7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 1/205
MINISTRY OF MEGAPOLIS & WESTERN
REGION DEVELOPMENTConsultancy for Construction Supervision and Project Management of
Micro Drainage Component at DEVI BALIKA Junction and KYNSEYRoad, Government of the Democratic Socialist Republic of SRI LANKA
METRO COLOMBO URBAN DEVELOPMENT PROJECT (MCUDP)(IBRD FUNDED) Ref No. 8145-LK
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 2/205
CONTENTS
1.LETTER OF TRANSMITTALLETTER OF ASSOCIATION
2.
COMPANY CREDENTIALS WAPCOS LTD.
INFORMATION FORMCOMPANY PROFILEREGISTRATION DETAILS
M/s. Infrastructure Development Consulting Services (Pvt.) Ltd.COMPANY PROFILEREGISTRATION DETAILS
Consultancy for Construction Supervision and Project Management of
Micro Drainage Component at DEVI BALIKA Junction and KYNSEYRoad, Government of the Democratic Socialist Republic of SRI LANKA
METRO COLOMBO URBAN DEVELOPMENT PROJECT (MCUDP)(IBRD FUNDED) Ref No. 8145-LK
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 3/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 4/205
No. WAP/INFRA/EOI-MCUDP/SRI LANKA/2015/12-01 18/12/2015
The ChairmanConsultancy Procurement CommitteeMETRO COLOMBO URBAN DEVELOPMENT PROJECTMinistry of Megapolis and Western DevelopmentWing-A, 12 th Floor, New Building, SethsiripayaBattaramulla, Sri Lanka
Sub: Consultancy for Construction Supervision and Project Management of Micro DrainageComponent at DEVI BALIKA Junction and KYNSEY Road, SRI LANKA under METRO COLOMBOURBAN DEVELOPMENT PROJECT (MCUDP) (IBRD FUNDED)- Expression of Interest.
Sir,
With reference to the subject cited above for the said work, we are pleased to enclose herewith ourExpression of Interest (EOI) in association with M/s Infrastructure Development Consulting Service
(Pvt.) Ltd. (IDCS), Sri Lanka.
WAPCOS Ltd, an ISO-9001:2008 certified Government of India Undertaking , under the Union
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 5/205
Storm Water Drainage , Sewerage & Sanitation, Environmental Engineering, Port & Harbors and InlandWaterways, Rural and Urban Development, Roads and Highway Engineering, Lakes & Wetlands
System Studies and Information Technology.
WAPCOS is registered with all major international funding institutions including the World Bank, AsianDevelopment Bank (ADB), African Development Bank (AfDB) the United Nations and its specializedagencies (UNDP, FAO) etc.
Over four decades of its operation, WAPCOS has worked in more than 55 countries abroad includingAfghanistan, Algeria, Armenia, Bangladesh, Bhutan, Burkina Faso, Burundi, Cambodia, Cameroon,Central African Republic, Chad, DR Congo, Eriteria, Ethiopia, Fiji Islands, Georgia, Ghana, Guiana,Indonesia, Iran, Iraq, Kenya, Korea, Lao PDR, Lesotho, Malaysia, Malawi, Mali, Mauritius, Mozambique,Myanmar, Namibia, Nepal, Niger, Nigeria, Oman, Philippines, Rwanda, Senegal, S ierra Leone,Singapore , Sri Lanka, Solomon Islands, South Africa, South Sudan, Swaziland, Syria, Taiwan, Tanzania,Togo, Uganda, Vietnam, Yemen, Zambia, Zimbabwe.
WAPCOS has carried out number of consultancy assignments pertaining to preparation of DetailedProject Reports , Feasibility Report and Project Management Consultancy for various Storm WaterDrainage System and Environment Improvement Projects.
With our background, experience and expertise we feel confident of providing you our bestprofessional consultancy services. In case you have any clarifications we shall be glad to provide thesame.
Thanking and assuring you of our best services at all times.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 6/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 7/205
i s
No: 55-2/1A, Galle Road, Colombo 3, Sri Lanka
Reg No: PV 18227
Telephone : 011 – 3052888E-Mail : [email protected]
Infrastructure Development Consulting Services (Pvt) Ltd.
16 th December 2015
ChairmanConsultancy Procurement Committee,Metro Colombo Urban Development Project,
Ministry of Mega polis and Western Development,Wing – A , 12 th Floor, New BuildingSethsiripaya, Battaramulla.
Dear Sir,
Consultancy Services for Construction Supervision and Project Management of MicroDrainage Component at Devi Balika Junction and Kysey Road
We, Infrastructure Development Consulting Services (Pvt) Ltd are pleased to confirm ourassociation with WAPCOS LIMITED of India to provide the required consulting services for theabove assignment.
We will work closely with WAPCOS to provide necessary resources and management supportto achieve the objectives of the assignment.
Yours sincerely,
Infrastructure Development Consulting Services (Pvt) Ltd
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 8/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 9/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 10/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 11/205
INFORMATION FORM
INFORMATION FORM
S. No. Item Description1. Name of the Organization WAPCOS Ltd.
(A Govt. of India Undertaking) 2. Registered Office Address
(With Telephone Nos., Fax Nos.& E-Mail)
5 th Floor, “Kailash”, 26, Kasturba Gandhi Marg,New Delhi-110001.Ph. No. +91-11-23313131-3/23313881,Fax No.:+91-11-23313134/23314924
E-Mail: [email protected]. Address for Correspondence(With Telephone Nos., Fax Nos.& E-Mail )
76-C, Institutional Area, Sector-18, Gurgaon – 122015, Haryana, IndiaPh. No. +91-124-2397391Fax No. +91-124-2399224E-Mail: [email protected]
4. Registration Details/Description of thefirm (Ownership & Organization)
Registered as Company on 26 th June, 1969 underCompanies Act, 1956.
Company No. 50705. No. of Years of Experience of the
Organization in Consultancy Services46 years (Estd.: 1969)
6. Areas of Consultancy Water Resources Projects- Agriculture- Irrigation & Drainage- Dam & Reservoir Engineering- Ground Water Management
- River Morphology- Dry Land Farming
Fl d C t l d Ri M t
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 12/205
INFORMATION FORM
“SCOPE Meritorious Award -2011- 2012” for“Corporate Governance”
Rated “Excellent” by the Department of PublicEnterprises, Government of India for the lastnineteen years continuously
Hon’ble Prime Minister of I ndia conferred“MoU Excellence Award” instituted byDepartment of Public Enterprises, Govt. ofIndia.
Hon’ble Prime Minister of India conferred
“SCOPE Award for Excellence and OutstandingContribution to the Public SectorManagement-Smaller Public Enterpri ses”instituted by Standing Conference of PublicEnterprises.
Water Awards 2011-2012:Best ConsultancyCompany in Water Sector for outstandingcontribution in the Field of Water in India
Water Awards 2010-2011 : Best ConsultancyCompany in Water Sector for outstandingcontribution in the Field of Water in India
“National Award for Excellence in Cost
Management” conferr ed by The Institute ofCost and Works Accountants of India, a
i f i l b d d h
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 13/205
INFORMATION FORM
9. Annual TurnoverYEAR TURNOVER (MUS$)
2010-2011 78.65
2011-2012 69.26
2012-2013 104.29
2013-2014 149.92
2014-2015 146.71
10. WAPCOS is also registered, asInternational consultants with severalInternational agencies like:
International Fund for AgriculturalDevelopment
Kuwait Fund for Arab EconomicDevelopment
African Development Bank/Fund
Arab Bank for Economic Development in Africa
Arab Fund for Economic and Social Development,Kuwait
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 14/205
INFORMATION FORM
Maldives, Mali, Mauritius, Mozambique,Myanmar, Namibia, Nepal, Niger, Nigeria, Oman,
Pakistan, Philippines, Rwanda, Senegal, SierraLeone, Singapore, Sri Lanka , Solomon Islands,South Africa, South Sudan, Sudan, Swaziland,Syria, Taiwan , Tanzania , Togo, Uganda, Vietnam,Yemen, Zambia, and Zimbabwe
12. Branch Offices (India)
Ahmedabad, Ajmer, Bikaner, Bangalore, Bhimtal, Bhopal,Bhubaneshwar, Chandigarh, Chennai, Dahod, Gandhinagar,Gurgaon, Guwahati, Hanumangarh, Hyderabad, Indore , Jaipur,Jodhpur, Jabalpur, Kalyan, Kochi, Kolkata, Kota, Kozhikode, Kutch,Lucknow, Nagpur, New Delhi, Noida, Patna, Pune, Pushkar, Raipur,Ranchi, Shimla, Thrissur.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 15/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 16/205
COMPANY PROFILE
COMPANY PROFILE
BACKGROUND AND ORGANIZATION
WAPCOS Ltd., is a “MINI RATNA” and an ISO: 9001:2008 Certified Government of India Undertaking since1969, under the Ministry of Water Resources, River Development & Ganga Rejuvenation is a well-knitorganization with specialised functional core groups fully equipped to provide comprehensive inter-disciplinary coverage of all aspects of consultancy in Water Resources, Power and Infrastructure sectorsranging from planning and feasibility studies, detailed surveys, investigations and designs to construction,operation, maintenance and monitoring. WAPCOS was incorporated on June 26, 1969 under the CompaniesAct 1956.
WAPCOS drives its strength from its human resources, which are backbone of the organisation. WAPCOS hasthe in-built capacity to provide multi-disciplinary project team comprising of its own core group ofprofessionals and specialists from various organisations of Govt. of India and other State Departments.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 17/205
COMPANY PROFILE
ORGANIZATION
Functionally WAPCOS can be broadly categorised into three groups:
Water Resources Projects Infrastructure Projects Power Projects
Each of the groups is headed by a specialist senior engineer with proven expertise, capability and experience inaspects relevant to that group. The groups have emerged as centres of excellence in their respective fields.Each of these centres has specified disciplines to cater for both the national and international projects specificto that discipline. These are briefly as below:
Water Resources Projects
1. Agriculture2. Irrigation & Drainage3. Dam & Reservoir Engineering4. Ground Water Management
5. River Morphology6. Dry Land Farming7. Flood Control and River Management8. Performance Evaluation & Impact Assessment9. Environmental & Socio-economic studies
Infrastructure Projects
1. Water Supply, Sewerage, and Sanitation2. Solid Waste Management3. Storm Water Drainage
d d d h
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 18/205
COMPANY PROFILE
FINANCIAL TURNOVER
60
80
100
120
140
160
I n M i l l i o n U S $
ANNUAL TURNOVER
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 19/205
COMPANY PROFILE
OUR MAJOR FIELDS OF SPECIALIZATION
The specialised functional core groups, each manned by experts to carry out consultancy assignments in anefficient and the best possible manner, are:
- Irrigation, Drainage and Water Management- Groundwater Exploration Development of Wells and Minor Irrigation- Flood Control Reclamation and River Morphology- Natural Resources Management - Rainfed and Irrigated Agriculture
- Dam and Reservoir Engineering- Power Engineering- Hydro Power Engineering- Water Supply, Sewerage and Sanitation- Lakes and Wetlands- Rural and Urban Development- Roads, Bridges and Highway Engineering- Environmental Engineering- Ports and Harbours and Inland Waterways- System Studies and Information Technology- Institutional Development, Capacity Building & Training- Human Resources Development
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 20/205
COMPANY PROFILE
INSTITUTIONS BACKING WAPCOS
Besides its own compliment of experienced personnel, WAPCOS has the institutional backing with privilege todraw upon the appropriate in-service expertise from its various reputed constituent units like:
Central Water Commission (CWC);
Survey of India (SOI);
Geological Survey of India (GSI);
Central Ground Water Board (CGWB);
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 21/205
COMPANY PROFILE
Central Water and Power Research Station (CWPRS);
Central Soil and Material Research Station (CSMRS)
State Irrigation Departments;
The Engineers, Scientists and other experts of these constituents, have worked in a variety of climatic,topographic and socio-economic environments both in India and abroad in more than fifty five countries ofAsia and Africa where various types of studies and designs connected resources development projects havebeen successfully completed. Many of these projects have been funded by International Agencies like theUnited Nations, The World Bank , the Asian Development Bank, The International Bank for ReconstructionDevelopment and the African Development Bank and from local funds of respective countries.
FIELDS OF SERVICES PROVIDED BY WAPCOS
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 22/205
COMPANY PROFILE
Major Canalisation Minor Canalisation to serve various systems of irrigation
Rehabilitation and Modernisation of Existing City Drainage Projects Ground Water Exploration and Development Water Management at Institutional and Farm level Remote Regulation Control and Tele-transmission system Project Management
3. Agriculture
Irrigated Agriculture Agriculture Soil Surveys and Analysis Watershed Management Farm Management, Extension Programmes Agricultural Mechanisation Support Services Experimental Farms and Pilot Projects Land Preparation, Levelling Arid Zone Farming Land Reclamation Command Area Development including On-farm and
Off- farm works Soil Conservation and Forestry Resettlement Plans for Transmigration Fisheries processing, Aquaculture engineering, Fishing Harbours and Infrastructural development, Small
Scale and Artisanal Fisheries etc.
Rural Institution Planning and Development Livestock Studies Market Research including Socio-economic and Techno-economic studies
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 23/205
COMPANY PROFILE
- System layout and designs including distribution network, including OH and UG tanks- Intake structures and treatment plants-
Construction Supervision and Quality Control- Operation and Maintenance- Monitoring and Evaluation
Source Appraisal and Development
- Surface/Ground water assessment- Water quality and monitoring surveillance- Water harvesting
- Water conservation
Treatment
- Water purification and treatment plants- Desalination- Sewage treatment and disposal- USAB based STPs- Sewage irrigation- Waste water treatment and recycling- Automation of treatment plants
Others- Pollution abatement- Low cost sanitation- Socio-economic surveys- Monitoring and Evaluation
- PRAs- Unaccounted for Water-Reduction & Control (UFW-R&C)- Training and institutional development
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 24/205
COMPANY PROFILE
8. Ports, Harbours & Inland Water Transport
Techno-economic Studies Investigations Civil Engineering complex Infrastructural facilities
9. Allied Fields
Management Consultancy Services Infrastructure Development
RANGE OF SERVICES
Topographical and Geodetic surveys Soil surveys by conventional and photo-interpretation methods Hydro-meteorological surveys Geo-technical investigations, construction material surveys and sub-soil explorations Aerial mapping and photogrammetric surveys GIS and Remote Sensing Data acquisition and processing Pre-investigations, Baseline surveys and investigations of project components Assessment of water resources and demands Master Plan and basin studies for overall development of water resources including formulation of short,
medium and long term plans Feasibility studies and reports for development
Master Plan/City Development Plans/Infrastructure Development Plans for Cities and Towns
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 25/205
COMPANY PROFILE
WAPCOS LINKS - INTERNATIONAL LEVEL
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 26/205
COMPANY PROFILE
African Development Bank
Arab Bank for Economic Development in Africa
Arab Fund for Economic and Social Development, Kuwait
Asian Development Bank
Food and Agriculture Organization
International Bank for Reconstruction and Development
International Fund for Agricultural Development
Kuwait Fund for Arab Economic Development
United Nations Development Program
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 27/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 28/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 29/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 30/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 31/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 32/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 33/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 34/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 35/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 36/205
Infrastructure Development Consulting Services (Pvt) Ltd.
THE COMPANY
Infrastructure Development Consulting Services (Private) Ltd (IDCS) is a multi-disciplinary consulting firmoffering a range of integrated, innovative and high quality services across sectors and practices.
The corporate offices of IDCS are located in the heart of Colombo in the Western Province of Sri Lanka. Inaddition to the core Management Team and Associate staff, the firm has access to a wide range of expertswho are registered with the firm to support the mobilization of well qualified and experienced experts atshort notice to address varying needs of any assignment. Furthermore, the firm has in house as well as oncontract basis, technical personnel consisting of AutoCAD Operators, Quantity Surveyors, TechnicalOfficers, Land Surveyors, together with field enumerators, survey and data management specialistswhose activities are guided by in-house supervisory and project management staff.
IDCS has the capacity to mobilize well experienced teams of specialists who are able to respond effectivelyto client needs with sound judgment, commitment and dedication to provide consulting services on awide range of development programs.
Name of Firm
Address No: 55 2/1A Galle Road Colombo 03
Infrastructure DevelopmentConsulting Services (Pvt) Ltd.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 37/205
SERVICES OFFERED
IDCS is able to effectively co-ordinate and build strong integrated project teams to cover a wide spectrumof disciplines. Comprehensive multi-disciplinary services are available, specifically tailored to suit therequirements of the most exacting project. The services offered by IDCS cover the full project cycle range
and includes:
Feasibility Studies
Project Preparation
Environmental and Social Impact Assessments
Project Implementation and Contract Management
Monitoring and Evaluation
ORGANIZATIONAL STRUCTURE OF THE FIRM
The Firm is led and managed by a well-qualified and experienced group of experts exposed todevelopment management consisting of a Core Management Team and Associate professionals who areof varying disciplines and expertise.
The Core Management Team consists of the following personnel who are well qualified and dedicated
senior members with work experience in Sri Lanka and overseas.
THE CORE MANAGEMENT TEAM
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 38/205
ILANGANTILLEKE, S.G PhD Director/Mechanical Engineer
B. Sc. Agriculture, Second Class Hons. Upper Division, University of Ceylon, 1966 – 1970: M.Sc. (Ag.
Mech.) Michigan State University, USA. 1975. Ph. D. (Ag. Mech Tech), Michigan State University, USA.
1978. Management training for the CGIAR System, Netherlands 1995. Has over 30 years of work
experience in Sri Lanka and worldwide. From 1994 to 2008 he has functioned as Regional Leader and
International Scientist at the International Potato Center (CIP) which is a CGIAR Center of the World
Bank, in Washington DC, USA. Countries of work experience during this assignment period includes,
South West Central Asia and the Caucasus (SWCA), including Bangladesh, Bhutan, India, Nepal,
Pakistan, Sri Lanka of South and West Asia, Uzbekistan, Khazakstan, Turkmenistan, Tajikistan, Kyrgyzstan
and Afghanistan of the Central Asian countries, and Armenia, Azerbaijan and Georgia of the Caucasus
region.
His early career was with the Department of Agricultural Engineering, University of Peradeniya, Sri Lankain the capacity of Head of the Department of Agricultural Engineering, followed by a period of
engagement as Professor / Consultant of Post Harvest Technology at the Asian Institute of Technology,
Bangkok, Thailand.
JAYASURIYA J Director/HR Management
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 39/205
KEY ASSOCIATES
R S A PERIES Highway Engineer
B.Sc Engineering (Hons), University of Ceylon – 1963; M. Eng. Sc. University of New South Wales, Australia -1978. Member, Institution of Civil Engineers, London, UK, 1968; Fellow, Institution of Engineers, Sri Lanka,1984. He possesses extensive work experience in Sri Lanka and in Brunei - Darussalam. A HighwayEngineer with wide experience and expertise in highway and bridge construction and construction
supervision of major highway projects. His project experience includes holding positions as SeniorConstruction Engineer, Resident Engineer and Deputy Team Leader positions. Recent assignments he hasfunctioned on include JICA funded Southern Expressway Project and the Outer Circular Highway Project asthe Resident Engineer / Deputy Team Leader engaged in construction supervision, contractadministration and management of consultants. His overseas work experience includes undertakingassignments as Road / Bridge Engineer for the Public Works Department, Brunei Darussalam. During this
period, was in charge of a number of Road and Bridge Construction Projects and was responsible forpreliminary Investigations; preparation of designs for roads, bridges and related structures and thepreparation of Tender Documents.
Ms. VASANTHA NALLATHAMBY Civil / Roads Engineer
B. Sc. Civil Engineering, University of Peradeniya, Sri Lanka. 1971. Fellow, Institute of Engineers (FIE), SriLanka since 2001 Member Institution of Civil Engineers (MICE) London since 1976 Diploma in
The key associates of IDCS are highly experienced personnel with extensive work experience in theirrespective fields of specialization.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 40/205
ANTON FERNANDO Structural Engineer Bsc Civil Engineering, University of Peradeniya, Sri Lanka, 1968. Member/Fellow on the followingprofessional organizations - Fellow, Institution of Engineers, Sri Lanka, 1984; Member, ICE-UK – 1971;
Member, SLSI committee on building materials, 1980 – 2000; Former Council Member, Institution ofEngineers in Sri Lanka – 1994; Member, Association of Consulting Engineers in Sri Lanka – 1999. Recentkey assignments include - Design of power house for Sierra Construction; Preliminary designs of HospitalBuilding for JICA Project; Supervision of Hospital and School Buildings in Batticaloa for the USAID fundedRISEN Project. Design and supervision of apartment buildings, land development work consisting ofdesign and supervision of retaining walls, roads and drainage structures; For commercial developmentclient carried out preparation of designs for multi-storied office buildings and apartment buildingsamong which was a 7-story Building for Ravi Jewellers, Pettah; With “Structura” Engineering Consultants,UK, 2007-8 Designed the Residential Blocks for The Edge, Newport, which consists of two 8-Storey Blockswith both masonry & RC option and one 21-storey Block in RC. Most of the designs were carried outusing “MASTER” Series Software.
