NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
LKS TK. NASIONAL XXI 2013 JAKARTA 1
Description of skill
The competition is to reflect the traditional, current and emerging technologiesused in the electrical installation contracting industry. The competitors are tocomplete test projects designed for typical commercial or domestic electricalinstallations.
Competency and scope of work
The Competition is a demonstration and assessment of the competencies
associated with this skill. The test project consists of practical work only.
Competency specification
Competitors must be competent in the use of necessary and appropriatetechniques to complete the modules. These competencies include:o Measuring and marking of installation materials and equipmento Measuring and installing equipment and pipeso Manual bending of pipeso Sawing, drilling and de-burringo Working with and assembling materials made from metal and plastico Wiring and connecting switches, control devices and consumer applianceso Modification and addition to installations and/or circuits to alter the function
(instructions to be presented graphically i.e. no text)
Theoretical knowledge is required but not tested explicitly
The theoretical knowledge is limited to that necessary to carry out the practicalwork the programming of electronic and electromechanical components(programmable relay/smart relay, programmable logic controllers), readingdrawings, sketches and schematic diagrams.
Practical work
The competitor must be able to demonstrate a range of skills in the installation ofelectrical equipment, wiring systems and structured cabling systems. Thecompetitor must be able to carry out all required inspection, testing andcommissioning for all relevant modules. When the test project is completed, it mustbe tested by the competitor and the results submitted in writing.
8/13/2019 Instruksi Peserta LKS 2013
2/14
NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
LKS TK. NASIONAL XXI 2013 JAKARTA 2
The test project will consist of the following modules:
Module A Domestic and/or commercial installation
o 6 hours maximumo Competitors use these instructions to design the installation using materials
from their own.o Materials (conduit, cable ducts, and cables) are provided by the committee.
Components of must be brought and prepared themselves by competitors.o If a programmable device is included in the installation, the competitor must
bring the device with them.o It is up to the competitor to choose which systems he prefers to use.o The program itself is not part of the marking; only requested function will be
marked as per Instructions circulated.
Instructions for module A
o Competitors must design a circuit that will meet the project specificationsusing materials and equipment from their homelands.
o Competitors must carry all equipment necessary to build the project.o Competitors who choose to use a programmable device, it must bring your
own (programmable device) or a laptop with the appropriate software.o All equipment for this module must be in condition "like new".o Pre-programming, pre-cable, pre-bent, pre-assembly, pre-cut (a certain
length), etc. not allowed.
Note : Organizer will provide materials that be informed at Module A Material Listonly.
Module B Control circuit installation
o 6 hours maximum.o Material provided by the committee.o Specific components (marked "*)" in the list of materials) must be brought
and prepared themselves by competitors.o Drawings to be circulated 1 months prior to the competition.
8/13/2019 Instruksi Peserta LKS 2013
3/14
NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
LKS TK. NASIONAL XXI 2013 JAKARTA 3
General instructions for all modules
Test specifications:o Insulation resistance The minimum resistance between any current
carrying conductors and any other conductors or earth may not be less than1 M, tested at a voltage of 500 V DC with an insulation resistance tester.
o Earth continuity resistance The maximum resistance between the mainincoming earth terminal and any point on the installation required to beearthed may not be more than 0.5 .
o Polarity phase pin socket outlet located on the left or clockwise from the
grounding pin.
Instructions for competitors
o Test project module B competitors must work in accordance with drawingsand technical requirements
o Competitors must perform checking the materials and components. Theycan request a replacement 10 minutes before the start of the competition ifthere is anything wrong.
o All technical terms and descriptions used in the test project must be inaccordance with SNI/PUIL 2000 standards and terms, if applicable.
o All dimensions must be from specific reference lines (datum lines).o Cable and conduit measurements are to the centre of the cable/conduit.o Duct and equipment measurements are to the centre or edge of the
duct/equipment.o Bend for PVC and metal conduit, standard radius cannot be less than six
times the external diameter of the conduit. Bend radius for standard cablecannot be less than three times the cable diameter.
o Dimensional tolerance 2 mm for the dimensions of length 0 to 500 mmand 5 mm for the dimensions of length over 500 mm in length.
o During the competition, competitors must read the drawing itself. Not
allowed to talk to each other.o Prohibited connect the power source to the project without the approval of
experts.o When the work is completed, competitors must clean up the environment
prior to commissioning.
