv Pipe Reinf Concrete Class IV 30‐In LF $87.98 $87.80 $116.76 522.0436 Culv Pipe Reinf Concrete Class IV 36‐In LF $93.77 $85.17 $122.97 522.0442 Culv Pipe Reinf Concrete Class IV 42‐In LF $119.10 $118.28 $117.12 522.0448 Culv Pipe Reinf Concrete Class IV 48‐In LF $106.19 $156.57 $199.04 522.0454 Culv Pipe Reinf Concrete Class IV 54‐In LF $159.12 $208.11 522.0460 Culv Pipe Reinf Concrete Class IV 60‐In LF $179.00 $217.67 $250.56 522.0466 Culv Pipe Reinf Concrete Class IV 66‐In LF 522.0472 Culv Pipe Reinf Concrete Class IV 72‐In LF $451.04 $302.86 $349.54 522.0478 Culv Pipe Reinf Concrete Class IV 78‐In LF 522.0484 Culv Pipe Reinf Concrete Class IV 84‐In LF $541.25 522.0512 Culv Pipe Reinf Concrete Class V 12‐In LF 522.0515 Culv Pipe Reinf Concrete Class V 15‐In LF $33.79 522.0518 Culv Pipe Reinf Concrete Class V 18‐In LF $44.51 $120.12 $324.65 522.0521 Culv Pipe Reinf Concrete Class V 21‐In LF 522.0524 Culv Pipe Reinf Concrete Class V 24‐In LF $51.50 $64.89 $54.82 522.0527 Culv Pipe Reinf Concrete Class V 27‐In LF 522.0530 Culv Pipe Reinf Concrete Class V 30‐In LF $95.94 $73.96 $121.72 522.0536 Culv Pipe Reinf Concrete Class V 36‐In LF $83.62 522.0542 Culv Pipe Reinf Concrete Class V 42‐In LF $74.30 522.0548 Culv Pipe Reinf Concrete Class V 48‐In LF $205.00 $104.67 522.0554 Culv Pipe Reinf Concrete Class V 54‐In LF

Page 28

Page 29: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 522.0560 Culv Pipe Reinf Concrete Class V 60‐In LF 522.0566 Culv Pipe Reinf Concrete Class V 66‐In LF 522.0572 Culv Pipe Reinf Concrete Class V 72‐In LF $298.00 522.0584 Culv Pipe Reinf Concrete Class V 84‐In LF 522.1012 Apr Endwls Culv Pipe Reinf Conc 12‐In EACH $729.85 $651.92 $628.08 522.1015 Apr Endwls Culv Pipe Reinf Conc 15‐In EACH $727.12 $674.12 $694.16 522.1018 Apr Endwls Culv Pipe Reinf Conc 18‐In EACH $830.16 $729.28 $737.65 522.1021 Apr Endwls Culv Pipe Reinf Conc 21‐In EACH $801.83 $778.33 $648.75 522.1024 Apr Endwls Culv Pipe Reinf Conc 24‐In EACH $910.42 $832.83 $887.01 522.1027 Apr Endwls Culv Pipe Reinf Conc 27‐In EACH $1,300.00 $550.00 $942.20 522.1030 Apr Endwls Culv Pipe Reinf Conc 30‐In EACH $1,038.67 $884.48 $1,097.39 522.1036 Apr Endwls Culv Pipe Reinf Conc 36‐In EACH $1,322.60 $1,210.85 $1,290.43 522.1042 Apr Endwls Culv Pipe Reinf Conc 42‐In EACH $1,483.31 $1,417.49 $1,477.37 522.1048 Apr Endwls Culv Pipe Reinf Conc 48‐In EACH $1,732.24 $1,633.01 $1,782.18 522.1054 Apr Endwls Culv Pipe Reinf Conc 54‐In EACH $2,328.38 $2,681.32 $2,551.37 522.1060 Apr Endwls Culv Pipe Reinf Conc 60‐In EACH $2,717.24 $2,803.26 $3,124.85 522.1066 Apr Endwls Culv Pipe Reinf Conc 66‐In EACH $3,001.44 522.1072 Apr Endwls Culv Pipe Reinf Conc 72‐In EACH $3,747.00 $3,353.06 $4,061.41 522.1084 Apr Endwls Culv Pipe Reinf Conc 84‐In EACH $5,500.00 $5,160.00 522.1500 Pipe Cattle Pass Reinforced Concrete LF $310.00 522.2000 Pipe Cattle Pass Reinforced Concrete LF 522.2314 Culv Pipe Reinf Conc Hor El HE‐III 14x23 LF $80.00 $160.00 522.2319 Culv Pipe Reinf Conc Hor El HE‐III 19x30 LF $65.39 $87.08 $77.29 522.2324 Culv Pipe Reinf Conc Hor El HE‐III 24x38 LF $67.00 $88.88 $84.93 522.2329 Culv Pipe Reinf Conc Hor El HE‐III 29x45 LF $81.95 $115.78 522.2334 Culv Pipe Reinf Conc Hor El HE‐III 34x53 LF $115.29 522.2338 Culv Pipe Reinf Conc Hor El HE‐III 38x60 LF $137.80 $166.62 $171.07 522.2343 Culv Pipe Reinf Conc Hor El HE‐III 43x68 LF $177.33 $184.56 $163.22 522.2348 Culv Pipe Reinf Conc Hor El HE‐III 48x76 LF $320.00 $213.31 $226.72 522.2353 Culv Pipe Reinf Conc Hor El HE‐III 53x83 LF $342.00 $336.35 522.2358 Culv Pipe Reinf Conc Hor El HE‐III 58x91 LF $560.00 $289.22 $374.27 522.2363 Culv Pipe Reinf Conc Hor El HE‐III 63x98 LF $452.00

Page 29

Page 30: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 522.2368 Culv Pipe Rein Conc Hor El HE‐III 68x106 LF $862.00 $618.75 522.2414 Cp Rnf Conc Horz Ell Cl HE‐IV 14x23‐Inch LF $74.23 $96.26 $91.66 522.2419 Cp Rnf Conc Horz Ell Cl HE‐IV 19x30‐Inch LF $72.05 $102.34 $96.59 522.2424 Cp Rnf Conc Horz Ell Cl HE‐IV 24x38‐Inch LF $96.00 $98.94 $106.47 522.2429 Cp Rnf Conc Horz Ell Cl HE‐IV 29x45‐Inch LF $200.57 $137.25 $126.52 522.2434 Cp Rnf Conc Horz Ell Cl HE‐IV 34x53‐Inch LF $229.12 522.2614 Apr Edwls Culv Reinf Conc Hor El 14x23 EACH $945.70 $834.66 $964.52 522.2619 Apr Edwls Culv Reinf Conc Hor El 19x30 EACH $963.35 $934.85 $1,054.01 522.2624 Apr Edwls Culv Reinf Conc Hor El 24x38 EACH $1,129.70 $1,146.61 $1,261.28 522.2629 Apr Edwls Culv Reinf Conc Hor El 29x45 EACH $1,403.45 $1,454.44 $1,380.35 522.2634 Apr Edwls Culv Reinf Conc Hor El 34x53 EACH $2,174.57 $2,130.00 522.2638 Apr Edwls Culv Reinf Conc Hor El 38x60 EACH $2,220.00 $1,727.45 $2,862.43 522.2643 Apr Edwls Culv Reinf Conc Hor El 43x68 EACH $3,241.78 $2,871.78 522.2648 Apr Edwls Culv Reinf Conc Hor El 48x76 EACH $4,100.00 $3,362.00 $4,073.26 522.2653 Apr Edwls Culv Reinf Conc Hor El 53x83 EACH $4,160.67 $4,400.00 $3,980.08 522.2658 Apr Edwls Culv Reinf Conc Hor El 58x91 EACH $5,000.00 $3,943.00 $6,277.99 522.2663 Apr Edwls Culv Reinf Conc Hor El 63x98 EACH 522.2668 Apr Edwls Culv Reinf Conc Hor El 68x106 EACH $6,450.00 523.0114 Culv Pipe Reinf Conc Hor El HE‐III 14x23 LF 523.0119 Culv Pipe Reinf Conc Hor El HE‐III 19x30 LF 523.0124 Culv Pipe Reinf Conc Hor El HE‐III 24x38 LF 523.0129 Culv Pipe Reinf Conc Hor El HE‐III 29x45 LF 523.0134 Culv Pipe Reinf Conc Hor El HE‐III 34x53 LF 523.0138 Culv Pipe Reinf Conc Hor El HE‐III 38x60 LF 523.0143 Culv Pipe Reinf Conc Hor El HE‐III 43x68 LF 523.0148 Culv Pipe Reinf Conc Hor El HE‐III 48x76 LF 523.0153 Culv Pipe Reinf Conc Hor El HE‐III 53x83 LF 523.0158 Culv Pipe Reinf Conc Hor El HE‐III 58x91 LF 523.0163 Culv Pipe Reinf Conc Hor El HE‐III 63x98 LF 523.0168 Culv Pipe Rein Conc Hor El HE‐III 68x106 LF 523.0414 Cp Rnf Conc Horz Ell Cl HE‐IV 14x23‐Inch LF 523.0419 Cp Rnf Conc Horz Ell Cl HE‐IV 19x30‐Inch LF

Page 30

Page 31: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 523.0424 Cp Rnf Conc Horz Ell Cl HE‐IV 24x38‐Inch LF 523.0429 Cp Rnf Conc Horz Ell Cl HE‐IV 29x45‐Inch LF 523.0434 Cp Rnf Conc Horz Ell Cl HE‐IV 34x53‐Inch LF 523.0514 Apr Edwls Culv Reinf Conc Hor El 14x23 EACH 523.0519 Apr Edwls Culv Reinf Conc Hor El 19x30 EACH 523.0524 Apr Edwls Culv Reinf Conc Hor El 24x38 EACH 523.0529 Apr Edwls Culv Reinf Conc Hor El 29x45 EACH 523.0534 Apr Edwls Culv Reinf Conc Hor El 34x53 EACH 523.0538 Apr Edwls Culv Reinf Conc Hor El 38x60 EACH 523.0543 Apr Edwls Culv Reinf Conc Hor El 43x68 EACH 523.0548 Apr Edwls Culv Reinf Conc Hor El 48x76 EACH 523.0553 Apr Edwls Culv Reinf Conc Hor El 53x83 EACH 523.0558 Apr Edwls Culv Reinf Conc Hor El 58x91 EACH 523.0563 Apr Edwls Culv Reinf Conc Hor El 63x98 EACH 523.0568 Apr Edwls Culv Reinf Conc Hor El 68x106 EACH 524.0112 Culvert Pipe Salvaged 12‐Inch LF $53.00 524.0115 Culvert Pipe Salvaged 15‐Inch LF $53.85 $8.00 524.0118 Culvert Pipe Salvaged 18‐Inch LF $49.57 $48.15 $100.90 524.0121 Culvert Pipe Salvaged 21‐Inch LF 524.0124 Culvert Pipe Salvaged 24‐Inch LF $72.92 $50.11 $99.68 524.0127 Culvert Pipe Salvaged 27‐Inch LF 524.0130 Culvert Pipe Salvaged 30‐Inch LF $78.75 $58.34 $141.93 524.0133 Culvert Pipe Salvaged 33‐Inch LF 524.0136 Culvert Pipe Salvaged 36‐Inch LF $93.62 $57.28 $221.07 524.0142 Culvert Pipe Salvaged 42‐Inch LF $51.00 $105.00 524.0148 Culvert Pipe Salvaged 48‐Inch LF $98.00 $91.08 $235.00 524.0154 Culvert Pipe Salvaged 54‐Inch LF $119.70 $88.76 524.0160 Culvert Pipe Salvaged 60‐Inch LF $151.20 $67.49 524.0166 Culvert Pipe Salvaged 66‐Inch LF 524.0172 Culvert Pipe Salvaged 72‐Inch LF 524.0178 Culvert Pipe Salvaged 78‐Inch LF 524.0184 Culvert Pipe Salvaged 84‐Inch LF

Page 31

Page 32: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 524.0190 Culvert Pipe Salvaged 90‐Inch LF 524.0196 Culvert Pipe Salvaged 96‐Inch LF $220.00 524.0202 Culvert Pipe Salvaged 102‐Inch LF 524.0208 Culvert Pipe Salvaged 108‐Inch LF 524.0612 Apr Endwls Culvert Pipe Salvaged 12‐In EACH $1,250.00 $131.73 $428.48 524.0615 Apr Endwls Culvert Pipe Salvaged 15‐In EACH $725.00 524.0618 Apr Endwls Culvert Pipe Salvaged 18‐In EACH $458.49 $437.09 $527.84 524.0621 Apr Endwls Culvert Pipe Salvaged 21‐In EACH 524.0624 Apr Endwls Culvert Pipe Salvaged 24‐In EACH $445.84 $394.18 $744.95 524.0627 Apr Endwls Culvert Pipe Salvaged 27‐In EACH $450.00 524.0630 Apr Endwls Culvert Pipe Salvaged 30‐In EACH $556.42 $439.73 $920.36 524.0633 Apr Endwls Culvert Pipe Salvaged 33‐In EACH 524.0636 Apr Endwls Culvert Pipe Salvaged 36‐In EACH $602.55 $468.91 $902.78 524.0642 Apr Endwls Culvert Pipe Salvaged 42‐In EACH $1,200.00 $510.56 $1,524.07 524.0648 Apr Endwls Culvert Pipe Salvaged 48‐In EACH $955.00 $535.29 $806.67 524.0654 Apr Endwls Culvert Pipe Salvaged 54‐In EACH $625.00 524.0660 Apr Endwls Culvert Pipe Salvaged 60‐In EACH $221.39 524.0666 Apr Endwls Culvert Pipe Salvaged 66‐In EACH 524.0672 Apr Endwls Culvert Pipe Salvaged 72‐In EACH 524.0678 Apr Endwls Culvert Pipe Salvaged 78‐In EACH 524.0684 Apr Endwls Culvert Pipe Salvaged 84‐In EACH 524.0800 Pipe Cattle Pass Salvaged LF 524.0900 Pipe Arch Salvaged Corrugated Steel LF 525.0112 Culvert Pipe Corrugated Aluminum 12‐In LF 525.0115 Culvert Pipe Corrugated Aluminum 15‐In LF 525.0118 Culvert Pipe Corrugated Aluminum 18‐In LF $37.70 $46.23 $30.48 525.0121 Culvert Pipe Corrugated Aluminum 21‐In LF 525.0124 Culvert Pipe Corrugated Aluminum 24‐In LF $68.00 $47.05 $75.18 525.0130 Culvert Pipe Corrugated Aluminum 30‐In LF $62.94 $59.43 $95.00 525.0136 Culvert Pipe Corrugated Aluminum 36‐In LF $88.22 $125.00 525.0142 Culvert Pipe Corrugated Aluminum 42‐In LF 525.0148 Culvert Pipe Corrugated Aluminum 48‐In LF $105.65

Page 32

Page 33: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 525.0154 Culvert Pipe Corrugated Aluminum 54‐In LF 525.0160 Culvert Pipe Corrugated Aluminum 60‐In LF 525.0172 Culvert Pipe Corrugated Aluminum 72‐In LF $295.00 525.0184 Culvert Pipe Corrugated Aluminum 84‐In LF 525.0312 Apron Endwalls for Alum CP 12‐Inch EACH 525.0315 Apron Endwalls for Alum CP 15‐Inch EACH 525.0318 Apron Endwalls for Alum CP 18‐Inch EACH $319.00 $395.12 $340.00 525.0321 Apron Endwalls for Alum CP 21‐Inch EACH 525.0324 Apron Endwalls for Alum CP 24‐Inch EACH $597.00 $430.89 $744.14 525.0330 Apron Endwalls for Alum CP 30‐Inch EACH $924.01 $898.24 $1,000.00 525.0336 Apron Endwalls for Alum CP 36‐Inch EACH $1,485.00 $1,417.59 $1,320.69 525.0342 Apron Endwalls for Alum CP 42‐Inch EACH 525.0348 Apron Endwalls for Alum CP 48‐Inch EACH $2,816.36 $2,950.00 525.0354 Apron Endwalls for Alum CP 54‐Inch EACH 525.0360 Apron Endwalls for Alum CP 60‐Inch EACH 525.0372 Apron Endwalls for Alum CP 72‐Inch EACH $4,305.94 $4,450.00 525.0384 Apron Endwalls for Alum CP 84‐Inch EACH 525.0412 Steel Apron Endwalls for Alum CP 12‐Inch EACH 525.0415 Steel Apron Endwalls for Alum CP 15‐Inch EACH 525.0418 Steel Apron Endwalls for Alum CP 18‐Inch EACH 525.0421 Steel Apron Endwalls for Alum CP 21‐Inch EACH 525.0424 Steel Apron Endwalls for Alum CP 24‐Inch EACH $510.50 525.0430 Steel Apron Endwalls for Alum CP 30‐Inch EACH $830.00 525.0436 Steel Apron Endwalls for Alum CP 36‐Inch EACH 525.0442 Steel Apron Endwalls for Alum CP 42‐Inch EACH 525.0448 Steel Apron Endwalls for Alum CP 48‐Inch EACH $2,219.00 525.0454 Steel Apron Endwalls for Alum CP 54‐Inch EACH 525.0460 Steel Apron Endwalls for Alum CP 60‐Inch EACH 525.0472 Steel Apron Endwalls for Alum CP 72‐Inch EACH 525.0484 Steel Apron Endwalls for Alum CP 84‐Inch EACH 526.0100 Temporary Structure (station) LS $116,166.67 $122,829.59 $258,750.00 526.0200.S Temporary Pedestrian Structure (station) LS