A. PIYASIRI Chartered Architect
MSc in Architecture, University of Moratuwa, Sri Lanka, 1976. Mr. Piyasiri is a Chartered Architectregistered with the Sri Lanka Institute of Architects, Registration No. A00395. Member, Royal Institute ofBritish Architects (RIBA). Associate Member of the Institute of Architects, Sri Lanka – AIA (SL). Mr. Piyasiri
has commenced his career with the Department of Buildings, Sri Lanka, where he has functioned as anArchitect for nearly 20 years. Thereafter he has functioned as a freelance independent consultant
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 41/205
LALITH PERERA Environmentalist M.Sc in Environmental Management and Development, Australian National University, Canberra,Australia, 2004; M.Sc in Forestry, University of Sri Jayawardenapura, Sri Lanka, 1997; B.Sc Special in
Agriculture, University of Ruhuna, Sri Lanka (1993). Areas of Expertise include Environmental ImpactAssessments (EIA); strategic project designing, development and appraisals; addressing policy andadvocacy issues with relevant agencies; developing effective monitoring and evaluation methodologies;evaluations and report writing; Community Based Disaster Risk Management (CBDRM) Having won theJoint Japan /World Bank Graduate Scholarship (JJ/WBGSP, 2003) he obtained an M.Sc. from ANU,Australia. Previously won gradate scholarship from ODA, UK to follow a master's degree at University of Sri
Jayawardenapura, Sri Lanka. Recent assignments include functioning as Environmental Specialist on theADB funded Local Government Infrastructure Improvement Project. Key achievements – Several IEEscompleted addressing tasks that included - Monitoring ongoing projects connected to water, buildingsand roads sectors (infrastructure) at various locations in Sri Lanka; Coordinating with government bodies toassess the environmental and social perspectives of development projects; Contributing to resolve thecommunity issues that are likely to emerge due to implementation of projects; Analyzing baseline data andpreparation of technical reports for project development
ORGANIZATION CHART OF THE FIRM
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 42/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 43/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 44/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 45/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 46/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 47/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 48/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 49/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 50/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 51/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 52/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 53/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 54/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 55/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 56/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 57/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 58/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 59/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 60/205
Consultants Experience Project Description Sheets
Assignment Name:Development of Six Lift Irrigation Schemes in ChampassackProvince (under Line of Credit, Government of India)
Approximate Value of the contract(in current US$): 17.34 Million
Country : Lao PDR Project Location within Country: Champassack Province
Duration of assignment (months) :33
Name of Client : Ministry of Agriculture and ForestryDepartment of Irrigation, Government of Lao PDR
Total no. of Staff Months of theassignment: 270
Address:Department of Irrigation , Ministry of Agriculture &Forestry, Patuxay Road, P.O. Box: 811, Vientiane, Lao PDR.
Approximate Value of the Servicesprovided by your firm under thecontract (in current US$): 17.34Million
Start Date(Month/Year): May, 2009Completion Date(Month/Year): Feb., 2015
No. of professional staff-monthsprovided by associatedConsultants: Nil
Name of associated Consultants, if any : Nil Name of senior professional staff ofyour firm involved and functionsperformed (indicate mostsignificant profiles such as ProjectDirector/Coordinator, TeamLeader):Anil Arora, Team LeaderR.K.Agrawal, Project DirectorR.K.Sharma, Project ManagerS.L. Aggarwal, Irrigation ExpertS.P. Goyal, Irrigation ExpertN.K.Arora, Canal ExpertDr. A.K. Sharma, Environmentalist
Sanjay Sharma, Irrigation ExpertDr . Mahendra Singh, AgronomistAkhil G R id t E gi
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 61/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 62/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 63/205
Consultants Experience Project Description Sheets
Assignment Name:Remodelling and Covering of Ramesh NagarDrain from Kirti Nagar FurnitureBlock/Railway Crossing to Najafgarh Drain
COUNTRY/STATE:India
Project Location within Country:New Delhi
Professional Staff Provided by yourFirm/entity (profiles): 5
Name of Client:
Municipal Corporation of Delhi.
No. of Person-Months of Professional staffprovided by your company:
180 man-month StartDate(Month/Year)May, 2010
Completion Date(Month/Year)April, 2013
Approximate Value of Consulting ServicesProvided by your Firm(US$):18.5 Million
Name of associated Consultants, if any:
M/s Park Infrastructure Ltd., New Delhi
No. of Months of Professional Staff providedby Associate Consultants:8
Name of Senior Staff ( Project Director/Coordinator/Team Leader) involved andfunctions performed:Mr. R.K. Gupta Project AdvisorMr. R.K. Agrawal Project Co-ordinatorMr. V.K. Mathur Team LeaderMr. Sanjay Bohidar Dy. Chief Engineer
Mr. Sanjay Sharma Sr. EngineerNarrative Description of Project:
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 64/205
Consultants Experience Project Description Sheets
Actual Services Provided by the firm:
Both L and T shaped Pre-cast RCC segments are being casted at WAPCOS casting yard atSaraswati Vihar, Mansarovar Garden by a full-fledged batching plant. Simultaneously, diversionworks of 500 m length in first phase have been completed. The placement of L and T Sections onDrain bed after laying of PCC has been commenced. Material checking, Quality Supervision withregular Sample testing are being strictly adhered to maintain standard as per TenderSpecifications.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 65/205
Consultants Experience Project Description Sheets
Assignment Name :Master Plan and DPR for Kaliaghai - Kapaleswari BaghaiDrainage Basin in West Bengal(Area 2145 Km 2)Country :India
Duration of assignment (months ):9
Location within Country :Midnapore, West Bengal
Total number of Staff Months of theassignment : 183
Name of Client :Irrigation and Waterways Department, Govt. of WestBengalAddress Of Client :Jalasampad Bhawan, Salt Lake City, Kolkata – 700 091
Technologies involved/numbers oflocations covered, etc.East Midnapore and West MidnaporeStart Date:
(Month/Year)November, 2007
Completion Date:
(Month/Year) August 2008
Name of Associated Consultants, if any : NilName of senior professional staff of your firm involved and functions performed :
1. Sh D. N. Lahon2. Sh P.K.Basu3. Sh Kamalesh Chatterjee
4. Sh Biplav De5. Sh Chandan Ray
Approximate Value of the contractUSD 2.416 Million
Approximate Value of the serviceprovided by your firm under thecontract: USD 2.42 Million
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 66/205
Consultants Experience Project Description Sheets
Project Name Preparation of Detailed Project Reports for 24X7 Water Supply,Integrated Sewerage and Storm Water Drainage in 59 towns of Bihar -
Package 6 (Bakhtiyarpur, Barh, Danapur, Fatuha, Khagaul, Masaurhiand Phulwarisharif). Name of Client Bihar Urban Development Corporation Limited (BUDCo), Govt. of Bihar
Country India Project locationwithin Country
Patna-1, Bihar
Participation As lead firm
Value of Services USD 182620 Million
Source of Financing BUIDCo, Govt. of Bihar
Consultancy Services
(i) No. of Key Expert 17
(ii) No. of Key person months 74
Length of Consultancy Assignment Start Date June, 2013
Completion Date Ongoing
Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and FunctionsPerformed
Dr. Aman Sharma, Team Leader cum Public Health Engineering Expert.
Sh. GS Mishra, Water Supply Expert.Sh. Rakesh Srivastava, Sewerage Expert.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 67/205
Consultants Experience Project Description Sheets
prepare requisite DPRs and Bid Documents for 24x7 Drinking Water Supply, Integrated SewerageSystem, and Storm Drainage System as per the ToR. The objective of the Projects proposed is to
promote sustainable environment and basic urban infrastructure and sanitation facilities to the allcitizens and visitors of the proposed towns and to ensure effective abatement of pollution byadopting a river basin approach for comprehensive planning and management, and to maintainminimum ecological flows in the rivers in vicinity with the aim of ensuring water quality andenvironmentally sustainable development. Detailed Description of the Actual Services Provided by your Firm
a) 24X7 Water Supply
The objective is to cover entire town (including new/upcoming areas, slums etc.) with 100%sustainable drinking water supply facilities on 24x7 basis. The tasks to be undertaken include:
(i) Identification and development of source (surface source and/or ground water source)(ii) Provision of treatment units(iii) Provision of storage facility(iv) Provision of distribution network and House Service connections(v) Program of water demand management.(vi) Detailed designs, drawings, cost estimates and bidding documents for planning and
implementation of prioritized capital investment plan.
b) SewerageThe objective is to cover entire town (including new/upcoming areas and slum etc.) with 100%sewage collection, conveyance and treatment facilities. The tasks to be undertaken include:
(i) Identification of the disposal arrangements for the treated sewage.(ii) Providing a suitable treatment plant to treat the sewage to acceptable standards
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 68/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 69/205
Consultants Experience Project Description Sheets
Assignment name Preparation of Master Plan of WaterSupply, Sewerage & Storm Water DrainageSystems of NOIDA for 2021(Area 203 Km 2)
Country: India
Name of lead consultant (firm) to whomassignment is awarded by client:WAPCOS Ltd.
Professional Staff provided by your firm/ Entity(Profiles) : 7
Location within country: NOIDA, India
Name of Client:New Okhla Industrial DevelopmentAuthority
No. of Staff :10
Address:NOIDA, India
Duration ofassignment: 19Months
No. of Staff Months :15
Start date: April, 2001
Completion date:October, 2001
Approx. value of the services :USD 33333
Name of Associated Consultants, if anyNil
No. of months of Professional Staff, provided byAssociated Consultants. Nil
Name of Senior Staff:1. Sh. S.A. Swamy, Advisor2. Sh. P.K. Jain, Consultant3. Sh. G. Bandyopadhyay, Chief Engineer4. Sh. R.K. Agrawal , Project Manager5 Dr Aman Sharma Water supply Expert
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 70/205
Consultants Experience Project Description Sheets
To examine various options for sewerage system including the finalization of Sewage TreatmentPlant (STP).
To work out storm water drainage system including storm water pumping stations, etc. To prepare broad cost estimate . To examined rain water harvesting. To examine the gainful utilisation of treated effluents from STPs for Agriculture & Horticulture. To prepare a schedule of execution of schemes corresponding to the year 2011 and 2021. To broadly assess Environmental Impact Assessment. Any other activity; which is found essential for smooth implementation and management of
water supply and sanitation works in the selected GPs.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 71/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 72/205
Consultants Experience Project Description Sheets
Project Name :Consultancy Services for Planning, Designingof storm water drainage & rain waterconservation scheme for Gurgaon.(Area 732 km²)
Country/State :India
Project Location Within Country :Gurgaon
Professional Staff Provided By Your Company :No. of Staff : 6
Name Of Client :Haryana Urban Development Authority
No. Of Person-Months Of Professional StaffProvided By Your Company :50 Manmonths
Start Date :(Month/Year)March 2007
Completion Date :(Month/Year)Feb 2008
Approx. Value Of Consulting Services ProvidedBy Your Firm :USD 41666
Total Cost Of Project :USD 8.33 Million
Status Of Your Firm In The Association /Consortium :LEAD :√ ASSOCIATE :
Name Of Associated Firm(S) If Any : - Nil - No. Of Persons-Months Of Professional StaffProvided By Associated Firm(S) :- Nil -
Name Of Senior Staff From Your Firm Who Were Involved And Functions PerformedMr. R.K. GUPTA, Team Leader
Dr. H.S. Bhatia, Dy. Team LeaderMr. M.A. Khan, Project Coordinator
Mr. V.K. Gupta, Drainage Expert
Mr. V.K. Mathur, HydrologistMr. Sanjay Sharma, Sr. Engineer
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 73/205
Consultants Experience Project Description Sheets
Assignment name :Design of Storm water drainage Systemalong NH-31A in Gangtok(Area 13 sq. km)
Country/state :India / Sikkim
Location within country :Sikkim State
Professional staff provided by your company :No. of Staff : 04
Name of client :Urban Development & Housing Department,
Govt. of Sikkim, Gangtok
No. Of person – months of professional staffprovided by your company : 5 manmonths
Start date : completion date:(month/year) (month/year)June, 2001 July, 2001
Approx. Value of consulting services providedby your firm :USD 12833
Total cost of project :USD 1.167 Million
Status of your firm in the association :Consortium :LEAD : ASSOCIATE :√
Name of associated firm(s) if any :
-Nil-
No. Of persons-months of professional staffprovided by associated firm(s) :-Nil-
Name of senior staff (project director, co-ordinator, team leader) from your firm who wereinvolved and functions performed :
1. Mr. A.V.S. Prasad, Team Leader
2.
Mr. O.P Chibber, Electro – Mechanical Engineer3. Mr. V.K. Gupta, Drainage Expert
C l E i j i i Sh
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 74/205
Consultants Experience Project Description Sheets
Project name :Detailed Project Report on IntegratedSewerage and Storm water drainage Systemfor Cuttack City(Area 43.7 km 2)
Country/state :India/Orissa
Project location within country :Cuttack
Professional staff provided by your company :No. of Staff : 8
Name of client :Cuttack Development Authority (CDA)
No. Of person-months of professional staffprovided by your company :22 Manmonths
Start date :(month/year)March,2007
Completion date :(month/year)Feb.,2008
Approx. Value of consulting services providedby your firm :USD 41667
Total cost of project :
USD 44 Million
Status of your firm in the association /consortium :LEAD : ASSOCIATE :
Name of associated firm(s) if any :- Nil -
No. Of persons-months of professional staffprovided by associated firm(s) : - Nil -
Name of senior staff from your firm who were involved and functions performed S.A.Swamy, Project Director G.Bandyopadhyay, Chief Engineer/Co-ordinator S.K.Sengupta, Team Leader Rakesh Srivastava, Design Engineer R.K Agarwal, Drainage Expert O.P. Chibber, Electro Mechanical Engineer
Detailed narrative of the project :
C l E i P j D i i Sh
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 75/205
Consultants Experience Project Description Sheets
Project name :Master Plan for Storm water Drainage forCoimbatore and Trichy (A World Bank FundedProject)
Country/state :
India/ Tamilnadu
Project location within country :Tamilnadu
Professional staff provided by yourcompany : No. of Staff : 23
Name of client :
Tamil Nadu Urban Development
No. Of person-months of professionalstaff provided by your company :140Manmonths
Start date :(month/year)April, 1994
Completion date :(month/year)Sept.,1995
Approx. Value of consulting servicesprovided by your firm :USD 141405
Total cost of project :
USD 450 Million
Status of your firm in the association /consortium :LEAD : ASSOCIATE :
Name of associated firm(s) if any :
M/s ECI, DENVER, USA
No. Of persons-months of professional
staff provided by associated firm(s) :3 ManmonthsName of senior staff from your firm who were involved and functions performedShri E.V.Jagannathan, CooridnatorShri R.K.Agrawal, Project EngineerShri T.Ramachandran, Team LeaderShri R.D.Rao, Project EngineerShri S.A.Jagadeesan, Consultant
Shri R.K.Agrawal, Project EngineerShri R.D.Rao, Project EngineerShri S.M.Shivkumar, Project EngineerShri R.K.Gupta, Project Manager
Detailed narrative of the project :The major objective of the study is to prepare a long term storm water drainage master plan for
C lt t E i P j D i i Sh
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 76/205
Consultants Experience Project Description Sheets
Assignment Name :Master Plan of Storm water drainage Systemfor Gangtok (Also Includes retaining walls fromlandslides)(Area 25 sq. km)
Country/State :India / Sikkim
Location Within Country :Sikkim State
Professional Staff Provided By Your Company :No. of Staff : 08
Name Of Client :Irrigation & Flood Control Department,Govt. of Sikkim, Gangtok
No. Of Person – Months Of Professional StaffProvided By Your Company :188 manmonths
Start Date : Completion Date:(Month/Year) (Month/Year)March, 2001 Jan., 2003
Approx. Value Of Consulting Services ProvidedBy Your Firm : USD 99333
Total Cost Of Project :
USD 141.67 Million
Status Of Your Firm In The Association :Consortium :LEAD : ASSOCIATE :√
Name Of Associated Firm(S) If Any :
-Nil-
No. Of Persons-Months Of Professional StaffProvided By Associated Firm(S) :-Nil-
Name Of Senior Staff (Project Director, Co-Ordinator, Team Leader) From Your Firm Who WereInvolved And Functions Performed :1. Mr. A.V.S. Prasad, Team Leader2. Mr. O.P Chibber, Electro – Mechanical Engineer3. Mr. V.K. Gupta, Drainage Expert4. Mr. U.P. Srivastava, Hydrogeologist
5. Mr. V.K. Mathur, Hydrologist6. Mr. Amit Satya, Sr. Engineer
C lt t E i P j t D i ti Sh t
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 77/205
Consultants Experience Project Description Sheets
Assignment name:Storm Water Drainage scheme for Silvassa Country: India, U.T. of Dadra and Nagar Haveli
Location within country: Dadra and NagarHaveli Duration of assignment (months): 10
Name of Client:Dadra and Nagar Haveli Total No of person-manmonth of the
assignment: 25Approx. value of the contract:
USD 20.67 Million
Approx. value of the services :
USD 20000
Address:Dadra and Nagar Haveli
No of professional person-manmonth providedby joint venture Partner:Nil
Start date: 2000 Completion date: 2001 Name of Senior Staff:
1. Sh. A.P. Sinha, Sewerage Expert2. Sh. R.K. Agrawal, Computer Expert3. Sh. S.C. Garg, Site Engineer4. Deepak Lakhanpal, Project EngineerName of joint venture Partner: Nil
Narrative Description of Project
The project involves design of storm water drains for an area of about 18 sq km. The total lengthof sewer line proposed was about 180 km. size ranging from 150 mm to 900 mm was proposed. Intotal 8 pumping stations were proposed. Facultative lagoon was proposed for treatment of Storm.Description of the Actual Services Provided in the assignment:
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 78/205
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 79/205
Consultants Experience Project Description Sheets
Professional Staff Provided By Your Company :No. of Staff : 6
Name Of Client :Public Works Department, Administration of
Andoman and Nicobar Island
No. Of Person-Months Of Professional StaffProvided By Your Company :
197 Manmonths
Start Date :(Month/Year)April,2002
Completion Date :(Month/Year)Dec.,2002
Approx. Value Of Consulting Services ProvidedBy Your Firm :USD 58333
Total Cost Of Project : Status Of Your Firm In The Association /Consortium :
LEAD : ASSOCIATE :
Name Of Associated Firm(S) If Any :
- Nil -
No. Of Persons-Months Of Professional StaffProvided By Associated Firm(S) :- Nil -
Name Of Senior Staff (Project Director, Co-Ordinator, Team Leader) From Your Firm Who WereInvolved And Functions PerformedMr. A.V.S. Prasad, Team LeaderMr R K Agrawal Modelling Expert
Mr. V.K. Mathur, HydrologistMr Amit Satya Sr Engineer
Country/State :INDIA
Project Name :Consultancy Services For Preparation OfDetailed Project Report On Drainage SystemFor Port Blair Town Including Airport Complex(Area 36 sq. km)Project Location Within Country :Port Blair Area
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 80/205
Consultants Experience Project Description Sheets
Detailed Description Of Actual Services Provided By Your Company :
The project included following components: Contour survey @ 0.5 m interval for an area of 20 sqkm. Digitization of maps. Condition / survey of the drains. Analysis of the adequacy / in adequacy of the existing drainage system. Data collection and analysis – Meteorological data & Tidel data. Remodelling of the drains Desiltation / cleaning of the existing drain
Removal of encroachments on both sides of the drain to facilitate the remodelling of thedrain Proper disposal of the storm water flow may be maintained Provision of parapet wall / fencing on both sides of the drain to avoid any mishappening
etc. Proper disposal of debris and other waste materials Design and cost estimates of existing drains / proposed drains in town area as well as in
airport complex
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 81/205
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 82/205
Consultants Experience Project Description Sheets
Project name:Preparation of DPR of UndergroundDrainage Scheme of Tambaram(Area 23 sq. km)
Country: India
Project location within country:Tambaram, Chennai
Professional staff providedNo. of staff: 10
Name of client:TWAD Board
NO. OF PERSON-MONTHS:20 Manmonths
Start date
(Month/Year)
September, 2001
Completion
Date(Month/Year)
Jan, 2003
Approx. Value of consulting services provided by
your firm :( In INR):USD 3.34 MillionTotal Cost of Project ( In INR):USD 75000
Name of associated firm(s) if any : - Nil - No. Of persons-months of professional staffprovided by associated firm(s) : - Nil -
Name of senior staff (project director, co-ordinator, team leader) from your firm who wereinvolved and functions performed :
1. Sh.G.Bandyopadyay, Chief Engineer2. Sh. J.D.Cruz, Project Advisor3. Sh.S.Sethurathinam, Project Advisor4. Sh. S.K.Saini, Estimator5. Sh. D.S.Verma, Chief Design Engineer
6.
Sh. S.M.Shiv Kumar, Tender ExpertDetailed narrative of the project :f f
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 83/205
Consultants Experience Project Description Sheets
Assignment name Consultancy services for Design ofUnderground Drainage Scheme ofPallavaram(Area 26 sq. km)
Country: India
Total value of the services :USD 9.34 Million
Name of lead consultant (firm) to whomassignment is awarded by client:WAPCOS Ltd.
Professional Staff provided by your firm/ Entity(Profiles) : 10
Location within country: PallavaramName of Client:
Tamil Nadu Infrastructure Financial ServicesLtd. (TNUIFSL)
No. of Staff : 8
Address:Tamil Nadu Infrastructure Financial ServicesLtd. (TNUIFSL), Pallavaram, Tamilnadu
Duration ofassignment: 16months
No. of Staff Months :20
Start date:Nov.,1997
Completion date:March’99
Approx. value of the services :USD 27700
Name of Associated Consultants, if anyNil No. of months of Professional Staff, provided byAssociated Consultants.Nil
Name of Senior Staff:Sh.G.Bandyopadyay, Chef Engineer Sh.S.K.Saini, EstimatorSh.S.Sethurathinam, Project Adivser Sh.P.K.Jain, Chief Design Engr.Sh.S.K.Sengupta, Project Coordinator Sh.Pradeep Kumar, Project Engr.Sh.O.P.Chadha, Process Design Engr. Sh.Ayan Batabyal, Project Engr.
