Financial StatementsFor the Period
September 1, 2012 ‐ September 30, 2012
For the Meeting of the Board of Trustees ‐ October 25, 2012
for
Houston Community College System&
Houston Community College Public Facility Corporation
Memorandum Management Discussion & Analysis
Summary HCCS Unrestricted Revenue & Expenditures 1
Adjusted Budgets by Division 2
Actual YTD by College 2
Cash Flow Analysis 3
Contact Hours Reimbursement 8
Enrollment Data 9Charts Revenue & Expenditure YTD thru September 30, 2012 10
Revenue and Expenditures with Trendlines 11
Revenue Source Comparison By Year 12
Expenditure Source Comparison By Year 13
Fund Balances Balance Sheet By Fund 14
Designated Funds Budget Summary / Cash Position 15
Capital Projects & Unexpended Plant Fund Projects 16
Unexpended 2004 CIP Projects 17
Plant Fund Maintenance Tax Notes 2006 (Central Utility Plant Project) 25
Maintenance Tax Notes/Sr. Lien Bonds 2008 26
Maintenance Tax Notes 2010 28
Bonds/Notes Schedule of Bonds & Maintenance Tax Notes 29
Auxiliary Sources and Uses of Auxiliary Funds 30
Restricted Funds Grants, Contracts and Student Aid 32
Position Control 2013 Positions 38
Pos. Control Charts FTE (Full‐Time Equivalent) Monthly Comparison 40
Duplicated Headcount Monthly Comparison 49
Unduplicated Headcount Monthly Comparison 50
Statement of Net Assets PFC 1
Statement of Cash Flows (Cash Basis‐ Interim Period) PFC 2
Public Safety Institute PFC 3
Westgate PFC 4
Hayes Road ‐ Alief Project PFC 5
Northline Mall Project PFC 6
Houston Community College ‐ Public Facility Corporation
Table of ContentsFor the Period September 1, 2012 ‐ September 30, 2012
For the Meeting of the Board of Trustees
Houston Community College System
MEMORANDUM
To: Houston Community College System Board of Trustees
Via: Dr. Mary Spangler, Chancellor
From: Dr. Art Tyler, Deputy Chancellor Chief Operating Officer
Date: October 18, 2012
Re: Financial Report for Month Ended September 30, 2012
Enclosed please find the preliminary financial reports for the month ending September 30, 2012 for your review. The financial report is an internal management report submitted to the Board of Trustees to compare actual financial activities to the approved budgets, strategic priorities, and financial policies for the reported fiscal year.
Operating Fund net revenue through September 30, 2012 is $55,236,069 which is 5.5% below last year. Expenditures year‐to‐date total $25,333,253 which is 26.5% less than the same time last year, for a net of $29,902,816.
The reserves for the month of September 2012 are $62,779,856 or 21.2% of revenues (see page IV). Thus, we continue to project a healthy fiscal strength for the college.
Managements Discussion and Analysis
Thru September 30, 2012
Revenues
Expenditures
Total revenue collections, net of exemptions and waivers, totaled $55,236,069 year‐to‐date. This is a 5.5% decrease below last year.
Total Salaries are $14,180,843 year‐to‐date, 0.5% below the previous year. Total salaries at year end are
expected to be $161,390,172.
Benefits costs totaled $1,331,833 year‐to‐date, 3.7% above last year. Total benefits at fiscal year end are
expected to be $18,209,297.
Contract Services expense totaled $462,147 year‐to‐date. Fiscal year end expenses are projected to be
$23,480,438.
Utilities costs totaled $357,816 year‐to‐date. We will continue to monitor these costs. Total utilities cost at
fiscal year end is projected to $12,889,610.
Total revenues and expenditures by expense type for the Operating Fund for 2012‐2013 are reported on page one,
behind the tab Detailed Financial Statements. Highlights of financial activities year‐to‐date are as follows:
State Appropriations received year to date totaled $9,633,901, 0.4% below last year. Total appropriations
received are expected to be $70,014,007. This amount was reduced by $218,031 due to a formula reallocation
to align with the Legislative Budget Board data and methodology.
Ad Valorem Tax collections totaled $2,602 year‐to‐date. The year‐to‐date total is 50.4% below last year. We
project total tax revenue for the fiscal year will be $102,195,871
Tuition and Fees net revenue year to date totaled $43,959,695 which is 7% lower than the same time last year.
We are projecting tuition and fees revenue to be $114,588,415.
i
Insurance/Risk Management payments totaled $6,562,016 year‐to‐date, 5.8% above last year. The increase is
due to an increase in insurance premiums. Total expenses for the year are expected to be within budget at
$6,871,724.
Tuition & Fee‐Extended Learning receipts totaled $1,531,158 year to date, 8.9% above last year. Total tuition
and fees‐Extended Learning at fiscal year end are expected to be $6,188,581.
Marketing and Advertising expense totaled $148,098 year‐to‐date, a 69.7% increase compared to last year.
Marketing expenses are projected to be $1,459,487 at fiscal year end.
Rental and Leases expenses totaled $175,466 year‐to‐date, which is 88.5% below the previous year. Total
expenses at year end are projected to be $3,825,364.
Managements Discussion and Analysis
Thru September 30, 2012
Budget Priorities funding allocated for the year are detailed below through September 30, 2012.
Contingency/Budget Priorities
Capital Outlay & Equipment
Position Management
Other
Total Contingency/Budget Priorities
Grants
Unexpended Plant Fund
Public Facility Corporation
Budget expenditures for grant‐funded projects so far this year total $939,825.
Budgeted
1,445,240 148,654 1,296,586
11,372,376$ 3,624,008$ 7,748,368$
Expensed Remaining
6,127,136$ ‐$
The college has received $110,000 in new grant awards since the beginning of the current fiscal year.
Transfers/Debt activities totaled $980,946 year‐to‐date. Items in this expense category include all student
revenue bond payments, transfers for scholarship matching funds, and transfers to the Unexpended Plant Fund.
Total expenses are expected to be $33,699,339.
Total operating fund expenditures year‐to‐date total $25,333,253, a 26.5% decrease below last year.
6,127,136$
3,800,000 3,475,354 324,646
Instructional and Other Materials expenses totaled $378,773 year‐to‐date, which is 63.7% below last year.
Expenses in this area are projected to be $11,135,329.
The Public Facility Corporation tracks the progress of the PFC ‐ Public Safety Institute, Katy Campus (Westgate),
Alief and Northline Mall deferred maintenance, new construction and renovation projects. Expenditures year‐to‐
date total $100.8 million, 98.7% of budget. See pages PFC 1‐6 for details.
ii
Total grant awards (federal, state & private) year‐to‐date total, $40,722,024.
Cash Position ‐ The use of the Unexpended Plant Fund Excluding 2004 CIP for deferred maintenance projects was
discontinued in FY 2009. All deferred maintenance expense is captured in the operating account. See page 15
for prior year encumbrances.
Unexpended Plant Fund Projects include current construction, deferred maintenance, and property acquisition
projects for a budget of $46,115,648. Funds for these projects are 100% committed. See page 16 for more
details.
The 2004 CIP budgets are $263,779,995 and are 99.98% committed. The spending categories in the schedule
have now been revised for more ease of reference to the Board approved budget. Please see page 17 for the
summary and pages 19 through 23 for details.
The Maintenance Tax Note 2006 tracks the financial progress of the Central Utility Plant. Commitments year‐to‐
date total $12.5 million, 99.87% of budget. See page 25 for the details.
Managements Discussion and Analysis
Thru September 30, 2012
Balance Sheet – Operating Fund
Cash and Investments
Cash
Investments
Total
Fund Balance
Unaudited Fund Balance, August 31, 2012
Projected Revenue @ 08/31/2013
Total Projected Revenue
Projected Expenses @ 08/31/2013
FY 2012 Purchase Order Roll
Total Projected Expenses @ 08/31/2013
Ending Fund Balance (Beg. Fund Balance + Revenue ‐ Expenses)
Required Reserve for FY 2013 (11% Projected Revenues)
Added Reserves
Additional Expenditures Funded From Reserves:
FY2012‐2013 Salary Increases
Total Expenses Paid From Reserves
Added Reserves
Required Reserve for FY 2013 (11% Projected Revenues)
Current Reserves
% of Total Operating Revenue
September 2012 September 2011
79,071,982$ 65,832,195$
296,157,275
363,169,685$
296,157,275$
2,395,994
10,982,176 ‐
90,054,158$ 65,832,195$
67,012,410$
30,202,556$
32,577,300$
62,779,856$
21.2%
Budget
298,553,269$
64,616,416$
32,577,300$
32,039,116$
Expense to Date Balance
The projected reserves at September 30, 2012 of $62,779,856 is an estimate at this time and represents 21.2% of
expected general fund revenue for this fiscal year, which is within our financial stability policy requiring us to maintain
a fund balance of 9% ‐11% of general fund revenues as of August 31.
iii
(1,836,560) ‐ (1,836,560)
(1,836,560)$ ‐$ (1,836,560)
FY2011‐12 FY2012‐13
Tuition
Budget:AdjustedBudgetFY2012‐13 43,067,676$Exemptions&Waivers (2,811,473)AdjustedBudgetFY2012‐13,Net 40,256,203$
RevenuesReceived:Tuition 48,824,432 21,595,136 20,075,321
Waivers&Exemptions:DualCredit (5,170,736) (2,357,760) (2,071,988)Other (1,693,502) (690,087) (739,485)
TotalWaivers&Exemptions (6,864,238) (3,047,847) (2,811,473)TotalTuitionRevenue,Net 41,960,194$ 18,547,289$ 17,263,848$
Tuition‐ExtendedLearning
Budget:BudgetFY2012‐13 6,188,581$Exemptions&Waivers (180,108)BudgetFY2012‐13,Net 6,008,473$
RevenuesReceived:
Tuition 8,853,381 1,595,561 1,711,266Waivers&Exemptions:
Corrections (2,612,080) (188,991) (180,108)
TotalELTuitionRevenue,Net 6,241,301$ 1,406,570$ 1,531,158$
Exemptions&WaiversDeptofCorrections 2,612,080$ 188,991$ 180,108$DualCreditWaiver 5,170,736 2,357,760 2,071,988
Other:EmployeeFeeExemptions 84,810 33,212 29,244Firemen 42,521 19,661 8,458Hazelwood 906,036 347,914 437,834Deaf&Blind 309,603 127,154 120,599HighRankingHiSCHGrad 868 372 1,178ChildofDisabledVetETC 431 978 1,139NonresMilitaryPer&Dep 2,390 708 ‐NonresTeach/ResearchAsst 13,905 5,418 5,841NonresCompetitiveScholar ‐ ‐ 1,062SeniorCitizens 18,730 8,130 6,653ScholarshipDistribution 1,450 1,450 ‐ApprenticeshipWaivers (28) ‐ ‐SpecialFeesWaiverHFD 117 26 ‐AVISAWaiver(Non‐AlienWaiver) 1,110 1,110 ‐RefugeeWaiver (1,554) (1,110) ‐FosterChildren‐Resident 294,543 135,904 123,617FireAcademyWaiver 157 ‐ ‐UndocumentedStudents 2,171 1,283 ‐TXTomorrowWaiver 2,874 2,875 ‐PeaceOfficerExemption 13,368 5,002 3,860
TotalOtherExemptions 1,693,502 690,087 739,485GrandTotalExemptions&Waivers 9,476,318$ 3,236,838$ 2,991,581$
Note:AsofDecember31,2008,thefinancialstatementsreflectallexpensesincurredforExemptionsandWaiversasnetoftuitionandfeerevenue.PriortothisdateExemptions&Waiverswereshownasanexpenditureandrevenuewasshownasgrossrevenue.
iv
Exemptions&WaiversThruSeptember30,2012
Year‐to‐DateActivitythru09/30/2012
Year‐to‐DateActivitythru09/30/2011
EndofYearActivityAccount
g
YTD Adjusted Budget
YTD Actuals Thru
September 30, 2012
YTD Actuals Thru
September 30, 2011
2012‐2013 Inc/(Dec)
vs. 2011‐2012
Actuals %
Inc/(Dec)YTD vs.
