8/22/2019 RETAM
1/136
Arm
(Pa
D/DGD&D/18/34/34
8/22/2019 RETAM
2/136
Copyright This work is Crown copyright and the intellectual property
rights for this publication belong exclusively to the Ministry ofDefence (MOD). No material or information contained in thispublication should be reproduced, stored in a retrievalsystem or transmitted in any form outside MODestablishments except as authorised by both the sponsorand the MOD where appropriate.
Security This document is issued for the information of such personswho need to know its contents in the course of their officialduties. Any person finding this document should hand it in toa British Forces unit or to a British Police Station for its safereturn to the MINISTRY OF DEFENCE, D MOD SY,LONDON SW1A 2HB, with particulars of how and where
found. THE UNAUTHORISED RETENTION ORDESTRUCTION OF THIS DOCUMENT COULD BE ANOFFENCE UNDER THE OFFICIAL SECRETS ACTS OF1911-1989.
Authority This publication is issued under the overall direction of theCGS. It is an MOD Approved Code of Practice (ACOP).Where issues of health and safety are concerned it takesinto account the provisions of the Health & Safety at WorkAct 1974.
Status The contents provide clear military information concerning
8/22/2019 RETAM
3/136
CONTENTS
Section
6.1 Operational Planning
6.2 Engineer Task Aide M
BridgingMinefield BreachingMinefield ConstructionDemolitions Field Fortifications Water Supply
6.3 Planning Times for Eng
INTRODUCTION
Aim. The aim of the RE insert to TAM is to provide anAide Memoire of essential engineer information for useat sub-unit level and below.
Scope. The insert is intended for use by officers and
NCOs in appointments ranging from squadron to sectioncommander and concentrates on operations at trooplevel.
Use. The insert is intended to be used in conjunctionwith Part 1 of the TAM. The information given isperforce condensed. The insert should not be used asa substitute for the volumes of Military Engineering listedin Part 2 that contain detailed information on militaryengineering subjects.
8/22/2019 RETAM
4/136
INTENTIONALLY BLANK
8/22/2019 RETAM
5/136
Operational Planning CheckSECTION 6.1 OPERATIONAL PLANNING
AND ORDERS
Orders must be brief, clearly delivered, unambiguousand relevant to the operation. Orders are intended totell subordinates what must be done within the givenconstraints and why (commanders intent), but not how itshould be done. Although commanders must think
through points of detail, these should not be included inorders if they are already known or are standardoperating procedures. Other general points on ordersand warning orders are in TAM Part 2, Section 2.
Format. The format for engineer orders is the same asthe generic Orders Format given in TAM Part 2, Pages2-3. Reference should be made to this section of theTAM for guidance on detail specific to the operation ofwar or transitional phase being conducted.
Missions. When formulating missions, maximum useshould be made of defined doctrinal terms to affordconsistency in approach and to avoid misunderstanding.
Use of Aide Memoire. While paragraph headings aremandatory, their detailed contents are not. There is norequirement to use all the headings in every box.
Conduct TimeAppreciation
Identify oRemembsufficien
available
Conduct MissionAnalysis
CommanSpecified(time, spChangedCheck.
Issue InitialWarning Order
Do not dorder. Abe filled for store
8/22/2019 RETAM
6/136
RelativeStrengths
Identify Engineercapability usingmodified productionrates
Summary ofpossible tasks
Comparison ofcapability identified in
Relative Strengthsand Tasks identifiedin Mission Analysis.Priortise tasks andidentify own MainEffort
ConductCombatEstimate
CommandersDecision
Engineer plan whichbest supports highercommanders intent
Update InitialWarningOrder
Conduct
Recce
In addition to engineer data, also liaise
with local Combined Arms commanderreference C2 arrangements and G4support, protection and CSMs
Write Orders Incorporate
Deliver Orders
Orders.
1. Preliminaries.
Security ofOrders Group
Location; Sen
Administr-ation
Introduction oseating plan (Model and orfolds/traces/m
Weather Time of Fi rst/State; Visibilit
TaskOrganization
Ensure C2 arfor subordina
Ground
Orientation
Should alway
possible/prac
8/22/2019 RETAM
7/136
3. Mission. Own mission of BG Comds/COs/OC
4. Execution.
a. Concept of Operat(the overall effect
of Manoeuvre (hoMission) and Maisuccess of Misstimings.
b. Mission Statemenin turn to include; and Why.
c. Co-ordinating Instrtable below, refereTactical Check No
OffensivDefensiv
2. Situation.
En Forces Friendly Forces Atts/Dets
Deductions fromenemy and groundin the estimateprocess:
StrengthsLocationsWeaponsEquipmentMoraleObstaclesDFsAir ThreatNBCFuture Intentions
2 Up CommandersIntent
1 Up Comds
Mission and Conceptof Ops (Include Intentand Main Effort)Locations and futureactions ofneighbouring forceswhich may affectoperation
Outline Fire SupportPlanAir
Only if notcoveredunderTask Org
8/22/2019 RETAM
8/136
d. Summary of Execu
Delaying Ops 3-3-1Transitional Ops 3-4-1Obstacle Crossing 3-5-1
Timings Con Measures NBC
Recce NMBNMB less recceFirst veh on siteH HrTask Complete
FEBABdrysRVsAD WCS
Threat LevelDress CatWarning/ReportingDetectionContaminationControl
Deception/
Surprise/Security
Mov Actions On
CSMsTrack PlanSTAPNTMTrenches stage
SP & Rel PtRoutesSpeedGuides/hide/recce partiesOOM
HidesEmergency RV
En recceAir/GroundattackNBC attackPWCivs
VehicleCasualty
Engineer Construction DetailEngineer Operation Recce anInstructions Aide Memoire.
Mob
Operations
BridgingMinefieldBreaching
CMobOperations
MinefieldConstructionDemolitions
SurvOperations
FieldFortificationsWater Supp
8/22/2019 RETAM
9/136
5. Service Support.
SOPVariations
Log Sp Med Tpt and Rec
DressEquipmentWeapons
ReplenCSupsIPE
Engr stores
LocationsCASEVACMed Packs
Morphine
Rec PlanLocations:Echelon
Rec Veh
6. Command and Signal.
HQ Comms Codes Password
LocsMovAltn Comd
CEIChanges
CodewordsNicknamesNicknumbers
?Synchronise
watches
7. Questions.
8/22/2019 RETAM
10/136
INTENTIONALLY BLANK
8/22/2019 RETAM
11/136
Amphibious Bridging/Ferry
Sequence.
a. Preparation in harb
b. Move, liaison, searea.
c. Construction:
Call forward vehiclOrder of entry.Preparation of appFerries (also durinAnchorages.Reserves.Configurations.EOB.Defile marking.
d. Traff ic crossing.
e. Recovery and regr
SECTION 6.2 ENGINEER TASK AIDEMEMOIRES
BRIDGING
Deliberate Dry Bridging Operation.
Sequence.
a. RV, check bridge equipment, rehearsals.
b. Move, secure site and marshalling areas.
c. Crossing construction:
Site layout and preparation.Call forward vehicles.Bridge construction.Approaches and exits.Lay trackway.Defile marking.Vehicle recovery.
d. Traffic bridge.
e. Handover/maintain/strip.
8/22/2019 RETAM
12/136
Co-ordinating Instructions.Reconnaissance.
Dry Bridging BR 90 Bridges.
Timings
Move fromassembly areaMove from
marshallingareaRecce on siteConstructionstartsCrossing open
Moves/Ro
To marshaareaTo site
OOMConvoy DrCritical Poi
Areas for
MarshallingCushioningWaitingTp Harbour
Safety
Safety boatsConstructionsafetyUser safety
Ser Essential information(a) (b)
1 All sites should have straight approaches and
exits to avoid vehicles slewing2 Bankseats: Minimum CBR 8%. Maximum
cross slope to be within 5%. This is equal to0.2m over the 4m width of the bridge
3 Maximum bank height di fference:CSB:GSB:
4 Completed AFW 4012A
5 Overhead clearance for CSB:
No 10 - 15m, No 11 17m, No 12 14.5m
6 Consider number and type of veh, vehrecovery, cushion and waiting areas,
trackway/hardcore
8/22/2019 RETAM
13/136
h. Tape tracing.i. Winders tape.j. Pickets 1.8m.k. Sledgehammer/picl. Mine markers.m. Pulling cables.n. Lightweight markino. Safe lane stores.p. Dannert wire.q. Visors.r. Explosive stores
MINEFIELD BREACHING
Sequence.
a Collect and check stores, rehearsals.b. Move, liaise with covering troops, secure site.c. Setting out and breaching parties deploy to
remove mines.d. Lane repair, defile marking.e. Disposal of mines, maintainance/handover,
redeployment.
Stores Check List.
a. Mine prodders.b. Mine detectors.c. Prismatic compass.d. Wire cutters.e. Pliers.
f. Safety pins/25mm nails.g. 150mm nails.
8/22/2019 RETAM
14/136
Co-ordinating Instructions.Reconnaissance. Determine:
Extent of minefield (front and rear edge)Types of mine and fuze and density.Number of rows/strips and approximatelocations.Trip wires and anti lift devices.
Ground conditions and other obstacles.Enemy positions.Number of lanes required.Vehicles/personnel using lanes.Silent/noisy breach.Day or night operation.
Timings
Recce on siteMove fromassembly areaOn siteBreaching
startsBreach open
Moves/Rou
OOMFor recceTo siteApproachinbreach
Convoy drilCritical poin
Control/Safety
Orders to pullEntry and exitto minefieldMines dumpDangerousdevices
Areas
Waiting areStores areaMines dum
8/22/2019 RETAM
15/136
g. Signs for mine rowh. Lights for mine rowi. Beta lights.
j. Perimeter markingk. Prismatic compassl. AFW 4017.m. Lane closure store
n. Tracing tape.
MINEFIELD CONSTRUCTION
Sequence.
a. Collect and check stores/rehearsals.b. Move, secure site, set up, mines dump.c. Setting out, loading mines (loading plan).
d. Minelaying and fence construction:Mine outloading and resupply.Mechanical laying (direction of lay, gaps andlanes, routes, end of row procedure).
e. Route closure.f. Redeployment.
Stores Check List.
a. Mine laying system.b. Mines with fuzes.c. 1.8m pickets.
d. 0.6m pickets.e. Sledgehammers.f. Picket drivers.
8/22/2019 RETAM
16/136
Co-ordinating Instructions.Reconnaissance. Prepare a sketch map showing:
a. The ground including tracks, trees,ditches and other physical details.
b. The exact location of proposed:
Mine rows with direction of lay.Landmarks.Perimeter fence.Minefield lanes.Construction routes.Mine dump and resupply routes.Control point and RV.
c. Scale of sketch map.
d. North.
e. Direction of enemy approach.
Timings
Move toassemblyareaMCP openSetting out
startsConstructionstarts
Moves/Rou
OOM to mindumpConstructonroutesConvoy drills
Critical pointGuides andmarking
Plant
Tasks andcontrol point
Control
At mines duAt MCPAFW 4017 (tally)Lane closure
8/22/2019 RETAM
17/136
Briefing for Reconnaissance
a. Location and type ob. Aim of the demolitioc. Preliminary or reserd. Time to be at State e. Restrictions on reso
f. When and where AF
DEMOLITIONS
Sequence.
a. Move to, and secure, site.b. Prepare charges and ringmains.c. Site/construct firing points.d. Prepare priority two tasks as required.e. Fire/handover demolition.
