22
WITS PROJECT 2013 THE NERVE CENTRE

WITS Presentation - 6 Dec 2013

Embed Size (px)

Citation preview

Page 1: WITS Presentation - 6 Dec 2013

WITS PROJECT 2013

THE NERVE CENTRE

Page 2: WITS Presentation - 6 Dec 2013

Project  Selec+on  Process  

S/N   Decision  Criteria  Poten+al  Projects  

A   B   C   D   Total   Rank  

1  Upda%ng  the  Corporate  Website  for  user-­‐friendliness  

4   2   5   1   12   2  

2  Upda%ng  the  Corporate  Video  for  accuracy  based  on  changes  in  the  Court    

4   3   2   2   11   3  

3  Solve  the  problem  of  losing  ins+tu+onal  knowledge  due  to  high  turnover  rate    

3   4   4   5   16   1  

4  Migra%ng  physical  photo  CD-­‐ROM  inventory  into  a  digital  cloud  or  format  to  save  physical  space.  

2   2   3   3   10   4  

5  Refreshing  Corporate  giH  inventory  to  have  more  variety  and  to  be  consistent  in    brand  iden%ty  and  corporate  look  and  feel    

3   2   2   3   10   4  

Ra+ng  Scale                                  1-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐3-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐5  (Meets  Criterion  Least)                (Meets  Criterion  Moderately)                                  (Meets  Criterion  Most)  

A.  Urgency  of  the  problem  B.  Improvement  to  work  processes    C.  Time  and  Cost  Savings  achieved    D.  Ease  of  Implementa%on    

Page 3: WITS Presentation - 6 Dec 2013

Original  situa+on  

•  No  electronic  back-­‐up  of  hard  copy  informa%on  in  Physical  Files  on  pre-­‐2008  projects  –  probably  due  to  migra%on  of  servers    

•  No  electronic  back-­‐up  of  QSM  mails.  Officers  will  archive  QSM  mails  in  their  personal  mailbox  and  delete  mails  from  QSM  mailbox  (space  constraints)  and  retain  hard  copy  physical  files  

•  Media  materials  such  as  previous  speeches,  media  releases,  clippings  have  no  addi%onal  back-­‐up  except  in  network  drive.    

•  Inconsistent  filing  system  in  network  drive.    

Page 4: WITS Presentation - 6 Dec 2013

Problems  To  Tackle  

•  Retrieval  of  hard  copy  informa%on  in  Physical  Files  on  pre-­‐2008  projects  is  very  %me  consuming  and  tedious  

•  Upon  QSM  officers  leaving  organisa%on,  archival  of  previous  emails  in  electronic  form  are  lost  and  only  available  in  physical  hard  copies  

•  Media  materials  (which  are  very  important  in  the  Office  of  Public  Affairs)  have  no  addi%onal  back-­‐up  except  in  network  drive  and  if  there  were  network  problems,  there  is  no  back-­‐up  to  refer  to.    

•  Staff  find  difficulty  in  loca%ng  and  retrieving  files  due  to  inconsistent  filing  in  network  drives.    

Page 5: WITS Presentation - 6 Dec 2013

Plan,  Do,  Check,  Act!  PDCA  Cycle  GanQ  Chart  

Page 6: WITS Presentation - 6 Dec 2013

Data  Collec+on  

    TYPES  OF  PROBLEMS   FREQ  

A   Staff  unable  to  locate  files  or  documents  in  Z  Drive   17  

B   Staff  incorrectly  files  documents  in  Z  Drive   12  

C   Staff  unable  to  retrieve  old  QSM  correspondences  for  reference   24  

D  Delay  in  planning  and  processing  of  projects  due  to  %me  spent  loca%ng  correct  physical  files  

9  

    TOTAL:   62  

Page 7: WITS Presentation - 6 Dec 2013

Pareto  Analysis  

    Problem   Frequency  (No.)   Frequency  (%)   C u m u l a + v e  Frequency  (No.)  

