WESTERN TURNER SYNCLINE STAGE 2 

B1 and S17 Deposits 

 Assessment on Proponent Information  Environmental Review Document 

 

  

 

Hamersley Iron Pty Limited 

152‐158 St Georges Terrace, Perth 

GPO Box A42, Perth, WA 6837 

 

April 2013 

 

 

Page ii 

Disclaimer and Limitation 

This  document  has  been  based  on  draft  documents  prepared  by  Strategen  environmental  consultancy, 

amended by Rio Tinto in response to comments from the Office of the Environmental Protection Authority.  

The efforts of Strategen in contributing to this document are appreciated. 

Copyright and any other  Intellectual Property arising from this report and the provision of the services  in 

accordance with the Agreement belongs exclusively to Strategen unless otherwise agreed.  This document 

may not be reproduced or disclosed to any person without the express written authority of Rio Tinto unless 

the document has been released for referral and assessment of proposals. 

Report version Revision 

No. Purpose  Author/Reviewer 

Submission 

To whom  Date 

Preliminary Draft Report 

Rev. A  Review  Strategen (N. Zago)  Rio Tinto  28/09/12 

Draft Report  Rev B  Review  Strategen (N. Zago)  Rio Tinto  12/10/12 

Draft Report  Rev O  Review  Strategen (N. Zago/H. Ventriss)  Rio Tinto  25/10/12 

Draft Report  Rev 1  Review  Strategen (N. Zago)  Rio Tinto  29/10/12 

Draft Report  Rev C  Review  Strategen (N. Zago/H. Ventriss)  Rio Tinto  08/11/12 

Draft Report  Rev D  Review  Strategen (N. Zago)  Rio Tinto  12/12/12 

Final Draft Report  Rev E  Review  Strategen (N Zago/K Oliver)  Rio Tinto  19/12/12 

Final Report  Rev 2 EPA 

Review Strategen (N Zago)  EPA  20/12/12 

Final Report  Rev F  Review  Strategen (N Zago/H Ventriss)  Rio Tinto  07/02/13 

Final Report  Rev G  Review  Strategen (N Zago)  Rio Tinto  14/02/13 

Final Report  Rev H  Review  Strategen (N Zago)  Rio Tinto  15/02/13 

Final Report  Rev 3  Review  Strategen (N Zago)  Rio Tinto  18/02/13 

Final Report  Rev 4 EPA 

Review Rio Tinto (J. English)  EPA  10/04/13 

 

 

 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page iii 

TABLE OF CONTENTS 

Disclaimer and Limitation  ii 

1  PROPOSAL  1 

1.1  Proponent Details  1 

1.2  Proposal Description  1 

1.3  Changes to the Proposal since Referral  3 

1.4  Proposal Tenure  4 

1.5  Land Use and Social Environment in Proximity to the Proposal  5 

2  STAKEHOLDER CONSULTATION  15 

3  ENVIRONMENTAL IMPACTS AND MANAGEMENT  27 

3.1  Environmental Impacts and Management  27 

3.2  Environmental Management Overview  27 

4  OTHER ENVIRONMENTAL FACTORS  61 

5  OTHER LEGISLATION AND APPROVALS  69 

6  PRINCIPLES OF ENVIRONMENTAL PROTECTION AND EIA  71 

6.1  Principles of Environmental Protection  71 

6.2  Principles of EIA for the Proponent  72 

6.3  Criteria for API Category A  74 

7  REFERENCES  75 

FIGURES 

Figure 1‐1:  Regional Location  6 

Figure 1‐2:  Proposal Locality  7 

Figure 1‐3:  Proposal Boundary and Indicative Infrastructure Layout  8 

Figure 1‐4:  Landscapes and Vegetation of the WTS Area  9 

Figure 1‐5:  Proposal Boundary Revision  13 

Figure 1‐6:  Proposal Tenure  14 

Figure 3‐1:  Vegetation and Flora of Localised Conservation Significance  37 

Figure 3‐2:  B1 Groundwater Drawdown and Dewatering Discharge  39 

Figure 3‐3:  Significant Species and Fauna Habitats  43 

Figure 3‐4:  Modelled Discharge Extent and Aquatic Fauna Sampling Sites  49 

Figure 3‐5:  B1 Deposit Geological Sections  53 

Figure 3‐6:  Section 17 Geological Sections  54 

   

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page iv 

TABLES 

Table 1‐1:  Proposal Summary  3 

Table 1‐2:  Location and Extent of Physical and Operational Elements of the Proposal  3 

Table 1‐3:  Changes to the Proposal since Referral  3 

Table 2‐1:  Stakeholder Consultation Relevant to the Proposal  16 

Table 3‐1:  Summary of Supporting Studies  29 

Table 3‐2:  Vegetation and Flora: Description of Factor, Impact Assessment and Management  35 

Table 3‐3:  Terrestrial Fauna: Description of Factor, Impact Assessment and Management  41 

Table 3‐4:  Subterranean Fauna: Description of Factor, Impact Assessment and Management  45 

Table 3‐5:  Hydrological Processes and Inland Water Environmental Quality (Aquatic Fauna): Description of Factor, Impact Assessment and Management  47 

Table 3‐6:  Hydrological Processes and Inland Waters Environmental Quality (Groundwater): Description of Factor, Impact Assessment and Management  51 

Table 3‐7:  Hydrological Processes and Inland Waters Environmental Quality (Surface Water): Description of Factor, Impact Assessment and Management  55 

Table 3‐8:  Rehabilitation and Closure: Description of Factor, Impact Assessment and Management  57 

Table 3‐9:  Residual Impacts: Description of Factor, Impact Assessment and Management  59 

Table 4‐1:  Other Environmental Factors, Impact Assessment and Management  62 

Table 5‐1:  Other Legislation and Approvals  69 

Table 6‐1:  Principles of Environmental Protection  71 

Table 6‐2:  Principles of EIA for the Proponent  72 

Table 6‐3:  Criteria for API Category A  74 

LIST OF PLATES 

Plate 1:  Proposal Area from the Nanutarra‐Munjina Road, view Southwest to Northwest (L to R) from Point A on Figure 1‐4  11 

Plate 2:  Proposal Area from the Nanutarra Munjina Road; view Northwest to Northeast (L to R) from Point B on Figure 1‐4  11 

Plate 3:  B1 deposit; view to East, from Point C Figure 1‐4, B1 satellite pits will be located on the lower slopes of the ridgeline in right of picture  12 

Plate 4:  S17; view northwest to north (L to R), from Point D on Figure 1‐4  12 

 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page v 

APPENDICES 

Appendix 1   Supporting Tables  79 

Appendix 2  A Vegetation and Flora Survey of the West Turner Section 10 Area and Infrastructure Corridor (Biota 2007).  89 

Appendix 3  West Turner Syncline Section 10 Development Two‐Phase Fauna Survey (Biota 2009a).  89 

Appendix 4  A Two‐Phase Fauna Survey of the West Turner Syncline Area, (Biota 2009b).  89 

Appendix 5  West Turner Targeted Fauna Survey (Biota 2011a).  89 

Appendix 6  West Turner Syncline Section 10 Expanded Vegetation and Flora Survey Report (Biota 2011b).  89 

Appendix 7  West Turner Syncline Phase 2 Vegetation and Flora Report (Biota 2013a).  89 

Appendix 8  West Turner Syncline NES Species Assessment (Biota 2012a).  89 

Appendix 9  West Turner Syncline Fauna Survey Summary Report (Biota 2012b).  89 

Appendix 10  West Turner Syncline Stage 2 – Phase 1 Survey and Targeted Vegetation Survey (Biota 2013b).  89 

Appendix 11  West Turner Syncline Stage 2 B1 and Section 17 Deposits Subterranean Fauna Survey (Biota 2012c).  89 

Appendix 12  Western Turner Syncline Stage 2 Visual Impact Assessment (Ecoscape 2012).  89 

Appendix 13  Predicted Dust Levels from Western Turner Syncline Stage 2 (B1 and S17) Iron Ore Project (Environmental Alliances 2012).  89 

Appendix 14  Western Turner Syncline Stage 2 Project Ecological Risk Assessment (Equinox Environmental 2012).  89 

Appendix 15  WTS2 B1 Water Quality Assessment (KCB 2012b).  89 

Appendix 16  Potential Impacts of Dewatering and Discharge to Duck Creek and Caves Creek, Greater Nammuldi (Rio Tinto 2011).  89 

Appendix 17  Baseline Hydrology Assessment for Local Creek Discharge from WTS B1 (Rio Tinto 2012a).  89 

Appendix 18  Western Turner Syncline B1 – Feasibility Study Groundwater Modelling: Dewatering and Closure (Rio Tinto 2013a).  89 

Appendix 19  WTS Phase II Surface Water Management, unpublished report prepared by Rio Tinto (Rio Tinto 2012c).  89 

Appendix 20  Western Turner Syncline B1 – Feasibility Studies Groundwater Modelling: Dewatering and Closure (Rio Tinto 2012d).  89 

Appendix 21  Surface hydrology in the vicinity of the WTS2 infrastructure corridor between WTS B1 and S10; assessment and modelling of natural surface flows (Rio Tinto 2012e).  89 

Appendix 22  Western Turner Syncline B1 and S17 AMD Risk Assessment (Rio Tinto 2012f).  89 

Appendix 23  Western Turner Syncline (Stage 2) Closure Plan (Rio Tinto 2012g).  89 

Appendix 24  Environmental Noise Assessment of Western Turner Syncline Stage II Project (SVT 2012).  89 

Appendix 25  West Turner Syncline Stage 2 ‐ Potential impacts of mining operations on overland flow dependent vegetation ‐ Preliminary assessment (UWA 2012a).  89 

Appendix 26  West Turner Syncline Stage 2 ‐ Potential impacts of mining operations on groundwater dependent vegetation ‐ Preliminary assessment (UWA 2012b).  89 

Appendix 27  Western Turner Syncline Project, wet & dry 2011 sampling, final report (WRM 2012a).  89 

Appendix 28  WTS2 – groundwater quality updated data (WRM 2012b).  89 

Appendix 29  WTS Stage 2 FS – Water balance & strategy update (Rio Tinto 2013b).  89 

Appendix 30  Checklist for documents submitted for EIA on marine and terrestrial biodiversity.  89 

Appendix 31  EPA prepared scoping guideline.  89 

 

 

 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 1 

1 PROPOSAL 

The Proposal was referred to the Environmental Protection Authority (EPA) on 4 May 2012.  The EPA set an 

Assessment on Proponent Information (API) level of assessment under s 38 of the Environmental Protection 

Act 1986 (EP Act) on 25 June 2012.  An EPA prepared Environmental Scoping Document (ESD) was provided 

on 5 October 2012.  This Environmental Review document has been prepared in accordance with the ESD, 

and the information requirements for a Category A API as set out in the Environmental Impact Assessment 

(Part IV Divisions 1 and 2) Administrative Procedures 2012 (2012 Administrative Procedures). 

1.1 Proponent Details 

The Proponent for this Proposal is Hamersley Iron Pty Ltd. 

Hamersley Iron Pty Limited 

ABN: 49 004 558 276 

GPO Box A42  

PERTH WA 6837 

The contact person for the Proposal is: 

Jeremy English 

Rio Tinto Iron Ore: Superintendent Approvals 

T: +61 (0)8 9205 2919 

[email protected] 

1.2 Proposal Description 

Hamersley  Iron  Pty  Limited  (a wholly‐owned  subsidiary  of  Rio  Tinto)  proposes  to  develop  the Western 

Turner Syncline Stage 2 – B1 and Section 17 Deposits (Proposal), located approximately 30 km west of Tom 

Price in the central Pilbara region of Western Australia (Figure 1‐1).  The Proposal involves open‐pit mining 

of the B1 and Section 17 (S17)  iron ore deposits, transport of ore to the existing Western Turner Syncline 

(WTS) Section 10 (S10) mine (approximately 12 km east of the B1 deposit) and construction/operation of 

associated infrastructure (Figure 1‐2).  The Proposal will operate at production rates of up to approximately 

32 million tonnes per annum (Mtpa). 

The  Proposal will  be  integrated  into  the  current  Rio  Tinto  Greater  Tom  Price mining  operation.    After 

transport to the WTS S10 mine, ore will be transferred via an existing transportation corridor to the Tom 

Price mine for further processing, and subsequently to port facilities at Cape Lambert and Dampier via the 

existing Rio Tinto rail network. 

The main components of the Proposal comprise the following elements: 

1. Open pit mining of iron ore at productions rates of up to approximately 32 Mtpa from the B1 deposit 

(one main pit and four small satellite pits) and S17 deposit (eight pits) for at least 15 years. 

2. An infrastructure corridor (approximate length of 12 km) linking B1 to the S10 mine site, including a 

conveyor  system,  light and heavy vehicle access  roads, above‐ground power  lines, water pipelines 

and communications. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 2 

3. Mine  support  infrastructure  (located  predominantly  near  B1)  including  primary  crushing  facilities, 

ROM pad, workshops,  fuel  storage/refuelling  facilities, waste disposal  facilities,  explosives  storage 

facility,  communications  infrastructure,  heavy  and  light  vehicle  access  roads,  power  distribution 

infrastructure, administration facilities, and other ancillary facilities as required. 

4. Dewatering of  the B1 main pit  via  in‐pit bores  at  extraction  rates up  to  approximately 30 ML/day 

(11 GL/annum)  to  enable mining  to  a  depth  of  approximately  195 m  below  water  table  (BWT).  

Required  rates of dewatering are expected  to peak  in  the  first  three  years of operation and  then 

decline to approximately 14 ML/day from 2018 to 2027.   The four B1 satellite pits are above water 

table (AWT). 

5. Minor dewatering of S17 pits 3 and 8  (to enable mining to approximately 15 m BWT); the other six 

pits at S17 are AWT. 

6. Water  supply  from  mine  dewatering  with  current  demand  expected  to  average  approximately 

6 ML/day.   

7. Dewatering  from  the  B1  deposit  in  excess  of  operational  requirements  will  be  discharged  to  a 

watercourse  north  of  the  deposit  (discharge  watercourse),  that  joins  the  Beasley  River  10 km 

downstream of  the discharge point.    From 2015  to 2017, potential discharge of up  to 30 ML/day 

(excluding  expected  on‐site water  use  of  6 ML/day)  is  predicted  to  extend  approximately  18 km 

downstream  of  the  discharge  point.    From  2018  to  2027,  potential  discharge  of  approximately 

14 ML/day (excluding expected on‐site water use of 6 ML/day) is predicted to extend approximately 

13 km downstream of the discharge point.   With operational water use of approximately 6 ML/day, 

discharge is expected to be <10 ML/day for the majority of the life of the Proposal. 

8. Mineral waste disposal in permanent out‐of‐pit waste dumps.  Progressive backfill of the B1 satellite 

pits and S17 pits will be undertaken where practical, with prioritisation to ensure S17 pits 3 and 8 are 

backfilled to a level sufficient to prevent formation of pit lakes. 

9. Stockpiling of high grade and low‐grade ore, topsoil and subsoil.  

10. Power supply through connection to existing Rio Tinto power supply network.  Diesel generators will 

be used during construction and as emergency supply during operations. 

11. Investigative and monitoring activities. 

The  Proposal  boundary,  and  indicative  layout  of  the main mine  and  infrastructure  components  (during 

Feasibility Study) is illustrated in Figure 1‐3.  The proposed extent of clearing (2700 ha) within the Proposal 

boundary  (8430 ha) allows  for an approximately 30%  larger  footprint  than  the  current  indicative  layout.  

This is to enable: 

•  potential  design modifications  during  the  Proposal  Feasibility  Study,  detailed  design,  construction 

and operational phases; 

•  temporary construction disturbance;  

•  additional minor infrastructure components and activities. 

Landscapes and vegetation of the WTS area, where the Proposal is located, are illustrated in Figure 1‐4 and 

Plate 1 to Plate 4. 

Table 1‐1 summarises the Proposal and Table 1‐2 details the key characteristics of the Proposal. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 3 

Table 1‐1:  Proposal Summary 

  Western Turner Syncline Stage 2 – B1 and S17 Deposits 

Short description 

The proposal is to develop and operate an iron ore mine approximately 30 km west of Tom 

Price, Western Australia.  The proposal involves open‐pit mining of the B1 and Section 17 

iron ore deposits, transport of ore to the existing Western Turner Syncline Section 10 mine 

(approximately 12 km east of the B1 deposit) and the construction/operation of associated 

infrastructure. 

Table 1‐2:  Location and Extent of Physical and Operational Elements of the Proposal 

Element  Location  Extent 

Clearing for mine pits and associated 

infrastructure Figure 1‐3 

Up to 2700 ha within the 8430 ha 

Proposal boundary  

Dewatering  B1 and S17 deposits  (Figure 1‐3)  Up to 11 GL/annum 

Discharge water To watercourse near B1 deposit 

(Figure 1‐3) Up to 11 GL/annum 

1.3 Changes to the Proposal since Referral 

Changes to the proposal since referral to the EPA on 4 May 2012 are defined  in Table 1‐3.   The change  in 

spatial extent of the Proposal boundary is illustrated in Figure 1‐5.  

Table 1‐3:  Changes to the Proposal since Referral 

Element Proposed in 

Referral Current Proposal  Comment/Justification 

Clearing  2,500 ha  2,700 ha 

An additional 200 ha of clearing is required based on more 

detailed Proposal design during the Feasibility Study, 

primarily associated with an additional waste dump 

location and haul roads. 

Construction 

camp 

Construction 

workforce to be 

located in a camp 

near B1 deposit. 

Construction 

workforce to be 

located off‐site. 

Rio Tinto has determined that alternative accommodation 

options are preferable to construction of a new camp near 

the WTS B1 deposit. 

B1 deposit 

dewatering 

rate and 

volume 

Maximum 

dewatering rate 

13 ML/day 

(5 GL/annum). 

Total dewatering 

volume approx. 

21 GL. 

Maximum 

dewatering rate 

30 ML/day 

(11 GL/annum). 

Total dewatering 

volume approx. 

80 GL. 

Based on data collected from bores in 2012, the 

groundwater model for the B1 deposit was updated in 

November 2012.  This model update has indicated an 

increase in the required rate and volume of dewatering 

from the B1 deposit (Rio Tinto 2013a). 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 4 

Element Proposed in 

Referral Current Proposal  Comment/Justification 

Dewatering 

discharge 

rate, volume 

and extent 

Up to 13 ML/day 

discharge. 

Maximum 

discharge extent 

approx. 13 km. 

Up to 30 ML/day 

discharge. 

Maximum 

discharge extent 

approx. 18 km. 

Due to the increased rate of dewatering from the B1 

deposit, an increase in the rate of dewatering discharge to 

the environment is required (Rio Tinto 2013a, 2013b). 

Proposal 

Boundary 9,000 ha  8,430 ha 

Based on higher level of certainty regarding infrastructure 

locations, and in consideration of outcomes of vegetation 

and fauna surveys, the western extent of the Proposal 

boundary has been reduced in size during the Feasibility 

Study (Figure 1‐5), achieving the following environmental 

outcomes: 

Significant reduction in the area of the locally 

significant ‘gorge and gully’ vegetation community 

within the Proposal boundary (e.g. from 61% to 34% of 

the mapped extent of the 'gorge and gully' community 

in WTS area). 

Exclusion from the Proposal boundary of the gorge 

east of Mt Turner where both the Leaf‐nosed Bat and 

the Olive Python have been recorded. 

Exclusion from the Proposal boundary of three 

locations of the P1 species Hibiscus sp. Mt Brockman 

(Figure 3‐1). 

Two small additional areas have been included in the 

Proposal boundary: 

Near the existing Section 10 mine, to align with the 

boundary of a tenure application. 

Near the S17 waste dump, to provide additional area 

between the indicative dump footprint and the 

Proposal boundary. 

1.4 Proposal Tenure 

Proposed infrastructure is located on current and pending tenure under the Iron Ore (Hamersley Range) 

Agreement Act 1963 (State Agreement Act), Mining Act 1978 (Mining Act), and the Land Administration 

Act 1997 (LA Act) as follows (Figure 1‐6): 

•  The B1 and S17 deposits, and the majority of support infrastructure, are located on State Agreement 

Act tenure Mining Lease No. 4SA. 

•  Applications for Miscellaneous Licences under the Mining Act have been submitted where required 

for infrastructure corridors. 

•  Applications for leases under the LA Act have been made where required for infrastructure, 

stockpiles and waste dumps. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 5 

The Proposal boundary incorporates some 'off tenure' areas where tenure is held by third parties 

(Exploration Licences under the Mining Act).  While Proposal infrastructure is not planned to be located in 

these areas, they are included within the Proposal boundary to provide some flexibility if locations of 

infrastructure are modified during ongoing Proposal planning, or preferred tenure locations cannot be 

obtained.   

If any additional 'off‐tenure' areas are required due to modifications in planned location of infrastructure, 

suitable tenure and other legislative approvals required will be obtained prior to implementing activities 

within these areas. 

1.5 Land Use and Social Environment in Proximity to the Proposal 

The Proposal  is  located within  the Shire of Ashburton  (Pilbara Region), approximately 30 km west of  the 

town  of  Tom  Price.    Landscapes  and  vegetation  of  the WTS  area,  where  the  Proposal  is  located,  are 

illustrated in Figure 1‐4 and Plate 1 to Plate 4. 

The Proposal  is  located within  the  traditional  lands of  the Eastern Guruma people, and  the Yinhawangka 

people.   The B1 deposit occurs within  the Eastern Guruma native  title  claim area  (WC97/89).   Rio Tinto 

entered  into an  Indigenous Land Use Agreement  (ILUA) with  the Eastern Guruma People on 13 February 

2008.   The S17 deposit occurs within the Yinhawangka native title claim area (WC10/16).   Rio Tinto has a 

Multiple Project Binding Agreement with the Yinhawangka people, and  is currently  in negotiations with a 

view to reaching a commercial Participation Agreement, that will be registered later as an ILUA. 

The Rocklea pastoral station (leased and operated by Hamersley Iron)  is partially  intersected by the north 

of  the  Proposal  boundary,  and  occurs  in  close  proximity  to  the west  (4  km)  and  south  (200 m)  of  the 

Proposal boundary (Figure 1‐6).   The Hardey River borefield, that provides water to the Tom Price mining 

operation, occurs to the south east of the Proposal boundary, on a Land Act lease, held by Hamersley Iron. 

Mining operations  in proximity  to  the Proposal  include  the WTS S10 mine  (12 km  to  the east of B1),  the 

Tom Price mine (30 km southeast of B1) and the Brockman 4 mine (22 km northwest of B1), all owned and 

operated  by  Hamersley  Iron  (Figure  1‐2).   White Quartz  Road, which  passes  through  the  north  of  the 

Proposal  boundary,  is  a  sealed  private  road  constructed  and  operated  by Hamersley  Iron  that  provides 

access to the Brockman 4 mine site. 

The Proposal boundary intersects, and occurs in proximity to, several Mining Act Exploration Licences held 

by third parties.  A proposed LA Act lease to be held by the Eastern Guruma is located approximately 1.4 km 

west of  the north‐west  corner Proposal boundary, north of  the White Quartz Road  (Hamersley  Iron has 

agreed  to  excise  this  area  from  the  Rocklea  pastoral  station).    The  proposed  lease  includes  a  ~3.6  km 

section of the Beasley River, which is within the extent of dewatering discharge at rates >15 ML/day. 