Command and Control.
a. Any formation commander may reserve ademolition providing their superiorcommander has not ordered it to be fired.
b. AFW 9811 must be completed for all reservedemolitions (normally by formation staff) andmay be prepared for preliminary demolitions(normally by engineer staff).
c. Changes of authorised commander areordered via Box 8g and recorded in Box 12.
8/22/2019 RETAM
18/136
Co-ordinating Instructions.Reconnaissance. All Targets
Determine method of attack.Take detailed measurements at charge locationto enable the calculation of charges.Design firing circuits.Select firing point, stores area, harbour area and
control point.Consider protection of own troops fromblast/fragmentation and any secondary hazardreleased as a result of the demolition.Prepare the AFW 4012.
Reconnaissance. Bridges
Categorise the bridge.Take recce measurementsSelect method of attack.Identify line of cut/s
Take detailed measurements at cut/s locations.
Timings
Move toassembly areaRecce on siteTask startsTask complete
Moves/Ro
OOMRoute to sCritical po
Control
AF W9811AuthorisedCommanderDemolitionGuardReporting State1 to State 2
Safety
ExplosivesWorking aheightWorking owaterSecondaryhazardsSafety disWarning o
8/22/2019 RETAM
19/136
Reconnaissance and Planni
a. Liaise with user unType and number Schematic layout aPriority of work.Stage to which con
Counter-surveillanTrack plan during cSpoil plan.Deception.Timings.
b. Plant and stores re
c. Plan and orders.
d. Description.Type of fortification
Extent of work.Sections and plant
FIELD FORTIFICATIONS
Sequence.
a. Collect and check plant and stores.
b. Move, secure site, set out.
c. Construction:
Cfm arcs of fire/obs.Remove turf.Excavate, dispose of surplus in accordancewith spoil plan.Revetment and OHP.Camouflage.Further development as ordered.
d. Handover, redeploy.
8/22/2019 RETAM
20/136
Co-ordinating Instructions.
Timings
No movebeforeCollect storesArrival on site
Completion
Plant
TypeAllocationControl on site
Priority
ExcavationRevetmentShelterconstruction
OHPCamouflage
Safety
Working withplant
ConstructionDetails
Marking systemAlignmentArcs of fire/obsDimensionsOHPCamouflage
Recovery
Site stripPlant availabilityEqptrecovery/reload
8/22/2019 RETAM
21/136
Reconnaissance and Planning.WATER SUPPLY
Sequence.
a. Collect and check plant and stores.b. Move, secure site, set out.c. Construction:
Set up WPU and storage tanks.Set up sedimentation tank.Pump water to all tanks.Construct tower.Construct distribution point.Erect signs.Construct fence.Camouflage.Send sit reps as required.Confirm quantity/quality and issue timings.Site development and maintenance.Neutralisation of sterilised water and disposal.
Recovery and site restoration.Redeployment.
Subject Prior to recce
(a) (b)
Situation Enemy update
Locat ion Map recce for:Likely sourcesWaiting areasHarbour areasRoutes
Limitations ManpowerEquipmentTime
8/22/2019 RETAM
22/136
Co-ordinating Instructions.(a) (b) (c)
Quantity Quantity/ Type of waterOutput/Issuesrequired
Quality/yield of source
Time Duration of
operation
Timings for:
ConstructionRunningIssue periodsBattle procedure
Layout N/A Siting of pumps, tanks,tower, fencing,signs, trackway,distribution points,guides, control point
Recom-mendations
N/A Confirm bids for stores,plant, transport,chemicals, fuel,recovery, assistance
from other arms.
Timings
No movebeforeCollect storesOrdersArrival on
siteOpeningtimesDuration ofoperation
Rehearsals
EquipmentfamiliarizationConstructiondetailsEquipment
layout
Safety
Use ofchemicalsTowerconstruction
Water qualityMode ofoperationRequiredstandardDisposal ofcalciumhypochlorite
Testing regime
8/22/2019 RETAM
23/136
SECTION 6.3 PLANNING TIMES FORENGINEER TASKS
Ser Activity Description Unit Rate/t
(a) (b) (c) (d) (e)
Basic Engineering
1 Digging by Digging fd def in normal ground with occasional per man 0.3 m3/h
hand roots and stones. Spoil placed alongside excavation. Depth of excavation not exceeding
1.5 m
Planning Times. The table below is a guide to the timesrequired for various activities. It assumes that units are atfull establishment and that troops are experienced, restedand working in NBC Dress Category Zero by day. Thefollowing factors should be applied in other conditions:
a. Working in NBC Cat Two in warm weather (suitworn with overboots) multiply time by a factor of1.4.
b. Working at night mult
c. In the case of tiredmultiply the time by a
8/22/2019 RETAM
24/136
(a) (b) (c) (d) (e)
2 Fill ing Fil ling sandbags wi th dumped loose f il l. One man per man 20 bags/sandbags filling, two men holding bag and tying
3 Defile marking Marking a minefield safe lane with danart corners, one sect 400m of
pickets at 15 m spacing, cross tapes, and markers lane/hr at 30 m spacing
Marking a X-country route with pickets at 30m one sect 750m of spacing plus markers and beta lights defile/hr
Minefield perimeter marking using lightweight half sect 1000m/hmarking set
4 Wire obstacles Construct a Type 2 catwire fence one sect 55m/hr
Construct simplified Type 4 fence one sect 75 m/hr
8/22/2019 RETAM
25/136
(a) (b) (c) (d) (e)
Mobility Support
5 AVRE (1) Single fascine (3-4 m span) AVRE Up to 5(2) Double fascine (5-7 m span) AVRE Up to 5
6 AVLB/No 10, (1) Launch No 10 br (effective span 20.5 m & 24.5 m) AVLB 5 minsand 12 brs (2) Launch No 12 br (effective span 12 m) AVLB 5 mins
(3) Combination - to follow(4) Over br - to follow
7 MGB Build 12 Bay DS MGB. one tp 1 hr 30
8/22/2019 RETAM
26/136
(a) (b) (c) (d) (e)
8 Br90 GSB Build 32 m GSB 10 man team 40 mins
9 EWBB Build 30m Double Single EWBB, incl setting out one tp 7 hrs
10 MGOB Build 5 bay MGOB. Time includes placing packing one sect 20 mins
11a M3 Construct 100m M3 floating br one amph tp 30 min
b M3 Construct a 4 rig ferry one amph sect 10 min
12 Floating APB Construct and launch one APB raft two sects 1 hr 10
8/22/2019 RETAM
27/136
(a) (b) (c) (d) (e)
13 Mine Breaching Hand breach own minefield 800m deep one tp 8 hrs
Hand breach a safe lane 120m by 8m one tp 7.5 hrs
Breach a 360m safe lane with two Python and one AVRE 25 minplough
Plough breach 4m wide lane AVRE Up to(plough only) 100 m
per min
8/22/2019 RETAM
28/136
(a) (b) (c) (d) (e)
Counter Mobility Support
14 Pattern Lay 1 km, 3 row light minefield one tp 4 hrsMinelaying
Lay 1 km, 5 row medium minefield one tp 5.5 hrs
Lay 1 km, 7 row heavy minefield one tp 7.5 hrs
15 Abatis Deny an area of woodland 500m by 200m two tps 4.5 hrs
8/22/2019 RETAM
29/136
(a) (b) (c) (d) (e)
16 Br Dml Destroy major RC continuous span br as a one tp 2.5 hrprelim dml
Prep a major RC continuous span br as a res dml one tp 6.5 hr
Destroy a minor masonry arch br as a prelim dml one sect 3.5 hrs
17 Route Denial Close road using 2 angled rows of 3 craters, one sect 1 hr 40 mmining the upheave
18 Combat Construct Atk ditch 3.5m wide 1.5m deep in 2 x MWT or 40m perDigging normal ground 2 x CET or
combination
Side hill cut slope to vertical face of 1.5 m one MWT 35m per
8/22/2019 RETAM
30/136
(a) (b) (c) (d) (e)
Fortifications
19 Weapon Pits Dig a Type C weapon pit for a MBT one MWT/ 50 minCET
Dig a weapon pit for one AS 90 How. one MWT/ 1 hr 15 mExcluding shelter trenches for crews CET
Dig a weapon pit for FH 70 towed How including one MWT 1 hr 10 mammo bay and shelter trenches and one LWT
Dig pit for 81 mm Mor baseplate one LWT 40 mins
20 MEXE Excavate for single MEXE shelter one LWT 1 hr
8/22/2019 RETAM
31/136
(a) (b) (c) (d) (e)
21 Trenches Excavate for 4 man trench one LWT 20 mins
8/22/2019 RETAM
32/136
INTENTIONALLY BLANK
8/22/2019 RETAM
33/136
Arm(Pa
D/DGD&D/18/34/34
8/22/2019 RETAM
34/136
Copyright This work is Crown copyright and the intellectual propertyrights for this publication belong exclusively to the Ministry of
Defence (MOD). No material or information contained in thispublication should be reproduced, stored in a retrievalsystem or transmitted in any form outside MODestablishments except as authorised by both the sponsorand the MOD where appropriate.
Security This document is issued for the information of such personswho need to know its contents in the course of their officialduties. Any person finding this document should hand it in toa British Forces unit or to a British Police Station for its safereturn to the MINISTRY OF DEFENCE, D MOD SY,LONDON SW1A 2HB, with particulars of how and wherefound. THE UNAUTHORISED RETENTION OR
DESTRUCTION OF THIS DOCUMENT COULD BE ANOFFENCE UNDER THE OFFICIAL SECRETS ACTS OF1911-1989.
Authority This publication is issued under the overall direction of theCGS. It is an MOD Approved Code of Practice (ACOP).Where issues of health and safety are concerned it takesinto account the provisions of the Health & Safety at WorkAct 1974.
Status The contents provide clear military information concerning
8/22/2019 RETAM
35/136
INTRODUCTION
1. Aim. The aim of the RE insert to TAM is toprovide an aide memoire of essential engineerinformation for use at sub-unit level and below.
2. Scope. The insert is intended for use by officersand NCOs in appointments ranging from squadron
to section commander and concentrates onoperations at troop level.
3. Use. The insert is intended to be used inconjunction with Part 2 of the TAM. Theinformation given is perforce condensed. Theinsert should not be used as a substitute for thevolumes of Military Engineering listed in Part 2which contain detailed information on militaryengineering subjects.