Page 33

Page 34: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 527.0160 Pipe Structural Plate 60‐Inch LF 527.0172 Pipe Structural Plate 72‐Inch LF 527.0184 Pipe Structural Plate 84‐Inch LF 527.0196 Pipe Structural Plate 96‐Inch LF 527.0208 Pipe Structural Plate 108‐Inch LF 527.0220 Pipe Structural Plate 120‐Inch LF 527.0232 Pipe Structural Plate 132‐Inch LF 527.0244 Pipe Structural Plate 144‐Inch LF 527.0256 Pipe Structural Plate 156‐Inch LF 527.0268 Pipe Structural Plate 168‐Inch LF 527.0280 Pipe Structural Plate 180‐Inch LF 527.0305 Pipe Arch Structural Plate 6‐FT Span LF 527.0310 Pipe Arch Structural Plate 7‐FT Span LF 527.0315 Pipe Arch Structural Plate 8‐FT Span LF 527.0320 Pipe Arch Structural Plate 9‐FT Span LF 527.0325 Pipe Arch Structural Plate 10‐FT Span LF 527.0330 Pipe Arch Structural Plate 11‐FT Span LF 527.0335 Pipe Arch Structural Plate 12‐FT Span LF 527.0340 Pipe Arch Structural Plate 13‐FT Span LF 527.0345 Pipe Arch Structural Plate 14‐FT Span LF 527.0350 Pipe Arch Structural Plate 15‐FT Span LF 527.0355 Pipe Arch Structural Plate 16‐FT Span LF 527.0360 Pipe Arch Structural Plate 16.5‐FT Span LF 528.0112 Culv Pipe Corr Stl Polymer Coated 12‐In LF 528.0115 Culv Pipe Corr Stl Polymer Coated 15‐In LF 528.0118 Culv Pipe Corr Stl Polymer Coated 18‐In LF 528.0121 Culv Pipe Corr Stl Polymer Coated 21‐In LF 528.0124 Culv Pipe Corr Stl Polymer Coated 24‐In LF 528.0130 Culv Pipe Corr Stl Polymer Coated 30‐In LF 528.0136 Culv Pipe Corr Stl Polymer Coated 36‐In LF 528.0142 Culv Pipe Corr Stl Polymer Coated 42‐In LF 528.0148 Culv Pipe Corr Stl Polymer Coated 48‐In LF

Page 34

Page 35: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 528.0154 Culv Pipe Corr Stl Polymer Coated 54‐In LF 528.0160 Culv Pipe Corr Stl Polymer Coated 60‐In LF 528.0172 Culv Pipe Corr Stl Polymer Coated 72‐In LF 528.0184 Culv Pipe Corr Stl Polymer Coated 84‐In LF 528.0196 Culv Pipe Corr Stl Polymer Coated 96‐In LF 528.0317 Pipe Arch Polymer Coated Corr Stl 17x13 LF 528.0321 Pipe Arch Polymer Coated Corr Stl 21x15 LF 528.0324 Pipe Arch Polymer Coated Corr Stl 24x18 LF 528.0328 Pipe Arch Polymer Coated Corr Stl 28x20 LF 528.0335 Pipe Arch Polymer Coated Corr Stl 35x24 LF 528.0342 Pipe Arch Polymer Coated Corr Stl 42x29 LF 528.0349 Pipe Arch Polymer Coated Corr Stl 49x33 LF 528.0357 Pipe Arch Polymer Coated Corr Stl 57x38 LF 528.0364 Pipe Arch Polymer Coated Corr Stl 64x43 LF 528.0371 Pipe Arch Polymer Coated Corr Stl 71x47 LF 528.0377 Pipe Arch Polymer Coated Corr Stl 77x52 LF 528.0383 Pipe Arch Polymer Coated Corr Stl 83x57 LF 529.0112 Cul Pipe Corr Stl Aluminum Coated 12‐In LF 529.0115 Cul Pipe Corr Stl Aluminum Coated 15‐In LF 529.0118 Cul Pipe Corr Stl Aluminum Coated 18‐In LF 529.0121 Cul Pipe Corr Stl Aluminum Coated 21‐In LF 529.0124 Cul Pipe Corr Stl Aluminum Coated 24‐In LF 529.0130 Cul Pipe Corr Stl Aluminum Coated 30‐In LF 529.0136 Cul Pipe Corr Stl Aluminum Coated 36‐In LF 529.0142 Cul Pipe Corr Stl Aluminum Coated 42‐In LF 529.0148 Cul Pipe Corr Stl Aluminum Coated 48‐In LF 529.0154 Cul Pipe Corr Stl Aluminum Coated 54‐In LF 529.0160 Cul Pipe Corr Stl Aluminum Coated 60‐In LF 529.0172 Cul Pipe Corr Stl Aluminum Coated 72‐In LF 529.0184 Cul Pipe Corr Stl Aluminum Coated 84‐In LF 529.0196 Cul Pipe Corr Stl Aluminum Coated 96‐In LF 529.0317 Pipe Arch Corr Stl Aluminum Coated 17x13 LF

Page 35

Page 36: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 529.0321 Pipe Arch Corr Stl Aluminum Coated 21x15 LF 529.0324 Pipe Arch Corr Stl Aluminum Coated 24x18 LF 529.0328 Pipe Arch Corr Stl Aluminum Coated 28x20 LF 529.0335 Pipe Arch Corr Stl Aluminum Coated 35x24 LF 529.0342 Pipe Arch Corr Stl Aluminum Coated 42x29 LF 529.0349 Pipe Arch Corr Stl Aluminum Coated 49x33 LF 529.0357 Pipe Arch Corr Stl Aluminum Coated 57x38 LF 529.0364 Pipe Arch Corr Stl Aluminum Coated 64x43 LF 529.0371 Pipe Arch Corr Stl Aluminum Coated 71x47 LF 529.0377 Pipe Arch Corr Stl Aluminum Coated 77x52 LF 529.0383 Pipe Arch Corr Stl Aluminum Coated 83x57 LF 530.0112 Culvert Pipe Corrugated Polyethyl 12‐In LF $19.75 $55.00 530.0115 Culvert Pipe Corrugated Polyethyl 15‐In LF $25.44 $35.29 $29.44 530.0118 Culvert Pipe Corrugated Polyethyl 18‐In LF $30.29 $32.81 $34.72 530.0124 Culvert Pipe Corrugated Polyethyl 24‐In LF $81.12 $40.88 $57.38 530.0130 Culvert Pipe Corrugated Polyethyl 30‐In LF $52.30 $78.10 530.0136 Culvert Pipe Corrugated Polyethyl 36‐In LF $69.35 $53.86 530.1112 Culvert Pipe Corrugated Polypropyl 12‐In LF 530.1115 Culvert Pipe Corrugated Polypropyl 15‐In LF 530.1118 Culvert Pipe Corrugated Polypropyl 18‐In LF 530.1121 Culvert Pipe Corrugated Polypropyl 21‐In LF 530.1124 Culvert Pipe Corrugated Polypropyl 24‐In LF 530.1127 Culvert Pipe Corrugated Polypropyl 27‐In LF 530.1130 Culvert Pipe Corrugated Polypropyl 30‐In LF 530.1136 Culvert Pipe Corrugated Polypropyl 36‐In LF 531.0200.S Noise Barriers SS Sound Absorptive SF 531.0300.S Noise Barriers DS Sound Absorptive SF $27.61 $28.51 $32.08 531.0400.S Noise Barriers Non‐Absorptive (struc) SF 532.0201.S Wall Modular Block Gravity LRFD SF 532.0225.S Wall Modular Block Gravity Landscape SF 532.0301.S Wall Mod Block Mech Stabilized Erth LRFD SF 532.0501.S Wall Conc Panel Mech Stabilize Erth LRFD SF

Page 36

Page 37: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 532.0601.S Wall CIP Facing Mech Stabilized LRFD SF 532.0701.S Wall Wire Faced Mech Stabilized LRFD SF 532.0750.S Temp Wall Wire Faced Mech Stab Earth SF $7.81 $240.00 $33.00 532.0751.S Temp Wall Wire Faced Mech Stab Earh LRFD SF 532.0800.S Wall Gabion CY $146.00 532.0801.S Wall Gabion LRFD CY 532.0900.S Wall Modular Bin or Crib SF 532.0901.S Wall Modular Bin or Crib LRFD SF 532.1000.S Precast Panels for Soldier Pile Walls SF 550.0010 Pre‐Boring Unconsolidated Materials LF 550.0020 Pre‐Boring Rock or Consolidated Material LF 550.0500 Pile Points EACH 550.0600 Pile Redriving EACH 550.1100 Piling Steel HP 10‐Inch X 42 Lb LF 550.1120 Piling Steel HP 12‐Inch X 53 Lb LF 550.1125 Piling Steel HP 12‐Inch X 74 Lb LF $60.00 550.1140 Piling Steel HP 14‐Inch X 73 Lb LF 550.2102 Piling CIP Concrete 10 3/4 X 0.219‐Inch LF $29.15 $35.00 $35.00 550.2104 Piling CIP Concrete 10 3/4 X 0.25‐Inch LF $38.46 $22.89 $34.12 550.2106 Piling CIP Concrete 10 3/4 X 0.365‐Inch LF $35.38 $29.71 $40.36 550.2108 Piling CIP Concrete 10 3/4 X 0.50‐Inch LF $50.00 $37.00 $55.79 550.2122 Piling CIP Concrete 12 3/4 X 0.219‐Inch LF 550.2124 Piling CIP Concrete 12 3/4 X 0.25‐Inch LF $38.48 $37.47 550.2126 Piling CIP Concrete 12 3/4 X 0.375‐Inch LF $35.00 $35.23 $41.30 550.2128 Piling CIP Concrete 12 3/4 X 0.50‐Inch LF $55.00 $63.51 550.2142 Piling CIP Concrete 14 X 0.219‐Inch LF 550.2144 Piling CIP Concrete 14 X 0.25‐Inch LF $44.70 550.2146 Piling CIP Concrete 14 X 0.375‐Inch LF $42.00 $45.13 550.2148 Piling CIP Concrete 14 X 0.50‐Inch LF $52.00 $51.79 550.2162 Piling CIP Concrete 16 X 0.219‐Inch LF 550.2164 Piling CIP Concrete 16 X 0.25‐Inch LF 550.2166 Piling CIP Concrete 16 X 0.375‐Inch LF $53.79

Page 37

Page 38: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 550.2168 Piling CIP Concrete 16 X 0.50‐Inch LF $57.00 $61.62 550.3010.S Piling Precast Concrete Testing LF 550.3100 Piling Precast Concrete 10‐Inch LF 550.3120 Piling Precast Concrete 12‐Inch LF 550.3140 Piling Precast Concrete 14‐Inch LF 550.3160 Piling Precast Concrete 16‐Inch LF 550.3810 Pile Splices Precast Concrete 10‐Inch LF 550.3812 Pile Splices Precast Concrete 12‐Inch LF 550.3814 Pile Splices Precast Concrete 14‐Inch LF 550.3816 Pile Splices Precast Concrete 16‐Inch LF 550.5100.S Piling Wav Analysis Steel HP 10" X 42 Lb LF 550.5120.S Piling Wav Analysis Steel HP 12" X 53 Lb LF 550.5125.S Piling Wav Analysis Steel HP 12" X 74 Lb LF 550.5140.S Piling Wav Analysis Steel HP 14" X 73 Lb LF 550.6102.S Pile Wv Anlys CIP Conc 10 3/4 X 0.219‐In LF 550.6104.S Pile Wv Anlys CIP Conc 10 3/4 X 0.25‐In LF 550.6106.S Pile Wv Anlys CIP Conc 10 3/4 X 0.365‐In LF 550.6108.S Pile Wv Anlys CIP Conc 10 3/4 X 0.50‐In LF 550.6122.S Pile Wv Anlys CIP Conc 12 3/4 X 0.219‐In LF 550.6124.S Pile Wv Anlys CIP Conc 12 3/4 X 0.25‐In LF 550.6126.S Pile Wv Anlys CIP Conc 12 3/4 X 0.375‐In LF 550.6128.S Pile Wv Anlys CIP Conc 12 3/4 X 0.50‐In LF 550.6142.S Pile Wv Anlys CIP Conc 14 X 0.219‐In LF 550.6144.S Pile Wv Anlys CIP Conc 14 X 0.25‐In LF 550.6146.S Pile Wv Anlys CIP Conc 14 X 0.375‐In LF 550.6148.S Pile Wv Anlys CIP Conc 14 X 0.50‐In LF 550.6162.S Pile Wv Anlys CIP Conc 16 X 0.219‐In LF 550.6164.S Pile Wv Anlys CIP Conc 16 X 0.25‐In LF 550.6166.S Pile Wv Anlys CIP Conc 16 X 0.375‐In LF 550.6168.S Pile Wv Anlys CIP Conc 16 X 0.50‐In LF 550.7100.S Pile Wv Anlys Pcast Conc 10‐Inch LF 550.7120.S Pile Wv Anlys Pcast Conc 12‐Inch LF

Page 38

Page 39: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 550.7140.S Pile Wv Anlys Pcast Conc 14‐Inch LF 550.7160.S Pile Wv Anlys Pcast Conc 16‐Inch LF 601.0105 Concrete Curb Type A LF $25.80 $27.96 $25.44 601.0110 Concrete Curb Type D LF $20.71 $30.48 $36.10 601.0115 Concrete Curb Type G LF $33.46 $34.18 $39.73 601.0120 Concrete Curb Type J LF $21.11 $32.07 $27.40 601.0150 Concrete Curb Integral Type D LF $8.81 $10.47 $11.43 601.0155 Concrete Curb Integral Type J LF $30.00 $30.00 601.0199.S Concrete Curb Precast EACH $265.82 601.0205 Concrete Gutter 24‐Inch LF $21.04 $41.52 $13.70 601.0319 Concrete Curb & Gutter 19‐Inch LF $20.55 $15.91 601.0322 Concrete Curb & Gutter 22‐Inch LF $25.94 $21.32 601.0331 Concrete Curb & Gutter 31‐Inch LF $16.85 $14.98 $13.75 601.0342 Concrete Curb & Gutter Integral 18‐Inch LF $18.50 $7.59 $10.12 601.0344 Concrete Curb & Gutter Integral 36‐Inch LF 601.0405 Concrete Curb & Gutter 18‐Inch Type A LF $17.12 $13.59 $13.24 601.0407 Concrete Curb & Gutter 18‐Inch Type D LF $16.34 $16.41 $16.22 601.0409 Concrete Curb & Gutter 30‐Inch Type A LF $13.80 $15.46 $16.49 601.0411 Concrete Curb & Gutter 30‐Inch Type D LF $14.07 $13.17 $13.34 601.0413 Conc C & G 6‐In Sloped 30‐In Type G LF $12.69 $12.60 $10.03 601.0415 Conc C & G 6‐In Sloped 30‐In Type J LF $14.48 $11.39 $13.15 601.0417 Concrete Curb & Gutter 30‐Inch Type K LF $31.45 $24.16 $25.00 601.0419 Concrete Curb & Gutter 30‐Inch Type L LF $16.96 $11.00 $13.18 601.0452 Concrete Curb & Gutter Integral 30‐Inch LF $10.71 $11.73 $9.69 601.0454 Concrete Curb & Gutter Integral 30‐Inch LF $20.00 601.0456 Concrete Curb & Gutter Integral 30‐Inch LF 601.0501 Conc Curb/Guttr Integrl 4‐In Slope 36‐In LF $18.48 $15.99 601.0511 Conc Curb/Guttr Integrl 6‐In Slope 36‐In LF $9.50 $15.99 $13.00 601.0551 Conc Curb/Guttr 4‐In Sloped 36‐In Type A LF $16.50 $14.76 $17.66 601.0553 Conc Curb/Guttr 4‐In Sloped 36‐In Type D LF $14.90 $17.40 $17.85 601.0555 Conc Curb/Guttr 6‐In Sloped 36‐In Type A LF $15.41 $15.21 $16.12 601.0557 Conc Curb/Guttr 6‐In Sloped 36‐In Type D LF $17.12 $14.74 $14.41

Page 39

Page 40: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 601.0574 Conc C & G 4‐In Sloped 30‐In Type G LF $18.10 $22.50 $13.91 601.0576 Conc C & G 4‐In Sloped 30‐In Type J LF $13.02 $11.88 $14.50 601.0580 Conc C & G 4‐In Sloped 36‐In Type R LF $17.59 $22.02 $18.45 601.0582 Conc C & G 4‐In Sloped 36‐In Type T LF $19.56 $23.18 $14.72 601.0584 Conc Crb & Gtr 4‐In Slop 30‐In Type TBT LF $32.00 $28.73 601.0586 Conc Crb & Gtr 4‐In Slop 30‐In Type TBTT LF $31.65 601.0588 Conc Crb & Gtr 4‐In Slop 36‐In Type TBT LF $36.00 601.0590 Conc Crb & Gtr 4‐In Slop 36‐In Type TBTT LF $28.25 $35.89 601.0600 Concrete Curb Pedestrian LF $24.21 $25.05 $24.31 602.0405 Concrete Sidewalk 4‐Inch SF $3.69 $3.74 $3.85 602.0410 Concrete Sidewalk 5‐Inch SF $3.72 $4.02 $3.84 602.0415 Concrete Sidewalk 6‐Inch SF $4.65 $4.58 $4.47 602.0420 Concrete Sidewalk 7‐Inch SF $7.97 $4.86 $5.09 602.0505 Curb Ramp Detectable Warnng Field Yellow SF $37.87 $36.49 $35.03 602.0510 Curb Ramp Detectable Warning Field White SF 602.0515 Curb Ramp Detect Wrning Fld Natrl Patina SF $35.83 $33.56 $38.17 602.0605 Curb Ramp Detect Warn Fld Radial Yellow SF 602.0610 Curb Ramp Detect Warn Field Radial White SF 602.0615 Crb Ramp Detect Warn Fld Radl Nat Patina SF 602.1000 Concrete Loading Zone SF $5.09 $9.50 $9.85 602.1500 Concrete Steps SF $53.95 $52.23 $63.76 602.2400 Concrete Safety Islands SF $9.69 $8.24 $6.21 603.0105 Concrete Barrier Single‐Faced 32‐Inch LF $308.82 $82.47 $40.68 603.0205 Concrete Barrier Double‐Faced 32‐Inch LF 603.0405 Conc Barrier Transition Section 32‐Inch LF $330.00 $220.63 603.1132 Concrete Barrier Type S32 LF $44.45 $43.93 $70.71 603.1136 Concrete Barrier Type S36 LF $48.03 $48.44 $52.91 603.1142 Concrete Barrier Type S42 LF $45.28 $43.38 $50.59 603.1156 Concrete Barrier Type S56 LF $51.76 $60.03 $54.41 603.1232 Concrete Barrier Type S32A LF 603.1236 Concrete Barrier Type S36A LF $245.00 $100.00 603.1242 Concrete Barrier Type S42A LF $103.91 $167.84 $44.97