Narrative Description of ProjectDesign of underground drainage scheme for Pallavaram town for providing sewerage system to a
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 84/205
Consultants Experience Project Description Sheets
Assignment name:
Consultancy Services for Preparation ofMaster Plan and DPR for Ghatal Area
Country:
India
Location within the Country: Ghatal, WestBengal
Approx. value of the services provided by yourfirm under the contract: USD 0.5 Million
Name of Client:Irrigation and Waterways Department, Govt.of West Bengal
Duration of the assignment: 24
Address of Client:
Irrigation and Waterways Department, Govt.of West Bengal
No. of person-months provided by your firm:
115
No. of professional person-months providedby the JV partners or the Sub-Consultants:
-Nil-
Name of Joint Venture partner or sub-Consultants, if any: -Nil-
Name of Senior Staff (Project Director/Coordinator, Team Leader) involved from your firm andfunctions performed indicated whether regular full- time employees of your firm or part-
time/independent:Sh. D.N.Lahon, Project DirectorSh. K.Islam, Water Resources ExpertSh.P.K.Basu, Drainage ExpertSh. A. Kalhia, Project EngineerSh. Sanjay Singhal, Drainage Expert
Narrative Description of Project in brief:
h h l b l h d f h d h l h h l b
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 85/205
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 86/205
Consultants Experience Project Description Sheets
Assignment name Conducting feasibility Study andPreparation of DPR for Water supply ,Waste Water Management andDevelopment of Ghats & Sarovars in GayaMunicipal Area(Area 50.17 km 2)
Country: India
Name of lead consultant (firm) to whomassignment is awarded by client:
WAPCOS Ltd.
Professional Staff provided by your firm/ Entity(Profiles) : 11
Location within country: Bihar, India
Name of Client:Support Program for Urban Reforms inBihar,Urban Development and HousingDepartment, Govt. of Bihar
No. of Staff :60
Address:Bihar, India
Duration ofassignment:
No. of Staff Months :
Start date: July 1, 2011
Completion date:Ongoing
Approx. value of the services :USD 336666.67(Inclusive of Service Tax)
Name of Associated Consultants, if anyNil
No. of months of Professional Staff, provided byAssociated Consultants. Nil
Name of Senior Staff:1. Dr. Aman Sharma, Team Leader, Sanitation Expert
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 87/205
Consultants Experience Project Description Sheets
Length of water supply network: 345 km Length of sewerage network: 307 km Length of Storm water drains: 25 Km
Actual Services Provided by the firm
Preparation of comprehensive Water supply scheme ensuring 24x7 drinking water supply through surface water sources i.e. Ganga River at Fatuwah (95 Kms from Gaya). The capacity ofWTP, Intake works and rising mains includes the 24x7 drinking water supply to the intermediatetowns (from Fatuwah to Gaya) such as Hilsa, Islampur, Bodhgaya etc.
Topographical survey of the project area
Preparation of Sewerage scheme for Gaya Municipal Corporation to ensure better sanitationand lesser pollution in the river Falgu
Preparation of Storm water drainage Scheme Rehabilitation/ Development of ancient Ghats and Sarovar- { AkshayvatSarovar,
BaitraniSarovar, BissarTalaab, BrahmasatSarovar, DiggiTalaab, Godavari Sarovar, Kalipokhar,LalbabaPaharSarovar, PitamaheshwarSarovar, PretshilaSarovar, Ramsagar, Ramkund orRamshila, RukmaniSarovar, SaryugTalaab, Surya kund, Warniya,Kendui Surya Mandir, JharkhandeshwarMandir, ShamshanBhoomi, VishnupadGhat,DevGhat, Hanuman or SangatGhat, ChowdharyGhat, GayatriGhat, KantahGhat, Mahadevor BrahmayaniGhat, PitamaheshwarGhat, KiraniGhat, Moriya Ghat, SitaKund, MallaToli,Siriya}
Renovation and rehabilitation of Sarovar and temples within the Sarovar premises withprovision for various amenities/ facilities such as water supply, boundary wall, Toilets,Bathrooms, Seating benches, Shaded seats, planters, dustbins, kiosks, pitching etc.
Renovation/ Development of Ghats and a connecting pathway (2.5 km) including provision forbasic amenities such as changing room, water-supply, toilet-bathrooms, information booths,parking facilities, entrance gates, inauguration stones, stone roofing’s, lamp posts, Rituall f di ki k i b h l d i f h
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 88/205
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 89/205
p j p
Assignment name Preparation of DPR and Construction Supervision of Water supply, Storm WaterDrainage, Sewerage, Solid WasteManagement , Roads & slum improvementfor 8 ULB’s in the state of Karnataka(World Bank Funded)
Country: India
Location within country: Karnataka
Name of lead consultant (firm) to whomassignment is awarded by client:WAPCOS Ltd.
Professional Staff provided by your firm/ Entity(Profiles) : 12
Name of Client:Karnataka urban Infrastructuredevelopment & Finance Corporation .
No. of Staff : 15
Address: Karnataka, India Duration of assignment:10 months
No. of Staff Months :90
Approx. value of the services :USD 583333
Name of Associated Consultants, if any:Nil
No. of months of Professional Staff, provided byAssociated Consultants: Nil
Name of Senior Staff:1. Dr. H.S. Bhatia, Team Leader2. Sh. R.K. Gupta, Project Coordinator3. Sh. D. N. Lahon, Team Manager
4.
Sh. Yogesh Wagh, Urban Planner5. Sh. A.K.D. Mazumdar, Public Health Engineer
Start date:Sep, 2006
Completion date:Dec, 2007
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 90/205
p j p
Land use, Investment Plan, Socio- Economic Surveys in the Project area, Preparation ofConceptual Plans for proposed infrastructure development, Environment Impact Assessment,Preparation of construction drawings and cost estimates, Preparation of DPR to improve theslum living standards.
Construction Supervision of the Projects viz. Water supply, Sewerage, Solid Waste Management ,Storm Water Drainage, Roads &slum improvement
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 91/205
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 92/205
p j p
Project Name Consultancy Services for Detailed Design, Tender DocumentPreparation and Supervision of Bondo & Siaya Water Supply andSanitation Projects (African Development Bank Funded)
Sources of Financing andamount of each source
African Development Bank Funded
Name of Client Lake Victoria South Water Services Board, KenyaContact Address Lake Victoria South Water Services Board
P.O. Box 3325, Kisumu. KenyaCountry Kenya Project location
within CountryKisumu, (Bondo & Siaya)
Name of Consulting firm WAPCOS Ltd.Participation √ As lead firm
As associate firmValue of services (i) Total USD 30 Million (ii) your firm USD 1.36 MillionNature/ category (ies) of consultancy services for Design, Construction, Supervision and ProjectManagement of Waste Water outlet and Waste Water Management project(i) No of Staff 16 National : √ International :
(ii)No of person months of Experts : 165(iii)No of person months of support staff : 20Length of Consultancy Assignment : 24 monthsStart Date June, 2011Completion Date OngoingName of Associate Firms (if any): NilNo of person-months of professional staff provided by Associate Firms (s) : Nil
Name of senior staff and duration involved Subhash Goyal- Team Leader
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 93/205
Verify the design parameters reported in the Feasibility Study reports for Bondo and Siayaas a basis of the detailed design.
Prepare detailed engineering designs (detailedscheme layout, topographic and profile surveys,hydraulic design of transmission mains anddistribution networks, design of hydraulic structures,raw water mains, pumping systems, powergeneration plant, water treatment plants, storagetanks, zoning and block mapping, development ofcustomer database appropriate with billing systemproposed, public water distribution outlets, e.g. waterkiosks and stand posts, mapping and metering of allconsumers), an engineer’s estimate and tender documents for construction of the works(Bills of Quantities, Drawings, Technical Specifications and Instructions to Bidders) forwater supply and sanitation improvements.
b) Detailed Design of Improved Wastewater Management Measures
Determine the influent characteristics and
propose appropriate on site interventionmeasures on best practices on sewage collectionand handling.
Asses the quantity of effluent discharge (serviceloads) expected as a result of proposed watersupply from the town and project discharge in 20years’ time through population projection data,hydraulic and organic loads.
Estimate the volumes of waste water flowsindicating the efficacy of where possible, contributions of storm water flows, industrial
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 94/205
Timely issue to the contractor all the necessarycorrespondences related to information,instructions, clarifications and suggestions so as toensure consistency in quality, positive progress andplanned costs.
Inspect, determine and approve the part of worksbefore, during and after construction of part and,or whole of the works to ensure all time compliancewith the specifications and standards.
Forecast variations and unforeseen incidences (during design of works) and inform in-timethe client including intervention measures to prevent adverse effects to the contract.
Monitor the value of works executed against payments made to the contractor and reportto the client monthly consistency against programme of expenditure and works givingreasons and recommendations.
Inspect, test and approve the materials procured by the contractor for the works to ensurethat they comply with standards and specifications.
Process the contractor’s payment statement including final certificate in accordance with
General Conditions of Contract and Conditions of Particular application.Construction Supervision works in respect of Water Supply Components :
Electro-mechanicalWorks
Installation of 5 hydro turbines coupled to pumps of capacity 17,500m3/day at a head of 126 m
Treatment Works Two lines of new treatment plant to produce 10,231 m 3/day.Rehabilitation and augmentation of the existing treatment plant to
produce 7,310 m 3/dayTreated Water Replacement of 1.7 km PVC-U section along the rising main and
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 95/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 96/205
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 97/205
Assignment Name: Consultancy Servicesfor the Design review and Supervision ofWorks for the Rehabilitation andExpansion of Cuamba City Water SupplySystem (FIPAG/NPTWSSP/CON-02/14)”,Mozambique
Approx. Value of the Contract (in current US$):22.00 Million US$
Country: Mozambique Location within Country: Cuamba
Duration of Assignment (Months): 30 Months (18Months: Design Review and Supervision, 12 Months:Defect Liability Period)
Name of Client: Fundo de Investimento e
Patrimonio do Abastecimento (FIPAG)under Ministry of Works and Housing
Total No. of person-months of the assignment:
135
Client’s Address: The Director GeneralFundo de Investimento e Património doAbastecimento de Água (FIPAG)Av. Filipe Samuel Magaia no. 1291Maputo, Mozambique
Tel: +258 21 308840Fax: +258 21 308881E-mail: [email protected]
Approx. Value of the Services provided by WAPCOSunder the Contract (in current US$):794,500 US$
Start Date (mm/yy): August 2014 Completion Date (mm/yy): Ongoing Funding Source, If Any:African Development Bank
Loan/TA/Grant No. (If Any):
Name of Senior Regular Full Time Employees ofWAPCOS involved and function performed:
Sh. V.K.Gupta, Team Leader
Sh. G. Venkata Ramana, Project Manager Sh. M. Manohar, Resident Engineer
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 98/205
1. Check and Approval of Proposed Design Changes by the Contractor - Covers checkingand approval of the Contractor’s proposed changes to the detailed design providedby the original Design and Supervision Consultant.
2. Construction Supervision - Covers construction supervision of all works for theproposed interventions, including attendance during the Defects Liability Period.
The design review and construction period is approximately 18 months.Description of Actual Services Provided in the Assignment:Description of Actual Services Provided by the Staff within the Assignment:
Design Check The Consultant shall be responsible for
reviewing and approval of theContractor’s design, drawings and otherproposals for the works. The design to beprepared by the Contractor and checkedby the Consulting Engineer shall include:
- Assessment of the existing situation: GISinformation, etc.
Review of the EMP and advise FIPAG ofany deviation from the WASISsafeguards instruments
Monitoring the Contractor’s design progress in accordance with theContractual Programme and willarrange, chair and take minutesof regular progress meetings.
S i i
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 99/205
The Consultant shall be responsible for instructing and monitoring theContractor regarding compliance with health and safety precautions andactions to comply with all the environmental requirements of the Schemeduring construction, as specified in the EMP.
Maintenance of all necessaryengineering and environmentalrecords pertaining to civilengineering works of this nature,including but not limited torainfall and other climaticconditions, contractor’smanpower levels, minutes ofmeetings, photographic records,financial reconciliations,Environmental MethodStatements etc.
Monitoring of the Contractor’s work progress in accordance with theContractual Programme and will arrange, chair and take minutes of regularprogress meetings.
Review all payment applications and approve all eligible payments for theEmployer’s action and will maintain and submit to the Employerreconciliations of payments and cost predictions to the end of the Scheme.
Management of all engineering and environmental variations to theContract and submit all documentation to FIPAG for their ‘no -objection’.
The Consultant shall manage all claims submitted and maked i FIPAG h f d l i f h l i
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 100/205
Assignment Name:Consultancy Services for the Engineering Design andConstruction Supervision of Irrigation Systems (Central and
Western Schemes)
Country: Republic of Ghana
Project Location within Country:Central and Western Regions in Ghana
Duration of assignment (months):22
Name of Client: Northern Rural Growth Programme Ministryof Food and Agriculture, Govt. of Republic of Ghana
Total no. of Staff Months of theassignment: 125
Address:P. O. Box TL 1237, Tamale, Ghana
Approximate Value of the Servicesprovided by your firm under thecontract (in current US$):990,175.00 + Taxes
Start Date(Month/Year): July, 2013Completion Date(Month/Year): Ongoing
No. of professional staff-monthsprovided by associatedConsultants: Nil
Name of associated Consultants, if any:JM& Partners, Ghana
Name of senior professional staff of your firm involved andfunctions performed (indicate
most significant profiles such asProject Director/Coordinator,Team Leader):
T. Mr. R P S Yaduwanshi- TeamLeaderMr. K V S Thakur, Irrigation andDrainage Design EngineerDr. S. K. Sharma, HydrologistMr. V. K. Malhotra, HydraulicEngineerM A it bh T i thi Ci il /
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 101/205
Description of actual services provided by your staff within the assignment:
The study covers the following:Phase-A:
Review of existing data and information on irrigation in the project areasReview of specifications for rehabilitation of existing water conservation structures forirrigation (e.g. weirs, dams, night storage reservoirs etc.) and their associated worksincluding cost estimates, capital as well as operation and maintenance costs.Preparation of general layout plans showing the locations of principal features such asfarm roads, drains, grass waterways, bunds and terraces.Propose flood protection works, land reclamation and drainage works required to ensuresustained economic operation of the project and determine the access requirements to
within the area.Prepare cost estimates for the project including site cost estimates, estimate fordevelopment, engineering and site planning, including construction, estimate forinfrastructure, electrical distribution and tie-ins, etc. estimate for office facilities andfurnishing, housing, mobile equipment and other fixed costs.
Phase-B:Preparation of irrigation and drainage network layouts, detailing all headworks, supplycanals, pipelines, turnouts, culverts and other appurtenant structures.Final engineering design of all components of the irrigation and drainage systems andthe preparation of design drawings of all components and structures .Preparation of the Bill of Quantities of all components of the irrigation and drainagesystem.Derivation of cost estimates based on current prices of goods and services of the designedsystem.Preparation of a priced Bill of Quantities under confidential cover for NRGP.Preparation of Draft Tender Documents with detailed specifications, and Conditions of Contract acceptable to AfDB and NRGP.
Support to NRGP during Tender Evaluation and award of contract.Phase-C:
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 102/205
Assignment Name :
Preparation of Detailed Project Report forExtension, Renovation and Modernization of Tawa Irrigation Project
Approx. project Cost (in current US$):
20.31 Million
Country :
India
Location within the Country:
Tawa, Madhya Pradesh
Duration of assignment (months) :
12
Name of Client :
Water Resources Dept., Govt. of MadhyaPradesh
Total no. of Staff Months of the assignment:305
Address:
Govt. of Madhya Pradesh, Madhya Pradesh, India
Approximate Value of the Services providedby your firm under the contract (in currentUS$): 2.00 Million
Start Date(Month/Year): May, 2011
Completion Date(Month/Year): Ongoing
No. of professional staff-months providedby associated Consultants:
Nil
Name of associated Consultants, if any :
Nil
Name of senior professional staff of yourfirm involved and functions performed(indicate most significant profiles such asProject Director/Coordinator, Team Leader):
Mr R K Agrawal Project Director
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 103/205
The latest revised administrative approval was accorded forRs. 91.42 Crores in March 1979. The project is designed toprovide annual flow irrigation to 3.33 Lac Ha in service areaof 2.47 Lac Ha of Hoshangabad and Harda District throughLeft Bank and Right Bank Canal System (1.86 lakh ha CCA of LBC and 0.61 lakh ha of RBC).
Description of actual services provided by your staff within the assignment:
Review of existing data, drawings etc. obtainedfrom WRD
Hydrological Studies, Water availability etc.
Surveys, investigations includingTopographical Survey of 10% of Command
Area, L-Sections, and X-sections of MainCanal, Branch Canals, Distributaries andMinors, Soils Surveys and Geo-technicalSurveys
Firming up Crop water requirements
Preparation of Detailed Project Report for Modernization of Tawa Irrigation Projectfor the purpose of approval from Ministry of Water Resources, Govt. of India and the
Planning Commission. DPR is to be prepared based on the guidelines of the Ministryof Water Resources Govt of India
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 104/205
Project Name :Rengali Irrigation Sub Project, LBC-II, Phase-I (JBICFunded)
Approximate Value of Contract (inUS$):254.75 Million
Country :IndiaProject Location within Country :Orissa (State)
No. of Professional Staff:17
Name of Client :Deptt. of Water Resources, Govt. of Orissa, India
No. of Staff-Months:850
Start Date:(Month/Year)February, 1999
Completion Date:(Month/Year)March, 2010
Approximate Value of Services (inUS$):1.92 Million
Name of Associated Firm(s), if any :Nippon Koei Co. Ltd., Japan
No. of Person-Months of Professional Staff Provided by theAssociated Firm(s):17
Name of Senior Staff involved and functions performed :
Mr. D.Datta, Project AdvisorMr. P.H.Dikshit, Project Co-ordinatorMr. K.C.Misro, Water Resources ExpertMr. S.Das, Construction ExpertMr. M. Rajagopal, PBME ExpertDr. S.S. Sharma, SociologistDetailed Narrative Description of Project:
Rengali Irrigation Project comprises the Samal Barrage and Right and Left Bank Canals serving aCCA of 121,200 ha and 119,300 ha respectively. The command area is situated in various blocks of Angul Dhenkanal Cuttack Jajpur and Keonjhar districts and lies between the Left Bank Canal (LBC)
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 105/205
Action plan of on-farm development program. Rehabilitation and resettlement action plan. Implementation of environmental action plan.
Pre-Construction and Procurement Finalisation of design and construction drawings. Finalisation of tender documents. Tender evaluation and finalisation of contracts. Review of design and construction drawings for all other works for modification during
construction stage.
Construction Supervision Control over progress, quality control, cost and safety of construction works. Review/check of contractors' schedule and drawings of performance of construction works. Modification of original design, technical specification, construction drawings, calculation and
estimation. Checking and certifying the contractors' claim for progress payment.
Operation and Maintenance Establishment of Water Management concept. Rotational water supply system. System design requirement. Operational requirement. Plan for operation and maintenance. Water Users' Association.
Other activities performed are: Carried out Environment & Natural Resource
Management Strengthening the capacity of Water Resource Management authority Strengthening of community participation & benefits sharing community & private sector
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 106/205
OFFICE OF THE SUPERINTENDING ENGINEERRENGAI-I CANAI. CIRCLE,
AT: JIRIDAMALI,P.O.KAMAKHYANAGAR
DT.DHENKANAL.-719018 ODISHA.
Letter No. toL+) Dated. A\ Q aotf_TO WHOM SO EVER IT MAY CONCERN
This is to certify that WAPCoS timited (A Govt. of lndia Undertaking) has provided
consultancy services for Rengali lrrigation Proiect, LBC-ll, Phase-l under JICA loan assistance, in
association with M/S.NIPPON Koei Co. Limited, Japan. The consultancy value of the portion of work
executed by WAPCOS upto March 2012 is Rs.9.19 Crores and the portion of work done by
M/s.Nippon Koei is Rs.41.64 Crores. The total cost of the project is estimated at 23,478 million
Japanese Yen (equivalent to INR 1,222.8 Crores with exchange rate Re.l = Yen 1.92,base year of cost
estimation November,2009).
The proiect under JICA loan assistance envisages construction of left bank main canalbetween R0.29.717 Km to RD.71.313 Km. with its distribution systems, having design discharge 145
m3/s at RD 29.L77 Km. and 115 m3/s at RD.71.313 Km. and to irrigate a net CCA of 29,177 ha.
o,u$*4df *,,
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 107/205
Project Name :Kurnool-Cuddapah Canal Modernization Project, AndhraPradesh (OECF Funded)
Approximate Value of Contract (inUS$):132.32 Million
Country:IndiaProject Location within Country:Andhra Pradesh
No. of Professional Staff :18
Name of Client:Deptt. of Water Resources, Govt. of Andhra Pradesh
No. of Staff Months :510
Start Date(Month/Year)
February, 1999
Completion Date(Month/Year)
Dec, 2006
Approximate Value of Services (inUS$):
2.26 MillionName of Associated Firm(s), if any:Nippon Koei Co. Ltd., Japan
No. of Months of Professional Staff Provided by the Associated Firm(s):10
Senior Staff involved and functions performed:Mr. D.Datta, Project AdvisorMr. S.K.Ghosh, Project Co-ordinatorMr. Syamal Ray, Structural Design ExpertMr. S.C.Sinha,On Farm ExpertMr. M. Rajagopal, PBME – Expert
Detailed Narrative Description of Project:
The K.C. Canal Project, which was constructed during the period 1863-1870, comprises an anicutacross Tungabhadra river, a tributary of Krishna river at Sunkesula in Kurnool district. The K.C.Canal offtakes from right flank of Sunkesulaanicut and after traversing 305.6 kms from Kurnool toCuddapah town terminates near Krishnapuram.Project area is in Kurnool and Cuddapah (KC) districts of Andhra Pradesh, about 200 km. south
of Hyderabad. It covers a gross area of 194,500 ha. with a Cultivable Command Area (CCA) of 146 200 ha but only 106 440 ha is planned to be irrigated The mean annual rainfall is 630 mm in
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 108/205
development of suitable software for data processing and decision support system both forconstruction work and water management
Preparation of a plan of the model unit development to prepare guidance for crop area andcropping pattern including crop budget & farm budget.