Military Engineering Volume,
Volume IIPam 1
- Part 1- Part 2
Pam 2Pam 3Pam 4
Pam 5Pam 6
Pam 7Pam 7APam 7BPam 9Pam 20
Field EngineeBasic Field EnMaterials & TTools & SkillsField FortificaObstacles 1984Demolitions 19
Minelaying 19Breaching MinExplosive ObsGap Crossing Basic BridgingClassification Water Supply All Arms Guid
Volume III- Part I- Part III- Part V
- Part VI
BridgingBasic BridgingMedium GirdeExtra Wide BaUses 1955Extra Wide BaConstruction 1
8/22/2019 RETAM
36/136
INTENTIONALLY BLANK
8/22/2019 RETAM
37/136
Section
Demolition StoresDemolition TargetsOperational Safety DistaDemolition Tasks, Time
3. SURVIVABILITY SUPP
Summary of Protection iField Fortifications TechWater Supply
4. GENERAL ENGINEER
Vehicle CharacteristicsMeasurement and MateImprovised MeasuremenCordage and AnchorageBasic Structures
Section Page
1. MOBILITY SUPPORT
Route Reconnaissance 6-1-1Close Support Bridging 6-1-9General Support Bridging BR 90 6-1-13General Support Bridging MGB 6-1-17
General Support Bridging APB 6-1-19and OverbridgingGeneral Support Bridging Wet/ 6-1-21Floating Bridges and BoatsLogistic Bridging and ExpedientSurfacing 6-1-27Mine Counter Measures 6-1-29Defile and Minefield Lane Marking 6-1-31
2. COUNTER MOBILITY SUPPORT
British Mines and Minelaying Systems 6-2-1
Minefield Design, Reporting andRecording. 6-2-5
8/22/2019 RETAM
38/136
INTENTIONALLY BLANK
8/22/2019 RETAM
39/136
(3) Visibility from (4) Critical points(5) Temporary br(6) Locations of a(7) Essential repa
c. Technical Reconnamay be to:(1) Assess the ca(2) Determine the
bring it to a pa(3) Prepare a roa
2. Reports. Initial tacticare given in the format Reports and Returns, ftechnical report if necenormally consist of 2 par
a. The standard NATOParagraph 9.
b. Technical data for t
SECTION 1 MOBILITY SUPPORT
ROUTE RECONNAISSANCE
1. Purpose. The purpose of the reconnaissancemust be clear:
a. Tactical Reconnaissance. Tactical
reconnaissance may be limited to:
(1) Width (one way/2 way with difficulty,etc).
(2) Surface in terms of trafficabili ty havingregard to weather at the time.
(3) Load capacity (normally governed bybridge MLC).
b. However, the following additional informationmay be required:
(1) Location and extent of damage byenemy action.
(2) Location and probable extent of minedareas.
8/22/2019 RETAM
40/136
Example. B g s (f?) 3ma road with limiting factosurface, doubtful foundaacross shoulders, waterrock or coral, 6.2 km lon
6. Bridges. Data on bridgusing the symbols in Par
7. Obstructions. Obstradding '(Ob)' to the rorecorded using the sym12. The following obstruction:
a. Overhead clearanc
b. Reductions in roacapacity, e.g. crate
c. Gradients of 7 per
d. Curves with less the. Fords and ferries.
3. NATO System. The NATO system has 2 parts:route classification and road classification.
4. Route Classification. Route classification is theoverall classification of the route and consists of 4elements:
a. Minimum width of carriageway (metres).
b. Type: X = All weather.Y = Limited all weather.Z = Fair weather.
c. MLC of the route, def ined by its weakestpoint or section.
d. Restrictions, if any (normally height).
Example. 10.5/X/60/4 refers to an allweather, Cl 60 route, carriageway width 10.5m with a height restriction of 4m.
5. Road Classification. Each section of road is
classified using a 6-part formula. The elements ofthe formula are given in Paragraph 10.
8/22/2019 RETAM
41/136
Notes:
(i) Record the scale, and G(ii) Use the symbols in P
features in their correcnecessary. Other factsside of the location.
9. NATO Route Report.are made in the format oused for other technical
8. Route Restriction Overlay. Data should berecorded during the reconnaissance on an overlay(example below).
GR 567890
GR 123456
4m4m
6m
25
47
N
43
26
10-14%
6m
41
18
B BA
A
C
C
D
30
5m5m
4m
3.5m4.5m
10mMap Sheet:Chichester and the DownsSheet 197, 1:50 000
ROUTE RESTRICTION OVERLAYBLUE ROUTE
8/22/2019 RETAM
42/136
4. Weather(to include last
5. NATO Route Classificat
6. Road Formula
a. Section A ............
From GR .......... to
b. Section B .............
From GR .......... to
7. Shoulders (type andemergency) ..................
To. . . . . . . . . . . . . . . . . . .(HQ ordering reconnaissance)
From . . . . . . . . . . . . . . . . . . . . . . . . .(Rank, name, unit)
Maps . . . . . . . . . . . . . . . . . . . .(Country, scale, sheet no)
Date/Time Group . . . . . . . . . . . . . . . . . . . .(Of signature)
General Information.
1. Road:
a. From ......................... to ..........................
b. From ......................... to .........................etc.
2. Road marking................... (Civil or military).
3. Date/Time of reconnaissance..................
8/22/2019 RETAM
43/136
8. Obstructions:
9. Enclosures. Overlays, maps, sketches, calculations, works programme, job priority list, deta(These are as required).
Signature ........
Ser Particulars Grid ref Rd Sect Obstruction Existing Recommendations Manpower Transport PlantDetails MLC for upgrade
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j)
8/22/2019 RETAM
44/136
(a) (b) (c)
h Shoulders -
3 Width ?m/?
4 Construct ionmaterial
a Type X route 'k'b Type X route 'kb
c Type X route 'p'd Type X or Y 'rb
route
e Type Y route 'r'
f Type Y route 'l'
g Type Y or Z 'nb
route
10. Symbols for Road Classification Formula.
Ser Element of Symbol MeaningFormula
(a) (b) (c) (d)
1 Prefix A No limiting factorsB One or more limiting
factors
2 Limit ing factors:a Sharp curves 'c' Radius less than 25mb Steep gradients 'g' Gradients of 7 percent
or overc Poor drainage 'd' Inadequate or blocked
drainaged Weak foundations 'f' Unstable, loose or
easily displacede Rough surface 's' Likely to reduce convoy
speedf Excessive camber 'j' Likely to cause heavy
superelevation veh to skid or dragtowards roadside
g Doubtful conditions ? Indeterminate ordoubtful conditionsexpressed with ? and (),
e.g (f?)
8/22/2019 RETAM
45/136
11. Route Reconnaissance(a) (b) (c) (d)
h Type Z route 'n' Natural earth,stabilised soil, sand-clay, shell, cinders etc
i 'b' Bituminousconstruction. To beused alone only whentype of bituminousconstruction cannotbe determined.
j 'v' Various other types notmentioned above
5 Length: (?km) Length of section maybe added if desired
6a Obstructions: (Ob) Symbol at end offormula indicatesexistence ofobstruction (seeparagraph 7)
b Snow (T) Regular, recurrent andserious snow blockage
c Flooding (W) Regular flooding which
impedes traffic
25m
>14%10-14%
7-10%
4m
4m 3.5m
5m 4m
8/22/2019 RETAM
46/136
12. Conventional Symbols
13. Further Information. Fuis given in ME, Vol II Pam
Bridge. Classification (top segment)overhead clearance [left]
width (underneath) length [right]
Limit of sector
Civil or Military Route Design Notation
Cover (deciduous [left] evergreen [right])
Cover (woods) (deciduous [left] evergreen[right]). Arrow denotes possibility ofdriving off the road
Ferry. Type and seasonal limitations [top].
Capacity [centre]. Crossing width [bottom]A=Automobile P=Passenger
Ford. Current velocity m/s and seasonallimitations [top]. Width. Nature of bottom.
Depth [bottom]. Approach easy [left].Exit difficult [right]
ROAD SYMBOLS TYPE OF
All weat heha rd su rfaf rost sus ce
All weat heloose or ligsurface loc
f rost sus ce
Fair weathwi thout suor l ight ly m
(B2019)
3.5m
3.6m
6m30
A/Y
6
25
1.0/x
2.5/G/0.4
8/22/2019 RETAM
47/136
CLOSE SUPPORT BRIDGING
1. Chieftain AVLB. The Chieftain AVLB systemcomprises:
a. The Chieftain Bridgelayer, FV4205 (SeeSection 4).
b. No 10 (22 m) Bridge, MLC 70, span 20.5 m.
c. No 10 (26 m) Bridge, MLC 70, span 24.5 m(See Paragraph 7).
d. No 11 (16 m) Bridge, MLC 70, span 14.5 m.
e. No 12 (13.5 m) Bridge, MLC 70, span 12.0 m(See Paragraph 7).
f. Tank Bridge Transporter (See Section 4).
8/22/2019 RETAM
48/136
e. Select alternative s
5. Setting Out. Sites for bshown below. At least home bank to indicate tthe position at which the
L = Length of No 10 or No 12 d = Gap between angle of rep
L-d
D = 2 + 3.8m where 3.8mrepresents the length of AVL
2. Combination Bridges. All combinations are MLC70. Maximum depth of water on wet sites must beknown. It is essential for safety reasons for thetrafficable surface of the bridge to be above water.
a. No 10 + No 12 span 26.75 - 33.5m.b. 2 x No 10 span 32-46m.c. 3 x No 10 span 52-66m.
3. Trestle. New trestle ISD 2002. Informationto follow.
4. Reconnaissance.a. All sites should have straight approaches andexits to avoid tracked vehicles slewing.b. Bankseats: Minimum CBR 8 percent. Maxcross slope: No 10 & 12 (to be within 5% (2.8deg). This is equal to 0.2m over the 4m width ofbridge)c. Consider number of vehicles (tracks andwheels) using the site.d. Check dimensions in paragraph 5 plus width
and overhead clearance (No 10-15m, No 12-14.5m).
L
xd
8/22/2019 RETAM
49/136
b. Mini Pipe Fascine
Length - 4.6Size - diaWeight - 210Transport - AFV
c. Setting Out. Setti
same as that shothat the fascine sto
d. No more than 2 faone crossing as th
e. Sites require additracked/wheeled vtrackway or plant.
L - d2
must be greater than or equal to 0.75 m atboth ends of bridge.
At night the pickets must carry a light:Lining up - Red or Beta light pointing up.Stop - Green or Beta light pointing down.
6. Fascines.
a. Maxi Pipe Fascine (MLC 70).
Length - 4.6 m.Span - one fascine 5.0 m gap, 2.5 m
deep.- 2 fascines 7.0 m gap.
Weight - 2.5t (up to 5t if dirty).Transport - 3 per Chieftain AVRE.
- one per CET (operations only).- one per AVRE trailer.
RESTRICTED7 Chieftain AVLB and BR 90 CSB
8/22/2019 RETAM
50/136
7. Chieftain AVLB and BR 90 CSB.
a. No 10 (26).Bridge No 10 (26)Max/Min ground bearing capaci ty 20/11 tonnes/m
2
Min bank support ful l width of br idge 7.5 mMax bank support ful l width of br idge 7.5 mMax clear span 24.5 mMax cross slope - home bank 5% (2.8 deg)Max cross slope - far bank 5% (2.8 deg)Max longitudinal slope 10% (5.7 deg)Max difference in far bank seat 2.45 mMax surface water speed 0.5 m/sec
Wind speed limitation:Launching/recovery 54 Km/h (Beaufort scale 6)Trafficking 108 Km/h (Beaufort scale 10)Launched and clear of traffic 72 Km/h (Beaufort scale 8)
26.12m
24.5m
24.37m
24.5m
b. No 12.BridgeMax/Min ground bear ing capacityMin bank suppor t full wid th of br idgeMax bank support full width of bridgeMax clear spanMax cross slope - home bankMax cross slope - far bankMax longitudinal slopeMax difference in far bank seatMax surface water speedWind speed limitation:
Launching/recoveryTraffickingLaunched and clear of traffic11.95m
12m
12m
13.62m
1.15m
RESTRICTED
8/22/2019 RETAM
51/136
GENERAL SUPPORT BRIDGING - BR 90
2. The bridge is carried oand constructed with theof 10 men.
3. Site Selection. Sites sdrive off where possible
and off loading areaspossible. Minimum CBR 5% ( 0.2m over 4 m w
4. Note that 56m span cABLE before a reinforcein about 2007.
1. Bridge Conditions. Br 90 GSB bridge constructionsare: (Full details are in AESPS)
32m max untensioned single span
44m max tensioned single span
56m max tensioned single span
62m max floating double span
60m max double span using fixed pier (span A tensioned)
Span A
8/22/2019 RETAM
52/136
5. Main Components.
4m panel 2m panel 8m panel
8m ramp panel
2m articulator panel
4m tensioning panel
2m hinge panel
8/22/2019 RETAM
53/136
BR 90 General Support Bridge Design Proforma Edition 7
Sheet No Grid Ref Site Name
MLC Name Unit
1. Measure AR Span AA m 2. Select bridge Length (L): AA (Round up to nearest e
______ + 2m = ______3. Position Bridge
4. Take Levels: Datum
Location FW RW F A
Datum
Staff
RW
FW F'
F'A' ______ A'A ______
A'
13.3m
5.95m WL
Min 1mMax 6m
MMa
8/22/2019 RETAM
54/136
GENERAL SUPPORT BRIDGING - MGB
8/22/2019 RETAM
55/136
GENERAL SUPPORT BRIDGING - MGBMLC and maximum length of MGBs.
