8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
1/41
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
2/41
2
YTL Communications, a subsidiary within the YTL Corporation Bhd,was awarded 4G WIMAX (NSP,NFP,ISP&ASP) license by the Malaysian
Communications and Multimedia Commission (MCMC) to roll out
nationwide.
YTLs WiMAX standard, 802.16e 4G technology (full IP), has the
capability to provide ubiquitous, higher speed, quality mobile broadbandinternet access Anytime, Anywhere and On the Move.
This is cutting edge technology that has been successfully deployed by
other developed countries (USA, Europe, Korea & Japan) and will the
first in the country.
We are building a 4G-WiMAX ecosystem, with global partnerships with
CISCO, Clearwire, Frog, Oracle, Ericsson, Nokia-Siemens, Samsung etc
Having been appointed by Kementerian Pelajaran Malaysia to deliver
1Bestarinet Project
YTL Communications Sdn Bhd
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
3/41
1BestariNet : Pengenalan
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
4/41
1BestariNet : Pengenalan
1BestariNet merupakan perkhidmatan rangkaianEnd To End (E2E) bagi tujuan pengajaran dan
pembelajaran (P&P) serta pengurusan danpentadbiran bagi kesemua 10,000 sekolah dibawah
Kementerian Pelajaran Malaysia.
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
5/41
E-Learning : Salah satu komponen utama di dalam Program Transformasi
Ekonomi.
NKEA (CCI) EPP 6 : Projek 1BestariNet adalah platform utama di dalamkonsep E-Learning yang dicadangkan.
Majlis Ekonomi1 (7 Januari 2011 dan 28 Mac 2011) telah membuat keputusan :o Projek 1BestariNet akan dilaksanakan pada 2011o Meningkatkan lebar jalur akses internet untuk semua sekolah.o Persekitaran Pembelajaran Maya (Virtual Learning Environment, VLE) sebagai
komponen utama di dalam 1BestariNet
1BestariNet : ETP/NKEA
NKEA (CCI) EPP6
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
6/41
1BestariNet : Kronologi
Kronologi Berkaitan Pelaksanaan Projek Perkhidmatan 1BestariNet
Mesyuarat Jawatankuasa Pemandu NKEA CCI Bil.3/2010: 16 Disember 2010
Mesyuarat Majlis Ekonomi: 17 Januari 2011 & 28 Mac 2011
Jawatankuasa Pemandu ICT Khas KPM: 21 Februari 2011
Mesyuarat Jawatankuasa Kabinet Berkaitan dengan Jalur Lebar: 4 Mac 2010
Mesyuarat Penyelarasan 1BestariNet KPM & 1GovNet: 21 Mac 2011
Mesyuarat Penyelarasan 1BestariNet MAMPU: 5 April 2011
Mesyuarat JTICT: 21 Oktober 2011
Mesyuarat JPMK: 21 November 2011
Penyerahan SST Kepada Syarikat Yang Berjaya: 24 Disember 2011
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
7/41
1BestariNet : Komponen
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
8/41
1BestariNet : Komponen utama
Access & Connectivity(1BRIS)
Frog VLE Platfom
Security &
AntivirusPatch Mgmt. Content Filtering
Data Center & Hosting Platform
Support Platform
PMO/
TransformationProgram
Schools
1BestariNet enabler
Internet Access
1BestariNet/VLECloud
Platform
CloudBasedSolution/
Back-e
ndSupport
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
9/41
1BestariNet : Akses Internet untuk P&P
Akses Internet untuk P&P diseluruh kawasan
sekolah
Sebelum : Akses internet terhad
Akses dimana-mana di seluruh kawasan sekolah untuk P&P
Penambahbaikkan dari
servis internet sedia ada + VLE
(e-learning) platform
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
10/41
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
11/41
Persekitaran Pembelajaran Maya
Virtual Learning Environment (VLE)
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
12/41
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
13/41
1BestariNet : Akses VLE
Wireless
Access in
School
Connectivity
to Frog VLE
Cloud
Frog VLE
Application
Connectivity
to
INTERNET
Teachers and
Students using PCs to
access
From schools
Teachers and Students using
PCs to access
From the Internet
E.g. Home and community
centres
Any Time Any Where
Learning
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
14/41
1BestariNet : Persekitaran Pembelajaran Maya (FROG VLE)
Create and shareteaching materials moreeffectively so save time.