Page 40

Page 41: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 603.1256 Concrete Barrier Type S56A LF $72.03 $64.83 $80.56 603.1332 Concrete Barrier Type S32B LF $291.64 $148.33 603.1336 Concrete Barrier Type S36B LF 603.1342 Concrete Barrier Type S42B LF $171.00 $189.96 603.1356 Concrete Barrier Type S56B LF $228.00 603.1432 Concrete Barrier Type S32C LF 603.1436 Concrete Barrier Type S36C LF $193.67 $134.39 $90.00 603.1442 Concrete Barrier Type S42C LF $134.12 $101.17 $169.75 603.1456 Concrete Barrier Type S56C LF $142.35 $116.34 $137.90 603.2132 Conc Barrier Fixed Obj Protect Type S32 LF 603.2136 Conc Barrier Fixed Obj Protect Type S36 LF $230.00 603.2142 Conc Barrier Fixed Obj Protect Type S42 LF $316.43 $277.12 603.2156 Conc Barrier Fixed Obj Protect Type S56 LF $297.00 $210.00 603.3111 Conc Barrier Trans Type NJ32SF to S32 EACH $5,542.67 $7,500.00 603.3113 Conc Barrier Trans Type NJ32SF to S36 EACH $4,201.63 $4,675.65 $3,850.00 603.3155 Conc Barrier Trans Type NJ42SF to S42 EACH 603.3175 Conc Barrier Trans Type NJ51SF to S42 EACH 603.3211 Conc Barrier Trans Type F32SF to S32 EACH $4,128.00 603.3213 Conc Barrier Trans Type F32SF to S36 EACH $4,782.85 603.3255 Conc Barrier Trans Type F42SF to S42 EACH 603.3275 Conc Barrier Trans Type F51SF to S42 EACH $3,500.00 603.3279 Conc Barrier Trans Type F51SF to S56 EACH $2,775.00 603.3311 Conc Barrier Trans Type NJ32DF to S32 EACH 603.3313 Conc Barrier Trans Type NJ32DF to S36 EACH $6,000.00 $4,620.03 603.3355 Conc Barrier Trans Type NJ42DF to S42 EACH 603.3375 Conc Barrier Trans Type NJ51DF to S42 EACH 603.3411 Conc Barrier Trans Type F32DF to S32 EACH 603.3413 Conc Barrier Trans Type F32dDF to S36 EACH 603.3455 Conc Barrier Trans Type F42DF to S42 EACH 603.3475 Conc Barrier Trans Type F51DF to S42 EACH 603.3513 Conc Barrier Trans Type S32 to S36 EACH $3,568.86 $4,902.98 $3,860.00 603.3535 Conc Barrier Trans Type S36 to S42 EACH $3,754.44 $4,828.89 $4,406.21

Page 41

Page 42: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 603.3559 Conc Barrier Trans Type S42 to S56 EACH $2,564.19 $5,757.07 $5,250.13 603.3611 Conc Barrier Trans Type V32 to S32 EACH $3,000.00 603.3613 Conc Barrier Trans Type V32 to S36 EACH $4,266.67 $6,550.00 603.3655 Conc Barrier Trans Type V42 to S42 EACH 603.3675 Conc Barrier Trans Type V51 to S42 EACH 603.3699 Conc Barrier Trans Type V56 to S56 EACH $3,748.27 603.8000 Concrete Barrier Temp Precast Delivered LF $11.05 $10.18 $9.07 603.8125 Concrete Barrier Temp Precast Installed LF $3.84 $3.25 $3.28 603.8505 Anchor Concrete Barrier on Bridge Decks LF 604.0400 Slope Paving Concrete SY $57.87 $72.85 $60.06 604.0500 Slope Paving Crushed Aggregate SY $21.29 $21.98 $22.46 604.0600 Slope Paving Select Crushed Material SY $22.81 $20.87 $21.02 604.9010.S Slope Paving Repair Crushed Aggregate CY $130.85 $110.59 $50.44 604.9015.S Reseal Crushed Aggregate Slope Paving SY $9.14 $8.86 $11.80 606.0100 Riprap Light CY $47.76 $51.06 $43.78 606.0200 Riprap Medium CY $46.93 $46.20 $54.96 606.0300 Riprap Heavy CY $51.39 $48.03 $56.08 606.0400 Riprap Extra‐Heavy CY $45.08 $50.70 $75.00 606.0500 Grouted Riprap Light CY $95.00 $75.00 $200.00 606.0600 Grouted Riprap Medium CY $112.00 606.0700 Grouted Riprap Heavy CY $50.22 $105.86 $125.00 606.0800 Grouted Riprap Extra‐Heavy CY 606.1100.S Transition Mat SY $67.55 608.0005 Storm Sewer Rock Excavation CY $53.12 $7.13 608.0106 Relaid Storm Sewer 6‐Inch LF 608.0108 Relaid Storm Sewer 8‐Inch LF 608.0110 Relaid Storm Sewer 10‐Inch LF 608.0112 Relaid Storm Sewer 12‐Inch LF $172.10 $64.22 608.0115 Relaid Storm Sewer 15‐Inch LF $86.05 608.0118 Relaid Storm Sewer 18‐Inch LF $64.58 608.0121 Relaid Storm Sewer 21‐Inch LF 608.0124 Relaid Storm Sewer 24‐Inch LF $90.87 $92.60 $70.21

Page 42

Page 43: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 608.0127 Relaid Storm Sewer 27‐Inch LF 608.0130 Relaid Storm Sewer 30‐Inch LF $120.82 $60.00 608.0136 Relaid Storm Sewer 36‐Inch LF $159.58 $79.14 608.0142 Relaid Storm Sewer 42‐Inch LF $75.00 608.0148 Relaid Storm Sewer 48‐Inch LF 608.0154 Relaid Storm Sewer 54‐Inch LF 608.0160 Relaid Storm Sewer 60‐Inch LF 608.0166 Relaid Storm Sewer 66‐Inch LF 608.0172 Relaid Storm Sewer 72‐Inch LF $397.68 $175.00 608.0178 Relaid Storm Sewer 78‐Inch LF 608.0184 Relaid Storm Sewer 84‐Inch LF 608.0190 Relaid Storm Sewer 90‐Inch LF 608.0196 Relaid Storm Sewer 96‐Inch LF 608.0212 St Sewer Pipe Reinf Conc Class II 12‐In LF $250.00 $280.00 $80.36 608.0215 St Sewer Pipe Reinf Conc Class II 15‐In LF 608.0218 St Sewer Pipe Reinf Conc Class II 18‐In LF 608.0221 St Sewer Pipe Reinf Conc Class II 21‐In LF 608.0224 St Sewer Pipe Reinf Conc Class II 24‐In LF 608.0227 St Sewer Pipe Reinf Conc Class II 27‐In LF 608.0230 St Sewer Pipe Reinf Conc Class II 30‐In LF 608.0236 St Sewer Pipe Reinf Conc Class II 36‐In LF $130.00 608.0242 St Sewer Pipe Reinf Conc Class II 42‐In LF 608.0248 St Sewer Pipe Reinf Conc Class II 48‐In LF 608.0254 St Sewer Pipe Reinf Conc Class II 54‐In LF 608.0260 St Sewer Pipe Reinf Conc Class II 60‐In LF 608.0266 St Sewer Pipe Reinf Conc Class II 66‐In LF 608.0272 St Sewer Pipe Reinf Conc Class II 72‐In LF 608.0278 St Sewer Pipe Reinf Conc Class II 78‐In LF 608.0284 St Sewer Pipe Reinf Conc Class II 84‐In LF 608.0290 St Sewer Pipe Reinf Conc Class II 90‐In LF 608.0296 St Sewer Pipe Reinf Conc Class II 96‐In LF 608.0297 St Sewer Pipe Reinf Conc Class II 102‐In LF

Page 43

Page 44: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 608.0298 St Sewer Pipe Reinf Conc Class II 108‐In LF 608.0312 St Sewer Pipe Reinf Conc Class III 12‐In LF $53.46 $46.72 $46.86 608.0315 St Sewer Pipe Reinf Conc Class III 15‐In LF $54.22 $46.74 $42.04 608.0318 St Sewer Pipe Reinf Conc Class III 18‐In LF $59.44 $48.70 $43.95 608.0321 St Sewer Pipe Reinf Conc Class III 21‐In LF $56.63 $63.52 $42.08 608.0324 St Sewer Pipe Reinf Conc Class III 24‐In LF $71.81 $65.72 $57.78 608.0327 St Sewer Pipe Reinf Conc Class III 27‐In LF $140.48 $71.00 $74.48 608.0330 St Sewer Pipe Reinf Conc Class III 30‐In LF $86.72 $94.75 $72.89 608.0336 St Sewer Pipe Reinf Conc Class III 36‐In LF $105.22 $107.75 $86.24 608.0342 St Sewer Pipe Reinf Conc Class III 42‐In LF $148.32 $129.64 $102.22 608.0348 St Sewer Pipe Reinf Conc Class III 48‐In LF $218.03 $184.90 $131.77 608.0354 St Sewer Pipe Reinf Conc Class III 54‐In LF $329.15 $170.19 $157.55 608.0360 St Sewer Pipe Reinf Conc Class III 60‐In LF $362.86 $185.28 $186.94 608.0366 St Sewer Pipe Reinf Conc Class III 66‐In LF $413.06 $260.78 608.0372 St Sewer Pipe Reinf Conc Class III 72‐In LF $534.69 $387.00 608.0378 St Sewer Pipe Reinf Conc Class III 78‐In LF 608.0384 St Sewer Pipe Reinf Conc Class III 84‐In LF $440.00 608.0390 St Sewer Pipe Reinf Conc Class III 90‐In LF 608.0396 St Sewer Pipe Reinf Conc Class III 96‐In LF $850.00 $639.00 608.0397 St Sewer Pipe Reinf Conc Cls III 102‐In LF 608.0398 St Sewer Pipe Reinf Conc Cls III 108‐In LF 608.0412 St Sewer Pipe Reinf Conc Class IV 12‐In LF $50.73 $46.19 $44.08 608.0415 St Sewer Pipe Reinf Conc Class IV 15‐In LF $51.75 $47.07 $45.92 608.0418 St Sewer Pipe Reinf Conc Class IV 18‐In LF $58.98 $49.73 $51.17 608.0421 St Sewer Pipe Reinf Conc Class IV 21‐In LF $74.76 $69.00 $55.14 608.0424 St Sewer Pipe Reinf Conc Class IV 24‐In LF $81.51 $65.42 $57.54 608.0427 St Sewer Pipe Reinf Conc Class IV 27‐In LF $81.03 $68.00 $58.46 608.0430 St Sewer Pipe Reinf Conc Class IV 30‐In LF $116.64 $76.45 $70.03 608.0436 St Sewer Pipe Reinf Conc Class IV 36‐In LF $132.55 $104.74 $95.06 608.0442 St Sewer Pipe Reinf Conc Class IV 42‐In LF $238.32 $128.78 $123.38 608.0448 St Sewer Pipe Reinf Conc Class IV 48‐In LF $368.02 $572.76 $146.50 608.0454 St Sewer Pipe Reinf Conc Class IV 54‐In LF $530.71 $238.86 $188.01

Page 44

Page 45: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 608.0460 St Sewer Pipe Reinf Conc Class IV 60‐In LF $218.45 $224.00 $212.52 608.0466 St Sewer Pipe Reinf Conc Class IV 66‐In LF $390.33 $293.48 608.0472 St Sewer Pipe Reinf Conc Class IV 72‐In LF $795.00 $260.00 608.0478 St Sewer Pipe Reinf Conc Class IV 78‐In LF $970.00 $318.61 608.0484 St Sewer Pipe Reinf Conc Class IV 84‐In LF 608.0512 Storm Sewer Pipe Reinf Conc Cls V 12‐In LF $62.07 $67.05 $53.69 608.0515 Storm Sewer Pipe Reinf Conc Cls V 15‐In LF $49.11 $47.61 $78.09 608.0518 Storm Sewer Pipe Reinf Conc Cls V 18‐In LF $78.20 $67.66 $75.11 608.0521 Storm Sewer Pipe Reinf Conc Cls V 21‐In LF 608.0524 Storm Sewer Pipe Reinf Conc Cls V 24‐In LF $385.00 $77.94 $64.34 608.0527 Storm Sewer Pipe Reinf Conc Cls V 27‐In LF $76.00 608.0530 Storm Sewer Pipe Reinf Conc Cls V 30‐In LF $257.75 $80.00 $79.49 608.0536 Storm Sewer Pipe Reinf Conc Cls V 36‐In LF $305.76 $122.16 $106.42 608.0542 Storm Sewer Pipe Reinf Conc Cls V 42‐In LF 608.0548 Storm Sewer Pipe Reinf Conc Cls V 48‐In LF $299.51 $90.00 $294.62 608.0554 Storm Sewer Pipe Reinf Conc Cls V 54‐In LF $184.00 $237.36 608.0560 Storm Sewer Pipe Reinf Conc Cls V 60‐In LF 608.0566 Storm Sewer Pipe Reinf Conc Cls V 66‐In LF $396.34 608.0572 Storm Sewer Pipe Reinf Conc Cls V 72‐In LF $985.00 608.2314 St Swr Pip Reinf Conc H El HE‐III 14x23 LF $60.24 $73.21 608.2319 St Swr Pip Reinf Conc H El HE‐III 19x30 LF $92.53 $88.64 $80.45 608.2324 St Swr Pip Reinf Conc H El HE‐III 24x38 LF $106.73 $153.00 $104.41 608.2329 St Swr Pip Reinf Conc H El HE‐III 29x45 LF $132.44 $96.31 $133.66 608.2334 St Swr Pip Reinf Conc H El HE‐III 34x53 LF $177.16 $133.58 $150.00 608.2338 St Swr Pip Reinf Conc H El HE‐III 38x60 LF $214.05 $196.16 $156.25 608.2343 St Swr Pip Reinf Conc H El HE‐III 43x68 LF $194.33 608.2348 St Swr Pip Reinf Conc H El HE‐III 48x76 LF $273.39 $595.88 608.2353 St Swr Pip Reinf Conc H El HE‐III 53x83 LF $292.50 608.2358 St Swr Pip Reinf Conc H El HE‐III 58x91 LF $615.00 $487.00 608.2363 St Swr Pip Reinf Conc H El HE‐III 63x98 LF 608.2368 St Swr Pip Reinf Conc H El HEIII 68x106 LF 608.2414 Ssp Rnf Con Hz Ellip Cl HE‐IV 14x23‐In LF $96.82 $104.34 $65.81

Page 45

Page 46: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 608.2419 Ssp Rnf Con Hz Ellip Cl HE‐IV 19x30‐In LF $63.58 $89.30 $88.57 608.2424 Ssp Rnf Con Hz Ellip Cl HE‐IV 24x38‐In LF $114.89 $102.58 $98.75 608.2429 Ssp Rnf Con Hz Ellip Cl HE‐IV 29x45‐In LF $100.61 $123.88 $136.37 608.2434 Ssp Rnf Con Hz Ellip Cl HE‐IV 34x53‐In LF $122.94 $132.61 $152.88 608.3012 Storm Sewer Pipe Class III‐A 12‐Inch LF $31.59 $49.93 608.3015 Storm Sewer Pipe Class III‐A 15‐Inch LF $50.09 608.3018 Storm Sewer Pipe Class III‐A 18‐Inch LF $59.86 608.3021 Storm Sewer Pipe Class III‐A 21‐Inch LF $65.00 608.3024 Storm Sewer Pipe Class III‐A 24‐Inch LF $52.31 608.3027 Storm Sewer Pipe Class III‐A 27‐Inch LF 608.3030 Storm Sewer Pipe Class III‐A 30‐Inch LF 608.3036 Storm Sewer Pipe Class III‐A 36‐Inch LF 608.3612 Storm Sewer Pipe Class III‐B 12‐Inch LF $46.48 608.3615 Storm Sewer Pipe Class III‐B 15‐Inch LF $43.91 608.3618 Storm Sewer Pipe Class III‐B 18‐Inch LF $51.32 608.3621 Storm Sewer Pipe Class III‐B 21‐Inch LF $65.66 608.3624 Storm Sewer Pipe Class III‐B 24‐Inch LF $63.83 608.3627 Storm Sewer Pipe Class III‐B 27‐Inch LF 608.3630 Storm Sewer Pipe Class III‐B 30‐Inch LF $107.21 608.3636 Storm Sewer Pipe Class III‐B 36‐Inch LF $92.93 608.6006 Storm Sewer Pipe Composite 6‐Inch LF $22.51 608.6008 Storm Sewer Pipe Composite 8‐Inch LF $49.50 $43.32 608.6010 Storm Sewer Pipe Composite 10‐Inch LF $37.69 608.6012 Storm Sewer Pipe Composite 12‐Inch LF $50.92 $59.17 608.6015 Storm Sewer Pipe Composite 15‐Inch LF $71.65 609.0106 Relaid Storm Sewer 6‐Inch LF 609.0108 Relaid Storm Sewer 8‐Inch LF 609.0110 Relaid Storm Sewer 10‐Inch LF 609.0112 Relaid Storm Sewer 12‐Inch LF 609.0115 Relaid Storm Sewer 15‐Inch LF 609.0118 Relaid Storm Sewer 18‐Inch LF 609.0121 Relaid Storm Sewer 21‐Inch LF

Page 46

Page 47: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 609.0124 Relaid Storm Sewer 24‐Inch LF 609.0127 Relaid Storm Sewer 27‐Inch LF 609.0130 Relaid Storm Sewer 30‐Inch LF 609.0136 Relaid Storm Sewer 36‐Inch LF 609.0142 Relaid Storm Sewer 42‐Inch LF 609.0148 Relaid Storm Sewer 48‐Inch LF 609.0154 Relaid Storm Sewer 54‐Inch LF 609.0160 Relaid Storm Sewer 60‐Inch LF 609.0166 Relaid Storm Sewer 66‐Inch LF 609.0172 Relaid Storm Sewer 72‐Inch LF 609.0178 Relaid Storm Sewer 78‐Inch LF 609.0184 Relaid Storm Sewer 84‐Inch LF 609.0190 Relaid Storm Sewer 90‐Inch LF 609.0196 Relaid Storm Sewer 96‐Inch LF 610.0114 St Swr Pip Reinf Conc H El HE‐III 14x23 LF 610.0119 St Swr Pip Reinf Conc H El HE‐III 19x30 LF 610.0124 St Swr Pip Reinf Conc H El HE‐III 24x38 LF 610.0129 St Swr Pip Reinf Conc H El HE‐III 29x45 LF 610.0134 St Swr Pip Reinf Conc H El HE‐III 34x53 LF 610.0138 St Swr Pip Reinf Conc H El HE‐III 38x60 LF 610.0143 St Swr Pip Reinf Conc H El HE‐III 43x68 LF 610.0148 St Swr Pip Reinf Conc H El HE‐III 48x76 LF 610.0153 St Swr Pip Reinf Conc H El HE‐III 53x83 LF 610.0158 St Swr Pip Reinf Conc H El HE‐III 58x91 LF 610.0163 St Swr Pip Reinf Conc H El HE‐III 63x98 LF 610.0168 St Swr Pip Reinf Conc H El HEIII 68x106 LF 610.0414 Ssp Rnf Con Hz Ellip Cl HE‐IV 14x23‐In LF 610.0419 Ssp Rnf Con Hz Ellip Cl HE‐IV 19x30‐In LF 610.0424 Ssp Rnf Con Hz Ellip Cl HE‐IV 24x38‐In LF 610.0429 Ssp Rnf Con Hz Ellip Cl HE‐IV 29x45‐In LF 610.0434 Ssp Rnf Con Hz Ellip Cl HE‐IV 34x53‐In LF 611.0410 Reconstructing Catch Basins EACH $723.59 $598.86 $876.92