Karijini National Park, 18 km east of the Proposal boundary, is the only location registered on the Australian 

Heritage Database in the vicinity of Tom Price.  No Heritage Council of Western Australia listed sites occur 

within the vicinity of the Proposal. 

 

700,000 mE 800,000 mE7,600,000 m

N7,700,000 m

N

700,000 mE

7,500,000 mN

500,000 mE

500,000 mE

600,000 mE

600,000 mE

400,000 mE7,

600,

000

mN

7,70

0,00

0 m

N

400,000 mE

7,50

0,00

0 m

N

Millstream-ChichesterNational Park

KarijiniNational Park

Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10

Mount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom Price

Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4

NammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiBrockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2

Mesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa A

ChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreek

CloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreak

BHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO Yandi

MarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandoo

Mount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount Whaleback

ParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdoo

Eastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern Range

Mesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa J

MACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMAC

PannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonica

NewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewman

Marble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble Bar

KarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampier

Western Turner Syncline Stage 2Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10Western Turner Syncline S10

Mount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom PriceMount Tom Price

Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4Brockman 4

NammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiNammuldiBrockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2Brockman 2

Mesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa AMesa A

ChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasChristmasCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreekCreek

CloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreakCloudbreak

BHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO YandiBHPIO Yandi

MarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandooMarandoo

Mount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount WhalebackMount Whaleback

ParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdoo

Eastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern RangeEastern Range

Mesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa JMesa J

MACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMACMAC

ChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannarChannar

West AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest AngelasWest Angelas

YandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicooginaYandicoogina

Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1Hope Downs 1

PannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonicaPannawonica

NewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewmanNewman

Marble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble BarMarble Bar

KarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaKarrathaDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampierDampier

Cape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape LambertCape Lambert

OnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslowOnslow

ParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdooParaburdoo

RoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourneRoebourne

Tom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom PriceTom Price

WickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickhamWickham

Western Turner Syncline Stage 2

LEGEND

1:2 000 000 @ A4

SCALE

LOCATION MAP

Town

Port

Railway

Sealed Road

Nor

th

West Coastal

Highway

Hw

y

Road

Nanutarra

Unsealed Road

10 0 10 20 30 40km

Mine

Western TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerWestern TurnerSyncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2Syncline Stage 2

- Munjina

FIGURE 1 - 1

Regional Location ofWestern Turner Syncline

Stage 2Plan No. PDE0092359v1Proj: MGA94 Zone50

Drawn: T. LinklaterDate: April, 2013

Resource Strategy & Planning

Great

Northern

Plate 1:  Proposal area from the Nanutarra‐Munjina Road; view southwest to northwest (L to R) from point A on Figure 1‐4 

 

Plate 2:  Proposal area from the Nanutarra‐Munjina Road; view northwest to northeast (L to R) from point A on Figure 1‐4 

Plate 3:   B1 deposit; view to east from point C on Figure 1‐4 

B1 satellite pits will be located on the lower slopes of the ridgeline in right of picture. 

 

 

Plate 4:   S17; view northwest to north (L to R), from point D on Figure 1‐4 

 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 15 

2 STAKEHOLDER CONSULTATION 

Identified key stakeholders for this project include: 

Government agencies: 

o Office of the Environmental Protection Authority (OEPA); 

o Department of Environment and Conservation (DEC) – Pilbara Region, Perth Environmental 

Management Branch (EMB), Perth Contaminated Sites Branch (CSB); 

o Department of Mines and Petroleum (DMP); 

o Department of State Development (DSD); 

o Department of Water (DoW) – Pilbara regional office and Perth office; 

o Department of Indigenous Affairs (DIA); 

o Shire of Ashburton. 

Traditional Owners: 

o Eastern Guruma Group; 

o Yinhawangka Group. 

Stakeholder consultation undertaken to date, and Rio Tinto’s response to issues raised, is detailed in Table 

2‐1.    Rio  Tinto  will  continue  to  consult  with  relevant  stakeholders  during  the  environmental  approval 

process, and during implementation of the Proposal. 

 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 16 

Table 2‐1:  Stakeholder Consultation Relevant to the Proposal 

Date  Topics/Issues Raised  Proponent Response 

Office of the Environmental Protection Authority (OEPA) 

29/02/2012 

Rio  Tinto  provided  a  detailed  overview  of  the  Proposal,  current/planned environmental studies, potential environmental impacts and proposed management. 

 

OEPA advised the key issue for Proposal is likely to be associated with closure. 

Rio Tinto has addressed closure as a key issue during the Environmental Impact Assessment (EIA) for the Proposal.  A Proposal Closure Plan has been prepared  in  accordance with  the Guidelines  for Preparing Mine Closure Plans (DMP/EPA 2011), and is provided as Appendix 23. 

OEPA advised the referral should include assessment of requirement for an offset in accordance with Appendix 2 of EPA Guidance Statement No. 19. 

The  referral document  included an assessment of  requirement  for an offset. 

A proposed offset package has been provided as a separate document to the Environmental Review. 

3/09/2012 Discussion  of  key  environmental  factors  identified  in  EPA‐prepared  Environmental Scoping Document (ESD).  

Rio  Tinto  to  address  key  environmental  factors  in  Environmental Review. 

5/10/2012 

Meeting included DMP. 

Rio  Tinto  provided  detailed  overview  of  the  Proposal,  with  focus  on  waste characterisation, pit lake water quality modelling, and closure management. 

 

OEPA  advised  Environmental  Review  needs  to  clearly  define  whether  impacts  to potential groundwater‐dependent vegetation (GDV) are likely. 

Environmental Review provides detail  that  impact  to potential GDV  in the WTS area is highly unlikely. 

2/11/2012 Discussion  of  structure  and  content  of  Environmental  Review  document  to  be submitted for EPA assessment.  General agreement reached. 

Rio  Tinto  will  prepare  the  Environmental  Review  document  in accordance with the agreed approach. 

30/01/2013 Discussion of OEPA comments on  submitted Environmental Review document, and approach to address.  General agreement reached. 

Rio  Tinto  will  revise  Environmental  Review  document  in  accordance with agreed approach, and resubmit. 

12/03/2013 Site visit to WTS2 with OEPA and DOW. 

General discussion of relevant environmental factors and potential impacts.  

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 17 

Date  Topics/Issues Raised  Proponent Response 

DEC ‐ Environmental Management Branch (EMB) 

20/02/2012 

Rio  Tinto  provided  a  detailed  overview  of  the  Proposal,  current/planned environmental studies, potential environmental impacts and proposed management, with focus on biological issues. 

 

DEC  advised  the  proposed  approach  to  identify  areas where  potentially  overland flow‐dependent  vegetation  may  be  impacted  by  the  infrastructure  corridor  was reasonable. 

Rio  Tinto  has  subsequently  implemented  a more  rigorous modelling approach to assess the potential  impacts of the  infrastructure corridor on  surface  hydrology  (Appendix  21).    This  updated  approach  was discussed with DEC EMB on 23 October 2012. 

DEC  advised  the  proposed  approach  to  assessment  of  impacts  on  troglofauna identified in the Proposal area (genetic analysis, habitat assessment) was reasonable. 

Rio  Tinto  has  implemented  proposed  approach,  as  detailed  in  the Environmental Review. 

DEC queried  the potential  for  further  ‘gorge and gully’ vegetation  to occur outside the Proposal boundary. 

Rio Tinto  implemented  further surveys outside  the Proposal boundary in 2012, and has identified further areas of ‘gorge and gully’ vegetation within the Environmental Review (Figure 3‐1). 

DEC queried the timeframe to further develop understanding of likely pit lake water quality at the B1 deposit, and proposed management. 

Rio Tinto has undertaken 2 phases of pit lake water quality modelling in 2012  (Appendix  15).    The  modelling  report  is  an  appendix  to  the Environmental Review.  The Closure Plan (Appendix 23) provides detail on proposed management of the pit lake. 

23/10/2012 

Rio Tinto provided an overview of the Proposal with focus on: 

Outcomes  of  surface  hydrology modelling  that  indicates  any  overland  flow occurring  in  the  vicinity  of  the  proposed  infrastructure  corridor  is  highly unlikely (Appendix 21), and the approach is to optimise the location of culverts within watercourses. 

Overview  of  subterranean  fauna  survey  results,  with  focus  on  risk‐based approach  that  demonstrates  Proposal  is  likely  to  comprise  low  risk  to troglofauna based on (i) outcomes of genetic analysis of troglophiles collected at  B1  and  S17  deposits,  and  (ii)  habitat  assessment  based  on  geology (Appendix 11). 

 

DEC  indicated approach to  issues generally considered reasonable, and that  further comment on the Proposal will be provided if warranted following EMB assessment of the Environmental Review document. 

Detail on issues has been provided in the Environmental Review. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 18 

Date  Topics/Issues Raised  Proponent Response 

DEC – Pilbara Region 

01/03/2012 

Rio Tinto provided detailed overview of the Proposal, current/planned environmental studies, potential environmental impacts and proposed management. 

 

Weed monitoring methodology was discussed in the context of the recently updated Rio Tinto Weed Management Strategy, and potential Ministerial  conditions  for  the Proposal. 

Rio Tinto will align weed monitoring methodology with updated Weed Management  Strategy,  and  potential  Ministerial  conditions  for  the Proposal. 

The  possibility  for  baseline  monitoring  of  potential  overland  flow‐dependent vegetation and weeds  in 2012 was discussed.   DEC advised that the EMB  is the first point of contact to discuss monitoring methodologies. 

Noted. 

DEC – Contaminated Sites Branch (CSB) 

1/11/2012 

Meeting included DoW. 

Rio Tinto provided overview of  the Proposal, with  focus on geology, hydrogeology, geochemical waste characterisation, pit  lake water quality modelling, mineral waste management, and closure planning. 

 

DEC  advised  approach  to  geochemical  waste  characterisation  and  pit  lake  water quality modelling was reasonable, and appropriate for the stage of the Proposal. 

Acknowledged. 

DEC provided several suggestions for consideration in future phases of pit lake water quality modelling, including:  

consideration of sorption by iron oxides;  

leach  testing with water  of  similar  total  dissolved  solids  (TDS)  to  predicted future  pit  lake  TDS  to  investigate  possible  effects  such  as  desorption  of phosphates;  

consideration of the Leaching Environmental Assessment Framework. 

Rio Tinto confirms the LEAF procedures were considered during development of the current sequential leach scheme. 

Rio  Tinto  will  investigate  these  recommendations  and incorporate  in future phases of pit  lake water quality modelling where appropriate. 

Rio Tinto will continue  to seek  feedback  from key stakeholders regarding approach to pit lake water quality modelling. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 19 

Date  Topics/Issues Raised  Proponent Response 

Department of Mines and Petroleum – Minerals Branch 

28/02/2012 

Rio Tinto provided detailed overview of the Proposal, current/planned environmental studies, potential environmental  impacts and proposed management, with focus on waste characterisation and closure issues. 

 

DMP  provided  comment  on  a  range  of  Proposal‐specific  issues,  predominantly associated with mine closure, including: 

•  potential  for  dewatering  of  Mount  McRae  Shale  to  generate  Acid  and Metalliferous Drainage (AMD); 

•  potential impacts of dewatering discharge on watercourse vegetation; 

•  waste characterisation and volumes of material to be managed; 

•  location of topsoil stockpiles preferably in proximity to rehabilitation areas; 

•  potential  to  recover  material  other  than  topsoil  for  utilisation  as  growth medium in rehabilitation; 

•  commitments in relation to closure need to be realistic, site‐specific, consider available  baseline  data,  and  demonstrate  a  plan  is  in  place  to  address knowledge gaps; 

•  ensure any potential risk of fibrous material is addressed;  

•  DMP  also  provided  general  advice  on  expectations  regarding  mine  closure plans. 

Rio  Tinto  has  considered  these  issues  during  development  of  the Proposal Closure Plan (Appendix 23).  

DMP  advised  Rio  Tinto  to  ensure  Miscellaneous  Licences  are  granted  prior  to submission of Mining Proposals under the Mining Act. 

Noted. 

05/10/2012 Rio  Tinto  provided  detailed  overview  of  the  Proposal,  with  focus  on  waste characterisation, pit lake water quality modelling, and closure management. 

 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 20 

Date  Topics/Issues Raised  Proponent Response 

DMP provided comment on a range of Proposal closure issues, including: 

•  Provide justification that 1 m of competent capping material on outer surfaces of waste  dumps will  be  sufficient  to  ensure  dump  stability,  and  prevent  tunnel erosion. 

•  If waste dumps are located within the potential maximum flood (PMF) extent of the watercourse to north of S17 ridge, consider armouring the toe of the dump to prevent erosion. 

•  Provide  evidence  that  sufficient  material  (e.g.  topsoil,  competent  capping material) will be available to achieve planned final landform designs. 

•  Demonstrate  issues  identified  during  Proposal  baseline  studies  (e.g.  waste characterisation  etc.)  are  considered  and  integrated  into  planned  operational management procedures. 

•  Demonstrate  linkage between closure objectives,  indicative completion criteria and proposed measurement  tools, similar  to  table  in Appendix K of Guidelines for Preparing Closure Plans (DMP/EPA 2011).  Consider SMART principles during development of  objectives  and  completion  criteria,  and  ensure  objectives  are not a process. 

•  Demonstrate fibrous material, if present, will be managed appropriately. 

The Closure Plan (Appendix 23) provides further justification that 1 m of competent capping material is sufficient. 

The  Closure  Plan  provides  confirmation  that  dumps  are  located outside the modelled PMF extent of this watercourse. 

The  Closure  Plan  demonstrates  material  volumes  required  to achieve final landform designs are available, and will be stockpiled as required to ensure availability at closure. 

The  Closure  Plan  provides  detail  on  operational  procedures relevant to issues identified during Proposal baseline studies. 

The  Closure  Plan  provides  closure  objectives,  indicative completion criteria and proposed measurement  tools, developed with consideration of SMART principles. 

Low  likelihood  of  encountering  fibrous  material,  based  on extensive drilling within the Proposal area.  However, as stated in the Closure Plan, should fibrous material be encountered, it will be managed  in accordance with the Rio Tinto  Iron Ore  (WA) Fibrous Minerals Management Plan. 

Department of Mines and Petroleum – Legislation and Compliance Branch 

Ongoing since 05/2012 

Ongoing consultation regarding Mining Act clearance for LA Act licences and tenure. Rio  Tinto  to  continue  consultation  with  DMP  regarding  tenure requirements under the LA Act. 

Department of Water – Pilbara Region 

01/03/2012 

Rio Tinto provided detailed overview of the Proposal, current/planned environmental studies, potential environmental impacts and proposed management. 

 

DoW advised key issues of interest to address in Environmental Review: 

•  low connectivity of ore body aquifer to the regional aquifer; 

•  factors likely to influence the pit lake water quality;  

•  minimisation of discharge water volumes. 

Rio Tinto has addressed these issues in the Environmental Review.   

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 21 

Date  Topics/Issues Raised  Proponent Response 

Department of Water – Perth Office 

02/03/2012 

Rio Tinto provided detailed overview of the Proposal, current/planned environmental studies, potential environmental  impacts and proposed management, with focus on water management issues. 

 

DoW  indicated  the  proposed  approach  to  discharge  water  quality  management strategy was reasonable and was willing to provide further advice on draft strategy. 

Rio Tinto is further developing the approach to discharge water quality management strategy and will liaise with DoW as necessary. 

DoW suggested a site visit would be beneficial. A  site  visit was  undertaken  to WTS2  on  12/03/2013 with OEPA  and DoW.  

01/11/2012 

Meeting included DEC CSB. 

Rio Tinto provided overview of  the Proposal, with  focus on geology, hydrogeology, geochemical waste characterisation, pit  lake water quality modelling, mineral waste management, and closure planning. 

 

DoW  advised  approach  to  geochemical waste  characterisation  and  pit  lake water quality modelling was reasonable, and appropriate for the stage of the Proposal. 

Acknowledged. 

12/03/2013 Site visit to WTS2 with OEPA and DOW. 

General discussion of relevant environmental factors and potential impacts.  

Department of State Development  

Ongoing since 11/2011 

Rio Tinto has provided ongoing updates on  the Proposal at monthly meetings with DSD. 

Rio Tinto will continue consultation with DSD regarding the Proposal. 

Department of Indigenous Affairs 

13/12/2012 Rio Tinto discussed the Proposal and heritage matters with DIA, at a regular  liaison meeting. 

Rio  Tinto will  continue  regular  liaison with  the  DIA,  and will  discuss Proposal specific matters as required. 

Rio Tinto will  consult with DIA  regarding any planned  submissions  for approval under s 18 of the Aboriginal Heritage Act 1972 to disturb any heritage sites. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 22 

Date  Topics/Issues Raised  Proponent Response 

Department of Sustainability, Environment, Water, Population and Communities 

01/11/2012 

Rio Tinto provided an overview of the Proposal, presence/absence of   species  listed under  the  Environmental  Protection  and  Biodiversity  Conservation  Act  1999  (EPBC Act), and approach to consider potential impacts of the Proposal on listed species at a population or species level.  

Rio Tinto will proceed with planned referral of Proposal under the EPBC Act. 

28/11/2012 

Rio Tinto provided an overview of the Proposal, and approach to consider potential impacts  of  the  Proposal  on  EPBC‐listed  species  at  a  population  or  species  level.  Provided  update  on  revised maximum  dewatering  volumes  and  discharge  extent since previous consultation. 

Rio Tinto will proceed with planned referral of Proposal under the EPBC Act. 

DSEWPaC requested the Proposal referral under the EPBC Act provide detail on how Proposal planning/design has  implemented measures to reduce potential  impact on EPBC‐listed species and/or potential ‘core’ habitat for these species.   

The referral how Proposal planning/design has  implemented measures to  reduce  potential  impact  on  EPBC‐listed  species  and/or  potential ‘core’ habitat for these species.   Rio Tinto referred the proposal under the  EPBC Act on  17/12/2013.   On  11/01/2013 DSEWPaC  advised  the proposal was  not  considered  a  proposed  action  under  the  EPBC  Act (EPBC Ref: 2012/6681). 

Eastern Guruma – Traditional Owner 

14/09/2011  Rio Tinto provided an overview of the Proposal during site visit. Rio Tinto  to continue consultation with  the Eastern Guruma regarding the Proposal. 

04/10/2011  Rio Tinto provided overview of the Proposal. Rio Tinto  to continue consultation with  the Eastern Guruma regarding the Proposal during regular Monitoring and Liaison meetings. 

24/04/2012 

Rio  Tinto  provided  overview  of  the  Proposal,  environmental  studies,  potential environmental  impacts  and  proposed  management,  tenure  requirements,  and overview of closure planning. 

Rio Tinto  to continue consultation with  the Eastern Guruma regarding the Proposal during regular Monitoring and Liaison meetings. 

Note  Monitoring  and  Liaison  meetings  with  the  Eastern  Guruma scheduled  for  August  and  November  2012  were  cancelled  at  the Group’s request.  

Potential  impacts  to  planned  Eastern  Guruma  lease  north  of White Quartz  Road.  Primary concern was traffic on site access road (e.g. north from B1 deposit to White Quartz Road), suggested access road be located as far east as practical. 

Preferred access route joins White Quartz Road 8 km east of the area of concern;  impacts  due  to  site  traffic  are  therefore  expected  to  be minimal. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 23 

Date  Topics/Issues Raised  Proponent Response 

Visual impacts on Mt Turner. 

Current  infrastructure  layout  does  not  directly  impact  Mt  Turner.  Visual  impact  assessment  (VIA) of  the Proposal has been undertaken (Appendix 12).   The VIA  indicates minimal visual  impact on views from the White Quartz  Road,  and  no  impact  on  views  of Mt  Turner  from White Quartz Road. 

General  interest  in the extent of dewatering discharge,  including possible beneficial uses should discharge reach planned Eastern Guruma lease. 

Rio  Tinto  originally  advised  discharge  not  expected  to  reach  the planned Eastern Guruma lease. 

However, November 2012 revision to groundwater modelling indicates discharge  is now expected to reach the planned Eastern Guruma  lease for approximately the first 5 years of operation.   Rio Tinto will update the Eastern Guruma on  this  issue  at  the next Monitoring  and  Liaison meeting. 

Existing prevalence of weeds on the Beasley River was discussed, in context of how to differentiate between impacts of cattle and dewatering. 

Rio Tinto will  implement a weed monitoring/management strategy on the discharge water course, with appropriate control sites. 

08/05/2012 Rio  Tinto mailed  a  copy of  the  Proposal  referral  (as  submitted  to  the  EPA)  to  the Eastern Guruma. 

Rio Tinto  to continue consultation with  the Eastern Guruma regarding the Proposal. 

19/02/2013 Rio  Tinto  mailed  to  the  Eastern  Guruma  a  copy  of  the  Proposal  Environmental Review, as submitted to the EPA on 19/02/2013 and distributed to other government agencies for comment. 

Rio Tinto  to continue consultation with  the Eastern Guruma regarding the Proposal. 

Ongoing since 08/2012 

Representatives  of  the  Eastern  Guruma  have  participated  in  several  ethnographic and archaeological heritage surveys of Proposal area. The archaeological surveys are ongoing and are expected to be completed in 2013. 

Rio Tinto will ensure  the Eastern Guruma continues  to be  involved  in ongoing  heritage  surveys  for  the  Proposal.    All  sites  identified  are registered with  the DIA  and  copies of  all  reports  are provided  to  the Eastern Guruma. 

The Eastern Guruma will be consulted if Rio Tinto seeks approval under s18 of  the Aboriginal Heritage Act 1972  to disturb  any heritage  sites within the Eastern Guruma Native Title Claim area. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 24 

Date  Topics/Issues Raised  Proponent Response 

Yinhawangka – Traditional Owners 

17/06/2011 Rio Tinto provided brief overview of planned Rio Tinto expansion Proposals, including WTS Stage 2. 

Rio Tinto to continue consultation with the Yinhawangka regarding the Proposal. 

10/10/2011  Rio Tinto provided overview of the Proposal. Rio Tinto to continue consultation with the Yinhawangka regarding the Proposal. 

28/02/2012 

Proposal  information  incorporated  into  Agreement  negotiations  presentation  to describe  proposed  S31  Agreement  application  under  the  Native  Title  Act  1993 seeking  conversion of part of  the Western Turner  Syncline exploration  area  into  a mining lease. 

Rio Tinto to continue consultation with the Yinhawangka regarding the Proposal. 

Ongoing since 03/2012 

Ongoing meetings  regarding negotiation of Participation Agreement and  ILUA, with updates included regarding WTS Stage 2 Proposal tenure requirements. 

Resolution  of  Rio  Tinto/Yinhawangka  Participation  Agreement imminent; authorisation expected Q4 2012. 

08/05/2012 Rio  Tinto mailed  a  copy of  the  Proposal  referral  (as  submitted  to  the  EPA)  to  the Yinhawangka. 

Rio Tinto to continue consultation with the Yinhawangka regarding the Proposal. 

19/02/2013 Rio Tinto mailed to the Yinhawangka a copy of the Proposal Environmental Review, as  submitted  to  the  EPA  on  19/02/2013  and  distributed  to  other  government agencies for comment. 

Rio Tinto  to continue consultation with  the Eastern Guruma regarding the Proposal. 