PriorYTD
Projected Actuals
2012‐2013
Projected 2012‐2013
Inc/(Dec) vs. Adj
Budget
Projected 2012‐
2013 Inc/(Dec) vs.
Adj Budget %
REVENUES
State Appropriations 70,232,038$ 9,633,901$ 9,676,923$ (43,022)$ ‐0.44% 70,014,007$ (218,031)$ ‐0.31%Ad Valorem Taxes 102,195,871 2,602 5,244 (2,643) ‐50.39% 102,195,871 ‐ 0.00%Tuition, Net 43,067,676 17,263,848 18,547,289 (1,283,442) ‐6.92% 43,067,676 ‐ 0.00%Fees 71,520,739 26,695,847 28,720,591 (2,024,744) ‐7.05% 71,520,739 ‐ 0.00%Other Local Income* 2,952,370 74,021 72,589 1,432 1.97% 2,952,370 ‐ 0.00%Tuition & Fee, Net
‐‐ Extended Learning6,188,581 1,531,158 1,406,570 124,588 8.86% 6,188,581 ‐ 0.00%
Grant Revenue ‐ 34,693 19,708 14,985 76.04% ‐ ‐
Total Revenues 296,157,275 55,236,069 58,448,914 (3,212,845) ‐5.50% 295,939,244$ (218,031)$ ‐0.07%
EXPENSES
Faculty‐FT 52,316,048 6,368,921 5,987,203 381,719 6.38% 52,316,048 ‐ 0.00%
Faculty‐PT 30,453,368 1,456,256 1,577,506 (121,250) ‐7.69% 30,453,368 ‐ 0.00%
Librarian/Counselor‐FT 5,190,562 508,769 790,333 (281,564) ‐35.63% 5,190,562 ‐ 0.00%
Librarian/Counselor‐PT 888,774 49,389 49,706 (317) ‐0.64% 888,774 ‐ 0.00%
Staff‐FT 62,735,672 5,205,203 5,157,476 47,727 0.93% 62,735,672 ‐ 0.00%Staff‐PT 9,805,748 592,304 685,034 (92,730) ‐13.54% 9,805,748 ‐ 0.00%
Sub‐total Salaries 161,390,172 14,180,843 14,247,257 (66,414) ‐0.47% 161,390,172 ‐ 0.00%
Employee Benefits 18,209,297 1,331,833 1,284,137 47,695 3.71% 18,209,297 ‐ 0.00%
Supplies Gen Exp 5,585,712 541,528 408,352 133,176 32.61% 5,585,712 ‐ 0.00%
Travel 935,511 78,961 38,100 40,861 107.25% 935,511 ‐ 0.00%
Marketing Costs 1,459,487 148,098 87,262 60,836 69.72% 1,459,487 ‐ 0.00%
Rental & Leases 3,825,364 175,466 1,528,632 (1,353,167) ‐88.52% 3,825,364 ‐ 0.00%
Insurance/Risk Mgmt 6,871,724 6,562,016 6,202,960 359,056 5.79% 6,871,724 ‐ 0.00%
Contract Services 23,480,438 462,147 201,221 260,927 129.67% 23,480,438 ‐ 0.00%
Utilities 12,889,610 357,816 188,752 169,065 89.57% 12,889,610 ‐ 0.00%
Other Departmental Expenses 1,796,440 109,474 191,079 (81,605) ‐42.71% 1,578,409 (218,031) ‐12.14%
Instructional & Other Materials 11,135,329 378,773 1,044,532 (665,759) ‐63.74% 11,135,329 ‐ 0.00%
Maintenance & Repair 1,206,310 18,033 39,445 (21,412) ‐54.28% 1,206,310 ‐ 0.00%
Transfers/Debt 33,699,339 980,946 8,980,493 (7,999,547) ‐89.08% 33,699,339 ‐ 0.00%
Contingency 5,751,686 ‐ ‐ ‐ 0.00% 5,751,686 ‐ 0.00%Capital Outlay 7,920,856 7,319 19,722 (12,403) ‐62.89% 7,920,856 ‐ 0.00%
Total Expenses 296,157,275 25,333,253 34,461,944 (9,128,691) ‐26.49% 295,939,244 (218,031) ‐0.07%
REVENUES H/(L) Vs EXPENSES 0 29,902,816 23,986,971 5,915,846 ‐ ‐
* Includes interest & dividends income, fines & penalties and parking fines
1
HOUSTON COMMUNITY COLLEGE2012‐2013 Revenues & Expenditures HCCS CURRENT UNRESTRICTED
CENTRAL
NORTH
WEST
NORTH
EAST
SOUTH
WEST SOUTH EAST COLEMAN
EXTENDED
LEARNING
CHAN‐
CELLOR
DEPUTY CHAN‐
CELLOR
INSTITU‐
TIONAL
EFFECTIVE‐
NESS
INSTRUC‐
TION
INFO
TECH
STUDENT
SUCCESS SYSTEM HCCS
% of
Adjusted
Budget
EXPENSES
Faculty‐FT 10,232,840 10,013,179 7,175,356 11,984,886 4,796,935 5,585,395 2,272,908 ‐ ‐ ‐ 180,454 74,095 ‐ ‐ 52,316,048 17.66%
Faculty‐PT 4,771,479 6,269,336 4,066,211 5,831,605 3,779,281 1,790,194 3,616,117 ‐ ‐ ‐ 328,386 759 ‐ ‐ 30,453,368 10.28%
Librarian/Counselor‐FT 938,992 1,109,561 1,021,882 902,253 741,335 53,730 69,269 ‐ ‐ ‐ 201,482 ‐ 152,058 ‐ 5,190,562 1.75%
Librarian/Counselor‐PT 87,030 173,185 119,380 247,215 82,452 33,248 ‐ ‐ ‐ ‐ 19,773 ‐ 126,491 ‐ 888,774 0.30%
Staff‐FT 5,268,932 4,103,994 4,645,563 5,238,731 3,405,116 2,317,022 3,634,613 3,682,948 15,418,815 102,108 3,426,622 7,509,296 3,981,912 ‐ 62,735,672 21.18%
Staff‐PT 1,983,664 1,647,655 740,349 1,412,573 1,205,886 438,333 638,076 263,028 573,372 ‐ 261,148 235,344 406,320 ‐ 9,805,748 3.31%
Sub‐total Salaries 23,282,937 23,316,910 17,768,741 25,617,263 14,011,005 10,217,922 10,230,983 3,945,976 15,992,187 102,108 4,417,865 7,819,494 4,666,781 ‐ 161,390,172 54.49%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 18,209,297 18,209,297 6.15%
Supplies Gen Exp 219,491 327,597 201,282 234,433 194,295 336,728 198,426 312,950 1,358,257 ‐ 176,107 217,263 8,883 1,800,000 5,585,712 1.89%
Travel 103,360 88,077 34,545 62,926 52,434 89,547 71,355 120,104 140,510 ‐ 56,671 83,281 32,701 ‐ 935,511 0.32%
Marketing Costs 49,979 46,349 109,159 36,266 101,115 38,323 201,230 14,220 860,846 ‐ ‐ 2,000 ‐ ‐ 1,459,487 0.49%
Rental & Leases 34,418 123,510 1,312,254 639,660 41,484 508,719 48,180 24,980 228,951 ‐ ‐ 853,487 9,721 ‐ 3,825,364 1.29%
Insurance/Risk Mgmt 794 15 ‐ 154 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 676 ‐ 6,870,085 6,871,724 2.32%
Contract Services 328,653 276,647 60,950 49,485 176,544 326,191 52,992 427,798 13,426,926 ‐ 78,452 2,285,814 31,883 5,958,103 23,480,438 7.93%
Utilities 5,025 ‐ 4,600 ‐ ‐ ‐ ‐ ‐ 1,575,778 ‐ ‐ 1,400,000 ‐ 9,904,207 12,889,610 4.35%
Other Departmental Expenses 79,300 45,543 39,283 43,245 145,419 84,769 59,949 298,739 234,893 ‐ 136,159 212,675 138,493 277,973 1,796,440 0.61%
Instructional & Other Materials 450,701 274,437 140,214 217,090 68,115 363,430 1,352,560 36,261 131,277 ‐ 1,058,476 6,773,079 269,689 ‐ 11,135,329 3.76%
Maintenance & Repair 116,709 24,787 49,353 33,463 15,572 84,713 157,400 825 704,028 ‐ 7,655 8,870 416 2,519 1,206,310 0.41%
Transfers/Debt ‐ 845,619 5,636,142 1,155,001 ‐ ‐ ‐ ‐ 3,264 ‐ ‐ ‐ ‐ 26,059,313 33,699,339 11.38%
Contingency 50,000 42,001 60,250 50,001 40,000 50,000 ‐ 150,000 125,000 ‐ 50,000 50,000 50,000 5,034,434 5,751,686 1.94%
Capital Outlay 602,055 343,670 284,443 180,144 282,606 559,924 30,859 58,150 776,959 ‐ 1,089 686,084 1,873 4,113,000 7,920,856 2.67%
Total Budget 25,323,422 25,755,162 25,701,216 28,319,131 15,128,589 12,660,266 12,403,934 5,390,003 35,558,876 102,108 5,982,474 20,392,723 5,210,440 78,228,931 296,157,275 100.00%
CENTRAL
NORTH
WEST
NORTH
EAST
SOUTH
WEST SOUTH EAST COLEMAN
EXTENDED
LEARNING
CHAN‐
CELLOR
DEPUTY CHAN‐
CELLOR
INSTITU‐
TIONAL
EFFECTIVE‐
NESS
INSTRUC‐
TION
INFO
TECH
STUDENT
SUCCESS SYSTEM HCCS
% of
Actuals
EXPENSES
Faculty‐FT 1,278,252 1,207,749 862,661 1,466,826 595,348 670,206 277,584 ‐ ‐ ‐ 3,433 6,862 ‐ ‐ 6,368,921 25.14%
Faculty‐PT 230,959 315,129 179,939 268,779 148,905 77,973 222,152 ‐ ‐ ‐ 12,421 ‐ ‐ ‐ 1,456,256 5.75%
Librarian/Counselor‐FT 102,244 109,009 101,351 78,989 64,570 4,471 2,886 ‐ ‐ ‐ 35,783 ‐ 9,466 ‐ 508,769 2.01%
Librarian/Counselor‐PT 4,266 10,955 8,634 14,371 5,086 2,695 ‐ ‐ ‐ ‐ ‐ ‐ 3,382 ‐ 49,389 0.19%
Staff‐FT 443,688 341,563 388,273 447,425 287,592 196,131 296,670 307,917 1,270,979 8,509 282,452 607,042 326,962 ‐ 5,205,203 20.55%
Staff‐PT 105,491 111,664 52,878 103,698 68,468 22,906 49,971 10,158 30,200 ‐ 7,875 6,538 22,458 ‐ 592,304 2.34%
Sub‐total Salaries 2,164,899 2,096,069 1,593,735 2,380,089 1,169,968 974,382 849,263 318,075 1,301,179 8,509 341,964 620,442 362,269 ‐ 14,180,843 55.98%
Employee Benefits ‐ ‐ ‐ 3 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,331,829 1,331,833 5.26%
Supplies Gen Exp 4,963 6,327 9,991 17,460 13,358 15,576 21,642 24,523 113,699 ‐ 19,165 5,260 13,245 276,320 541,528 2.14%
Travel 2,507 6,428 892 3,774 975 9,384 11,573 13,547 11,396 ‐ 9,871 6,228 2,385 ‐ 78,961 0.31%
Marketing Costs ‐ 10,432 ‐ 10,513 7,234 1,346 20,430 173 97,969 ‐ ‐ ‐ ‐ ‐ 148,098 0.58%
Rental & Leases 15,000 2,578 135,424 8,447 1,939 377 2,418 1,720 5,904 ‐ ‐ 854 805 ‐ 175,466 0.69%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6,562,016 6,562,016 25.90%
Contract Services 1,241 ‐ 2,985 4,515 4,090 3,750 12,019 ‐ 20,187 ‐ ‐ 1,705 3,076 408,579 462,147 1.82%
Utilities ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 35,395 ‐ ‐ 180,598 ‐ 141,823 357,816 1.41%
Other Departmental Expenses 2,915 25 550 2,651 551 11,509 12,295 26,613 13,112 ‐ 11,926 16,903 347 10,077 109,474 0.43%
Instructional & Other Materials 20,739 4,225 3,060 3,064 1,497 3,189 32,921 ‐ ‐ ‐ 8,685 301,393 ‐ ‐ 378,773 1.50%
Maintenance & Repair 6,643 ‐ 262 516 ‐ 614 4,289 ‐ 5,671 ‐ 38 ‐ ‐ ‐ 18,033 0.07%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 980,946 980,946 3.87%
Contingency ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 0.00%
Capital Outlay 1,954 1,287 5 671 1,847 ‐ ‐ ‐ 1,555 ‐ ‐ ‐ ‐ ‐ 7,319 0.03%
Total Expense 2,220,863 2,127,371 1,746,904 2,431,704 1,201,459 1,020,128 966,850 384,651 1,606,067 8,509 391,648 1,133,384 382,126 9,711,592 25,333,253 100.00%% of Adjusted
Budget by Division 8.77% 8.26% 6.80% 8.59% 7.94% 8.06% 7.79% 7.14% 4.52% 8.33% 6.55% 5.56% 7.33% 12.41% 8.55% 100.00%
Remaining Balance 23,102,559 23,627,791 23,954,312 25,887,427 13,927,130 11,640,138 11,437,084 5,005,352 33,952,809 93,599 5,590,826 19,259,339 4,828,314 68,517,339 270,824,022
HOUSTON COMMUNITY COLLEGE2012‐2013 Expenditures
YTD Adjusted Budget by Division
YTD Actuals by Division
2
Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug.