O&M of irrigation and drainage facilities. Provision of land and water for irrigation investment Participatory monitoring & evaluation system Introduction of new agricultural technology and agricultural guidance. Detailed Design of canals Carry out Network Planning Preparation of Cost Estimates Transfer of technology and training to counterpart experts
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 109/205
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 110/205
Assignment Name:Consultancy Services for Project Monitoring,Construction Supervision & Quality Control forSewerage Project of Jabalpur city under JNNURM
Country: IndiaLocation within Country: Jabalpur, Madhya Pradesh
Duration of Assignment: 60 Months
Name of Client: Jabalpur Municipal Corporation Total No. of Person Month of the Assignment: 450Address: Jabalpur Municipal Corporation, Jabalpur Approx. Value of Services provided by the firm
No. of Professional Person Months provided by the joint venture partners or sub Consultant: Nil
Name of Joint Venture Partner or Sub Consultant if any:
NIl
Name of senior Regular Full time employee of theFirm:
Sh. G.S. Mishra, Team LeaderSh. Ashok Bahuguna, Project ManagerSh. Arun Gore, Sewerage Design ExpertSh. Mridul Verma, Project EngineerSh. Sorav Arora , Project Engineer
Narrative Description of Project:
The Municipal Corporation Jabalpur is a statutory independent Authority and the local Govt. The MunicipalCorporation has decided to fulfill the need of the City Development plan of Jabalpur for Sewerage and
Sewerage Treatment works. Consultancy services for Project Monitoring & Construction Supervisionalongwith the Quality Control is required. Total value of the Project (Zone-II, III, IV, V including coordinationwith Zone-I) is Rs. 14167 lacs.
The project involves lying of about 185 km of sewer lines, 22 km of rising main, construction of 5 sewagepumping stations and 2 STPs of 85 MLD capacities.
Description of Actual Services Provided in the Assignment:
Survey, Designs, Construction Drawings, laying & jointing of different diameter Stoneware and RCCpipe sewer lines, outfall sewer lines, etc.
Approx. Value of Contract (in USD ):
USD 21 . 25 Crores
under the contract: USD 603198
Start Date (Month/Year): May, 2007Completion Date (Month/Year): April, 2012
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 111/205
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 112/205
Assignment name : Consultancy services for Keralasustainable urban Development project “ Design andSupervision Consultancy for package 2 (Kochi,
Thrissur and Kozhikode) – DSC 2” ( Asia DevelopmentBank Funded )
Country: India
Approx. value of the contract (in US $):240 Million
Name of lead consultant (firm) to whomassignment is awarded by client: WAPCOS Ltd.
Professional Staff provided by your firm/ Entity(Profiles): 80
Location within country: Kerala
Name of Client:
Project Director, Kerala Sustainable UrbanDevelopment Project, Local Self GovernmentDepartment, Government of Kerala
No. of Staff : 90
Address:Kerala, India
Duration of assignment:60 months
No. of Staff Months:703
Start date:May, 2007
Completion date:April, 2012
Approx. value of the services (in US $):5.4 Million
Name of Associated Consultants, if any:
M/s Institute for Societal Advancement
No. of months of Professional Staff, provided byAssociated Consultants:225 man-month
Name of Senior Staff:1. Sh. P. D. Kharkhanis, Team Leader, Environmental Expert2. Dr. T. V. Jacob, Dy. Team leader3. Sh. Anup Singh, Design Engineer(WS)4. Sh. D. Bandyopadhyay, Water Supply Expert5. Sh. A. P. Sinha, Water Supply Expert
Consultants Experience Project Description Sheets
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 113/205
24. Sh. A. K. D. Majumdar, Sanitation Expert25. Sh. S. C. Garg, Senior Surveyor
26. Sh. B. K. Chakrabarti, Construction Supervision Expert
Narrative Description of Project :Overall objective of the project is to provide sustainable growth and reduction in poverty through provisionof urban infrastructure services and promote good governance to urban local bodies in the State. Theproject involves preparation of Detailed project Report and Construction supervision of variouscomponents of the project viz. water supply, sewerage, solid waste management, traffic andtransportation, storm water drainage, slum development etc.
Actual Services Provided by the firm:
Inventory of existing water supply, sewerage and drainage.To firm up the feasibility study, findings of identified projects for project cities under variousinfrastructural development components viz. water supply, sewerage-sanitation, drainage , solidwaste management, slum improvement, road and transport.To prepare master plan, conceptual plans and preliminary engineering design for all projectcomponents.To carryout survey and investigation of the project cities for required inputs for planning and designingvarious project components. These would include topographical surveys, total station surveys,construction material survey, water, waste water sampling and analysis, soil and hydrologicalinvestigations.To assess and confirm land acquisition requirement and assessment of project site’s environmentalaspects for designing sub projects.To undertake detailed engineering design and cost estimation of the project components.To prepare construction drawings.To prepare bids and specifications for procurement of works and goods.
To confirm procurement packages and contract documents prepared under advanced procurementactivities.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 114/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 115/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 116/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 117/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 118/205
MAJOR WORK WHICH BEST ILLUSTRATES QUALIFICATIONS
Assignment Name: Country: Sri Lanka Construction Supervision of Access Road,Internal Roads and infrastructurefacilities - Orchid Housing Project, SriLanka
Total Project Cost:RS. 2.6 Billion
Location Within Country:Malabe
Professional Staff Provided by YourFirm/Entity (Profiles):
No. of Staff : 4
Name of Client:Nivasie Developers (Pvt) Ltd
No. of Staff Months:
Address: Duration of Assignment:
No. 57, S D S Jayasinghe Mawatha, KohuwalaNugegoda.
24 months
Start Date:(Month/Year) Completion Date:(Month/Year) Approx. Value of Services :
May 2013 May 2015 Ongoing Rs.20 million approx.
Name of Associated Consultants, if Any: No of Months of Professional Staff Providedby Associated Consultants:
N/A N/A
Names of Senior Staff Involved and Functions Performed :
D A E Senadheera – Civil Engineer
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 119/205
MAJOR WORK WHICH BEST ILLUSTRATES QUALIFICATIONS
Assignment Name: Country: Sri LankaUga Bay, Resort.Construction of 48 Villas, 2 Luxury Suiteswith private plunge pools, RestaurantBuilding, Main Pool & Staff Quarters
Total Project Cost: Rs. 540 Million
Location Within Country: Professional Staff Provided by YourFirm/Entity (Profiles):
Passikudah No. of Staff : 06 plus support staff Name of Client: No. of Staff Months: 60Uga Resorts (Pvt) Ltd,
Associated Resort Developers (Pvt) LtdAddress: Duration of Assignment:No. 49/16, Iceland Buildings, Galle Road, Colombo03
15 months
Start Date:(Month/Year)
Completion Date:(Month/Year)
Approx. Value of Services :Rs.35 million
Oct. 2011 December 2012Name of Associated Consultants, if Any: No of Months of Professional Staff Provided
by Associated Consultants:
N/A N/ANames of Senior Staff Involved and Functions Performed : J Munasignhe Team LeaderA Piyasiri ArchitectC Gamage Design / Structural EngineerK N D Perera Electrical EngineerG K Srimal MEP EngineerStanley Weerarathne Services EngineerSupported by Site Engineers and Technical Officers.
Detailed Narrative Description of Project:Design review, construction supervision and contract administration of a resort hotel with 48 private
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 120/205
MAJOR WORK WHICH BEST ILLUSTRATES QUALIFICATIONS
Assignment Name: Country: Sri LankaJungle Beach Resort :40 Nos Single Storied Chalets & 10 nosTwo Storied Chalets, Kuchchaveli
Total Project Cost: Rs. 355 Million
Location Within Country: Professional Staff Provided by YourFirm/Entity (Profiles):
Kuchchaveli – Trincomalee No. of Staff : 06 plus support staff Name of Client: No. of Staff Months: 48 monthsUga Resorts (Pvt) Ltd,
Address: Duration of Assignment:No. 49/16, Iceland Building, Galle Road, Colombo 03 18 monthsStart Date:(Month/Year)
Completion Date:(Month/Year)
Approx. Value of Services :Rs. 27 million
February 2011 July 2012Name of Associated Consultants, if Any: No of Months of Professional Staff Provided
by Associated Consultants:N/A N/A
Names of Senior Staff Involved and Functions Performed : J Munasinghe Team LeaderA Piyasiri ArchitectP A S Fernando Design / Structural EngineerR Gurusinghe Electrical EngineerG K Srimal MEP EngineerStanley weeratrathne Services EngineerSupported by 2 Nos. Site EngineersDetailed Narrative Description of Project:Design review, construction supervision and contract administration of the buildings and relatedinfrastructure facilities including landscaping. The structures included single and two storiedindependent chalets together with main restaurant, recreation facilities such as swimming pool, jogging
k
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 121/205
MAJOR WORK WHICH BEST ILLUSTRATES QUALIFICATIONS
Assignment Name: Country: Sri Lanka
Ulagalla Walawwa Resort Boutique Hoteltogether with internal and access roads – Construction Supervision
Total Project Cost: RS. 575 Million
Location Within Country: Professional Staff Provided by YourFirm/Entity (Profiles):
Thirappane , Anuradhapura No. of Staff : 06
Name of Client: No. of Staff Months: 65
Uga Escapes (Pvt) LtdAddress: Duration of Assignment:
No. 49/16, Iceland Building, Galle Road, Colombo 03 12 months
Start Date:(Month/Year)
Completion Date:(Month/Year)
Approx. Value of Services :Rs.20.0 million
2009 2010
Name of Associated Consultants, if Any: No of Months of Professional Staff Providedby Associated Consultants:
N/A N/A
Names of Senior Staff Involved and Functions Performed : A Piyasiri Architect
P A S Fernando Structural Engineer
R Gurusinghe Electrical Engineer
G K Srimal MEP Engineer
A Liyanage Roads Engineer
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 122/205
MAJOR WORK WHICH BEST ILLUSTRATES QUALIFICATIONS
Assignment Name: Country: India
NS 2 / IC / AP 3 on NH 7 fromThondapalli (22.3 kms) to Jadcheria(80.25 kms) – BOT Project
Total Project Cost: US $ 10.5 m
Location Within Country: Professional Staff Provided by YourFirm/Entity (Profiles):
Hyderabad No. of Staff : 01
Name of Client: No. of Staff Months: 19 months
National Highways Authority of India, PIU,Hyderabad
Address: Duration of Assignment:
Hyderabad, India. 19 months
Start Date:(Month/Year)
Completion Date:(Month/Year)
Approx. Value of Services :
May 2007 December 2008 US $ 152,000/= Name of Associated Consultants, if Any:None
No of Months of Professional Staff Providedby Associated Consultants:
- -
Names of Senior Staff Involved and Functions Performed :
J S Wirasinha - Team Leader (International) / Engineer’s Representative
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 123/205
MAJOR WORK WHICH BEST ILLUSTRATES QUALIFICATIONS
Assignment Name: Country:
59 Housing Units at Hill Crest Estate,Piliyandala - Construction Supervision Total Project Cost: SL Rs. 135 Million
Location Within Country: Professional Staff Provided by YourFirm/Entity (Profiles):
Hill Crest Estate, Piliyandala No. of Staff :
Name of Client: No. of Staff Months:Nivasie Developers (Pvt) Ltd.
Address: Duration of Assignment:
Start Date:(Month/Year)
Completion Date:(Month/Year)
Approx. Value of Services :
2007
Name of Associated Consultants, if Any: No of Months of Professional Staff Providedby Associated Consultants:
Names of Senior Staff Involved and Functions Performed :
Detailed Narrative Description of Project:
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 124/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 125/205
Short CV`s of Key Experts
SHORT CV`s OF KEY EXPERTS
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 126/205
Dr. H.S. Bhatia1. AREA OF EXPERTISE : STORM WATER DRAINAGE EXPERT2. NAME OF FIRM : WAPCOS LTD
3. NAME OF EXPERT : Dr. H.S. Bhatia4. DATE OF BIRTH : 26. 06. 1942
CITIZENSHIP : Indian5. EDUCATION : B.E. Civil Engineering, Roorkee University
M.E., Environmental Engineering, Roorkee University Ph.D.,Environmental Engineering, IIT, Delhi
6. MEMBERSHIP INPROFESSIONAL SOCIETIES
: Institution of Engineers India Indian water works association Indian association of air pollution control Indian association of water pollution control
7. OTHER TRAINING : Undergone six months training in Finite Element Analysis atNational Informatics Centre, New Delhi, 1990
Undertaking training in use of Bentley Softwares. Programme on “Bharat Nirman” launched by Govt. of India for
infrastructure Development, Dec, 20058. COUNTRIES OF WORK : Sudan, Yemen, Bhutan, Lesotho, India, Vietnam, Tanzania9. LANGUAGE & DEGREE
OF PROFICIENCY: de Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : More than 42 years of experience in planning, designing , constructionsupervision and benchmarking of water supply, drainage & sanitationschemes , pumping station, transmission mains, water sewerage schemes ,water quality monitoring, storm water drainage systems , rain water
harvesting, wastewater management, hydro meteorological andhydrological analysis etc
Short CV`s of Key Experts
9. LANGUAGE & DEGREEOF PROFICIENCY
: Read Speak WriteEnglish Excellent Excellent Excellent
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 127/205
Hindi Excellent Excellent Excellent10. EXPERIENCE SUMMARY : Over 19 years of experience in project management, preparation of
feasibility reports , construction supervision, detailed design and
implementation . Undertaken works pertaining to water supply, drainage &sanitation, storm water drainage and waste water management, alsoinvolved in preparation of DPRs , project Implementation, O&M, etc.Has been involved in a number of projects aided by multilateral fundingagencies like World bank, ADB, JICA etc.
P.K. Basu1. AREA OF EXPERTISE : STORM WATER DRAINAGE EXPERT
2. NAME OF FIRM : WAPCOS LTD3. NAME OF EXPERT : P.K. Basu4. DATE OF BIRTH : 21. 01. 1942
CITIZENSHIP : Indian5. EDUCATION : BE., Civil Engg, Jadavpur University, 19626. MEMBERSHIP INPROFESSIONAL SOCIETIES
: Life Fellow of the Institute of Engineers (India) Life Fellow of the Indian Geo- Technical Society. Life Membership of the Indian Council of Arbitration.
7. OTHER TRAINING : Undertaking training in use of Bentley Softwares. Programme on “Bharat Nirman” launched by Govt. of India for
infrastructure Development, Dec, 20058. COUNTRIES OF WORK : India, Bhutan, Vietnam, Tanzania9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
Bengali Excellent Excellent Excellent10 EXPERIENCE SUMMARY : More than 35 years of experience in planning designing and construction
Short CV`s of Key Experts
8. COUNTRIES OF WORK : India, Bhutan, Vietnam, Tanzania9. LANGUAGE & DEGREE : Read Speak Write
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 128/205
OF PROFICIENCY English Excellent Excellent ExcellentHindi Excellent Excellent ExcellentBengali Excellent Excellent Excellent
10. EMPLOYMENT RECORD : More than 39 years of experience in planning and designing of groundwater reservoirs, water tower, pumping station in water supply sector,drainage & sanitation schemes , reviewing topographical surveys ,planning & implementation of water optimization studies, waterdistribution network and waste water management. Well experiencedwith software like water cad, storm cad, sewer gems and LOOP, leakdetection studies, audit, cost estimation, quality control & contract
management.Has been involved in a number of projects aided by multilateral fundingagencies like World bank, ADB, JICA etc.
Hemant Kumar Rawat1. AREA OF EXPERTISE : STORM WATER DRAINAGE EXPERT2. NAME OF FIRM : WAPCOS LTD3. NAME OF EXPERT : HEMANT KUMAR RAWAT4. DATE OF BIRTH : 09. 10. 1947
CITIZENSHIP : Indian5. EDUCATION : BE., Civil Engg,
M.E., Public Health Engineering6. MEMBERSHIP INPROFESSIONAL SOCIETIES
: AWWI/Member of City Level Technical Advisory Committee forJNNURM AJMER –PUSHKAR.
President, Ajmer Engineers Institution, Ajmer
7. OTHER TRAINING : Undergone six months training in Finite Element Analysis atNational Informatics Centre
Short CV`s of Key Experts
6. MEMBERSHIP INPROFESSIONAL SOCIETIES
: Indian Water Works Association
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 129/205
7. OTHER TRAINING : Course on "Air Pollution Control & Management" at San Luis ObispoCalifornia State Polytechnic University, U.S.A (Sept., 1985 - March, 1986)Course on "Waste assessment and leakage control in WATER SUPPLY &
SANITATION Distribution System" at Jaipur in May '89 sponsored byCentral Public Health & Environmental Engg. Organisation (Ministry ofUrban Development, Govt. of India).
8. COUNTRIES OF WORK : India, Mozambique9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : About 4 decades of expertise in studies pertaining to planning &
designing , construction supervision, project management of sewerageschemes, water supply, drainage, waste water management , storm waterdrainage schemes and water supply schemes etc.
A.K.D. Mazoomdar1. AREA OF EXPERTISE : STORM WATER DRAINAGE EXPERT2. NAME OF FIRM : WAPCOS LTD3. NAME OF EXPERT : A.K.D. Mazoomdar4. DATE OF BIRTH : 20.12.1944
CITIZENSHIP : Indian5. EDUCATION : B.Sc., Civil Engg.
BE., Civil Engg, M.E.
6. MEMBERSHIP INPROFESSIONAL SOCIETIES
: Indian Water Works Association
7. OTHER TRAINING : Computer Training of Computer aided Design of waterdistribution System and Rising Mains for Raw water as well as
Short CV`s of Key Experts
5. EDUCATION : ME, Civil (Public Health.), from All India Institute of Hygiene &Public Health, Kolkata under Calcutta University in 1976
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 130/205
BE., Civil Engg, from Calcutta University in 19656. MEMBERSHIP INPROFESSIONAL SOCIETIES
: Indian Water Works Association
7. OTHER TRAINING : Computer Training of Computer aided Design of waterdistribution System and Rising Mains for Raw water as well astreated water.
8. COUNTRIES OF WORK : India, Bhutan, Afghanistan, Ethiopia, Mozambique, Sri lanka, Laos,Cambodia
9. LANGUAGE & DEGREEOF PROFICIENCY
: Read Speak WriteEnglish Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : 43 years of experience in water supply, drainage, storm water, sewerage& sanitation projects, water resources planning, watershed planning,hydrology, hydro meteorological studies with specialization in analysis ofstorms by physical and statistical method, computation of PMP/ SPSvalues, water availability studies.Design of subsurface drainage system. Computer based modelling of thehydrologic system, planning and project preparation, feasibility studiesand detailed project report.He is well experienced with software’s like water cad , sewer gems andLOOP, leak detection studies, audit, cost estimation, quality control &contract management.Has been involved in a number of projects aided by multilateral fundingagencies like World bank, ADB, JICA etc.
Pradeep Ranjan Basudhar
1. AREA OF EXPERTISE : CIVIL ENGINEER2. NAME OF FIRM : WAPCOS LTD
Short CV`s of Key Experts
A.P. Sinha1. AREA OF EXPERTISE : CIVIL ENGINEER
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 131/205
2. NAME OF FIRM : WAPCOS LTD3. NAME OF EXPERT : A.P. Sinha4. DATE OF BIRTH : 06.08.1940
CITIZENSHIP : Indian5. EDUCATION : B.Sc. Engineering6.MEMBERSHIP INPROFESSIONAL SOCIETIES
: Life member of Institution of Engineers (India)
7. OTHER TRAINING : Training in use of SEWER PRO software Training in use of STAAD-III software
8. COUNTRIES OF WORK : India, Bhutan, Afghanistan, Mozambique, Cambodia,9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : Over 4 decades of experience in pre-feasibility, feasibility, planning,designing, tender engineering and construction supervision water supply& sanitation and waste water treatment, sewerage schemes, stormwater drainage, etc .Prepared no. of DPRs & pre-feasibility reports for water supply,sewerage and sanitation projects, storm water drainage systems.Has been involved in a number of projects aided by multilateral fundingagencies like World bank, ADB, JICA, etc.Well experienced with softwares like water cad, sewer gems, etc.
