THE FUTURE FOR HAVEN OOSTENDE
STRATEGY FOR SUSTAINABLE GROWTH
OOSTENDE GREEN PORT
Drop in traffic UK
1. Situation 2009 – crisis beats hard in the port of Oostende
12 projecten voor duurzame groei
1. Situation 2009
1st 6 months (tonnage) 2008 (tonnage) 2009 %
Oostende 3.535.528 2.320.163 - 34,38 %
12 projecten voor duurzame groei
Statistics Ro-Ro Oostende1st semester 2008 versus 1st semester 2009
Statistics Total Tonnage Haven OostendePeriod 1999 -2009
1. Situation 200912 projecten voor duurzame groei
Drop in traffic UK
Stop activities Cobelfret in Oostende
TEF recovers
a little drop in bulk
conclusion: -30% traffic
1. Situation 200912 projecten voor duurzame groei
Strategy for a sustainable diversification of the economic and logistic activities in the port of Oostende.
2. Situation 2010 : new strategy for sustainable growth.
12 projecten voor duurzame groei
Stress on accompanied freight (roro)
Consolidating gravel and sand
Stress on renewable energy
New activities : leverage
Cruises: stimulating actively
consolidating fishery
Follow-up ro-ro
2. Action-points of the strategy
12 projecten voor duurzame groei
The port of Oostende : homeport for renewable and offshore energy, and related equipment
12 projecten voor duurzame groei
3. Port of Oostende - Green Port
3.Port of Oostende : todayRenewable energy Port of Oostende
3. Port of Oostende – Green Port
Renewable energy Port of Oostende
3. The port of Oostende – Green port
Renewable energy Port of Oostende
The port of Oostende – Green port:
assets and instruments
3.1. Port of Oostende Renewable energy Port of Oostende
Financial & operational engineering Design of port facilities Financing Management coordinator
3.1.Port of Oostende – Zeewezendock
Renewable energy Port of Oostende
3.1.Port of Oostende – Zeewezendock
Renewable energy Port of Oostende
3.2.Port of Oostende – New port entrance
Renewable energy Port of Oostende
Project has started : - building permit Eastern dam OK - building permit Western dam introduced
September 09Goal: finished end of 2012Budgets OK
3.2. Port of Oostende - New port entrance
12 projecten voor duurzame groei
3.3. Port of Oostende offshore: C-Power
Renewable energy Port of Oostende
3.3. Port of Oostende offshore: Re-Power
Renewable energy Port of Oostende
3.4. Area for renewable energy in Port
Renewable energy Port of Oostende
3.4. Quays for renewable energy
Renewable energy Port of Oostende
3.4. Quays for renewable energy
Renewable energy Port of Oostende
3.4.The Fjell – Chiwan Port
Renewable energy Port of Oostende
3.5. Plassendale I – Industrial area
Renewable energy Port of Oostende
3.5. Plassendale II – Industrial area
Renewable energy Port of Oostende
Biofuel Plant
Biosteam Plant
3.6. Greenbridge IncubatorGent University – Port Oostende
Renewable energy Port of Oostende
Cleantech business park Incubator high tech starters R&D environment
3.6. The Energy Box
Renewable energy Port of Oostende
Emergent energy technologies Combine, demonstrate, monitor,
Commercialise Research – development -
entrepreneurship
3.6. The Energy Box in Shanghai
Renewable energy Port of Oostende
Model of the Energy box for the World Exposition in Shanghai
3.6.Power-Link
Renewable energy Port of Oostende
Develop a knowledge centre for renewableenergy for scientists, entrepreneurs, authorities.
4. To Summarise…Renewable energy Port of Oostende
The future of offshore
windenergy in the port of
Oostende
4. To Summarise…Renewable energy Port of Oostende
1. Port Infrastructure reorientationLand and water available for off-shoreenergy activities
4. To Summarise…Renewable energy Port of Oostende
2. Port Infrastructure reorientationLand and water available for off-shoreenergy activities
4. To Summarise…Renewable energy Port of Oostende
3. Academic & Start-up support
4. To Summarise…Renewable energy Port of Oostende
4. Clustering & networking
4. Belgian Windfarm ProjectsRenewable energy Port of Oostende
5. Is there an opportunity
Projectgebied Seastar
Projectgebied Norther
4. Belgian Windfarm ProjectsRenewable energy Port of Oostende
Off-shore projects Description Year
C-Power 300 MW in 2 Phases1000 GWh/Year
2011 -2012
Belwind 330 MW in 2 Phases1100 GWh/Year
2011 -2013
Eldepasco 216 MW670 GWh/Year
2013
Rentel 288 MW893 GWh/Year
2015
Norther 420 MW1360 GWh/Year
2014
Seastar 220 MW ?
5. Is there an opportunity
4. To Summarise…Renewable energy Port of Oostende
5. Is there an opportunity
4. To Summarise…Renewable energy Port of Oostende
6. Round 3 - UK
Zones MW Capacity
TCE Target Proposed by developer
Moray Firth 1000 1300
Firth of Forth 1000 3500
Doggerbank 9000 9000
Holderness/Hornsea 4000 4000
Norfolk 5000 7200
Hastings 1000 600
West Isle of Wight 1500 900
Bristol Channel 1000 1500
Irish Sea 1500 4200
4. To Summarise…Renewable energy Port of Oostende
300 MW represents 1 billion Euro Capital expenditure
Round 3 UK = 107 billion euro
Ostend,
Green Port of Oostende:
hub for offshore windfarms and other
equipment