DIREKTORAT JENDERAL MINYAK DAN GAS BUMI
Jakarta, 18 Maret 2011
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
PENGUMUMAN PEMENANG
LELANG PENAWARAN LANGSUNG
WILAYAH KERJA GAS METANA BATUBARA
TAHUN 2010
LELANG PENAWARAN LANGSUNG
WILAYAH KERJA MIGAS
TAHAP II TAHUN 2010
DAN
PENGAMBILAN DOKUMEN LELANG : 10 DESEMBER 2010 - 7 FEBRUARI 2011
PEMASUKAN DOKUMEN PARTISIPASI : 9 FEBRUARI 2011 PENGUMUMAN PEMENANG : 18 MARET 2011
TATA WAKTU LELANG PENAWARAN LANGSUNG TAHAP II TAHUN 2010
WILAYAH KERJA PENAWARAN LANGSUNG (DIRECT PROPOSAL)
Note :
1) FTP 20 % is shared for Government and Contractor based on split
BLOCK LOCATION FTP 1)
GOVERNMENT
TAKE (%)
CONTRACTOR TAKE
(%) MINIMUM
BONUS
US$
MNIMUM
KOMITMEN PASTI AFTER TAX AFTER TAX
OIL GAS OIL GAS
1 GURITA Kepri 20% 65 60 35 40 1,500,000 Seismik 3D
2 SEMBILANG Kepri 20%
75 65 25 35 1,000,000 Re-opening Well
3 MARQUISA Sumut 20%
75 60 25 40 1,000,000 Seismik + 1 Well
4 SOUTH BETUNG Jambi-Sumsel 20% 70 60 30 40 1,000,000 Seismik + 1 Well
5 SUMBAGSEL Sumsel
20%
75 60 25 40 1,000,000 Seismik + 1 Well
6 ARAFURA SEA II Maluku
20%
65 60 35 40 1,000,000
Seismik + 1 Well
(tahun ke-4)
7 INDRAGIRI HILIR Riau 20% 65 60 35 40 1,000,000
Seismik + 1 Well
TABEL T & C
NO BLOK PERUSAHAAN PEMBELI
DOKUMEN
PESERTA LELANG
1 GURITA 1 1
2 MARQUISA 1 1
3 SOUTH BETUNG 1 1
4 SUMBAGSEL 2 1
5 ARAFURA SEA II 3 TIDAK ADA
6 INDRAGIRI HILIR TIDAK ADA TIDAK ADA
7 SEMBILANG 1 1
JUMLAH 9 5
PEMBELIAN DOKUMEN LELANG & PESERTA LELANG
SOP EVALUASI DOKUMEN
EVALUASI ADMINISTRASI (Lengkap/ Tidak Lengkap)
• interpretasi data harus memenuhi kaidah keteknikan • Identifikasi lead/prospect berdasarkan data yang mendukung
• Komitmen sumur dan seismik harus didukung oleh hasil identifikasi prospect/lead serta resources
• Strategi eksplorasi yang efektif dan beralasan (kesesuaian antara rencana kerja, target serta biaya)
• Usulan Komitmen yang tidak rasional dianggap tidak valid
EVALUASI KEUANGAN (Memenuhi/Tidak memenuhi)
• Kemampuan keuangan untuk mendukung rencana kerja komitmen pasti 3 tahun pertama masa eksplorasi / 2 tahun pertama produksi
EVALUASI KINERJA: • Track Record perusahaan
EVALUASI TEKNIS (Memenuhi/Tidak memenuhi)
• Kelengkapan Dokumen sesuai persyaratan
PEMENANG LELANG
Komitmen Eksplorasi
3 Tahun Pertama Volume US$
G&G 500.000
Seismik 2D
Sesimik 3D 400 km2 4.600.000
Sumur
Total 5.100.000
NAMA BLOK PEMENANG LELANG
1. GURITA NATUNA VENTURES B.V
Signature Bonus : US$ 1.500.000
PEMENANG LELANG
Komitmen
Eksplorasi
3 Tahun Pertama Volume US$
G&G 500.000
Seismik 2D 200 km 2.000.000
Sesimik 3D
Sumur 1 sumur 3.000.000
Total Komitmen 5.500.000
NAMA BLOK PEMENANG LELANG
2. MARQUISA PT SCHINTAR
Signature Bonus : US$ 1.000.000
PEMENANG LELANG
Komitmen
Eksplorasi
3 Tahun Pertama Volume US$
G&G 600.000
Seismik 2D 200 km 2.000.000
Sesimik 3D
Sumur 1 sumur 3.500.000
Total Komitmen 6.100.000
NAMA BLOK PEMENANG LELANG
3. SOUTH
BETUNG
TECHWIN
ENERGY LTD
Signature Bonus : US$ 1.000.000
PEMENANG LELANG
Komitmen Eksplorasi
3 Tahun Pertama Volume US$
G&G 300.000
Seismik 2D 1000 km 3.500.000
Sesimik 3D
Sumur 1 sumur 2.100.000
Total Komitmen 5.900.000
NAMA BLOK PEMENANG LELANG
4. SUMBAGSEL COOPER ENERGY