Central FY2013 8.77%
FY2012 8.89% 17.89% 27.03% 35.01% 41.49% 49.28% 58.01% 66.97% 74.34% 81.43% 88.98% 94.59%
Northwest FY2013 8.26%
FY2012 8.55% 18.72% 27.39% 33.69% 38.31% 46.70% 55.31% 66.77% 74.43% 81.57% 89.43% 95.09%
Northeast FY2013 6.80%
FY2012 6.70% 20.76% 27.75% 33.82% 40.16% 46.70% 53.35% 76.04% 82.19% 88.46% 94.27% 98.45%
Southwest FY2013 8.59%
FY2012 8.58% 19.19% 28.11% 36.68% 43.63% 50.96% 58.38% 71.97% 79.03% 85.23% 92.21% 96.87%
Southeast FY2013 7.94%
FY2012 8.68% 17.97% 27.56% 35.39% 41.33% 49.39% 57.90% 67.21% 74.92% 81.69% 89.81% 95.46%
Coleman FY2013 8.06%
FY2012 8.26% 17.29% 25.18% 32.46% 39.63% 47.52% 55.02% 63.80% 71.21% 79.83% 87.22% 93.29%
Extended Learning FY2013 7.79%
3 FY2012 7.97% 15.68% 23.55% 30.39% 37.09% 45.43% 53.07% 60.96% 69.35% 76.72% 84.68% 91.63%
Chancellor FY2013 7.14%
FY2012 8.66% 16.11% 23.27% 30.27% 39.34% 45.84% 53.37% 61.08% 68.18% 74.82% 81.30% 89.24%
Deputy Chancellor FY2013 4.52%
FY2012 4.52% 10.28% 16.85% 22.58% 31.70% 38.52% 45.34% 51.71% 59.06% 69.23% 76.82% 80.46%
Instruction FY2013 6.55%
FY2012 6.73% 16.23% 22.67% 28.96% 35.81% 42.78% 52.10% 59.22% 65.59% 72.63% 82.25% 89.27%
Info Tech FY2013 5.56%
FY2012 20.14% 33.96% 40.28% 45.47% 52.99% 59.23% 64.92% 71.03% 76.35% 82.70% 88.44% 99.49%
Student Success FY2013 7.33%
FY2012 8.33% 15.89% 23.44% 30.58% 40.76% 48.76% 56.63% 65.19% 72.58% 80.37% 90.28% 98.41%
System FY2013 12.41%
FY2012 22.23% 25.94% 29.46% 32.09% 36.45% 39.69% 43.39% 63.98% 68.16% 71.84% 79.45% 88.27%
Total HCCS FY2013 8.55%
FY2012 12.05% 20.09% 26.81% 32.55% 38.82% 45.08% 51.63% 65.11% 71.48% 77.90% 85.35% 91.73%
Houston Community College
Cash Flow Analysis ‐ Monthly Percentage of Budget UsedFY2013 vs. FY2012
Adjusted Budget
FY2012
YTD Actuals Thru
September 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
September 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 11,355,982 1,273,496 11.21% 10,232,840 1,278,252 12.49%
Faculty‐PT 3,746,465 172,485 4.60% 4,771,479 230,959 4.84%
Librarian/Counselor‐FT 1,061,084 127,581 12.02% 938,992 102,244 10.89%
Librarian/Counselor‐PT 70,473 6,294 8.93% 87,030 4,266 4.90%
Staff‐FT 5,266,583 446,271 8.47% 5,268,932 443,688 8.42%
Staff‐PT 1,728,025 129,702 7.51% 1,983,664 105,491 5.32%
Sub‐total Salaries 23,228,612 2,155,828 9.28% 23,282,937 2,164,899 9.30%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 220,468 10,866 4.93% 219,491 4,963 2.26%
Travel 78,348 ‐ 0.00% 103,360 2,507 2.43%
Marketing Costs 59,958 2,578 4.30% 49,979 ‐ 0.00%
Rental & Leases 84,498 13,000 15.38% 34,418 15,000 43.58%
Insurance/Risk Mgmt 794 ‐ 0.00% 794 ‐ 0.00%
Contract Services 321,483 69 0.02% 328,653 1,241 0.38%
Utilities ‐ ‐ ‐ 5,025 ‐ 0.00%
Other Departmental Expenses 67,928 2,384 3.51% 79,300 2,915 3.68%
Instructional & Other Materials 453,490 12,825 2.83% 450,701 20,739 4.60%
Maintenance & Repair 83,488 5,683 6.81% 116,709 6,643 5.69%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency 50,000 ‐ 0.00% 50,000 ‐ ‐
Capital Outlay 167,856 2,131 1.27% 602,055 1,954 0.32%
Total Expenses 24,816,923 2,205,365 8.89% 25,323,422 2,220,863 8.77%
Adjusted Budget
FY2012
YTD Actuals Thru
September 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
September 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 10,010,077 1,106,444 11.05% 10,013,179 1,207,749 12.06%
Faculty‐PT 4,182,370 221,987 5.31% 6,269,336 315,129 5.03%
Librarian/Counselor‐FT 837,200 122,441 14.63% 1,109,561 109,009 9.82%
Librarian/Counselor‐PT 137,949 11,119 8.06% 173,185 10,955 6.33%
Staff‐FT 3,456,746 291,731 8.44% 4,103,994 341,563 8.32%
Staff‐PT 1,152,977 89,309 7.75% 1,647,655 111,664 6.78%
Sub‐total Salaries 19,777,319 1,843,031 9.32% 23,316,910 2,096,069 8.99%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 284,305 (15,134) ‐5.32% 327,597 6,327 1.93%
Travel 77,581 3,529 4.55% 88,077 6,428 7.30%
Marketing Costs 41,176 6,600 16.03% 46,349 10,432 22.51%
Rental & Leases 73,501 9,834 13.38% 123,510 2,578 2.09%
Insurance/Risk Mgmt ‐ ‐ 0.00% 15 ‐ 0.00%
Contract Services 255,863 1,396 0.55% 276,647 ‐ 0.00%
Utilities ‐ ‐ ‐ ‐ ‐ 0.00%
Other Departmental Expenses 68,648 8,117 11.82% 45,543 25 0.05%
Instructional & Other Materials 170,770 2,823 1.65% 274,437 4,225 1.54%
Maintenance & Repair 23,486 ‐ 0.00% 24,787 ‐ 0.00%
Transfers/Debt 875,943 ‐ 0.00% 845,619 ‐ ‐
Contingency 39,502 ‐ 0.00% 42,001 ‐ ‐
Capital Outlay 94,178 2,012 2.14% 343,670 1,287 0.37%
Total Expenses 21,782,272 1,862,207 8.55% 25,755,162 2,127,371 8.26%
Central College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Northwest College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
4
Adjusted Budget
FY2012
YTD Actuals Thru
September 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
September 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 7,959,427 832,440 10.46% 7,175,356 862,661 12.02%
Faculty‐PT 2,768,580 187,371 6.77% 4,066,211 179,939 4.43%
Librarian/Counselor‐FT 1,094,779 114,878 10.49% 1,021,882 101,351 9.92%
Librarian/Counselor‐PT 109,210 5,904 5.41% 119,380 8,634 7.23%
Staff‐FT 4,552,746 381,360 8.38% 4,645,563 388,273 8.36%
Staff‐PT 684,104 58,281 8.52% 740,349 52,878 7.14%
Sub‐total Salaries 17,168,846 1,580,234 9.20% 17,768,741 1,593,735 8.97%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 338,797 4,485 1.32% 201,282 9,991 4.96%
Travel 30,235 757 2.50% 34,545 892 2.58%
Marketing Costs 46,417 383 0.82% 109,159 ‐ 0.00%
Rental & Leases 1,257,433 76,933 6.12% 1,312,254 135,424 10.32%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐
Contract Services 51,491 330 0.64% 60,950 2,985 4.90%
Utilities 4,600 ‐ 0.00% 4,600 ‐ 0.00%
Other Departmental Expenses 46,019 1,157 2.51% 39,283 550 1.40%
Instructional & Other Materials 156,062 36 0.02% 140,214 3,060 2.18%
Maintenance & Repair 24,986 573 2.29% 49,353 262 0.53%
Transfers/Debt 5,640,942 ‐ 0.00% 5,636,142 ‐ ‐
Contingency 42,000 ‐ 0.00% 60,250 ‐ ‐
Capital Outlay 48,101 98 0.20% 284,443 5 0.00%
Total Expenses 24,855,929 1,664,985 6.70% 25,701,216 1,746,904 6.80%
Adjusted Budget
FY2012
YTD Actuals Thru
September 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
September 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 13,901,079 1,548,352 11.14% 11,984,886 1,466,826 12.24%
Faculty‐PT 5,609,753 296,034 5.28% 5,831,605 268,779 4.61%
Librarian/Counselor‐FT 1,606,835 272,027 16.93% 902,253 78,989 8.75%
Librarian/Counselor‐PT 259,008 16,802 6.49% 247,215 14,371 5.81%
Staff‐FT 5,706,169 467,884 8.20% 5,238,731 447,425 8.54%
Staff‐PT 1,664,819 144,901 8.70% 1,412,573 103,698 7.34%
Sub‐total Salaries 28,747,663 2,746,000 9.55% 25,617,263 2,380,089 9.29%
Employee Benefits ‐ ‐ ‐ ‐ 3 ‐
Supplies Gen Exp 261,997 9,470 3.61% 234,433 17,460 7.45%
Travel 65,224 1,305 2.00% 62,926 3,774 6.00%
Marketing Costs 36,634 631 1.72% 36,266 10,513 28.99%
Rental & Leases 855,864 50,751 5.93% 639,660 8,447 1.32%
Insurance/Risk Mgmt 113 ‐ ‐ 154 ‐ 0.00%
Contract Services 36,150 251 0.69% 49,485 4,515 9.12%
Utilities ‐ ‐ ‐ ‐ ‐ ‐
Other Departmental Expenses 43,971 9,003 20.47% 43,245 2,651 6.13%
Instructional & Other Materials 237,586 12,382 5.21% 217,090 3,064 1.41%
Maintenance & Repair 19,504 827 4.24% 33,463 516 1.54%
Transfers/Debt 2,492,129 ‐ 0.00% 1,155,001 ‐ 0.00%
Contingency 50,000 ‐ 0.00% 50,001 ‐ 0.00%
Capital Outlay 129,654 43 0.03% 180,144 671 0.37%
Total Expenses 32,976,489 2,830,662 8.58% 28,319,131 2,431,704 8.59%
5
Northeast College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Southwest College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Adjusted Budget
FY2012
YTD Actuals Thru
September 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
September 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 5,665,791 577,333 10.19% 4,796,935 595,348 12.41%
Faculty‐PT 2,632,858 135,993 5.17% 3,779,281 148,905 3.94%
Librarian/Counselor‐FT 679,510 67,128 9.88% 741,335 64,570 8.71%
Librarian/Counselor‐PT 52,095 3,229 6.20% 82,452 5,086 6.17%
Staff‐FT 3,335,686 292,298 8.76% 3,405,116 287,592 8.45%
Staff‐PT 987,583 92,352 9.35% 1,205,886 68,468 5.68%
Sub‐total Salaries 13,353,523 1,168,333 8.75% 14,011,005 1,169,968 8.35%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 210,783 7,987 3.79% 194,295 13,358 6.87%
Travel 40,634 1,188 2.92% 52,434 975 1.86%
Marketing Costs 159,363 5,591 3.51% 101,115 7,234 7.15%
Rental & Leases 177,160 29,260 16.52% 41,484 1,939 4.68%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐
Contract Services 159,139 31,701 19.92% 176,544 4,090 2.32%
Utilities ‐ ‐ ‐ ‐ ‐ ‐
Other Departmental Expenses 88,546 2,405 2.72% 145,419 551 0.38%
Instructional & Other Materials 57,111 3,803 6.66% 68,115 1,497 2.20%
Maintenance & Repair 10,372 291 2.81% 15,572 ‐ 0.00%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency 50,000 ‐ 0.00% 40,000 ‐ 0.00%
Capital Outlay 93,901 34 0.04% 282,606 1,847 0.65%
Total Expenses 14,400,532 1,250,593 8.68% 15,128,589 1,201,459 7.94%
Adjusted Budget
FY2012
YTD Actuals Thru
September 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