Page 47

Page 48: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                             

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 611.0420 Reconstructing Manholes EACH $1,186.95 $1,341.59 $843.63 611.0430 Reconstructing Inlets EACH $958.41 $1,022.34 $863.97 611.0530 Manhole Covers Type J EACH $403.99 $434.15 $433.34 611.0535 Manhole Covers Type J‐Special EACH $441.05 $423.09 $442.17 611.0540 Manhole Covers Type K EACH $950.00 $823.00 611.0545 Manhole Covers Type L EACH $362.20 $353.56 $378.71 611.0550 Manhole Covers Type M EACH $561.50 $595.00 $550.00 611.0552 Manhole Covers Type M‐Communications EACH 611.0555 Manhole Covers Type Q EACH $675.15 611.0557 Manhole Covers Type Q‐Communications EACH $1,240.00 611.0600 Inlet Covers Type A EACH $591.39 $537.19 $519.15 611.0603 Inlet Covers Type A‐S EACH $606.67 $525.00 $450.00 611.0606 Inlet Covers Type B EACH $590.73 $591.04 $583.18 611.0609 Inlet Covers Type B‐A EACH $558.00 $900.00 611.0610 Inlet Covers Type BW EACH $588.40 $583.16 $688.08 611.0612 Inlet Covers Type C EACH $436.84 $481.38 $464.38 611.0615 Inlet Covers Type F EACH $887.57 $991.97 $1,017.76 611.0624 Inlet Covers Type H EACH $533.73 $551.01 $535.99 611.0627 Inlet Covers Type HM EACH $535.92 $519.64 $601.91 611.0630 Inlet Covers Type HM‐GJ EACH $641.71 $619.01 $532.57 611.0633 Inlet Covers Type HM‐GJ‐S EACH $699.31 $650.00 $525.00 611.0636 Inlet Covers Type HM‐S EACH $500.95 $546.19 $676.00 611.0639 Inlet Covers Type H‐S EACH $529.43 $564.33 $534.40 611.0642 Inlet Covers Type MS EACH $376.53 $407.16 $393.39 611.0645 Inlet Covers Type MS‐A EACH $440.17 $387.52 $513.67 611.0648 Inlet Covers Type R EACH $720.00 $863.33 611.0651 Inlet Covers Type S EACH $583.86 $569.28 $565.30 611.0652 Inlet Covers Type T EACH $621.25 $669.03 $710.97 611.0654 Inlet Covers Type V EACH $523.06 $533.70 $550.80 611.0657 Inlet Covers Type W EACH $976.11 611.0660 Inlet Covers Type WM EACH $1,165.48 $972.23 $1,084.21 611.0663 Inlet Covers Type X EACH $676.02 $597.60

Page 48

Page 49: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 611.0666 Inlet Covers Type Z EACH $526.72 $462.60 $521.49 611.1003 Catch Basins 3‐FT Diameter EACH $1,246.22 $1,789.41 $1,307.04 611.1004 Catch Basins 4‐FT Diameter EACH $1,759.51 $1,708.90 $1,549.46 611.1005 Catch Basins 5‐FT Diameter EACH $2,620.95 $2,718.14 $2,654.89 611.1006 Catch Basins 6‐FT Diameter EACH $3,530.73 $2,929.07 $3,707.03 611.1230 Catch Basins 2x3‐FT EACH $1,120.93 $1,340.50 $1,267.16 611.1253 Catch Basins 2.5x3‐FT EACH $1,654.67 $2,250.00 611.2003 Manholes 3‐FT Diameter EACH $1,441.29 $3,099.13 $1,385.78 611.2004 Manholes 4‐FT Diameter EACH $1,612.73 $2,060.54 $1,741.41 611.2005 Manholes 5‐FT Diameter EACH $2,576.04 $3,195.87 $2,510.35 611.2006 Manholes 6‐FT Diameter EACH $3,479.03 $3,647.26 $3,383.82 611.2007 Manholes 7‐FT Diameter EACH $5,426.00 $7,236.17 $4,864.33 611.2008 Manholes 8‐FT Diameter EACH $7,621.56 $7,340.95 $7,201.96 611.2033 Manholes 3x3‐FT EACH $2,667.04 $2,950.00 $2,400.00 611.2044 Manholes 4x4‐FT EACH $3,112.11 $3,280.00 $2,470.05 611.2055 Manholes 5x5‐FT EACH $4,887.50 $3,833.33 $4,486.78 611.2066 Manholes 6x6‐FT EACH $6,803.24 $3,737.50 $4,518.47 611.2104 Manholes Communication 4‐FT Diameter EACH $5,000.00 611.2504 Manholes Variable Tee 4‐FT Diameter EACH $6,065.00 $5,394.00 611.2604 Manholes Variable Special 4‐FT Diameter EACH $4,169.61 611.3003 Inlets 3‐FT Diameter EACH $1,273.30 $1,304.08 $1,466.87 611.3004 Inlets 4‐FT Diameter EACH $1,174.29 $1,684.93 $1,452.22 611.3220 Inlets 2x2‐FT EACH $1,223.40 $1,195.11 $1,108.98 611.3225 Inlets 2x2.5‐FT EACH $1,279.18 $1,220.85 $1,171.10 611.3230 Inlets 2x3‐FT EACH $1,046.53 $1,205.58 $1,059.58 611.3253 Inlets 2.5x3‐FT EACH $1,200.75 $1,383.98 $1,230.00 611.3901 Inlets Median 1 Grate EACH $1,724.71 $1,914.71 $1,690.43 611.3902 Inlets Median 2 Grate EACH $2,029.51 $2,916.96 $2,325.48 611.3903 Inlets Median 3 Grate EACH $2,423.13 $2,486.50 $2,755.00 611.3904 Inlets Median 4 Grate EACH $2,321.00 $3,501.65 $1,775.00 611.8105 Adjusting Catch Basin Covers EACH $564.21 $382.33 $335.71 611.8110 Adjusting Manhole Covers EACH $432.54 $393.41 $350.83

Page 49

Page 50: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 611.8115 Adjusting Inlet Covers EACH $338.19 $506.50 $359.67 611.8120.S Cover Plates Temporary EACH $171.38 $215.55 $174.04 611.9705 Salvaged Manhole Covers EACH $411.19 $219.46 611.9710 Salvaged Inlet Covers EACH $295.41 $263.49 $441.43 611.9800.S Pipe Grates EACH $890.35 $848.76 $891.00 611.9900.S Drain Slotted Vane EACH $9,678.00 $1,121.43 612.0104 Pipe Underdrain 4‐Inch LF $6.68 $6.53 $16.03 612.0106 Pipe Underdrain 6‐Inch LF $9.25 $6.34 $6.45 612.0108 Pipe Underdrain 8‐Inch LF $22.00 $25.50 $18.12 612.0110 Pipe Underdrain 10‐Inch LF 612.0112 Pipe Underdrain 12‐Inch LF 612.0115 Pipe Underdrain 15‐Inch LF 612.0118 Pipe Underdrain 18‐Inch LF 612.0121 Pipe Underdrain 21‐Inch LF 612.0204 Pipe Underdrain Unperforated 4‐Inch LF $8.45 $15.03 $6.65 612.0206 Pipe Underdrain Unperforated 6‐Inch LF $9.40 $10.62 $15.75 612.0208 Pipe Underdrain Unperforated 8‐Inch LF $25.00 $30.00 $17.13 612.0210 Pipe Underdrain Unperforated 10‐Inch LF $35.00 $10.00 612.0212 Pipe Underdrain Unperforated 12‐Inch LF $28.47 $31.48 $30.89 612.0215 Pipe Underdrain Unperforated 15‐Inch LF $48.00 612.0218 Pipe Underdrain Unperforated 18‐Inch LF $57.08 612.0221 Pipe Underdrain Unperforated 21‐Inch LF 612.0404 Pipe Underdrain Wrapped 4‐Inch LF $2.28 $6.64 $6.66 612.0406 Pipe Underdrain Wrapped 6‐Inch LF $6.77 $7.75 $7.06 612.0408 Pipe Underdrain Wrapped 8‐Inch LF $14.57 612.0410 Pipe Underdrain Wrapped 10‐Inch LF $25.00 612.0412 Pipe Underdrain Wrapped 12‐Inch LF 612.0415 Pipe Underdrain Wrapped 15‐Inch LF 612.0504 Pipe Underdrain Wrapped and Plowed 4‐In LF 612.0506 Pipe Underdrain Wrapped and Plowed 6‐In LF $26.68 612.0600 Underdrain Trench LF $10.21 $10.00 612.0700 Drain Tile Exploration LF $1.38 $2.50 $4.83

Page 50

Page 51: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 612.0804 Apr Endwls Underdrain Reinf Conc 4‐In EACH $91.35 $219.44 $219.39 612.0806 Apr Endwls Underdrain Reinf Conc 6‐In EACH $270.71 $251.45 $198.51 612.0902.S Insulation Board Polystyrene (inch) SY $23.03 $13.06 $16.41 613.1100.S Cable Barrier Type 1 LF $15.45 $16.83 613.1200.S Cable Barrier End Terminal Type 1 EACH $3,266.67 $3,561.91 614.0010 Barrier System Grade Shape Finish EACH $1,097.58 $1,365.26 $1,883.52 614.0115 Anchorages Stl Plt Beam Guard Type 2 EACH $775.91 $749.69 $753.08 614.0150 Anchor Assemblies Stl Plate Beam Guard EACH $133.33 $157.29 $192.22 614.0200 Steel Thrie Beam Structure Approach LF $51.09 $57.07 $54.73 614.0212 Stl Thrie Bm Str Appr Retro Cant Blunt EACH 614.0213 Stl Thrie Bm Str Appr Retro Cant Sloped EACH 614.0215 Stl Thrie Bm Str Appr Retrofit Span EACH $2,426.47 614.0216 Stl Thrie Bm Str Appr Retrofit Post EACH 614.0220 Steel Thrie Beam Bullnose Terminal EACH $5,402.53 $5,462.64 $5,535.51 614.0230 Steel Thrie Beam LF $22.39 $25.38 $25.63 614.0250 Steel Thrie Beam Struct Approach Temp LF $52.25 614.0305 Steel Plate Beam Guard Class A LF $15.73 $15.50 $15.63 614.0340 St Plt Beam Gd Over Lowfill Culv Class A LF $20.05 $22.00 $24.73 614.0345 Steel Plate Beam Guard Short Radius LF $21.07 $21.39 $24.52 614.0360 Steel Plate Beam Guard Temporary LF $13.35 $12.86 $12.00 614.0370 Stl Plt Beam Gd Energy Absorb Terminal EACH $2,509.28 $2,316.33 $2,502.99 614.0380 Stl Plt Beam Gd Engy Abs Terminal Temp EACH $2,000.00 $2,125.00 $2,150.00 614.0390 Steel Plate Beam Guard Shrt Rad Terminal EACH $1,393.62 $1,248.12 $1,445.83 614.0395 Guardrail Mow Strip Concrete SY $45.00 $50.83 614.0396 Guardrail Mow Strip Asphalt SY $29.00 $46.79 $23.26 614.0397 Guardrail Mow Strip Emulsified Asphalt SY $16.95 $15.58 $10.08 614.0400 Adjusting Steel Plate Beam Guard LF $7.99 $8.32 $8.27 614.0510 Guardrail Stiffened NW LF $25.00 614.0515 Guardrail Stiffened LHW LF $24.22 $22.99 $24.18 614.0700 Sand Barrel Arrays EACH $4,000.00 $2,127.27 614.0800 Crash Cushions Permanent EACH $20,471.43 $15,567.14 $14,023.53 614.0805 Crash Cushions Perm Low Maintanance EACH $25,467.07 $23,852.17 $25,642.86

Page 51

Page 52: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                      

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 614.0905 Crash Cushions Temporary EACH $5,857.47 $5,901.79 $5,778.52 614.0920 Salvaged Rail LF $7.45 $1.95 $1.81 614.0925 Salvaged Guardrail End Treatments EACH $252.24 $260.84 $200.42 614.0930 Salvaged Crash Cushions EACH $583.33 $200.00 614.0935 Salvaged Sand Barrels EACH 614.0950 Replacing Guardrail Posts and Blocks EACH $66.27 $80.67 $61.27 614.0951 Replacing Guardrail Rail and Hardware LF $14.86 $10.24 $8.57 614.1000 MGS Guardrail Temporary LF $12.44 $12.22 $16.19 614.1100 MGS Guardrail Temp Thrie Beam Transition LF $47.49 $61.09 $61.07 614.1200 MGS Guardrail Temporary Terminal EAT EACH $1,927.67 $2,350.00 $2,200.00 614.2300 MGS Guardrail 3 LF $15.60 $15.45 $16.06 614.2310 MGS Guardrail 3 HS LF $31.58 $27.70 $25.73 614.2320 MGS Guardrail 3 QS LF $50.00 $45.29 $37.91 614.2330 MGS Guardrail 3 K LF $23.57 $23.96 $24.11 614.2340 MGS Guardrail 3 L LF $20.24 $20.04 $19.73 614.2350 MGS Guardrail Short Radium LF 614.2500 MGS Thrie Beam Transition LF $60.64 $59.76 $60.56 614.2610 MGS Guardrail Terminal EAT EACH $2,394.53 $2,353.12 $2,386.61 614.2620 MGS Guardrail Terminal Type 2 EACH $844.58 $855.99 $870.11 614.2630 MGS Guardrail Short Radius Terminal EACH 614.8010 Anchor Post Assembly Top Mount EACH $344.15 $252.38 615.0100 Guard Fence Timber Rail LF 615.0200 Curbs Treated Timber EACH $90.00 $85.00 615.0300 Guard Posts Timber EACH $150.00 615.0400 Marker Posts Rustic EACH 615.1000 Wisconsin Historical Marker (project) LS 616.0100 Fence Woven Wire (height) LF $5.32 $4.61 $4.39 616.0120.S Fencing Small Animal LF 616.0204 Fence Chain Link 4‐FT LF $19.76 $28.87 $30.50 616.0205 Fence Chain Link 5‐FT LF $11.15 $30.56 $21.38 616.0206 Fence Chain Link 6‐FT LF $11.09 $11.75 $14.27 616.0207 Fence Chain Link 7‐FT LF

Page 52

Page 53: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 616.0208 Fence Chain Link 8‐FT LF $14.67 $32.24 $16.25 616.0210 Fence Chain Link 10‐FT LF $117.50 616.0329 Gates Chain Link (width) EACH $1,765.90 $1,084.92 $1,606.00 616.0350.S Gates Wood Single Leaf (length) EACH 616.0352.S Gates Wood Double Leaf (length) EACH 616.0360.S Gates Pipe Single Leaf (length) EACH 616.0404 Fence Chain Link Salvaged 4‐FT LF $50.00 $40.00 616.0405 Fence Chain Link Salvaged 5‐FT LF 616.0406 Fence Chain Link Salvaged 6‐FT LF $16.48 $26.34 $14.13 616.0407 Fence Chain Link Salvaged 7‐FT LF $40.00 616.0408 Fence Chain Link Salvaged 8‐FT LF 616.0410 Fence Chain Link Salvaged 10‐FT LF $44.00 616.0600.S Fence Temporary LF $10.00 $4.56 $5.00 616.0700.S Fence Safety LF $2.46 $2.64 $2.57 616.0800.S Fence Track Clearance LF $2.75 $2.25 $4.00 617.0100 Hauling (material) CYMI 618.0100 Maintenance And Repair of Haul Roads EACH $339.29 $382.26 $397.50 619.1000 Mobilization EACH $322,091.56 $287,695.20 $157,870.95 620.0100 Concrete Corrugated Median SF $6.38 $7.43 $8.27 620.0200 Concrete Median Blunt Nose SF $7.64 $10.65 $9.90 620.0300 Concrete Median Sloped Nose SF $7.82 $8.78 $7.99 621.0100 Landmark Reference Monuments EACH $108.10 $211.24 $215.97 621.1100 Landmark Ref Monuments&Cast Iron Covers EACH $550.00 $1,042.86 621.1200 Landmark Ref Monuments&Aluminum Covers EACH 623.0200 Dust Control Surface Treatment SY $0.08 $0.02 $0.06 624.0100 Water MGAL $17.09 $15.84 $14.28 625.0100 Topsoil SY $2.43 $1.59 $1.85 625.0105 Topsoil CY $4.38 $21.06 $23.91 625.0500 Salvaged Topsoil SY $0.61 $0.74 $0.62 626.0200 Peat Humus SY 627.0200 Mulching SY $0.15 $0.16 $0.15 627.0205 Mulching TON