Access a larger varietyof learning materials forthe needs of their pupils.
Access lesson plansfrom colleagues
anywhere.
Talk to the wider world.Managetimetables,
diary, email anddiscussions.
Receive work frompupils that is easy to
manage.
Monitor and trackindividual and group
progress.
Participate in livediscussionsand
forums with otherstudents and teachers
Access notes,assignments,
homework andrevision outside
normal school hours
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
15/41
1BestariNet : FROG VLE Reference (Rujukan Sekolah)
International: United Kingdom, Europe, Qatar &
Hong Kong
Malaysia:
Sekolah Swasta:
Alice Smith School & Kolej Tuanku Jaafar
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
16/41
1BestariNet : FROG VLE
Free of Charge (FOC)Access to FROG VLE from anywhere thru Yes4G
network, for all Teachers, Students including Parents :
- anywhere and from any computer
- even while travelling
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
17/41
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
18/41
1BestariNet : Akses Internet Di sekolah
Each school will be served by 1BRIS (1BestariNet Receiver Integrated System) that connects back to the
1Bestarinet data centre. 1BRIS will provide connectivity access in all common areas of the school using
WiMAX or WiFI using a 4G CPE/Dongle.
School Compound
CPE
Cabled LAN
Wi-Fi
1BRIS
CPEWi-Fi
Cabled
Connection
Wi-Fi
Cabled
Connection
CPE
Notebooks using
Dongles
Notebooks usingDongles
Notebooks usingDongles
Admin
Office
Computer Lab
Teachers
Room
Library
Classrooms
Common
Areas
* 3 CPE = 3 separate
internet feed
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
19/41
1BestariNet : Akses Internet Di sekolah
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
20/41
1BestariNet : 4G Devices
ZOOM
DONGLE
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
21/41
1BestariNet : Real Time Monitoring
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
22/41
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
23/41
Training Schedule
VLE ID Distribution
Dongle Distribution1Bestarinet School E-
mail Distribution
YTL
MOE PMO
MOE
Send 1Bestarinet
Schools E-mail
addresses to MOE
PMO
----------------------------
E-Mail addresses sent.
School
Forward the e-mail
addressesto schools
----------------------------
Confirm to YTL upondistribution
Review forecasted
coverage schedule to
plan training schedule
----------------------------
Actuals can bereviewed in Yes MON
Schedule training and
notify MOE PMO &
schools
---------------------------
Recommended 4weeks notification
prior to training
Distribution of VLE IDs by
MOE PMO to schools through
credential distribution system in
Yes MON
--------------------------------Recommended distribution
2 weeks prior to training
Schools receive
training schedule and
prepare for training,
Receive Email with VLE
IDs and confirm receipt to
MOE PMO through E-
--------------------------------
Password for the file will
be informed in the email
MOE PMO to call
school if no Email
confirmation received
Attend training and
login to VLE with
admin and other user
accounts
----------------------------
Participants should
attend training with
VLE IDs and login
details
MOE PMO to distribute Dongles to
schools (in 5/10/20/30 packs)
-------------------------------------
Schools unique
[schoolcode]@moe.yes.myaccounts to be activated by MOE
PMO through credential
distribution system
Send Dongles to MOE PMO
every month
Schools to use Dongles to
access their unique
[schoolcode]@moe.yes.my
accounts
1BestariNet : VLE Go-Live Process
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
24/41
1BestariNet Receiver Integrated System
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
25/41
1BestariNet Receiver Integrated System : 1BRIS
Kronologi Berkaitan Pelaksanaan 1BRIS di sekolah