September 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 6,724,220 630,489 9.38% 5,585,395 670,206 12.00%
Faculty‐PT 1,191,206 77,235 6.48% 1,790,194 77,973 4.36%
Librarian/Counselor‐FT 190,569 15,594 8.18% 53,730 4,471 8.32%
Librarian/Counselor‐PT 29,835 2,685 9.00% 33,248 2,695 8.11%
Staff‐FT 2,248,247 195,553 8.70% 2,317,022 196,131 8.46%
Staff‐PT 361,264 29,540 8.18% 438,333 22,906 5.23%
Sub‐total Salaries 10,745,341 951,096 8.85% 10,217,922 974,382 9.54%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 334,039 16,820 5.04% 336,728 15,576 4.63%
Travel 71,882 3,195 4.44% 89,547 9,384 10.48%
Marketing Costs 43,323 ‐ 0.00% 38,323 1,346 3.51%
Rental & Leases 490,886 38,910 7.93% 508,719 377 0.07%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐
Contract Services 257,301 1,200 0.47% 326,191 3,750 1.15%
Utilities ‐ ‐ ‐ ‐ ‐ 0.00%
Other Departmental Expenses 64,194 4,507 7.02% 84,769 11,509 13.58%
Instructional & Other Materials 267,551 6,225 2.33% 363,430 3,189 0.88%
Maintenance & Repair 54,113 604 1.12% 84,713 614 0.72%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency 50,000 ‐ 0.00% 50,000 ‐ 0.00%
Capital Outlay ‐ ‐ 0.00% 559,924 ‐ 0.00%
Total Expenses 12,378,630 1,022,557 8.26% 12,660,266 1,020,128 8.06%
Southeast College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Coleman College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
6
Adjusted Budget
FY2012
YTD Actuals Thru
September 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
September 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 2,439,050 245,511 10.07% 2,272,908 277,584 12.21%
Faculty‐PT 3,186,820 229,892 7.21% 3,616,117 222,152 6.14%
Librarian/Counselor‐FT 67,910 5,659 8.33% 69,269 2,886 4.17%
Librarian/Counselor‐PT ‐ ‐ 0.00% ‐ ‐ 0.00%
Staff‐FT 3,668,904 302,290 8.24% 3,634,613 296,670 8.16%
Staff‐PT 665,197 42,302 6.36% 638,076 49,971 7.83%
Sub‐total Salaries 10,027,881 825,654 8.23% 10,230,983 849,263 8.30%
Employee Benefits ‐ ‐ ‐ ‐ ‐ 0.00%
Supplies Gen Exp 188,836 7,583 4.02% 198,426 21,642 10.91%
Travel 64,880 4,498 6.93% 71,355 11,573 16.22%
Marketing Costs 198,496 49,523 24.95% 201,230 20,430 10.15%
Rental & Leases 40,370 2,380 5.90% 48,180 2,418 5.02%
Insurance/Risk Mgmt 2,000 ‐ ‐ ‐ ‐ 0.00%
Contract Services 73,537 26,730 36.35% 52,992 12,019 22.68%
Utilities ‐ ‐ ‐ ‐ ‐ ‐
Other Departmental Expenses 53,993 8,217 15.22% 59,949 12,295 20.51%
Instructional & Other Materials 1,127,263 32,594 2.89% 1,352,560 32,921 2.43%
Maintenance & Repair 102,500 32,850 32.05% 157,400 4,289 2.72%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency ‐ ‐ ‐ ‐ ‐ ‐
Capital Outlay 3,007 ‐ 0.00% 30,859 ‐ 0.00%
Total Expenses 11,882,763 990,029 8.33% 12,403,934 966,850 7.79%
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
7
Division of Extended Learning
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12Academic 12,077,904 12,739,232 14,345,992 16,652,752 17,802,080 17,354,256
Technical 4,378,250 4,422,336 4,883,890 5,680,164 5,924,078 5,822,072
Continuing Education 2,091,365 1,847,195 1,810,761 1,880,857 1,914,445 1,798,940
Total Fundable Contact Hou 18,547,519 19,008,763 21,040,643 24,213,773 25,640,603 24,975,268
Source: Certified CBM004 & CBM00C.
8
HOUSTON COMMUNITY COLLEGEAnnual Fundable Contact Hours
FY 2006-07 thru FY 2011-12
0
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
2006‐07 2007‐08 2008‐09 2009‐10 2010‐11 2011‐12
Continuing Education Technical Academic
+5.9%+15.1%
+10.7%+2.5%
‐2.6%
HOUSTON COMMUNITY COLLEGEUnduplicated Headcount Comparison Semester‐To‐Semester (FY 2009‐10 thru FY 2012‐13)
Fall Semester (Unduplicated Enrollment ‐ All Students)*
Spring Semester (Unduplicated Enrollment ‐ All Students)
Summer Semester (Unduplicated Enrollment ‐ All Students)
* As of October 12, 2012.
9
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
-70
-60
-50
-40
-30
-20
-10 0 10 20 30 40 50 60 70 80 90
Spr 12
Spr 11
Spr 10
Census Day
First Class Day
Spr 12 Enrollment:‐5.9% (Spr12 to 11)‐1.4% (Spr12 to 10)
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
-62
-52
-42
-32
-22
-12 -2 8 18 28 38 48 58 68
Sum 12
Sum 11
Sum 10
First Class Day
Census Day
Sum 12 Enrollment:‐0.0% (Sum12 to 11)‐4.1% (Sum12 to 10)
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000-1
10
-100 -90
-80
-70
-60
-50
-40
-30
-20
-10 0 10 20 30 40 50 60 70
Fall 12
Fall 11
Fall 10 Fall 12 Enrollment:‐5.9% (Fall12 to 11)‐2.8% (Fall12 to 10)
First Class Day
Census Day
HOUSTON COMMUNITY COLLEGERevenues & Expenditures Comparison Year to Date Thru September 30, 2012
2009 Positions
Revenues Expenditures Rev H/(L) Exp
YTD Actuals Thru September 30, 2012 55,236,069 25,333,253 29,902,816
YTD Actuals Thru September 30, 2011 58,448,914 34,461,944 23,986,971
(3,212,845) (9,128,691)
10
‐
10,000,000
20,000,000
30,000,000
40,000,000
50,000,000
60,000,000
Revenues Expenditures
` HOUSTON COMMUNITY COLLEGEMonthly Revenues & Expenditures Comparison Year to Date By Month
Revenues SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 58,227,650
2011‐2012 61,685,752 9,480,515 24,214,599 37,832,575 66,013,487 35,495,964 10,116,378 16,794,724 15,263,177 9,332,949 7,924,181 9,726,145
2009 Positions
Expenditures SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 28,324,834
2011‐2012 37,698,782 23,302,047 20,581,833 17,164,427 19,407,583 18,185,253 18,965,252 39,130,360 18,696,899 18,586,628 21,489,075 18,505,226
11
‐ 5,000,000
10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐ 5,000,000
10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
HOUSTON COMMUNITY COLLEGERevenues Comparison Year to Date Thru September 30, 2012 by Source
2009 Positions
State
Appropriations Ad Valorem Taxes Tuition, Net Fees
Other Local
Income* Extended Learning Grant Revenue Total Revenues
YTD Actuals Thru September 30, 2012 9,633,901 2,602 17,263,848 26,695,847 74,021 1,531,158 34,693 55,236,069
YTD Actuals Thru September 30, 2011 9,676,923 5,244 18,547,289 28,720,591 72,589 1,406,570 19,708 58,448,914
(43,022) (2,643) (1,283,442) (2,024,744) 1,432 124,588 14,985 (3,212,845)
12
‐
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
StateAppropriations
Ad Valorem Taxes Tuition, Net Fees Other LocalIncome*
Extended Learning Grant Revenue
HOUSTON COMMUNITY COLLEGEExpense Comparison Year to Date Thru September 30, 2012 by Source
2009 Positions
YTD Actuals Thru Faculty‐FT Faculty‐PT
Librarian/
Counselor‐FT
Librarian/
Counselor‐PT Staff‐FT Staff‐PT
Employee
Benefits
Supplies Gen
Exp Travel
Marketing
Costs
Rental &
Leases
Insurance/
Risk Mgmt
Contract
Services Utilities
Other
Departmental
Expenses
Instructional &
Other
Materials
Maintenance &
Repair
Transfers/
Debt Capital Outlay Total Expenses
September 30,
2012 6,368,921 1,456,256 508,769 49,389 5,205,203 592,304 1,331,833 541,528 78,961 148,098 175,466 6,562,016 462,147 357,816 109,474 378,773 18,033 980,946 7,319 25,333,253
September 30,
2011 5,987,203 1,577,506 790,333 49,706 5,157,476 685,034 1,284,137 408,352 38,100 87,262 1,528,632 6,202,960 201,221 188,752 191,079 1,044,532 39,445 8,980,493 19,722 34,461,944
381,719 (121,250) (281,564) (317) 47,727 (92,730) 47,695 133,176 40,861 60,836 (1,353,167) 359,056 260,927 169,065 (81,605) (665,759) (21,412) (7,999,547) (12,403) (9,128,691)
13
‐
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
9,000,000
10,000,000
11,000,000
12,000,000
13,000,000
14,000,000
15,000,000
16,000,000
17,000,000
18,000,000
19,000,000
20,000,000
21,000,000
22,000,000
23,000,000
24,000,000
25,000,000
26,000,000
27,000,000
28,000,000
29,000,000
30,000,000
Unrestricted Auxiliary Restricted Total
Unexpended
Plant Renewal
Retirement of
Debt
Investment in
Plant Total
Consolidation &
Elimination Total All Funds
ASSETSCurrent Assets:
Cash & cash equivalents 79,071,982$ 10,308,021$ ‐$ 89,380,003$ 4,516,539$ 9,828,644 ‐$ 14,345,183$ ‐$ 103,725,186$
Restricted cash & cash equivalents ‐ ‐ 11,291,141 11,291,141 137,990,454 681,052 ‐ 138,671,506 ‐ 149,962,647
Short term Investments ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Accounts/Other receivable (net) 22,873,345 2,122,417 4,172,866 29,168,628 70,798 781,795 ‐ 852,593 ‐ 30,021,221
Deferred charges ‐ 669,701 ‐ 669,701 ‐ ‐ ‐ ‐ ‐ 669,701
Prepaids ‐ 58,748 ‐ 58,748 1,762,224 ‐ ‐ 1,762,224 ‐ 1,820,972
Total Current Assets 101,945,327 13,158,887 15,464,007 130,568,221 144,340,015 11,291,491 ‐ 155,631,506 ‐ 286,199,727
Non‐current Assets:
Deferred charges, net ‐ ‐ ‐ ‐ 3,548,100 ‐ 2,601,880 6,149,980 ‐ 6,149,980
Restricted long‐term investments ‐ ‐ ‐ ‐ 2,906,199 2,680,088 ‐ 5,586,287 ‐ 5,586,287
Long‐term investments 10,982,176 ‐ ‐ 10,982,176 ‐ ‐ ‐ ‐ ‐ 10,982,176
Capital Assets, net ‐ ‐ ‐ ‐ 70,232,034 ‐ 655,456,684 725,688,718 ‐ 725,688,718
Total Non‐current Assets 10,982,176 ‐ ‐ 10,982,176 76,686,333 2,680,088 658,058,564 737,424,985 ‐ 748,407,161
Total Assets 112,927,503$ 13,158,887$ 15,464,007$ 141,550,397$ 221,026,348$ 13,971,579$ 658,058,564$ 893,056,491$ ‐$ 1,034,606,888$