C u m u l a + v e  Frequency  (%)  

1   C   24   38.7   24   38.7  

2   A   17   27.4   41   66.1  

3   B   12   19.3   53   85.5  

4   D   9   14.5   62   100.0  

    Total:   62   100          

           PARETO  CHECK  SHEET  

Page 8: WITS Presentation - 6 Dec 2013

Data  Collec+on  

24

17

12 9

0%

39%

66%

85%

100%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0

10

20

30

40

50

60

C A B D

Freq

uenc

y

PARETO CHART (BEFORE IMPLEMENTATION)

Page 9: WITS Presentation - 6 Dec 2013

Problem  Analysis  People Equipment

Control System

Manpower  changes  and  improper  handover

Improper  <iling  

habits  of  staff  

No  electronic  back  up  for  QSM  documents

No  proper  <iling  grid  system   No  controlled  <iling  system  

with  administrator  rights  for  important  media  materials  

New  staff  not  adequately  educated  on  <iling  system    

Lack  of  “policing”  of  staff  who  do  not  <ile  documents  properly    

Lack  of  regular  reminders  to  staff  to  stress  importance  of  proper  <iling

PROBLEM:  LOSS  OF  

INSTITUTIONAL  KNOWLEDGE

No  electronic  back  up  for  physical  <iles  on  pre-­‐2008  projects

Page 10: WITS Presentation - 6 Dec 2013

Proposed  Solu+ons  

Page 11: WITS Presentation - 6 Dec 2013

Proposed  Solu+ons  

Page 12: WITS Presentation - 6 Dec 2013

Post-­‐Implementa+on       Type  of  problem   Frequency  

(Before)  Target   F r equency  

(A]er)    

A   Staff  unable  to  locate  files  or  documents  in  Z  Drive  

17   8   7  

B   Staff  incorrectly  files  documents  in  Z  Drive  

12   5   6  

C   Staff  unable  to  retrieve  old  QSM  correspondences  for  reference  

24   12   10  

D   Delay  in  planning  and  processing  of  projects  due  to  %me  spent  loca%ng  correct  physical  files  

9   5   3  

    Total   62   30   26  

Page 13: WITS Presentation - 6 Dec 2013

Target  Reduc+on  in  Frequency  

Reduce  the  frequency  of  occurrence  of    the  iden+fied  problem  areas  by  51.6%  

Page 14: WITS Presentation - 6 Dec 2013

Varia+on  –  Results  vs  Target  

    Type  of  problem   Frequency  (Before)  

Target   F r equency  (A]er)    

A   Staff  unable  to  locate  files  or  documents  in  Z  Drive  

17   8   7  

B   Staff  incorrectly  files  documents  in  Z  Drive  

12   5   6  

C   Staff  unable  to  retrieve  old  QSM  correspondences  for  reference  

24   12   10  

D   Delay  in  planning  and  processing  of  projects  due  to  %me  spent  loca%ng  correct  physical  files  

9   5   3  

    Total   62   30   26  

Page 15: WITS Presentation - 6 Dec 2013

Post-­‐Implementa+on  

Problem   F requency  (No.)  

Frequency  (%)  

Cumula+ve  F requency  (No.)  

Cumula+ve  Frequency  (%)  

C   10   38.5   10   38.5  A   7   26.9   17   65.4  B   6   23.1   23   88.5  D   3   11.5   26   100  Total:   26   100          

Post-­‐implementa+on  frequency  of  errors:  26    Before  Implementa+on  frequency  of  errors:  62  

           PARETO  CHECK  SHEET  

Page 16: WITS Presentation - 6 Dec 2013

Post-­‐Implementa+on  

Page 17: WITS Presentation - 6 Dec 2013

Comparison  –  Before  &  A]er  

Page 18: WITS Presentation - 6 Dec 2013

Tangible  Benefits  

    BEFORE AFTER Man-­‐hours  saved

Es+mated  cost  savings  (annual)

A Annual  man-­‐hours  spent  loca%ng  files  or  documents  in  Z  drive

390 182 208 $3,120

B Annual  man-­‐hours  spent  re-­‐filing  incorrectly  filed  documents  in  Z  drive

390 78 312 $4,680

C Annual  man-­‐hours  spent  retrieving  old  QSM  correspondence  from  physical  files

910 390 520 $7,820

D Annual  man-­‐hours  spent  on  loca%ng  correct  specific  documents  in  precedent  physical  files  when  planning  for  new  projects

1,040 520 520 $7,800

GRAND  TOTAL 1,560 $23,400

ESTIMATED  MAN-­‐HOURS  SAVED  (ANNUAL  BASIS)  

 

Page 19: WITS Presentation - 6 Dec 2013

Tangible  Benefits  

REDUCING  OUR  CARBON  FOOTPRINT  

 

Page 20: WITS Presentation - 6 Dec 2013

Intangible  Benefits  

•  Beger  sense  of  direc%on  •  Higher  confidence  level  of  staff  •  Reduc%on  of  cluger  •  Higher  sense  of  security  and  insurance  

Page 21: WITS Presentation - 6 Dec 2013

Next  Steps  

•  Systema%cally  digi%ze  physical  documenta%on  of  all  future  projects  

•  Achieve  a  “paperless”  office!    

Page 22: WITS Presentation - 6 Dec 2013

THANK YOU.