Single Span
Single Storey Double Storey Double Storey Reinforced
Ser MLC Maximum Number Maximum Number Maximum NumberLength of Bays Length of Bays Length of Bays
(m) (m) (i) (m) (i)
(a) (b) (c) (d) (e) (f) (g) (h)
1 100(W)(ii) 9.8 5 27.4 10 - -2 70(T) 9.8 5 31.1 12 45.7 203 60 9.8 5 32.9 13 49.4(iv) 224 50 9.8 5 34.8 14 - -5 40 13.4 7 38.4 16 - -6 30 15.2 8 42.1 18 - -7 24 17.1 9 45.7 20 - -8 20 18.9 10 47.6 21 - -9 16 22.6 12 49.4(iv) 22 - -
Notes: (i ) For Double Storey br idges the length of two ends o f br idge (2E) must be added.(ii) A few vehicles may have difficulty negotiating the ramps.(i ii ) Restr ic ted to MLC 60.
(iv) This is the maximum length, limited by the equipment in the bridge sets.(v) Beyond these lengths an additional span is needed.(vi) DS MGB only trained on by paragraph, Cdo and Air Mob Sqns.
8/22/2019 RETAM
56/136
INTENTIONALLY BLANK
8/22/2019 RETAM
57/136
GENERAL SUPPORT BRIDGING - APB AND OVERBRIDGING
1. Airportable Bridge (APB) (Clear Span). Outlinecharacteristics of clear span APB are given belowand for floating APB and APB raft on Page 1-6-2.Further information is in ME Vol II, Pam 7 anddetailed building instructions are contained in theUser Handbook, Army Code No 60249.
a. Maximum Span. Overall length 15.85m, ARspan 15.2m.
b. Load Class. MLC 16 irrespective of span.c. Roadway Width. 3.35 m.d. Special Loads. The following vehicles may
cross the bridge if the special conditions areobserved:
MWT - MLC 20CET - MLC 18FV 432, 433 and 434 - MLC 17-19
Special conditions.Maximum span of 14.02 m.Ramps are evenly seated.
Loads are kepSpeed is belo
e. Speed. Vehicles Mexceed 8 kph.
f. Time/Labour to BNCO + 16 men.
g. Maximum Slope.laterally,
h. Transport. Threlaunching set.
2. MGB Overbridge.a. Deflections. The
central deflection MGB SS bridges the MLC shown.
8/22/2019 RETAM
58/136
b. Clearance using W(1) For a 4-bay b
centre of the live load 110
(2) For a 4-bay bends of theclearance und
3. Heavy Girder Overbrid
a. Dimensions: Len(m
RoaUnd75
b. Transport: 2 x
c. Time and Labour:
Dead Load + Dead Load +
Ser No of MLC Dead Load Live Load Live Load
Bays (central) (eccentric)
(a) (b) (c) (d) (e) (f)
1 4 70(T) 15 51 58
2 5 70(T) 25 83 95
3 6 40 38 121 1404 7 40 51 133 152(i)
5 8 30 70 190 222
6 9 24 89 210 241
7 10 20 108 267 310
8 11 16 146 324 381
9 12 16 184 406 495
Notes:
(i) This has not been confirmed by test and may be
greater.
(ii) The deflection under MLC 100(W) has not been
tested but with 4 and 5 bay bridges it should not be
greater than that for MLC 70(T).
GENERAL SUPPORT BRIDGING WET/FLOATING
8/22/2019 RETAM
59/136
(8) Speed laden
c. M3 Bridge Length.
L = (R x 11.50) - (CC x
where: R = Number o
CC = Number o
GENERAL SUPPORT BRIDGING - WET/FLOATINGBRIDGING AND BOATS
1. M3 Bridge and Ferry.
a. Land Travel Configuration. See Section 4.
b. Amphibious Operation.
(1) Deck (roadway) width 4.76 m
(2) Max bank slope for entry 29
(3) Max vertical drop for entry 0.60 m
(4) Draught unladen 0.54 m
(5) Draught laden Cl 70 1.02 m
(6) Draught (loading) Cl 70 1.10 m
(7) Draught laden (operating) 1.20 m
N t (i) F ll i h2 Fl ti APB d APB R ft (S P 1 5 1)
8/22/2019 RETAM
60/136
Notes: (i) Following vehs mconditions below MWT (MLC 20), C433, 434 (configuConditions:Deck length increLoads keep to th
(ii) Based on the lenwith the set.
2. Floating APB and APB Raft. (SeePage 1-5-1)
Ser Detail Floating APB APB Raft
(a) (b) (c) (d)
1 MLC 16 16(i)2 Deck width 3.35 m 3.35 m3 Deck length - 12.2 m4 Overall length min 15.85 m 21.9 m5 Bank range -0.15 m to -0.15 m to
+1.07 m +1.07 m6 Min water depth 0.35m at 5m 0.35 m at
5 m7 Max water depth 5.5 m(ii) -8 Constr party 1 + 24 1 + 249 Constr time - 1 hr by day10 Operating crew - 1 + 811 Transport 7 tlrs for 31.7 m 5 tlrs
8/22/2019 RETAM
61/136
3. Boats.
Ser Item Capacity Dimensions and Car
(a) (b) (c) (d)
1 Recce boat (AvonRedcrest)
2 men5 men as life raft
Packed: 0.46(diam)1.92 mInflated 2.8 x 1.3 m
Weight 18 kg2 Gemini boat 8 fully equipped men
or10 lightly equipped men
4.7 x 1.9 mWeight 138 Kg
3 Assault Boat Mk V 2 crew + 10 men 4.9 x 1.7 mWeight 220 Kg
4 Combat Support Boat 2 Crew 8.2 x 2.49 mWeight 4000 KgDedicated trailer
8/22/2019 RETAM
62/136
Ser Item Capacity Dimensions and Ca
(a) (b) (c) (d)5 Rigid Raider Mk 1 a. 7 ful ly equipped men + 91 Kg of
storesor
b. 9 lightly equipped men + 91 Kg ofstores
orc. 2 crew + 900 Kg of evenly distributedcargo
5.2 x 2.2 mWeight 700 KgDedicated trailer.Crib available to tpton flat bed veh
6 Large Rigid RaidingCraft MK 2
a. 2 crew + 8 Men + 680 Kg of cargoor
b. 2 crew + 1000 Kg of cargoor
c. Maximum payload 1850 Kg mixedcargo (if using NATO pallet for cargo seatswill have to be removed)
8.35 x 2.6 mWeight 1880 KgDedicated trailer.Crib available to tpt flat bed veh
8/22/2019 RETAM
63/136
Note: Draughts quoted are craft fully laden engine down.Dimensions are maximum, engines up where applicable.
Ser Item Capacity Dimensions and Carr
(a) (b) (c) (d)
7 Large Rigid RaidingCraft MK 3
a. 2 crew + 8 Men + 680 Kg of cargoor
b. 2 crew + 1000 Kg of cargoor
c. Maximum payload 1900 Kg of mixed
cargo(if using NATO pallet for cargo, seats willhave to be removed)
7.5 x 2.6 mWeight 2100 KgDedicated trailer.Crib available for tpt oflat bed veh
8/22/2019 RETAM
64/136
INTENTIONALLY BLANK
RESTRICTED
LOGISTIC BRIDGING AND EXPEDIENT SURFACING
8/22/2019 RETAM
65/136
LOGISTIC BRIDGING AND EXPEDIENT SURFACING
1. Extra Widened Bailey Bridge.
TimeQty (hrs)
Ser MLC Max Span for Type 4t Workingof Construction Vehs Party Day Ni Notes: (i) Bridg
built (a) (b) (c) (d) (e) (f) (g) (ii) Each
(3.041 30 SS 15.2 m 5 bays 10 One tp 5 10 (iii) The2 30 DS 24.4 m 8 bays 14 One tp 7 11 supp3 30 TS 33.5 m 11 bays 21 Two tps 9 18 trans4 30 DD 39.6 m 13 bays 28 One sqn 12 24 (iv) Road5 80 DS 15.2 m 5 bays 13 Two tps 5 9 (v) Tp w6 80 TS 21.3 m 7 bays 17 Two tps 7 12 minim7 80 DD 24.4 m 8 bays 21 One sqn 10 20 (vi) Timi8 80 DT 33.5 m 11 bays 31 One sqn 16 28 cond9 80 TT 45.7 m 15 bays 61 One sqn 30 60 weat
inter
b. Class 70 Trackw2. Trackway.
8/22/2019 RETAM
66/136
b C ass a
(1) Dimensionswide.
(2) Laying. Usucan be laid b
(3) Time to Lay.roll 4 mins by10 men, 30 m
(4) Weight. (Clea
(5) Use. May be100(W) vehic
y
a. Class 30 Trackway.
(1) Dimensions. Roll 32 m long, 3.4 mwide.
(2) Laying. Usually dispensed from a spoolon a 4t veh.
(3) Time to Lay. 5 mins by 5 men, butlonger if it has to be secured to theground.
(4) Weight. (Clean) Loaded spool 3.3t.
Short prodders.MINE COUNTER MEASURES
8/22/2019 RETAM
67/136
pMine detector.Trip wire feelers.Wire cutters.Safety pins for minAnti-mine visor.
51. Hand Clearance. (SeeTa. Basic Data.
(1) Setting out p
(2) Basic brea60m/hr.
(3) Parties work(4) Pulling party
by:(a) Pulling,
and the(b) Destroy
charge.Note: In extreme c
mines may be disruarms fire (greater th
reliable method.
(SeeME Vol II Pam 6 for detailed information)(SeeTAM Part 2 Section 5).
1. Action on Encountering Mines.a. STOP all movement.b. WARN other tps in vicinity.c. REPORT up and down the chain of
command.d. ASSESS the situation and CLASSIFY.e. ACT on your assessment.f. ASSESSMENT: Surface laid (SCATMIN?:
self-destruct anti-handling) or buried. Missioncritical: carry on and accept casualties or useengr eqpt. Mission non-critical: use engr eqpt(if avail) or await help or extract (look, feel,prod). CLASSIFY (seeTAM Part 2, Page 5-18-6).
2. Minefield Reconnaissance Patrol.a. RE element. 1 Offr or NCO + 2 sprs.b. Stores:
Prismatic compass.Fish line and pegs.