LIABILITIESCurrent Liabilities:
Accounts payable 9,847,741 397,960 1,648,010 11,893,710 167,748 ‐ ‐ 167,748 ‐ 12,061,458
Accrued liabilities 4,093,686 12,209 44,649 4,150,543 1,462,456 558,933 ‐ 2,021,389 ‐ 6,171,932
Compensated absences 2,351,464 ‐ ‐ 2,351,464 ‐ ‐ ‐ ‐ ‐ 2,351,464
Funds held for others 20,616 107,889 470,562 599,067 189,209 ‐ ‐ 189,209 ‐ 788,276
Deferred revenue ‐ 292,659 1,167,463 1,460,122 1,474,661 ‐ (1,600,060) (125,399) ‐ 1,334,723
Notes payable‐current portion ‐ ‐ ‐ ‐ 4,655,000 ‐ 2,595,000 7,250,000 ‐ 7,250,000
Bonds payable‐current portion ‐ ‐ ‐ ‐ ‐ ‐ 14,175,000 14,175,000 ‐ 14,175,000
Capital lease obligations‐current ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Current Liabilities 16,313,506 810,716$ 3,330,684 20,454,906 7,949,074 558,933 15,169,940 23,677,947 ‐ 44,132,853
Non‐current Liabilities:
Deposits ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Notes payable ‐ ‐ ‐ ‐ 146,206,719 ‐ 31,405,318 177,612,037 ‐ 177,612,037
Bonds payable ‐ ‐ ‐ ‐ 62,554,009 1,279,420 269,438,431 333,271,860 ‐ 333,271,860
Capital lease obligations ‐ ‐ ‐ ‐ ‐ ‐ 108,309,832 108,309,832 ‐ 108,309,832
Total Non‐current Liabilities ‐ ‐ ‐ ‐ 208,760,728 1,279,420 409,153,581 619,193,729 ‐ 619,193,729
Total Liabilities 16,313,506$ 810,716$ 3,330,684$ 20,454,906$ 216,709,802$ 1,838,353$ 424,323,521$ 642,871,676$ ‐$ 663,326,580$
Fund Balance‐
August 31, 2012 Unaudited 67,012,410 11,758,303 9,079,932 87,850,645 3,709,864 9,980,240 235,429,798 249,119,902 ‐ 336,970,547
Revenues Over Expenditures
Unrestricted 29,601,587 589,868 30,191,455 30,191,455
Restricted 3,053,391 3,053,391 3,053,391
Net Investment in Plant 606,684 2,152,986 (1,694,754) 1,064,916 1,064,916
Total Fund Balances 96,613,997$ 12,348,171$ 12,133,323$ 121,095,491$ 4,316,548$ 12,133,226$ 233,735,044$ 250,184,818$ ‐$ 371,280,309$
Total Liabilities & Fund Balances 112,927,503$ 13,158,887$ 15,464,007$ 141,550,397$ 221,026,349$ 13,971,579$ 658,058,565$ 893,056,494$ ‐$ 1,034,606,888$
14
PLANT & BOND FUNDS
Houston Community CollegeBalance Sheet By Fund
For Month Ended September 30, 2012
CURRENT & LOAN FUNDS
TOTAL
Unexpended Plant Funds
Total Unexpended Plant Fund Balances per Books 837,917$
Spending/Encumbrances/Reserve for Future Use
‐ Encumbrances/PO Issued General Unexpended FY12 (837,917)
Total Plant Fund PO (837,917)$
Anticipated Unexpended Plant Shortfall ‐$
HOUSTON COMMUNITY COLLEGEUnexpended Plant Fund Excluding 2004 CIP
Cash Position to September 30, 2012
15
Description of Use
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances To
Date Unexpended
DEFERRED MAINTENANCE FY05
System Administration 604,863$ 604,863$ ‐$ ‐$
Subtotal 604,863$ 604,863$ ‐$ ‐$
DEFERRED MAINTENANCE FY06
System Administration 649,625$ 649,624$ ‐$ ‐$
Northwest College 412,743 412,743 ‐ ‐
Coleman College 190,738 190,736 ‐ ‐
Subtotal 1,253,106$ 1,253,103$ ‐$ ‐$
DEFERRED MAINTENANCE FY07
System Administration 775,610$ 775,610$ ‐$ ‐$
Central College 373,917 373,917 ‐ ‐
Northwest College 599,383 599,383 ‐ ‐
Northeast College 1,059,733 1,059,733 ‐ ‐
Southwest College 74,607 74,607 ‐ ‐
Southeast College 38,742 38,742 ‐ ‐
Coleman College 9,900 9,900 ‐ ‐
Subtotal 2,931,893$ 2,931,892$ ‐$ ‐$
DEFERRED MAINTENANCE FY08
System Administration 10,195$ 10,195$ ‐$ ‐$
Central College 478,637 478,637 ‐ ‐
Northwest College 1,217,755 1,217,755 ‐ ‐
Northeast College 494,886 494,886 ‐ ‐
Southwest College 42,063 42,063 ‐ ‐
Coleman College 73,813 73,813 ‐ ‐
Subtotal 2,317,348$ 2,317,349$ ‐$ ‐$
OTHER GENERAL PROJECTS
Minor Construction 657,807$ 657,807$ ‐$ ‐$
System 11,555,483 10,990,789 564,694 ‐
Central College 3,045,140 2,906,526 138,614 ‐
Northwest College 4,060,039 4,044,540 15,499 ‐
Northeast College 626,331 619,524 6,807 ‐
Southwest College 1,103,100 1,000,997 102,103 ‐
Southeast College 1,995,204 1,987,854 7,350 ‐
Coleman College 1,341,159 1,341,159 ‐
Subtotal 24,384,263$ 23,549,196$ 835,067$ ‐$
SURPLUS PROPERTY
Palmetto Property ‐ Purchase 495,154$ 495,154$ ‐$ ‐$
Dixie Property‐ Refund 20,000 20,000 ‐
288 Property‐ Purchase 1,142,402 1,139,552 2,850 ‐
Warehouse Property 12,966,619 12,966,619 ‐ ‐
Subtotal 14,624,175$ 14,621,325$ 2,850$ ‐$
Total Anticipated Uses 46,115,648$ 45,277,728$ 837,917$ ‐$
UNEXPENDED PLANT FUND PROJECTSas of September 30, 2012
16
HOUSTON COMMUNITY COLLEGE
Total Budget
to Date
Total
Expenditures
To Date
Encumbrances
To Date
% of
Expen‐
ditures Unexpended
% of
Total
BudgetSources:
Central College 2001A Bond 25,318,535$
2003 Limited Tax Bond and Premium 150,748,497
Actural Interest Earned 2003 Limited Tax Bonds 20,868,074
2005 Limited Tax and Building Bond 1,875,000
2003/2005 LTD Bond Issuance Cost (2,068,522)
2006 Jr Lien Bond Std Revenue Bond 30,000,000
Bond Issuance Cost (913,149)
Actual Interest Earned 2006 Jr Lien Bonds 2,608,533
Transferred to Fund 7305/Hayes Road (3,169,049)
2008 Maintenance Tax Notes 56,912,320
2008 MTN Bond Issuance Cost (1,056,912)
Actual Interest Earned 2008 MTN 1,654,029
2008 Sr. Lien Bond 1,714,953
Transferred to Residual CIP Funds (20,712,314)
Total Available with Reclassification 263,779,995$
Uses:
Construction 119,713,267$ 119,499,752$ 213,515$ 100% ‐$ 0%
CPMS PGAL 11,121,809 11,121,809 ‐ 100% ‐ 0%
Facility Planning 1,677,989 1,677,989 ‐ 100% ‐ 0%
Architect Fees and Engineering 7,715,994 7,505,762 210,232 100% ‐ 0%
Other Costs including Bldg/Land Purchase 2,273,077 2,258,218 14,859 100% ‐ 0%
Inspectors 890,000 890,000 ‐ 100% ‐ 0%
Design Standard 103,370 103,370 ‐ 100% ‐ 0%
Site Improvement and Infrastructure Development 52,562,059 51,288,205 1,273,855 100% ‐ 0%
IT Infrastructure Master Plan 29,728,464 29,035,767 692,697 100% ‐ 0%
Furniture and Fixtures 14,352,845 13,903,933 448,396 100% 516 0%
Small Business 567,383 567,383 ‐ 100% ‐ 0%
Administrative Services 3,167,126 3,149,476 16,750 100% 900 0%
Material Testing 574,120 537,606 36,513 100% ‐ 0%
Contingency for Construction 59,876 0% 59,876 100%
Surveying 471,813 460,552 11,260 100% ‐ 0%
Design and Geotech 110,911 110,111 800 100% ‐ 0%
Signage 70,000 70,000 100% ‐ 0%
Blue Light Security 126,000 115,200 10,800 100% ‐ 0%
PGAL Website Development 181,208 181,208 ‐ 100% ‐ 0%
System Architect Furniture Consultant 11,367 11,367 100% ‐ 0%
Northline Demolition‐Pizza Hut 226,246 226,246 100% ‐ 0%
Police Cars 342,223 341,613 610 100% ‐ 0%
Bering St. Property 50,687 50,687 100% ‐ 0%
General Repairs & Maintenance 2,079,239 2,079,239 100% ‐ 0%
Land Purchase 1,919,729 1,919,729 100% ‐ 0%
Amatuer Sports Complex ‐ Willie Gay Hall 2,235,067 2,213,648 18,119 100% 3,300 0%
Total Construction Cost 252,331,872$ 249,318,872$ 2,948,408$ 100% 64,592$ 0%
Note: Expenditures Not In Construction Schedule
Deferred Maintenance 5,000,000$ 5,000,000$ ‐$ 100% ‐$ 0%
IT Development 6,448,123 6,448,122 ‐ 100% ‐ 0%
263,779,995$ 260,766,994$ 2,948,409$ 100% 64,592$ 0%
Anticipated Budget Shortfall/Surplus (0)
*Footnote on next page
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of September 30, 2012
17
2003/2005 Limited Tax Bonds 2003 2005 TotalBond counsel fees 150,000 57,000 207,000Underwriters' discount 814,813 57,000 871,813Insurance premium 558,764 558,764Financial advisory fee 205,391 68,081 273,472Rating agencies fees 114,350 16,000 130,350Printing costs 10,386 4,506 14,892CPA consent letter fee 1,500 1,500 3,000Verification fees 3,500 3,500Paying agent fee 300 5,432 5,732
1,855,504 213,018 2,068,522
2006 Jr Lien Revenue BondsBond counsel fees 79,500Underwriters' discount 509,509Insurance premium 117,904Financial advisory fee 137,910Rating agencies fees 54,850Printing costs 3,502CPA consent letter fee 1,500Verification fees 3,500Paying agent fee 4,974
913,149
2008 Maintenance Tax NotesBond counsel fees 63,500Underwriters' discount 342,526Insurance premium 498,600Financial advisory fee 95,105Rating agencies fees 47,100Printing costs 9,617Paying agent fee 463
1,056,912
18
HOUSTON COMMUNITY COLLEGE2004 CIP Projects Footnotes
as of September 30, 2012
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
Central ‐ San Jacinto:*
Construction Cost 1,241,868$ 1,241,868$ ‐$
CPMS PGAL 111,440 111,440 ‐ ‐
Facilities Space Programming 393,715 393,715 ‐ ‐
Material Testing ‐ ‐ ‐ ‐
IT Infrastructure Capital Projects 10,000 5,687 4,314 ‐
Design Standards 3,904 3,904 ‐
Total Central ‐ San Jacinto 1,785,007$ 1,780,694$ 4,314$ ‐$
Central ‐ Learning Hub/Science Bldg:*
Construction Cost 21,484,282$ 21,455,534$ 28,748$ -$ CPMS PGAL 1,967,801 1,967,801 ‐
Facilities Space Programming 148,096 148,096 ‐ ‐
Architect and Engineering 1,242,506 1,242,506 ‐
Furniture, Fixtures & Equipment 2,049,869 2,019,706 30,163 ‐
Inspectors 187,000 187,000 ‐
Project Software 7,614 7,614 ‐
Design Standards 15,086 15,086 ‐
Site Infrastructure Improvements 5,693,396 4,883,576 809,819 ‐
IT Infrastructure Master Plan 2,751,121 2,726,528 24,593 ‐
Design Geotech 10,150 10,150 ‐
Material Testing 32,994 32,356 638 ‐
Surveying 69,453 64,118 5,335 ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total Central ‐ Learning Hub/Science