Syarikat dilantik oleh Kementerian Pelajaran Malaysia (KPM): 24 Disember 2011
Mesyuarat berkenaan perlaksanaan 1BRIS antara KPM, KPKT, SKMM dan YTLC :
27 Feb 2012
KPM isu surat bersetuju pemasangan 1BRIS : 28 Feb 2012
SKMM dan KPKT mngeluarkan saranan senarai-semak permohonan (submission
check-list) harmoni : 5 Mac 2012
Pekeliling KPKT kepada semua PBT : 19 Mac 2012
KPM keluarkan surat setuju terima saranan KPKT : 13 April 2012
1B t iN t A k h 1BRIS
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
26/41
1BestariNet : Apakah 1BRIS
1BestariNet Radio Integrated System (1BRIS)
Struktur telekomunikasi bagi menyediakan liputan tanpa wayar 4G
Wimax
Komponen utama
Struktur samada boom atau tiang (monopole)Antenna (Panel & Dish)
Kabinet dan peralatan telekomunikasi
Berfungsi menggunakan bekalan elektrik fasa tunggal
(single phase) - 30 Amp
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
27/41
1BestariNet : 1BRIS Kelulusan Rasmi
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
28/41
1BestariNet Receiver Integrated System 1BRIS
3 options :
Roof-top School water tankMonopole
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
29/41
1BestariNet Receiver Integrated System 1BRIS S.O.P.P
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
30/41
1BestariNet Receiver Integrated System Surat Persetujuan Lokasi
1B iN R i I d S ki bi ( d )
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
31/41
1BestariNet Receiver Integrated System Lukisan Pra-Pembinaan (Pre-con dwg)
1B t iN t R i I t t d S t S M l k K j Di k
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
32/41
1BestariNet Receiver Integrated System Surat Memulakan Kerja Di tapak
1B t iN t R i I t t d S t S i S k S D S l
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
33/41
1BestariNet Receiver Integrated System Senarai Semak Semasa Dan Selepas
Tapak Siap
Safet G ideline & Compliance
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
34/41
Safety Guideline & Compliance
International Body in defining the EMF Safety Requirement:
ICNIRP
(International Commission for Non-Ionized Radiation Protection)
WHO (World Health Organization)
Malaysian Agencies in defining & regulating Safety Requirement in Malaysia :-
Ministry of Health
Malaysian Communications & Multimedia Commission (MCMC)
Malaysia Nuclear Agency
Standards and Industrial Research Institure of Malaysia (SIRIM)
Safety Guideline & Compliance
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
35/41
Safety Guideline & Compliance
All telecommunication equipment used in Malaysia has to comply to
RF EMF & Non-Ionization Safety Requirement of MalaysianCommunications & Multimedia Commission (MCMC).
TheMalaysian Nuclear Agency RF Teston YTL Communications
Equipments indicates the below :
The averaged levels of wide range frequency from 100kHz 3GHz were foundto vary between 0.02Watts/cm2and 1.68Watts/cm2(0.29V/m and 2.47V/m).
This correspond to about 0.17% or595x lower than the MCMC exposure
limit for public and 0.03% or 2976x lower than of the exposure limit for
workers.
The electrical field strengths were well below the exposure limits stipulated
by the MCMC and ICNIRP guidelines for workers and members of the
public.
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
36/41
Lokasi Ujian Radiasi
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
37/41
j
Lokasi Ujian Radiasi
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
38/41
j
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
39/41
Untuk keterangan lanjut, sila layari :
http://1bestarinet.net/
http://frogasia.com/
1B t iN t H l D k D t il
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
40/41
1BestariNet : HelpDesk Details
Jadual Perlaksanaan : 018-799 8771Bantuan Teknikal : 018-799 8787
8/13/2019 Taklimat Kesedaran 1BestariNet Tahun 2012
41/41
Terima Kasih
Q & A