V.K. Gupta1. AREA OF EXPERTISE : STORM WATER DRAINAGE EXPERT2. NAME OF FIRM : WAPCOS LTD
3. NAME OF EXPERT : V.K. Gupta4 DATE OF BIRTH : 01 10 1945
Short CV`s of Key Experts
CITIZENSHIP : Indian5. EDUCATION : M. Tech (Environmental Science &Engg.) IIT,Delhi
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 132/205
B. Tech ((Environmental Engineering) KIT’s College of Engineering,Kolhapur, Maharashtra
6. MEMBERSHIP IN
PROFESSIONAL SOCIETIES
: Life Member, Indian Water Resources Society
Member, Indian Water Works Association, Nagpur Member Institution of Engineers (India)7. OTHER TRAINING : Training in use of SEWER PRO software
Training in use of STAAD-III software8. COUNTRIES OF WORK : India, Bhutan, Afghanistan, Ethiopia, Mozambique, Sri lanka, Laos,9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : Over 18 years of experience in preparing DPRs, pre-feasibility, feasibility,planning , designing, implementation and commissioning of sewerageschemes, water supply, sanitation, storm water drainage, etc. Have carried out environmental impact assessment and preparedenvironment management plan for various water supply and sanitationprojects.
Rakesh Srivastav
1. AREA OF EXPERTISE : STORM WATER DRAINAGE EXPERT2. NAME OF FIRM : WAPCOS LTD3. NAME OF EXPERT : Rakesh Srivastav4. DATE OF BIRTH : 06.07.1966
CITIZENSHIP : Indian5. EDUCATION : B.E. (civil), 1989
ME (public Health), 1991
6. MEMBERSHIP INPROFESSIONAL SOCIETIES
: Member, Indian Water Works Association, Nagpur (1997).M b I di A i i f H d l i (R k )
Short CV`s of Key Experts
Attended 10 days short term course on optimization at IITKanpur.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 133/205
6. COUNTRIES OF WORK : India, Ethiopia, Bhutan7. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent8. EXPERIENCE SUMMARY : More than 21 years of experience of GIS development & implementationfor various water supply, sewerage, drainage and other infrastructureprojects.Software development for bed aggradation & degradation forBrahmaputra river morphological studies from GIS data.Digitization of survey of India topography map & its development ofvarious layers.
Development of nonlinear regression model for runoff simulation andforecasting for design of storm water drainage system for Coimbatoreand Trichy cities, Tamilnadu.Developments of software for estimation of earthwork & longitudinalsection profile generation for various irrigation & oil pipeline projects fromGIS data.
Jaganniwas1. AREA OF EXPERTISE : GIS EXPERT2. NAME OF FIRM : WAPCOS LTD3. NAME OF EXPERT : Jaganniwas4. DATE OF BIRTH : 13-07-1979
CITIZENSHIP : Indian5. EDUCATION : M. Tech. (GIS & Remote Sensing.), IIT Roorkee, 2004
B.Tech Civil Engineering, G.B. Pant University of
Agriculture & Technology, Pantnagar, 20026 MEMBERSHIP IN PROFESSIONAL : IRC (Indian Road Congress)
Short CV`s of Key Experts
4. DATE OF BIRTH : 08.08.1974CITIZENSHIP : Indian
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 134/205
5. EDUCATION : M.E (Environmental Engg.), DCE B.Tech, Civil Engineering, REC Warangal
6. MEMBERSHIP IN PROFESSIONAL
SOCIETIES
: Member, Indian Water Works Association, Nagpur (1997).
Life Member – Institution of Engineers7. OTHER TRAINING : Training on Sewer GEM software8. COUNTRIES OF WORK : India, Cambodia, Mozambique, Sri Lanka, Tanzania9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : Over 13 years of experience in studies pertaining to planning &designing , construction supervision, project management of watersupply, drainage, sewerage & sanitation schemes, storm waterdrainage schemes , treatment plants, water management etc. He hascarried out various studies pertaining to non-revenue water, leakdetection, water quality and testingHe has also been involved in preparation of training modules forcapacity building to strengthen the capacity of urban local bodies forvarious water supply and sanitation project.He has worked closely with funding agencies including ADB, WB, JICA,JBIC, and AfDB.Well experienced with softwares like water cad, sewer gems, etc.
Dr. K.K. Gaur1. AREA OF EXPERTISE : SOCIAL & INSTITUTIONAL EXPERT2. NAME OF FIRM : WAPCOS LTD3. NAME OF EXPERT : Dr. K.K. GAUR
4. DATE OF BIRTH : 31.12.1954CITIZENSHIP : Indian
Short CV`s of Key Experts
problems and prospects. From North-Eastern Hill UniversityShillong
8 COUNTRIES OF WORK I di Bh R d Vi M bi T i
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 135/205
8. COUNTRIES OF WORK : India, Bhutan, Rwanda, Vietnam, Mozambique, Tanzania9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent Excellent
Hindi Excellent Excellent ExcellentGujrati Excellent Excellent Excellent10. EXPERIENCE SUMMARY : More than 33 years of experience social research; conducting
benchmark and baseline surveys , socio-economic surveys forinfrastructure development projects, CDPs, master plans of varioussectors viz. water supply, sewerage & sanitation, drainage, storm water,road & transport and environment engineering projects training, etc.Has been involved in NRW Study and preparation of IEC material for
public awareness of use and maintenance of basic services like watersupply, sewerage and sanitation.Has been involved in a number of projects aided by multilateral fundingagencies like World bank, ADB etc.
D.V.S. Murthy
1. AREA OF EXPERTISE : CIVIL ENGINEER
2. NAME OF FIRM : WAPCOS Limited3. NAME OF EXPERT : D.V.S. MURTHY4. DATE OF BIRTH : 06.06.1969
CITIZENSHIP : Indian5. EDUCATION : Bachelor of Engineering (Civil) from Regional Engineering
College,NIT Suratkal – 1991 M-Tech (Water Resources) from Indian Institute of Technology,
Delhi
8. COUNTRIES OF WORK : India, , Ethiopia, , Vietnam, Mozambique, Sri lanka, Laos, Cambodia,
Short CV`s of Key Experts
5. EDUCATION : Bachelor of Engineering (Civil), 1 st Class, 1968 M. Tech (Civil) , Indian Institute of Technology Kharagpur
M S (E i i ) U i it f C lif i B k l USA
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 136/205
M.S. (Engineering), University of California Berkeley, USA Ph. D. (Civil), Indian Institute of Technology, Mumbai
6. MEMBERSHIP IN
PROFESSIONAL SOCIETIES
: Member, Indian Society of Hydraulics (ISH)
Member, The Institution of Engineers (India)
7. OTHER TRAINING : Hydraulic Dredging Sediment Transport in estuarine & coastal environment Stratification due to thermal discharge with particular reference
to estuaries, rivers and ponds8. COUNTRIES OF WORK : India, Bhutan, United States9. LANGUAGE & DEGREE
OF PROFICIENCY
: Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : Over42 years of experience in Design and Planning of water supply,sewerage, storm water drainage & sanitation schemes and maintenanceof sewerage & sanitation projects in many urban and rural areas. He iswell experienced with software’s like Water Cad, Sewer Gems, SewerCad and LOOP, Leak detection studies, Audit, cost estimation, qualitycontrol& Contract Management.He has worked closely with funding agencies including ADB, WB, JICA,JBIC, and AfDB.
SANJAY SHARMA1. AREA OF EXPERTISE : QUANTITY SURVEY EXPERT2. NAME OF FIRM : WAPCOS Ltd.3. NAME OF EXPERT : SANJAY SHARMA
4. DATE OF BIRTH : 08.03.1973CITIZENSHIP : Indian
Short CV`s of Key Experts
Well versed with World Bank, ADB, African Development Bank’spolicies and environmental safeguards.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 137/205
S.C.Garg
1. AREA OF EXPERTISE : SURVEY EXPERT2. NAME OF FIRM : WAPCOS Ltd3. NAME OF EXPERT : S.C Garg
4. DATE OF BIRTH : 05.12.1947CITIZENSHIP : Indian
5. EDUCATION : B.A.6. MEMBERSHIP INPROFESSIONAL SOCIETIES
: Life member of Indian national Cartographic Association – India Life member of the Institution of Surveyors – India.
7. OTHER TRAINING : Completed Top trainees type 'A' Course (Surveying SupervisorLevel Course) in Plane and geodetic surveying, Mapping and airSurveys etc. During 1963-64 from Training Directorate, Survey ofIndia. Hyderabad.
Undergone a special course No. 460 Electromagneticdistance measurement Technique Course during 1976 in SurveyTraining Institute- Hyderabad Undergone Course No. 550 SurveySupervision Management Course in Survey Training Institute,Hyderabad.
Undergone Course No. 640- Short Scribing (ModernTechnique of mapping) Course for Group 'A' and ‘B’ Officers inabove Institute.
8. COUNTRIES OF WORK : India, Bhutan, Afghanistan, Ethiopia, Vietnam, Mozambique, Sri lanka,Laos, Nigeria, Myanmar, Indonesia
9. LANGUAGE & DEGREE
OF PROFICIENCY
: Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
Short CV`s of Key Experts
7. OTHER TRAINING : ‘System Development for Project Managers’ organized underSingapore Corporation Programme, SingaporeTraining in ‘Bharat Nirmaan Programme’ launched by
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 138/205
Training in ‘Bharat Nirmaan Programme’ launched byGovernment of India for Institutional Development forInfrastructure Projects.
8. COUNTRIES OF WORK : India, Bhutan, Afghanistan, Ethiopia, Senegal, Rwanda, Vietnam,Mozambique, Sri lanka, Laos, Cambodia, Philippines, Nigeria, Myanmar,Indonesia, Kenya, Seirra Leone, Tanzania
9. LANGUAGE & DEGREEOF PROFICIENCY
: Read Speak WriteEnglish Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : Mr. Agrawal has over 23 years of experience in consulting industry. Hehas a rich experience on large scale change management initiatives within
Government covering Institutional Assessment and Strengthening, urbanreforms, business management, business process reengineering andfinancial management (across urban and other Government sectors),Governance & Administrative reforms.Mr.Agrawal leads multilaterally funded engagements for WAPCOS acrosssectors in Pre-Execution, Execution and Post Execution and hascontinuously refined approaches to business management, publicadministration, institutional assessment & Development, capacity
building and programme management.He has more than 20 years of experience in Housing Projects, LakeDevelopment, water collection system, Water Distribution , Upgrading ofTowns, Service Improvement, Sewerage & Drainage and has an excellentunderstanding to prepare strategies to enhance the InstitutionalEfficiency of housing related projects.He has worked closely with funding agencies including ADB, WB, JICA,JBIC, and AfDB. He has worked in different capacities from implementation to strategic
Short CV`s of Key Experts
He has worked closely with funding agencies including ADB, WB, JICA,JBIC, and AfDB. He has undertaken many GoI funded projects(JNNURM/UIDSSMT/NLCP etc)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 139/205
(JNNURM/UIDSSMT/NLCP etc)
R.K. PAL
1. AREA OF EXPERTISE : CONTRACT MANGEMENT EXPERT2. NAME OF FIRM : WAPCOS LTD.3. NAME OF EXPERT : R.K. PAL4. DATE OF BIRTH : 23.06.1940
CITIZENSHIP : Indian5. EDUCATION : AMIE (I)
Dip. in Civil Engg.8. COUNTRIES OF WORK : India, Bangladesh, Zimbabwe, Cambodia, Nepal, Vietnam, Laos and
Mozambique9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : He is a highly qualified Civil Engineer with over 45 years of professionalengineering experience in project administration contract management,project planning, design , construction management, project monitoring,
bid evaluations, execution, finalization and interpretation of Contracts ofinfrastructure projects in India, Bangladesh, Zimbabwe, Cambodia, Nepaland MozambiqueHas vast experience in different organizations and departments as legaladviser/ Contract Specialist for sewerage, water supply and drainage, Management, Quality Surveying and Documentation.He has worked as a Legal/Contract Specialist on BOT projects and has alsoworked on project funded by World Bank/ADB.
Experience in Training and Transfer of Technology.
Short CV`s of Key Experts
A.STEPHEN LEO
1. AREA OF EXPERTISE : STORM WATER DRAINAGE EXPERT
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 140/205
2. NAME OF FIRM : WAPCOS LTD.3. NAME OF EXPERT : A.STEPHEN LEO 4. DATE OF BIRTH : 03.06.1963
CITIZENSHIP : India5. EDUCATION : M.Sc. (Environmental Sciences), Bharthidasan University,
Tiruchirapalli, India 1987 B.Tech (Environmental Engg.),1985
8. COUNTRIES OF WORK : India, Ethiopia, Rwanda, Vietnam, Mozambique, Sri lanka, Seirra Leone9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent10. EXPERIENCE SUMMARY : Over 18 years of vast experience in carrying out Treatment Process design
for more than 20 projects in the field of infrastructure developmentincluding storm water drainage, water supply, Pumping stations, watercollection system, sewerage, sanitation, and solid waste management,water resources, hydro-power, irrigation, lake development. Well versedwith GoI and ADB’s Environment Policy and Environmental Safeguards.
A. D. Mohile
1. AREA OF EXPERTISE : STORM WATER DRAINAGE EXPERT2. NAME OF FIRM : WAPCOS Ltd.3. NAME OF EXPERT : A. D. Mohile4. DATE OF BIRTH : 20.08.1940
CITIZENSHIP : Indian5. EDUCATION : M.E. (Water Resources Development, Honours), WRTDC,
University of Roorkee, India, 1972
Short CV`s of Key Experts
HARISH PRAKASH
1. AREA OF EXPERTISE : ECONOMIC ANALYSIS EXPERT
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 141/205
2. NAME OF FIRM : WAPCOS Ltd.3. NAME OF EXPERT : HARISH PRAKASH4. DATE OF BIRTH : 12th March, 1964
CITIZENSHIP : India5. EDUCATION : M.A. (Economics)
B.Sc. Ag. (Hons.), 1986 Advanced P.G. Diploma in Computer Programming
8. COUNTRIES OF WORK : India9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : Over 25 years of experience in preparing socio-economic reports,economic & financial analysis and financial management assessment forvarious projects related to water supply, sewerage, storm water ,drainage, roads & bridges etc.He has worked in various internationally funded projects and is wellversed with ADB, World Bank, AfDb procedures and guidelines.
P.K.KUNDU
1. AREA OF EXPERTISE : GEOTECHNICAL EXPERT2. NAME OF FIRM : WAPCOS Ltd.3. NAME OF EXPERT : P.K.KUNDU4. DATE OF BIRTH : 31.10.1962
CITIZENSHIP : India5. EDUCATION : M.Tech (Soil Mech. & Foundation Engg.)Indian Institute of
Technology (IIT), New Delhi
Short CV`s of Key Experts
9. LANGUAGE & DEGREEOF PROFICIENCY
: Read Speak WriteEnglish Excellent Excellent ExcellentHindi Excellent Excellent Excellent
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 142/205
Hindi Excellent Excellent Excellent10. EXPERIENCE SUMMARY : Over47 years of experience as a professional Hydrogeologist , worked in
various hydrogeological and Geological setup in different capacities withCentral Ground Water Board (CGWB) till retirement and further postsuperannuation as Advisor and Consultants with Ministry of WaterResources, Govt. of India. In his entire carrier he has been vested with theresponsibilities of inordinate degree to carry out scientific surveys,exploration, monitoring, development, management and regulation ofthe country’s vast ground water resources along with supervision, policyplanning, coordination and successful implementation of the projectsand activities of National Importance. He has the wide experience of
FIDIC documents. He is well versed with ADB’s Geotechnical procedure.
Prof. (Dr) Rama Nand Gupta
1. AREA OF EXPERTISE : ROCK MECHANICS EXPERT2. NAME OF FIRM : WAPCOS Ltd.3. NAME OF EXPERT : Prof. (Dr) Rama Nand Gupta4. DATE OF BIRTH : August 27, 1964
CITIZENSHIP : India5. EDUCATION : BE (Mining Engg) M. Tech (Mine Planning and System Design, ISM) Ph.D. (Rock Mechanics and Strata Control), Univ. of New Castle
Upon Tyne. ENGLAND8. COUNTRIES OF WORK : India, Bhutan, Afghanistan, Laos9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent
Short CV`s of Key Experts
10. EXPERIENCE SUMMARY : More than 43 years of experience in the field of Baseline Surveys , Socio-Economic Studies, Social Impact Assessment and formulation of R&R plansin different parts of the country;
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 143/205
in different parts of the country;Also have experience in Survey research methodology, data processing andanalysis with specialization in rural social research.
Dr. Rohit Shukla
1. AREA OF EXPERTISE : SOCIOLOGIST2. NAME OF FIRM : WAPCOS Ltd.3. NAME OF EXPERT : Dr. Rohit Shukla4. DATE OF BIRTH : 6th February, 1944
CITIZENSHIP : India5. EDUCATION : M.A.,
Ph.D. (Economics). (Gujarat University) (Ph.D. Guide for theGujarat University and the Gujarat Vidyapeeth)
8. COUNTRIES OF WORK : India, Sri lanka, Vietnam , Mozambique, Kenya9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : Over4 decades of vast experience in carrying out studies pertaining to
impact assessment of various schemes, monitoring and evaluation, financialanalysis of projects, community participation through participatoryresearch technique
Dr. Barun Kumar Sarkar
1. AREA OF EXPERTISE : SOCIOLOGIST2. NAME OF FIRM : WAPCOS Ltd.
3. NAME OF EXPERT : Dr. Barun Kumar Sarkar4 DATE OF BIRTH : 7th November 1947
Short CV`s of Key Experts
Socio-Economic Infrastructure Services Agriculture, Animal Husbandry & Livestock Sector Socio-Agro-Economic Baseline/Impact Assessment Studies
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 144/205
Socio Agro Economic Baseline/Impact Assessment Studies
Moho Chaturvedi
1. AREA OF EXPERTISE : ENVIRONMENTAL EXPERT2. NAME OF FIRM : WAPCOS Ltd.3. NAME OF EXPERT : Moho Chaturvedi4. DATE OF BIRTH : 24. 07. 1970
CITIZENSHIP : India5. EDUCATION : MSc. (Environmental Assessment and Evaluation) London
School of Economics and Political Science, 1999 M.A. (Geography), Delhi School of Economics, 1993 B.A. (Geography), University of Delhi, 1991
8. COUNTRIES OF WORK : India, Sri lanka, Vietnam , Mozambique, Kenya9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : Over 10 years of experience in Gender Issues in community based WaterSupply and Sanitation Programmes
Worked on various Storm Water Drainage and Sanitation projects fundedby World Bank. Possess Excellent Institutional Analysis skills.Conducted many Socio - economic, Environmental studies includingParticipatory Planning and participatory Rural Exercises (includingquantitive evaluation also) with special focus on women.Excellent report writing skills, documented many UNIFEM Programmes.
Dr. R.S.Pachori
1 AREA OF EXPERTISE : CAPACITY BUILDING EXPERT
Short CV`s of Key Experts
DR. S.K. TYAGI
1. AREA OF EXPERTISE : ENVIRONMENTAL EXPERT
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 145/205
2. NAME OF FIRM : WAPCOS Ltd.3. NAME OF EXPERT : DR. S.K. TYAGI4. DATE OF BIRTH : 01.08.1965
CITIZENSHIP : India5. EDUCATION : Ph.D(Fisheries), Meerut University, UP, 1991
M.Sc. (Zoology), Meerut University, UP, 1985 B.Sc., Meerut University, UP, 1983
8. COUNTRIES OF WORK : India, Sri lanka, Vietnam , Mozambique, Kenya9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : Over15 Years of Experience in Environmental Impact Assessment ofWater Resources development projects . Ecology, with capability andexperience in Environmental Impact Assessment, Aquatic ResourcesManagement, Fish and Fisheries Development, WatershedManagement, Forest and Wildlife Management. Involved in more than50 consultancy assignment in the field of environment mainly related toEnvironmental Impact Assessment, Environment Auditing and Ecological
studies. Conducted environmental field monitoring related to terrestrialand aquatic ecology, wildlife and fisheries for various projects, alsoconducted the field studies for ambient air quality monitoring and theassessment of impacts of industrial emissions on the ecologicalparameters.
L.N. GUPTA
1. AREA OF EXPERTISE : STORM WATER DRAINAGE EXPERT2 NAME OF FIRM : WAPCOS Ltd
Short CV`s of Key Experts
V.K. MATHUR
1. AREA OF EXPERTISE : STORM WATER DRAINAGE EXPERTd
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 146/205
2. NAME OF FIRM : WAPCOS Ltd.3. NAME OF EXPERT : V.K. MATHUR4. DATE OF BIRTH : 29-11-1939
CITIZENSHIP : India5. EDUCATION : Bachelor of Engineering (Civil) 1960
8. COUNTRIES OF WORK : India, Sri lanka, Vietnam , Mozambique, Kenya9. LANGUAGE & DEGREE
OF PROFICIENCY: Read Speak Write
English Excellent Excellent ExcellentHindi Excellent Excellent Excellent
10. EXPERIENCE SUMMARY : Over40 years of vast experience in design, investigation & hydrological
Studies of Water Resources projects. Has undertaken Pre-feasibilityStudies, Feasibility studies and Detailed Project Reports.Identification of sites for water harvesting structures, Flood forecasting andflood control studies, Preparation of telemetry system for data collectionand transmission for real time operation of reservoirs, Design of floodprotection and anti-erosion works, Planning, Design and Cost Estimation ofRiver valley projects. River morphological studies.