8/13/2019 Instruksi Peserta LKS 2013
4/14
NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
LKS TK. NASIONAL XXI 2013 JAKARTA 4
Personal Protective Equipment (PPE)
Competition Name : Electrical Installation
EyeProtection
Hearing
Protection
SafetyShoes
DustMask
Respirator
WeldingMask
Gloves-rubber
Gloves-leather
HardHat
Protective
Clothing
VIP Y Y YServiceTechnicians Y Y Y
Jury Y Y Y
Competitors Y Y Y Y Y
Legend:Y = Yes required
R = Recommended
Evaluation and scoring
A Safety Score 10
B Commissioning Score 20
C Function Score 25
D Measurements Score 5
E Installation Equipment Score 10
FInstallation of Wire-ways Score 20
G Wiring Termination Score 10
Total Score 100
8/13/2019 Instruksi Peserta LKS 2013
5/14
NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
LKS TK. NASIONAL XXI 2013 JAKARTA 5
Proposed time table
Time Date I II III IV
08.00-10.00 Preparation/Information
Project StartModule A
Project StartModule B
Assessment
10.00-10.15 Coffee break Coffee break Coffee break Coffee break
10.15-12.00 Familiarization Be continue Be continue AssessmentFinished
12.00-13.00 Lunch Lunch Lunch Lunch
13.00-15.30 Familiarization Project Finished ProjectFinished
Ranking
15.30-15.45 Coffee break Coffee break Coffee break Coffee break
15.45-16.30 Closing
LIST OF ELECTRICAL MEASSUREMENT TOOLSFor 1 Competitor
Trade : Electrical Installation(Must be brought and provided by the competitors)
No. Tools Specification Quantity
1 MultimeterDigital Multimeter c/w Ohm meter,Volt meter, Milliampere Meter,Ampere Meter, Continuity tester.
1 unit
2 Insulation TesterDigital or Manual Insulation testerstandard
1 set
8/13/2019 Instruksi Peserta LKS 2013
6/14
NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
LKS TK. NASIONAL XXI 2013 JAKARTA 6
WORK PLEACE MATERIAL LISTFor 1 Competitor
Trade : Electrical Installation
(Provided by the organizers)
No. Materials Specification Quantity
1 Plywood 18 x 1200 x 2400 mm 2,5sheets
2 Square wood 5 x 5 x 400 cm 4 pieces3 Nails 3 Inch
2 Inch0,5 kg0,5 kg
4 NYM Cable 4 x 2.5 mm2 5 meters
5 Socket Outlet /Terminal
1 phase (3 pin)3 phase (5 pin)
1 unit1 unit
6 MCB 1 phase 4A3 phase 10A
1 piece1 piece
7 MCB Box Adjust requirements 1 piece
8 Work Table Wood Table (LWH) 100x70x80 cm 1 unit9 Cable Clamp for NYM
CableStandard 1 pack
8/13/2019 Instruksi Peserta LKS 2013
7/14
NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
LKS TK. NASIONAL XXI 2013 JAKARTA 7
LIST OF TOOLSFor 1 Competitor
Trade : Electrical Installation
(Provided by the organizers except those marked *)
No. Tools Specification Quantity Remark1 Screwdriver (Minus) 3 mm s/d 6 mm 1 set *)