Ongoing since 06/2003 

Representatives of the Yinhawangka have participated  in multiple ethnographic and archaeological heritage  surveys of Proposal area.   Archaeological and ethnographic surveys are ongoing and are expected to be completed by 2014. 

Rio Tinto will ensure that the Yinhawangka continues to be involved in ongoing  heritage  surveys  for  the  Proposal.    All  sites  identified  are registered with  the DIA  and  copies of  all  reports  are provided  to  the group. 

The Yinhawangka will be consulted  if Rio Tinto seeks approval under s 18  of  the  Aboriginal  Heritage  Act  1972  to  disturb  any  heritage  sites within the Yinhawangka Native Title Claim area. 

Shire of Ashburton 

19/04/2012 Rio  Tinto  provided  overview  of  the  Proposal,  including  plans  for  workforce accommodation,  potential  requirement  for  traffic management  on  the  Nanutarra Munjina road adjacent to S17 during blasting, and mine closure. 

Rio  Tinto  to  continue  consultation  with  the  Shire  regarding  the Proposal. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 25 

Date  Topics/Issues Raised  Proponent Response 

The Shire queried proposed management of water extracted during dewatering. Rio  Tinto  advised  water  extracted  for  dewatering  of  B1  pit  will  be preferentially utilised on site, with excess discharged to a watercourse. 

Department of Regional Development and Lands (DRDL) 

Ongoing since 05/2012 

Ongoing discussions regarding: 

•  s91 licences under the LA Act to enable access for investigative activities;  

•  final tenure requirements under the LA Act  for the Proposal, and progress of tenure applications. 

Rio  Tinto  to  continue  consultation  with  DRDL  regarding  tenure requirements under the LA Act. 

Third Parties 

FMG1 

17/01/2012 

Rio  Tinto  provided  overview  of  Proposal,  proposed  location  of  infrastructure  and Proposal tenure applications. 

Rio Tinto will continue to discuss Proposal tenure issues with FMG and will continue to provide notification of activities on co‐existing tenure.    

FMG 

Ongoing since 05/2012 

Ongoing meetings regarding proposed location of infrastructure and Proposal tenure applications. 

 

API2 

24/02/2012 Discussed WTS Stage 2 Proposal and proposed location of conveyor tenure. 

Rio Tinto will continue  to discuss Proposal  tenure  issues with API and will provide notification of activities on co‐existing tenure.    

API 

Ongoing since 02/2012 

Ongoing meetings regarding conveyor alignment and Proposal tenure applications. Rio Tinto will continue  to discuss Proposal  tenure  issues with API and will provide notification of activities on co‐existing tenure.    

                                                            

 

1 Fortescue Metals Group Ltd 

2 API on behalf of Aquila Steel Pty Ltd and AMCI (IO) Pty Ltd. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 26 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 27 

3 ENVIRONMENTAL IMPACTS AND MANAGEMENT 

3.1 Environmental Impacts and Management 

The EPA‐prepared ESD, for the Proposal, identified the following preliminary key environmental factors: 

•  vegetation and flora; 

•  fauna (terrestrial, subterranean and aquatic); 

•  ground and surface water; 

•  rehabilitation and mine closure;  

•  residual impacts. 

In  accordance  with  the  new  framework  for  the  EPA’s  principles  for  environmental  protection,  the 

preliminary key environmental factors are identified as: 

•  flora and vegetation; 

•  terrestrial fauna and subterranean fauna; 

•  hydrological processes and inland waters environmental quality;  

•  rehabilitation and closure;  

•  residual impacts. 

Studies and surveys utilised to support the impact assessment are summarised in Table 3‐1. 

Environmental  impacts and management of the preliminary key environmental factors are addressed  in a 

series of Tables (Table 3‐2 to Table 3‐9). 

The assessment of impacts and management of other factors is presented in Section 4 (Table 4‐1). 

3.2 Environmental Management Overview 

Rio Tinto has developed and  refined environmental management policies,  systems and procedures over 

decades of operational mining experience in the Pilbara region that are successfully applied at multiple iron 

ore mine sites. 

The key components to be implemented during the WTS Stage 2 Proposal include: 

1. The Rio Tinto  Iron Ore group Health, Safety, Environment, Communities and Quality Policy  (HSECQ 

Policy).    The HSECQ Policy  is  the  guiding document  for  environmental management  and provides 

context and direction for continuous improvement. 

2. Rio Tinto  Iron Ore  (WA) operates under an  ISO14001 certified Environmental Management System 

(EMS), contained within  the Health, Safety, Environment and Quality  (HSEQ) Management System.  

The HSEQ Management System is a continuous improvement model covering: 

systematic assessment of environmental risk and legal requirements; 

systems for training, operational control, communication, emergency response and corrective 

actions; 

the development of objectives and targets for improvement; 

audits and review. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 28 

3. A  Construction  Environmental  Management  Plan  (CEMP),  that  will  interface  with  the  HSEQ 

Management System. 

4. An  operational  Environmental  Management  Plan  (EMP)  that  will  interface  with  the  HSEQ 

Management System. 

5. The Rio Tinto Closure Standard will continue to guide Proposal closure planning and implementation, 

addressing  the  development  of  a  Closure  Knowledge  Base,  developing  and maintaining  a  Closure 

Strategy,  developing  and  maintaining  a  Closure  Management  Plan,  stakeholder  consultation, 

financial provisioning for closure, reviews of closure plans on a regular basis, and developing a final 

decommissioning plan five years prior to scheduled closure. 

6. The  Rio  Tinto  Iron  Ore  (WA)  Significant  Species  Management  Plan  (SSMP),  which  provides  the 

framework  for  Rio  Tinto  to minimise  impacts  to  Pilbara  populations  of  species  listed  under  the 

Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) from activities associated 

with  expansions  to  its  iron  ore  mining  operations.    The  SSMP  includes  standard  management 

measures  to  minimise  impacts  to  Matters  of  National  Environmental  Significance  (MNES),  and 

requires development of further site‐specific management measures where species of MNES occur, 

or are likely to occur, in proximity to expansion projects in the Pilbara.  

 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 29 

Table 3‐1:  Summary of Supporting Studies 

Report author 

and year  Report Title and Field of Investigation 

Study Type / 

Timing 

Relevant 

Standard/Guidance 

Appendix 

Vegetation and Flora 

Biota 

Environmental 

Consultants 

2007 

A Vegetation and Flora Survey of the West 

Turner S10 Area and Infrastructure Corridor. 

Vegetation and flora survey of the WTS S10 

area and associated infrastructure corridor 

to Tom Price. 

Desktop review 

and single 

phase field 

survey.   

‐ July ‐ Oct 

2007. 

EPA Guidance Statement 

No. 51 ‐ Terrestrial Flora 

and Vegetation Surveys for 

Environmental Impact 

Assessment in Western 

Australia (EPA 2004a), Level 

1 survey. 

Appendix 

Biota 

Environmental 

Consultants 

2011b 

West Turner Syncline S10 Expanded 

Vegetation and Flora Survey Report. 

Vegetation and flora survey of areas in 

proximity to the WTS S10 mine site. 

Desktop review 

and single 

phase field 

survey. 

‐ Apr 2011. 

EPA Guidance Statement 

51, Level 1 survey. 

Appendix 

Biota 

Environmental 

Consultants 

2013a 

West Turner Syncline Phase 2 Vegetation 

and Flora Report. 

Consolidates results of vegetation and flora 

surveys undertaken from 2007 to 2011 over 

approximately 22,000 ha of the WTS area, 

including second phase sampling of the 

areas originally sampled and reported in 

Biota 2007 and Biota 2011b. 

Desktop review 

and two phase 

field survey. 

‐ July‐ Oct 

2007. 

‐ Apr 2011. 

‐ June ‐ Oct 

2011. 

EPA Guidance Statement 

51, Level 2 survey. 

Appendix 

Biota 

Environmental 

Consultants 

2013b 

West Turner Syncline Stage 2 – Phase 1 

Survey and Targeted Vegetation Survey. 

Summary report of first phase of vegetation 

and flora survey of an additional 4000ha in 

NW of the WTS area, and targeted search 

for ‘gorge and gully’ vegetation in SW of the 

WTS area. 

Desktop review 

and single 

phase field 

survey. 

‐ July 2012. 

EPA Guidance Statement 

51, Level 1 survey (Level 2 

survey on completion of 

2nd phase sampling in 

2013). 

Appendix 

10 

University of 

Western 

Australia 

2012a 

Potential impacts of mining operations on 

overland flow dependent vegetation 

(Preliminary assessment). 

Assessment of potential overland flow‐

dependent vegetation in the WTS area, and 

potential impacts of infrastructure corridor. 

Desktop review 

and field 

survey. 

‐ June 2012. 

n/a Appendix 

25 

University of 

Western 

Australia 

2012b 

Potential impacts of mining operations on 

groundwater dependent vegetation 

(Preliminary assessment). 

Assessment of potential groundwater‐

dependent vegetation in the WTS area. 

Desktop review 

and field 

survey. 

‐ June 2012. 

n/a Appendix 

26 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 30 

Report author 

and year  Report Title and Field of Investigation 

Study Type / 

Timing 

Relevant 

Standard/Guidance 

Appendix 

Fauna ‐ Terrestrial 

Biota 

Environmental 

Consultants 

2009a 

West Turner Syncline Section 10 

Development Two‐Phase Fauna Survey 

Fauna survey of the WTS S10 area and 

associated infrastructure corridor to Tom 

Price. 

Desktop review 

and two phase 

field survey. 

‐ July & Sept 

’07. 

‐ July 2008. 

EPA Guidance Statement 

No. 56 ‐ Terrestrial Fauna 

Surveys for Environmental 

Impact Assessment in 

Western Australia (EPA 

2004b), Level 2 survey. 

Appendix 

Biota 

Environmental 

Consultants 

2009b 

A Two‐Phase Fauna Survey of the West 

Turner Syncline Area. 

Fauna survey of the area encompassing the 

WTS B1 and S17 deposits, and the 

north/centre of the WTS. 

Desktop review 

and two phase 

field survey. 

‐ July & Sept 

’07. 

‐ July 2008. 

EPA Guidance Statement 

56, Level 2 survey. 

Appendix 

Biota 

Environmental 

Consultants 

2011a 

West Turner Targeted Fauna Survey 

Targeted fauna survey in proximity to the 

WTS B1 and Section 17 deposits. 

Desktop review 

and single 

phase field 

survey.  

‐ Sept 2011. 

EPA Guidance Statement 

56, Level 2 (targeted) 

survey. 

EPA Guidance Statement 

No. 20 ‐ Sampling of Short 

Range Endemic 

Invertebrate Fauna for 

Environmental Impact 

Assessment in Western 

Australia (EPA 2009). 

EPA/DEC Technical Guide ‐ 

Terrestrial Vertebrate Fauna 

Surveys for Environmental 

Impact Assessment 

(EPA/DEC 2010). 

Appendix 

Biota 

Environmental 

Consultants 

2012a 

West Turner Syncline NES Species 

Assessment. 

An assessment of the potential impact of the 

Proposal on species listed under the EPBC 

Act, based on fauna surveys in the WTS area 

(Biota 2009a, 2009b, 2011a, 2012b). 

Desktop review 

of existing 

survey data. 

EPA Guidance Statement 

56. 

Appendix 

Biota 

Environmental 

Consultants 

2012b 

West Turner Syncline Fauna Survey Summary 

Report 

Consolidated results of previous fauna 

surveys to date over a total of approximately 

24,000ha in the WTS area (Biota 2009a, 

2009b, 2011a), including a summary of key 

results from an additional targeted survey in 

the NW of the WTS area undertaken in 

2012. 

Desktop review 

of existing 

survey data 

and single 

phase field 

survey. 

EPA Guidance Statement 

56, Level 2 (targeted) 

survey. 

EPA Guidance Statement 

20. 

EPA Technical Guide – 

Terrestrial Vertebrate Fauna 

Surveys. 

Appendix 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 31 

Report author 

and year  Report Title and Field of Investigation 

Study Type / 

Timing 

Relevant 

Standard/Guidance 

Appendix 

Fauna – Subterranean and Aquatic 

Biota 

Environmental 

Consultants 

2012c 

West Turner Syncline Stage 2 B1 and Section 

17 Deposits Subterranean Fauna Survey. 

Subterranean fauna surveys within and 

adjacent to the B1 and S17 deposits, and 

genetic analysis of troglomorphic Polyxenida 

and Blattodea specimens. 

Desktop 

review, genetic 

analysis, and 

three phase 

field survey. 

‐ June – July 

2009. 

‐ Aug – Dec 

2011. 

EPA Guidance Statement 

No. 54 ‐ Consideration of 

Subterranean Fauna in 

Groundwater and Caves 

during EIA in WA (EPA 

2003). 

EPA Guidance Statement 

No. 54a ‐ Sampling methods 

and survey considerations 

for subterranean fauna in 

Western Australia (EPA 

2007a). 

Appendix 

11 

Wetland 

Research and 

Management 

2012a 

Western Turner Syncline Project, wet & dry 

2011 sampling, final report. 

Aquatic fauna survey of ephemeral pools in 

the WTS area and surrounds. 

Desktop review 

and two phase 

field survey. 

‐ April ‐ Aug 

2011. 

EPA Guidance Statement 

56.  

EPA Guidance Statement 

20. 

Australian and New Zealand 

Guidelines for Fresh and 

Marine Water Quality 

(ANZECC/ARMCANZ 2000). 

Appendix 

27 

Groundwater 

URS 2009 

Western Turner Syncline Hydrogeological 

Bore Completion Report. 

Hydrogeological drilling investigation at B1 

in 2008, including installation of three 

production bores and 11 monitoring bores. 

Desktop 

analysis and 

field drilling 

investigation in 

2008. 

n/a  n/a 

MWH 2009 

B1 groundwater model. 

Development of a conceptual 

hydrogeological model and a numeric 

groundwater model for the B1 deposit. 

Desktop 

analysis of 

existing data 

and modelling. 

n/a  n/a 

Rio Tinto 

2012b 

Western Turner Syncline B1 Dewatering 

Strategy – Groundwater numerical 

modelling. 

Review of the conceptual hydrogeological 

model, development of an updated 

numerical groundwater model, and 

prediction of dewatering requirements, for 

the B1 deposit. 

Desktop 

analysis of 

existing data 

and modelling 

update. 

n/a  n/a 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 32 

Report author 

and year  Report Title and Field of Investigation 

Study Type / 

Timing 

Relevant 

Standard/Guidance 

Appendix 

Rio Tinto 

2012d 

Western Turner Syncline B1 – Feasibility 

Studies Groundwater Modelling: Dewatering 

and Closure. 

Initial memo updating the B1 groundwater 

modelling predictions utilising data collected 

from bores during 2012, including 

assessment of effect of revised pit lake 

recovery modelling on KCB (2012b) water 

quality predictions.  Majority of information 

incorporated into Rio Tinto 2013a. 

Desktop 

analysis and 

modelling 

update utilising 

2012 bore 

data. 

n/a Appendix 

20 

Rio Tinto 

2013a 

Western Turner Syncline B1 – Feasibility 

Study Groundwater Modelling: Dewatering 

and Closure. 

Update to the B1 groundwater model and 

predicted dewatering requirements utilising 

data collected from bores during 2012.  

Assessment of B1 aquifer groundwater level 

recovery post closure.  Incorporates majority 

of information in Rio Tinto 2012d. 

Desktop 

analysis and 

modelling 

update utilising 

2012 bore 

data. 

n/a Appendix 

18 

Rio Tinto 

2013b 

WTS Stage 2 FS: Water Balance and Water 

Strategy update. 

Summarises the results of a water balance 

update and assessment of beneficial use 

options for surplus dewatering, for the WTS 

Stage 2 feasibility study. 

Desktop 

analysis of 

existing data. 

Pilbara water in mining 

guideline (DoW 2009). 

Appendix 

29 

Wetland 

Research and 

Management 

2012b 

WTS2 – groundwater quality updated data. 

Summary of water quality of the B1 and S17 

ore body aquifers, ephemeral pools in the 

WTS area and surrounds, and regional 

surface water. 

Desktop 

analysis of 

water quality 

results from 

surface and 

groundwater 

sampling 2008‐

2012. 

Australian and New Zealand 

Guidelines for Fresh and 

Marine Water Quality. 

Appendix 

28 

Surface Water 

Rio Tinto 

2012a 

Baseline hydrology assessment for a local 

creek discharge from Western Turner 

Syncline (WTS) B1 deposit. 

Modelling of the extent of dewatering 

discharge downstream of the proposed 

discharge point located north of the B1 main 

pit. 

Desktop 

analysis of 

existing data 

and modelling. 

Pilbara water in mining 

guideline. 

Appendix 

17 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 33 

Report author 

and year  Report Title and Field of Investigation 

Study Type / 

Timing 

Relevant 

Standard/Guidance 

Appendix 

Rio Tinto 

2012c 

WTS Phase II Surface Water Management. 

Development of a Proposal surface water 

management plan, based on assessment of 

surface catchments and hydrology in the 

Proposal area. 

Desktop 

analysis of 

existing data. 

Pilbara water in mining 

guideline. 

Appendix 

19 

Rio Tinto 

2012e 

Surface hydrology in the vicinity of the WTS2 

infrastructure corridor between WTS B1 and 

S10. 

Modelling of surface hydrology and 

potential impacts of the infrastructure 

corridor from B1 to S10. 

Desktop 

analysis of 

existing data 

and modelling, 

and field 

survey.  

‐ June 2012. 

n/a Appendix 

21 

Rehabilitation and Mine Closure 

Rio Tinto 

2012g 

Western Turner Syncline (Stage 2) Closure 

Plan. 

Desktop 

analysis of 

existing data. 

EPA and DMP Guidelines for 

Preparing Mine Closure 

Plans (DMP/EPA 2011). 

Appendix 

23 

Rio Tinto 

2012f 

Western Turner Syncline B1 and Section 17 

AMD Risk Assessment. 

Acid and metalliferous drainage (AMD) risk 

assessment for the B1 and S17 deposits, 

based on comprehensive program of 

geochemical waste characterisation, with 

kinetic testing in progress. 

Desktop 

assessment of 

geochemical 

data, from 

drilling 

samples 

collected/analy

sed from 1982 

to 2011. 

Global Acid Rock Drainage 

(GARD) Guide. 

Leading Practice Sustainable 

Development Program for 

the Mining Industry ‐ 

Managing Acid and 

Metalliferous Drainage 

(Commonwealth 2007). 

Appendix 

22 

Klohn Crippen 

Berger 2012a 

Western Turner Syncline B1 Pit Post Closure 

Water Quality Assessment. 

Preliminary water quality modelling of the 

B1 pit lake. 

Desktop 

analysis of 

existing data 

and modelling. 

n/a  n/a 

Klohn Crippen 

Berger 2012b 

WTS2 B1 Water Quality Assessment. 

Updated water quality modelling of the B1 

pit lake. 

Desktop 

analysis of 

existing data 

and modelling. 

n/a Appendix 

15 

Equinox 

Environmental 

2012 

Western Turner Syncline Stage 2 Project 

Ecological Risk Assessment, Final Report. 

Desktop 

analysis of 

existing data. 

Australian Risk 

Management Standard 

AS/NZS ISO 31000:2009 Risk 

management — Principles 

and guidelines. 

Appendix 

14 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 34 

Report author 

and year  Report Title and Field of Investigation 

Study Type / 

Timing 

Relevant 

Standard/Guidance 

Appendix 

Other Factors 

Visual Amenity 

Ecoscape 2012 

Western Turner Syncline Stage 2 Visual 

Impact Assessment. 

Desktop 

analysis and 

field survey. 

‐ June 2012. 

Visual Landscape Planning 

in Western Australia: a 

manual for evaluation, 

assessment, siting and 

design (DPI 2007). 

Appendix 

12 

Air Quality – 

Dust 

Environmental 

Alliances 2012 

Predicted Dust Levels From Western Turner 

Syncline Stage 2 (B1 & Section 17) Iron Ore 

Project. 

Desktop 

analysis of 

existing data 

and modelling. 

USEPA dust modelling 

guidelines – refer to 

references in report. 

Appendix 

13 

Noise and 

Vibration 

SVT 2012 

Environmental Noise Assessment of Western 

Turner Syncline Stage II Project. 

Desktop 

analysis of 

existing data 

and modelling. 

EPA Guidance Statement 

No.8 – Environmental Noise 

(EPA 2007b). 

Appendix 

24 

Table 3‐2:  Vegetation and Flora: Description of Factor, Impact Assessment and Management 

Summary of how Proposal meets EPA objective 

Description of factor  Impacts and assessment of significance  Management and mitigation 

EPA objective To maintain representation, diversity, viability and ecological function at the species population and community level. 

Summary of how Proposal meets EPA objective  The proposal can be managed to meet the EPA environmental objective for this factor, as detailed in adjacent columns: 

Flora and vegetation potentially impacted by the Proposal is well represented outside the Proposal boundary, on a local and/or regional scale. 

The spatial and temporal extent of dewatering discharge is relatively limited. 

The infrastructure corridor is unlikely to impact overland flow or potentially dependent vegetation, and channelised flow will be maintained where practical via culvert installation. 

The predicted spatial extent of groundwater drawdown during dewatering of the B1 deposit is relatively limited, and is not expected to impact potentially groundwater dependent vegetation in the WTS area. 

Clearing will be restricted to 2,700 ha within the Proposal boundary. 

Appropriate management measures to avoid, minimise and mitigate potential impacts of the Proposal on flora and vegetation will be implemented (and where applicable have been implemented during Proposal design). 

Flora Flora and vegetation surveys have been undertaken over approximately 26,000 ha of the WTS area, incorporating the 8,430ha Proposal boundary and extensive surrounding areas (Biota 2013a, 2013b): 

No Threatened flora species protected under the Wildlife Conservation Act 1950 (WC Act) were recorded in the WTS area (Biota 2013a, 2013b). 

Three Priority 1 (P1) species were recorded in the WTS area (Biota 2013a, 2013b), comprising Hibiscus sp. Mt Brockman (E. Thoma ET1354), Grevillia sp. Turee (J. Bull & G. Hopkinson ONS JJ 01.01), and Sida sp. Hamersley Range (K. Newbey 10692). 

Multiple locations of eight Priority 3 (P3) and four Priority 4 (P4) flora species have been recorded within the WTS area (Biota 2013b; Figure 3‐1). 

Vegetation  The Proposal is within the Fortescue 

Botanical District of the Eremaean Botanical Province as defined by Beard (1975) and intersects two Beard vegetation units, both of which are widespread in the Pilbara region (Biota 2013a). 

No vegetation comprising Threatened or Priority Ecological Communities was recorded within the WTS area. 

Fifty nine (59) vegetation units were identified within the WTS area (Biota 2013a, 2013b). 

Five vegetation communities within the WTS area were considered by Biota (2013a) to have elevated local significance (Figure 3‐1): 

o lower slope mulga (AanAprArTeTw and AanAprTbr); 

o valley floor mulga (AanApr and AanTmTw); 

o riparian eucalypt woodland on major ephemeral watercourses (EcEvAci and EvMgERlt); 

o scattered riparian eucalypts on major ephemeral watercourses (EvAciTeCEc);  

o gorges and gullies (CfAanAciTbrTeERlm and ElCfGOrTe). 