Other WAPCOS Resources:
Sr. No. Key Professional Name Qualification Years of Experience1. Amar Kumar B.Tech. (Civil)
MBA31
2. A.V. Kulkarni PG ( Marine Structures)B. Tech. (Civil)
33
3. M.M. Verma M. Tech (Water Resource)B. Tech. (Civil)
32
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 147/205
Position Title and No. Senior Drainage Engineer
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 148/205
Name of Firm IDCS
Name of Expert: Peter SAMARAWEERA
Date of Birth: 05 August 1944Citizenship Sri Lankan
Education:College/University Year degree(s)/diploma(s)
University of Peradeniya, Sri Lanka 1971 BSc in Civil Engineering, ,IHE, Delft, The Netherlands 1980 Post Graduate Diploma in Hydrology
Employment record relevant to the assignment:
Period Employing organization and your title/position. Contact
information for references
Country Summary of activities performedrelevant to the Assignment
November2012 todate
Resources DevelopmentConsultants (Pvt) Ltd
Hydrologist /DrainageEngineer
For reference: Tel: 011-2432099 / E-mail:[email protected]; Eng. K WFernando, Director – Highways& Transportation
Sri Lanka China Development Bank fundedImprovement & Rehabilitation ofPriority Roads Project – 2 (Northern)Consultancy Service for ConstructionSupervisionIdentifying low lying sections of roads subject
to periodic flooding; Making hydraulicalassessment of catchment areas of suchsections of roads; Make recommendations forraising the levels of such road sections toovercome flooding; Inspection of all bridgesand culverts
May 2010toSeptember2010
Engineering ConsultantsLtd. (ECL) of Sri Lanka inassociation with OrientalConsultants (Pvt) Ltd ofJapan
Sri Lanka JICA funded Outer Circular HighwayProject – Kottawa to Kadawatha SectionReview the design report prepared by designconsultants with special focus on hydraulicand hydrological design of drainage
Executive Director – RiverBasin Planning andManagement
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 149/205
ManagementFor references: Tel: 011-2639200; Director General
September1990 toDecember2000
Mahaweli Authority of SriLanka
Director – WaterManagement SecretariatFor references: Tel: 011-2639200; Director General
Sri Lanka Carried out numerous hydrologicalinvestigations pertaining to water quality andsedimentation as well as rainfall and authoredseveral publications for use by the Authority,
September1984 to
August
1990
Mahaweli Authority of SriLanka
Deputy Director – WaterManagement SecretariatFor references: 011-2688425;Director – Water ManagementSecretariat
Sri Lanka Assisted the Director to carry out planning,allocating, monitoring the water resources ofmajor rivers for irrigation, hydropower
generations, domestic needs in Mahaweli,Kelani and Walawe rivers in Sri Lanka
January1979 toSeptember1979
Mahaweli DevelopmentBoard
Chief Engineer(Construction)
Sri Lanka Mahaweli Development Project
Assisted the field staff with the construction ofthe physical infrastructure works
June 1976toDecember1978
Mahaweli DevelopmentBoard
Deputy Resident ProjectManager and ResidentEngineer
Sri Lanka Kalawewa - System H
Was responsible for all constructionsupervision activities of the roads, irrigationworks and canals in System H area under theMaster Plan prepared for the area.
April 1974to May1976
Mahaweli DevelopmentBoard
Design Engineer
Sri Lanka Was responsible for carrying out site surveysand investigations, collection of hydrologicaldata for the preparation of designs and
drawings for the Bowatenna Power House,th Uk l W t T d i
Rehabilitation of Priority Roads Project – 2 Consultancy Service for ConstructionSupervision (Northern)Year: November 2012 to date
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 150/205
Year: November 2012 to dateLocation: Sri LankaClient: Road Development AuthorityMain project features: The Project is aimed at further improving the connectivity of the main roadnetwork in the Central, North Central, North Western and Western regions of Sri Lanka. The roadimprovements are aimed at improving the roads that have been hitherto left out from developmentprogrammesPositions held: Hydrologist /Drainage Engineer
Activities performed: Ensuring compliance with environmental and social impact mitigation Identifying low-lying sections of roads subject to periodic flooding Making a hydrological assessment of the catchment areas of such sections and make
recommendations to raising of the road section to overcome the flooding problem
Inspecting all bridges and culverts and identify structures where the openings are inadequate todischarge the storm water through the openings provided Where the openings are inadequate, made a hydrological assessment and recommended suitable
openings to avoid inundation.Name of assignment or project: JICA funded Outer Circular Highway Project – Kottawa toKadawatha Section
Year: May 2010 to September 2010Location: Sri LankaClient: Road Development AuthorityMain project features: The Outer Circular Highway (OCH) to the City of Colombo is a new accesscontrolled highway, linking Colombo – Katunayake Expressway (CKE) and Southern TransportDevelopment Project (STDP)Positions held: Senior Hydrologist
Activities performed: Responsible for review of the Design Report prepared by Oriental Consultants and ECL, with special
focus on hydrological and hydraulic design of drainage structures, identifying problems andshortcomings and making recommendations to remedy such shortcomings.
Carried out an assessment of run off to determine the hydraulic capacities for drainage designs andchecking of drainage designs to consider the effect of wet, dry and average hydrological conditions.
Carried out field visits and investigated drainage issues and problems raised by the residents in theOCH corridor and made appropriate recommendations to address these issues
Was specifically responsible for carrying out hydrological studies and assessments at sites andchecking of drainage designs in all housing schemes
Checking and approving working drawings prepared by the Contractors for construction works
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 151/205
Checking and approving working drawings prepared by the Contractors for construction works. Checking and certifying quantity calculations of structures and earthworks, supervision of
construction works to assure quality and conformity with specifications and the approved drawings. Responsible for contract management and construction supervision of the contract awarded for
internal road works in the project areas Name of assignment or project: River Basin Planning and Management
Year: June 2001 to August 2004Location: Sri LankaClient: Mahaweli Authority of Sri LankaMain project features: Transformation of Mahaweli Authority of Sri Lanka from a development agencyto a River Basin Management AgencyPositions held: Executive Director – River Basin Planning and Management
Activities performed: Responsible for transformation of MASL from a Development agency to a River Basin Management
Agency Conducting awareness programs for MASL Officers as well as for line agencies preparation of RiverBasin Plans, formation of River Basin Committees
Procurement and tender evaluation work for development and rehabilitation works funded by theWorld Bank.
Worked as a member of the Tender Evaluation Committee for the Water Resources Secretariatfunded by ADB
Name of assignment or project: Period of service with Mahaweli Authority of Sri Lanka Year: September 1990 to December 2000Location: Sri Lanka
Client: Irrigation DepartmentMain project features: Planning, allocating, monitoring the water resources of major rivers forirrigation, hydro power generations, domestic needs in Mahaweli, Kelani & Walawe Rivers in Sri Lanka.Positions held: Director – Water Management Secretariat
Activities performed: Carried out numerous hydrological investigations pertaining to water quality and sedimentation as
well as rainfall and authored several publications for use by the Authority, such as the Report onMahaweli Water Management to Maximise Benefits during the period of construction.
Worked as a Secretary of the Water Management PanelName of assignment or project: Period of service with Mahaweli Authority of Sri Lanka
Year: September 1984 to August 1990Location: Sri Lanka
Anuradhapura – Puttalam Road in the North. A major area of the project was in the AnuradhapuraDistrict while the balance was spread over the Matale and Kurunegala Districts.Positions held: Deputy Resident Project Manager and Resident Engineer - Kalawewa - System H
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 152/205
Activities performed: was responsible for all construction supervision activities of the roads,irrigation works and canals in System H area under the Master Plan prepared for the area. Specificduties involved ensuring the quality control of drainage structures in accordance with design parameters
based on hydrological data gathered during the planning stage
Expert’s contact information e-mail phone
Certification :
I, the undersigned, certify to the best of my knowledge and belief that I understand that any willful misstatement described herein may lead to my disqualification or dismissal, ifengaged.
06/12/15Date:
Signature of expert and authorized representative of the firm Day/Month/Year
CURRICULUM VITAE (CV
1. Proposed Position : Drainage Design Engineer
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 153/205
2. Name of Firm : IDCS
3. Name of Staff : A J MOHAMED RAZEEK
4. Date of Birth : 7 th October 1943 Nationality: Sri Lankan
5. Education : Engineering Council Examination, UK – 1984.[Equivalent to an Engineering Graduate Degree].
6. Membership ofProfessional Associations : [a] Member, Institute of Engineers, Sri Lanka,
1990.[b] G. MI Struct (UK) - Retired.
7. Other Training : [a] “International Training Program in Solid WasteManagement”, Chalmers University, Sweden,November 1993.
[b] “Solid Waste Management”, EngineeringAcademy, Pakistan, April 1994.
[c] “Municipal Management” VGA, Netherlands,May 1996.
[d] International Seminar on Combined Water andWaste Water Treatment, Hyderabad, India,20 th – 21 st March 2000.
[e] Prepared and submitted papers to His Worshipthe Mayor of the Colombo Municipal Councilfor the selection of the best Municipal Councilin Sri Lanka, August 2000.
[f] Sewerage and Waste Water TreatmentM t f A i C t i T h i l
10. Employment Record :
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 154/205
From January 2008 : To DateEmployer : Tudawe Brothers (Pvt) LtdPositions held : Project Manager / Senior Engineering Manager –
Planning & Progress Control
[a] As Project Manager in the construction of the Ceylon Petroleum Corporation Head Office,was engaged in project planning, implementation and controlling using MS ProjectSoftware.
[b] As Senior Engineering Manager – Planning and Progress Control, was engaged indesigning, planning and supervision of roads, buildings, sewerage and storm waterdisposal schemes.
From November 2004 : To December 2007Employer : USS Engineering, Ganemulla, Sri LankaPositions held : Senior Engineer – Construction of Housing Schemes
From August 1998 : To October 2004Employer : Colombo Municipal CouncilPositions held : Superintending Engineer – Water Supply and
Drainage Department
From January 1998 : To July 1998Employer : Colombo Municipal CouncilPositions held : District Engineer – Districts 04 and 05
Was engaged in the design and rehabilitation Roads, Drainage Works and Buildings in Districts04 and 05.
From July 1997 : To December 1997
Employer : Colombo Municipal CouncilP iti h ld Di t i t E i Di t i t 03
Was engaged in the construction of a Children’s Park at Mt. Lavinia Hill.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 155/205
From May 1978 : To January 1985Employer : Dehiwela – Mt Lavinia Municipal Council Position held : Superintendent of Works
From January 1978 : To May 1978Employer : Panadura Urban CouncilPosition held : Superintendent of Works
From October 1976 : To December 1977Employer : Panadura Urban CouncilPosition held : Superintendent of Works
From September 1964 : To November 1976Employer : Colombo Municipal Council Position held : Officer in Charge – Sewerage Pumping Stations
12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
Name of assignment or project: Period of Services at the Colombo Municipal CouncilYear: August 1998 – 2004Location: Sri LankaClient: Colombo Municipal CouncilMain project features: Design and construction of Storm Water Drainage Systems in ColomboMunicipal area.Positions held: Superintending Engineer – Water Supply and Drainage DepartmentActivities performed: Design and construction of a Storm Water System at Wolfendhal Street Rehabilitation of twenty six major storm water canals in the City of Colombo including Norris
Canal, Siridhamma Mawatha Canal and Maligawatte Canal. Design and Construction of a Storm Water Disposal System in the Kollupitiya area including
Clifford Road, R A De Mel Mawatha, Palm Grove Avenue, Col. T G Jayawardene Mawatha
Supervision of Sewerage and Storm Water Construction System in the Baseline Road Project (II).D i d i f ll i d di l i h Ki ill W d
Design and preparation of documents for the construction of road network including the stormwater drainage system damaged by the laying of sewer lines in Dehiwela West
Rehabilitation of the Road Network and surface drainage at Zoological Gardens, Dehiwela
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 156/205
Name of assignment or project: Period of Services at the Colombo Municipal CouncilYear: September 1964 – November 1976Location: Sri LankaClient: Colombo Municipal CouncilMain project features: Design and construction of Storm Water Drainage Systems and SewerageCollection and Disposal Systems in the Colombo Municipal areaPositions held: Officer in Charge – Sewerage Pumping StationsActivities performed: Maintenance of Pumping Stations, Machinery and Equipment, maintenance ofSewerage and Storm Water Networks.Was directly involved with the Municipal Engineer in the implementation of the following projects: Relining of Main Sewer from Kynsey Road to Madampitiya Pumping Station using trenchless
technology Design and Construction of the collapsed sewer line near the Colombo National Hospital
Design and Construction of a Sewer Line at St. John’s Road.
13. Certification:
I, the undersigned, certify to the best of my knowledge and belief, this CV correctly describes myself,my qualifications, and my experience. I understand that any willful misstatement described thereinmay lead to my disqualification or dismissal, if engaged.
02 / 12 / 2015 ____________________________________________________ Date : ____________________[Signature of staff member] Day / Month / Year
CURRICULUM VITAE (CV)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 157/205
Position Title and No. Drainage and Flood Control Engineer
Name of Firm IDCS
Name of Expert Handapangoda Mudalige Keerthi SRI
JAYAWARDENA
Date of Birth 04 April 1947
Citizenship Sri Lankan
Education :
College/University Year degree(s)/diploma(s)
Vrije Universiteit Brussel, Belg Sept1991
PhD in Research on Quantitative Surface Water Managementin Lowland Catchments
Vrije Universiteit Brussel, Belg 1986/87
M.Sc.in Hydrology (Grade A Pass)
Vrije Universiteit Brussel, Belg 1985/86
Post-graduate Diploma in Hydrology (Grade A Pass)
University of Moratuwa, Sri La 1976 Post-graduate Diploma in Engineering (Building Science andTechnology)
University of Peradeniya, SriLanka
1971 B.Sc. Engineering
Other training
Training Programme on Canal Maintenance using different types of dredgers in Netherlands – 1984 Hydrologic, Hydraulic, Sediment Transport & Dispersion Modelling using MIKE11 hydrodynamic Package at
Danish Hydraulic Institute, Denmark – 1991 Training programme on Hydrological and Hydraulic Modelling using HEC1, HEC2, HECRAS & UNET packages
conducted in Sri Lanka by Dr. Jayantha Obeysekera, Director, Hydrologic Systems Modelling, South FloridaWater Management District, USA under the UNDP TOKTEN Programme - Dec.1994, Dec.1995 & Dec.1996.
Study off-shore dredging techniques and reclamation with sea sand in the new air-port construction projectin Hong Kong - 1994
General Management Programme conducted by the National University of Singapore – 1998
References:Tel: ++94 (0)11 2853766, ++94 (0)777 781078E-mail: [email protected] & D ig ti M D T T l g l F
6 bridges & 105 culverts,reconstruction of 105 roads &Procurement of Consultancy &C t ti i d
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 158/205
Name & Designation: Mr. D. T. Talagala, FormerGeneral Manager of Sri Lanka Land Reclamation& Development Corporation
Construction services andOperation & MaintenanceEquipment.In-charge of implementation ofthe Technical Component of(LEI&CDP).
Dec1995to June2002
Sri Lanka Land Reclamation & DevelopmentCorporation
Deputy General Manager(Research &Designs)
References:Tel: ++94 (0)11 2853766, ++94 (0)777 781078
E-mail: [email protected]; Name & Designation:Mr. D. T. Talagala, Former General Manager of SriLanka Land Reclamation & DevelopmentCorporation
SriLanka
Oversee Research & DesignsDivision which consists ofHydrology & Hydraulics Unit,Structural Designs,Environmental Unit, LandClearance & PlanningCommittee Unit, SpecialProjects Unit, Engineering
Material Testing Laboratory.Responsible for preparation ofbidding documents and Bill ofQuantities.
April1995to Dec1995
Sri Lanka Land Reclamation & DevelopmentCorporation
Deputy General Manager (Planning &Progress) on Greater Colombo Flood Control& Environment Improvement Project -Phase I & II
References:Tel: ++94 (0)11 2853766, ++94 (0)777 781078E-mail: [email protected]; Name & Designation:Mr. D. T. Talagala, Former General Manager of SriLanka Land Reclamation & DevelopmentCorporation
SriLanka
In-charge of Greater ColomboFlood Control & EnvironmentImprovement Project -Phase I & II (cost Rs. 7billion), Design Office, PlanningUnit and Special Projects Unit.Involved in procurement ofgoods and services, reviewclimate change-recommendations andincorporate into planningactivities
Oct1992
to April1995
Sri Lanka Land Reclamation & DevelopmentCorporation
Deputy General Manager (Special Projects)
SriLanka
Planning and Management oflarge scale reclamation &
infrastructure developmentprojects including procurement
Mr. D. T. Talagala, Retired General Manager of SriLanka Land Reclamation & DevelopmentCorporation
Sep Agbim & Partners (Cons lting Engineers) Nigeria Carried o t cons ltanc
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 159/205
Sep1977to April1983
Agbim & Partners (Consulting Engineers),Nigeria
Senior Structural EngineerReferences: Tel: ++94 (0)112697808/2698910, ++94 (0)777 356634; E-mail: [email protected] & Designation: Mr. S.A. Karunaratne,Managing Director, Stems Consultants (Pvt) Ltd.
Nigeria Carried out consultancyassignments which consists ofstructural designs,procurements and supervision.
July1972to Sep1977
State Engineering Corporation of Sri Lanka
Civil EngineerFor references: Tel: 0094 (0)112697808/2698910, 0094 (0)777 356634; E-mail:
[email protected]; Name & Designation:Mr. S.A. Karunaratne, Managing Director, StemsConsultants (Pvt) Ltd.
SriLanka
Works involved in Design andconstruction of multi-storiedbuildings, warehouses, watertanks, sewerage & water supplyschemes etc.
Membership in Professional Associations and Publications: Member of the Institution of Engineers, Sri Lanka Member of Institution of Civil Engineers, London Member of European Federation of National Engineering Associations Member of Institute of Environmental Professionals, Sri Lanka
Language Skill : Languages Speaking Reading WritingEnglish- Excellent Excellent ExcellentSinhala- Excellent Excellent Excellent
Adequacy for the Assignment :Reference to Prior Work/Assignments that Best Illustrates Capability To Handle the TasksAssigned
(1) Name of assignment or project: JBIC funded Lunawa Environment Improvement andCommunity Development Project Year: From June 2002 to July 2012Location: Sri Lanka Client: Ministry of Water Supply and Drainage Main project features: The objective of LEI&CDP is to improve the environment in Lunawa area byalleviating flood, through improvement of storm water drainage system. Project involved design of
drainage improvements. Responsible for tendering and quantity surveying(4) Name of assignment or project: ODA Loan - Greater Colombo Flood Control &
Environment Improvement Project GCFCEIP (Phase I, II & III) Year: From 1995 (GCFCEIP Phase I) From 1994 to 1996 (GCFCEIP Phase II & III)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 160/205
Year: From 1995 (GCFCEIP Phase I) From 1994 to 1996 (GCFCEIP Phase II & III) Location: Sri Lanka Client: Sri Lanka Land Reclamation & Development Corporation on behalf of the Govt. of SriLanka
Main project features: The project objective is to mitigate flood damage by improvingunderdeveloped or old drainage systems in the most flood-affected areas of Greater Colombo,namely the five areas within the Colombo Municipal Council area and two areas in the DehiwalaMount Lavinia Municipal council, The project consisted of rehabilitation of 34 Km of canals,construction of 10 Km new canals & replacement of bridges & canal structures. Apart from aboveengineering works, the project work involved relocation/upgrading of 8000 housing units in lowincome communities situated along the canals.Positions held: Deputy General Manager (Planning & Progress)Activities performed: Responsible for Procurement of goods and services and conducting surveys under GCFCEIP (Phase I) ;Responsible for project planning, selection of sub-projects, preparation of study reports and review
design and specifications under GCFCEIP (Phase II & III)(5) Name of assignment or project: UDA Town Development Projects: (Minuwangoda,
Kiribathgoda, Godagama, Homagama, Padukka, Maharagama, Kesbewa, Kosgama,Delgoda, Yatiyantota, Talawatugoda, Bowala & Gatambe Towns) Year: From 1998 to 2000Location: Sri Lanka Client: Urban Development AuthorityMain project features: Preparation of Reclamation and drainage plans for UDA Town DevelopmentProjectsPositions held: Deputy General Manager(Research & Designs)Activities performed: Identified flood detention and drainage improvement requirements due toreclamation of marshes for Town Development.
(6) Name of assignment or project: Negombo Storm Water Drainage Project Year: From 1999 to 2000 Location: Sri Lanka Client: Negombo Municipal CouncilMain project features: : Hydrologic & Hydraulic modeling of the drainage system and design ofcanals & drains.Positions held: Deputy General Manager(Research & Designs)Activities performed: Analysed the drainage system and proposed improvements to alleviateflooding.
(7)
Name of assignment or project: Diyawanna Uyana Project Year: From 1999
Main project features: Planning for development of 200 ha (493 Acres) with sea sand extracted fromoff shore burrow areas and by provision of pumped drainage system.Positions held: Project DirectorActivities performed: Overall incharge of planning, designing & project formulation, Preparation of
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 161/205
p g p g, g g p j , pPrequalification documents, Tender Documents, served in Technical Evaluation.
(11) Name of assignment or project: Hydrologic & Hydraulic data collection and modelling ofBolgoda basin with MIKE 11 package
Year: From 1990 to 1993 Location: Sri LankaClient: European UnionMain project features: Measurement campaigns & catchment modelling Positions held: Coordinator/ResearcherActivities performed: Involved in the measurement campaigns to gather Hydrologic & Hydraulic dataand Catchment modelling with MIKE 11 package under the guidance of Prof. J.J.Peters of VrijeUniversiteit Brussel and Dr. J.A.Macdonald of Danish Hydraulic Institute. Arrangement of funds from EU.
