2/15
Project Description1,060 foot span cast in place concrete segmental twin
arch bridge with precast segmental columns
8/18/2019 PTI 2010 HooverDamBypassBridge
3/15
SDI’s Scope of Work Fabricate, furnish and install post-tensioned rock
anchors in the arch skew backs
8/18/2019 PTI 2010 HooverDamBypassBridge
4/15
SDI’s Scope of Work Fabricate, furnish and install post-tensioned rock
anchors in the stay anchor blocks
8/18/2019 PTI 2010 HooverDamBypassBridge
5/15
SDI’s Scope of Work Furnish post-tensioning materials, equipment and
technical assistance for precast columns, temporarytowers and bent caps
8/18/2019 PTI 2010 HooverDamBypassBridge
6/15
SDI’s Scope of Work Furnish temporary stay cable system and provided
technical assistance and inspection services
8/18/2019 PTI 2010 HooverDamBypassBridge
7/15
Contract Stay Cable Layout
• Backstay Cable Geometry
•
Access for installation & Stressing
8/18/2019 PTI 2010 HooverDamBypassBridge
8/15
Revised Stay Cable Layout
• Removed Lower Cables
• Brought all Cables to tower top
• Re-routed Backstay Cables• Lowered Forestay Connection
8/18/2019 PTI 2010 HooverDamBypassBridge
9/15
Stay Cable Design Considerations
•
More critical in many ways than permanent stay cables– Permanent stay cables
• Long term Fatigue
• Corrosion
– Temporary stay cables• Large load variations (wedge bite)
• Angle change due to sag from load variation
• Temporary construction obstacles
• Constructability
8/18/2019 PTI 2010 HooverDamBypassBridge
10/15
Additional Testing
•
Strand fatigue and wedge testing– Cyclical loading with high angle change(2 Million cycles)
• Critical Anchorage Testing
•
Swaged anchor with adjustable ring nut• Post-Blocking equipment
• Strand Installation equipment
8/18/2019 PTI 2010 HooverDamBypassBridge
11/15
Load Transfer – Strand to Anchorage
•
Machined Anchor Heads / Wedge Design• Post-Blocking Device
8/18/2019 PTI 2010 HooverDamBypassBridge
12/15
Installation Challenges
8/18/2019 PTI 2010 HooverDamBypassBridge
13/15
Forestay – Lower Anchorage
8/18/2019 PTI 2010 HooverDamBypassBridge
14/15
Dampeners