The mulga vegetation in the central WTS 

Flora ‐ clearing  Of the 13 locations of the P1 species Hibiscus sp. Mt Brockman recorded in the WTS area, three locations occur 

within the Proposal boundary, and one location occurs within the indicative infrastructure layout (Figure 3‐1, and Table 1 of Appendix 1).  Eleven (11) other locations of the species are known within 50 km of the Proposal, and some other existing records of Hibiscus haynaldii from the locality are likely to comprise Hibiscus sp. Mt Brockman (Biota 2013a).  Potential impact of the Proposal on this species is not considered significant. 

The two locations of the P1 species Grevillia sp. Turee and the single location of the P1 species Sida sp. Hamersley Range are outside the Proposal boundary (>2 km, Figure 3‐1) and will not be impacted by the Proposal. 

Eight of the P3 and P4 species occur within the Proposal boundary; therefore, some locations of these species are likely to be impacted by clearing for the Proposal (Table 1 of Appendix 1).  However, based on the broader distribution of these species both locally and regionally (Biota 2013a; Table 1 of Appendix 1), potential impact of the Proposal on these species is not considered significant. 

Vegetation ‐ clearing More than 50% of the surveyed extent (in the WTS area) of each of the five vegetation communities of local significance occurs outside the Proposal boundary, and more than 85% occurs outside the indicative infrastructure layout (Table 2 of Appendix 1).  These vegetation communities, and/or the habitat in which they occur, are relatively widespread regionally (Biota 2013a).  Potential impact of the Proposal to these communities on a local or regional scale due to clearing is not considered significant. 

Vegetation ‐ dewatering discharge Two vegetation units of localised significance occur in proximity to the watercourses affected by the maximum extent of discharge; vegetation unit EvAciTeCEc (overstorey of scattered E. victrix) occurs adjacent to the lower 5 km of the 10 km discharge watercourse, and vegetation units EvAciTeCEc and EcEvAci (woodland of E. camaldulensis subsp. refulgens and E. victrix) occur adjacent to the Beasley River (Figure 3‐1).  Detrimental impact to EcEvAci on the Beasley River is considered unlikely, and detrimental impact to vegetation unit EvAciTeCEc is considered possible, based on the following considerations: 

Expected dewatering discharge rates (Rio Tinto 2013b) indicate that during the initial stages of the Proposal (2015‐2017), discharge will affect the 10 km length of the discharge watercourse, and up to an 8 km length of the Beasley River (Rio Tinto 2012a).  For the majority of the Proposal life (e.g. approximately 2018‐2027), discharge will continue to affect the 10 km length of the discharge watercourse (where EvAciTeCEc occurs), and possibly a 1‐2 km length of the Beasley River (where both EvAciTeCEc and EcEvAci occurs).  If detrimental impacts to vegetation occur, it would most likely occur within this 10‐12 km length of watercourses affected by discharge for >3 years. 

Modelling indicates dewater discharge is expected to be contained within the low flow channel of the discharge watercourse and the Beasley River (e.g. the defined channel visible in Figure 1‐4, Photo Locations 1 to 4).  Therefore, the potential impact due to waterlogging is expected to be confined to vegetation growing immediately adjacent to the low flow channel, and the root systems of trees growing on the banks of these watercourses are likely to be partially, rather than completely, waterlogged. 

The key species within vegetation units EvAciTeCEc and EcEvAci are considered tolerant (E. camaldulensis subsp. refulgens) or relatively tolerant (E. victrix) to waterlogging, based on a review of previous studies and observations in the Pilbara (Rio Tinto 2011).  Detrimental impacts due to waterlogging may range from reduced growth  and health to tree death, with the degree of impact dependent on the species tolerance, complete or partial waterlogging of the root system, and duration of waterlogging.   

Based on these considerations, for the scattered E. victrix on the banks of the discharge watercourse, reduced growth and health, and some tree death, is considered possible.  For E. camaldulensis subsp. refulgens on the Beasley River, some reduced growth and health is possible, but widespread tree death is considered unlikely.   The vegetation communities would be expected to recover after cessation of discharge (as only the areas/individuals immediately adjacent to the low flow channel may be detrimentally affected), with timeframe to recovery dependent on the degree of detrimental impact.  

Potential detrimental impact to these vegetation units due to dewatering discharge is not considered significant, based on consideration of the following:  

These vegetation units are widespread regionally (Biota 2013a).    On a local scale, the area of these vegetation units in the vicinity of the maximum discharge extent comprises only 

The following key management measures for vegetation and flora will be implemented (and where applicable have been implemented during Proposal design to date): 

Proposal design has, and will continue to, minimise planned vegetation clearing to areas necessary for safe construction and operation. 

Proposal design has, and will continue to, avoid and minimise clearing of elevated conservation significance vegetation and flora, where practical: 

o Implementation of this key management measure during Proposal design has included modification of the Proposal boundary to exclude extensive areas of the locally significant ‘gorge and gully’ vegetation community, and three locations of the P1 species Hibiscus sp. Mt Brockman, in the north‐west of the WTS (Figure 1‐5). 

Proposal design has, and will continue to, incorporate consideration of surface water management, including minimising disruption to watercourses where practical (Rio Tinto 2012c, 2012e). 

Targeted surveys will be undertaken in 2013 to further investigate occurrence and distribution of the Hibiscus sp. Mt Brockman (P1) in the WTS area. 

A discharge water quality management and monitoring strategy (including site‐specific water quality trigger values) will be developed in accordance with the ANZECC/ARMCANZ (2000) water quality management framework, to manage the potential impacts of discharge water quality on the downstream environment. 

The Rio Tinto Iron Ore (WA) internal ground disturbance authorisation procedure will be implemented, including internal assessment and authorisation prior to any clearing of vegetation, and physical demarcation of areas to be cleared. 

Management of weeds will be carried out in accordance with the Rio Tinto Iron Ore (WA) Weed Management Strategy, Equipment Hygiene Inspections Procedure, Borrow Pit Specification and Management Procedure, and Soil Resource Management Procedure, including the following actions: 

o Weed monitoring will be undertaken within the discharge watercourse and management implemented as appropriate. 

o A weed action plan will be developed and implemented during construction and operations. 

Summary of how Proposal meets EPA objective 

Description of factor  Impacts and assessment of significance  Management and mitigation 

area, south of the infrastructure corridor (primarily AxAanTw) was considered to potentially comprise overland flow dependent vegetation (OFDV) (UWA 2012a).   

Three vegetation units within the study area were considered to potentially comprise groundwater dependent vegetation (GDV) due to the presence of facultative phreatophytes Eucalyptus camaldulensis subsp. refulgens and E. victrix (UWA 2012b, Figure 3‐2): 

o E. camaldulensis subsp. refulgens, E. victrix woodland over Acacia citrinoviridis tall open scrub (EcEvAci); 

o E. victrix scattered trees over A. citrinoviridis tall shrubland over Triodia epactia open hummock grassland and/or *Cenchrus ciliaris open tussock grassland (EvAciTeCEc); and 

o E. victrix low open woodland over Melaleuca glomerata tall open shrubland over Eriachne tenuiculmis very open tussock grassland (EvMgERIt). 

17% (EcEvAci) and 6% (EvAciTeCEc) of their surveyed extent in the WTS area (Table 2 of Appendix 1).  Based on helicopter and ground reconnaissance, and examination of aerial photography, extensive areas of eucalypt woodland occur locally on the Beasley and Hardey Rivers outside the extent of current vegetation surveys, and therefore the area of eucalypt woodland potentially impacted is relatively minor on a local scale. 

On a sub‐catchment scale, the length of watercourses within the maximum discharge extent is minimal (e.g. <8% of the total length of the Beasley River, and the 10 km discharge watercourse comprises <5% of the total length of similar sized tributaries within the Beasley River sub‐catchment). 

The assessment that the potential impact of discharge is not significant also applies in the unexpected circumstance that dewatering discharge extends beyond the predicted maximum extent of 18km.  For example, if the maximum extent of discharge extends to 22km (e.g. an additional 4km, assuming 25% variance in predicted discharge extent): 

Only 12% of the total length of the Beasley River would be affected at maximum discharge rates. 

The area of eucalypt woodland potentially impacted by discharge would increase by approximately 40ha to 109ha total, comprising 26% of the 412ha of eucalypt woodland mapped to date in proximity to the Proposal on the Beasley and Hardey Rivers.  Based on helicopter and ground reconnaissance, and examination of aerial photography, extensive areas of eucalypt woodland occur locally on the Beasley and Hardey Rivers outside the extent of current vegetation surveys, , and therefore the area of eucalypt woodland potentially impacted remains is relatively minor on a local scale (note that the Beasley River downstream of the current predicted discharge extent will be vegetation surveyed in 2013). 

The vegetation units that may be impacted are widespread regionally (Biota 2013a).   

Vegetation – disruption to surface flow  Modelling of surface hydrology indicates no ‘overland flow’ is likely to occur in the vicinity of the infrastructure 

corridor between B1 and S10 (Rio Tinto 2012e). 

‘Channelised flow’ within watercourses can generally be maintained where embankments are constructed within the infrastructure corridor via installation of culverts. 

Modelling of surface hydrology and on‐ground assessment of the mulga community downstream of the infrastructure corridor indicates that areas where localised overland flow may occur are located at least several hundred metres south of the corridor (Rio Tinto 2012e; UWA 2012b).  Installation of culverts, where practical, at watercourses intersected by the infrastructure corridor will reduce the potential for downstream impact due to alterations to surface hydrology. 

Vegetation – groundwater drawdown  The most significant potential GDV unit, EcEvAci (with extensive occurrence of E. camaldulensis subsp. refulgens), 

only occurs on the Beasley and Hardey rivers at least 4.5 km beyond the predicted 5 m drawdown contour for the B1 pit (Figure 3‐2).  It is highly unlikely groundwater drawdown will reach these areas, based on the distances from the pit, and the presence of typically low hydraulic conductivity rock types in these areas (Bunjima Formation and Weeli‐Wolli Formation, respectively). 

Potential GDV unit EvAciTeCEc (with scattered E. victrix) occurs on the dewatering discharge watercourse at least 1.5 km beyond the predicted 5 m drawdown contour for the B1 pit (Figure 3‐2).  The relatively shallow groundwater beneath the plain north of the WTS (where this vegetation is located) is separated from the geological units being dewatered at the B1 deposit by the typically low hydraulic conductivity Jeerinah Formation.  Therefore, it is considered highly unlikely drawdown from dewatering of B1 will affect these shallow aquifers, or the vegetation in this area.  

4.3 ha of potential GDV unit EvMgErit is located within the predicted area of 5–10 m drawdown, in a gully to the southwest of the B1 pit at an elevation of 640 to 700 mRL (Figure 3‐2).  The groundwater table where this vegetation occurs is considered to be >100 m below ground level, based on groundwater elevations at the B1 deposit (535 mRL), and the S17 deposit (500 mRL).  E. victrix is a facultative phreatophyte that may utilise shallow groundwater, but also inhabits areas without access to permanent groundwater, relying on stored soil water recharged by direct infiltration of rainfall and episodic stream flows (Rio Tinto 2011).  E. victrix at this location is not considered to be accessing the groundwater at depths >100 m.  Rather, E. victrix at this location is considered likely utilising stored soil water periodically recharged by run‐off from the upstream catchment, and therefore is unlikely to be impacted by dewatering of the B1 deposit. In the unlikely circumstance impact to this vegetation occurs due to groundwater drawdown, it is not considered significant, given the limited area of vegetation (4.3 ha), and the broader occurrence of equivalent habitat throughout the Hamersley sub‐region (Biota 2013a). 

o All equipment will be inspected to ensure they are clean and free of built up mud, rock, soil and vegetation prior to entry to, and departure from, site. 

o Areas to be cleared will be assessed for weeds; topsoil cleared from weed infested areas will be separated from other stockpiles and/or managed to prevent the spread of weeds. 

o Borrow pit locations will avoid areas with weed infestations.  If they cannot be avoided, appropriate weed treatment, hygiene and control will be implemented prior to disturbance. 

 

Table 3‐3:  Terrestrial Fauna: Description of Factor, Impact Assessment and Management 

Summary of how Proposal meets EPA objective 

Description of factor  Impacts and assessment of significance  Management and mitigation 

EPA objective To maintain representation, diversity, viability and ecological function at the species, population and assemblage level. 

Summary of how Proposal meets EPA objective  The proposal can be managed to meet the EPA environmental objective for this factor, as detailed in adjacent columns: 

Fauna habitats potentially impacted by the Proposal (including habitat of higher value for conservation significant fauna species) are well represented outside the Proposal boundary, on a local and regional scale. 

Of the seven conservation significant vertebrate fauna recorded in the WTS area, only the Western Pebble‐mound Mouse and Rainbow Bee‐eater were recorded within the Proposal boundary. 

None of the recorded taxa that may represent SRE species are considered likely to represent species restricted to the WTS area, and the majority of records of each of these taxa were collected from outside the Proposal boundary. 

Appropriate management measures to avoid, minimise and mitigate potential impacts of the Proposal on fauna will be implemented (and where applicable, have been implemented during Proposal design). 

Vertebrate terrestrial fauna and fauna habitat Fauna surveys have been undertaken over approximately 24,000 ha of the WTS area, incorporating the 8,430ha Proposal boundary and extensive surrounding areas (Biota 2009a, 2009b, 2011a, 2012b): 

Eighteen (18) species of conservation significant vertebrate fauna (listed under the EPBC Act, WC Act or as Priority species by DEC) are considered to potentially occur in the WTS area.  Seven of these species were recorded during surveys (Biota 2009a, 2009b, 2011a, 2012b): the Pilbara Olive Python (Liasis olivaceus barroni), Pilbara Leaf‐nosed Bat (Rhinonicteris aurantia), Rainbow Bee‐eater (Merops ornatus), Ghost Bat (Macroderma gigas), Western Pebble‐mound Mouse (Pseudomys chapmani), Australian Bustard (Ardeotis australis) and a skink (Notoscincus butleri)  (Figure 3‐3). 

15 fauna habitat types were recorded in the WTS area (Figure 3‐3).   

Invertebrate terrestrial fauna Five taxa that may represent short‐range endemic (SRE) species were recorded within the WTS area (Barychelidae sp, Aname sp., Conothele sp., Kwonkan sp. and Quistrachia sp) (Figure 3‐3); however, none of these are considered likely to represent species restricted to the WTS area (Biota 2012b). 

 

Terrestrial fauna – habitat clearing The 15 fauna habitats within the study area are both common and widespread throughout the Hamersley sub‐

region (Biota 2012b).  The Proposal boundary contains <50% of the extent of each habitat type mapped in the WTS area (with exception of habitat type 15) and the indicative infrastructure layout intersects <15% of the extent of each habitat type mapped in the WTS area (Table 3 of Appendix 1).  Therefore, clearing of these communities within the Proposal boundary is not expected to result in significant local or regional impact to fauna.   

Biota (2012a) identified two potential ‘core’ habitats of higher value to conservation significant fauna species (listed under EPBC Act), comprising ‘gorges and gullies’ (habitat types 9, 13 and 15) and ‘eucalypt woodlands on major watercourses’ (habitat type 6).  The Proposal boundary includes 34% and 4%, respectively, of the mapped extent of these potential core habitat types.  The indicative infrastructure layout intersects 10% and 0%, respectively, of the mapped extent of these potential core habitat types (Biota 2012a).  Clearing of these communities within the Proposal boundary is not expected to result in significant local or regional impact to conservation significant fauna species.   

Of the seven conservation significant vertebrate fauna recorded in the WTS area, only the Western Pebble‐mound Mouse and Rainbow Bee‐eater were recorded within the Proposal boundary (Table 4 of Appendix 1). 

Assessment of potential impacts to conservation significant species recorded in the WTS area (Table 4 of Appendix 1, Biota 2012a) concludes the Proposal is expected to have minimal impact on conservation significant fauna species. 

None of the taxa that may represent SRE species are considered likely to represent species restricted to the WTS area (Biota 2012b).  The majority of specimens of all five of these taxa were collected from outside the Proposal boundary (Table 4 of Appendix 1).  The Proposal is expected to have minimal impact on these species. 

The key potential impact of the Proposal on terrestrial fauna (e.g. loss of habitat due to clearing) will generally be minimised via management measures to minimise potential impacts on flora and vegetation, as detailed in Table 3‐2: Vegetation and Flora. 

In addition, the following key management measures will be implemented to manage potential impacts on fauna (and where applicable have been implemented during Proposal design to date): 

Ensure any sightings of conservation significant fauna species (primarily species listed under the EPBC Act) encountered by the workforce during Proposal implementation are reported to site Environmental Advisors, and recorded in a register.

Proposal design has, and will continue to, avoid and minimise clearing of higher value fauna habitat where practical: 

o Implementation of this key management measure during Proposal design has included modification of the Proposal boundary to exclude extensive areas of vegetation of higher value to conservation significant fauna species (Figure 1‐5). 

Food wastes appropriately disposed of in bins/waste facilities to discourage scavenging by both feral and native animals, and bin lids securely closed. 

Fencing of dams/turkey nests to prevent access to permanent water sources by feral animals, and the installation of fauna egress mats in lined water storage facilities. 

Internal reporting of all incidents involving fauna death. 

Implementing and enforcing appropriate vehicular speed limits on site access roads. 

 

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN

7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

560,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

570,

000

mE

7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN7,500,000 mN

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

550,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

540,

000

mE

7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN7,480,000 mN

7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN7,490,000 mN

Author: G Humphreys Projection: MGA Z50 (GDA94)Revised: Job No.: 794Drawn: M Robinson Scale: 1:100,000Date: 02 Apr 2013

Figure 3.3 West Turner SynclineSignificant Species & Fauna Habitats

50 2.5

kilometres

Location Map

KALGOORLIEPERTH

Map Area

KARRATHA

Aname sp.

Conothele

Quistrachia

Barychelidae sp.

Snails

Kwonkan

Spiders

sp.

sp.

sp.

WTS2 Indicative Project layout

WTS2 Proposal boundary

Pilbara Olive Python

Notoscincus butleri

Australian Bustard

Orange Leaf-nosed Bat

Western Pebble-mound Mouse

Rainbow Bee-eater

Vertebrate Fauna

Ghost Bat

Table 3‐4:  Subterranean Fauna: Description of Factor, Impact Assessment and Management 

Summary of how Proposal meets EPA objective 

Description of factor  Impacts and assessment of significance  Management and mitigation 

EPA objective To maintain representation, diversity, viability and ecological function at the species, population and assemblage level. Summary of how Proposal meets EPA objective  The proposal can be managed to meet the EPA environmental objective for this factor, as detailed in adjacent columns: 

No significant populations or species of stygofauna were recorded during surveys in the Proposal boundary. 

Troglofauna collected within the Proposal boundary comprised troglophiles (e.g. are not obligated to live in subterranean environments) rather than true troglobites; therefore, the Proposal poses a low risk of significant impact to these species. 

Assessment of distribution of troglophiles, and likely continuity of habitat (based on geology) in the WTS area, indicate significant impact to troglofauna is unlikely. 

Subterranean fauna are considered to occur in low density and limited diversity at WTS (Biota 2012c). 

Stygofauna  Sixteen (16) stygobitic specimens were collected; 15 

specimens from the Order Amphipoda were collected at B1 and one specimen from the Order Cyclopoida (juvenile, species indeterminate) was collected at S17. 

The amphipod species from B1 deposit is widespread throughout the Pilbara; the copepod from S17 is also likely to be widespread (Biota 2012c). 

The stygofauna results indicate a low density stygal community, and suggest no significant groundwater fauna occurs in the locality (Biota 2012c). 

Troglofauna  The troglomorphic taxa collected at WTS comprise 

troglophiles (e.g. are not obligated to live in subterranean environments) rather than true troglobites.  Similar sampling efforts at other sites known to support troglobitic communities typically yield greater numbers of troglobitic animals (Biota 2012c).  

Seventy seven (77) troglophiles were collected from five orders, with the most abundant groups comprising the Polyxenida and Blattodea.   

Genetic analysis of the Polyxenida specimens indicated two lineages that occurred at both the B1 and S17 deposits – both have previously been sampled widely in the Pilbara. 

Genetic analysis of the Blattodea specimens indicated two lineages.  Lineage BNA comprised 24 individuals, collected at both the B1 and S17 deposits, and has previously been sampled widely in the Pilbara.  Lineage BNR comprised one individual, collected at the S17 deposit, and has not been collected previously in the Pilbara, based on the limited material available for genetic comparison. 

Other orders collected from the S17 deposit comprised Hemiptera (16 juveniles, species indeterminate), Pauropoda (one juvenile, species indeterminate), and Symphyla (one specimen, insufficient taxonomic research to determine species). 

Stygofauna – groundwater drawdown and habitat removalNo significant populations or species of stygofauna have been recorded in the WTS area; therefore, the Proposal is considered unlikely to have a significant impact on stygofauna.    

Troglofauna – habitat removal  Both troglomorphic Polyxenida lineages and Blattodea Lineage BNA were detected at both the 

B1 and S17 deposits, and from multiple sites elsewhere in the Pilbara; therefore, these species are not considered to be of conservation significance.  The remaining three troglomorphic orders collected at S17 (Hemiptera, Pauropoda and Symphyla) are likely to have similar distributions to the Polyxenida and Blattodea, and therefore are not likely to be restricted to the WTS area (Biota 2012c). 

The single specimen of troglomorphic Blattodea Lineage BNR is unlikely to be restricted to a single site in the WTS area and is likely to be more widespread, based on the following considerations (Biota 2012c): 

o The single specimen of this species was recorded on the border of the Dales Gorge Member and Hydrated Zone at S17.  Both of these geology units are considered continuous throughout the WTS area, and not restricted to the S17 deposit boundaries.  Therefore, this species appears unlikely to be restricted in terms of geology. 

o The presence of both Polyxenida lineages and Blattodea Lineage BNA at both the B1 and S17 deposits supports the previous observation that suitable habitat is unlikely to be restricted to deposit boundaries.  Contiguous habitat extends at least along the ridge between the two deposits, and likely to be present more broadly in the WTS. 

o The apparent spatial restriction of this single specimen is more likely due to the limited sequencing completed on Blattodea specimens from the Pilbara. 

o Previous genetic studies on Blattodea in the Pilbara have found that short‐range endemism is not characteristic of this order. 

Based on these site‐specific considerations, and the consideration that troglophiles are generally at minimal risk of conservation impacts due to local scale development proposals (Biota 2012c), the Proposal is considered unlikely to have a significant impact on troglofauna. 

The following key management measure for subterranean fauna will be implemented: 

Comparisons of the Blattodea Lineage BNR to Blattodea specimens collected from ongoing Rio Tinto Iron Ore (WA) projects in the Pilbara will be undertaken via molecular analysis. 

  

 

Table 3‐5:  Hydrological Processes and Inland Water Environmental Quality (Aquatic Fauna): Description of Factor, Impact Assessment and Management 

Summary of how Proposal meets EPA objective 

Description of factor  Impacts and assessment of significance  Management and Mitigation 

EPA objective To maintain the quality of groundwater and surface water, sediment and/or biota so that the environmental values, both ecological and social, are protected. 

Summary of how Proposal meets EPA objective  The proposal can be managed to meet the EPA environmental objective for this factor, as detailed in adjacent columns: 

All aquatic fauna species recorded in ephemeral pools within the dewater discharge extent have also been recorded outside the discharge extent, locally or regionally. 

Groundwater from the B1 aquifer that will be discharged to the environment is generally of good quality. 

Appropriate monitoring of discharge water quality will be undertaken. 