Bldg:*
35,677,368$ 34,776,271$ 901,096$ ‐$
NEC ‐ Learning Hub:*
Construction Cost 14,088,357$ 14,001,119$ 87,238$ ‐
CPMS PGAL 1,187,440 1,187,440 ‐
Facilities Space Programming 145,889 145,889 ‐
Architect and Engineering 723,556 723,556 ‐
Furniture, Fixtures & Equipment 1,660,682 1,651,908 8,774 ‐
Other Costs including Bldg/Land Purchase ‐ ‐
Inspectors 205,000 205,000 ‐ ‐
Project Software ‐ ‐
Design Standards 9,015 9,015 ‐
Site Infrastructure Improvements 92,682 92,682 ‐ ‐
IT Infrastructure Master Plan 1,250,254 1,249,836 418 ‐
Design Geotech ‐ ‐
Material Testing 131,870 123,607 8,263 ‐
Surveying 71,081 71,081 ‐
Total NEC ‐ Learning Hub 19,565,826$ 19,461,133$ 104,693$ ‐$
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of September 30, 2012
19
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of September 30, 2012
NEC ‐ Science Engineering & Technology:*
Construction Cost 11,627,061$ 11,626,428$ 633$ ‐$
CPMS PGAL 857,203 857,203 ‐ ‐
Facilities Space Programming 52,058 52,058 ‐
Architect and Engineering 635,906 635,906 ‐
Furniture, Fixtures & Equipment 644,019 607,016 37,003 ‐
Other Costs including Bldg/Land Purchase 84,400 73,800 10,600 ‐
Inspectors ‐ ‐
Project Software ‐ ‐
Design Standards 6,818 6,818 ‐
Site Infrastructure Improvements 15,423,846 15,339,461 84,385 (0)
IT Infrastructure Master Plan 1,173,585 1,160,824 12,761 ‐
Design Geotech 28,500 28,500 ‐
Material Testing 95,465 95,465 ‐ ‐
Surveying 15,960 10,035 5,925 ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total NEC ‐ Science Eng & Technology 30,662,821$ 30,509,714$ 153,107$ (0)$
NEC ‐ Pinemont:
CPMS PGAL 6,269$ 6,269$ ‐$ ‐$
Facilities Space Programming 71,292 71,292 ‐ ‐
Other Costs including Bldg/Land Purchase
102,156 102,156
‐ ‐
Surveying 22,483 22,483 ‐ ‐
Total NEC ‐ Pinemont 202,200$ 202,200$ ‐$ ‐$
SEC - Felix Fraga (Drennan):*Construction Cost 12,419,860$ 12,333,251$ 86,609$ ‐$
CPMS PGAL 1,216,969 1,216,969 ‐
Facilities Space Programming 227,023 227,023 ‐
Architect and Engineering 850,383 835,511 14,872 ‐
Furniture, Fixtures & Equipment 1,007,615 977,469 30,146 ‐
Other Costs including Bldg/Land Purchase 62,466 62,466 ‐
Inspectors - ‐
Project Software - ‐
Design Standards 6,873 6,873 ‐
Site Infrastructure Improvements 5,981,474 5,959,525 21,949 ‐
IT Infrastructure Master Plan 1,279,923 1,268,405 11,518 ‐
Design Geotech 19,000 18,200 800 ‐
Material Testing 150,272 137,662 12,610 ‐
Surveying 27,674 27,674 ‐
HUB/Small Business Program ‐ ‐ ‐ ‐
HUB/Small Business Program ‐ ‐
Bering St Property 50,687 50,687 ‐
Signage ‐ ‐
Blue Light Security 18,000 16,200 1,800 ‐ Total SEC - Felix Fraga (Drennan):* 23,318,219$ 23,137,915$ 180,304$ ‐$
20
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of September 30, 2012
SEC ‐ Felix Morales:*
Construction Cost 3,653,331$ 3,653,330$ ‐$
CPMS PGAL 667,905 667,905 ‐
Facilities Space Programming 62,181 62,181 ‐
Architect and Engineering 367,853 351,968 15,885 ‐
Furniture, Fixtures & Equipment 929,072 898,276 30,796 ‐
Inspectors ‐ ‐ ‐ ‐
Project Software ‐ ‐ ‐ ‐
Design Standards 3,117 3,117 ‐ ‐
Site Infrastructure Improvements 98,015 96,070 1,945 ‐
IT Infrastructure Master Plan 1,165,326 1,008,321 157,005 ‐
Design Geotech ‐ ‐ ‐ ‐
Material Testing 10,009 5,808 4,201 ‐
Surveying 1,225 1,225 ‐ ‐
Total SEC ‐ Felix Morales 6,958,033$ 6,748,200$ 209,832$ ‐$
SEC ‐ Learning Hub:*
Construction Cost 16,555,351$ 16,550,039$ 5,312$ ‐$
CPMS PGAL 1,744,048 1,744,048 ‐
Facilities Space Programming 126,588 126,588 ‐
Architect and Engineering 875,415 875,415 ‐
Furniture, Fixtures & Equipment 2,006,664 1,833,862 172,802 ‐
Other Costs including Bldg/Land Purchase 32,480 28,221 4,259 ‐
Inspectors 258,000 258,000 ‐ ‐
Project Software ‐ ‐
Design Standards 9,367 9,367 ‐
Site Infrastructure Improvements 12,134,156 11,844,127 290,029 ‐
IT Infrastructure Master Plan 2,177,705 2,157,010 20,695 ‐
Administrative Services ‐ ‐
Design Geotech 9,525 9,525 ‐ ‐
Material Testing 122,370 115,883 6,487 ‐
Surveying 144,094 144,094 ‐
Blue Light Security 18,000 18,000 - ‐
Total SEC ‐ Learning Hub 36,213,761$ 35,714,178$ 499,584$ ‐$
21
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of September 30, 2012
SW ‐ Missouri City:*
Construction Cost 8,891,630$ 8,891,630$ ‐$
CPMS PGAL 601,635 601,635 ‐ ‐
Facilities Space Programming 194,111 194,111 ‐
Architect and Engineering 989,044 958,905 30,139 ‐
Furniture, Fixtures & Equipment 1,053,411 1,011,146 42,265 ‐
Library & Bookstore 1,991,575 1,991,575 ‐
Inspectors ‐ ‐
Project Software ‐ ‐
Design Standards 4,999 4,999 ‐
Site Infrastructure Improvements 5,061,234 5,061,234 ‐ ‐
IT Infrastructure Capital Projects 2,259,481 2,246,083 13,398 ‐
Design Geotech ‐ ‐
Material Testing ‐ ‐
Surveying 48,311 48,311 ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total SW ‐ Missouri City 21,113,430$ 21,025,828$ 87,602$ ‐$
SW ‐ West Loop Phase I:*
Construction Cost 9,033,809$ 9,031,922$ 1,887$ ‐$
CPMS PGAL 1,033,865 1,033,865 ‐
Facilities Space Programming 76,260 76,260 ‐
Architect and Engineering 829,776 718,694 111,082 ‐
Furniture, Fixtures & Equipment 2,166,396 2,154,214 12,182 ‐
Design Standards 8,170 8,170 ‐
IT Infrastructure Capital Projects 2,893,767 2,864,190 29,577 ‐
Design Geotech 22,116 22,116 ‐
Material Testing 21,141 21,140 1 ‐
Surveying 14,995 14,995 ‐ ‐
Exterior Signage 70,000 70,000 ‐ ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total SW ‐ West Loop Phase I 16,188,294$ 16,031,765$ 156,529$ ‐$
22
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of September 30, 2012
SW ‐ Learning Hub ‐ Stafford:*
Construction Cost 20,717,717$ 20,714,629$ 3,088$ ‐$
CPMS PGAL 1,727,234 1,727,234 ‐
Facilities Space Programming 180,778 180,778 ‐
Architect and Engineering 1,193,942 1,155,688 38,254 ‐
Furniture, Fixtures & Equipment 2,835,121 2,750,339 84,265 517
Inspectors 240,000 240,000 ‐
Project Software ‐ ‐
Design Standards 15,845 15,845 ‐
Site Infrastructure Improvements 8,077,256 8,011,530 65,726 ‐
IT Infrastructure Capital Projects 2,611,069 2,535,820 75,249 ‐
Design Geotech 21,620 21,620 ‐
Material Testing ‐ ‐
Surveying 56,536 56,536 ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total SW ‐ Learning Hub ‐ Stafford 37,695,119$ 37,426,219$ 268,382$ 517$
System ‐ Network:
IT Infrastructure Capital Projects 12,162,330$ 11,814,846$ 347,484$ ‐
Administrative Services 3,167,126 3,149,476 16,750 900
PGAL Website Development 181,209 181,208 1 ‐
HUB/Small Business Program 567,383 567,383 ‐ ‐
System Architect Furniture Consultant
11,367 11,367
‐
Ft. Bend Library Inflation Cost Increase
‐
‐
Northline Demolition‐Pizza Hut 226,246 226,246 ‐
Police Cars 342,223 341,613 610 ‐
General Repairs & Maintenance 2,079,239 2,079,239 ‐
Land Purchase 1,919,729 1,919,729 ‐
Amatuer Sports Complex ‐ Willie Gay Hall 2,235,067 2,213,648 18,119 3,300
Total ‐ System ‐ Network 22,891,919$ 22,504,755$ 382,962$ 4,200$
Construction Contingency 59,876$ ‐$ ‐$ 59,876
Subtotal Above 252,331,873$ 249,318,872$ 2,948,406$ 64,592$
100.00% 98.81% 1.17% 0.03%
EXPENDITURES NOT IN CONSTRUCTION SCHEDULE
Deferred Maintenance 5,000,000$ 5,000,000$ ‐$ ‐$
IT Development 6,448,123 6,448,122 1 ‐
GRAND TOTAL 263,779,996$ 260,766,994$ 2,948,407$ 64,592$
100.00% 98.86% 1.12% 0.02%
23
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures to
Date Encumbrances Unexpended
Sources:Transferred CIP Funds 20,712,314
Uses:
Central Learning Hub/Science Bldg:
Site Infrastructure Improvements 6,599,554$ 5,500$ 234,238$ 6,359,816$
NEC ‐ Science Engineering & Technology:
Site Infrastructure Improvements 2,184 2,184 ‐
SEC ‐ Learning Hub:
Site Infrastructure Improvements 1,950,382 ‐ ‐ 1,950,382
System ‐ Network:
IT Infrastructure Capital Projects 7,569,405 2,253,135 5,217,108 99,161
Construction Contingency 1,400,720 ‐ ‐ 1,400,720
Contingency 3,190,069 ‐ ‐ 3,190,069
Total Construction Cost 20,712,314$ 2,260,819$ 5,451,346$ 13,000,148$
Anticipated Budget Shortfall/Surplus ‐
24
HOUSTON COMMUNITY COLLEGE SYSTEMResidual CIP Funds
as of 09/30/12
Total Budget
to Date
Total
Revenues /
Expenditures
To Date
Encumbrances To
Date Unexpended
Sources of funds:
Proceeds from
2006 Tax Maintenance Notes 12,000,000$
Discount (88,756)
Bond Issuance Cost (256,244)
Interest Income 835,330
Funds Available 12,490,330$
Uses of funds:
Site Infrastructure 341,092$ 327,728$ 13,364$ ‐$
Project Management 450,479 450,479 ‐ ‐
Construction 8,805,292 8,805,292 ‐ ‐
Design Phase 1,117,820 1,117,820 ‐ ‐
Architecture 17,822 17,822 ‐
Material Testing & Inspection 6,399 6,399 ‐ ‐
Land/Demolition 420,541 420,541 ‐ ‐
Survey 9,473 9,473 ‐ ‐
Construction‐Maintenance 1,259,003 1,247,114 11,889 ‐
Contingency 62,408 46,700 15,708
Grand Total Uses 12,490,330$ 12,449,368$ 25,253$ 15,708$
Net Available 0$
25
HOUSTON COMMUNITY COLLEGEMaintenance Tax Notes 2006 (Central Utility Plant Project)
as of September 30, 2012
*Note 1 Budgets are adjusted as contracts are awarded; otherwise, budget is preliminary from
inception.