Mine markers.
4. Mine Plough (Full Widtb. Stores Check List.
8/22/2019 RETAM
68/136
a. Mounted on AVREb. Cleared lane 3.8
metre wide ceattachment in the3.8 m to be cleare
c. Depth to bottom od. Speed 4 to 6 km/he. Maximum slope 20
5. Python.a. Trai ler details, seeb. Hose box, 2160 kgc. Effective length 18d. Firing vehicle, AV
vehicle with 24 vole. Clears 90% single
mines in 8m wide f. Use plough in co
with plough tank sg. Crossing vehicles h. Lane repair may
vehicles.
i. Allow 50% reserve
(1) Mine detectors.(2) Mine prodders.(3) Prismatic compass.(4) Wire cutters.(5) Pliers.(6) Safety pins/25 mm nails.(7) Nails 150 mm.(8) Tape tracing.
(9) Winders, tape.(10) Pickets, A/l 1.8 m.(11) Sledgehammer/picket driver.(12) Mine markers.(13) Pulling cable.(14) Markers, minefield, perimeter.(15) Markers, minefield, safe lane.(16) Markers, def i le, i l luminated (beta
lights).(17) Dannert wire.(18) Wire for safe lane fences.(19) Anti-mine visors.
DEFILE AND MINEFIELD LANE MARKING
8/22/2019 RETAM
69/136
1. Defile Marking System.
D E F I L E
WHE E
WHEELROUTES
TRTRACKROUTES
LINING
UP BOX
APPROACH TRACKS
30m
approxExit lights
Illuminatsigns
Markers, minefield, safe lane,with Beta arrows or green orwhite lights at night
Entrancelights
Illuminated tracksigns fixedbeneath route markers
Illuminated wheel signs fixed beneath route markers
2 Safe Lane Maximum
8/22/2019 RETAM
70/136
2. Safe Lane Maximum
Marking.
Dannert coils continued at least 50 m from four corners
Lane maintainance stores dumplocated near safe lane entrance
Signal cable
Tape orscrim
Cleared area for unexploded
mines from the safe lane
8m
70m
70m
Red triangles at10-50m spacing
SAFELANE
ENEMYMINEFIELD
MINEFIELD
50m
30m
Picket
SECTION 2 COUNTER MOBILITY SUPPORT(This chapter covers mines and demolitions. Other non-explosive obstacles are included in Tam Part 2
8/22/2019 RETAM
71/136
( p p
BRITISH MINES AND MINELAYING SYSTEMS
1. Anti-tank Mines.
Ser Mine Packing Arming D
(a) (b) (c) (d)
1 Barmine 4 mines per bundle, Pressure fuze DisaLength 1.2m 18 bundles (72 mines) 1. Remove safety pin. 1. TWidth 110mm per pallet (weight 900kg) 2. T urn arming lever 90o anti-Height 80mm clockwise. 2. InWeight 10.4 kg Add-on-fuzes Neut
1. Remove safety pins. a. I f2. Move arming lever No 1 armeto armed position. 1. M
safe 2. Msafe 3. Wsafe b. If
fully
(a) (b) (c) (d)
8/22/2019 RETAM
72/136
2 Mk 7 mine Two mines per wooden No 5 Fuze No 5Diameter 330mm box. 30 boxes (60 mines) 1. U nscrew mine cap. ReveHeight 127mm per pallet (weight 1114 kg) 2. Remove fuze safety clip.Weight 13.6 kg 3. Insert fuze.
4. Replace cap.
No 5 Fuze 28 fuzes in a steel
ammunition box
3 Non-metallic mine Clipped in pairs with domed 1. Remove split pin. DisaL3A1 metal covers. 2. Pull key across ReveDiameter 266mm 24 pairs (48 mines) per rubber cover and lift toHeight 145mm pallet (weight 504kg) vertical, ensuring sleeveWeight 7.5 kg slips down into position.
3. Turn key 90o clockwise.4. Withdraw key.
4 AT2Diameter 103 mm Scatterable mine emplaced by MLRS. Laid lifeHeight 165 mm 3 to 96 hrs. Self destructs. Cannot be disarmed or neutralised.Weight 2.22 kg Anti-handling device.
8/22/2019 RETAM
73/136
2. Other Devices.
Note: Claymore must only be command detonated.
Ser Device Packing Arming
1 ClaymoreBody:Width 213mmHeight 82.5mmThickness 35mmWeight 1.5kg
Height on legs171mm
One Claymore andaccessories in a bandolier.Six bandoliers in a box.(Weight 24.1kg)
See instruction sheet with eachclaymore.
(a) (b) (c) (d)
5 VolcanoL35A1Diameter 127mmHeight 83 mmWeight 1.6 kg
6 mines per tube.120 tubes per launcher plus80 tubes for reload on thevehicle
Scatterable mine dispensed from Shhr or 15 days set at launch. Self ddisarmed or neutralized. Integral a
a Capabilities3. Barmine Layer.
8/22/2019 RETAM
74/136
a. Capabilities.a. Laying Rate. Planning figure 200 mines per
hour.
b. Laying Depth. All fuzes except AD - 80mm.AD fuze - 130mm. Depth to bottom offurrow.
c. Towbar Positions.
4. Shielder. Vehicle Launched Scatterable MineSystem (VLSMS). Dispensing system for the
Volcano mine. Capable of dispensing 720 mines in5 mins dependant on terrain and minefield density.
Position Towing vehiclehook height
Typicalvehicle
Straight 250-600mm FV 432
Cranked up 600-900mm 4 or 8t
Offset 350-700mm
Minefieldtype
Descrip
Hasty 1 x pass byShielder laypanel 50 1deep.
Deliberate 1 x pass by Shielder laypanels withinrequired.
c. Heavy MinefieldStopping Power E
MINEFIELD DESIGN, REPORTING ANDRECORDING
8/22/2019 RETAM
75/136
Stopping Power. E
Three rows of barm
Two rows of barmi
Two rows of barmi
RECORDING
1. Minefield Design.
a. Light Minefield. 10 percent General StoppingPower. Example content:
Two rows of barmines with FWAM (E) fuzes.
One row of barmines with FWAM (M) fuzes.
b. Medium Minefield. 25 percent General
Stopping Power. Example content:
One row of barmines with AD fuzes.
Two rows of barmines with FWAM (E) fuzes.
Two rows of barmines with FWAM (M) fuzes.
2. Minelaying Reports.
8/22/2019 RETAM
76/136
Ser Report (i) Initiator Sent to D
(a) (b) (c) (d)
1 Intention to lay Unit or formation Next higher formation 1. Type of mintending to lay a 2. Types ofa minefield 3. GRs of c
and locs of g4. Duration
5. Estimatetimes.
2 Start of laying Laying unit Next higher formation 1. Time sta2. ETC.3. Changesreport.
3 Completion (ii) Laying unit Formation ordering 1. Time comlaying 2. Marking
4 Change Formation or unit Those concerned Details of chordering change.
Notes: (i) Reports are sent in the format directed by formation HQ.(ii) AF W4017 must be completed in addition to sending the completion report.
3. Setting out Pickets.
8/22/2019 RETAM
77/136
a. Start laying. b. Intermediate. c. Change direction. d. Wa
e. Stop laying. f. Stop laying but g. Last mine in the
continue ploughing. ground unarmed.
White tape
Three paces
Light
Row sign
White tape
Three paces
Enemy
approach
Enemy approach Tap
Ser Row S4. Mine Row Markers.
8/22/2019 RETAM
78/136
(a) (b)
1 A
2 B
3 C
4 D
5 E
6 F
7 G
Notes:
(i) Largest dimension of sign 0.3 m.
(ii) Signs coloured on one side only.
(iii) Signs drilled to take 14 gauge wire.
(iv) If more than 7 rows repeat from rowA.
(v) The use of these signs is optional.
5. Safety Distances. ENEMY
8/22/2019 RETAM
79/136
Notes:
(i) Perimeter markers atbetween 10 and 50 m.
Minimum 2m
Minimum 2m
Minimum 2m
Minimum 15m (when handlaying)
Minimum 15m
Minimum 8m(when laying mech
8m for vehicles
I 1
++ + +
+++++
+
I 2
MIN
EFIELDLANE
8/22/2019 RETAM
80/136
INTENTIONALLY BLANK
DEMOLITION STORES
8/22/2019 RETAM
81/136
1. Explosives and Accessories. The main service items are listed below. Full details are given in
Ser Item Description /Packing/Remarks
(a) (b) (c)
1 PE 4 0.23 kg cartridge. 175 mm long. 35 mm diam. 10 cartr4 cartons (9.2 kg) per wooden box.
2 CD L3A1 6 slabs of PE4 in metal container. Each slab 0.9 kg. 252 containers per carrier.
3 CD Sheet Explosive No 2 Sheets 0.57 kg. 465 x 250 x 3 mm. 40 sheets per wood
4 CD Necklace L1A1 5 x CD 14 (Hayrick). Each CD14, 9.3 kg. 241 x 133 x 25One set in steel box.
5 Charge Linear Cutting Two metre lengths with 25, 40, 80, 100, 120 or 180 g/m
6 RCK L25A2 Kit of 1 x 8 .5 kg conical charge and 2 x 9.8 kg bags of HE
7 RBD Chargesa. Conical L7A1b. Underbridge L11A1c. Overbridge L12A1
Diam 256 mm, height 362 mm, weight 17.6 kg.Length 282 mm, width 240 mm, height 375 mm, weight Length 473 mm, width 380 mm, height 490 mm, weight
8 Expl Cutting Tape Two metre lengths with 100, 240, 450 or 1150 gm explos
8/22/2019 RETAM
82/136
Ser Item Description /Packing/Remark
(a) (b) (c)
9 Fir ing Device Kit Demolit ionGrip L41A4
Tin contains 1 x Firing Device Demolition Grip and 415 tins per metal box, 2 boxes per metal carrier, initisupplied separately 7 per tin.
10 Fuze Safety L1A2 Colour black but other types different colours. 8m ppackages per metal box, 300 mm burns between 36
11 Cord Detonating L4A1 Colour grey but other types dif ferent colours. 150 mmetal box, 2 metal boxes plus clips and seals per wo
12 Detonator Demoli tion L1A1 5 in polythene pack, 25 packs per metal base H82.
14 Demolit ion Remote FiringDevice
One transmitter in L17A1 ammunition container.Two receivers in L17A1 ammunition container. Codclassified items. Line of sight range 2 kms.
15 Pla tform Access Under Br idge Single span 12.4 m.Double span 24.8 m.
4. Demolition Techniqcategorised into one ott k d d ib d
DEMOLITION TARGETS
1 Bridge Demolition The economical demolition of
8/22/2019 RETAM
83/136
attacked as described:a. Simply Supported
attack cutting beDeck cut across ittrusses above an70o to the horizodeck cut.
b. Simply Supportebetween 1/3 and cuts not less than Any metal or concas Sub-paragraph
c. Concrete Portals, Spandrel Bridges.the required gap.
d. All continuous bradjacent spans, lofrom the cuts to thare in the proportio
1. Bridge Demolition. The economical demolition ofsome bridges is complicated. The techniquesgiven below are simplified and may be wasteful.Wherever possible ME Vol II Pam 4 should beconsulted.
2. Demolition Priorities.a. Priority 1. Create a gap of at least 25 metres.
b. Priority 2. In the following order:(1) Crater and mine the home abutment.(2) Mine likely adjacent bridging sites.(3) Crater and mine the enemy approaches.(4) Destroy piers.