Page 53

Page 54: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                        

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 628.1104 Erosion Bales EACH $8.81 $9.04 $8.61 628.1504 Silt Fence LF $1.67 $1.77 $1.70 628.1520 Silt Fence Maintenance LF $0.07 $0.05 $0.04 628.1550 Silt Screen LF $24.81 $28.48 628.1905 Mobilizations Erosion Control EACH $143.41 $175.00 $191.54 628.1910 Mobilization Emergency Erosion Control EACH $100.56 $133.94 $138.07 628.1920 Cleaning Sediment Basins CY $25.00 $20.00 $11.59 628.2002 Erosion Mat Class I Type A SY $0.86 $0.85 $0.90 628.2004 Erosion Mat Class I Type B SY $0.90 $0.92 $0.92 628.2006 Erosion Mat Urban Class I Type A SY $1.37 $1.45 $1.46 628.2008 Erosion Mat Urban Class I Type B SY $1.37 $1.50 $1.52 628.2021 Erosion Mat Class II Type A SY $1.25 $4.90 628.2023 Erosion Mat Class II Type B SY $1.50 $1.34 $1.51 628.2027 Erosion Mat Class II Type C SY $3.61 $3.64 $4.25 628.2031 Erosion Mat Class III Type A SY $5.06 $3.73 628.2033 Erosion Mat Class III Type B SY $6.03 $7.39 $8.00 628.2037 Erosion Mat Class III Type C SY $5.94 $5.71 $15.00 628.2039 Erosion Mat Class III Type D SY $12.50 $12.25 $9.04 628.5505 Polyethylene Sheeting SY $2.96 $2.71 $1.26 628.6005 Turbidity Barriers SY $27.66 $32.92 $28.87 628.6505 Soil Stabilizer Type A ACRE $3,044.17 $1,998.86 $1,976.25 628.6510 Soil Stabilizer Type B ACRE $495.70 $650.58 $645.03 628.7005 Inlet Protection Type A EACH $77.04 $84.03 $92.52 628.7010 Inlet Protection Type B EACH $52.54 $49.98 $52.33 628.7015 Inlet Protection Type C EACH $48.27 $48.57 $49.45 628.7020 Inlet Protection Type D EACH $106.42 $109.56 $97.34 628.7504 Temporary Ditch Checks LF $7.19 $7.34 $7.30 628.7515.S Stone or Rock Ditch Checks CY $27.36 $38.81 628.7555 Culvert Pipe Checks EACH $15.81 $16.37 $15.72 628.7560 Tracking Pads EACH $1,295.45 $672.00 $802.56 628.7570 Rock Bags EACH $8.72 $8.76 $7.40 629.0205 Fertilizer Type A CWT $46.97 $52.13 $49.20

Page 54

Page 55: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                          

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 629.0210 Fertilizer Type B CWT $56.36 $51.03 $52.30 629.1100 Agricultural Limestone Treatment TON $880.00 630.0110 Seeding Mixture No. 10 LB $5.76 $5.06 $5.46 630.0120 Seeding Mixture No. 20 LB $4.53 $5.01 $5.11 630.0130 Seeding Mixture No. 30 LB $5.59 $5.30 $5.03 630.0140 Seeding Mixture No. 40 LB $6.80 $7.37 $9.56 630.0160 Seeding Mixture No. 60 LB $7.35 $11.43 $16.33 630.0170 Seeding Mixture No. 70 LB $50.01 $88.86 $125.41 630.0171 Seeding Mixture No. 70A LB $70.21 $130.00 $120.11 630.0175 Seeding Mixture No. 75 LB $23.49 $18.41 $25.00 630.0180 Seeding Mixture No. 80 LB $29.12 $16.00 630.0200 Seeding Temporary LB $2.13 $1.93 $2.20 630.0300 Seeding Borrow Pit LB $4.05 $5.86 $3.57 630.0400 Seeding Nurse Crop LB $2.35 $2.14 $2.44 631.0300 Sod Water MGAL $21.20 $31.96 $17.22 631.1000 Sod Lawn SY $3.68 $3.92 $4.12 631.1100 Sod Erosion Control SY $4.95 $9.24 $3.93 631.1200 Sod Erosion Control Sandy Soil SY $10.00 $20.00 632.0101 Trees (species) (size) (root) EACH $303.30 $437.79 $461.13 632.0201 Shrubs (species) (size) (root) EACH $53.74 $57.44 $58.64 632.0301 Vines (species) (size) (root) EACH $26.54 $18.00 $22.34 632.9101 Landscape Planting Surv & Care Cycles EACH $663.00 $677.44 $750.47 633.0100 Delineator Posts Steel EACH $22.23 $21.86 $21.98 633.0200 Delineators Flexible EACH $41.87 $36.49 $39.50 633.0500 Delineator Reflectors EACH $5.07 $5.07 $4.39 633.1000 Delineator Brackets EACH $38.20 $34.73 $39.97 633.1100 Delineators Temporary EACH $21.86 $27.37 $19.91 633.5100 Markers Row EACH $28.44 $32.07 $46.32 633.5200 Markers Culvert End EACH $39.08 $40.65 $42.15 633.5300 Markers Crossover EACH 633.9010 Salvaged Delineator Steel EACH 634.0410 Posts Wood 4x4‐Inch X 10‐FT EACH $49.53 $51.15 $51.67

Page 55

Page 56: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                       

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 634.0412 Posts Wood 4x4‐Inch X 12‐FT EACH $51.51 $54.00 $40.00 634.0414 Posts Wood 4x4‐Inch X 14‐FT EACH $50.67 $49.75 $54.82 634.0416 Posts Wood 4x4‐Inch X 16‐FT EACH $57.39 $59.59 634.0418 Posts Wood 4x4‐Inch X 18‐FT EACH $80.00 $75.00 634.0612 Posts Wood 4x6‐Inch X 12‐FT EACH $53.38 $51.33 $52.35 634.0614 Posts Wood 4x6‐Inch X 14‐FT EACH $54.12 $53.57 $50.76 634.0616 Posts Wood 4x6‐Inch X 16‐FT EACH $57.54 $54.67 $53.43 634.0618 Posts Wood 4x6‐Inch X 18‐FT EACH $65.81 $63.63 $60.88 634.0620 Posts Wood 4x6‐Inch X 20‐FT EACH $74.11 $72.98 $83.49 634.0622 Posts Wood 4x6‐Inch X 22‐FT EACH $83.96 $83.26 $81.70 634.0624 Posts Wood 4x6‐Inch X 24‐FT EACH $115.56 $125.00 634.0801 Posts Tubular Steel 2x2‐Inch X 1.5‐FT EACH 634.0803 Posts Tubular Steel 2x2‐Inch X 3‐FT EACH 634.0805 Posts Tubular Steel 2x2‐Inch X 5‐FT EACH $109.00 $105.95 $103.75 634.0808 Posts Tubular Steel 2x2‐Inch X 8‐FT EACH $235.23 $115.81 $119.46 634.0809 Posts Tubular Steel 2x2‐Inch X 9.5‐FT EACH $115.91 $130.00 634.0810 Posts Tubular Steel 2x2‐Inch X 10‐FT EACH $200.14 $115.93 $127.58 634.0811 Posts Tubular Steel 2x2‐Inch X 11‐FT EACH $121.37 $123.78 $116.58 634.0812 Posts Tubular Steel 2x2‐Inch X 12‐FT EACH $132.89 $120.03 $128.74 634.0814 Posts Tubular Steel 2x2‐Inch X 14‐FT EACH $134.99 $119.94 $133.78 634.0816 Posts Tubular Steel 2x2‐Inch X 16‐FT EACH $130.56 $126.49 $130.79 634.0818 Posts Tubular Steel 2x2‐Inch X 18‐FT EACH $170.12 $176.67 634.0885 Posts Tubular Steel 2x2‐Inch X 8.5‐FT EACH $148.04 $250.00 635.0200 Sign Supports Structural Steel HS LB $3.24 $3.11 $2.76 635.0300 Sign Supports Replac Base Connect Bolts EACH $86.34 $165.13 $147.16 635.9010.S Sign Supports Shorten Structural Steel EACH $175.00 $825.00 636.0050.S Foundation Drilling (diameter) LF $63.37 636.0100 Sign Supports Concrete Masonry CY $757.51 $968.56 $842.03 636.0500 Sign Supports Steel Reinforcement LB $3.11 $2.41 $2.84 636.1000 Sign Supports Steel Reinforcement HS LB $1.36 $1.03 $3.14 636.1500 Sign Supports Steel Coated Reinf HS LB $1.54 $1.24 $2.89 637.0620 Sign Flags Permanent Type II EACH $118.12 $96.90 $121.44

Page 56

Page 57: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 637.1210 Signs Type I Reflective H SF $21.33 $19.38 637.1220 Signs Type I Reflective SH SF $22.09 $18.83 $20.37 637.1230 Signs Type I Reflective F SF $21.55 $20.62 $20.74 637.2110 Signs Type II Non Reflective SF 637.2115 Signs Type II Non Reflective Folding SF 637.2210 Signs Type II Reflective H SF $16.38 $15.01 $15.05 637.2215 Signs Type II Reflective H Folding SF $22.26 $22.82 $22.62 637.2220 Signs Type II Reflective SH SF $19.71 $20.64 $18.19 637.2225 Signs Type II Reflective SH Folding SF 637.2230 Signs Type II Reflective F SF $18.23 $17.39 $16.89 637.2235 Signs Type II Reflective F Folding SF $25.00 $23.09 637.5453 Barricades Permanent Type III EACH $398.42 $216.49 $445.38 638.2101 Moving Signs Type I EACH $455.98 $453.52 $647.86 638.2102 Moving Signs Type II EACH $66.04 $63.38 $69.15 638.2601 Removing Signs Type I EACH $232.97 $199.34 $289.05 638.2602 Removing Signs Type II EACH $18.90 $19.16 $15.86 638.3000 Removing Small Sign Supports EACH $19.20 $16.82 $15.53 638.3100 Removing Structural Steel Sign Supports EACH $236.05 $236.35 $223.49 638.3150 Remv Ovrhd Sign Supp Cantlvr (structure) EACH 638.3155 Remv Ovrhd Sign Supp Full Span (structr) EACH 638.3210 Revising Signs Type I Demountable EACH $877.11 $551.56 $1,190.67 638.3215 Revising Signs Type I Non‐Removeable EACH 638.3610 Erecting State Owned Signs Type I EACH $2,166.67 638.3620 Erecting State Owned Signs Type II EACH $75.00 $50.00 $100.00 638.4000 Moving Small Sign Supports EACH $55.78 $57.09 $56.85 638.4100 Moving Structural Steel Sign Supports EACH $366.67 $341.30 $471.43 639.0106 Drill Hole in Earth 6‐Inch LF 639.0108 Drill Hole in Earth 8‐Inch LF $150.00 639.0110 Drill Hole in Earth 10‐Inch LF $26.25 639.0112 Drill Hole in Earth 12‐Inch LF $175.00 639.0504 Drill Hole in Rock 4‐Inch LF 639.0506 Drill Hole in Rock 6‐Inch LF

Page 57

Page 58: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 639.0508 Drill Hole in Rock 8‐Inch LF 639.0510 Drill Hole in Rock 10‐Inch LF 639.0512 Drill Hole in Rock 12‐Inch LF 639.1004 Well Casing Pipe 4‐Inch LF 639.1006 Well Casing Pipe 6‐Inch LF $18.60 639.1008 Well Casing Pipe 8‐Inch LF $55.00 639.1010 Well Casing Pipe 10‐Inch LF 639.1012 Well Casing Pipe 12‐Inch LF 639.1700 Well Screen LF $300.00 $550.00 639.2100 Grout for Sealing Well Casing CF $21.00 $75.00 639.2500 Pump and Well Platform EACH 639.3000 Wayside Well Shelter EACH 639.4000 Test Pumping EACH $630.00 $3,500.00 640.0200.S Placing Industrial (byproduct) CY $2.42 640.0250.S Hauling Industrial (byproduct) TON $8.65 640.0270.S Maintenance of Cells (byproduct) HRS 640.0400.S Basin Lysimeter EACH 640.0500.S Head Monitoring Well EACH 640.1303.S Pond Liner Clay CY $13.67 $8.49 $18.00 640.1305.S Clay Cover CY 641.0100 Sign Brg Single Pole Sign Support 1 Sign LS $19,420.00 $16,050.00 $16,765.00 641.0600 Sign Brg Single Pole Sign Support 2 Sign LS $20,673.33 $25,514.50 $22,297.50 641.1200 Sign Bridge Cantilevered (structure) LS $26,863.50 $26,167.50 $26,312.25 641.5100 Sign Bridge Structure Mounted (struct) LS $19,500.00 $53,825.00 641.6600 Sign Bridge (structure) LS $66,927.42 $56,455.44 $54,948.93 641.8100 Overhead Sign Support (structure) LS $21,994.83 $21,559.98 $17,864.33 642.5001 Field Office Type B EACH $4,891.80 $5,371.72 $4,761.99 642.5201 Field Office Type C EACH $8,101.71 $9,163.41 $8,697.04 642.5401 Field Office Type D EACH $14,096.71 $11,704.49 $13,660.99 642.6001 Field Laboratory EACH $8,333.33 $6,666.67 643.0100 Traffic Control (project) EACH 643.0200.S Traffic Control Surv & Maint (project) DAY $261.40

Page 58

Page 59: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                           

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 643.0300 Traffic Control Drums DAY $0.32 $0.32 $0.37 643.0310.S Temporary Portable Rumble Strips LS $10,945.08 643.0405 Traffic Control Barricades Type I DAY 643.0410 Traffic Control Barricades Type II DAY $0.51 $0.51 $0.49 643.0420 Traffic Control Barricades Type III DAY $0.77 $0.70 $0.68 643.0453 Traffic Control Barricades Perm Type III EACH 643.0500 Traffic Cntrl Flex Tubular Marker Posts EACH $22.41 $26.93 $27.29 643.0600 Traffic Cntrl Flex Tubular Marker Bases EACH $6.34 $4.65 $2.25 643.0705 Traffic Control Warning Lights Type A DAY $0.22 $0.17 $0.20 643.0710 Traffic Control Warning Lights Type B DAY $1.00 $1.00 643.0715 Traffic Control Warning Lights Type C DAY $0.20 $0.19 $0.21 643.0800 Traffic Control Arrow Boards DAY $19.83 $16.82 $17.23 643.0900 Traffic Control Signs DAY $0.76 $0.65 $0.73 643.0910 Traffic Control Covering Signs Type I EACH 643.0920 Traffic Control Covering Signs Type II EACH $73.88 $50.10 $35.50 643.1000 Traffic Control Signs Fixed Message SF $22.80 $19.87 $24.12 643.1017.S Traffic Control Cones 42‐inch DAY $0.40 643.1050 Traffic Control Signs PCMS DAY 643.1051 Traf Cntrol Sign PCMS w Cellulr Communic DAY $59.92 643.1055.S Truck or Trailer Mounted Attenuator DAY $241.33 $113.40 $352.45 643.1070 Traffic Control Cones 42‐Inch DAY 643.2000 Traffic Control Detour (project) EACH $8,224.19 $8,899.04 $4,304.86 643.3000 Traffic Control Detour Signs DAY $0.27 $0.27 $0.30 643.4100.S Traffic Control Interim Lane Closure EACH 643.5000 Traffic Control EACH $29,084.79 $27,735.16 $22,648.28 644.1410.S Temporary Pedestrian Surface Asphalt SF $1.46 $2.75 644.1420.S Temporary Pedestrian Surface Plywood SF $0.38 $4.55 644.1430.S Temporary Pedestrian Surface Plate SF $1.73 $2.52 644.1601.S Temporary Curb Ramp EACH $400.73 $388.89 644.1616.S Temporary Pedestrian Safety Fence LF $6.08 $5.00 644.1810.S Temporary Pedestrian Barricade LF 645.0105 Geotextile Type C SY $2.61 $2.65 $2.87

Page 59

Page 60: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                       

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 645.0111 Geotextile Type DF Schedule A SY $1.88 $1.61 $2.18 645.0112 Geotextile Type DF Schedule B SY $2.73 $2.05 $3.09 645.0113 Geotextile Type DF Schedule C SY $2.12 $2.00 645.0115 Geotextile Type ES SY $18.00 $14.45 645.0120 Geotextile Type HR SY $2.89 $3.11 $3.11 645.0125 Geotextile Type MS SY 645.0130 Geotextile Type R SY $2.17 $2.50 $2.30 645.0135 Geotextile Type SR SY $1.05 $3.28 $2.20 645.0140 Geotextile Type SAS SY $1.65 $1.80 $2.18 645.0220 Geogrid Type SR SY $1.56 645.0240 Geogrid Type MR SY 645.0260 Geogrid Type SSR SY 646.0101.S Pavement Marking Paint High Build 4‐Inch LF 646.0103 Pavement Marking Paint 4‐Inch LF 646.0106 Pavement Marking Epoxy 4‐Inch LF 646.0107.S Pvmt Mrkg Grooved Epoxy 4‐Inch LF $0.58 646.0109 Pavement Marking Preformed Plastic 4‐In LF $8.73 $3.05 646.0113 Pavement Marking Paint 6‐Inch LF 646.0116 Pavement Marking Epoxy 6‐Inch LF $1.18 $0.66 $0.95 646.0119 Pavement Marking Preformed Plastic 6‐In LF 646.0121.S Pavement Marking Paint High Build 8‐Inch LF 646.0123 Pavement Marking Paint 8‐Inch LF 646.0126 Pavement Marking Epoxy 8‐Inch LF 646.0127.S Pvmt Mrkg Grooved Epoxy 8‐Inch LF $2.07 646.0129 Pavement Marking Preformed Plastic 8‐In LF $5.42 $8.00 646.0133 Pavement Marking Paint 12‐Inch LF 646.0136 Pavement Marking Epoxy 12‐Inch LF $3.67 $4.10 $8.77 646.0139 Pavement Marking Preformed Plastic 12‐In LF 646.0143 Pavement Marking Paint 16‐Inch LF 646.0146 Pavement Marking Epoxy 16‐Inch LF $5.00 646.0149 Pavement Marking Preformed Plastic 16‐In LF 646.0153 Pavement Marking Paint 18‐Inch LF