LTD
Signature Bonus : US$ 1.000.000
PEMENANG LELANG
NAMA BLOK PEMENANG LELANG
5. SEMBILANG PT MANDIRI
PANCA USAHA
Signature Bonus : US$ 1.100.000
Komitmen
Volume US$
G&G 700.000
Surface Facility Study 200.000
Detail Design Surface
Facility 300.000
Re-Activation Wells 4 sumur 2.600.000
Total
Komitmen Pasti
3.800.000
Signature Bonus : US$ 1.100.000
Komitmen Volume US$
Sign Bonus 4.500.000
G&G 1.900.000
Seismik 2D 1400 km 7.500.000
Sesimik 3D 400 km2 4.600.000
Sumur 3 sumur 8.600.000
Total Komitmen Pasti
3 tahun pertama 22.600.000
A. KOMITMEN PASTI 4 BLOK ( Gurita, Marquisa, Sumbagsel dan South Betung)
Komitmen Volume US$
Sign Bonus 1.100.000
G&G 700.000
Surface Facility Study 200.000
Detail Design Surface Facility 300.000
Re -activation wells 4 sumur 2.600.000
Total Komitmen Pasti
2 tahun pertama 3.800.000
B.KOMITMEN PASTI Blok Sembilang
Bonus (US$)
Total Komitmen (US$)
5.600.000 26.400.000
TOTAL SELURUH KOMITMEN
PAPARAN LELANG PENAWARAN LANGSUNG WILAYAH KERJA GAS METANA BATUBARA TAHUN 2010
PENGUMUMAN PEMENANG LELANG PENAWARAN LANGSUNG
WILAYAH KERJA GAS METANA BATUBARA TAHUN 2010 - 2011
No
WORKING AREA
Contract
Model
TERMS AND CONDITIONS
Offering
Mechanism Blocks Size
(Km2)
Relinquishment
DMO**
* (%)
Government Take (%) Contractor
take (%)
Cost
Recovery****
Minimum Firm
Commitment
Minimum
Signature
Bonuss
(US$)
First
3 Year
(%)
Remaining
Area
6 Year*
(%)
FTP**
(%)
After Tax
Gas After Tax
Gas
1. GMB Sijunjung 1,305 PSC 15 70 25 10 55 45 100% G&G Study 2 corehole, 2
exploration well
1,000,000 Direct Proposal
Tender
2. GMB Kutai Timur 1,496 PSC 15 70 25 10 60 40 100% G&G Study 2 corehole, 2
exploration well
2,000,000 Direct Proposal Tender
3. GMB Kutai Barat 1,699 PSC 20 60 25 10 60 40 100% G&G Study 2 corehole, 2
exploration well
2,000,000 Direct Proposal Tender
4. GMB Kapuas I 1,102 PSC 10 80 25 10 55 40 100% G&G Studi, 3 Corehole, 1
exploration well
1,000,000 Direct Proposal
Tender
5. GMB Kapuas II 1,108 PSC 10 80 25 10 55 45 100% G&G Studi, 3 Corehole, 1
exploration well
1,000,000 Direct Proposal Tender
6. GMB Kapuas III 977.7 PSC 10 80 25 10 55 45 100% G&G Studi, 2 Corehole, 1
exploration well
1,000,000 Direct Proposal Tender
Information :
* If the area of CBM found more than 80% from the total of the Original Working Area, then size of the remaining Working Area can be maintained up to 90%
If the area of CBM found more than 70% from the total of the Original Working Area, then size of the remaining Working Area can be maintained up to 85%
If the area of CBM found more than 60% from the total of the Original Working Area, then size of the remaining Working Area can be maintained up to 80%
** FTP 10% for Government and undivided with Contractor
*** DMO since commercial production with domestic market prices
****Cost Recovery 100% from Annual Gross Revenue
Generally applicable provisions in the Production Sharing Contract which will be applied to the Work Area :
•Contract Period of 30 Years
•Contractor are required to pay a signature bonus, production bonus and the bonus support equipment / services to the Government
and the payment can not be charged as operating costs in the PSC.