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances To
Date Unexpended
Sources:
2008 Maintenance Tax Notes 39,780,489$
2008 Maintenance Tax Notes‐Phase 1 Infrastructure 15,078,286
Transferred to CIP Residual Fund (7170) (17,522,242)
Interest Earned To date 1,677,987
Funds Available for Projects 39,014,520$
Uses:
Site Infrastructure Improvements 5,666,582$ 4,932,298$ 734,284$ ‐$
Architectural/Engineering Fees 165,537 151,654 13,883 ‐
IT Infrastructure Master Plan 19,553,388 19,199,543 353,845 ‐
Furniture, Fixtures & Equipment 5,056,049 4,572,572 483,477 ‐
Material Testing 33,351 29,035 4,316 ‐
Construction 5,437,915 5,381,526 56,389 ‐
Construction Management 132,478 132,478 ‐
Campus Security 243,116 242,415 600 101
Truck Driving School 99,200 99,200 ‐
Land 517,306 517,306 ‐
Energy Services 8,860 8,860 ‐
Design GEOTECH 5,189 5,189 ‐ ‐
Surveying 16,310 16,310 ‐ ‐
Contracted Services 2,079,239 2,079,239 ‐
Residual Funds for Completion of CIP Projects ‐ ‐ ‐ ‐
Total 39,014,520$ 37,367,625$ 1,646,794$ 101$
Bond Issuance Cost:
Bond counsel fees 63,500$
Underwriters' discount 342,526
Insurance premium 498,600
Financial advisory fee 95,105
Rating agencies fees 47,100
Printing costs 9,617
CPA consent letter fee 463
Total 1,056,912$
HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds
as of September 30, 2012
Fund 7203
Fund 7203 ‐ Maintenance Tax Notes
26
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances To
Date Unexpended
Source:
2008 Senior Lien Bonds:
Southeast Workforce Project 14,300,000$
Emergency Preparedness 1,000,000
Interest Earned To date 469,549
Funds Available for Projects 15,769,549$
Uses:
Operation and Maintenance 77,034 77,034 ‐
Major Repairs and Renovation 821,560 820,726 834 ‐
South East Work Force Project 3,712,405 3,442,290 270,115 ‐
Land Purchase (Rosalie Property) 2,314,967 2,314,967 ‐
Material Engineering and Testing 8,380 3962 4,418 ‐
Construction of Workforce Building 7,262,398 6,995,583 266,815 ‐
Residual Funds for All Projects 1,572,805 1,572,805
15,769,549$ 13,654,562$ 542,182$ 1,572,805$
Bond Issuance Cost:
Bond counsel fees 123,267$
Underwriters' discount 336,128
Insurance premium 620,827
Financial advisory fee 100,981
Rating agencies fees 51,750
Printing costs 5,880
Paying agent fee 460
Verification fee 5,000
Escrow agent fee 4,600
1,248,893$
27
Fund 7308 ‐ Senior Lien Bonds
HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds
Fund 7308as of September 30, 2012
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances To
Date Unexpended
Central
San Jacinto Memorial 21,391,231$ 7,566,536 3,280,522 10,544,173$
J.B. Whitely Bldg. 4,540,000 669,110 1,134,290 2,736,600
Theater One 1,699,500 159,101 48,311 1,492,088
Staff Instructional Services 1,100,000 153,621 444,141 502,238
Curriculum Innovation Center 190,000 ‐ 190,000
Fine Arts Parking Structure 190,000 138,731 37,452 13,818
Crawford Annex 68,200 18,138 ‐ 50,062
Learning Hub/Science Bldg. 27,500 15,953 ‐ 11,547
Planned Parenthood Renovation 1,608,769 1,605,024 3,746 ‐
Total Central 30,815,200$ 10,326,213$ 4,948,461$ 15,540,526$
Northeast
Automotive Tech. Training Ctr. 4,000,000$ 562,473$ 133,339$ 3,304,188$
Pinemont 66,558 39,237 ‐ 27,321
Codwell Hall 438,000 204,117 166,538 67,345
Codwell Hall Shower (Temp) 150,000 ‐ 150,000
Roland Smith Truck Driving Ctr. 140,000 54,406 ‐ 85,594
Northline 120,000 11,636 2,789 105,575
Public Safety Institute 115,000 10,501 1,166 103,333
NE Science and Tech. Bldg 49,500 ‐ 49,500
NE Learning Hub 47,500 6,309 ‐ 41,191
Total Northeast 5,126,558$ 888,678$ 303,831$ 3,934,047$
Southeast
Angela Morales 599,000$ 413,199$ ‐$ 185,801$
Office City 38,500 ‐ ‐ 38,500
Total Southeast 637,500$ 413,199$ ‐$ 224,301$
Southwest
Stafford Campus (7 Bldgs) 4,216,086$ 3,769,583$ 446,502$ ‐$
Scarcella Center 927,356 347,710 91,289 488,357
Alief 165,000 132,664 ‐ 32,336
Academic Ctr Sienna Plantation 93,500 85,660 7,736 104
Stafford Learning Hub 54,000 ‐ 54,000
Applied Technology Center 50,000 1,715 ‐ 48,285
Greenbriar Annex 30,000 22,033 414 7,553
Total Southwest 5,535,942$ 4,359,365$ 545,942$ 630,635$
System
System Building 2,185,425$ 1,415,937$ 769,488$ ‐$
Teaching Enhancement Renovations 2,920,459 1,028,346 85,926 1,806,187
Surface Parking & Civil Infrastructure 2,400,000 1,291,070 325,942 782,987
Parking Structure 2,394,116 2,286,034 104,901$ 3,181
Total System 9,900,000$ 6,021,388$ 1,286,257$ 2,592,355$
Grand Total 52,015,200$ 22,008,843$ 7,084,491$ 22,921,864$
HOUSTON COMMUNITY COLLEGE SYSTEM2010 Maintenance Tax Notes
as of September 30, 2012
28
Description Date Issued
Original Bond
Amount
Principal
Payments
Principal
Balance
Principal &
Interest FY12
Final Due
Date Call Dates
Foot‐
note
2005 Senior Lien Revenue/Refunding Bonds 04/15/05 51,285,000 (13,540,000) 37,745,000 6,676,363 04/15/20 04/15/15 (A)
2006 Junior Lien Revenue/Refunding Bonds 11/01/06 72,815,000 (15,360,000) 57,455,000 6,274,230 04/15/30 04/15/16 (A) (B)
2008 Senior Lien Revenue Bonds 05/14/08 54,540,000 (6,115,000) 48,425,000 4,075,100 04/15/30 04/15/18 (A)
2010 Senior Lien Revenue Bonds 07/29/10 27,250,000 (875,000) 26,375,000 2,124,275 04/15/31 04/15/20 (A)
2011 Junior Lien Revenue Refunding Bonds 03/10/11 33,940,000 (2,350,000) 31,590,000 4,150,431 04/15/25 04/15/21 (A)
2011T Senior Lien Revenue Bond 11/15/11 16,000,000 16,000,000 388,800 04/15/21 11/15/13 (A)
2003 Limited Tax Bonds 12/01/03 144,155,000 (142,960,000) 1,195,000 782,175 02/15/14 (C)
2011 Limited Tax Refunding Bonds 10/20/11 109,490,000 109,490,000 5,308,300 02/15/28 02/15/21 (C)
2006 Maintenance Tax Notes 02/01/06 12,000,000 (2,660,000) 9,340,000 890,550 02/15/26 02/15/16 (C)
2008 Maintenance Tax Notes 03/01/08 54,975,000 (7,735,000) 47,240,000 4,171,426 02/15/28 02/15/18 (C)
2009 Maintenance Tax Notes 09/01/09 13,830,000 (1,445,000) 12,385,000 1,242,569 02/15/25 02/15/19 (C)
2010 Maintenance Tax Notes 07/29/10 47,645,000 (1,840,000) 45,805,000 3,998,400 02/15/29 02/15/20 (C)
2011 Maintenance Tax Notes 03/10/11 41,560,000 (1,295,000) 40,265,000 3,293,775 02/15/31 02/15/21 (C)
2011A Maintenance Tax Notes 10/12/11 19,590,000 19,590,000 1,583,875 02/15/31 02/15/21 (C)
PFC Series 2005A Lease Revenue Bonds 06/01/05 11,605,000 (2,485,000) 9,120,000 837,663 04/15/28 04/15/15 (A)
PFC Series 2005C Lease Revenue Bonds 12/01/05 19,155,000 (3,155,000) 16,000,000 1,313,456 04/15/30 04/15/15 (A)
PFC Series 2006 Lease Revenue Bonds 10/01/06 36,950,000 (5,135,000) 31,815,000 2,484,773 04/15/31 04/15/16 (A) (D)
PFC Series 2007 Lease Revenue Bonds 02/01/07 58,885,000 (6,285,000) 52,600,000 4,321,500 04/15/31 04/15/17 (A) 825,670,000 (213,235,000) 612,435,000 53,917,660
Note: This schedule represents all bonds and maintenance tax notes with outstanding principal balances as of 9/30/12;
previously retired debt issues are not shown (i.e. 1997, 1998, 1999, 2001, 2001A, 2003 LTD, 2005 LTD)
Footnotes:
(A) Funded from current operations, Fund 1110
(B) Approximately $3.4 MM annually through 8/31/17 to be funded from student technology fees, Fund 8110; remainder from
current operations
(C) Funded from real estate taxes, Fund 8300
(D) $1,329,772 of interest expense to be funded from real estate taxes
Schedule of Bonds and Maintenance Tax Notes
For the Month Ended September 30, 2012
Houston Community College
29
3101‐3100 Main
Leasing
3102‐Conference
Training Center 3103‐HCC‐TV
Auxiliary
3105‐HCCS ‐ PFC
Leasing 3110‐Auxiliary
3201‐Cafe Club
NEO 3100 Main
3202‐Fitness
Center‐Central
3204‐Heinen
Theater
3207‐
International
Initiatives
3208‐Saudi
Consulting
Services 3209‐Qatar Subtotal
Fund Balance 8/31/12 16,586,942$ (744,125)$ 36,165$ 898,968$ (7,498,516)$ (1,362,924)$ (76,298)$ 33,917 (82,495) 203,712 807,349 8,802,695
FY2013 Revenue 442,342 8,070 3,085 27,841 48,224 1,672 5,255 23,333 615,212 1,175,034
Salaries 30,096 52 52,783 22,489 597 479,768 585,785
Benefits 8,109 4 12,265 5,307 3 75,113 100,802
Supplies Gen Exp 134 25,599 43 1,822 491 28,089
Travel 2,832 1,489 350 4,671
Marketing Costs ‐
Rental & Leases 446 446
Contract Services 4,199 209,925 33,000 247,124
Utilities 2,294 2,294
Departmental Expenses 350,806 270 355 351,431
Instructional & Other Materials ‐
Maintenance & Repair 1,983 1,983
Indirect Cost Expenditures ‐
Exemptions and Waivers ‐
Capital Outlay 1,837 1,837
Transfer ‐ ‐ ‐
Net Income /(Loss) FY13 395,674 7,567 ‐ 3,085 (626,368) 18,445 1,072 4,942 20,022 ‐ 26,135 (149,426)
16,982,616 (736,558) 36,165 902,053 (8,124,884) (1,344,480) (75,226) 38,859 (62,473) 203,712 833,484 8,653,269
*Discretionary Funds
30
HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund
as of September 30, 2012
Auxiliary Funds*
Net Fund Balance
HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund
as of September 30, 2012
3110‐ Student
Vending
Commission
3111‐Auxiliary
Student
Services
3112‐Auxiliary
Student Athletic
Fee Subtotal Grand Total
Fund Balance 8/31/12 1,197,891 172,750 1,584,968 2,955,608 11,758,303
FY2013 Revenue ‐ 470,177 349,712 819,889 1,994,923
Salaries 700 20,359 21,059 21,059
Benefits 2,980 2,980 2,980
Supplies Gen Exp 37,730 18,527 56,256 56,256
Travel ‐ ‐
Marketing Costs ‐ ‐
Rental & Leases ‐ ‐
Contract Services ‐ ‐
Utilities ‐ ‐
Departmental
Expenses
300 300 300
Instructional &
Other Materials
‐ ‐
Maintenance &
Repair
‐ ‐
Indirect Cost
Expenditures
‐ ‐
Exemptions and
Waivers
‐ ‐
Capital Outlay ‐ ‐
Transfer ‐ ‐
Net Income /(Loss) FY13 (700) 432,147 307,847 739,294 589,868
1,197,191 604,897 1,892,815 3,694,902 12,348,171
*Funds can only be used for services related to students
31
Net Fund Balance
Student Auxiliary Funds ‐ Restricted*
Federal Grantor Perform‐ Federal
Pass‐through Grantor ance CFDA Total Budget Total AwardProgram Title Period Number Expenditures Amount Amount** Ends Starts
U. S. Department of Education