Page 60

Page 61: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 646.0156 Pavement Marking Epoxy 18‐Inch LF $20.20 $20.51 $15.05 646.0159 Pavement Marking Preformed Plastic 18‐In LF 646.0406 Pavement Marking Same Day Epoxy 4‐Inch LF 646.0600 Removing Pavement Markings LF 646.0690.S Removing Pavement Markings Water Blastng LF 646.0790.S Removing Raised Pavement Markers EACH 646.0805.S Pavement Marking Outfall EACH 646.0841.S Pvt Mkng Grvd Wet Rflct Cntrst Tape 4‐In LF $6.72 $7.17 $6.11 646.0842.S Pvt Mkng Grvd Cntrst Wet Refl Epoxy 4‐In LF 646.0843.S Pvt Mkng Grvd Wet Rflct Cntrst Tape 8‐In LF $9.77 $10.15 $8.51 646.0844.S Pvt Mkng Grvd Cntrst Wet Refl Epoxy 8‐In LF 646.0871.S Pvmt Mrking Wet Reflective Tape 4‐Inch LF 646.0873.S Pvmt Mrking Wet Reflective Tape 8‐Inch LF 646.0881.S Pvt Mrking Grvd Wet Reflct Tape 4‐Inch LF $4.24 $5.28 $4.17 646.0883.S Pvt Mrking Grvd Wet Reflct Tape 8‐Inch LF $7.67 $7.28 $7.13 646.0900.S Pavement Marking Late Season LF 646.1005 Marking Line Paint 4‐Inch LF $0.10 $0.08 $0.11 646.1020 Marking Line Epoxy 4‐Inch LF $0.31 $0.32 $0.29 646.1040 Mrking Grvd Wet Reflct Epoxy 4‐Inch LF $1.30 $1.13 $1.00 646.1050 Mkng Line Grvd Perm Tape 4‐Inch LF 646.1545 Mkng Grvd Wet Cntrst Refl Epoxy 4‐In LF $1.81 646.1555 Mkng Line Grvd Contrst Perm Tape 4‐Inch LF 646.2304.S Pvt Mrking Grvd Wet Reflct Epoxy 4‐Inch LF 646.2308.S Pvt Mrking Grvd Wet Reflct Epoxy 8‐Inch LF 646.3005 Marking Line Paint 8‐Inch LF $0.31 $0.27 $0.17 646.3020 Marking Line Epoxy 8‐Inch LF $0.85 $0.66 $0.65 646.3040 Mrking Grvd Wet Reflct Epoxy 8‐Inch LF $2.50 $2.13 $2.26 646.3050 Mkng Line Grvd Perm Tape 8‐Inch LF 646.3545 Mkng Grvd Wet Refl Crntrst Epoxy 8‐In LF $3.90 646.3555 Mkng Line Grvd Crntrst Perm Tape 8‐Inch LF 646.4505 Marking Line Same Day Paint 4‐Inch LF 646.4520 Marking Line Same Day Epoxy 4‐Inch LF $0.61 $0.68 $0.71

Page 61

Page 62: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 646.4605 Marking Line Same Day Paint 8‐Inch LF 646.4620 Marking Line Same Day Epoxy 8‐Inch LF 646.5005 Marking Arrow Paint EACH $81.81 $60.00 $196.43 646.5020 Marking Arrow Epoxy EACH $193.31 $166.29 $168.14 646.5105 Marking Word Paint EACH $47.32 $100.00 646.5120 Marking Word Epoxy EACH $200.45 $192.76 $191.79 646.5205 Marking Symbol Paint EACH $72.00 $55.00 $198.00 646.5220 Marking Symbol Epoxy EACH $155.25 $110.25 $127.23 646.5305 Marking Railroad Crossing Paint EACH $175.00 646.5320 Marking Railroad Crossings Epoxy EACH $937.95 $715.70 $882.25 646.5420 Marking Aerial Enforcement Bar Epoxy LF $23.93 $21.41 $32.85 646.5520 Marking Outfall Epoxy EACH $38.98 $20.82 $20.25 646.6005 Marking Stop Line Paint 12‐Inch LF 646.6020 Marking Stop Line Epoxy 12‐Inch LF $9.12 $6.46 $8.32 646.6105 Marking Stop Line Paint 18‐Inch LF $5.41 $6.00 $4.67 646.6120 Marking Stop Line Epoxy 18‐Inch LF $10.16 $9.30 $8.66 646.6205 Marking Yield Line Paint 18‐Inch EACH 646.6220 Marking Yield Line Epoxy 18‐Inch EACH $18.55 $45.86 $44.40 646.6305 Marking Dotted Extension Paint 18‐Inch LF 646.6320 Marking Dotted Extension Epoxy 18‐Inch LF 646.6464.S Cold Weather Mrkg Epoxy 4‐Inch LF $0.58 $0.75 646.6468.S Cold Weather Mrkg Epoxy 8‐Inch LF 646.7005 Marking Diagonal Paint 6‐Inch LF 646.7020 Marking Diagonal Epoxy 6‐Inch LF $5.00 $5.14 $5.80 646.7105 Marking Diagonal Paint 12‐Inch LF $2.80 646.7120 Marking Diagonal Epoxy 12‐Inch LF $5.19 $7.16 $6.66 646.7205 Marking Chevron Paint 24‐Inch LF 646.7220 Marking Chevron Epoxy 24‐Inch LF 646.7405 Mrkg Crosswalk Paint Transvse Lin 6‐Inch LF $5.35 $5.02 646.7420 Mrkg Crosswalk Epoxy Transvse Ln 6‐Inch LF $6.77 $7.08 $7.67 646.7505 Mrkg Crosswalk Paint ladder Ptrn 24‐Inch LF 646.7520 Mrkg Crosswalk Epoxy Ladder Ptrn 24‐Inch LF $12.15 $8.60 $9.32

Page 62

Page 63: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 646.8005 Marking Corrugated Median Paint SF 646.8020 Marking Corrugated Median Epoxy SF $3.93 $3.59 $4.35 646.8105 Marking Curb Paint LF 646.8120 Marking Curb Epoxy LF $6.89 $6.98 $6.48 646.8205 Marking Island Nose Paint EACH 646.8220 Marking Island Nose Epoxy EACH $106.71 $116.98 $112.43 646.8305 Marking Parking Stall Paint LF $3.50 $0.60 $4.83 646.8320 Marking Parking Stall Epoxy LF $3.77 $3.51 $2.43 646.9000 Marking Removal Line 4‐Inch LF $0.63 $0.47 $0.30 646.9010 Marking Removal Line Water Blastg 4‐Inch LF $5.68 $0.80 646.9100 Marking Removal Line 8‐Inch LF 646.9110 Marking Removal Line Water Blastg 8‐Inch LF 646.9200 Marking Removal Line Wide LF 646.9210 Marking Removal Line Water Blastg Wide LF 646.9300 Marking Removal Special Marking EACH 646.9310 Removal Special Marking Water Blstg EACH $225.00 $90.00 646.9400 Marking Remvl Plowable Raised Pmt Marker EACH $23.45 $16.98 $15.55 647.0105 Pvt Marking Railroad Crossings Paint EACH 647.0110 Pvt Marking Railroad Crossings Epoxy EACH 647.0115 Pvt Marking RR Crossings Pref Plastic EACH 647.0130 Pavement Marking Arrows Epoxy Type 7R EACH 647.0132 Pvmt Mark Arrows Preform Plastic Type 7R EACH 647.0136 Pavement Marking Arrows Epoxy Type 7 EACH 647.0139 Pvmt Marking Arrws Preformd Plstc Type 7 EACH 647.0140 Pavement Marking Arrows Epoxy Type 6R EACH 647.0142 Pvmt Markng Arrow Prefrmd Plastc Type 6R EACH 647.0146 Pavement Marking Arrows Epoxy Type 6 EACH 647.0149 Pvmt Marking Arrws Preformd Plstc Type 6 EACH 647.0153 Pavement Marking Arrows Paint Type 1 EACH 647.0156 Pavement Marking Arrows Epoxy Type 1 EACH 647.0159 Pvt Marking Arrows Pref Plastic Type 1 EACH $400.00 647.0160 Pavement Marking Arrows Epoxy Type 2R EACH

Page 63

Page 64: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 647.0162 Pvt Mrkg Arrows Preformd Plastic Type 2R EACH $550.00 647.0163 Pavement Marking Arrows Paint Type 2 EACH 647.0166 Pavement Marking Arrows Epoxy Type 2 EACH 647.0169 Pvt Marking Arrows Pref Plastic Type 2 EACH $560.00 $500.00 647.0170 Pvt Mrkg Arrows Epoxy Type 3R EACH 647.0172 Pvt Mrkg Arrows Prefrmed Plastic Type 3R EACH 647.0173 Pavement Marking Arrows Paint Type 3 EACH 647.0176 Pavement Marking Arrows Epoxy Type 3 EACH 647.0179 Pvt Marking Arrows Pref Plastic Type 3 EACH $600.00 $800.00 647.0183 Pavement Marking Arrows Paint Type 4 EACH 647.0186 Pavement Marking Arrows Epoxy Type 4 EACH 647.0189 Pvt Marking Arrows Pref Plastic Type 4 EACH 647.0193 Pavement Marking Arrows Paint Type 5 EACH 647.0196 Pavement Marking Arrows Epoxy Type 5 EACH 647.0199 Pvt Marking Arrows Pref Plastic Type 5 EACH $700.00 647.0203 Pavement Marking Arrows Bike Lane Paint EACH 647.0206 Pavement Marking Arrows Bike Lane Epoxy EACH 647.0209 Pvt Marking Arrow Bike Lane Pref Plastic EACH 647.0253 Pavement Marking Symbols Paint EACH 647.0256 Pavement Marking Symbols Epoxy EACH 647.0259 Pavement Marking Symbols Pref Plastic EACH 647.0303 Pavement Marking Symbols Bike Lane Paint EACH 647.0306 Pavement Marking Symbols Bike Lane Epoxy EACH 647.0309 Pvt Marking Syb Bike Lane Pref Plastic EACH 647.0313 Pvt Mkg Symbols Bike Detector Paint EACH 647.0316 Pvt Marking Symbols Bike Detector Epoxy EACH 647.0319 Pvt Mking Sym Bike Detector Prefmed Plas EACH 647.0323 Pvmt Mrkg Symbols Bike Crossing Paint EACH 647.0326 Pvmt Mrkg Symbols Bike Crossing Epoxy EACH 647.0329 Pvmt Mrkg Symb Bike Cross Prefrm Plastic EACH 647.0333 Pvmt Mrkg Symb Bike Shared Lane Paint EACH 647.0336 Pvmt Mrkg Symb Bike Shared Lane Epoxy EACH

Page 64

Page 65: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 647.0339 Pvmt Mrkg Symb Bike Shrd Ln Pfrm Plastic EACH 647.0353 Pavement Marking Words Paint EACH 647.0356 Pavement Marking Words Epoxy EACH 647.0359 Pvt Marking Words Preformed Plastic EACH $691.67 $650.00 647.0403 Pavement Marking Words Bike Lane Paint EACH 647.0406 Pavement Marking Words Bike Lane Epoxy EACH 647.0409 Pvt Marking Words Bike Lane Pref Plastic EACH 647.0453 Pavement Marking Curb Paint LF 647.0456 Pavement Marking Curb Epoxy LF 647.0503 Pavement Marking Curb Ramp Paint LF 647.0506 Pavement Marking Curb Ramp Epoxy LF $4.50 647.0509 Pavement Marking Curb Ramp Pref Plastic LF 647.0523 Pvmt Mark Yield Line Symb Paint 18‐Inch EACH 647.0526 Pvmt Mark Yield Line Symb Epoxy 18‐Inch EACH 647.0529 Pvmt Mrk Yld Line Symb Prfrm Plas 18‐In EACH 647.0543 Pvmt Mrkg Yield Line Symb Paint 36‐In EACH 647.0546 Pvmt Mrkg Yield Line Symb Epoxy 36‐In EACH $16.00 $50.00 647.0549 Pvmt Mrk Yld Line Symb Prfrm Plas 36‐In EACH 647.0556 Pavement Marking Stop Line Epoxy 12‐Inch LF 647.0563 Pavement Marking Stop Line Paint 18‐Inch LF 647.0566 Pavement Marking Stop Line Epoxy 18‐Inch LF 647.0569 Pvt Marking Stop Line Pref Plastic 18‐In LF $7.00 647.0576 Pavement Marking Stop Line Epoxy 24‐Inch LF $11.02 $11.65 $9.91 647.0579 Pvt Marking Stop Line Pref Plastic 24‐In LF $14.60 647.0603 Pavement Marking Island Nose Paint EACH 647.0606 Pavement Marking Island Nose Epoxy EACH 647.0653 Pavement Marking Parking Stall Paint LF 647.0656 Pavement Marking Parking Stall Epoxy LF 647.0659 Pvt Marking Parking Stall Pref Plastic LF 647.0706 Pavement Marking Diagonal Epoxy 6‐Inch LF 647.0723 Pavement Marking Diagonal Paint 12‐Inch LF 647.0726 Pavement Marking Diagonal Epoxy 12‐Inch LF

Page 65

Page 66: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 647.0729 Pvt Marking Diagonal Pref Plastic 12‐In LF 647.0743 Pavement Marking Diagonal Paint 24‐Inch LF 647.0746 Pavement Marking Diagonal Epoxy 24‐Inch LF $7.82 $8.42 $8.19 647.0749 Pvt Marking Diagonal Pref Plastic 24‐In LF 647.0763 Pavement Marking Crosswalk Paint 6‐Inch LF 647.0766 Pavement Marking Crosswalk Epoxy 6‐In LF 647.0769 Pvet Marking Crosswalk Pref Platic 6‐In LF $13.00 647.0773 Pavement Marking Crosswalk Paint 12‐In LF $4.45 $9.50 647.0776 Pavement Marking Crosswalk Epoxy 12‐In LF $7.93 $8.15 $7.47 647.0779 Pvt Marking Crosswalk Pref Plastic 12‐In LF $7.75 647.0783 Pavement Marking Crosswalk Paint 18‐In LF 647.0786 Pavement Marking Crosswalk Epoxy 18‐In LF $8.77 $8.25 $10.23 647.0789 Pvt Marking Crosswalk Pref Plastic 18‐In LF 647.0793 Pavement Marking Crosswalk Paint 24‐Inch LF 647.0796 Pavement Marking Crosswalk Epoxy 24‐Inch LF 647.0799 Pvmt Mrkg Crosswalk Prfrmd Plastic 24‐In LF $14.60 647.0803 Pvt Marking Aerial Enforce Bars Ep 24‐In LF 647.0806 Pvt Mark Aerial Enfrc Bar Pre Plas 24‐In LF 647.0853 Pvt Marking Conc Corrugated Median Paint SF 647.0856 Pvt Marking Conc Corrugated Median Epoxy SF 647.0955 Removing Pavement Markings Arrows EACH $113.54 $106.52 $153.08 647.0960 Removing Pavement Markings Symbols EACH $136.43 $162.50 $84.44 647.0965 Removing Pavement Markings Words EACH $157.81 $103.44 $160.77 647.0990.S Removing Spcial Pvmt Marking Water Blstg EACH 648.0100 Locating No‐Passing Zones MI $236.80 $302.67 $331.43 649.0105 Temporary Marking Line Paint 4‐Inch LF $0.23 $0.30 649.0120 Temporary Marking Line Epoxy 4‐Inch LF $0.55 $0.57 649.0150 Temp Marking Line Removable Tape 4‐In LF $0.77 $0.87 $0.83 649.0155 Temp Markg Line Remov Contrast Tape 4‐In LF $1.61 649.0205 Temporary Marking Line Paint 8‐Inch LF $0.28 $0.32 649.0220 Temporary Marking Line Epoxy 8‐Inch LF $0.64 $0.72 649.0250 Temp Mrkg Line Removable Tape 8‐Inch LF $1.79 $1.70 $1.84

Page 66

Page 67: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 649.0400 Temp Pvt Marking Removable Tape 4‐In LF 649.0401 Temp Pvmt Markg Remov Contrast Tape 4‐In LF 649.0402 Temporary Pavement Marking Paint 4‐Inch LF 649.0403 Temporary Pavement Marking Epoxy 4‐Inch LF 649.0505 Temporary Marking Arrow Paint EACH $54.44 $45.87 649.0506 Temp Pvmt Mark Remove MaskOut Tape 6‐In LF 649.0510 Temp Mrkg Removable Mask‐Out Tape 10‐In LF 649.0520 Temporary Marking Arrow Epoxy EACH $175.00 649.0550 Temp Pvt Marking Arrows Removable Tape EACH $109.81 $139.77 $160.00 649.0600 Temp Pvmt Marking Removable Tape 6‐Inch LF $1.45 $1.78 $1.94 649.0605 Temporary Marking Word Paint EACH $75.68 $50.00 649.0620 Temporary Marking Word Epoxy EACH 649.0650 Temporary Marking Word Removable Tape EACH $117.11 $105.56 $181.52 649.0760 Temporary Mrkg Raised Pvmt Marker Type I EACH $4.47 $2.09 $5.73 649.0770 Temp Mrkg Raised Pvmt Marker Type II EACH $1.00 649.0801 Temp Pvt Mking Removable Tape 8‐Inch LF 649.0802 Temporary Pavement Marking Paint 8‐Inch LF 649.0803 Temporary Pavement Marking Epoxy 8‐Inch LF 649.0805 Temp Marking Stop Line Paint 18‐In LF $2.38 $3.00 $2.85 649.0820 Temp Marking Stop Line Epoxy 18‐In LF 649.0850 Temp Marking Stop Line Rem Tape 18‐Inch LF $4.98 $4.76 $4.72 649.0900 Temp Pvt Marking Stop Line 12‐In LF $1.68 $2.74 $4.94 649.0905 Temp Marking Diagonal Paint 12‐Inch LF $3.68 $1.00 649.0920 Temp Marking Diagonal Epoxy 12‐Inch LF 649.0950 Temp Marking Diagonal Rem Tape 12‐Inch LF $3.15 $4.05 649.0960 Temp Mrkg Removable Mask Out Tape 6‐In LF $2.07 $1.69 649.0970 Temp Mrkg Removable Mask Out Tape 10‐In LF $3.00 $2.49 649.1000 Temp Pvt Marking Stop Line Rem Tape 12in LF $3.74 $4.08 $5.00 649.1100 Temp Pvt Marking Stop Line 18‐In LF 649.1200 Temp Pvt Marking Stop Line Rem Tape 18in LF 649.1300 Temp Pvt Marking Stop Line 24‐In LF $6.77 $3.53 $9.13 649.1400 Temp Pvt Marking Stop Line Rem Tape 24in LF $7.23 $6.29 $6.65