Aquatic fauna  Helicopter reconnaissance in the 2011 wet 

and dry seasons established no ephemeral pools were present on the discharge watercourse between the discharge point and the junction with the Beasley River, 10 km downstream (WRM 2012a).   

Ephemeral pools occur on the Beasley River both upstream and downstream of the junction with the discharge watercourse (e.g. the 8 km of the Beasley River within the maximum extent of discharge contains pools), and are populated by aquatic fauna assemblages (Figure 3‐4).   

All aquatic fauna species recorded within the dewater discharge extent were also recorded at control sites (on the Beasley or Hardey River) or have been recorded elsewhere in the Pilbara (WRM 2012a) (Table 5 of Appendix 1). 

Aquatic fauna – dewatering dischargeDewatering discharge will potentially impact aquatic fauna via changes in surface water quality and flow regimes: 

Analysis of groundwater from the B1 aquifer indicates discharge water is generally of good quality, concentrations of all analytes are less than ANZECC/ARMCANZ (2000) water quality trigger values (TVs) for drinking water and livestock water; however, some analytes exceed TVs for the protection of aquatic ecosystems, particularly nutrients (WRM 2012b).  For further detail on groundwater quality refer to Table 3‐6: Groundwater. 

Discharge could reduce the diversity and abundance of aquatic fauna within the discharge extent, via: o The particular chemical characteristics of the groundwater being unfavourable for some species. 

o Elevated nutrient concentrations could cause eutrophication that may have detrimental effects on some species. 

o Precipitation of carbonate minerals could cause areas of cementation of river alluvium, thereby reducing habitat availability for some species. 

o Change in aquatic fauna assemblages from species adapted to ephemeral pools to species adapted to more permanent water bodies. 

The Proposal is considered unlikely to cause significant impacts to aquatic fauna on a local and regional scale, based on: 

o The generally good quality of discharge water. 

o The flushing and diluting effect of natural surface flows of high volume during the wet season. 

o The relatively limited spatial and temporal extent of discharge (e.g. <8% of the total length of the Beasley River may be impacted, and the 10 km discharge watercourse comprises <5% of the total length of similar sized tributaries within the Beasley River sub‐catchment). 

o The present distribution, both locally and regionally, of aquatic fauna species recorded in the dewater discharge area (e.g. no species is confined to the discharge area). 

o The presence of similar habitat and fauna assemblages in the surrounding WTS area, including upstream of the discharge area, which provides recruitment sources to repopulate the area after cessation of discharge should fauna assemblages be altered. 

The following key management measures for aquatic fauna will be implemented: 

A Proposal discharge water quality management and monitoring strategy (including site‐specific water quality trigger values), will be developed in accordance with the ANZECC/ ARMCANZ (2000) water quality management framework, to manage the potential impacts of discharge water quality on the downstream environment. 

  

 

Table 3‐6:  Hydrological Processes and Inland Water Environmental Quality (Groundwater): Description of Factor, Impact Assessment and Management 

Summary of how Proposal meets EPA objective 

Description of factor  Impacts and assessment of significance  Management and mitigation 

EPA objective  To maintain hydrological 

regimes of groundwater and surface water so that existing and potential uses, including ecosystem maintenance, are protected. 

To maintain the quality of groundwater and surface water, sediment and/or biota so that the environmental values, both ecological and social, are protected. 

Summary of how Proposal meets EPA objective  The proposal can be managed to meet the EPA environmental objective for this factor, as detailed in adjacent columns: 

The B1 ore body aquifer is isolated from the regional groundwater system by low permeability geological units, and hence the total volume of water required to dewater the ore body, and the spatial extent of groundwater drawdown, are relatively limited. 

The aquifer is predicted to recover to near pre‐mining water levels within approximately 60 years after cessation of dewatering. 

No significant populations or species of stygofauna that may be affected by groundwater drawdown have been recorded in the vicinity of the B1 deposit. 

Groundwater drawdown during dewatering of the B1 deposit is not expected to impact potentially groundwater dependent vegetation in the WTS area. 

Hydrogeology  The B1 orebody aquifer is considered to be 

isolated from the regional groundwater system by low permeability un‐mineralised Brockman Iron Formation to the south, and Mount McRae Shale to the north (Figure 3‐5), Rio Tinto 2013a).   

The B1 orebody aquifer is considered to be isolated from the aquifer in the Wittenoom formation located to the north of the deposit, by the low permeability Mount McRae Shale and Mt Silvia Formations.   

The water table is approximately 40 mbgl in the central area of the B1 deposit, and approximately 62% of the B1 resource is BWT (Figure 3‐5). 

The S17 orebody aquifer is considered to be isolated from the regional groundwater system by low permeability un‐mineralised Brockman Iron Formation and Mount McRae Shale Formation.   

The water table at S17 is approximately 40 to 125 mbgl, and approximately 3% of the S17 resource is BWT (Figure 3‐6). 

Groundwater quality Analysis of the B1 orebody aquifer indicates the groundwater is of good quality, concentrations of all analytes are less than ANZECC/ARMCANZ (2000) water quality trigger values (TVs) for drinking water and livestock water; however, several analytes exceed the default TVs for the protection of aquatic ecosystems (WRM 2012b): 

Chromium and Copper are slightly above the 95% TVs, but are below 90% TVs. 

Zinc (Zn) is above the 95% TV; however, data for Zn should be treated with caution, as the elevated levels are likely due to incidental contamination. 

Mean and median values for nitrate are above the 95% TV, but are below the 80% TV. 

Other nutrients are above default TVs (associated with eutrophication risk rather than direct toxicity) ‐ total phosphorus, filterable reactive phosphorus, nitrate‐nitrite nitrogen and total nitrogen (latter two analytes significantly above the default TVs). 

Groundwater abstraction Dewatering of the B1 main pit via in‐pit bores is required at extraction rates of up to approximately 

30 ML/day (11 GL/annum) to enable mining to a maximum depth of approximately 195 m BWT.  Total dewatering volume is approximately 80 GL.  Required rates of dewatering are expected to peak at 30 ML/day in 2015‐2017 and then decline to approximately 14 ML/day in 2018 to 2027 (Rio Tinto 2013a).  The modelled groundwater drawdown is relatively limited in extent (Rio Tinto 2013a) (Figure 3‐2).   

Abstraction of groundwater at B1 is expected to have minimal impact on other groundwater resources, as the available data indicate the orebody aquifer is isolated by low permeability un‐mineralised Brockman Iron Formation and Mount McRae Shale Formation (Rio Tinto 2013a).   

At S17, minor dewatering is required for pits 3 and 8 (undertaken via in‐pit sumps) to a depth of approximately 15 m BWT.  The other six pits at S17 are AWT.  Extraction of groundwater from the S17 aquifer is expected to have minimal impact on surrounding local groundwater resources due to the minor volumes extracted, and the isolation of the orebody aquifer by low permeability un‐mineralised Brockman Iron Formation and Mount McRae Shale Formation. 

Vegetation –  groundwater drawdown 

Refer to Table 3‐2: Vegetation and Flora. 

Subterranean fauna –groundwater drawdown  

Refer to Table 3‐4:  Subterranean Fauna. 

The following key management measures for groundwater will be implemented (and where applicable have been implemented during Proposal design to date): 

Monitoring of water levels and abstraction rates during B1 dewatering, and ongoing validation of the hydrogeological conceptual model and numerical groundwater model.  

Prioritisation of beneficial use of water extracted during dewatering, predominantly via utilisation to meet operational requirements (including planned supply to the nearby S10 minesite), with discharge to the environment the least preferred management option (Rio Tinto 2013b). 

Management of pit voids that extend BWT at cessation of mining are considered in Table 3‐8: Rehabilitation and Closure. 

      

?

??

?

? ?

?

?

20,000 mN

19,000 mN

9,0

00

mE

10

,00

0 m

E

11

,00

0 m

E

12

,00

0 m

E

CB

Main PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitMain PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite PitSatellite Pit

A

FIGURE 3 - 5

B1 DepositGeological Sections

PDE0094906v1April 2013

11140E20

300

N

Water TableRL 550m

RL 250m

RL 500m

RL 450m

RL 400m

RL 300m

RL 350m

1890

0 N

DETMCS

HYDDET

DG1

FWZ

DG2

MCS

WS2

WS1

DG3

MINHYD

DOR

J2

DORJ3

J5J4

J6

WS2

WS1

DG3

DG2

J1

DET

10480 E

2030

0 N

Water Table

RL 300m

RL 400m

RL 350m

1890

0 N

RL 500m

RL 450m

RL 250m

RL 550m DET

FWZ MIN

DG1 MIN

DG2 MIN

DG3 MIN

FWZ

HYD

WS1 MIN

MCS

DOR

DET

DG1

DG2

DG3

J2 MIN

J1 MIN

WS2 M

IN

J3 MIN

J4 MINJ5 MINJ6 MIN

DET

HYD

WS1

WS2J1

J2

J5J4

J3

J6

2030

0 N

9580E

Water Table

RL 600m

RL 400m

RL 550m

RL 750m

RL 450m

RL 650m

RL 700m

1890

0 N

RL 500m

DETMIN

HYD

MCS

DG1

FWZ

MCS

DG1

DG2

FWZ

DG3

J1

J2

J3

WS2

WS1

J2

A

B

C

Cross Sections looking west

MOUNT McRAE SHALE

MOUNT SYLVIA FORMATION

WITTENOOM FORMATION

MINERALISATION

Mineralisation >55% Fe

FOOTWALL ZONEFWZ

HydratedHYD

MIN

DoleriteDOR

MCS

MTS

WD

Legend

Whaleback Shale member - Strand WS1 - WS2

Joffre member - Strand J1 - J6

Dales Gorge member - Strand DG3

Dales Gorge member - Strand DG2

Dales Gorge member - Strand DG1

Yandicoogina Shale member

BROCKMAN IRON FORMATION

Detritals

J1

WS1

DG2

DG1

DET

YS

DG3

500 1000m0

Local grid

16

,00

0 m

E

17

,00

0 m

E

18

,00

0 m

E

19

,00

0 m

E

10,000 mN

9,000 mN

8,000 mN

15

,00

0 m

E

14

,00

0 m

E

C

66666666666666666666666666666666666666666666666667777777777777777777777777777777777777777777777777 88888888888888888888888888888888888888888888888884444444444444444444444444444444444444444444444444

5555555555555555555555555555555555555555555555555

B

3333333333333333333333333333333333333333333333333

A

11111111111111111111111111111111111111111111111112222222222222222222222222222222222222222222222222

FIGURE 3 - 6

Section 17Geological Sections

PDE0094906v1April 2013

J1 MIN

HYD

J2

J2 MIN

J1DG3 WS2WS1

WS1 MIN

DG3 MIN

DG1 DG2

DG1 MIN

DG2 MINHYD

HYD

FWZ MIN

MTS FWZMCS

CALDIW

9800

N

9600

N

RL 500m

RL 400m

RL 550m

RL 450m

1000

0N

1020

0N

19040E

Water Table 500m

J2

J3

WS1DG3DG2 WS2 J1

HYD

DG3 MIN

WS1 MIN

DG1

CAV

FWZ

MCS

HYD

DG2 MIN

DG1 MIN

MTS

HYD

DG1 MIN FWZ MIN

CA

RL 450m

9800

N

9700

N

RL 650m

RL 550m

RL 500m

RL 600m

1030

0N

1000

0N

17120EWater Table 500m

J1 MINW

S2 MIN

HYD

WS2WS1DG3 J1 J2

FWZ DG2DG1

WS1 MINDG3 MIN

DIL

HYD

DG1 MIN

FWZ MIN

MCS

DG2 MIN

MTS

PILHYDDIL

RL 500m

RL 450m

RL 600m

9600

N

9800

N

1020

0N

RL 550m

Water Table 500m

1000

0N

15320E

A

B

C

Cross Sections looking west

WITTENOOM FORMATION

MOUNT McRAE SHALE

MOUNT SYLVIA FORMATIONMTS

Mineralisation >55% Fe

Hydrated

Immature Detritals

MCS

FOOTWALL ZONEFWZ

CA

MINERALISATION

Canga

WD

HYD

MIN

DIL

Legend

Whaleback Shale member - Strand WS1 - WS2 PisolitePIL

Dales Gorge member - Strand DG1

Yandicoogina Shale member

BROCKMAN IRON FORMATION

Joffre member - Strand J1 - J6

Dales Gorge member - Strand DG3

Dales Gorge member - Strand DG2

CalcreteCAL

Detritals

Detrital Waste

DET

DIW

YS

J1

WS1

DG2

DG3

DG1

0 1 2 km

Local grid

Table 3‐7:  Hydrological Processes and Inland Waters Environmental Quality (Surface Water): Description of Factor, Impact Assessment and Management 

Summary of how Proposal meets EPA objective 

Description of factor  Impacts and assessment of significance  Management and mitigation 

EPA objectives  To maintain hydrological regimes 

of groundwater and surface water so that existing and potential uses, including ecosystem maintenance, are protected. 

To maintain the quality of groundwater and surface water, sediment and/or biota so that the environmental values, both ecological and social, are protected. 

Summary of how Proposal meets EPA objective  The proposal can be managed to meet the EPA environmental objectives for this factor, as detailed in adjacent columns: 

Groundwater from the B1 orebody aquifer that will be discharged to the environment is generally of good quality. 

The spatial and temporal extent of dewatering discharge is relatively limited, and substantial areas of similar watercourses occur outside the discharge extent within the Beasley River sub‐catchment. 

Appropriate monitoring and management of discharge water quality will be undertaken, in accordance with the ANZECC/ARMCANZ (2000) water quality management framework. 

The infrastructure corridor is unlikely to impact overland flow or potentially dependent vegetation, and channelised flow will be maintained where practical via culvert installation. 

Appropriate management measures to avoid, and minimise potential impacts of the Proposal on surface water will be implemented (and where applicable have been implemented during Proposal design). 

Dewatering discharge  Dewatering in excess of operational requirements will be discharged to a minor watercourse north of the 

B1 deposit, that joins the Beasley River approximately 10 km downstream of the discharge point (Figure 3‐2).  

During the first three years of operation, potential discharge of up to 30 ML/day (excluding on‐site water use of 6 ML/day) is predicted to extend approximately 18 km downstream of the discharge point (Rio Tinto 2012a).   

From 2018 to 2027, potential discharge of approximately 14 ML/day (excluding on‐site water use of 6 ML/day) is predicted to extend approximately 13 km downstream of the discharge point (Rio Tinto 2012a).   

With on‐site water use of approximately 6 ML/day, discharge is expected to be <10 ML/day for the majority of the life of the Proposal. 

Beasley River  The Beasley River is approximately 100km in length, and is a tributary of the Hardey River (that eventually joins 

the Ashburton River a further 90km downstream).  Dewatering discharge will occur in the upper reaches of the Beasley River, approximately 70km upstream of the junction with the Hardey River. 

Approximately 8% of the total length of the Beasley River is within the predicted maximum discharge extent (additionally, the 10 km discharge watercourse comprises <5% of the total length of similar sized tributaries within the Beasley River sub‐catchment). 

The Beasley River sub‐catchment comprises 2.6% of the total area of the Ashburton River catchment.  Multiple named rivers and creeks in the southern half of the Hamersley sub‐region are tributaries of the Ashburton River (including the Hardey River, Angelo River, Turee Creek, Seven Mile Creek, Duck Creek, Urandy Creek). 

A eucalypt woodland of of E. camaldulensis subsp. refulgens and E. victrix (EcEvAci) occurs immediately adjacent to the Beasley River, bordered by scattered E. victrix (EvAciTeCEc).   Extensive areas of these communities have also been mapped in the WTS area on the Hardey River.  The Hardey River and associated eucalypt woodland in the WTS area is more substantial (e.g. vegetation unit EcEvAci generally mapped as 150‐400m in width) compared to the Beasley River (vegetation unit EcEvAci generally mapeed as 50‐200 m in width) (Figure 7).  Based on helicopter and ground reconnaissance, and examination of aerial photography, extensive areas of eucalypt woodland occur locally on the Beasley and Hardey Rivers outside the extent of current vegetation surveys, and therefore the area of eucalypt woodland on the Beasley River potentially impacted by discharge is relatively minor on a local scale. 

The vegetation communities EcEvAci and EvAciTeCEc on major ephemeral watercourses are considered to have local significance as a vegetation community and as fauna habitat, but are not considered regionally significant as they are widespread in the Pilbara (Biota 2012a; Biota 2012b; Biota 2013a).  

Watercourses throughout the WTS area, including the Beasley River, are impacted cattle from the Rocklea pastoral station.  The surveyed extent of the Beasley River is colonised by multiple weeds (15 weed species recorded, more significant environmental weed species present include Buffel Grass, Kapok, Birdwood Grass, Mimosa Bush, Spiked Malvastrum).  The condition of vegetation on the Beasley River, and on the 10km discharge watercourse, was described as good to very poor, due to weeds and cattle impacts (Biota 2013a).  The Hardey River has a similar suite of weeds present, and vegetation was also described as good to very poor due to weeds and cattle impacts (Biota 2013a). 

Although conservation significant fauna species are likely to utilise the eucalypt woodland within the surveyed extent of the Beasley River, no significant species were recorded on the Beasley River during fauna surveys (Biota 2012a; Figure 9).   

Ephemeral pools occur on the Beasley River both upstream and downstream of the junction with the discharge watercourse and are populated by aquatic fauna assemblages (Figure 3‐4).  All aquatic fauna species recorded within the dewater discharge extent on the Beasley River were also recorded at control sites (on the Beasley or Hardey River) or have been recorded elsewhere in the Pilbara (WRM 2012a)  

Surface water flows Modelling of surface hydrology in the vicinity of the infrastructure corridor indicates the following outcomes (Rio Tinto 2012e): 

no ‘overland flow’ is likely to occur in the vicinity of the proposed infrastructure corridor;  ‘channelised flow’ within watercourses can generally be maintained where embankments are constructed 

within the infrastructure corridor via installation of culverts. 

Vegetation – dewatering discharge 

Detrimental impacts to vegetation bordering the watercourses affected by dewatering discharge may occur, but is not considered significant, primarily due to the widespread occurrence of the relevant vegetation communities in the local area, and the relatively limited temporal and spatial extent of discharge.  Refer to detailed assessment in Table 3‐2: Vegetation and Flora. 

Vegetation – disruption to surface flow  

No significant impact expected ‐ refer to detailed assessment in Table 3‐2: Vegetation and Flora. 

Aquatic fauna – dewatering discharge 

Some detrimental impacts to aquatic fauna within the extent of dewatering discharge may occur, but is not considered significant, as all aquatic fauna species within the discharge extent have been recorded elsewhere in the Pilbara, and due to the relatively limited temporal and spatial extent of discharge.  Refer to detailed assessment in Table 3‐5: Aquatic Fauna. 

The following key management measures for surface water will be implemented (and where applicable have been implemented during Proposal design to date): 

The Proposal surface water management plan has, and will continue to, be implemented (Rio Tinto 2012c) with the objective of minimising adverse impacts to water courses, water quality and the downstream environment. 

Proposal design has, and will continue to, incorporate consideration of surface water management, including minimising disruption to watercourses where practical (Rio Tinto 2012c, 2012e). 

Prioritisation of beneficial use of water extracted during dewatering, predominantly via utilisation to meet operational requirements (including planned supply to the nearby S10 mine site), with discharge to the environment the least preferred management option (Rio Tinto 2012b). 

A Proposal discharge water quality management and monitoring strategy (including site‐specific water quality trigger values), will be developed in accordance with the ANZECC/ARMCANZ (2000) water quality management framework, to manage the potential impacts of discharge water quality on the downstream environment. 

 

Table 3‐8:  Rehabilitation and Closure: Description of Factor, Impact Assessment and Management 

Summary of how Proposal meets EPA objective 

Description of factor  Impacts and assessment of significance  Management and mitigation 

EPA objectives To ensure that premises can be closed, decommissioned and rehabilitated in an ecologically sustainable manner, consistent with agreed outcomes and land uses, and without unacceptable liability to the State.  

Summary of how Proposal meets EPA objective  The proposal can be managed to meet the EPA environmental objectives for this factor, as detailed in adjacent columns: 

Mineral waste dumps are unlikely to have significant environmental impacts, based on analysis of mineral waste volumes, and physical and chemical properties, which indicates the majority of mineral waste is relatively benign. 

Pit voids are unlikely to have significant environmental impacts, based on predicted water quality of the proposed B1 pit lake, and commitment to backfill S17 pits to a level sufficient to prevent formation of pit lakes. 

A Mine Closure Plan has been developed in accordance with the DMP/EPA (2011) Mine Closure Guideline, which provides appropriate management measures regarding closure and rehabilitation, and will be regularly reviewed and updated during the operational phase of the Proposal. 

Geology The B1 and S17 deposits occur within the Brockman Iron Formation of the Hamersley Group, and are typical of similar Banded Iron Formation derived deposits that occur throughout the Pilbara.  The Brockman Iron Formation comprises four members (Yandicoogina Shale, Joffre, Whaleback Shale, and Dales Gorge), and is underlain by the Mount McRae Shale.  Mineralisation at B1 and S17 occurs primarily within the Dales Gorge and Joffre Members, and to a lesser extent within the Whaleback Shale Member  (Figure 3‐5 and Figure 3‐6).  Both B1 and S17 are predominantly bedded deposits, although some deposits of secondary surficial ironstone have also accumulated.  Rio Tinto has extensive experience mining similar deposits within the Brockman Iron Formation at other mines in the Pilbara. 

Mineral waste physical characteristics Substantial volumes of mineral waste classified as ‘low’ to ‘medium’ erodibility will be mined from both the B1 and S17 deposits (Rio Tinto 2012g).   

Mineral waste geochemical characteristics  The AMD risk assessment for the B1 deposit identified a moderate AMD risk, and for the 

S17 deposit a low‐moderate AMD risk.  This assessment was based primarily on the presence of unoxidised Mt McRae Shale in proximity to the deposits (Rio Tinto 2012f).   

Additionally, some elevated Sulfur levels were recorded AWT in other rock types, that may contain alunite, which can release low levels of acid. 

Mineral waste that may pose an AMD risk comprises <3% of the B1 waste, and <2% of the S17 waste (Rio Tinto 2012f). 

Pit voids and lakes   The B1 main pit will be mined to a maximum depth of approximately 195 m BWT.  The 

four B1 satellite pits are AWT and will be progressively backfilled where practical.  Progressive backfill of the B1 main pit during operations is not practical due to the required pit design and operational constraints. 

A pit lake will form in the B1 main pit void, with water level recovery to approximately 525 mRL after 60 years (Rio Tinto 2013a), resulting in a maximum pit lake depth of approximately 185 m, and a pit lake surface approximately 50 mbgl.  The B1 pit void will comprise a groundwater sink (Rio Tinto 2013a). 

The B1 pit lake is expected to salinise after approximately 450 years, with pH declining from 8.3 to 5.5 over 1000 years (KCB 2012b).   

The final equilibrated water quality of the pit lake (at 1000 years) indicates B, F, SO4, and Se are above the ANZECC/ARMCANZ (2000) livestock water quality trigger values, while As, F, Mn, Pb, SO4 and Se are above the ANZECC/ARMCANZ (2000) drinking water trigger values (KCB 2012b). 