3. Conditions for a Successful Demolition.a. Condition 1. A collapse mechanism must be
formed, either:(1) A see-saw mechanism, or(2) A beam mechanism, or(3) A member-without-support mechanism.
b. Condition 2. The collapse mechanism must
be free to move under its own weight tocreate the desired gap.
c. Continuous.5. Bridge Categorisationa. Identification.
(1) If simply supported see Sub paragraph b
8/22/2019 RETAM
84/136
(1) If simply supported see Sub-paragraph b.(2) If continuous see Sub-paragraph c.(3) If uncertain treat as continuous.(4) If neither, e.g suspension, attack from
first principles.b. Simply Supported.
SIMPLY SUPPORTED
BOWSTRING
REINFORCED
CONCRETESLAB/BEAM
THROUGHBRIDGE
NORMAL
STEELTRUSS
STEELBEAM
TOPSUPPORT
BOTTOMSUPPORT
DECKBRIDGE
CONTINU
CONCRETE STEEL
ARCH PORTAL CANTILEV
PINNEDFOOTING
FIXEDFOOTING
SOLIDSPANDREL
OPENSPANDREL
b. Continuous Bridge
6. Bridge Reconnaissance Measurements.
a. Simply Supported Bridges.
8/22/2019 RETAM
85/136
b. Continuous Bridgea. Simply Supported Bridges.
Notes:
(1) Record all information required for AFW 4012.
(2) Record dimension of all members to be cut.
(3) Value H in continuous bridges required only for arch andportal bridges.
H
LE1
E = E1 + E2
E2
LS2LS1
LS = LS1 + LS22
L
H
(a) (b)7. Targets other than Bridges.
8/22/2019 RETAM
86/136
3 Airfields Crater rundamaContamwith watextinguipumping
4 Railways Cut railsstraight outside track.
5 Buildings WoodenHouses Large buwalls anone sideAttack aboreholereinforce
Ser Target Method
(a) (b) (c)
1 Roads Use craters or mined charges at:(1) Bridge approaches.(2) Hillsides. Aim to blow away
the road.(3) Embankments. Select sites
where by-pass is difficult.(4) Cutting. Avoid if possible.(5) Culverts. Tamping needed.
Aim to destroy the road ordrainage system.
Use falling block obstacles whenavailable. In towns use rubble andmines. In woods fell trees and usemines.
2 Tunnels Attack the l ining with small minedcharges for a length of 15-25 m
(a) (b)
9 POL R t
8. Continued.
(a) (b) (c)
8/22/2019 RETAM
87/136
9 POL RuptureInstallations within b
and expjerrycanContamfuel is nofor aviat
10 Ammunition Initiate scontaini
bulk det
SAA in g
HE can
11 Concrete Dragonsobstacles Massive
Light waPill boxe
6 Guns Block the barrel and then fire around, or place a PE chargebehind the blockages.
0.34 kg for 30 mm bore.2.0 kg for 76 mm bore3.5 kg for 100 mm bore
Destroy the gun sights.
7 AFVs Detonate 10 kg inside the hull, orplace charge under the gunmantlet. Destroy the gun. Perhapsset the AFV on fire.
8 B Vehs Use a sledgehammer on radiatorand ignition system. Detonate0.5 kg PE on the cylinder head.Fire the veh.
8/22/2019 RETAM
88/136
INTENTIONALLY BLANK
RESTRICTED
OPERATIONAL SAFETY DISTANCES
1. Safety Distances Against Injury(operational useonly) Distances in metres at which injury may be
(a) (b) (c)
8/22/2019 RETAM
89/136
only). Distances in metres at which injury may beexpected from an explosion in the open.
Injury from blast
Wt of Safe if Ear Serious DeathsSer expl protected damage injury possible
(kg) against possible possible
debris(i) (ii) (iii) (iv)
(a) (b) (c) (d) (e) (f)
1 10 25 15 8 52 15 30 17 9 63 25 30 20 11 64 35 35 20 12 75 45 40 20 12 76 65 45 25 14 87 90 50 30 18 98 140 55 30 20 109 190 65 35 20 10
10 250 7511 350 8012 450 8513 700 10014 900 10515 1100 11516 1300 120
Notes:
(i) Distance at which mehave adequate protecdebris.
( ii) Distance up to whichdiscomfort and possibly
(iii) Distance up to which injury and possibility of m
(iv) Distance up to which mprobably not fatal inju
fatalities by blast pressu
(a) (b) (c) (
13 700 40 6
2. Safety Distances Against Damage. Distances inmetres at which damage to property may beexpected from an explosion in the open.
8/22/2019 RETAM
90/136
14 900 45 815 1100 50 916 1300 60 1
Notes:
(i) Average distance up to wdamaged and require dem(ii) Average distance up to w
uninhabitable. Extensive (iii) Average distance up to w
occurs.(iv) Average distance up to w
broken. 10% may be brodistance.
Damage to property
Wt of Houses Houses Minor 50%Ser expl destroyed badly house glass
(kg) damaged damage broken(i) (ii) (iii) (iv)
(a) (b) (c) (d) (e) (f)
1 10 - - 10 232 15 - - 15 353 25 - - 20 454 35 - 10 20 555 45 - 10 25 656 65 - 15 35 857 90 10 20 40 1058 140 15 25 55 1409 190 15 30 65 16510 250 20 35 85 21511 350 25 45 105 260
12 450 30 50 120 300
DEMOLITION TASKS - TIME AND LABOUR ESTIMATES.
Ser Task Manpower Time
8/22/2019 RETAM
91/136
Ser Task Manpower Time
(a) (b) (c) (d)
1 Prepare a bridge over a major river (100m) for demolition 1 Fd Tp 4-5 hr
2 Cut one span of a bridge over a river or canal using RDDsteel
1 Fd Sect 2-3 hr
3 Cut the span of a masonry or concrete arch bridge 1 Fd Sect 4-6 hr
4 Cut one span of a reinforced concrete slab and girderbridge
2 Fd Sect 4 hr
5 Prepare one bridge abutment using camouflet equipment 1 Fd Sect 2 hr
6 Destroy a pier using a pier footing charge 1 Fd Sect 1 hr
7 Crater a road using 3 measle shafts, and mine the debris 1 Fd Sect 1 hr
8 Crater a road using camouflet, 3 craters plus mines indebris
1 Fd Sect 3 hr
Ser Task Manpower Time
8/22/2019 RETAM
92/136
Ser Task Manpower Time
(a) (b) (c) (d)
9 Crater a road using RCK, 3 craters plus mines in debris 1 Fd Sect 1 hr
10 Tree felling and mining to make a road block 1 Fd Sect 2 hr
11 Prepare a pylon using PE4 cartridges 1 Fd Sect 0.5 hr
12 Destroy 4 Dragons Teeth 1 Fd Sect 0.5 hr
13 Prepare a 2 storey building using concussion charges 1 Fd Sect 1 hr
14 Build the Platform Access Under Bridge 1 Fd Sect 0.75 hr
RESTRICTED
SECTION 3 SURVIVABILITY SUPPORT
(8) MILAN BattleBattle Trench
SUMMARY OF PROTECTION IN TAM PART 2.
8/22/2019 RETAM
93/136
Battle Trench
(9) MILAN BattleArch OHP).
(10) Emplacement
(11) Field shelter:
(a) Time andshelter.(b) Packagi
e. Packaging of defenf. Protective slots forg. House prepared fo
1. Details of the following are in TAM Part 2 Section 5:
a. Protective thicknesses of materials.
b. Digging.
(1) Stages.
(2) Explosive digging.
(3) LWT digging.
c. Battle Trenches - standard dimensions.d. Standard designs for field fortifications.
(1) 2 and 4 Man Battle Trench (using KIP)
(2) Revetment using CGI/SHS.
(3) Overhead cover using CGI/SHS.
(4) 2 Man Battle Trench.
(5) 4 Man Battle Trench Type A.
(6) 4 Man Battle Trench Type B.
(7) GPMG (SF) firing platform (based on 4Man Battle Trench Type A).
8/22/2019 RETAM
94/136
INTENTIONALLY BLANK
FIELD FORTIFICATIONS TECHNIQUES
1. Sandbagging. Filled sandbag is 500mm x 250mm x 125mm. 64 sandbags required for a m3. Sawell compacted and bonded.
8/22/2019 RETAM
95/136
p
(1) Face of wall. (2)a. Bonding of sandbags.
b. Sandbag blast walls.
Joints are broken and chokes
not shown
Headers
Courses 1,3,5 etc.
Ref: ME Vol II Pam No.2 Field FortificationsPages: 1-22 to 1-26
2. Revetment.
8/22/2019 RETAM
96/136
b. Sandbag revetmen
Notes: (i) Not vertica(ii) Bags at rig
a. CGI and picket revetment.
0.30m
Not less thantwice the depth
of the trench
(2.7m min)
0.45m
Anchor picket at anangle to the pull
6-8 strands of wirewindlassed tight
Wire pulling at rightangles to the picket
Ref: ME Vol II Pam No.2 Field FortificationsPages: 1-8 to 1-13
3. Breastwork.
8/22/2019 RETAM
97/136
b. Earth breastwork aa. Sandbag and earth breastwork.
1.50m min
GL
Slope 4/1
Slope 4/1
1.50m min
> 2h
Slope 4/1
Brushwood,CGI etc
h__4
h
0.45m min
Ref: ME Vol II Pam No.2 Field FortificationsPages: 8-4 to 8-6
4. Defensive Work in Sand or Loose Material.
8/22/2019 RETAM
98/136
Slope 4/1
Sand falling awayat an approximate
slope of 1/1
Back fill compact
sand
Stage 1
Stage 2
Stage 3
Ref: ME Vol II Pam No.2 Field FortificationsPages: 8-2 to 8-3
5. Drains and Soakaways.
8/22/2019 RETAM
99/136
a. Drainage sump. b. Catch water drain.
Slope
Large stones at bottom
Pit not less than
300mm cubeShelter ba
Fire ba
Slope
Section A - A
A
Ref: ME Vol II Pam No.2 Field FortificationsPages: 1-27 to 1-30
8/22/2019 RETAM
100/136
INTENTIONALLY BLANK
WATER SUPPLY
1. Yield Tests.
a Wells Lower the water level by pumping and
lake 'd' (m) and mone quarter of thwater = 0.75 d2h 1000 to give capac
d S i T h
8/22/2019 RETAM
101/136
a. Wells. Lower the water level by pumping andmeasure the time taken to refill.
Approximate yield = 780hd 2
litres/minutet
Where t = t ime to refi ll in minutes
d = diameter of well in metresh = height in metres water
level raised in time t
b. Rivers. Tents are not necessary for largerivers. For small rivers and streams, obtainthe cross-sectional area 'A' (m2) of the riverby measuring the width, and depth at 3 or 4places across its width. Measure the surfacevelocity 'V' (m/sec) in the centre of the river.