Page 67

Page 68: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                            

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 649.1500 Temp Pvt Marking Diagonal 12‐In LF 649.1600 Temp Pvt Marking Diagonal Rem Tape 12‐In LF 649.1800 Temp Pvt Marking Arrows Removable Tape EACH 649.1802 Temporary Pavement Marking Arrows Paint EACH 649.1803 Temporary Pavement Marking Arrows Epoxy EACH 649.2000 Temp Pvt Marking Words Removable Tape EACH 649.2002 Temporary Pavement Marking Words Paint EACH 649.2003 Temporary Pavement Marking Words Epoxy EACH 649.2100 Temporary Raised Pavement Markers Type I EACH 649.2102 Temp Raised Pavement Markers Type II EACH 650.4000 Construction Staking Storm Sewer EACH $51.52 $65.99 $63.20 650.4500 Construction Staking Subgrade LF $0.16 $0.15 $0.12 650.5000 Construction Staking Base LF $0.46 $0.46 $0.48 650.5500 Construction Staking Curb Gutter & C&G LF $0.48 $0.77 $0.78 650.6000 Construction Staking Pipe Culverts EACH $87.04 $98.73 $125.82 650.6500 Construction Staking Structure Layout LS $1,319.14 $2,145.74 $1,865.95 650.7000 Construction Staking Conc Pavement LF $0.90 $0.88 $1.45 650.7500 Construction Staking Concrete Barrier LF $1.09 $0.50 $1.34 650.8000 Construction Staking Resurfacing Ref LF $0.08 $0.07 $0.08 650.8500 Const Staking Elec Install (project) LS $992.79 $1,559.07 $2,110.93 650.9000 Construction Staking Curb Ramps EACH 650.9910 Const Staking Supplemental Contrl (proj) LS $1,015.08 $1,118.89 $1,584.33 650.9920 Construction Staking Slope Stakes LF $0.41 $0.51 $0.67 651.1000.S Signal Controller Training LS $2,250.00 652.0105 Conduit Rigid Metallic 3/4‐Inch LF $18.00 652.0110 Conduit Rigid Metallic 1‐Inch LF $14.38 $16.05 652.0115 Conduit Rigid Metallic 1 1/4‐Inch LF $4.00 $14.89 $3.00 652.0120 Conduit Rigid Metallic 1 1/2‐Inch LF 652.0125 Conduit Rigid Metallic 2‐Inch LF $20.85 $21.38 $26.32 652.0130 Conduit Rigid Metallic 2 1/2‐Inch LF $31.50 652.0135 Conduit Rigid Metallic 3‐Inch LF $38.32 $25.70 $30.58 652.0140 Conduit Rigid Metallic 3 1/2‐Inch LF

Page 68

Page 69: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 652.0145 Conduit Rigid Metallic 4‐Inch LF $89.01 652.0205 Conduit Rigid Nonmetallic Sch 40 3/4‐In LF $3.25 $4.76 652.0210 Conduit Rigid Nonmetallic Sch 40 1‐In LF $4.12 $4.35 $5.08 652.0215 Conduit Rigid Nonmetallic Sch 40 11/4‐In LF $4.01 $2.50 $4.25 652.0220 Conduit Rigid Nonmetallic Sch 40 11/2‐In LF $4.50 $4.25 $8.20 652.0225 Conduit Rigid Nonmetallic Sch 40 2‐In LF $4.55 $4.65 $4.64 652.0230 Conduit Rigid Nonmetallic Sch 40 21/2‐In LF $5.37 $5.14 $5.04 652.0235 Conduit Rigid Nonmetallic Sch 40 3‐In LF $5.77 $5.91 $6.63 652.0240 Conduit Rigid Nonmetallic Sch 40 4‐In LF $7.91 $8.98 $8.31 652.0305 Conduit Rigid Nonmetallic Sch 80 3/4‐In LF 652.0310 Conduit Rigid Nonmetallic Sch 80 1‐In LF $4.00 652.0315 Conduit Rigid Nometallic Sch 80 1 1/4‐In LF $3.39 652.0320 Conduit Rigid Nometallic Sch 80 1 1/2‐In LF 652.0325 Conduit Rigid Nonmetallic Sch 80 2‐In LF $5.12 $4.91 $5.47 652.0330 Conduit Rigid Nonmetallic Sch 80 21/2‐In LF $5.10 652.0335 Conduit Rigid Nonmetallic Sch 80 3‐In LF $6.38 $7.15 $6.55 652.0340 Conduit Rigid Nonmetallic Sch 80 4‐In LF $7.45 652.0405 Conduit Reinf Thermosetting Resin 2‐In LF $17.00 $25.65 $33.05 652.0410 Conduit Reinf Thermosetting Resin 3‐In LF 652.0415 Conduit Reinf Thermosetting Resin 4‐In LF 652.0605 Conduit Special 2‐Inch LF $15.82 $16.40 $19.21 652.0610 Conduit Special 2 1/2‐Inch LF $27.16 $18.51 652.0615 Conduit Special 3‐Inch LF $19.69 $17.83 $22.60 652.0620 Conduit Special 3 1/2‐Inch LF 652.0625 Conduit Special 4‐Inch LF $29.90 $19.60 652.0690 Conduit Special (inch) LF $15.00 652.0700.S Install Conduit into Existing Item EACH $221.14 $131.67 $208.35 652.0800 Conduit Loop Detector LF $4.30 $4.16 $4.15 652.0900 Loop Detector Slots LF $24.66 $24.46 $27.53 653.0105 Pull Boxes Steel 12x24‐Inch EACH $477.49 $409.40 $486.24 653.0110 Pull Boxes Steel 12x30‐Inch EACH $531.61 653.0115 Pull Boxes Steel 12x36‐Inch EACH $750.00 $513.89 $450.00

Page 69

Page 70: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 653.0120 Pull Boxes Steel 18x24‐Inch EACH $650.00 653.0125 Pull Boxes Steel 18x30‐Inch EACH 653.0130 Pull Boxes Steel 18x36‐Inch EACH $648.52 $667.20 $500.00 653.0135 Pull Boxes Steel 24x36‐Inch EACH $683.98 $691.27 $700.23 653.0140 Pull Boxes Steel 24x42‐Inch EACH $704.08 $700.44 $785.13 653.0145 Pull Boxes Steel 24x48‐Inch EACH $801.28 $782.38 $1,014.35 653.0154 Pull Boxes Non‐Conductive 24x36‐Inch EACH 653.0164 Pull Boxes Non‐Conductive 24x42‐Inch EACH 653.0180 Pull Boxes Steel Communications (inch) EACH $607.47 $621.05 $663.89 653.0208 Junction Boxes 8x8x8‐Inch EACH $1,000.00 $350.00 $1,579.73 653.0220 Junction Boxes 18x6x6‐Inch EACH $840.00 $823.55 $1,179.31 653.0222 Junction Boxes 18x12x6‐Inch EACH $1,145.42 $1,097.77 $1,171.53 653.0900 Adjusting Pull Boxes EACH $234.71 $229.60 $241.16 653.0905 Removing Pull Boxes EACH $75.87 $94.02 $93.07 654.0101 Concrete Bases Type 1 EACH $540.74 $586.52 $588.20 654.0102 Concrete Bases Type 2 EACH $779.37 $781.15 $783.92 654.0105 Concrete Bases Type 5 EACH $658.63 $679.24 $644.48 654.0106 Concrete Bases Type 6 EACH $691.85 $619.02 $659.86 654.0107 Concrete Bases Type 7 EACH $783.65 $751.32 $770.32 654.0108 Concrete Bases Type 8 EACH $1,119.60 $1,086.25 $1,095.40 654.0110 Concrete Bases Type 10 EACH $3,254.60 $4,001.61 $4,069.86 654.0111 Concrete Bases Type 11 EACH $510.00 $490.52 $500.00 654.0113 Concrete Bases Type 13 EACH $5,543.87 $6,180.18 $6,479.86 654.0200 Concrete Control Cabinet Bases Type 6 EACH $1,017.14 $1,122.63 $1,200.00 654.0205 Concrete Control Cabinet Bases Type 7 EACH $948.00 $1,100.00 654.0210 Concrete Control Cabinet Bases Type 8 EACH $1,400.00 654.0215 Concrete Control Cabinet Bases Type 9 EACH $1,409.00 $1,200.00 654.0217 Conc Cntrl Cabinet Bases Type 9 Special EACH $1,253.51 $1,311.87 $1,532.14 654.0220 Concrete Control Cabinet Bases Type 10 EACH $703.64 $788.49 $660.92 654.0224 Concrete Control Cabinet Bases Type L24 EACH $987.50 $1,042.37 $1,105.92 654.0230 Concrete Control Cabinet Bases Type L30 EACH $1,112.61 $1,360.14 $1,069.51 654.1130 Concrete Bases Camera Pole 30‐FT EACH $825.00

Page 70

Page 71: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 654.1150 Concrete Bases Camera Pole 50‐FT EACH $2,279.64 $2,216.38 $2,498.33 654.1180 Concrete Bases Camera Pole 80‐FT EACH $4,733.33 $3,986.00 $4,219.00 654.1239 Concrete Control Cabinet Bases ITS EACH $1,511.25 $1,688.00 $955.00 655.0102 Cable In Duct 2‐2 AWG LF $5.75 655.0104 Cable In Duct 2‐4 AWG LF 655.0106 Cable In Duct 2‐6 AWG LF 655.0108 Cable In Duct 2‐8 AWG LF 655.0110 Cable In Duct 2‐10 AWG LF 655.0122 Cable In Duct 3‐2 AWG LF $8.61 655.0124 Cable In Duct 3‐4 AWG LF $10.00 $7.13 655.0126 Cable In Duct 3‐6 AWG LF 655.0128 Cable In Duct 3‐8 AWG LF 655.0130 Cable In Duct 3‐10 AWG LF 655.0144 Cable In Duct 4‐4 AWG LF $7.38 655.0146 Cable In Duct 4‐6 AWG LF $6.30 655.0148 Cable In Duct 4‐8 AWG LF 655.0150 Cable In Duct 4‐10 AWG LF 655.0205 Cable Traffic Signal 3‐12 AWG LF $2.20 655.0210 Cable Traffic Signal 3‐14 AWG LF $0.86 $1.00 $1.02 655.0215 Cable Traffic Signal 4‐12 AWG LF 655.0220 Cable Traffic Signal 4‐14 AWG LF $1.11 $0.95 $1.20 655.0223 Cable Traffic Signal 5‐10 AWG LF 655.0225 Cable Traffic Signal 5‐12 AWG LF $1.43 655.0230 Cable Traffic Signal 5‐14 AWG LF $1.00 $1.10 $1.06 655.0233 Cable Traffic Signal 7‐10 AWG LF 655.0235 Cable Traffic Signal 7‐12 AWG LF 655.0240 Cable Traffic Signal 7‐14 AWG LF $1.20 $1.38 $1.23 655.0243 Cable Traffic Signal 9‐10 AWG LF 655.0245 Cable Traffic Signal 9‐12 AWG LF 655.0250 Cable Traffic Signal 9‐14 AWG LF $1.39 $1.59 $1.32 655.0253 Cable Traffic Signal 12‐10 AWG LF 655.0255 Cable Traffic Signal 12‐12 AWG LF $1.86

Page 71

Page 72: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 655.0260 Cable Traffic Signal 12‐14 AWG LF $1.68 $1.87 $2.01 655.0263 Cable Traffic Signal 15‐10 AWG LF 655.0265 Cable Traffic Signal 15‐12 AWG LF $4.85 655.0270 Cable Traffic Signal 15‐14 AWG LF $2.10 $2.03 $2.20 655.0273 Cable Traffic Signal 19‐10 AWG LF 655.0275 Cable Traffic Signal 19‐12 AWG LF 655.0280 Cable Traffic Signal 19‐14 AWG LF $3.04 $2.29 $2.40 655.0285 Cable Traffic Signal 21‐12 AWG LF 655.0290 Cable Traffic Signal 21‐14 AWG LF $2.97 $3.75 $2.00 655.0305 Cable Type UF 2‐12 AWG Grounded LF $0.90 $1.07 $0.99 655.0310 Cable Type UF 2‐12 AWG LF $1.37 $0.91 655.0315 Cable Type UF 2‐10 AWG LF $1.28 $1.17 $1.26 655.0320 Cable Type UF 2‐10 AWG Grounded LF $1.16 $1.24 $1.23 655.0325 Cable Type UF 2‐8 AWG Grounded LF 655.0400 Communication Cable Plowed LF 655.0405 Communication Cable Trenched LF 655.0410 Communication Cable Installed in Conduit LF $2.36 $0.50 655.0505 Electrical Wire Traffic Signals 14 AWG LF $0.56 $0.56 655.0510 Electrical Wire Traffic Signals 12 AWG LF $0.59 $0.61 $0.73 655.0515 Electrical Wire Traffic Signals 10 AWG LF $0.71 $0.70 $0.67 655.0520 Electrical Wire Traffic Signals 8 AWG LF $0.83 655.0525 Electrical Wire Traffic Signals 6 AWG LF $1.34 $1.32 $1.01 655.0530 Electrical Wire Traffic Signals 4 AWG LF $1.11 655.0535 Electrical Wire Traffic Signals 2 AWG LF $2.00 655.0610 Electrical Wire Lighting 12 AWG LF $0.55 $0.51 $0.58 655.0615 Electrical Wire Lighting 10 AWG LF $0.70 $0.65 $0.66 655.0620 Electrical Wire Lighting 8 AWG LF $0.81 $0.86 $0.81 655.0625 Electrical Wire Lighting 6 AWG LF $0.99 $0.93 $0.99 655.0630 Electrical Wire Lighting 4 AWG LF $1.17 $1.26 $1.39 655.0635 Electrical Wire Lighting 2 AWG LF $1.64 $1.73 $1.45 655.0640 Electrical Wire Lighting 1 AWG LF $1.75 $8.00 $1.71 655.0645 Electrical Wire Lighting 1/0 AWG LF $2.25 $2.35

Page 72

Page 73: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                         

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 655.0700 Loop Detector Lead In Cable LF $0.98 $1.13 $1.13 655.0800 Loop Detector Wire LF $0.72 $0.72 $0.71 655.0900 Traffic Signal EVP Detector Cable LF $1.26 $1.40 $1.03 656.0100 Electrical Service Meter Socket (loc) LS $1,154.50 $1,200.00 656.0200 Elec Service Meter Breaker Pedestal LS $1,057.68 $1,083.08 $1,150.20 656.0300 Electrical Service Unmetered (location) LS $850.00 $900.00 656.0400 Elec Service Main Lugs Only Meter Ped LS $867.90 $727.98 $1,104.41 656.0500 Elec Service Breaker Disconnect Box LS $672.45 $609.11 $814.41 657.0100 Pedestal Bases EACH $187.32 $159.36 $202.53 657.0205 Transf Base Brkawy 13‐15 In Bolt Circle EACH $268.00 $310.44 657.0210 Transf Base Brkawy 15‐17 In Bolt Circle EACH $378.81 $376.94 $371.62 657.0255 Trans Base Brkwy 11 1/2‐Inch Bolt Circle EACH $315.07 $319.74 $322.09 657.0305 Poles Type 2 EACH $1,285.66 $1,027.98 $1,129.34 657.0310 Poles Type 3 EACH $2,384.99 $2,336.92 $2,339.13 657.0315 Poles Type 4 EACH $1,237.35 $1,076.68 $1,347.50 657.0321 Poles Type 5‐Steel EACH $1,263.80 $1,143.25 $1,137.13 657.0322 Poles Type 5‐Aluminum EACH $1,031.72 $1,009.92 $1,030.44 657.0326 Poles Type 6‐Steel EACH $1,050.00 $1,250.00 657.0327 Poles Type 6‐Aluminum EACH $1,190.58 $1,001.94 $1,223.40 657.0330 Poles Type 7 EACH $1,325.00 $1,440.00 657.0336 Poles Type 17‐Steel EACH 657.0337 Poles Type 17‐Aluminum EACH $1,089.08 $1,051.15 $1,060.84 657.0375 Poles Type A EACH $2,205.87 $1,738.30 $1,882.00 657.0380 Poles Type E EACH $2,034.25 $2,658.50 657.0405 Traffic Signal Standards Aluminum 3.5‐FT EACH $220.77 $109.73 $209.33 657.0410 Traffic Signal Standards Aluminum 9‐FT EACH $382.22 $331.00 $324.40 657.0415 Traffic Signal Standards Aluminum 11‐FT EACH $336.65 657.0420 Traffic Signal Standards Aluminum 13‐FT EACH $436.94 $371.82 $393.22 657.0425 Traffic Signal Standards Aluminum 15‐FT EACH $434.77 $365.25 $442.67 657.0430 Traffic Signal Standards Aluminum 10‐FT EACH $334.47 $345.69 $369.66 657.0585 Trombone Arms 15‐FT EACH $1,021.51 $972.78 $1,171.00 657.0590 Trombone Arms 20‐FT EACH $954.25 $1,023.78 $1,030.67

Page 73

Page 74: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 657.0595 Trombone Arms 25‐FT EACH $1,422.57 $1,270.08 $1,412.09 657.0605 Lum Arms Singl Membr 4 1/2‐In Clamp 4‐FT EACH $139.05 $190.03 $157.58 657.0609 Lmnair Arm Singl Membr 4‐Inch Clamp 6‐FT EACH $196.43 $193.81 $201.41 657.0610 Lum Arms Singl Membr 4 1/2‐In Clamp 6‐FT EACH $177.58 $150.55 $169.45 657.0614 Lmnair Arm Singl Membr 4‐Inch Clamp 8‐FT EACH $240.47 $224.00 $188.14 657.0615 Lum Arms Singl Membr 4 1/2‐In Clamp 8‐FT EACH $162.65 $242.74 $188.77 657.0620 Lum Arms Single Member 6‐In Clamp 4‐FT EACH $160.26 $147.47 $206.67 657.0625 Lum Arms Single Member 6‐In Clamp 6‐FT EACH 657.0630 Lum Arms Single Member 6‐In Clamp 8‐FT EACH $165.57 657.0635 Lum Arms Single Member 6‐In Clamp 10‐FT EACH $223.41 657.0640 Lum Arms Single Member 6‐In Clamp 15‐FT EACH $445.00 657.0704 Lmnair Arm Truss Type 4‐Inch Clamp 10‐FT EACH $294.25 657.0705 Lum Arms Truss Type 4 1/2‐In Clamp 10‐FT EACH $304.53 $350.14 657.0709 Lmnair Arm Truss Type 4‐Inch Clamp 12‐FT EACH $360.00 $375.00 $418.76 657.0710 Lum Arms Truss Type 4 1/2‐In Clamp 12‐FT EACH $306.00 $292.79 $401.65 657.0714 Lmnair Arm Truss Type 4‐Inch Clamp 15‐FT EACH $625.00 $310.00 657.0715 Lum Arms Truss Type 4 1/2‐In Clamp 15‐FT EACH $383.13 $397.82 $380.67 657.0720 Lum Arms Truss Type 6‐In Clamp 20‐FT EACH $443.00 657.0725 Lum Arms Truss Type 6‐Inch Clamp 15‐FT EACH $500.00 657.0730 Lum Arms Truss Type 6‐In Clamp 12‐FT EACH $290.00 $286.10 $290.39 657.0735 Lum Arms Truss Type 6‐Inch Clamp 10‐FT EACH 657.1345 Install Poles Type 9 EACH $1,166.63 $1,226.61 $1,135.00 657.1350 Install Poles Type 10 EACH $1,033.24 $1,265.90 $1,275.13 657.1355 Install Poles Type 12 EACH $1,235.01 $1,717.72 $1,502.41 657.1360 Install Poles Type 13 EACH $1,339.15 $1,742.19 $1,372.16 657.1445 Install Poles Over Height Type 9 EACH 657.1450 Install Poles Over Height Type 10 EACH 657.1455 Install Poles Over Height Type 12 EACH 657.1460 Install Poles Over Height Type 13 EACH 657.1515 Install Monotube Arms 15‐FT EACH $1,132.05 $1,452.00 657.1520 Install Monotube Arms 20‐FT EACH $1,233.22 $845.28 $950.00 657.1525 Install Monotube Arms 25‐FT EACH $1,306.77 $2,467.16 $1,608.91