•Contractor are required to offer the 10% Participating Interest since POD I is approved by the Government to the Local Government Owned Company (LGOC)
or private companies if LGOC are not interested.
TERMS AND CONDITIONS PENAWARAN LANGSUNG WK GMB TAHUN 2010-2011
TATA WAKTU LELANG PENAWARAN LANGSUNG WILAYAH KERJA GAS METANA BATUBARA TAHUN 2010-2011
• AKSES BID DOCUMEN : 10 JANUARI,2011 - 23 FEBRUARI 011
• FORUM KLARIFIKASI : 14 PEBRUARI 2011 – 22 FEBRUARI 2011
• PEMASUKAN DOCUMEN PARTISIPASI : 24 PEBRUARI 2011, PUKUL : 09.30– 14.30 WIB
• EVALUASI DAN PENILAIAN : 3 - 11 MARET 2011
• PENGUMUMAN PEMENANG : 18 MARET 2011
PESERTA LELANG PENAWARAN LANGSUNG WK GMB TAHUN 2010-2011
No NAMA BLOK
PERUSAHAAN
PELAKSANA STUDI
BERSAMA
AKSES BID DOCUMEN MENYERAHKAN DOKUMEN
PARTISIPASI
1 GMB Kapuas I
PT TransAsia Resources 1. BP Exploration Indonesia
Ltd.
1. Konsorsium PT. TransAsia Resources –
BP Exploration Indonesia Ltd.
2. PT. TransAsia Resources
2 GMB Kapuas II
PT TransAsia Resources 1. BP Exploration Indonesia
Ltd.
1. Konsorsium PT. TransAsia Resources –
BP Exploration Indonesia Ltd.
2. PT. TransAsia Resources
3 GMB Kapuas III
PT TransAsia Resources 1. BP Exploration Indonesia
Ltd.
1. Konsorsium PT. TransAsia Resources –
BP Exploration Indonesia Ltd.
2. PT. TransAsia Resources
4
GMB Kutai Timur
Konsorsium Ephindo
Ilthabi CBM Holding Inc.-
Total E&P Indonesie 1. Total E&P Indonesie
1. Konsorsium Senyiur CBM Inc. –
Total E&P Kutai Timur
2. Ephindo Ilthabi CBM Holding
Inc.
GMB Kutai Barat
Konsorsium PT. Sugico
Graha - Exxon Mobile 1. PT. Sugico Graha 1. PT. Sugico Graha
5 2. Total E&P Indonesie
GMB Sijunjung
Konsorsium PT. Lion
Global Energi - PT. Bukit
Asam (Persero) Tbk.
1. PT. Lion Global Energi 1. Konsorsium PT. Lion Global Energi –
PT. Bukit Asam (Persero) Tbk. 6
2. PT. Bukit Asam (Persero)
Tbk.
KRITERIA PENILAIAN
• Kriteria penilaian oleh Tim adalah sebagai berikut :
– Pembukaan dokumen partisipasi dan evaluasi kelengkapan administrasi
– Evaluasi dan penilaian dokumen teknis
– Evaluasi dan penilaian dokumen keuangan 3 (tiga) tahun terakhir dan
– Evaluasi dan penilaian kinerja.
– Klarifikasi kepada peserta lelang terhadap Dokumen Lelang yang masuk.
– Pemeringkatan calon pemenang lelang
• Ke-6 peserta lelang memenuhi syarat kelengkapan administrasi dan layak untuk dinilai oleh Tim Penilai Wilayah Kerja GMB.
• Hasil evaluasi dan penilaian teknis terhadap ke-6 peserta lelang memenuhi minimum komitmen yang ditetapkan dalam Bid Dokumen
• Hasil evaluasi penilaian finansial ke-6 peserta lelang memenuhi karena memiliki kemampuan finansial untuk melaksanakan komitmen dan penawaran bonus tandatangan memenuhi minimum bonus tandatangan pada Bid Dokumen
• Hasil evaluasi dan penilaian kinerja terhadap ke-6 perusahaan/konsorsium peserta lelang bernilai baik karena umunya memiliki pengalaman dan reputasi yang baik di industri migas maupun non migas.