2 Screwdriver (Plus) 3 mm s/d 6 mm 1 set *)
3 Adjustable or Set ring pass Suitable for Hexagon set Screw M5 1 set *)
4 Hammer 0,3 Kg 1 piece *)
5 Universal Vice / Pipe Vice Standard 1 set *)
6 Hack saw frame with blade 24 TPI 1 set *)
7 PVC Bending Spring 20 mm 1 piece *)
8 Cutting Pliers Standard 1 piece *)
9 Combination Pliers Standard 1 piece *)
10 Wire Stripper Standard 1 piece *)
11 Crimping Tools 1,5 mm s/d 4 mm 1 piece *)
12 Universal Cable Knife Medium size 1 piece *)
13 Drill Bits 3 mm s/d 10 mm 1 set *)14 Hole Saw or Steps Drill 20 mm s/d 24 mm 1 set *)
15 Flat file 3 x 150 mm 1 piece *)
16 Round file 3 x 150 mm 1 piece *)
17 Meter Roll 3 meter 1 piece *)
18 Electric Hand Drill MachineDrill chuck 10mm, 0-2500 rpm,350W, 220 V 50 Hz.
1 unit *)
19 Heater gun 220V/50Hz/1800 Watt 1 unit *)
20 Cordless DrillRechargeable Battery 9,6 V,1,5 AH,400-10.000 rpm
1 unit *)
21 Tool Box Standard 1 unit *)22 Work Table Wood Table (LWH) 100x70x80 cm 1 unit
23 Chair Standard 1 piece
24 Basket 40 x 40 x 60 cm 1 piece
25 Step Leader H 150 cm 1 unit
26 Metal Bending PipeStand Bending Pipe for Metalconduit 20 mm
1 unit
27PPE (personal protectiveequipment)
Standard1 set
*)
Note : *) Must be brought by the competitors
8/13/2019 Instruksi Peserta LKS 2013
8/14
NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
LKS TK. NASIONAL XXI 2013 JAKARTA 8
MODULE A MATERIAL LISTFor 1 Competitor
Trade : Electrical Installation
(Provided by the organizers)
1 PVC Conduit PVC Conduit 20mm x 4m,Clipsal
1 pieces
2 Metal Conduit Metal Conduit 20mm (EMTE19)
2 meters
3 Cable Clamp for NonArmored Cable
Accordance with therequirements
1 pack
5 PVC Pipe Clamp PVC half saddle 20 mm 20 pieces
6 Metal Pipe Clamp Metal half saddle 20 mm 10 pieces
7 Flexible PVC Conduit Flexible PVC Conduit 20 mm 2 meters
8 PVC Adaptor PVC adaptor 20 mm 8 pieces
9 Metal Adaptor Metal Adaptor 20 mm 4 pieces
10 Cable gland Cable gland PG 13,5 mm 2 pieces
11 3 Core Non Armored Cable NYM 3 x 1,5 mm2 5 meters12 4 Core Non Armored Cable NYM 3 x 1,5 mm2 3 meters
13 Electric Wire NYA (Red) 1,5 mm2 10 meters
14 Electric Wire NYA (Yellow) 1,5 mm2 10 meters
15 Electric Wire NYA (Black) 1,5 mm2 10 meters
16 Electric Wire NYA (Blue) 1,5 mm2 10 meters
17 Electric Wire NYA (Green-Yellow) 2,5 mm2 5 meters
No. Materials Specification Quantity Remark
8/13/2019 Instruksi Peserta LKS 2013
9/14
NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
LKS TK. NASIONAL XXI 2013 JAKARTA 9
MODULE B MATERIAL LISTFor 1 Competitor
Trade : Electrical Installation (Commercial Wiring)
(Provided by the organizers except those marked *)
No. Materials Specification Quantity Remark
1 Panel Box Dimension, 150 x 400 x 500 mm 1 unit
2 PVC ConduitPVC Conduit 20mm x 4m,Clipsal
1 pieces
3 PVC Cable DuctPVC Wiring Duct40X40x2900mm
1 pieces
4 Metal Conduit Metal Conduit 20mm (EMTE19)
2 meter Mandatory
5 Metal Cable TrayNewlec Medium duty Cable Tray100 mm
1,5 meter
6 Tray Support Brakets Newlec 90oTray Support Brakets 8 pieces
7 Adjustable BendNewlec Medium duty AdjustableBend 100 mm
1 pieces
8 Hexagon Set Srew and Nut Galvaizing Hexagon set srewand nut M5x20 mm
16 set
9 ELCB/RCCDELCB 3 phase 25 A IA=30mA,220-240V
1 pieces *)
10 Circuit Breaker MCB 1 phase 4 A 1 pieces *)
11 Circuit Breaker MCB 3 phase 16 A 1 pieces *)
12 Magnetic ContactorMC 3 Pole Main Contact + 2NO, 2 NC AC 230 V 50 Hz
2 pieces *)
13 Thermal Overload Relay TOR 0,5 25 A 2 pieces *)
14 Tree Phase Socket Outlet Shuko 5 pin 16A 3 N PE 1 pieces
153 Station Push buttom andBox
XALB334 XAL-B334 schneiderswitch (Forward Stop- Reverse) 1 pieces
16 Empty Control StationXAL BEmpty Control Station 1hole 22 mm
5 pieces
17 Pilot Light RedSet LED Pilot Light Head andBlock , Round; Size 22 mm; 230V 50 Hz (Red)