Yield = 48,000 VA litres/minute
c. Lakes. Estimate the average diameter of the
d. Springs. Test the vessel of known ca
2. pH and Residual Chlowater:
pH between 5 and 9.2 busing Universal IndicatoResidual chlorine level Med. Test using Checkit
3. Sedimentation.
a. When. Use sedimthe purification unfrequently or if theand always when t
b. Timing. With aluwithout 6 to 8 hour
Ref: ME Vol II Pam No.9 Water SupplyPages: 3-5 to 3-6 and 5-5 to 5-12
c. Acidity. For a floc to form with Alum, pHvalue should be in range 7.0 to 8.0. If tooacid (below 7.0) add slaked lime; if tooalkaline (above 8.0) add more alum. Allowabout 15 minutes for floc to form Test for pH
4. Sterilisation.
a. Fixed Dose ChloCalcium Hypochlo
8/22/2019 RETAM
102/136
about 15 minutes for floc to form. Test for pHvalue with Universal Indicator Paper.
d. Quantities.
ypWait at least 30 mweather). Test usiresidual chlorineUniversal Indicatoand 9.2. If more doses of 0.25 g pe
b. Variable Dosing.level of 5 mg/l and
c. Detasting. Use 1 just before use.
Dosage required
Ser Type and effective Chemical g cupscapacity of tank (approx)
(a) (b) (c) (d) (e)
1 Small collapsible Crushed alum 1001
/2 to 1tank (SCT) 1550 l Slaked lime 50
1
/4 to1
/2
2 Large collapsible Crushed alum 500 21
/2 to 4tank (LCT) 8000 l Slaked lime 250 1
1
/2 to 2
3 Per 10,000 litres Crushed alum 600 3 to 5Slaked lime 300 2 to 2
1
/2
Ref: ME Vol II Pam No.9 Water SupplyPages: 5-5 to 5-12
Pump - Output 618.3 m.Sterilisation - VVDFilter unit - uses ki
5. Water Purification Sets.
a. Water Purification Unit (NBC). Normallymounted on dedicated 21/2 t trailer. Consists
8/22/2019 RETAM
103/136
Tanks - 2 x 11400 Hoses (44mm) - 4
6. Pumps.
a. Pump Water Set 9
water pump heldGilkes J30/180 TM
of: main unit, 2 additional pumps (source anddistribution), 2 x 13,640 litre pillow tanks,hoses etc. Non-NBC operation. Kieselguhrfiltration and calcium hypochlorite injection.Output 164,000 l/day.NBC operation. Reverse osmosis. Output
45,000 l/day. NB: RO elements are fragile.Follow the instructions in the AESP. Timingsusing 1 NCO and 4 men:
(1) Set up and fill one storage tank: Non-NBC mode - 3 hr. NBC mode - 8.15 hr.
(2) Close down, back flush, clean andrepack - 3.5 hr.
b. Water Purification Unit (Standard). (Weight520 kg, transport 1 x 3/4t trailer)
Ref: ME Vol II Pam No.9 Water SupplyPages: 6-23 to 7-18
b. Tanks.b. Godwin Model 6-DC. 100 mm boreholepump. Output 5400 1/hr at 30m head Maxhead 43m. Power supply 110v AC, fromCombat Power Tools Generator. Issued c/w
Ser Type Effectivecapacity
(a) (b) (c)
8/22/2019 RETAM
104/136
30 m x 50 mm hose. Held by support andconstruction squadrons.
c. Grindex Minex. Average Output 390 l/min.Max Head 13.5m. Part of Combat PowerTools Kit.
7. Storage.
a. Water Carriage Pack. Capacity 680 litres.Weight full 725 kg. Load onto vehicle beforefilling. Held by all arms.
(a) (b) (c)
1
2
3
Largecollapsible
Smallcollapsible
Pillow tank
8,000litres
1,550litres
13,640
litres
Ref: ME Vol II Pam No.9 Water SupplyPage: 9-6
c. Improvised. Line a pit or improvised framewith a tarpaulin or plastic sheet. A tank 7.0 x7.0 x 0.75m has a capacity of 29,000 litres.
8/22/2019 RETAM
105/136
Elevation of Cuplok Tow
8. Water Tower. (See alsoSection 4). The standardCuplok tower is illustrated below. It will support atank holding 25,000 litres of water. The correctbracing is essential. It is similar for each storey andshould be positioned on the lower storey beforethe ledgers of the upper storey are added. The
bracing is inserted in sequence, starting at 'A', in aclockwise direction.
Plan of Cuplok Towershowing bracing
A
2m
1.3m
Side view of tow(Diagonal bracing no
Ref: ME Vol II Pam No.9 Water SupplyPages: 9-15 to 9-27
9. Layout of Water Points usingWPU (NBC) and Sedimentation,
a WPU (NBC) Layout
Distance = 6m
Head = 4.5m
Distance = 90m
Head = 18m
8/22/2019 RETAM
106/136
a. WPU (NBC) Layout
Dist ance = 100m
Head = 18m Distance = 18m
Head = 10m
Water Source
b. Sedimentation - Site Layout.
8/22/2019 RETAM
107/136
9-18m
Cart and water bottle
filling point
Metalled road or track with hard standing
Water Source
Pump
Pump
Sedimentation tanks
Alum solution drums
38mm canvas hose
38mm armo
Sterilisation tank
8/22/2019 RETAM
108/136
INTENTIONALLY BLANK
SECTION 4 GENERAL ENGINEER INFORMATION
VEHICLE CHARACTERISTICS
1. A Vehicles and SP Guns.
Ser Vehicle Weight MLC Width Height
8/22/2019 RETAM
109/136
Notes (i) With gun to the front.
(ii) With gun to the rear.
Ser Vehicle Weight MLC Width Height(tonnes) (m) (m)
(a) (b) (c) (d) (e) (f)
1 Challenger 62.0 70 3.50 2.95
2 Challenger ARRV 61.5 70 3.85 3.013 Chieftain ARRV 53.5 60 3.53 3.434 CVR(T) Scimitar 7.76 10 2.18 2.125 CVR(T) Spartan and Samson 8.15 10 2.21 2.236 CVR(T) Sultan and Samaritan 8.68 10 2.41 2.497 CVR(W) Fox 6.36 8 2.23 2.208 Warrior 25.4 30 3.09 2.749 FV 432 15.1 15 2.97 2.1710 Saxon 11.67 12 2.49 2.6511 AS 90 44.5 50 3.43 3.0
2. Engineer Specialist Vehicles.
Ser Vehicle and Weight MLC Width Height Length Track-Configuration (tonnes) (m) (m) (m) width (m)
8/22/2019 RETAM
110/136
(a) (b) (c) (d) (e) (f) (g) (h)
1 Chieftain AVRE 61.2(i) 70 4.67(ii) 4.26(iii) 10.30(iv) 0.61 (i) WCl 6
(ii) (iii) W(iv)
2 Chieftain AVLB
a Unladen 41.1 45 3.5 3.2 10.56 0.61 Bridb No 10 (22) bridge 51.7 70 4.00 4.00 14.53 0.61c No 10 (26) bridge 53.7 70 4.00 4.08 14.53 0.61d No 11 bridge 47.8 70 4.00 3.49 16.03 0.61e No 12 bridge (one) 46.8 70 4.00 3.23 13.90 0.61f No 12 bridge (two) 52.3 70 4.00 3.94 14.00 0.61
(a) (b) (c) (d) (e) (f) (g) (h)
3 CET 17.7 18 2.92 2.83 7.30 0.51 Win
Wi h f i S i
8/22/2019 RETAM
111/136
a With one fascine 18 4.6 3.4 7.3 0.51 Swi
4 AVRE Trailer
a Unladen with CES 6.90 3.11 2.11 7.14
b Laden 17.70 18 3.11 2.25 7.14
5 Python 4.3 2.2 3.8 5.9
6 TBT 22.9 20(w) 3 3.05 11.5
a With No 10 (22)(Spanned out) 33.5 31(w) 4.07 4 14.24(Contracted) 33.5 31(w) 3.18 4 13.21
b With No 10 (26)(Spanned out) 35.5 33(w) 4.07 4 14.45(Contracted) 35.5 33(w) 3.18 4 13.45
(a) (b) (c) (d) (e) (f) (g) (h)
c With 1 x No 12(Spanned out) 28.5 26(w) 4.07 3.5 13.7
8/22/2019 RETAM
112/136
(Spanned out) 28.5 26(w) 4.07 3.5 13.7(Contracted) 28.5 26(w) 3.18 3.5 13.7
d With 2 x No 12(Spanned out) 34.1 31(w) 4.07 4 14.48(Contracted) 34.1 31(w) 3.18 4 14.48
7a M3 26 26 3.35 3.93 12.822 Roa
b 26 26 6.57 3.23 12.822 Wat
8a BV Unladen 23.1 24 3.1 4 12.0
b Laden 30.0 29 3.1 4 12.0 StanGSB
9 ABLE 37.0 35 3.1 4 12.0
3. B Vehicles.
Ser Vehicle Make Unladen Laden MLCWeight Weight
(tonnes) (tonnes) He
8/22/2019 RETAM
113/136
(to es) (to es) e(
(a) (b) (c) (d) (e) (f) (
1 MC Armstrong 0.16
2 Tlr Cargo 3/4t Various 0.4 1.2 13 Truck Ut Lt Rover 90 1.58 2.9 2 24 Truck Ut Med Rover 110 1.9 3.05 3 25 Truck 8t 4 x 4 Bedford TM 8.4 16.3 16 36 Drops MMLC Leyland DAF 13.98 30.06 32 37 Drops LWB Tlr King 3.4 20.34 52 (ii) 18 Truck Cargo 4 t Leyland DAF 5.98(iii) 10.0 16 29 Truck Cargo Bedford TM 10.39 24.4 30 3
14t 6 x 6 MMLC10 Rec Veh GS Foden 24 27 3
6 x 6
(a) (b) (c) (d) (e) (f) (
11 Tcr GS Tk Tptr Scammell Commander 38 100 100(ii) 3and s/tlr 90t
8/22/2019 RETAM
114/136
12 Oversnow Veh Volvo BV 206 4.32 6.4 5 213 TTF 12,000 litre Foden 12.1 22.8 24 314 TTF 22,500 litre Foden 12.3 28.9 32 3
Notes: (i) Height includes normal canopy and superstructure.(ii) MLC is for the Gross Train Weight of prime mover and trailer.(iii) 6.66 tonne with winch.
4. C Vehicles.
Ser Equipment Unladen Weight MLC
Height Length Wid
Dimensions (m)
8/22/2019 RETAM
115/136
Height Length Wid
(a) (b) (c) (d) (e) (f) (g)
1. MCT Caterpiller 17.8 With blade & winch 22 3.16 With cab 5.92 With ripper 3.89 WithD6D 2.1 Less cab blade
2. MCE Atlas 17.0 With backhoe 17 2.75 With cab 8.9 Rigged for Tpt 2.81404 LC
3. HCT Liebherr 25.0 With blade & winch 30 3.3 With cab 6.2 With winch 3.99 strai742B blade
25.06 With blade & ripper 7.14 With ripper 4.59 anglblade
4. HCE Hymac 22.0 24 3.16 8.56 2.57201 LC
5. ULWT JCB 3CX 7.36 9 3.8 6.15 2.24
(a) (b) (c) (d) (e) (f) (g)
6. LWT Hydrema 806 8.8 10 3.97 6.65 2.3
8/22/2019 RETAM
116/136
7. MWT Terex 72/51 18.3 21 3.45 with cab 7.18 2.95
8. MWT Volvo 11.45 14 3.02 6.9 2.5BM 4400
9. MWT Case 721 17.5 20 3.55 With Cab 8.52 2.75
10. MWE O & K MH5 16.2 19 3.5 6.1 2.5
11. MWE O & K MH6 2.06 27 (i) 4.0 6.95 2.49535 (ii)
12. HWT Terex 72/71 44.55 83 4.14 11.4 3.63
13. MMG Aveling 14.72 15 3.29 11.81 2.49Barford ASG 113
(a) (b) (c) (d) (e) (f) (g)
14. MDT Haulamatic 11.46 18 2.97 6.77 2.44
15 MDT Ford Iveco 16 25 3 4 8 0 2 5
8/22/2019 RETAM
117/136
Note: (i) Boom Retracted. (ii) Boom Extended.