(12) Name of assignment or project: Maduru Oya, Mahaweli Project Year: 1984Location: Sri Lanka Client: Mahaweli Development BoardMain project features: Project involved construction of causeway and flood bundPositions held: Chief Engineer Activities performed: Execution of the construction of causeway and flood bund.
(13)Name of assignment or project: Period of services at Sri Lanka Land Reclamation &Development Corporation Year: From 1983 to 1986 & From 1988 to 1989Location: Sri Lanka Client: Sri Lanka Land Reclamation & Development CorporationMain project features: Reclamation of 100 acres of marshy land at Attidiya and Construction of 4ac Lake and canal systemPositions held: Chief Engineer/AGM(Special Projects)Activities performed: Planning and execution of reclamation and drainage works using cuttersuction dredgers.
Expert’s Contact Information: Email: [email protected] / [email protected] Phone: +94112435746 / +94 112320159
Certification:
I, the undersigned, certify to the best of my knowledge and belief that:
I understand that any wilful misstatement described herein may lead to my disqualification or dismissal,if engaged
CURRICULUM VITAE (CV) FOR PROPOSED PROFESSONAL STAFF
1. Proposed Position: Hydraulics Engineer
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 162/205
:2. Name of Firm: IDCS
3. Name of Staff: Govini Thantrige Dharmasena
4. Date of Birth: 15 July 1944 Nationality: Sri Lankan
5. Education:
B.Sc., Engineering, University of Ceylon, Peradeniya, Sri Lanka, 1968 Diploma in Hydrology, University of Delft, Netherlands, 1979
6. Membership of Professional Associations: Member, Institution of Engineers, Sri Lanka, 1975 Member, Sri Lanka Association for the Advancement of Science, 1985
7. Other Training:
Member, Institution of Engineers, Sri Lanka, 1975o Advanced Short term training courses in Hydrology and Water Resources Planningo Flood Mitigation, California State University, Davis, USAo Irrigation Engineering, Colorado State University, Fort Collins, Denvero Rainfall Runoff Modeling, University of Galway, Irelando Water Resources Planning, Asian Institute of Technology, Bangkok, Thailando Hydraulic Modeling, Central Water & Power Res. Station, Pune, India.
Followed a three months course on "Irrigation and drainage problems" at the Colorado StateUniversity, U.S.A, 1982.
Attended the regional seminar on "Flood zoning in river basins" at the ESCAP Bangkok, 1984. Attended a two weeks regional work shop on "Time series analysis in Water Resources Planning"
at the Asian Institute of Technology Bangkok, 1985. Attended one month regional work shop on "Application of computers in Water resources
Planning" at the Central Water and Power Research Centre, Pune, India, 1986. Attended two weeks regional workshop on "Standard procedures in flow measurements" at Asian
Institute of Technology, Bangkok, 1986. Attended six weeks workshop on "Irrigation, Drainage planning and management" at the
International Institute of Irrigation Management Digana, Sri Lanka, 1987.A d d I i l i Mi i i h l f d fl d di i
9. Languages
Speaking Reading Writing
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 163/205
LANGUAGESp g g g
Good Fair Poor Good Fair Poor Good Fair Poor
English O O OSinhala O O O
10. Employment Record:
From: September 2009 To: August 2013
Employer: SMEC International, Australia
Positions held: Co Team leader /Water Resources Specialist / Hydraulic Engineer
From: January 2005 To: September 2009
Employer: United Nations Office for Project Services (UNOPS)
Positions held: Water Resources Specialist / Hydraulic Engineer
From: April 2004 To: December 2004
Employer: Department of Irrigation, Sri Lanka
Positions held: Director General
From: April 2003 To: April 2004
Employer: Ministry of Irrigation and Mahaweli Development
Positions held: Additional Secretary (Irrigation and Water Resources) / Hydraulic
Employer: Department of Irrigation, Sri Lanka
Positions held: Deputy Director – Bandarawela Range / Hydraulic Engineer
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 164/205
From: January 1980 To: January 1981
Employer: Department of Irrigation, Sri Lanka
Positions held: Chief Resident Engineer / Hydraulic Engineer
From: January 1971 To: December 1979
Employer: Department of Irrigation, Sri Lanka
Positions held: Divisional Chief Engineer / Hydraulic Engineer
12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
Name of assignment or project: World Bank funded Dam Safety and Water Resources Planning Project(DSWRPP)Year: September 2009 ~ August 2013Location: Sri LankaClient: Ministry of Irrigation & Water Resources ManagementMain project features: Modelling of 103 river basins using MIKE Basin software and planning of waterresources of Sri Lanka for integrated water resources management for next 20 to 30 yearsPositions held: Co Team Leader / Senior Hydraulics EngineerActivities performed: Co Team leader on the overall Project coordinating the work of around 30 foreignand local experts and processing of all hydrological data base of the country to cover all 103 river basinsto incorporate as inputs to MIKE Basin model and model calibration and validation
Name of assignment or project: Water Supply & Sanitation Project for Tsunami effected areasYear: July 2005 ~ September 2009Location: Sri LankaClient: UNICEF
Name of assignment or project: Irrigation and Flood Control Projects with Ministry of Irrigation andMahaweli DevelopmentYear: April 2003 ~ April 2004
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 165/205
Location: Sri LankaClient: Ministry of Irrigation and Mahaweli DevelopmentMain project features: Policy planning, institutional strengthening and development for irrigation and
water resources sector institutions. Projects sought to provide efficient irrigation and flood control tocommercial and residential developments nearby project area.Positions held: Additional Secretary Irrigation and Water Resources ManagementActivities performed: Responsible for assisting the formulation of policy on water resourcesmanagement at national level and monitoring of the project implementation under the ministry.Preparation and promotion of project proposals for the Government funding through the Ministry ofNational Planning and External Resources Department of the General Treasury.
Name of assignment or project: Irrigation and Flood Control Projects with Ministry of Irrigation andMahaweli DevelopmentYear: March 2001 ~ April 2003
Location: Sri LankaClient: Ministry of Irrigation and Mahaweli DevelopmentMain project features: Planning, design and plan implementation of water resources and irrigationprojects. Projects sought to provide efficient irrigation and flood control to commercial and residentialdevelopments nearby project area.Positions held : Director Planning and Plan ImplementationActivities performed: Responsible for Financial planning, physical planning and design of all waterresources development projects at national, provincial and regional levels and monitoring of progress ofongoing internationally and locally funded programs and projects of the irrigation development.Promoted the preparation of development plans on the basis of River Basin Concept and exposure wasprovided to the staff of the Irrigation Department on Decision Support System tools such as in such asMIKE BASIN,MIKE II,HEC-HMS,HEC_RAS and WEAP. Carried out several training workshops onsimulation models for Hydrological, hydrodynamic and morpho dynamic studies. During these workshopshands on training was provided with software facilities to handle models such as MIKE II, HEC- RAShydrodynamic models and HEC-HMS, NAM, SMAAR, Xinanjiang rainfall runoff models.
Name of assignment or project: Planning, Design, Operation and maintenance of Hydrometric Networkof Sri LankaYear: January 1997 ~ December 1999Location: Sri LankaClient: Irrigation Department
Main project features: Planning, Design, Operation and maintenance of river gauges and other relatedmetrological network to cover 103 river basins in Sri Lanka; Provision of hydraulic and hydrological
Develop a 1D-2D hydraulic model of the drainage system.
Name of assignment or project: Detailed Hydrodynamic and Morpho-dynamic studies to assess thef
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 166/205
impact of proposed salinity barrier at Ambatale in Kelani GangaYear: March 1996 ~ May 1996Location: Sri Lanka
Client: National Water Supply & Drainage BoardMain project features: Hydrodynamic and Morpho-dynamic studies to assess the impact of proposedsalinity barrier at Ambatale in Kelani Ganga.Positions held: Deputy Hydraulics EngineerActivities performed: Using newly introduced Hydrodynamic modeling systems such as MIKEII,HEC_RAS LPM, SMAAR, NAM, HEC-HMS and Xinanjiang models, engineering services were conducted.Collect and review available data (hydrological, topographical, structural and coastal), and determine thegeographical extents and channels to be included within the hydraulic model based on the drainage layout,Develop a 1D-2D hydraulic model of the drainage system.
Name of assignment or project: Preparation of a Water Resources Inventory for the North CentralProvince (funded by the ADB) Year: July 1995 ~ September 1995Location: Sri LankaClient: International Irrigation Management InstituteMain project features:Positions held: Deputy Hydraulics EngineerActivities performed: Using newly introduced Hydrodynamic modeling systems such as MIKEII,HEC_RAS LPM, SMAAR, NAM, HEC-HMS and Xinanjiang models, engineering services were conducted.Collect and review available data (hydrological, topographical, structural and coastal), and determine the
geographical extents and channels to be included within the hydraulic model based on the drainage layout,Develop a 1D-2D hydraulic model of the drainage system.
Name of assignment or project: Preparation of a Water Resources Inventory for South Eastern Dry Zoneof Sri Lanka for S.P.R.D.P project (funded by the ADB) Year: February 1995 ~ Mar 1995Location: Sri LankaClient: Ministry of Plan ImplementationMain project features:Positions held: Deputy Hydraulics Engineer
Activities performed: Using newly introduced Hydrodynamic modeling systems such as MIKEII HEC RAS LPM SMAAR NAM HEC HMS and Xinanjiang models engineering services were conducted
II,HEC_RAS LPM, SMAAR, NAM, HEC-HMS and Xinanjiang models, engineering services were conducted.Collect and review available data (hydrological, topographical, structural and coastal), and determine thegeographical extents and channels to be included within the hydraulic model based on the drainage layout,Develop a 1D-2D hydraulic model of the drainage system.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 167/205
p y g y
Name of assignment or project: Morphological Modelling of Kelani Ganga estuary with Hydro dynamic
modellingYear: October 1992 ~ January 1994Location: Sri LankaClient: Coast Conservation Department, Sri Lanka Main project features: Morphological and Hydro dynamic Modelling Positions held: Deputy Hydraulics EngineerActivities performed: Using newly introduced Hydrodynamic modeling systems such as MIKEII,HEC_RAS LPM, SMAAR, NAM, HEC-HMS and Xinanjiang models, engineering services were conducted.Collect and review available data (hydrological, topographical, structural and coastal), and determine thegeographical extents and channels to be included within the hydraulic model based on the drainage layout,Develop a 1D-2D hydraulic model of the drainage system.
Name of assignment or project: Sediment transport study on Kukule Hydro power reservoirYear: November 1991 ~ October 1992Location: Sri LankaClient: Ceylon Electricity Board Main project features: Hydrological studies Positions held: Deputy Hydraulics EngineerActivities performed: Using newly introduced Hydrodynamic modeling systems such as MIKEII,HEC_RAS LPM, SMAAR, NAM, HEC-HMS and Xinanjiang models, engineering services were conducted.
Collect and review available data (hydrological, topographical, structural and coastal), and determine thegeographical extents and channels to be included within the hydraulic model based on the drainage layout,Develop a 1D-2D hydraulic model of the drainage system.
Name of assignment or project: Reclamation of Muturajawela under the Master plan for Muturajawela andNegombo lagoonYear: April 1991 ~ September 1991Location: Sri LankaClient: Greater Colombo Economic Commission Main project features: Hydrological studies
Positions held: Deputy Hydraulics EngineerActivities performed: Using newly introduced Hydrodynamic modeling systems such as MIKE
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 168/205
13. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describesmyself, my qualifications, and my experience. I understand that any willful misstatement describedherein may lead to my disqualification or dismissal, if engaged.
Date: December 5, 2015[Signature of staff member]
CURRICULUM VITAE (CV)
Position Title and No. M E P Engineer (Service Engineer)
Name of Firm IDCS
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 169/205
Name of Firm IDCS
Name of Expert Gallege Kapila SRIMAL
Date of Birth 30th
December 1952Citizenship Sri Lankan
Education : College/University Year degree(s)/diploma(s)
Friendship University, Moscow, USSR 1972/78 MSc. in Mechanical EngineeringUniversity of Roorkee, India 1984/85. Masters Degree in Hydrology,University of Colombo 1995/96. Executive Diploma in Business Administration
Institute of Personnel Management Sri La 2001/2003. National Diploma in Human Resources Management,Centre for Housing Planning and Building(CHPB)
2002/2004 Diploma in Landscape Design and Horticulture
Bandaranaike Centre for International StudiSri Lanka
2005/2006. Post Graduate Diploma in International Relations
Other trainingEmployment Record Relevant to the Assignment:
Period Employing Organization and Position.Contact Information for References
Country Summary of Activities PerformedRelevant to the Assignment
Jan.2010 toDec2012
Employing Organization :National Water Supply & Drainage Board
Title / Position Deputy General Manager – Development( 2 Years )
For Reference : General Manager,NWS&DB +94 11 2635990
+94 11 2636449
Sri Lanka Has over 34 years effective work experiencewith hands-on exposure to developmentactivities through the National Water Supply& Drainage Board holding progressivelyresponsible positions. Retiring as DeputyGeneral Manager, Development. Activitiesperformed relevant to the assignment -
Trincomalee and Kantale WaterSupply Project. - Worked as a
Mechanical Engineer and responsiblef S i i i i d
[email protected] attached to three sections of theCorporation, namely; water, electricaland solid waste.
Nov.1998 to
Aug.
Employing Organization :National Water Supply & Drainage Board
Sri Lanka
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 170/205
2003 Title / Position : Assistant GeneralManager attached to the Ground WaterSection( 5 Years)
For Reference : General Manager,NWS&DB+94 11 2635990+94 11 [email protected]
May
1990 toOct.1998
Employing Organization :
National Water Supply & Drainage BoardTitle / Position : Chief Engineer (WaterSource Investigation ) attached to theInvestigation Section( 8 Years)
Sri Lanka
Jan1990 to
Apr1990
Employing Organization :National Water Supply & Drainage Board
Title / Position : Mechanical Engineer
For Reference : General Manager,NWS&DB+94 11 2635990+94 11 [email protected]
Sri Lanka
May1987 toDec
1989
Employing Organization :Public Utilities Commission
Title / Position : ElectromechanicalE gi
Republic ofSeychelles
1979 toJan1981
National Water Supply & Drainage Board
Title / Position : Mechanical Engineerattached to the Southern Regional Office
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 171/205
Oct1978 toDec1978
Employing Organization :National Water Supply & Drainage Board
Title / Position : Mechanical Engineerattached to the Central Workshop
Sri Lanka
Membership in Professional Associations : Member, Institution of Engineers, Sri Lanka – C.Eng, MIESL, 1991. Corporate Member, Institute of Management, Sri Lanka, 2004 Affiliate Member, Institute of Personnel Management Sri Lanka (Inc), 2004.
Publications : -
Language Skill : Languages Speaking Reading WritingEnglish- Good Good GoodSinhala- Good Good Good
Adequacy for the Assignment :
Reference to Prior Work/Assignments that Best Illustrates Capability To Handle the Tasks Assigned (1) Name of assignment or project: Provided services to National Water Supply and Drainage Board. Jan
2010 - 2012 Year: January 2010 to December 2012
Client: Ministry of Water Supply & Drainage (NWSD&BLocation: Sri LankaMain project features: The NWSDB is responsible for providing safe drinking water and facilitating theprovision of sanitation with the planning and development of appropriate development initiatives.Position held: Deputy General Manager (Development)
Activities performed: Coordination with Regional Support Centers to collect information on water resources and
preparation of water resources maps. Attend meetings for water sector with relevant organizations. Advice on improvement of Rural Water Supply Systems and Ground Water activities.
(2) Name of assignment or project: Provided services to National Water Supply and Drainage Board. Year: August 2004 to December 2009Client : Ministry of Water Supply & Drainage
and Mannar.During Tsunami in December 2004, was actively engaged in providing standby water supply through browsersand other means to the North & East region. I was working in the Tsunami Rescue team and certificate wasawarded by ITT,USA accordingly.
(4) Name of assignment or project: Provided services to National Water Supply and Drainage Board
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 172/205
(4) Name of assignment or project: Provided services to National Water Supply and Drainage Board. Year : Nov 1998 – Aug 2003Client : Ministry of Water Supply and DrainageLocation: Sri LankaMain project features: Assisting with activities in the Ground Water Section of the NWS&DBPosition held: Assistant General Manager attached to the Ground Water Section
Activities performed: Other than the activities as chief engineer (Water Source Investigation) wasresponsible for the allocation and supervision of drilling machines and drilling staff to various parts of theisland.Preparation of specifications, tender documents for procurement of machinery and equipment required fordrilling operations.
(5) Name of assignment or project : Provided services to National Water Supply and Drainage Board. Year : May 1990 – Oct 1998Client: Ministry of Water Supply & DrainageLocation: Sri Lanka
Main project features: Investigation of water sources and other activities of the Investigation Section.Position held : Chief Engineer (Water Source Investigation) attached to the Investigation Section Activities performed: Investigation section consisted of seven team for the above period and each group isheaded by Officer -in- charge. My main duties were ;to arrange investigation for water sources, water jettingand carrying out drilling of shallow bore holes, pumping tests for selection of yields, carryout flowmeasurements for streams and rivers, maintenance of all machinery attached to the section; shallow drillingmachines, pumps etc.
(6) Name of assignment or project: Provided services to National Water Supply and Drainage Board. Year : Jan 1990 – April 1990Client: Ministry of Water Supply & DrainageLocation: Sri LankaMain project features: Providing mechanical engineering services to the NWSDBPosition held: Mechanical Engineer
Activities performed: Supervision of the maintenance of drilling rigs, compressors, all vehicles and other accessories. Preparation of specifications for the purchase of above machinery and tube well hand pumps. Preparation of maintenance schedules for the above, detail the staff, instruct and advice them in the
maintenance work.(7) Name of assignment or project: Provided services to Public Utilities Corporation (PUC).
Year : May 1987 – Dec 1989Client : Government of the SeychellesLocation : Republic of SeychellesMain project features: Undertaking all electro mechanical works at the PUC
Position held: Electromechanical Engineer Acti ities performed
maintenance work. Collect the details and all information of mechanical and electrical equipment existing in the Region. Conducting training courses on operation and maintenance of machinery and equipment.
(10) Name of assignment or project: Trincomalee and Kantale Water Supply Project.Year: Feb 1983 to Dec 1985
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 173/205
Year: Feb 1983 to Dec. 1985Client: National Water Supply & Drainage BoardLocation: Sri LankaMain project features : A project to augment the water supply services in Trincomalee and KantalePosition held: Mechanical Engineer
Activities performed: Responsible for Supervision, inspection and commissioning of all machinery andequipment at the above mentioned schemes. The project cost was approximately Rs.600 million andinstallation of these machinery and equipment was carried out by Degremont, France.
(11) Name of assignment or project: Provided services to National Water Supply and Drainage Board. Year: Aug 1982 – Sept 1982Client: Ministry of Water Supply & DrainageLocation : Sri LankaMain project features: Assisting with mechanical engineering activities at the Head OfficePosition held : Mechanical Engineer attached to the Head Office
Activities performed: Responsible for Supervision of fabrication and installation of trusses of the three
storey building at head office, Rathmalana.(12) Name of assignment or project: Provided services to National Water Supply and Drainage Board.
Year: January 1979 to January 1981Client: Ministry of Water Supply & DrainageLocation: Sri LankaMain project features : In charge of water supply assignments in the Southern Regional OfficePosition held :Mechanical Engineer attached to the Southern Regional Office
Activities performed : Supervision of all the mechanical and electrical activities in the region from Hikkaduwa to Kataragama
as Regional Mechanical Engineer. Preparation of Preventive maintenance schedules for all plant and equipment in the region and
monitoring the programme. Collect the details and all information of mechanical and electrical equipment existing in the Region. Monitoring the asset condition/performance to meet target levels of service. Planning for upgrading or replacement of an asset or asset component to restore the asset to its
required functional condition and performance. Planning of an asset disposal when it becomes less economical and preparation of budgets for
replacement of assets. Conducting training courses on operation and maintenance of machinery and equipment for O & M
staff. Attend all breakdown maintenance of plants..
Certification:
CURRICULUM VITAE CV)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 174/205
1. Proposed Position: Environmental Specialist
2. Name of Firm: IDCS
3. Name of Staff: Roshan K RODRIGO
4. Date of Birth: 20 April 1978 Nationality: Sri Lankan
5. Education: B.Sc (Natural Science), Open University of Sri Lanka – 2005 M.Sc (Disaster Management and Sustainable Development), Northumbria University, UK– 2010
Diploma in endangered Species Management (DESMAN), University of Kent, UK – 2001 Chartered Environmentalist – Society for the Environment (Soc Env), UK – April 2012todate)
6. Membership of Professional Associations: Full member-The Society of Biology, UK (Oct, 2012 to date) Commissioned member - World Commission on Protected Areas, IUCN, Switzerland (Jul,2012 to date)
Commissioned member - Commission on Ecosystem Management, IUCN, Switzerland
(May, 2012 to date) Full member- Chartered Institute of Ecology and Environment Management (CIEEM),UK. (Sep, 2010 up to date)
Full member- Institute of Biology (IOB), Sri Lanka (Sep, 2011 to date) Life Member - Royal Asiatic Society Sri Lanka Branch (RAS-SL), Sri Lanka, (Mar, 2008 todate)
Life Member - Geo-informatics Society of Sri Lanka (GIS-SL), Sri Lanka, (Jan, 2004 todate)
7. Other Relevant Qualifications:Possess excellent working experience in MS Windows based programs and experience
(2001) Breeding, culture and management of ornamental fish training, (2000) Forest garden product certification workshop, (1999) Wildlife and environmental conservation study program- field of reptiles, (1998/99)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 175/205
y p g p ( ) Wildlife and environmental conservation study program- field of aquatic life, (1995/96)
8. Country Experience: Sri Lanka, United Kingdom
9. Employment Record
From: May 2014 To: DateEmployer: RR Construction (Pvt) LtdPositions held: Manager – Environment, Health and Safety - “Sangupitiya” RoadConstruction Project, Sri LankaBrief description of activities performed:
Environmental Impact Assessment (EIA) and Initial Environmental Examination (IEE) Preparation of environmental management action plan (EMAP). Monitoring and evaluation of EMAP. Responsible for obtaining and maintaining necessary clearances and licenses for
project activities. Overall responsibility of protection of environment and site safety. Social safeguard. Monitoring, evaluation and reporting.