2 pieces
18 Pilot Light GreenSet LED Pilot Light Head, andBlock Round; Size 22 mm; 230
V 50 Hz(Green)
2 pieces
19 Pilot Light YellowSet LED Pilot Light Head, andBlock, Round; Size 22 mm; 230
1 pieces
8/13/2019 Instruksi Peserta LKS 2013
10/14
NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
LKS TK. NASIONAL XXI 2013 JAKARTA 10
V 50 Hz(Yellow)
20Emergency Stop buttomand Box
XAL B164 control station1 pieces
21 DIN Rell Omega Standard C Omega 1 meters
22 Electric Wire NYA (Red) 2,5mm2 6 meters
23 Electric Wire NYA (Yellow) 2,5mm2 6 meters
24 Electric Wire NYA (Black) 2,5mm2 6 meters
25 Electric Wire NYA (Blue) 2,5mm2 6 meters
26 Electric Wire NYA (Green-Yellow) 2,5mm2 6 meters
27 Electric Wire NYA (Red) 1,5mm2 15 meters
28 Electric Wire NYA (Blue) 1,5mm2 5 meters
293 core Flexible ElectricWire
NYMHY 3 x 1,5 mm2 12 meter
30Cable Clamp for 3 CoreNon Armored Cable
Standard 1 pack
31 PVC Pipe Clamp PVC half saddle 20 mm 12 pieces
32 PVC adaptor PVC adaptor 20 mm 4 pieces
33 Metal Pipe Clamp Metal Pipe Clamp 20 mm 6 pieces
34 Cable gland Cable gland PG 13,5 mm 12 pieces
35 Bold Screw inch & 1 Inch200
pieces
36 Cable Ties 2,5 mm x 100 mm 50 pieces
37 Square Junction BoxJunction box (LWD)120x120x80mm,
1 piece
38 Terminal Block Weidmuller WDU 2,5 Brown 30 pieces
Weidmuller WDU 2,5 Blue 10 pieces
Weidmuller WDU 2,5 Green -Yellow
10 pieces
Weidmuller End Plate 4 pieces
Weidmuller Stoper 4 pieces
39 Electric Motor 0,5 HP , 3 ~ 380/600 V 50 Hz,Electric Motor
1 pieces
40 Terminal Strip Legrand 12 mm2 1 pieces
8/13/2019 Instruksi Peserta LKS 2013
11/14
NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
LKS TK. NASIONAL XXI 2013 JAKARTA 11
Works Area Cabine
8/13/2019 Instruksi Peserta LKS 2013
12/14
NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
LKS TK. NASIONAL XXI 2013 JAKARTA 12
La
y-outWorkshopCompetitionArea17x30m
2
(for34competitors)
8/13/2019 Instruksi Peserta LKS 2013
13/14
NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
LKS TK. NASIONAL XXI 2013 JAKARTA 13
Module AProject specifications
You have the task to undertake an electrical installation on a property in aremote area of your country. This property has horses and so a gate is requiredat the main entrance. The only problem with a gate is that every time theowners want to enter or leave the property they need to get out of the car toopen and close the gate.They have requested you to design an installation so that once a motion
detector detects motion a solenoid opens the solenoid operated gate (this maybe represented by a light L1). As soon as the solenoid loses power the gateautomatically closes. The owners have also requested to include a drivewaylight (L2) and a light in the garage (L3).
Operation
Once motion has been detected the gate (L1), and lights L2 and L3 will
come on simultaneously.
After 10 sec the gate (L1) will close.
Driveway light L2 will remain on for another 10sec. This will give the driver
time to get to the house.
The light (L3) is to be switched off manually
The sub-switchboard is to be installed in the garage, the owner also require
a socket outlet to be installed in the garage for the use of portable plug-in
appliances in the garage.
The Installation is to be carried out using as a minimum all the equipmentlisted below:
2 m of metal conduit (including 2 90 degree manually formed bends)
2 m of PVC conduit (including 2 90 degree manually formed bends)
1 m of flexible conduit.
4 m of NYM Cable
1 Distribution Board / Panel box completed with safety protection devices
1 Switched metal socket outlet
8/13/2019 Instruksi Peserta LKS 2013
14/14
NATIONAL SKILL COMPETITION
(LKS) - XXI 2013
VOCATIONAL SENIOR SECONDARY SCHOOL
Module B
Project specifications on the drawings (3 pages)