PEMENANG LELANG PENAWARAN LANGSUNG
WK GMB TAHUN 2010-2011
Firm Commitment
Konsorsium PT. TransAsia
Resources – BP Exploration
Indonesia Ltd.
Aktivitas Budget
G & G US$ 600,000
Corehole 3 US$ 3,000,000
Sumur Eksplorasi 1 US$ 1,250,000
Total US$ 4.850,000
Bonus-Bonus Tanda Tangan US$ 1,100,000
Equipment & Services US$ 100,000
Bonus Produksi :
250 BCF US$ 500,000
500 BCF US$ 750,000
1000 BCF US$ 1,000,000
1. BLOK GMB KAPUAS I (Kalteng)
PEMENANG
Firm Commitment
Konsorsium PT. TransAsia
Resources – BP Exploration
Indonesia Ltd.
Aktivitas Budget
G & G US$ 600,000
Corehole 3 US$ 3,000,000
Sumur Eksplorasi 1 US$ 1,250,000
Total US$ 4.850,000
Bonus-Bonus Tanda Tangan US$ 1,100,000
Equipment & Services US$ 100,000
Bonus Produksi :
250 BCF US$ 500,000
500 BCF US$ 750,000
1000 BCF US$ 1,000,000
2. BLOK GMB KAPUAS II (Kalteng)
3. BLOK GMB KAPUAS III (Kalteng)
Firm Commitment
Konsorsium PT. TransAsia
Resources – BP Exploration
Indonesia Ltd.
Aktivitas Budget
G & G US$ 600,000
Corehole 2 US$ 2,000,000
Sumur Eksplorasi 1 US$ 1,250,000
Total US$ 3.850,000
Bonus-Bonus Tanda Tangan US$ 1,100,000
Equipment & Services US$ 100,000
Bonus Produksi :
250 BCF US$ 500,000
500 BCF US$ 750,000
1000 BCF US$ 1,000,000
PEMENANG
4. BLOK GMB KUTAI TIMUR (Kaltim)
Firm Commitment
Konsorsium Senyiur CBM Inc.
– Total E&P Kutai Timur
Aktivitas Budget
G & G US$ 300,000
Corehole 2 US$ 1,400,000
Sumur Eksplorasi 2 US$ 2,600,000
Total US$ 4.300,000
Bonus-Bonus
Tanda Tangan US$ 2,000,000
Equipment & Services US$ 25,000
Bonus Produksi :
250 BCF US$ 500,000
500 BCF US$ 750,000
1000 BCF US$ 1,000,000
PEMENANG
5. BLOK GMB KUTAI BARAT (Kaltim)
Firm Commitment
PT. Sugico Graha
Aktivitas Budget
G & G US$ 600,000
Corehole 3 US$ 2,250,000
Sumur Eksplorasi 3 US$ 3,900,000
Total US$ 6.750,000
Bonus-Bonus Tanda Tangan US$ 2,000,000
Equipment & Services US$ 100,000
Bonus Produksi :
250 BCF US$ 500,000
500 BCF US$ 750,000
1000 BCF US$ 1,000,000
PEMENANG
6. BLOK GMB SIJUNJUNG (Sumbar)
Firm Commitment
Konsorsium PT. Lion Gobal
Energi – PT. Bukit Asam
(Persero) Tbk.
Aktivitas Budget
G & G US$ 600,000
Corehole 2 US$ 1,400,000
Sumur Eksplorasi 2 US$ 3,000,000
Total US$ 5.000,000
Bonus-Bonus Tanda Tangan US$ 1,000,000
Equipment & Services US$ 100,000
Bonus Produksi :
250 BCF US$ 500,000
500 BCF US$ 750,000
1000 BCF US$ 1,000,000
PEMENANG
PERKIRAAN INVESTASI DAN BONUS-BONUS HASIL LELANG PENAWARAN LANGSUNG WK GMB
Firm Commitment Total Komitmen Pasti dan
bonus-bonus Aktivitas Budget
G & G US$ 3,300,000
Corehole 15 US$ 13,050,000
Sumur Eksplorasi 10 US$ 13,250,000
Total Firm Commitment US$ 29,600,000
Bonus-Bonus
Tanda Tangan US$ 8,300,000
Equipment & Services US$ 525,000
Bonus Produksi :
250 BCF US$ 3,000,000
500 BCF US$ 4,500,000
1000 BCF US$ 6,000,000