From: April 2011 To: May 2014
Employer: Self-employed Positions held: Environment and Sustainable Development ConsultantBrief description of activities performed:
Strategic Planning and development Governance and management mentor Research (program assessment and evaluations) Program design and development Disaster management and Risk Reduction Development of training and learning material Workshop Facilitation and Training
Monitoring and Reporting
Brief description of activities performed: Performance management of the environmental remediation teams, monitoring and
evaluation, project planning, conducting EIA’s and SIA’s, budget management,resource allocations, coordination and communication with government, non-
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 176/205
government, NGO’s INGO’s and CBO’s, documentation and reporting, expert advice toEuropean Union partnership members, provide support and advice to the solid waste
management project and drainage/ road construction projects of ERP, capacitybuilding for Tunami affected community, preparation of GIS maps using ERDAS imagesfor project progress monitoring and evaluation purpose, regular project progressreports (Bi-weekly, Monthly and quarterly) to the program manager and to thegovernment institutions.
Achievements Successfully established a functional community management structure at both village
and district level in Ampara and Batticaloa districts. Facilitated the drawing up of the financial recovery plan and its implementation. Reviewed and rolled out the policies and procedures developed by the society to unify
its dysfunctional units. Successfully supported the National Society in handling conflict management &
resolution between governance and staff, and among staff themselves. Successfully supported the development of Provincial strategic and operational plans of
various programs and projects. Successfully established long term practical income for Tsunami effected communities.
From: January 2007 To: December 2008
Employer: United States Agency for International Development (USAID), SriLanka Positions held: Environment Manager on the Bridge Reconstruction of Arugambay andAccess Roads ProjectBrief description of activities performed: Daily monitoring of impact to the physical lagoon environment and proposing
mitigation measures and actions to contractors, maintained environmental license andclearance for bridge construction, conducting pocket meetings for minimizing impact tothe lagoon for the contractors, advising to the senior project staff on better practice to
minimize impact to the lagoon on construction work community mobilizationmonitoring and e al ation of q arr sites b rro pits and ork place maintain of
Achievement Successfully produced training materials on organizational development, which has
been implemented regionally.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 177/205
Core trained and established the Regional Disaster Response Team with the disasterdepartment.
Produced education and scientific materials. Trained trainers on institutional development.
From: January 1996 To: January 2002 Employer: Neo-Synthesis Research Center, Sri Lanka Positions held: Researcher Brief description of activities performed: Conducting intensive field work on biodiversity special emphasis interaction of fauna
and flora in home gardens and surrounding ecosystems, providing expert knowledgeon livelihood programs such as animal husbandry (poultry, exotic ornamental fishproduction –special techniques of mud pond cultivations), farming practice on eco-friendly home grading (Analog forestry) and better practice of Chena (slash andburning) cultivations, providing intensive practical and theoretical knowledge, andexperience for plant nurseries establishment, maintain and management for villages,development of school gardens concept in the project area, conducting educationawareness programs such as lectures, field trips, competitions and exhibitions forschools, universities and general public, regular progress reports to the projectcoordinator.
Achievement; Successfully implemented and established Analog forestry program.
10 Certification
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctlydescribes myself, my qualifications, and my experience. I understand that any willfulmisstatement described herein may lead to my disqualification or dismissal, if engaged.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 178/205
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 179/205
Hon’ble Prime Minister of Indiad “T P f i CPSE ’ “MOU
“SCOPE Meritorious Award -CorporateGovernance”
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 180/205
presented “Top Performing CPSEs’ “MOUExcellence Award” instituted by
Department of Public Enterprises,Government of India
Instituted by Standing Conference of Public Enterprises, anapex body of Central Government owned Public Enterprises
“National Award for Excellence in Cost Management”conferred by The Institute of Cost and Works
Accountants of India, a premier professional bodyset up under the Act of Parliament.
Water Awards 2013-2014Best Consultancy Company
Awards/Recognition
(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 181/205
Best Consultancy Company Supported by UNESCO PHD Chamber of Commerce Water Digest
PSE Excellence Awards – 2013Instituted by Department of Public Enterprises, Ministry of Heavy Industry and
Public Enterprises, Government of India and Indian Chamber of Commerceto recognize the contribution of Public Sector to the Indian Economy
“C f h ”
Awards/Recognition
(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 182/205
“Company of the Year”
“CorporateGovernance” “Human ResourceManagement”
Awards/Recognition
(Contd.)
“SCOPE Award for Excellence and OutstandingContribution to the Public Sector Management-
Smaller Public Enterprises” instituted by StandingConference of Public Enterprises .
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 183/205
44 th National Export Award –“Excellence in EPO Services -2011-2012 ”instituted by Engineering Export Promotion Council (EEPC), Ministry
of Commerce & Industry, Government of India for Outstanding ExportPerformance.
Presented by Mr. Martin Kuba, Hon’ble Minister of Trade & Industry, the Czech Republic Water Awards 2012-13
Best Consultancy Company Supported by
UNESCO
PHD Chamber of Commerce Water Digest
PSE Excellence Award -“Human Resource Management”
Instituted by Department of PublicEnterprises, Ministry of Heavy Industryand Public Enterprises, Government of India and Indian Chamber of Commerceto recognize the contribution of PublicSector to the Indian Economy.
Most Valuable Indian Power Sector Enterprise Making Global Impact
8 th ENERTIA Awards-2014 Awards/Recognition
(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 184/205
The Eminent Jury Panel recognizes that “WAPCOS Limited is the leader in theIndian and Overseas markets with Best Performance levels in 2013-14with increase in turnover to Rs. 920.93 crores (1.6 times) with PAT of Rs.67.02 crores (1.2 times) and getting the PSE global recognition as India’sBest Water & Power Consulting Company / PSE from India withInternational footprints”
Most Valuable Indian Power Sector Enterprise Making Global Impact
7 th ENERTIA Awards-2013 Awards/Recognition
(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 185/205
Power Persona of the year Award 2013- Hydro
Power Sector
The Eminent Jury adjudicated that “WAPCOS has made India’sengineering and consulting capacity get a Global fillip
through its International footprints in Hydro-Power, Waterand Transmission Infra Projects spread in 55 countriesacross Asia, Africa, Middle-East and Oceania providingconsultancy services to more than 2900 projects. The Jury recognized WAPCOS role in consolidation of India’sStrategic Hydro-Power Interests in Bhutan and consultingexpertise to 47 prestigious National Hydro-Power Projects with 9000MW aggregate capacity” .
The Eminent Jury recorded CMD’s Yeomencontribution and leading WAPCOS to leadershipin Indian Market and also globally as the Best Water & Power Consulting Company/PSE fromIndia with global footprints.
Mi i PSE f h Y
IPSE Awards 2014- Ind ia Publ ic Sec tor Ente rpr i ses Awards for Exce l lence
19.12.2014 PSE Persona of the Decade -
Consulting & Engineering
Awards/Recognition
(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 186/205
Miniratna PSE of the Year g g g
CMD, WAPCOS Conferred TheGreatest Corporate Leaders of India
Corporate Governance &Sustainability Award
- Instituted by Indian Chamber of Commerce
Awards/Recognition
(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 187/205
Greatest Corporate Leaders of India Awards- Endorsed by Asian Confederation
Businesses and World CSR Day
Awards/Recognition
(Contd.)
Asia Pacific HRM Congress- Organization with Innovative HR
Practices√ E d d b A i
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 188/205
“India Today”Best Performing PSU-
”Mini Ratna ”
√ Endorsed by Asian
Confederation of Businesses
10
Awards/Recognition
(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 189/205
Eminent EngineerAward-2014 byInstitution ofEngineers (India)
Exemplary services in the fields of Engineering and Technology
11
CBIP Award – “Best Consultancy Organization” Instituted by Central Board of Irrigation and Power, Premier Institution setup by the Government of India .
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 190/205
12
Institution setup by the Government of India .
India Hydro Awards√ 7th Hydro Vision Conclave India-International
Water & Power Sector Company of the Year 2014 with Overseas
Awards/Recognition(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 191/205
Hydro CEO of the Year-2014
the Year-2014 with Overseas
Footprints
13
WAPCOS’ LinkagesChairman -
Indo-CambodiaBusiness Forum of
Federation of
Chairman -Indian Water
ResourcesSociety (IWRS),
Chairman- Indo-LaosBusiness Forum of
Federation of IndianChamber of Commerce and
Awards/Recognition(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 192/205
Federation ofIndian Chamber of
Commerce andIndustry (FICCI)
Delhi CentreIndustry (FICCI)
Co-Chairman- TaskForce of Africa
Committee on PowerSector of Confederationof Indian Industry (CII)
President-India WaterPartnership
(IWP)
Executive Vice-President - IndianWater ResourcesSociety (IWRS)
Jury Member-Water Digest
Awards
Member- ASEANCommittee, Confederation
of Indian Industry (CII)
Member-Confederation ofIndian Industry
(CII) - Delhi StateCouncil
14
Member - WorkingGroup on Irrigation andDrainage in the Statesunder Socio-Economic
Transformation,International
Commission onIrrigation & Drainage
Member - Indo-Bhutan Empowered
Joint Group forDevelopment of10,000 MW Power
in Bhutan
Director - Board ofGlobal Procurement
Consultants Limited, asubsidiary of EXIM
Bank
Member - Executive
Board, StandingConference of PublicEnterprises (SCOPE)
Member - GlobalWater Partnership,
SwedenMember-
Joint Steering Committee(Indian Side), Indo Nepal
Electric Power Trade, Cross-Border Transmission
Interconnection and GridConnectivity
Member - AsianRegional Working
Group, InternationalCommission on
Irrigation & Drainage
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 193/205
What our Clients Say ?
Water & Sewerage Authority
Earning Goodwill and Respect for the Nation
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 194/205
Trinidad & Tobago“I would like to congratulate the WAPCOS team for their organization of this study tour. The professionalism, efficiency and teamwork at WAPCOS and the other agencies with whom we metwas beyondour expectations and highly commendable ” .“I wish to indicate that this visit was highly informative, pioneering and created wide opportunities for collaboration and team work inseveral areas including training and development in Water, Wastewater, General Management and Leadership programs, technical & other specialized training programs, project attachments, exchange visits, short courses, long-term degree and masters programs and project managementand consultancy services” .2nd February 2015 Director (Human Resources)
Ministry of Water Resources and Meteorology, Rural Development ,Royal Government of Cambodia
“WAPCOS as the Project Developer has provided concept to commissioning services covering feasibility Studies, Survey & Investigation,Design Engineering, Tender Engineering, Contract Management, Quality & Quantity Control, Pre-shipment Inspections, Capacity Buildingand executed the Project on turnkey basis successfully .”
WAPCOS has done a commendable job and provided professional services which would help in development of the Water Resources systemin Kampong Spue Province, Cambodia as a first Dam on perk Thot tributary. The performance of WAPCOS Ltd. is appreciated.
October 2014 Secretary of State (MOWRM)
Druk Green Power Corporation LimitedThis is to certify that M/s WAPCOS Limited (A Government of India Undertaking) under Ministry of Water Resources hasprepared the Project Completion Reports as the part of their Consultancy assignments for the following Hydroelectricprojects in the Kingdom of Bhutan:
Tala H ydroelectri c Project (6X170MW) ChhukhaHydroelectri cProject(4X84MW)
What our clients say(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 195/205
Chhukha Hydroelectri c Project (4X84 MW) It is to put on record that the Completion Reports prepared by M/s WAPCOS Limited for these projects were of the highest
quality and demonstrated a high level of professional input into the preparation of the Reports.24 th June, 2014 Managing Director
Indian Coast Guard Region, MumbaiThis is to certify that M/s WAPCOS Limited has undertaken astudy of “Wave tranquility” and “Siltation pattern "of BhagwatiBunder, Ratnagiri for assessment of suitability of site for creationof Coast Guard Reparir Infrastructure. M/s WAPCOS have handledthe above assignment deftly and professionally and submittedthe feasibility report within stipulated time.
5th March , 2014 Dy. Inspector General
FUNDO DE INVESTIMENTO E PATRIMONIO DO ABASTECIMENTO DEAGUA, MOZAMBIQUE
M/s WAPCOS Limited have been providing Consultancy Services for Water Services and Institutional Support Project ;Design Check and Supervi sion of Emergency works for N acala (Worl d Bank Fu nded), Mozambique . WAPCOS scopealso includes Supervision of the construction works in accordance with the Contract Conditions and the WASISsafeguard documents and local legislation including the environmental and social safeguards framework . T he P f fM / WAPCOSi ll d h h b i ll h i i i i f i l
What our clients say(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 196/205
Perf ormance of M /s WAPCOS is excell ent and they have been carr ying out all the activi ties in a professional manner for successful completion of the Project.December, 2013 Director General
Electricite Du LaosLao People’s Democratic Republic
“This is to certify that WAPCOS has been providing Consultancy Services for Preparation of Feasibility Report, Tender Engineering, Design Engineering and Construction Supervision of 230kV & 115 kV Transmission Line & Associated Sub-stationProjects” .“WAPCOS has successfully completed the Design Engineering, Pre Shipment Inspection at manufacture’s work, Supervision of Construction and Erection works commencedby EPC contract upto satisfactory of the Client” .
“We are glad to inform that we are utmost pleased with the efforts and timely & quality services provided by WAPCOS . Theservices provided by WAPCOS are Excellent” .October 2014 Project Manager
What our clients say(Contd.)
Andhra Pradesh Power Development Company Limited
This is to certify that M/s. WAPCOS Limited was awarded” Consultancy Services for SeaWater Intake & Outfall System for 2 x 800 MW Sri Damodaram Sanjeevaiah Thermal Power Station at Nelatur village, SPSR Nellore District, Andhra Pradesh . The Consultancy Servicesrendered so far by M/s. WAPCOS are satisfactory in implementing SWIO System, which isnearing completion
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 197/205
Direc tora te of Por ts & In land Water Transpo r t , Government of Odish a
WAPCOS Limited has comp leted the work “Preparation of Pre-Techno Eco nom ic Feasibility Repor t for development of a Container Cargo Port and Cruise Terminal a t Bal iharachandhi in Puri District” suc cessf ully and subm itted the report with in the stipu lated tim e. The report are well docum ented and fulfi ll the objectiv es of the pro ject.
5 th A pril , 2014 Direc to r
nearing completion.
20th
May, 2014 Project Manager
Energy Water and Sanitation Authority, RwandaThis is to confirm that WAPCOS Limited has successfully completed the following works for Energy, Waterand Sanitation Authority (EWSA), Rwanda:
Preparati on of Pre-feasibil ity Report for 15 MW Peat-to-Power Pr oject, Rul indo, Rwanda P i fP f ibil i R f 50M WP P P j R b dBi h R d
What our clients say(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 198/205
Preparation of Pre-feasibil ity Report for 50 M W Peat-to-Power Pr oject, Rwabusoro and Bi shya, Rwanda
The studies were done competently and have been accepted as very useful for further development work.August, 2013 Director General
Reliance Ports & Terminals Limited
We hereby would like to express our appreciation forthe whole team of WAPCOS for successful completionof “Feasibility Studies of safegrade Alivation of Triangular plot & Jetty at Dahej and Hazira ” withinthe stipulated time schedule.
November,2013 Astt. Vice President
Fundo De Investmento E Patrimonio Do Abastecimento De Agua
Mozambique“
WAPCOS has completed the Design Check and Supervisionof Emergency Works for Nacala project. FIPAG hereby expressit’s satisfaction with WAPCOS’s professional execution of the project ”
27th January, 2015 Director General
What our clients say(Contd.)
CCE (Army) No 1 and CCE (Army) No.2 Missamari MilitaryEngineer Services
Detailed Engineering and Project Management Services for Provision of Buildings and Works at various locations, Arunachal Pradesh and Missamari, Assam
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 199/205
Lao People’s Democratic Republic
“ This is to certify that M/s WAPCOS Limited (a Government of India undertaking) was engaged as ProjectManagement Consultant for successful execution of the Nam Song Hydro Power Project (3x2 MW), Lao PDR. All the three units of the project, each of 2MW of Nam Song Hydro Power Project have been commissionedsuccessfully on 31.08.2012 under the supervision of WAPCOS. EDL-GEN has enjoyed good working relations with WAPCOS. The professionalism imparted by WAPCOS throughout the duration, appropriate to the needof the project activities is highly appreciable. ”
5th September, 2012
What our clients say(Contd.)
Extracts from the Aide Memoire of Implementation Support Mission from WorldBank during its visit from September 10-18, 2012 to review the progress of “Tamilnadu Irrigated Agriculture Modernization and Water Bodies Restoration andManagement Project”
“Construction Quali ty Managem ent and Techn icalSuperv isio n Con su ltancy
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 200/205
Construction Quali ty Managem ent and Techn ical Superv isio n Con su ltancy i s n o w f u ll y f u n ct io n al an d h as g r ea tl y s t ren g t hen ed t h e Q u al it y Managemen t System by co nd ucti ng quali ty co ntro l tests ind ependently as well as helpin g in the enforc emen t of specif icat io ns & co rrect Constru ct io n Procedu res and quali ty co ntro l requir ements in the executio n of variou s r eh a b il it at io n w o r k s . T h e C o n s u lt an t s h a v e c o n d u c t ed o n e t r ai n in g pro gram m e of three days each for the eng ineers in Madu rai and Chenn ai region s. The Missi on foun d the feed back from the engin eers to be very
useful” .
What our clients say(Contd.)
Kerala Rural Water Supply & Sanitation AgencyThis is to certify that WAPCOS Limited had “ prepared the Water Secur it y Plans (Phase I I of the World Bank Ai ded Rur al Water Supply Scheme and Sani tation ) for E leven Grama Panchayanths in I dukki & Kasaragod Districts on GI S platform” . The performance of WAPCOS Limited is appreciated.
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 201/205
August, 2013 Executive Director
Gujarat Infrastructure Development Board
WAPCOS have completed the study on “Flood Vulnerability and Risk Assessment of Ahmedabad – Dholera Special InvestmentRegion area” . We appreciate their sincere efforts and quality services that are rendered throughout the project tenure. August, 2013 GIDB, Gandhinagar
Ministry of Water Resources Development and Management, ZimbabweThe Study conducted by WAPCOS has brought out a number of short term, medium term andlong term projects which on implementation would usher a new era in the Save River basin tofulfill the aspirations of, not only people in that area, but the rest of Zimbabwe due to otherdownstream benefits of the intervention in Save River Basin.
What our clients say(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 202/205
downstream benefits of the intervention in Save River Basin.I would like to thank WAPCOS for their efforts in bringing out the Strategy Paper in such ashort span of time and would welcome more and more participation by WAPCOS in my country, Zimbabwe in the development and management of water resources, inclusive of allinterventions towards the achievement or realization of the objectives of this noble initiative.
8th July, 2012
Ministry of Housing & Urban Poverty Alleviation, Govt. of IndiaIt is to certify that WAPCOS Ltd. (a Govt. of India Undertaking) has been appointed asThird Party Inspection and Monitoring Agency at the Central level for the work of thirdparty inspection & Monitoring of Basic Services to Urban Poor (BSUP) & IntegratedHousing & Slum Development programme (IHSDP) Projects under Jawaharlal Nehru
What our clients say(Contd.)
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 203/205
Housing & Slum Development programme (IHSDP) Projects under Jawaharlal Nehru
National Urban Renewal Mission (JNNURM) in 15 states (for 56 BSUP and 67 IHSDPprojects) vide this office letter no. N-11027/34/2009-IHSDP dated -15.01.2010 and N-11027/34/2009-IHSDP (Vol.II) dated-11.11.2011. So far the reports submitted by WAPCOSare in order and their performance has been found satisfactory.
24th April,2012
Ministry of Energy and Mines, Electricite du Laos“This is to certify that WAPCOS has provided a hands-on training oncomputerised transmission line designing and profiling using PLS-CADDsoftware to EDL Engineers from 10 th September, 2012 to 12 th September , 2012at EDL head office, Vientiane. The training has been first to its kind in EDLand the concerned Engineers have been benefitted in their maximumcapacity”
12th December, 201 2 Dy. Department Director
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 204/205
What our clients say(Contd.)
Department of Energy, Ministry of Economic Affairs Thimphu: Bhutan
This is to certify that WAPCOS Limited a Government of India Undertaking, has carriedout the Survey and Investigations of Punatsangchhu – II Hydroelectric Project (990MW) inBhutan and prepared the Detailed Project Report (DPR). The Department of Energy,Ministry of Economic Affairs, Royal Government of Bhutan as the implementing agencyhas found the works carried out by WAPCOS Limited of International Standards and weare satisfied with the quality of works done while preparing this Report.
22 nd November 2010 Director General
7/24/2019 Devi Balika & Kynsey Srilanka
http://slidepdf.com/reader/full/devi-balika-kynsey-srilanka 205/205
22 November, 2010 Director General
Recommended