Groundwater recovery has been remodelled since the KCB (2012) water quality modelling; however, the predicted higher steady state water level (e.g. 525 mRL vs. 490 mRL) and increased rate of recovery to a steady state water level (e.g. 60 vs. 150 years) is not expected to significantly change the KCB (2012b) water quality predictions (Rio Tinto 2012d).  The water quality model will be re‐run to confirm this assessment. 

At S17, pits 3 and 8 will be mined to approximately 15 m BWT; these pits will be preferentially backfilled to a level sufficient to prevent formation of pit lakes.  The remaining pits at S17 are AWT, and backfill will be undertaken where practical; however, pit voids are expected to remain at closure. 

Waste dumpsWaste dumps are considered unlikely to have significant environmental impacts based on the following considerations: 

waste dump designs have considered the physical and chemical properties of waste material; 

substantial volumes of competent waste is available, enabling design/construction of waste dumps that are stable and not susceptible to excessive erosion; and 

substantial volumes of inert waste material is available, enabling design/construction of waste dumps that encapsulate the low volumes of waste rock that poses a potential AMD risk. 

Pit voids Pit voids are considered unlikely to have significant environmental impacts based on the following considerations: 

S17 pits 3 and 8 (that extend approximately 15 m BWT) will be preferentially backfilled to a level sufficient to prevent formation of pit lakes. 

The B1 pit lake will comprise a groundwater sink, minimising potential for impacts beyond the immediate vicinity of the pit lake. 

The B1 pit lake is predicted to maintain circumneutral pH over 1000 years, and while concentration of a limited suite of elements may reach ANZECC/ARMCANZ (2000) trigger levels, a preliminary assessment suggests the pit lake is likely to pose a low ecological risk (Equinox Environmental 2012). 

Rio Tinto is committed to ensuring the B1 pit lake will meet closure objectives, in particular that “Pit voids do not cause significant adverse impacts on the regional groundwater resource, or environmental values of the WTS area”.  During the operational phase, Rio Tinto will undertake periodic review of the preferred closure strategy for the B1 pit lake (no backfill, potentially with implementation of additional management measures) based on ongoing improvements in geological, hydrogeological, geotechnical and environmental knowledge.   

While a non‐preferred closure strategy, backfill of the B1 pit void is a management option that will be considered should ongoing investigations, and/or monitoring, establish the predicted or actual impacts of a pit lake managed via the preferred closure strategy will not meet closure objectives. 

Closure will be undertaken in accordance with the Mine Closure Plan (Rio Tinto 2012g; Appendix 23), which details management and mitigation measures, including the following: 

The Rio Tinto Iron Ore (WA) Landform Design Guidelines will continue to be implemented to ensure waste dumps meet closure objectives. 

The Rio Tinto Iron Ore (WA) Mineral Waste Management Plan, and the Spontaneous Combustion and ARD (SCARD) Management Plan will continue to be implemented, to ensure waste material is adequately geochemically characterised (via static testing, and kinetic testing where warranted) during Proposal planning and operational stages, and material that poses an AMD risk is appropriately managed.  Ongoing tests and studies include: 

o Static and Kinetic testing of samples from B1 and Section 17; 

o Leaching under highly saline conditions; 

o Leaching under lower contact ratios. 

The Rio Tinto Iron Ore (WA) Soil Resource Management Work Practice will be implemented to manage recovery and storage of topsoil and subsoil resources. 

S17 Pits 3 and 8 will be preferentially backfilled to a level sufficient to prevent formation of pit lakes. 

Rio Tinto will undertake periodic review of the preferred closure strategy for the B1 pit lake (no backfill, potentially with implementation of additional management measures) based on ongoing improvements in geological, hydrogeological, geotechnical and environmental knowledge, to ensure the pit lake closure strategy will achieve closure objectives. 

    

Table 3‐9:  Residual Impacts: Description of Factor, Impact Assessment and Management 

Summary of how Proposal meets EPA 

objective 

Description of factor 

Impacts and assessment of significance 

Management and mitigation 

EPA objective To counterbalance any significant residual environmental impacts or uncertainty through the application of offsets. 

Summary of how Proposal meets EPA objective   An assessment of 

potential impacts of the Proposal was undertaken in accordance with EPA Position Statement No. 9, Environmental Offsets (EPA 2006) and EPA Guidance Statement No. 19, Environmental Offsets – Biodiversity (EPA 2008). 

The Proposal is considered unlikely to have significant adverse impacts on any potential ‘critical’ or ‘high value’ assets; no significant residual impact to these assets is expected. 

The potential requirement for an offset was determined based on recent WA Ministerial decisions for mining developments in the Pilbara and advice provided by the OEPA in a meeting on 26/03/2013. 

A proposed offsets package to counterbalance potential significant residual impacts of the Proposal has been provided to the OEPA in a separate document; 

The Proposal will require clearing of up to 2700ha of vegetation in good to excellent condition; 

Of the 2700ha of vegetation clearing, up to 575ha comprises vegetation considered of local environmental significance. 

Management and mitigation measures to prevent and minimise significant environmental impacts will be implemented (and where applicable have been implemented during Proposal design to date), as specified in Tables 3‐2 to 3‐8.   

Management and mitigation measures of direct relevance to preventing and minimising significant residual impacts are also detailed in in the proposed offsets package provided to the OEPA in a separate document. 

   

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 61 

4 OTHER ENVIRONMENTAL FACTORS 

Table 4‐1 briefly outlines potential  impacts and management associated with other environmental factors 

for  the  Proposal,  that  were  not  identified  as  key  factors  in  the  EPA‐prepared  Environmental  Scoping 

Document. 

 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 62 

Table 4‐1:  Other Environmental Factors, Impact Assessment and Management 

Factor  EPA objective  Description of factor  Impacts  Management and Mitigation 

Heritage 

To ensure that 

historical and 

cultural 

associations are 

not adversely 

affected. 

The Proposal is located within the traditional 

lands of the Eastern Guruma people and the 

Yinhawangka people. 

The B1 deposit occurs within the Eastern 

Guruma native title claim area (WC97/89).  Rio 

Tinto entered into an Indigenous Land Use 

Agreement (ILUA) with the Eastern Guruma 

People on 13 February 2008.   

In the Eastern Guruma native title claim area, 

multiple archaeological sites have been 

identified (sites of low–moderate significance) 

and no ethnographic sites identified to date (Mt 

Turner was identified as an ethnographic site, 

but is outside the Proposal boundary). 

The S17 deposit occurs within the Yinhawangka 

native title claim area (WC10/16).  Rio Tinto has 

a Multiple Proposal Binding Agreement with the 

Yinhawangka people, and is currently in 

negotiations with a view to reaching a 

commercial Participation Agreement, that will 

be registered later as an ILUA.   

In the Yinhawangka native title claim area, 

multiple archaeological sites have been 

identified (sites of low to moderate 

significance) and no ethnographic sites have 

been identified to date. 

Surveys undertaken to date indicate 

the Proposal is unlikely to have 

significant impact on Aboriginal 

heritage: 

No ethnographic sites have been 

identified to date within the 

Proposal boundary. 

Some archaeological sites 

identified to date may be 

impacted by the Proposal; 

however, these sites identified to 

date are of low to moderate 

significance. 

Heritage values will be addressed during planning 

and implementation of the Proposal by: 

Avoiding disturbance to heritage sites where 

practical. 

Obtaining approval for any required 

disturbance to identified sites in accordance 

with s 18 of the Aboriginal Heritage Act 1972 

and in consultation with the Eastern Guruma or 

Yinhawangka people. 

Protecting all identified sites located near 

construction or operational areas that are not 

approved to be disturbed under s 18 of the 

Aboriginal Heritage Act 1972 (e.g. through the 

installation of physical barriers and buffer 

zones). 

Documenting the location of all protected sites 

in the Rio Tinto Iron Ore (WA) Geographic 

Information System (GIS) database and on site 

plans, and designating buffer zones around 

these sites. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 63 

Factor  EPA objective  Description of factor  Impacts  Management and Mitigation 

Amenity 

(Visual) 

To ensure that 

impacts to amenity 

are reduced as low 

as reasonably 

practicable. 

The visual landscape of the Pilbara is generally 

characterised by rugged ridges and ranges 

supporting spinifex grasslands, with land uses 

generally comprising pastoralism and mining 

infrastructure. 

The visual character of the landscape in the 

broader area around the Proposal is 

predominantly natural in appearance, with 

localised areas of highly modified landscapes 

due to multiple mining developments (e.g. Tom 

Price mine, WTS S10 mine) and the Tom Price 

town site (Ecoscape 2012). 

In general, visual impact of the 

Proposal from public roads and 

publicly accessible viewpoints is 

expected to be minimal, considering 

the following (Ecoscape 2012): 

The Proposal will be visually 

prominent when viewed from 

the unsealed Nanutarra‐Munjina 

Road within approximately 5 km 

of the S17 pits. 

The Proposal will likely be visible 

from the Mt Nameless lookout, 

but is not expected to have a 

significant visual impact due to 

the distance and the extensive 

mining infrastructure visible 

from this lookout (viewing the 

Tom Price mine from this lookout 

is promoted as an attraction by 

Tourism WA). 

The Proposal will not be visible 

from the 'Warlu Way' tourist 

route; this route utilises the 

sealed section of the Nanutarra‐

Munjina Road from the NWCH to 

the junction with the 

Paraburdoo‐Tom Price Road, 

approximately 28 km southwest 

of the Proposal. 

Visual amenity will be addressed during planning 

and implementation of the Proposal by: 

Undertaking waste dump design in accordance 

with the Rio Tinto Iron Ore (WA) Landform 

Design Guidelines and with consideration of 

closure objectives for the Proposal, to achieve 

final landforms that are considered 

aesthetically compatible with the surrounding 

landscape. 

Where practical, designing Proposal waste 

dumps to abut adjacent ridgelines, and avoid 

maximum dump heights that exceed the 

adjacent ridgeline. 

Rehabilitating waste dumps with native 

vegetation. 

Rehabilitating any long‐term low grade 

stockpiles that remain in‐situ at mine closure 

with native vegetation (as per waste dumps). 

Removing infrastructure (other than pits and 

dumps) at closure, and rehabilitate remaining 

disturbed areas with native vegetation. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 64 

Factor  EPA objective  Description of factor  Impacts  Management and Mitigation 

Air quality 

(Dust) 

To maintain air 

quality for the 

protection of the 

environment and 

human health and 

amenity. 

The Proposal will generate dust due to clearing, 

blasting, loading, crushing and screening, 

conveyors, stockpiling, and vehicle activity. 

Dust modelling was undertaken based on the 

year of operation with peak production. 

Rio Tinto has adopted criteria for dust 

concentrations at sensitive receptors in 

proximity to inland Pilbara mining operations, 

based on review of relevant State and National 

guidelines, as specified in the Rio Tinto Iron Ore 

(WA) Cleaner Air Management Plan. 

The only sensitive receptor that could be 

affected by the Proposal (that is not part of the 

Proposal) is the Eastern Guruma facility, located 

approximately 6 km northwest of the B1 main 

pit.  This facility comprises a fenced area with 

several transportable buildings.  The facility is 

located on a proposed LA Act lease, expected to 

be granted to the Eastern Guruma people and 

utilised for training and cultural purposes. 

The predicted dust concentrations at 

the Eastern Guruma facility are not 

predicted to exceed the criteria 

specified in the Rio Tinto Iron Ore 

(WA) Cleaner Air Management Plan 

(Environmental Alliances 2012): 

PM10 concentrations at the 

nearest sensitive receptor not to 

exceed 70 µg/m3 over an average 

period of 24 hours, on more than 

10 days per year. 

PM10 concentrations at the 

nearest sensitive receptor not to 

exceed an annual average of 

70 µg/m3. 

Deposited dust at sensitive 

receptors not to exceed a total of 

4 g/m2/month from all sources 

(equivalent to 2 g/m2/month as 

additional maximum from mining 

operations).  

Dust emissions will be managed in accordance with 

Rio Tinto Iron Ore (WA) Cleaner Air Management 

Plan.  Management measures to minimise dust will 

include: 

The application of water (or appropriate 

suppressants) to haul roads, working surfaces 

and stockpiles (as required). 

Sand sealing the haul road from B1 to S10 

where practical. 

Sand sealing the main site access road where 

practical. 

Incorporation of dust controls within key 

infrastructure, such as water sprays at the ROM 

bin, and dust collectors at major dust 

generating centres (primary crusher, conveyor 

transfers). 

Implementing and enforcing appropriate 

vehicular speed limits on site access roads. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 65 

Factor  EPA objective  Description of factor  Impacts  Management and Mitigation 

Air Quality 

(Noise and 

vibration) 

To maintain air 

quality for the 

protection of the 

environment and 

human health and 

amenity. 

The Proposal will generate noise and vibration 

from activities such as blasting, loading, 

crushing and screening, conveyors, and vehicle 

activity. 

Modelling was undertaken to determine if noise 

emissions from the Proposal are likely to 

exceed the Environmental Protection (Noise) 

Regulations 1997 at sensitive receptors.  

Modelling was undertaken for two scenarios: 

o the year of operation with peak 

construction activity;  

o the year of operation with peak production. 

The only sensitive receptor that could be 

affected by the Proposal (that is not part of the 

Proposal) is the Eastern Guruma facility, located 

approximately 6 km northwest of the B1 main 

pit.  This facility comprises a fenced area with 

several transportable buildings.  This facility is 

located on a proposed LA Act lease, expected to 

be granted to the Eastern Guruma people and 

utilised for training and cultural purposes.  The 

Eastern Guruma facility was modelled as a 

'residence', the most noise sensitive premise 

under the Regulations, with the lowest levels of 

acceptable noise being 35 dB(A). 

Modelling indicates that noise from 

the Proposal will not impact the 

Eastern Guruma facility, with 

received noise below 20 dB (A) for all 

scenarios modelled (SVT 2012). 

The generation of noise and vibration from the 

Proposal will be managed in accordance with the 

Rio Tinto Standard E6 ‐ Noise and Vibration Control.  

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 66 

Factor  EPA objective  Description of factor  Impacts  Management and Mitigation 

Air Quality 

(Greenhouse 

gas emissions) 

To maintain air 

quality for the 

protection of the 

environment and 

human health and 

amenity. 

The major contributors to greenhouse gas (GHG) 

emissions from the Proposal will be mobile 

equipment, crushing and conveying of ore.  

GHG emissions from the Proposal 

will average approximately 

85 000 tCO2‐e/year, or approximately 

5 tCO2‐e per tonne of ore (excluding 

emissions from subsequent activities 

that are not part of the 

Proposal ‐ ore transport from S10 to 

Tom Price, ore processing at Tom 

Price, rail and port shipment).   

In accordance with the Rio Tinto Standard 

E4 ‐ Greenhouse Gas Emissions, opportunities 

for GHG emission reduction and energy 

efficiency improvement will be identified during 

Proposal design/engineering phases and 

implemented where practical.   

The Rio Tinto Iron Ore (WA) Electrical Design 

Criteria ensure energy efficiency is considered 

during the Proposal engineering design process. 

Non‐mineral 

waste NA 

The Proposal will generate non‐mineral waste that 

will require disposal both on‐site and off‐site, 

including: 

domestic solid and liquid wastes (including 

general office waste); 

sewage; 

general mine site waste (including scrap metal, 

drums, tyres); 

controlled waste (e.g. paints, acids, 

hydrocarbons, batteries). 

Inappropriate handling or disposal of 

non‐mineral waste has the potential 

to result in the following impacts: 

discharges to the environment 

contaminating surface water, 

groundwater, soil or the 

atmosphere; 

fire hazards; 

food source attracting feral and 

native animals. 

All non‐mineral waste generated by the Proposal 

will be managed in accordance with Rio Tinto 

Standard E7 (Non‐mineral Waste Management) and 

the Non‐Mineral Waste Management Work 

Practice.   

Domestic wastes will be disposed of at an on‐

site landfill, established and operated in 

accordance with the Rio Tinto Iron Ore (WA) 

Procedure – Landfill Management Plan, or at an 

appropriate off‐site licensed facility. 

Sewage will be treated at an on‐site wastewater 

treatment plant (WWTP) in accordance with 

the Rio Tinto Iron Ore (WA) WWTP Standard 

Specification, or disposed at an appropriate off‐

site licensed facility. 

Controlled waste will be handled and disposed 

of in accordance with the Rio Tinto Iron Ore 

(WA) Procedure – Controlled Waste Guidelines.  

These guidelines address the requirements of 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 67 

Factor  EPA objective  Description of factor  Impacts  Management and Mitigation 

the Environmental Protection (Controlled 

Waste) Regulations 2004. 

Liquid hydrocarbon waste will be treated at an 

on‐site biofarm facility installed and operated in 

accordance with the Rio Tinto Iron Ore (WA) 

Biofarm Remediation Facility – Design, 

Construction & Management Guideline, or 

disposed at an appropriate off‐site licensed 

facility. 

Soil contaminated with hydrocarbons will be 

treated at an on‐site (or off‐site) land farm 

facility installed and operated in accordance 

with the Rio Tinto Iron Ore (WA) Procedure – 

Landfarm Management Plan. 

Hazardous 

materials NA 

The Proposal will involve the use of a number of 

hazardous materials.  An indicative list of the types 

of hazardous materials that may be used includes 

(but is not limited to): 

fuels including distillate and liquefied 

petroleum gas;  

oil, greases, coolants and degreasers; 

ammonium nitrate. 

Inappropriate handling and/or 

storage of hazardous materials has 

the potential to result in the 

following impacts: 

discharges to the environment 

contaminating surface water, 

groundwater, soil or the 

atmosphere; 

creation of health hazards;  

flammable or explosive safety 

hazards. 

Hazardous materials will be managed in 

accordance with the Rio Tinto Standard E5 – 

Hazardous Materials and Contamination 

Control and the Rio Tinto Iron Ore (WA) 

Hazardous Materials Management Work 

Practice. 

Any accidental discharges of hazardous 

materials will be managed in accordance with 

the Rio Tinto Iron Ore (WA) Procedure – Spill 

Response. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 68 

Factor  EPA objective  Description of factor  Impacts  Management and Mitigation 

Public risk and 

safety NA 

The Proposal will likely require traffic 

management on the Nanutarra‐Munjina Road, 

a public, unsealed road.   

The Proposal will require transportation of 

personnel, construction materials, fuel, 

explosives, hazardous materials and waste 

to/from Tom Price.  The transport route 

to/from Tom Price will likely require utilisation 

of the public Nameless Valley Road, the private 

White Quartz Road, and/or the haul road from 

B1‐S10‐Tom Price. 

Due to the proximity of the S17 

deposit to the Nanutarra‐

Munjina Road, it is likely the road 

will need to be temporarily 

closed (for durations of up to 

approximately 1 to 2 hours) 

during blasting of the most south 

easterly pits.  Of note, the ‘Warlu 

Way’ tourist route will not be 

affected by the Proposal (e.g. 

closest point of the Warlu Way is 

the junction of the 

Nanutarra‐Munjina Road with 

the Paraburdoo‐Tom Price Road, 

approximately 28 km southwest 

of the Proposal). 

Transportation of personnel and 

equipment will result in an 

increase in traffic on the public 

Nameless Valley Road. 

Temporary closure of the Nanutarra‐Munjina 

Road will be carried out in accordance with a 

traffic management plan developed in 

consultation with, and approved by, Main 

Roads WA.  

All other road interactions (e.g. heavy vehicle 

access, signage, etc.) will be carried out in 

accordance with the requirements of the 

relevant road authority, and relevant 

legislation. 

Utilisation of the private White Quartz Road, 

and/or the haul road from B1 ‐ S10 ‐ Tom Price, 

for a significant proportion of the transport 

route to/from Tom Price will reduce 

interactions with public traffic. 

Transport of any fuel, explosives or hazardous 

materials will be undertaken in accordance with 

the Dangerous Goods Safety Act 2004 and 

associated Dangerous Goods Safety Regulations 

2007 at minimum, and in accordance with the 

Rio Tinto Iron Ore (WA) Hazardous Materials 

Management Work Practice, which mandates 

practices to minimise adverse health, safety 

and environment risks from the use, storage, 

transport and disposal of hazardous substances. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 69 

5 OTHER LEGISLATION AND APPROVALS 

Other  legislation  applicable  to  regulation  of  the  potential  environmental  impacts  of  the  Proposal,  and 

approvals required, are outlined  in Table 5‐1.   Rio Tinto will comply with all relevant  legislation (including 

obtaining specific approvals where required) prior to, and during, implementation of the Proposal. 

Table 5‐1:  Other Legislation and Approvals 

Environmental 

Factor Secondary Approval  Responsible Agency  Statute 

Vegetation and 

flora 

Licence to take Rare flora (none 

identified in Proposal area to date). DEC 

Wildlife Conservation Act 

1950 

Fauna Licence to take Protected fauna (none 

identified in Proposal area to date). DEC 

Wildlife Conservation Act 

1950 

Interference with 

watercourses 

Permit to obstruct or interfere with 

bed/banks. DoW 

Rights in Water and 

Irrigation Act 1914 

Groundwater 

abstraction 

Licence to construct or alter wells. 

Licence to take 

groundwater/amendment to existing 

groundwater licences. 

DoW Rights in Water and 

Irrigation Act 1914 

Dewatering 

discharge  

Licence to Operate for prescribed 

premises –e.g. Category 6, dewatering 

and discharge. 

DEC Environmental Protection 

Act 1986 

Rehabilitation and 

closure 

Mining Proposal and Mine Closure Plan 

– for infrastructure on Mining Act 

tenure. 

DMP  Mining Act 1978 

Greenhouse gas 

emissions 

National Greenhouse and Energy 

Reporting (NGER) Scheme. 

Australian Government 

(Clean Energy 

Regulator) 

National Greenhouse and 

Energy Reporting Act 

2007 

Aboriginal heritage Section 18 consent to disturb a heritage 

site. DIA 

Aboriginal Heritage Act 

1972 

Visual amenity  NA  NA  NA 

Air quality (Dust) 

Works Approval and Licence to Operate 

for prescribed premises – e.g. Category 

5, crusher and conveyor. 

DEC Environmental Protection 

Act 1986 

Air Quality 

(Noise and 

vibration) 

No specific approval required – 

compliance with the regulations is 

required. 

DEC Environmental Protection 

(Noise) Regulations 1997 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 70 

Environmental 

Factor Secondary Approval  Responsible Agency  Statute 

Public risk and 

safety 

Mining Proposal (includes other 

environmental aspects also) – for 

infrastructure on Mining Act tenure. 

DMP, Resources Safety 

Branch Mining Act 1978 

Proposal Management Plan. DMP, State Mining 

Engineer 

Mines Safety and 

Inspection Act 1994 

Hazardous 

materials Dangerous Goods Licence. 

DMP, Resources Safety 

Branch 

Dangerous Goods Safety 

Act 2004 

Non‐mineral waste 

Works Approval and Licence to Operate 

for prescribed premises – e.g. Category 

63/64, Landfill. 

DEC Environmental Protection 

Act 1986 

Application to construct or install an 

apparatus for the treatment of sewage. 

Shire of 

Ashburton/DoH 

Health (Treatment of 

Sewage and Disposal of 

Effluent and Liquid 

Waste) Regulations 1974 

Other 

State Agreement Act approval.  DSD 

Iron Ore (Hamersley 

Range) Agreement Act 

1963 

EPBC Approval (not required; decision of 

"not a controlled action" on 11 Jan 2013 

[reference EPBC 2012/6681]). 