15. MDT Ford Iveco 16 25 3.4 8.0 2.5
16. SLDT Scammell 15.22 32 3.5 8.86 2.5S26
17. HDT Frame Steer 23.8 Unladen with skip 25 3.56 With beacon 11.2 2.67
Terex 3066 (net)43.80 Laden 53 3.52 Less beacon
18. Tcr Wld Fork Lift 7.4 8 3.65 5.62 2.25Rough TerrainJCB 410 M/C
19. Med Fd Crane 21.9 22 3.61 8.8 2.5Coles 315M
8/22/2019 RETAM
118/136
INTENTIONALLY BLANK
MEASUREMENT AND MATERIALS
1. Units of Measurement .
METRIC IMPERIAL CONVERSIO
Length10 1 12 i 1 ft 1 0 039 i
8/22/2019 RETAM
119/136
10 mm = 1 cm 12 in = 1 ft 1 mm = 0.039 in
100 cm = 1 m 3 ft = 1 yd 1 m = 1.09 yd1000 m = 1 km 1760 yd = 1 mile 1 km = 0.621 (approx 5/8) mile
(1 nm = 1.828 km = 1.136 miles)
Area10,000m2 = 1 ha 4840 yd2 = 1 acre 1m2 = 1.196 yd2 = 10.75 ft2
1 ha = 2.47 acres
Volume1 ml = 1 cc 2 pt = 1 qt 1 litre = 2.2 04 pt = 0.220 gal1,000 cc = 1 litre 4 qt = 1 gal1,000 litre =1 m3 1 ft3 = 6.23 gal 1 m3 =1.31 yd3
(1 gal = 1.20 gal (US))
Mass1,000 gm = 1kg 112 lb = 1 cwt 1 kg = 2.205 lb1,000 kg = 1 tonne 20 cwt = 1 ton 1 tonne = 0.984 ton
Density Force1 kg/m3 = 0.0624 lb/ft3 1 lb/ft3 = 16.02 kg/m3 1 kgf = 9.81 N 11 tonne/m3 = 0.752 ton/yd3 1 ton/yd3 = 1.33 tonne/m3 1 N = 0.225 lbf 1
1 kN = 0.100 tonf
8/22/2019 RETAM
120/136
Area loading Stress1 tonne/m2 = 1.42 lb/in2 1 lb/in2 = 0.730 tonne/m2 1 N/mm2 = 145 lbf/in2 1= 0.0914 ton/ft2 1 ton/ft2 = 10.9 tonne/m2 1 kN/m2 = 0.084 tonf/yd2 1
Velocity Volume flow1 knot = 1 nm/hr = 0.515 m/s = 1.85 km/hr = 1.15 mph 1 gal/min = 0.075 l/sec 1
= 273 l/hr
Angle Power1 degree = 17.778 mils, 90 degrees = 1600 mils, 1 kW = 1.34 hp 11 mil = 202.5 seconds of arc 1 W = 3.41 Btu/h 1
2. Common Engineering Materials.
Ser Material Units of Density/DimensionsSpecification/Supply
(a) (b) (c) (d)
8/22/2019 RETAM
121/136
1 Sand, soil, Metre3 1.65 t/m3 Loose/aggregates
2 Sand, soil Metre3 2.0 t/m3 Satura
3 Cement Bags (50kg, 0.036 m3) 1.45 t/m3
4 Water Litres or metre3 1 t/m3
5 Bricks Number (390 to 500 bricks Stacked bricks Allow 6per pack) 1.85 t/m3 single
6 Masonry 2.2 to 2.6 t/m3 Bonde
7 Diesel fuel Litres or metre3 0.85 t/m3
8 Timber Cross section and length 0.5 to 1.2 t/m3
9 Iron/Steel 7.6 t/m3
(a) (b) (c) (d)
10 Armco Culvert Sheets All sections 0.61m long. Diameter:0.3, 0.45, 0.6 or 0.9 m
11 Wire
a Barbed Wire Coils 100 or 200m
8/22/2019 RETAM
122/136
a Barbed Wire Coils, 100 or 200m.5000 m per pallet
b Dannert Coils Coils. 15 coils per pallet Co
c D10 signal 1000 m per coil
cabled 14 SWG 25 kg coils (500 m). 20 Coils
(10,000 m) per pallet
12 Nails Specify by length (mm) 15Supplied by weight (kg) 10
50
13 CGI Sheets. 200 per pallet Sheets 24 gauge, 0.66m wide.Length: 1.8, 2.4, and 3.0m
Note: Standard NATO pallet measures 1016 x 1219 mm.
2. Setting out Angles.
IMPROVISED MEASUREMENT
1. Sun Compass.
Note:Adjust for
8/22/2019 RETAM
123/136
a. 90 de
b. 60 de
Adjust forsummer time.
12 1
2
3
4
567
8
9
10
11 SOUTH
NORTH
SUN
Ref: ME Vol II Pam No.1 Basic Field Engineering Part 1Pages: 1-1 to 1-22
b. Flat Bottle.3. Improvised Levels.
a. Flexible Tube. Flat sided bottlehalf-full of water
8/22/2019 RETAM
124/136
Glass Tubes
1.5m
Approx 3.0m
Water Level
Flexible Tube
25mm wide strip of paperwith 6mm divisions
1st Rea
2nd Re
Ref: ME Vol II Pam No.1 Basic Field Engineering Part 2Page: 1-19
4. Gap Measurement.
8/22/2019 RETAM
125/136
AB =
DE x BC
CD
8/22/2019 RETAM
126/136
INTENTIONALLY BLANK
CORDAGE AND ANCHORAGES
1. Strength of cordage for field use. Ref: ME Vol IIPam 1 Pages 3-3 to 3-9.
Ser Cordage Type Safe load (kg)
Cordage adj factors
Old, worn orabraded Unevendistribution
0.8
Knot or sharp 0.7
8/22/2019 RETAM
127/136
Note: Further detail of reduct
cordage are in the referen
Note:
1. d = diameter in mm
Ser Cordage Type Safe load (kg)
1 Natural fibre(Sisal/Manilla)
d2/100 x adjfactor
2 Floating man-made fibre 1.7 x d2/100 xadj factor
3 Sinking man-made fibre 2.5 x d2/100 xadj factor
4 Steel wire rope (SWR) d2/12 xreduction factor
Knot or sharpbend Watersaturated
2. Loads on Sling Legs. The tension (T) in the leg ofa sling is calculated as follows:
s
W
T T
W
T
8/22/2019 RETAM
128/136
T2=
S T2=
S
W2 4S2 - a2 W2 4 (4S2 - a2 - b2)
a. 2-arm sling. b. 4-arm sling.
sT T
a
T
T
s
ab
4. Anchor Earth Holdfast3. Picket Anchorage.
Single 1 : 1(a) (b)
8/22/2019 RETAM
129/136
Notes:(i) Normally all pins used i
hard ground.(ii) Angle between legs app(iii) Pull not to exceed 20o fro(iv) Capacity 10kN to 20k
capacity of 60kN.
Notes:( i) Pickets driven 2/3 length into ground at right
angles to the pull.(ii) Lashings taut and at angle of pull.(iii) Capacity: Single picket 3.5kN. 1:1 pickets 7kN.
2:1 pickets 10kN. 3:2:1 pickets 20kN.
2 : 1
3 : 2 : 1
(d)
The bars and papproximately
Ref: ME Vol II Pam No.1 Basic Field EngineeringPages: 7-1 to 7-19
Notes:(i) Baulk to be protected fro(ii) Cable trench minimum w(iii) Main trench backfilled an(iv) Capacity. In normal gro
long timber, buried to 100kN t 20o t th h i
5. Buried Baulk Anchorage.
Main trench backfilled withearth and rammed
8/22/2019 RETAM
130/136
100kN at 20o to the horiz
Sheet metal bearing for cable
Cable trench revettedif necessary
BASIC STRUCTURES
1. Timber. The permissible stresses in common timber are given below:
Permissible stress N/mm2
Type of Density CompressionSer timber kg/m3 Bending Tension
8/22/2019 RETAM
131/136
Ser timber kg/m3 Bending TensionAlong Perp tograin grain
(a) (b) (c) (d) (e) (f) (g)
1 Common medium 1000 12.7 7.5 8.1 2.2strength hardwoods
2 Common softwoods 750 6.7 4.1 6.4 1.6
Note: With timber used in compression along the grain:(i) Length should be less than 40 x minimum cross section dimension.(ii) Should not deviate from straight more than minimum cross section dimension.
2. Timber Shoring.
225x50mm Needlefixed to dead shore
225xmeta
8/22/2019 RETAM
132/136
b. Raking shore (spaced aa. Dead shore (spaced at 1.5 to 2.1m)
by dogs
220x200/225x225mm dead shores
150x25mm bracing
Folding wedges(hardwood)
225x50mm sole plate
Braces-100/150x25mm boardsnailed to each side
225x225mm rider.A rider may be of smathe lower rakers - this whandling. The rider is tmeans of hardwood fo
Jack shore 225x22
Chock
225x225mm rakers
Hoop iron bindto boarding at b
Transverse timbers or slee
ground conditions require be spread [ also known as 'crib' or grillage]
225x225mm sole plate
Dogs
3. Timber Fished Joints.
d
d/2
d
8/22/2019 RETAM
133/136
b. Rounda. Squared timber
6d
6d
6d
6d
Ref: ME Vol II Pam No.1 Basic Field Engineering Part 1Pages: 2-16 to 2-20
4. Tubular Scaffolding. (See alsoSection 3 WaterSupply) Notes: Using 25 mm steel tubi
(i) Tower should not excee3:1.
(ii) Load capacity of structuvertical
50 - 75mm thick decking forflexible tanks
8/22/2019 RETAM
134/136
vertical.(iii) Spacing of verticals not (iv) Maximum height of ver
(ledgers) 1.7 m.(v) Load carrying ends of v
m.(vi) No vertical should be ou
in 6 m.(vii) Each elevat ion to be
bracing in opposing direc(viii) Bracing to be connected(ix) Bracing also required in
flexible tanks
1.7mmax
2.4m max
2.4m max
Ref: ME Vol II Pam No.1 Basic Field Engineering Part 1Pages: 4-1 to 4-13
5. PW Cage. Gross space of 3500m2 required for 500 PW and 5750m2 for 1000 PW. Officers, Narms, nationalities etc, and interrogated and uninterrogated PW should be segregated. Roomperimeters of internal sub-cages. Diagrammatic layout for 500 PW is shown below. Fences: concertina, internal - double apron.
60m 25m
8/22/2019 RETAM
135/136
LATRINES
LATRINES
SPARE
CAGE
SPARE
CAGE
NCOs
NCOs SPECIAL
ARMS
SPECIAL
ARMS
PRIVATES
PRIVATES
OFFICERS
OFFICERS
ASSEMBLY YARD FOR
COLLECTION, LOADINGAND UNLOADING PW
INTERROGATED
UNINTERROGATED
25m
10m
25m
8/22/2019 RETAM
136/136
INTENTIONALLY BLANK
Recommended