Page 74

Page 75: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                       

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 657.1530 Install Monotube Arms 30‐FT EACH $1,415.33 $1,155.74 $1,909.18 657.1535 Install Monotube Arms 35‐FT EACH $1,404.80 $1,655.43 $1,333.20 657.1540 Install Monotube Arms 40‐FT EACH $1,546.35 $1,316.96 $1,815.26 657.1545 Install Monotube Arms 45‐FT EACH $1,316.00 $2,000.88 $1,916.82 657.1550 Install Monotube Arms 50‐FT EACH $1,756.19 $1,374.63 $1,863.99 657.1555 Install Monotube Arms 55‐FT EACH $1,727.46 $1,550.00 $2,003.10 657.1806 Install Luminaire Arms Steel 6‐FT EACH 657.1808 Install Luminaire Arms Steel 8‐FT EACH $153.30 $144.38 $203.36 657.1810 Install Luminaire Arms Steel 10‐FT EACH $210.00 $250.00 657.1812 Install Luminaire Arms Steel 12‐FT EACH $175.00 $148.53 $171.12 657.1815 Install Luminaire Arms Steel 15‐FT EACH $144.99 $223.69 $219.80 657.6005 Anchor Assemble Light Poles on Structure EACH 657.6005.S Anchor Assembl Light Poles on Structures EACH $521.30 $611.87 $491.53 658.0101 Traffic Signal Face 1‐8 Inch Vertical EACH 658.0103 Traffic Signal Face 1‐12 Inch Vertical EACH 658.0105 Traffic Sig Face 1‐12 Inch 2‐8 Inch Vert EACH 658.0110 Traffic Signal Face 3‐12 Inch Vertical EACH 658.0115 Traffic Signal Face 4‐12 Inch Vertical EACH 658.0120 Traffic Signal Face 5‐12 Inch Vertical EACH 658.0155 Traffic Signal Face 3‐12 Inch Horizontal EACH 658.0160 Traffic Signal Face 4‐12 Inch Horizontal EACH 658.0165 Traffic Signal Face 5‐12 Inch Horizontal EACH 658.0170 Traffic Signal Face 1S 8‐Inch EACH 658.0171 Traffic Signal Face 1S 12‐Inch EACH $103.07 $343.75 $181.54 658.0172 Traffic Signal Face 2S 12‐Inch EACH 658.0173 Traffic Signal Face 4S 12‐Inch EACH $329.92 $352.94 $339.07 658.0174 Traffic Signal Face 4S 12‐Inch EACH $403.11 $462.03 $409.24 658.0175 Traffic Signal Face 5S 12‐Inch EACH $487.03 $488.53 $440.82 658.0190.S Traffic Signal Face ‐ LED State Furnish EACH $125.00 658.0205 Backplates Signal Face 1 Section 8‐Inch EACH 658.0210 Backplates Signal Face 1 Section 12‐Inch EACH $71.94 $91.25 $60.36 658.0215 Backplates Signal Face 3 Section 12‐Inch EACH $63.55 $62.64 $74.11

Page 75

Page 76: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                              

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 658.0220 Backplates Signal Face 4 Section 12‐Inch EACH $72.22 $75.04 $88.61 658.0225 Backplates Signal Face 5 Section 12‐Inch EACH $77.96 $67.51 $78.18 658.0300 Backplates Signal Face 12‐8‐8 Inch EACH 658.0412 Pedestrian Signal Face 12‐Inch EACH $258.33 $215.00 658.0416 Pedestrian Signal Face 16‐Inch EACH $227.96 $212.81 $220.39 658.0420.S Ped Signal Face ‐ LED State Furnished EACH $100.00 658.0500 Pedestrian Push Buttons EACH $236.82 $237.56 $257.09 658.0600 Led Modules 12‐Inch Red Ball EACH $55.59 $58.66 $55.84 658.0605 Led Modules 12‐Inch Yellow Ball EACH $56.78 $59.84 $57.11 658.0610 Led Modules 12‐Inch Green Ball EACH $57.53 $60.53 $59.26 658.0615 Led Modules 12‐Inch Red Arrow EACH $56.70 $60.60 $59.61 658.0620 Led Modules 12‐Inch Yellow Arrow EACH $58.05 $60.88 $60.97 658.0625 Led Modules 12‐Inch Green Arrow EACH $57.81 $59.84 $62.32 658.0635 Led Modules Ped Countdwn Timer 16‐Inch EACH $153.32 $187.14 $188.32 658.0660 Led Modules Countdwn Timer 12‐Inch EACH $201.54 $155.00 658.1110 Progrm Traffic Signal Face 3‐12 Vertical EACH 658.1115 Progrm Traffic Signal Face 4‐12 Vertical EACH 658.1120 Progrm Traffic Signal Face 5‐12 Vertical EACH 658.1133 Progrm Traffic Signal Face 3S 12‐Inch EACH $2,700.00 $2,550.00 658.1134 Progrm Traffic Signal Face 4S 12‐Inch EACH $3,375.00 658.1135 Progrm Traffic Signal Face 5S 12‐Inch EACH 658.1155 Progrm Traffic Signal Face 3‐12 Horizntl EACH 658.1160 Progrm Traffic Signal Face 4‐12 Horizntl EACH 658.1165 Progrm Traffic Signal Face 5‐12 Horizntl EACH 658.5069 Signal Mounting Hardware (location) LS $2,742.69 $2,169.45 $2,476.29 659.0115 Luminaires Utility HPS 150 Watts EACH $346.13 $390.00 $310.00 659.0125 Luminaires Utility HPS 250 Watts EACH $393.00 $412.69 659.0135 Luminaires Utility HPS 400 Watts EACH 659.0150 Luminaires Utility MH 250 Watts EACH 659.0205 Luminaires Underdeck 70 Watts EACH 659.0210 Luminaires Underdeck 100 Watts EACH 659.0215 Luminaires Underdeck 150 Watts EACH

Page 76

Page 77: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                             

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 659.0400 Luminaires High Mast Lighting LED EACH $2,455.00 659.0600 Underdeck Lighting (location) LS $3,967.09 $4,728.21 $3,412.00 659.0700 Lighting Units Walkway EACH $1,336.67 659.1115 Luminaires Utility LED A EACH $499.14 $432.82 $387.17 659.1120 Luminaires Utility LED B EACH $585.87 $409.12 $454.80 659.1125 Luminaires Utility LED C EACH $682.37 $497.70 $519.81 659.1130 Luminaires Utility LED D EACH $818.39 $698.50 $513.06 659.1205 Luminaires Underdeck LED A EACH $1,073.33 $475.00 659.1210 Luminaires Underdeck LED B EACH $610.00 $585.33 $475.00 659.1215 Luminaires Underdeck LED C EACH $1,550.00 $760.84 $556.00 659.2124 Lighting Control Cabinets 120/240 24‐In EACH $7,089.80 $5,729.36 $5,812.83 659.2130 Lighting Control Cabinets 120/240 30‐In EACH $5,556.04 $6,319.23 $5,820.80 659.2230 Lighting Control Cabinets 240/480 30‐In EACH $8,198.67 $9,393.03 $6,894.27 660.0100 High Mast Foundation (location) LS $26,445.00 $18,550.00 660.0200 High Mast Lighting Tower (location) LS $41,680.00 661.0100 Temporary Traffic Signals for Bridges LS $10,900.10 $8,957.50 $11,370.00 661.0200 Temp Traffic Signals for Intersections LS $33,192.94 $27,634.61 $38,529.43 661.0300 Generators DAY $244.44 $53.08 $510.30 661.0700 Temporary Ramp Meter (location) LS $14,500.00 $1,875.00 662.1024.S Ramp Closure Gates Hardwired 24‐FT EACH $11,545.80 $10,600.00 662.1026.S Ramp Closure Gates Hardwired 26‐FT EACH $11,391.67 $12,255.00 662.1028.S Ramp Closure Gates Hardwired 28‐FT EACH $10,457.50 $11,849.22 662.1030.S Ramp Closure Gates Hardwired 30‐FT EACH $12,458.57 $11,842.50 662.1032.S Ramp Closure Gates Hardwired 32‐FT EACH $11,501.00 $11,748.90 662.1037.S Ramp Closure Gates Hardwired 37‐FT EACH $10,858.00 $11,814.69 $12,573.75 662.1040.S Ramp Closure Gates Hardwired 40‐FT EACH $11,133.67 $12,341.05 $12,408.25 662.2024.S Ramp Closure Gates Solar 24‐FT EACH $13,033.33 662.2026.S Ramp Closure Gates Solar 26‐FT EACH $12,140.00 $11,490.00 662.2028.S Ramp Closure Gates Solar 28‐FT EACH $13,034.00 $14,422.00 662.2030.S Ramp Closure Gates Solar 30‐FT EACH $13,887.00 $14,449.00 $11,595.00 662.2032.S Ramp Closure Gates Solar 32‐FT EACH $13,455.72 662.2037.S Ramp Closure Gates Solar 37‐FT EACH $14,079.66 $14,418.50 $12,438.33

Page 77

Page 78: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 662.2040.S Ramp Closure Gates Solar 40‐FT EACH $13,557.26 $14,518.98 $12,364.71 662.3024.S Ramp Closure Gate Arms Stockpile 24‐FT EACH 662.3026.S Ramp Closure Gate Arms Stockpile 26‐FT EACH $2,135.00 $2,083.00 662.3028.S Ramp Closure Gate Arms Stockpile 28‐FT EACH $2,187.00 $2,100.45 662.3030.S Ramp Closure Gate Arms Stockpile 30‐FT EACH $2,540.00 $2,279.48 $2,047.00 662.3032.S Ramp Closure Gate Arms Stockpile 32‐FT EACH $2,298.00 $2,049.90 662.3037.S Ramp Closure Gate Arms Stockpile 37‐FT EACH $2,408.00 $2,413.30 $2,303.40 662.3040.S Ramp Closure Gate Arms Stockpile 40‐FT EACH $2,429.38 $2,394.27 $2,343.71 662.4000.S Ramp Closure Gate Flashers Stockpile EACH $936.74 $1,054.58 $859.71 662.6020.S Ramp Closure Barricade Rack 2‐Unit EACH $750.00 662.6030.S Ramp Closure Barricade Rack 3‐Unit EACH $1,175.00 $1,700.00 $500.00 670.0100 Field System Integrator LS $5,079.18 $6,163.09 $4,853.11 670.0200 ITS Documentation LS $2,440.32 $3,389.30 $2,683.77 671.0100 Conduit HDPE 4‐Duct 1 1/4‐Inch LF 671.0112 Conduit HDPE 1‐Duct 2‐Inch LF $6.55 $5.61 $5.44 671.0122 Conduit HDPE 2‐Duct 2‐Inch LF $10.10 $12.00 671.0132 Conduit HDPE 3‐Duct 2‐Inch LF $9.06 $9.99 $7.74 671.0142 Conduit HDPE 4‐Duct 2‐Inch LF $12.00 $12.00 $12.00 671.0200 Conduit HDPE Dir Bore 4‐Duct 1 1/4‐In LF 671.0212 Conduit HDPE Dir Bore 1‐Duct 2‐In LF $14.79 $32.75 $19.08 671.0222 Conduit HDPE Dir Bore 2‐Duct 2‐In LF $24.00 $18.17 $28.22 671.0232 Conduit HDPE Dir Bore 3‐Duct 2‐In LF $29.34 $18.72 $21.96 671.0242 Conduit HDPE Dir Bore 4‐Duct 2‐In LF $35.00 $30.00 $30.00 671.0244 Conduit HDPE Dir Bore 4‐Duct 4‐In LF 671.0300 Fiber Optic Cable Marker EACH $82.14 $78.48 $80.01 672.0100 Base ITS Controller Cabinet EACH 672.0230 Base Camera Pole 30‐FT EACH 672.0250 Base Camera Pole 50‐FT EACH 672.0280 Base Camera Pole 80‐FT EACH 673.0105 Communication Vault Type 1 EACH $1,602.48 $1,766.98 $1,615.13 673.0110 Communication Vault Type Round EACH 673.0200 Tracer Wire Marker Posts EACH

Page 78

Page 79: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                                                                                       

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 673.0200.S Install ITS Field Cabinet EACH $1,373.43 $1,394.00 $966.50 673.0225.S Install Pole Mounted Cabinet EACH $1,314.48 $1,342.05 $1,436.45 674.0106 Cable ITS Communication 6 Pair LF $2.39 674.0112 Cable ITS Communication 12 Pair LF $3.33 674.0125 Cable ITS Communication 25 Pair LF $5.36 674.0200 Cable Microwave Detector LF $3.04 $2.13 $2.83 674.0300 Remove Cable LF $0.35 $0.57 $0.78 674.0400 Reinstall Cable LF $1.54 $1.90 $0.64 675.0100 Install Cont Ramp Meter Processor Ass EACH $897.50 $715.00 675.0200 Install Contr Detector Processor Ass EACH $1,630.00 675.0300 Install Mounted Contr Microwave Det Ass EACH $1,984.74 $2,107.24 $1,875.13 675.0400.S Install Ethernet Switch EACH $573.32 $637.78 $790.42 676.0100 Signal Assembly Ramp Control Sidemount EACH $2,073.33 $1,965.00 676.0105 Signal Assembly Ramp Control Overhead EACH $1,752.67 $1,996.00 676.0200 Signal Assembly Display Enforcement EACH 676.0300 Signal Assembly Advance Flasher Type 1 EACH $1,330.45 $1,128.33 $900.00 676.0305 Signal Assembly Advance Flasher Type 2 EACH $1,250.80 676.9001.S Remov Adv Flasher Assemblies Type 1 EACH $296.67 $300.00 676.9002.S Remov Adv Flasher Assemblies Type 2 EACH $597.50 677.0130 Install Camera Pole 30‐FT EACH 677.0150 Install Camera Pole 50‐FT EACH $2,430.00 677.0180 Install Camera Pole 80‐FT EACH $3,756.00 677.0200 Install Camera Assembly EACH $2,625.35 $2,579.56 $2,298.00 677.0300.S Install Video Encoder EACH $587.78 $721.25 $530.67 677.0400.S Install Video Image Detector Card EACH 677.0500.S Install Video Detection Camera EACH $4,116.00 677.0600.S Install Video Detection Processor EACH 677.9050.S Salv 50‐FT Camera Pole w/Lowering Sys EACH $550.00 $1,400.00 677.9051.S Removing 50‐FT Camera Pole EACH $1,186.14 $960.00 $820.00 677.9080.S Salv 80‐FT Camera Pole w/Lowering Sys EACH 677.9081.S Removing 80‐Foot Camera Pole EACH 677.9200.S Removing CCTV Camera EACH $717.00 $740.00 $1,186.00

Page 79

Page 80: WISCONSIN DEPARTMENT OF TRANSPORTATION - …wisconsindot.gov/hcciDocs/contracting-info/average-unit-price.pdf · ITEM DESCRIPTION. UNIT FY 15 FY 16 FY17 ... $8.77: 204.0120 Removing

           

 

                                                                                                                                                                                                                                                                                                                

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/17/2017

ITEM DESCRIPTION UNIT FY 15 FY 16 FY 17 678.0006 Install Fbr Opt Cable Outdoor Plant 6CT LF $1.42 $1.21 $1.33 678.0012 Install Fbr Opt Cable Outdoor Plant 12CT LF $2.00 $1.25 $1.43 678.0024 Install Fbr Opt Cable Outdoor Plant 24CT LF $2.50 $1.15 678.0036 Install Fbr Opt Cable Outdoor Plant 36CT LF $1.22 $1.29 $1.31 678.0048 Install Fbr Opt Cable Outdoor Plant 48CT LF 678.0072 Install Fbr Opt Cable Outdoor Plant 72CT LF $1.77 $1.28 $1.60 678.0096 Install Fbr Opt Cable Outdoor Plant 96CT LF 678.0100.S Install Overhead Freeway DMS Full Matrix EACH $6,817.50 $6,838.00 $6,101.75 678.0144 Instal Fbr Opt Cable Outdoor Plant 144CT LF 678.0200 Fiber Optic Splice Enclosure EACH $1,455.84 $1,418.13 $1,671.11 678.0300 Fiber Optic Splice EACH $54.33 $60.35 $48.28 678.0400 Fiber Optic Termination EACH $73.30 $84.36 $80.36 678.0500 Communication System Testing LS $2,383.01 $2,564.37 $3,867.11 678.0600 Install Ethernet Switches EACH 678.0700 Install Wireless Antennas EACH 678.0800 Install Cellular Modems EACH 690.0150 Sawing Asphalt LF $0.79 $1.05 $1.20 690.0250 Sawing Concrete LF $1.69 $1.66 $2.08 999.1000.S Seismograph LS $4,035.71 $4,938.01 $5,437.50 999.1500.S Crack and Damage Survey LS $7,829.60 $10,928.37 $12,136.33 999.1800.S Picnic Tables Single Pedestal EACH $800.00 999.1950.S Bicycle Rack Asphalt or Concrete‐Mounted EACH $1,200.00 $1,283.33

Page 80