DSEWPaC 

Environment Protection 

and Biodiversity 

Conservation Act 1999 

 

 

 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 71 

6 PRINCIPLES OF ENVIRONMENTAL PROTECTION AND EIA 

This section describes how the object of the EP Act and the principles of EIA have been addressed, and how 

the proposal meets the criteria for an API category A assessment as described  in the 2012 Administrative 

Procedures. 

6.1 Principles of Environmental Protection 

The objective of  the EP Act  is  to protect  the environment of  the  State, having  regard  to  five principles.  

These principles have been considered  in the environmental  impact assessment  for the Proposal and are 

summarised in Table 6‐1. 

Table 6‐1:  Principles of Environmental Protection 

Principle  Consideration given in Proposal 

1.  Precautionary Principle 

Where there are threats of serious or irreversible damage, lack of full scientific certainty should not be used as a reason for postponing measures to prevent environmental degradation. 

In the application of the precautionary principle, decisions should be guided by: 

Careful evaluation to avoid, where practicable, serious or irreversible damage to the environment. 

An assessment of the risk‐weighted consequences of various options. 

During Proposal planning and design phases, Rio Tinto will continue to undertake comprehensive baseline studies, investigations and modelling of Proposal aspects that may affect the surrounding environment.  Where significant potential environmental impacts are identified, measures have been, and will continue to be, incorporated into Proposal design and management to avoid or minimise these impacts where practical. 

2.  Intergenerational equity 

The present generation should ensure that the health, diversity and productivity of the environment is maintained or enhanced for the benefit of future generations. 

The Rio Tinto Iron Ore group HSECQ Policy incorporates the principles of sustainable development.  This includes the following commitments: 

Prioritising research and implementation programs through technology to reduce impacts to land, enhancing our contribution to biodiversity and improving our efficiency in water and energy use. 

Identifying climate change improvement solutions through dedicated optimisation work programs. 

Contributing to the health and well‐being of local communities. 

3.  Conservation of biological diversity and ecological integrity 

Conservation of biological diversity and ecological integrity should be a fundamental consideration. 

Biological investigations are undertaken by Rio Tinto during the Proposal planning process to identify aspects of the environment that are of conservation significance.  Where significant potential environmental impacts are identified, measures have been, and will continue to be, incorporated into Proposal design and management to avoid or minimise these impacts where practical.  The Rio Tinto HSEQ Management System has well established rehabilitation procedures for restoring disturbed environments. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 72 

Principle  Consideration given in Proposal 

4.  Improved valuation, pricing and incentive mechanisms 

Environmental factors should be included in the valuation of assets and services. 

The polluter pays principle – those who generate pollution and waste should bear the cost of containment, avoidance or abatement. 

The users of goods and services should pay prices based on the full life cycle costs of providing goods and services, including the use of natural resources and assets and the ultimate disposal of any wastes. 

Environmental goals, having been established, should be pursued in the most cost‐effective way, by establishing incentives structures, including market mechanisms, which enable those best placed to maximise benefits and/or minimise costs to develop their own solutions and responses to environmental problems. 

Environmental factors have been considered during the Proposal planning phase, and will continue to be considered during the operational and closure phases of the Proposal.  Proposal planning, design and operational management will continue to investigate and implement opportunities to reduce impact to land, and improve efficiency in water and energy use, in accordance with the Rio Tinto Iron Ore group HSECQ Policy. 

5.  Waste minimisation 

All reasonable and practicable measures should be taken to minimise the generation of waste and its discharge into the environment. 

Proposal planning, design and operational management will continue to investigate and implement opportunities to reduce impact to land, and improve efficiency in water and energy use, in accordance with the Rio Tinto Iron Ore group HSEQ Policy.  The Proposal will be implemented in accordance with Rio Tinto Standard E7 – Non‐mineral Waste Management, which requires minimisation of waste generation and safe handling, treatment and disposal of all generated wastes.  

6.2 Principles of EIA for the Proponent 

Table 6‐2 outlines the principles of EIA as described in clause 5 of the 2012 Administrative Procedures. 

Table 6‐2:  Principles of EIA for the Proponent 

The Principles of EIA for the Proponent  Discussed in the Document 

Consult with all stakeholders, including the 

EPA, DMAs, other relevant government 

agencies and the local community as early as 

possible in the planning of their proposal, 

during the environmental review and 

assessment of their proposal, and where 

necessary during the life of the project. 

Table 2‐1 details the extensive stakeholder consultation undertaken 

to date.  This consultation included the OEPA and relevant DMAs, as 

well as Traditional Owners and other mining companies.  Rio Tinto 

will continue to consult with relevant stakeholders during the 

environmental approval process, and during implementation of the 

Proposal. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 73 

The Principles of EIA for the Proponent  Discussed in the Document 

Ensure the public is provided with sufficient 

information relevant to the EIA of a proposal 

to be able to make informed comment, prior 

to the EPA completing the assessment report. 

Table 3‐2 to Table 3‐9  provide an EIA of the Proposal, for the 

preliminary key environmental factors identified by the EPA, based 

on: 

a summary of the key findings of studies and investigations (full 

reports provided as appendices); 

assessment of potential impacts of the Proposal; 

key environmental management measures.   

Table 4‐1 provides a brief EIA of the Proposal for other environmental 

factors.   

Use best practicable measures and genuine 

evaluation of options or alternatives in 

locating, planning and designing their 

proposal to mitigate detrimental 

environmental impacts and to facilitate 

positive environmental outcomes and a 

continuous improvement approach to 

environmental management. 

As stated in Table 3‐2 to Table 3‐9, avoiding and minimising impacts 

to the environment where practical is a key management 

commitment for the Proposal, and has been implemented during 

Proposal design.  For example, modification of the Proposal boundary 

since referral has been undertaken, to exclude extensive areas of 

vegetation of elevated conservation significance, and several 

occurrences of a Priority 1 flora species (Table 3‐2 and Figure 1‐5). 

As detailed in Section 3.2, continuous improvement is a key aspect of 

the Rio Tinto Iron Ore (WA) HSEQ Management System.   

Identify the environmental factors likely to be 

impacted and the aspects likely to cause 

impacts in the early stages of planning for 

their proposal. The onus is on the proponent 

through the EIA process to demonstrate that 

the unavoidable impacts will meet the EPA 

objectives for environmental factors and 

therefore their proposal is environmentally 

acceptable. 

Table 3‐2 to Table 3‐9 identifies the preliminary key environmental 

factors relevant to the Proposal, potential impacts, key management 

measures, and how the EPA objectives relevant to each 

environmental factor can be met by the Proposal. 

Table 4‐1 provides a brief EIA of the Proposal for other environmental 

factors. 

Consider the following, during project 

planning and discussions with the EPA, 

regarding the form, content and timing of 

their environmental review: 

a. The activities, investigations (and 

consequent authorisations) required to 

undertake the environmental review. 

b. The efficacy of the investigations to 

produce sound scientific baseline data 

about the receiving environment. 

c. The documentation and reporting of 

investigations. 

d. The likely timeframes in which to 

complete the environmental review;  

e. Use best endeavours to meet 

assessment timelines. 

The form and content of the environmental review has incorporated 

advice provided by the OEPA in several meetings, and addressed 

OEPA comment on drafts of the environmental review.   

Comprehensive studies and investigations, of high standard, have 

been undertaken to support the environmental review, and are 

provided as appendices. 

Project planning has considered the expected timeframes for 

completion of supporting studies, environmental review preparation 

and assessment, and timings for key milestones are regularly 

discussed with the OEPA. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 74 

The Principles of EIA for the Proponent  Discussed in the Document 

Identify in their environmental review, 

subject to EPA guidance: 

a. Best practicable measures to avoid, 

where possible, and otherwise 

minimise, rectify, reduce, monitor and 

manage impacts on the environment. 

b. Responsible corporate environmental 

policies, strategies and management 

practices, which demonstrate how the 

proposal can be implemented to meet 

the EPA environmental objectives for 

environmental factors. 

Table 3‐2 to Table 3‐9 and Table 4‐1 identifies key management 

measures to avoid, where possible, and otherwise minimise, rectify, 

reduce, monitor and manage impacts on the environment. 

Table 3‐2 to Table 3‐9 provides an assessment of how the Proposal 

meets EPA environmental objectives for relevant environmental 

factors, based on implementation of key management practices, and 

corporate environmental policies and strategies (summarised in 

Section 3.2). 

6.3 Criteria for API Category A 

Clause 10.1.1 in the 2012 Administrative Procedures states that the EPA applies an API level of assessment 

where  the proponent has provided sufficient  information about  the proposal,  its environmental  impacts, 

proposed management, and it appears that the Proposal is consistent with category A criteria.  Consistency 

of the Proposal with these criteria is addressed in Table 6‐3. 

Table 6‐3:  Criteria for API Category A 

Category A criteria  Discussion 

The proposal raises a limited number of key 

environmental factors that can be readily 

managed and for which there is an established 

condition‐setting framework. 

The Proposal raises five preliminary key environmental factors as 

identified in the ESD, and assessed in Table 3‐2 to Table 3‐9.  These 

factors are typical of iron ore mining in the Pilbara and can be 

readily managed.  Numerous operating iron ore mines in the region 

subject to Ministerial Conditions provide appropriate precedents 

for assessment and condition‐setting. 

The proposal is consistent with established 

environmental policies, guidelines and 

standards. 

The Proposal is consistent with established environmental policies, 

guidelines and standards, as set out in Table 3‐1, Table 3‐2 to Table 

3‐9 and Table 4‐1. 

The proponent can demonstrate that it has 

conducted appropriate and effective 

stakeholder consultation, in particular with 

DMAs. 

Section 2 details the extensive stakeholder consultation that has 

been undertaken to date, issues raised, and Proponent response to 

issues raised.  This consultation included the OEPA and other 

DMAs, as well as Traditional Owners and other mining companies. 

There is limited or local concern only about the 

likely effect of the proposal, if implemented, on 

the environment. 

Extensive stakeholder consultation has been undertaken to date; 

stakeholders have not raised any major concerns with the Proposal 

(Section 2). 

 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 75 

7 REFERENCES 

Australian  and  New  Zealand  Environment  and  Conservation  Council  &  Agriculture  and  Resource 

Management Council of Australia and New Zealand (ANZECC/ARMCANZ) 2000, Australian and New 

Zealand Guidelines for Fresh and Marine Water Quality, Australian Water Association, Sydney. 

Beard JS 1975, Pilbara Explanatory Notes and Map Sheet, 1:1,000,000 Series, Vegetation Survey of Western 

Australia, University of Western Australia Press, Nedlands. 

Biota Environmental Sciences  (Biota) 2007, A Vegetation and Flora Survey of  the West Turner Section 10 

Area  and  Infrastructure  Corridor,  unpublished  report  prepared  for Rio  Tinto, RTIO‐HSE‐0063557, 

Perth. 

Biota  Environmental  Sciences  (Biota)  2009a,  West  Turner  Syncline  Section 10  Development  Two‐Phase 

Fauna Survey, unpublished report prepared for Rio Tinto, RTIO‐HSE‐0123438, Perth. 

Biota Environmental Sciences (Biota) 2009b, A Two‐Phase Fauna Survey of the West Turner Syncline Area, 

unpublished report prepared for Rio Tinto, RTIO‐HSE‐0063545, Perth. 

Biota  Environmental  Sciences  (Biota)  2011a,  West  Turner  Targeted  Fauna  Survey,  unpublished  report 

prepared for Rio Tinto Iron Ore, RTIO‐HSE‐0131480, Perth. 

Biota  Environmental  Sciences  (Biota)  2011b, West  Turner  Syncline  Section 10  Expanded  Vegetation  and 

Flora Survey Report, unpublished report prepared for Rio Tinto, RTIO‐HSE‐0123440, Perth. 

Biota  Environmental  Sciences  (Biota)  2012a, West  Turner  Syncline NES  Species Assessment, unpublished 

report prepared for Rio Tinto, RTIO‐HSE‐0164398, Perth. 

Biota  Environmental  Sciences  (Biota)  2012b,  West  Turner  Syncline  Fauna  Survey  Summary  Report, 

unpublished report prepared for Rio Tinto, RTIO‐HSE‐0164353, Perth. 

Biota  Environmental  Sciences  (Biota)  2012c, West  Turner  Syncline  Stage  2  B1  and  Section 17  Deposits 

Subterranean Fauna Survey, unpublished report for Rio Tinto, RTIO‐HSE‐0159400, Perth. 

Biota  Environmental  Sciences  (Biota)  2013a, West  Turner  Syncline  Phase 2 Vegetation  and  Flora Report, 

unpublished report prepared for Rio Tinto, RTIO‐HSE‐0164513, Perth. 

Biota Environmental Sciences (Biota) 2013b, West Turner Syncline Stage 2 – Phase 1 Survey and Targeted 

Vegetation Survey, unpublished report for Rio Tinto, RTIO‐HSE‐0164845, Perth. 

Commonwealth of Australia (Commonwealth) 2007, Leading Practice Sustainable Development Program for 

the  Mining  Industry,  Managing  Acid  and  Metalliferous  Drainage,  Commonwealth  of  Australia, 

Canberra. 

Department of Water (DoW) 2009, Pilbara Water in Mining Guideline, Report no. 34, Department of Water, 

Perth 

Department  of  Mines  and  Petroleum  and  the  Environmental  Protection  Authority  (DMP/EPA)  2011, 

Guidelines for Preparing Mine Closure Plans, Department of Mines and Petroleum, Perth. 

Department of Planning and Infrastructure (DPI) (2007) Visual Landscape Planning  in Western Australia: a 

manual  for  evaluation,  assessment,  siting  and  design. Western Australian  Planning  Commission, 

Perth. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 76 

Ecoscape  (Australia) Pty Ltd  (Ecoscape) 2012, Western Turner Syncline Stage 2 Visual  Impact Assessment, 

unpublished report for Rio Tinto, RTIO‐HSE‐0159656, Perth. 

Environmental Alliances 2012, Predicted Dust Levels from Western Turner Syncline Stage 2 (B1 and S17) Iron 

Ore Project, unpublished report for Rio Tinto, RTIO‐HSE‐0160666, Perth. 

Environmental Protection Authority (EPA) 2003, Consideration of Subterranean Fauna in Groundwater and 

Caves during EIA  in WA, Guidance Statement No. 54, published by  the Environmental Protection 

Authority, Perth. 

Environmental  Protection  Authority  (EPA)  2004a,  Terrestrial  Flora  and  Vegetation  Surveys  for 

Environmental Impact Assessment  in Western Australia, Guidance Statement No. 51, published by 

the Environmental Protection Authority, Perth. 

Environmental  Protection  Authority  (EPA)  2004b,  Terrestrial  Fauna  Surveys  for  Environmental  Impact 

Assessment  in Western Australia, EPA Guidance  Statement No. 56, published by  the Environmental 

Protection Authority, Perth.  

Environmental Protection Authority (EPA) 2006, Environmental Offsets, Position Statement No. 9, published 

by the Environmental Protection Authority, Perth. 

Environmental  Protection  Authority  (EPA)  2007a,  Sampling  methods  and  survey  considerations  for 

subterranean  fauna  in Western Australia, Draft EPA Guidance  Statement No. 54a, published by  the 

Environmental Protection Authority, Perth. 

Environmental  Protection Authority  (EPA)  2007b,  Environmental Noise, Draft Guidance  Statement No.8, 

published by the Environmental Protection Authority, Perth. 

Environmental Protection Authority (EPA) 2008, Environmental Offsets – Biodiversity, Guidance Statement 

No. 19, published by the Environmental Protection Authority, Perth. 

Environmental Protection Authority  (EPA) 2009, Sampling of Short Range Endemic  Invertebrate Fauna for 

Environmental Impact Assessment in Western Australia, EPA Guidance Statement No. 20, published by 

the Environmental Protection Authority, Perth. 

Environmental Protection Authority  and Department of  Environment  and Conservation  (EPA/DEC) 2010, 

Technical  Guide  ‐  Terrestrial  Vertebrate  Fauna  Surveys  for  Environmental  Impact  Assessment, 

published by the Environmental Protection Authority, Perth. 

Equinox  Environmental  2012,  Western  Turner  Syncline  Stage  2  Project  Ecological  Risk  Assessment, 

unpublished report for Rio Tinto, RTIO‐HSE‐0168076, Perth.  

Klohn Crippen Berger (KCB) 2012a, Western Turner Syncline B1 Pit Post Closure Water Quality Assessment, 

unpublished report for Rio Tinto, RTIO‐HSE‐0145681, Perth. 

Klohn Crippen Berger (KCB) 2012b, WTS2 B1 Water Quality Assessment, unpublished report for Rio Tinto, 

RTIO‐PDE‐0102103, Perth.  

MWH 2009, B1 Groundwater Model: A  transient numerical groundwater model of  the dewatering of  the 

proposed B1 mine site  in  the Western Turner Syncline using MODFLOW 2000, unpublished  report 

for Rio Tinto, RTIO‐PDE‐0062664, Perth. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 77 

Rio Tinto 2011, Groundwater Dependant Ecosystems in the Pilbara and predicted impacts from dewatering 

and discharge along Caves and Duck Creek,  internal memo prepared by Rio Tinto  Iron Ore, RTIO‐

HSE‐0166230, Perth. 

Rio Tinto 2012a, Baseline hydrology assessment  for a  local creek discharge  from Western Turner Syncline 

(WTS) B1 deposit, unpublished report prepared by Rio Tinto, RTIO‐HSE‐0095090, Perth. 

Rio  Tinto  2012b, Western  Turner  Syncline B1 Dewatering  Strategy  – Groundwater Numerical Modelling, 

unpublished report prepared by Rio Tinto, RTIO‐PDE‐0092036, Perth. 

Rio  Tinto  2012c, WTS  Phase  II  Surface Water Management,  unpublished  report  prepared  by  Rio  Tinto, 

RTIO‐PDE‐0101051, Perth. 

Rio Tinto 2012d, Western Turner Syncline B1 – Feasibility Studies Groundwater Modelling: Dewatering and 

Closure, unpublished report prepared by Rio Tinto, RTIO‐PDE‐0103028, Perth. 

Rio Tinto 2012e, Surface hydrology in the vicinity of the WTS2 infrastructure corridor between WTS B1 and 

S10; assessment and modelling of natural surface flows, unpublished report prepared by Rio Tinto, 

RTIO‐PDE‐0103316, Perth. 

Rio Tinto 2012f, Western Turner Syncline B1 and S17 AMD Risk Assessment, November 2012, unpublished 

report prepared by Rio Tinto, RTIO‐PDE‐0102519, Perth. 

Rio Tinto 2012g, Western Turner Syncline (Stage 2) Closure Plan, unpublished report prepared by Rio Tinto, 

Perth. 

Rio Tinto 2013a, Western Turner Syncline B1 – Feasibility Study Groundwater Modelling: Dewatering and 

Closure, unpublished report prepared by Rio Tinto, RTIO‐PDE‐0104666, Perth. 

Rio Tinto 2013b, WTS Stage 2 FS – Water balance & strategy update, unpublished report prepared by Rio 

Tinto, Perth. 

SVT Engineering Consultants (SVT) 2012, Environmental Noise Assessment of Western Turner Syncline Stage 

II Project, unpublished report for Rio Tinto, RTIO‐HSE‐0160668, Perth. 

University of Western Australia  (UWA) 2012a, West Turner Syncline Stage 2  ‐ Potential  impacts of mining 

operations on overland flow dependent vegetation ‐ Preliminary assessment, unpublished report for 

Rio Tinto, RTIO‐HSE‐0159807, Perth. 

University of Western Australia (UWA) 2012b, West Turner Syncline Stage 2  ‐ Potential  impacts of mining 

operations on groundwater dependent vegetation ‐ Preliminary assessment, unpublished report for 

Rio Tinto, RTIO‐HSE‐0159544, Perth.  

URS 2009, Western Turner Syncline Hydrogeological Bore Completion Report, unpublished report prepared 

for Rio Tinto, RTIO‐PDE‐0061401, Perth.  

Wetland  Research  and  Management  (WRM)  2012a,  Western  Turner  Syncline:  Baseline  Assessment  of 

Aquatic  Fauna & Water Quality  – Wet & Dry  2011  Survey, unpublished  report prepared  for Rio 

Tinto, RTIO‐HSE‐0134269, Perth. 

Wetland  Research  and  Management  (WRM)  2012b,  WTS2  –  groundwater  quality  –  updated  data, 

unpublished report prepared for Rio Tinto, RTIO‐HSE‐0166326, Perth. 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 79 

Appendix 1 Supporting Tables 

 

Appendix 1 Table 1  Potential impacts to conservation significant flora 

Species Conservation 

status 

Locations within WTS study area 

Locations within proposal boundary 

Locations within indicative 

infrastructure layout1  Potential impact 

#  # % of total in study area 

# % of total in study area 

Grevillia sp. Turee (J. Bull & G Hopkinson ONS JJ 01.01) 

P1  2  0  0  0  0 

Two locations comprising one population2 of 15 individuals were recorded in the west of the WTS during 2012 

(Biota 2013b), while three locations comprising one population of seven plants have been recorded east of the WTS.  These populations are 5.5 km west and 2.3 km east of the Proposal boundary, respectively, and will not be impacted by the Proposal.  This species occurs through the Hamersley Range over a range of approximately 220 km east‐west (from near Hope Downs to Mount Brockman) and 70 km north‐south.  There are currently over 80 additional location records from this area representing 30 separate populations, including one in Karijini National Park. 

Hibiscus sp. Mt Brockman (E. Thoma ET 1354) 

P1  13  3  23  1  8 

Six locations (comprising five populations) were recorded in 2012, which led to the re‐examination of specimens previously assigned to the Hibiscus ‘haynaldii’ complex.  This identified a further seven locations (comprising six populations) sampled previously to give a total of 13 locations, comprising 11 separate populations (Biota 2013a).  Multiple individuals were recorded at these locations, which generally occurred in steep terrain in the west of the WTS, near Mt Turner.  This species is currently known from 11 additional locations, comprising eight separate populations; however, it is probable that some of the other existing records of Hibiscus haynaldii from the locality will also prove to be this species (Biota 2013a).  Based on the current records, the distribution of this species extends over a radius of approximately 35 km around the Brockman Syncline 4 locality.  The Proposal is not expected to have significant local or regional impacts on this species, as only one location of this species is expected to be cleared (for a waste dump). 

Sida sp. Hamersley Range (K. Newbey 10692) 

P1  1  0  0  0  0 

This species was recorded from a single location on the southern edge of the study area (see Biota 2013a).  This location is over 5 km from the Proposal boundary, and no impacts are therefore expected on this species. This species has a range of approximately 100 km east‐west and 70 km north‐south, roughly centred on Mount Brockman. 

Dampiera anonyma  P3  12  1  8  0  0 

Twelve (12) locations with multiple individuals were recorded on upper slopes of the ridges in the west of the study area (Biota 2013a, 2013b), comprising five separate populations.  The majority of these locations are not within close proximity to the indicative infrastructure layout; a single location lies within the western section of the Proposal boundary, approximately 200 m west of a proposed waste dump.  This species has been previously recorded at 47 other locations within 60 km of the study area (which comprise all the other known locations), over a range approximately 100 km east‐west and north‐south.  These locations represent 20 additional populations, eight of which are located in Karijini National Park.  The Proposal is not expected to have significant local or regional impacts on this species. 

Eremophila magnifica subsp. velutina 

P3  87  81  93  5  6 

Eighty seven (87) locations with multiple individuals were recorded, concentrated on scree slopes of hills in the east of the study area (Biota 2013a); these locations comprised 10 populations.  Five locations (comprising one population) lie within the indicative infrastructure layout.  Twenty six (26) additional locations of the species have been recorded within 60 km of the study area, representing 11 additional populations (including two populations in Karijini National Park).  The species occurs over a range of approximately 300 km east‐west from Newman to west of Mount Brockman.  The Proposal is not expected to have significant local or regional impacts to this species.  

Species Conservation 

status 

Locations within WTS study area 

Locations within proposal boundary 

Locations within indicative 

infrastructure layout1  Potential impact 

#  # % of total in study area 

# % of total in study area 

Goodenia sp. East Pilbara (A.A. Mitchell PRP 727) 

P3  247  36  15  0  0 

This species was distributed relatively widely through the centre of the study area.  Five locations with multiple individuals were identified by Biota (2012a), while 242 additional locations were recorded by Rio Tinto botanists in 2003 and 2011 (Biota 2013a).  These locations represented seven populations in total.  All records were within vegetation units EsMeAbTaTw and ElTwTa on calcrete outcrops.  These locations are generally not within close proximity to the indicative infrastructure layout.  This species has been previously recorded at 19 other locations within 50 km of the study area.  It is known from a broad range of 320 km east‐west, mainly distributed from the West Turner locality to Newman, with an outlying record from Noreena Downs.  The Proposal is not expected to have significant local or regional impacts on this species. 

Indigofera sp. Bungaroo Creek (S. van Leeuwen 4301) 

P3  113  58  51  10  9 

One hundred and thirteen (113) locations with multiple individuals were recorded from a variety of habitats within the western and southern sections of the study area, including scree slopes, gullies and creek lines (Biota 2013a, 2013b); these comprised 26 populations.  This species has previously been recorded at hundreds of other locations within 50 km of the study area, representing approximately 50 additional populations.  It also occurs more widely from the Robe Valley (near Pannawonica) to Tom Price, a range of over 200 km northwest‐southeast.  Although some locations of this species within the Proposal boundary are in close proximity to the indicative infrastructure layout and will potentially be cleared, this is not expected to have significant local or regional impacts on this species. 

Nicotiana umbratica 

P3  1  0  0  0  0 

This species was recorded at one location in a gully east of Mt Turner during first phase sampling by Biota (2013a) outside the Proposal boundary.  The species was not recorded during second phase sampling, but it is likely that it was not present or identifiable at the time given rainfall was low prior to the survey.  This species has previously been recorded from three locations within 50 km of the study area, all to the south.  It occurs over a range of some 350 km southwest‐northeast, extending from near Paraburdoo to southeast of Port Hedland.  One population is known from Karijini National Park.  The Proposal is not expected to have significant local or regional impacts to this species. 

Ptilotus subspinescens 

P3  141  119  84  0  0 

Ninety six (96) locations with multiple individuals were recorded on the low stony undulating plains in the north and west of the study area (Biota 2013a, 2013b).  In addition, 45 locations were recorded during other previous surveys (Biota 2013a).  These 141 total locations represent 19 separate populations in the study area.  The distribution of this species extends over a radius of approximately 35 km around Mount Brockman, and all of the known records (in the order of 500 locations in total) lie within 50 km of the study area.  The majority of locations of this species in the study area were not recorded within close proximity to the indicative infrastructure layout.  Although some locations of this species within the Proposal boundary may be cleared, this is not expected to have significant local or regional impacts to this species.   

Sida sp. Barlee Range (S. van Leeuwen 1642) 

P3  111  77  69  7  6 

One hundred and eleven (111) locations with multiple individuals were recorded, widely distributed throughout the study area; these comprised 26 populations.  This species is relatively common in the Mt Turner locality, having been recorded from approximately 200 additional locations within 50 km of the study area, representing numerous populations.  The species has a broad distribution across 370 km east‐west, extending from Barlee Range Nature Reserve to near Newman.  Although some locations of this species within the Proposal boundary are expected to be cleared, this is not expected to have significant local or regional impacts on this species. 

Acacia bromilowiana 

P4  2  0  0  0  0 

Two locations of this species were recorded near Mt Turner in the west of the study area (Biota 2013b), at least 1.4 km west of the Proposal boundary.  This species has been recorded from several locations within 50 km of the study area, and is known from numerous populations, including two in Karijini National Park.  The species has a broad distribution through the Pilbara, occurring over a range of 390 km from Balfour Downs Station in the east to the Mount Brockman locality in the west.  The Proposal is not expected to have significant local or regional impacts on this species.     

Species Conservation 

status 

Locations within WTS study area 

Locations within proposal boundary 

Locations within indicative 

infrastructure layout1  Potential impact 

#  # % of total in study area 

# % of total in study area 

Eremophila magnifica subsp. magnifica 

P4  108  72  67  21  19 

A total of 108 locations with multiple individuals were recorded, on the scree slopes of the western and central northern hills of the study area, by Biota and previous surveys (Biota 2013a).  These represented eight populations.  It is relatively common in the Mount Brockman locality, with over 330 additional locations (representing 46 additional populations) known from within 50 km of the study area (Biota 2013a).  The species occurs over a range of approximately 300 km east‐west, from Newman to west of Mount Brockman, with nine populations known from Karijini National Park.  Although some locations of this species within the Proposal boundary are expected to be cleared, this is not expected to have significant local or regional impacts on this species.  

Goodenia nuda  P4  1  0  0  0  0 

One location with six individuals was recorded on a flat stony plain in association with vegetation unit ElAsppTe in the southeast of the study area (Biota 2013a).  This location is not within the Proposal boundary.  This species has previously been recorded at numerous locations within 50 km of the study area, comprising over 40 populations.  This species has a broad distribution; most records occur over a range of approximately 450 km through the Pilbara bioregion, with populations known from Karijini and Millstream‐Chichester National Parks.  There are also two outlying records from east of Rudall River in the Great Sandy Desert and the Canning Stock Route in the Gascoyne bioregion.  The Proposal is not expected to have significant local or regional impacts on this species.   

Ptilotus mollis  P4  2  0  0  0  0 

One location of this species was recorded near Mt Turner in the west of the study area, 1.4 km west of the Proposal boundary (Biota 2013a).  A second location is known from the west of the study area, 200 m west of the Proposal boundary (Biota 2013b).  This species has a broad distribution through the Pilbara, occurring over a range of approximately 300 km north‐south and 550 km east‐west, from Rudall River to the Mount Brockman locality.  One population is known from Karijini National Park.  The Proposal is not expected to have significant local or regional impacts on this species. 

1 Based on indicative infrastructure layout during Proposal Feasibility Study.  Infrastructure layout is subject to change during Project Feasibility Study, construction and operational phases.  Proposed extent of 

clearing (2,700 ha) within the Proposal boundary (8,430 ha) allows for a footprint approximately 30% larger than the current indicative infrastructure layout, as detailed in Figure 3‐1 

2  Location records greater than 500 m apart have been considered to represent separate populations. 

 

Appendix 1 Table 2  Potential clearing and dewatering discharge impact to vegetation communities of localised conservation significance 

Vegetation community 

Area within WTS study area 

Area within Proposal boundary Area intersected by indicative 

infrastructure layout 1 Area in proximity to maximum extent 

of dewatering discharge 2 

ha  ha % of total surveyed 

area ha 

% of total surveyed area 

ha % of total surveyed 

area 

Lower slope mulga  1,382  293  21  97  7  0  0 

Valley floor mulga  354  162  46  20  6  0  0 

Riparian eucalypt woodland on major ephemeral watercourses  412  0  0  0  0  69  17 

Scattered riparian eucalypts on major ephemeral watercourses  877  53  6  0  0  55  6 

Gorges and gullies  205  67  33  22  11  2.5  1 

Total  3,230  575  18  139  4  126  4 

1 Based on indicative infrastructure layout during Proposal Feasibility Study.  Infrastructure layout is subject to change during ProposalFeasibility Study, construction and operational phases.  Proposed extent of 

clearing (2,700 ha) within the Proposal boundary (8,430 ha) allows for a footprint approximately 30% larger than the current indicative infrastructure layout, as detailed in Figure 1‐3. 

2 Highly conservative estimate of vegetation that may be affected by discharge at maximum rates of 30 ML/day, based on the area within 100 m of the centreline of the low flow channel(s) on the discharge 

watercourse and the Beasley River.  On the Beasley River the low flow channel is generally 25 m width, and when braided, multiple channels can occur over approximately a 50 m width.  On the discharge 

watercourse the low flow channel is generally 15 m width, and when braided, multiple channels can occur over approximately a 90 m width. 

 

Appendix 1 Table 3 Potential Impacts to fauna habitat

No. Habitat description

Area within WTS study area Area within Proposal boundary Area within indicative Proposal

footprint 1

ha ha % of area in study area ha % of area in study

area

1 Acacia inaequilatera tall shrubs over Triodia hummock grassland on low hills.

37 0 0 0 0

2 Acacia spp. tall shrubland over *C. ciliaris tussock grassland on minor drainages and flow lines.

315 43 14 1 0.2

3 Acacia xiphophylla shrubland over Triodia hummock grassland on clay plains.

1,035 322 31 36 3

4 Corymbia spp. open woodland over mixed Acacia spp. shrubland over tussock grasslands on low hills and stony plains.

1567 31 2 0 0

5 Disturbed. 35 27 77 1 3

6 Eucalypt woodland over Acacia citrinoviridis shrubland on major creeks. 1,285 53 4 0 0

7 Eucalypt woodland over Acacia spp. shrubland over Triodia hummock grassland on stony plains and slopes.

5813 2,149 37 564 10

8 Eucalyptus leucophloia woodland over Acacia spp. shrubland over Triodia hummock grassland on spurs and hill slopes.

11,300 4,279 38 1,014 9

9 Eucalyptus victrix woodland over Melaleuca glomerata shrubland over tussock grassland on major creeks.

4 0 0 0 0

10 Mixed Acacia spp. shrublands over Triodia hummock grasslands on stony plains and low hills.

2,557 499 20 164 6

11 Mulga and Acacia shrublands over Triodia hummock grasslands on rocky hill slopes.

723 292 40 76 11

12 Eucalypt woodland over Acacia spp. shrubland over tussock grassland on minor drainages.

1,243 610 49 192 15

13 Corymbia spp. and eucalypt open woodland over mixed Acacia spp. shrubland over tussock grasslands in gullies and gorges.

198 66 33 22 11

14 Eucalypt woodland over Acacia spp. shrubland over Triodia hummock grassland on incised flow lines.

137 51 37 3 2

15 Eucalyptus leucophloia over Mulga (Acacia aneura)/A. citrinoviridis over Triodia hummock grassland in gullies and gorges.

14 8 57 1 7

TOTAL 26,263 8,430 2074 1 Based on indicative infrastructure layout during Proposal Feasibility Study. Infrastructure layout is subject to change during Feasibility Study, construction and operational phases. Proposed extent of clearing (2,700 ha) within the Proposal boundary (8,430 ha) allows for a footprint approximately 30% larger than the current indicative infrastructure layout, as detailed in Figure 1-3.

* Introduced species.

Appendix 1 Table 4  Potential impacts to conservation significant terrestrial fauna species 

Fauna group 

Species Conservation 

status (EPBC Act) Conservation status (State) 

Locations recorded in relation to Proposal 

boundary 

Habitat unit(s) 

Description 

Bats 

Rhinonicteris aurantius  

(Pilbara Leaf‐nosed Bat) 

Vulnerable  Schedule 1 

2 locations  

All outside Proposal boundary 

The Pilbara Leaf‐nosed Bat has only been recorded from three single calls in the WTS area (Biota 2012a).  One of these was in 2011 from a site located in a gorge to the east of Mt Turner (site WTTBAT03), and two subsequent calls were recorded in 2012 on separate nights from a gully to the north of Mt Turner (site WTEBAT01 – Figure 3‐1).  These records were all outside of the Proposal boundary.  As these isolated single calls were the only records from four systematic field surveys, it is unlikely that there is a permanent roost supporting a colony of the species in the WTS area (Biota 2012a).   

Field searches and helicopter reconnaissance have not located any caves of sufficient depth in the WTS area to offer permanent roost sites for this species.  The records are considered to represent itinerant individuals foraging at considerable distance from their roost, the latter two calls were after midnight, consistent with individuals foraging at distance after dusk emergence from the permanent roost (Biota 2012a).  The only habitats that may be of value to this species would be the potential transitory roost sites (e.g. temporary overnight refuges for dispersing males) or foraging areas, within the ‘gorges and gullies’ (habitat types 9, 13, 15) and ‘major ephemeral creek’ habitats (habitat type 6) (Figure 3‐1).  There is no evidence that a population of the species exists within the WTS area (Biota 2012a).  The Proposal is expected to have minimal impact on this species. 

Macroderma gigas  

(Ghost Bat) 

NA  Priority 4 1 location  

Outside Proposal boundary 13 

The Ghost Bat has been recorded from a single call in the WTS area, at site WTEbat05, in a gorge (habitat type 13) west of the Proposal boundary (Biota 2012b).  As this is the only call of this species recorded to date at WTS, the Ghost Bat was considered to be foraging a significant distance from a roost, suggesting it is unlikely a roost of any significance occurs in the area (Biota 2012b).  The Proposal is expected to have minimal impact on this species. 

Reptiles 

Liasis olivaceus barroni 

(Pilbara Olive Python) 

Vulnerable  Schedule 1 

2 locations  

All outside Proposal boundary 

7, 13 

Two specimens of the Pilbara Olive Python have been recorded in the WTS area, at site WTC14E in 2009 (just beyond the eastern extent of the WTS survey area) and at site WTT02E in 2012, outside the Proposal boundary.  It is likely the python occurs in the gorges and rocky habitats to the east of the WTS area.  Within the WTS area, the ‘gorges and gullies’ habitat in the west represents the most suitable habitat (habitat types 9, 13 and 15), and the ‘major ephemeral creeks’ habitat (habitat type 6) may also represent core habitat when temporary pools are available (Biota 2012a).  These habitats would potentially be utilised by the species for foraging or breeding activities at different times and subject to seasonal conditions.  It is likely that a 'population' of Pilbara Olive Pythons occurs in the WTS area, but it would be at the low density of individuals in the landscape typical of the species.  The available data suggest that the area and population are typical of the broader Hamersley sub‐region (Biota 2012a).  The Proposal is expected to have minimal impact on this species.  

Notoscincus butleri 

NA  Priority 4 1 location  

Outside Proposal boundary 2 

N. butleri was recorded in mixed Acacia open shrubland over spinifex (Triodia sp.) hummock grassland (habitat type 2) near the Hardey River, south of the Proposal boundary (Figure 3‐1).  The fauna habitats found within the study area are common and widespread throughout the Hamersley sub‐region (Biota 2012a).  The Proposal is expected to have minimal impact on this species. 

Fauna group 

Species Conservation 

status (EPBC Act) Conservation status (State) 

Locations recorded in relation to Proposal 

boundary 

Habitat unit(s) 

Description 

Mammals (excl. bats) 

Pseudomys chapmani 

(Western Pebble‐mound Mouse) 

NA  Priority 4 

6 locations  

5 outside Proposal boundary 

7, 8, 10 

Active pebble‐mounds were located at six sites, both within and outside the Proposal boundary, with three individuals recorded (Figure 3‐1).   

The fauna habitats found within the study area are common and widespread throughout the Hamersley sub‐region (Biota 2012b).  The Proposal is expected to have minimal impact on this species.  

Birds 

Ardeotis australis 

(Australian Bustard) 

NA  Priority 4 

3 locations  

All outside Proposal boundary 

7, 8, 12 

The Australian Bustard was recorded at three locations in the WTS area, all outside the Proposal boundary (Figure 3‐1).  This species is relatively widespread and mobile, as the fauna habitats found within the study area are common and widespread throughout the Hamersley sub‐region (Biota 2012b).  The Proposal is expected to have minimal impact on this species. 

Merops ornatus 

(Rainbow Bee‐eater) 

Migratory  Schedule 3 

7 locations 

6 outside Proposal boundary 

2, 3, 7, 10, 11 

The Rainbow Bee‐eater was recorded at seven sites distributed throughout the study area (Figure 3‐1).  The species has a wide ranging distribution and is highly mobile, and is one of the most commonly recorded birds in the Pilbara (Biota 2012b).  The Proposal is expected to have minimal impact on this species. 

Potential SREs 

Aname sp.  NA  NA 

10 locations 

7 outside Proposal boundary 

2, 7, 8, 10, 13 

This species was recorded at 10 locations, in a variety of habitats, throughout the WTS area (Figure 3‐1).  Genetic analysis of several specimens that belong to a species widely distributed across the Pilbara indicates the specimens are unlikely to represent a species restricted to the WTS area, and are unlikely to comprise an SRE species (Biota 2012b).  The Proposal is expected to have minimal impact on this species. 

Barychelidae sp.  NA  NA 

6 locations 

4 outside Proposal boundary 

8, 10, 12 

This species was recorded at six locations, in a variety of habitats, throughout the WTS area (Figure 3‐1).  The species is known from 25 specimens recorded at 23 localities (Biota 2012b).  The species is considered to comprise an SRE, but is known to occur outside the WTS area (Biota 2012b).  The Proposal is expected to have minimal impact on this species. 

Conothele sp.  NA  NA 1 location 

Outside Proposal boundary 11 

This species was recorded from a single location 2 km south of the Proposal boundary in habitat type 11 (Figure 3‐1).  The specimen may represent an SRE, pending genetic analysis to confirm if the specimen comprises one of the 23 known Conothele species recorded from the Pilbara (Biota 2012b).  The Proposal is expected to have minimal impact on this species. 

Kwonkan sp.  NA  NA 

4 locations 

All outside Proposal boundary 

2, 3, 10, 11 

Recorded from four locations in a variety of habitats, south of the Proposal boundary  (Figure 3‐1).  The taxa are unlikely to be restricted to the WTS area, pending genetic analysis to confirm (Biota 2012b).  The Proposal is expected to have minimal impact on this species. 

Quistrachia sp.  NA  NA 

2 locations 

All outside Proposal boundary 

2, 12 

This species was recorded from two locations south of the Proposal boundary (Figure 3‐1).  The specimens are considered likely to comprise a species (Quistracia turneri) broadly distributed in the Pilbara, with identification from the WA Museum pending (Biota 2012b).  The Proposal is expected to have minimal impact on this species. 

 

 

Appendix 1 Table 5  Conservation significant aquatic fauna in the WTS region (WRM 2012a) 

Fauna group  Taxa Conservation status  Recorded from Hardey or 

Beasley River Control or Potential 

Impact site EPBC Act  State  IUCN 

Micro‐invertebrates 

Lecane noobijupi        Both  Both 

Synchaeta sp. (undescribed) 

      Beasley  Control 

Hyporheic fauna 

Microcyclops varicans        Both  Both 

Scirtidae spp.        Both  Control 

Oligochaeta spp.        Both  Both 

Pentaneura sp.        Beasley  Potential Impact 

Limbodessus occidentalis        Beasley  Control 

Macro‐invertebrates 

Hemicordulia koomina 

(Pilbara emerald dragonfly)     Near Threatened  Both  Both 

Eurysticta coolawanyah 

(Pilbara pin damselfly)     Near Threatened  Beasley  Both 

Haliplus pilbaraensis        Beasley  Both 

Fish Leiopotherapon aheneus 

(Fortescue grunter)   Priority 4 

Lower Risk Near Threatened 

Beasley  Both 

 

Western Turner Syncline Stage 2 – B1 and S17 Deposits API: Environmental Review Document

 

Page 89 

List of Appendices – Supporting Document 

Appendix 2  A Vegetation and Flora Survey of the West Turner Section 10 Area and  Infrastructure Corridor (Biota 2007). 

Appendix 3  West Turner Syncline Section 10 Development Two‐Phase Fauna Survey (Biota 2009a). 

Appendix 4  A Two‐Phase Fauna Survey of the West Turner Syncline Area, (Biota 2009b). 

Appendix 5  West Turner Targeted Fauna Survey (Biota 2011a). 

Appendix 6  West Turner Syncline Section 10 Expanded Vegetation and Flora Survey Report (Biota 2011b). 

Appendix 7  West Turner Syncline Phase 2 Vegetation and Flora Report (Biota 2013a). 

Appendix 8  West Turner Syncline NES Species Assessment (Biota 2012a). 

Appendix 9  West Turner Syncline Fauna Survey Summary Report (Biota 2012b). 

Appendix 10  West Turner Syncline Stage 2 – Phase 1 Survey and Targeted Vegetation Survey (Biota 2013b). 

Appendix 11  West  Turner  Syncline  Stage 2 B1  and  Section 17 Deposits  Subterranean  Fauna  Survey  (Biota 2012c). 

Appendix 12  Western Turner Syncline Stage 2 Visual Impact Assessment (Ecoscape 2012). 

Appendix 13  Predicted  Dust  Levels  from Western  Turner  Syncline  Stage  2  (B1  and  S17)  Iron Ore  Project (Environmental Alliances 2012). 

Appendix 14  Western  Turner  Syncline  Stage  2  Project  Ecological  Risk  Assessment  (Equinox  Environmental 2012). 

Appendix 15  WTS2 B1 Water Quality Assessment (KCB 2012b). 

Appendix 16  Potential  Impacts  of  Dewatering  and  Discharge  to  Duck  Creek  and  Caves  Creek,  Greater Nammuldi (Rio Tinto 2011). 

Appendix 17  Baseline Hydrology Assessment for Local Creek Discharge from WTS B1 (Rio Tinto 2012a). 

Appendix 18  Western Turner Syncline B1 – Feasibility Study Groundwater Modelling: Dewatering and Closure (Rio Tinto 2013a). 

Appendix 19  WTS Phase II Surface Water Management, unpublished report prepared by Rio Tinto (Rio Tinto 2012c). 

Appendix 20  Western  Turner  Syncline  B1  –  Feasibility  Studies  Groundwater  Modelling:  Dewatering  and Closure (Rio Tinto 2012d). 

Appendix 21  Surface hydrology in the vicinity of the WTS2 infrastructure corridor between WTS B1 and S10; assessment and modelling of natural surface flows (Rio Tinto 2012e). 

Appendix 22  Western Turner Syncline B1 and S17 AMD Risk Assessment (Rio Tinto 2012f). 

Appendix 23  Western Turner Syncline (Stage 2) Closure Plan (Rio Tinto 2012g). 

Appendix 24  Environmental Noise Assessment of Western Turner Syncline Stage II Project (SVT 2012). 

Appendix 25  West  Turner  Syncline  Stage  2  ‐  Potential  impacts  of  mining  operations  on  overland  flow dependent vegetation ‐ Preliminary assessment (UWA 2012a). 

Appendix 26  West  Turner  Syncline  Stage  2  ‐  Potential  impacts  of  mining  operations  on  groundwater dependent vegetation ‐ Preliminary assessment (UWA 2012b). 

Appendix 27  Western Turner Syncline Project, wet & dry 2011 sampling, final report (WRM 2012a). 

Appendix 28  WTS2 – groundwater quality updated data (WRM 2012b). 

Appendix 29  WTS Stage 2 FS – Water balance & strategy update (Rio Tinto 2013b). 

Appendix 30  Checklist for documents submitted for EIA on marine and terrestrial biodiversity. 

Appendix 31  EPA prepared scoping guideline.