Direct Programs:
Higher Education ‐ Institutional Aid 5 yrs. 84.031A 8,701 214,275 1,542,133 9/30/2014 10/1/2009
TRIO ‐ Student Support Services 5 yrs. 84.042 26,667 436,682 2,078,155 8/31/2015 9/1/2010
TRIO ‐ Upward Bound ‐ Southeast 4 yrs. 84.047 1,767 16,669 1,172,562 ^ 8/31/2012 9/1/2007
TRIO ‐ Upward Bound ‐ Southeast 5 yrs. 84.047 16,283 291,335 1,465,615 8/31/2017 9/1/2012
TRIO ‐ Upward Bound ‐ Central 5 yrs. 84.047A 26,100 410,056 2,845,845 5/31/2017 6/1/2012
Astra Stem Grant 3 yrs. 84.120A 25,804 293,375 881,873 9/30/2014 10/1/2011
Vast Academy TPSID 5 yrs. 84.407A 37,262 292,577 2,498,250 9/30/2015 10/1/2010
Pass‐Through From:
Texas Educational Agency
Adult Education ‐ State Grant Program 1 yr. 84.002 311,099 5,084,289 5,542,104 6/30/2013 7/1/2012
Adult Education ‐ State Grant Program 1 yr. 84.002 6,056 96,974 102,000 6/30/2013 7/1/2012
University of St. Thomas
Higher Education ‐ Institutional Aid 5 yrs. 84.031C 72,156 212,731 3,243,025 9/30/2016 10/1/2011
Texas Higher Education Coordinating Board
Vocational Education ‐ Basic Grants to States 1 yr. 84.048 14,956 1,051,987 1,051,987 8/31/2013 9/1/2012
College Access Challenge Grant Program 1 yr. 4 mos. 84.378A 15,000 26,707 208,548 8/13/2012 4/6/2011
College Access Challenge Grant Program 1 yr. 84.378A 5,008 169,803 171,798 8/13/2013 8/15/2012
Total Department of Education 566,858$ 8,597,461$ 22,803,895$
U.S. Department of Agriculture
Direct Programs:
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 1,025 36,414 298,538 ^ 8/31/2013 8/1/2009
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 (0) 26,428 244,000 ^ 8/14/2013 8/15/2010
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 (3,020) 135,610 445,000 ^ 8/31/2013 9/1/2010
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 ‐ 202,726 245,000 8/31/2013 9/1/2011
Pass‐Through From:
Texas A & M University‐Corpus Christi 2 yrs 10.223 ‐ 30,435 48,700 ^ 8/31/2013 9/1/2010
Total Department of Agriculture (1,995)$ 431,613$ 1,281,238$
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
^ No Cost Extension
32
HOUSTON COMMUNITY COLLEGE
as of September 30, 2012
Date Grant
Schedule of Federal Awards *
FY12 ‐ 13
Federal Grantor Perform‐ Federal
Pass‐through Grantor ance CFDA Total Budget Total Award
Program Title Period Number Expenditures Amount Amount** Ends Starts
U.S. Department of Housing and Urban Development
Direct Programs:
Pass‐Through From:
Child Care Council of Greater Hous. Inc
Community Development Block Grant‐Entitlement Grant 1 yr 14.218 2,711 3,976 32,000 ^12/31/12 8/1/2011
Total Department of Housing And Urban Development 2,711$ 3,976$ 32,000$
Department of Labor
DOL‐Logistics Technician Training 3yrs. 4,535$ 159,097 327,404 6/30/2013 7/1/2010
Pass‐Through From:
Texas Workforce Commission
Recovery ‐ WIA Dislocated Worker Formula Grant 1 yr. 17 1,798 61,804 243,163 9/30/2012 7/1/2011
Total Department of Labor 6,333$ 220,901$ 570,567$
Department of State
Pass‐Through From:
Northern Virginia Community College 1 yr 19 8,272 73,538 109,830 5/31/2013 3/8/2012
Total Department of State 8,272$ 73,538$ 109,830$
National Science Foundation
Direct Programs:
Education and Human Resources 4 yrs. 47.076 1,512 64,204 423,300 1/31/2013 2/15/2009
Pass‐Through From:
University of Houston System
Education and Human Resources 5 yrs. 47.076 ‐ 47,212 190,000 8/31/2013 9/1/2011
Total National Science Foundation 1,512$ 111,416$ 613,300$
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
33
as of September 30, 2012
HOUSTON COMMUNITY COLLEGE
Schedule of Federal Awards *
Date Grant
FY12 ‐ 13
Federal Grantor Perform‐ Federal
Pass‐through Grantor ance CFDA Total Budget Total Award
Program Title Period Number Expenditures Amount Amount** Ends Starts
U. S. Department of Energy
Energy Sector Grant (SECO) 8 mos 81.041 ‐ 63,836 460,480 ^ 9/30/2012 05/10/10
Solar Energy Technical Program 13 mos 81.087 12,930 591,069 750,000 12/30/14 11/1/2012
Total U. S. Department of Energy 12,930$ 654,905$ 1,210,480$
U. S. Department of Health and Human Services
Direct Programs:
Head Start 5 yrs. 93.600 9,023 34,617 426,159 9/29/2013 9/30/2008
Pass‐Through From:
Texas Education Agency
Temporary Assistance for Needy Families 1 yr. 93.558 141 10,200 208,614 8/31/2012 9/1/2011
Temporary Assistance for Needy Families 1 yr. 93.558 8,283 244,749 244,749 8/31/2013 9/1/2012
YMCA of Greater Houston
Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 19,869 82,578 374,938 9/30/2012 10/1/2011
Pitt Community College
Health Information Tech Professionals 2 yrs. 93.721 34,557 461,664 1,287,568 4/1/2013 4/2/2010
University of Texas at Austin
Block Grants for Prevention and Treatment of Substance Abus 1 yr. 93.959 ‐ 9,015 22,000 9/29/2012 9/30/2011
Total Department of Health and Human Services 71,872$ 842,822$ 2,564,028$
U. S. Department of Homeland Security
Direct Programs:
Homeland Security 2 yrs. 97.062 2,729 58,856 250,000 ^12/31/12 9/1/2010
Total Department of Homeland Security 2,729$ 58,856$ 250,000$
Total Federal Financial Assistance 671,222$ 10,995,487$ 29,435,338$
* Scholarship grants are not included in this schedule.
**Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
^ No Cost Extension
HOUSTON COMMUNITY COLLEGE
Schedule of Federal Awards *
as of September 30, 2012
FY12 ‐ 13
34
Date Grant
Perform‐
ance Total Budget Total Award
Program Title ‐ State Grantor Period Expenditures Amount Amount** Ends Starts
Texas Education Agency
Adult Education 1 yr. 18,361$ 24,615$ 1,165,635$ 8/31/2012 9/1/2011
Adult Education 1 yr. 78,768 1,165,635 1,165,635 8/31/2013 9/1/2012
Drop‐Out Recovery Program 18mos 960 43,998 194,000 2/28/2013 8/1/2011
Drop‐Out Recovery Performance Pay 1 yr. 5,667 181,750 181,750 until expended 6/1/2011
Temporary Assistance for Needy Families 1 yr. 8,687 16,869 111,445 8/31/2012 9/1/2011
Temporary Assistance for Needy Families 1 yr. 5,891 131,283 131,283 8/31/2013 9/1/2012
Total Texas Education Agency 118,333$ 1,564,151$ 2,949,748$
Texas Higher Education Coordinating Board
Adult Basic Education Innovation Grant 1 yr. 29,257$ 158,314 500,000 8/31/2013 9/1/2012
Collegiate G‐Force Mentorship 1 yr. ‐ 27,148 50,000 8/31/2013 9/1/2009
First Year Experience 13 mos. 3,931 8,709 50,000 until expended 7/18/2011
Nursing Shortage Reduction Program 1 yr. ‐ 112,280 157,314 8/31/2014 9/1/2010
Rider 58 ATCP School Grant 8 1/2 mos. ‐ 13,960 46,360 until expended 12/18/2009
Pass‐Through From:
University of Tex Health Science Center
Navigator Grant 1 yr. 6,315 51,452 129,195 ^11/30/2012 6/1/2011
Total Texas Higher Education Coordinating Board 39,503$ 371,863$ 932,869$
Texas Workforce Commission
Skills Development ‐ Skills for Small Business Initiatives 1 yr. ‐ 20,000 20,000 5/31/2013 6/1/2012
Total Texas Workforce Commission ‐$ 20,000$ 20,000$
Total State Financial Assistance 157,837$ 1,956,013$ 3,902,617$
* Scholarship grants are not included in this schedule.**Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
Date Grant
as of September 30, 2012
Schedule of State Awards *
FY12 ‐ 13
35
HOUSTON COMMUNITY COLLEGE
Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts
21st Century FY 12 10 mos. ‐ 1 984 10/31/2012 1/3/2012
Achieving the Dream ‐ Intiative 1 yr.‐cont. ‐ 9,433 20,000 until expended 12/1/2009
Achieving the Dream ‐ Gates Foundation 3 yrs. 19,697 262,135 743,000 ^12/31/2012 7/1/2009
Adult Education/We Can Work 1 yr. ‐ ‐ 11,500 until expended 1/1/2010
American Chemical Society 8 mos ‐ 248 500 until expended 9/1/2011
AT&T High School Success Grant 1 yr. 7 mos. ‐ 25,216 35,000 until expended 1/31/2010
Bank of America 2 yrs. ‐ 316 50,000 until expended 5/1/2008
Baylor Summer Interns 1 yr. ‐ 1,638 60,000 until expended 5/1/2010
Brown Foundation 1 yr.‐cont. ‐ ‐ 100,000 until expended 2/1/2008
Bulletproof Vest Partnership Program 1 yr.‐cont. ‐ ‐ 5,345 until expended 9/1/2004
Capital Idea project 1 yr. 1,245 73,794 341,000 until expended 8/1/2010
Carnegie FDTN 1 yr 4,501 30,901 67,500 12/31/2012 1/1/2012
Citibank ‐ College Connection Program 1 yr. ‐ 20,475 41,718 until expended 8/15/2007
Civic Ventures 1 yr. 1 mo. ‐ 1,246 25,000 until expended 7/1/2010
Dow Male Minority Initiative Summer Prog. 1 yr. ‐ 12,588 23,986 1/2/2013 1/2/2012
Early College High School (Southeast) ‐ Gates/Dell 5 yrs. ‐ 6,779 400,000 until expended 6/10/2005
Financial Empowerment Strat. Student Success 2 yrs. ‐ 60,808 63,050 12/31/2013 1/1/2012
Goldman Sachs Grant ‐ Phase I 5 yrs. 54,925 765,458 1,786,121 5/31/2016 1/3/2011
Gulf Coast Pass 3 yrs. 3,445 227,625 318,750 12/31/2014 1/1/2012
Hammill FDTN ‐ Veterans Grants 2 yrs. ‐ 11 18,191 until expended 9/1/2010
Houston Endowment Grant 3 yrs. ‐ 814 267,000 until expended 11/16/2005
Houston Pathways Initiative 2 yrs. 3,900 345,471 1,580,000 8/31/2013 3/26/2009
Interlocal Metro (PSI) 10 yrs. ‐ 45,000 200,000 8/23/2017 8/23/2008
Interlocal Stafford ‐ City of Stafford 1 yr. 6,400 71,986 149,011 until expended 10/1/2010
KBR Veterans Orientation 1 yr.‐cont. ‐ 5,540 19,685 until expended 9/1/2008
Kresge Fdtn‐Coordinator/Evaluation 1 yr. 4,531 17,221 82,450 until expended 9/1/2011
Kresge Fdtn‐Parent Academy 1 yr. 957 40,254 89,320 until expended 9/1/2011
Kresge Fdtn‐Veterans Grant 1 yr. 10,109 51,298 128,230 until expended 9/1/2011
MDRC ‐ Learning Community Demonstration Grant ‐ Northeast 4 yrs. ‐ 26,495 60,233 until expended 11/1/2007
MDRC ‐ Learning Community Demonstration Grant ‐ Southeast 4 yrs. ‐ 738 75,000 until expended 11/1/2007
MDRC ‐ Learning Community Demonstration Grant ‐ Central 4 yrs. ‐ 385 33,000 until expended 11/1/2007
Metlife Caregiving for Older Americans 1 yr.‐cont. ‐ 18,012 23,855 until expended 7/1/2007
Microsoft Elevate America 1 yr. ‐ 31,985 34,969 3/20/2013 3/20/2012
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
FY12 ‐ 13
36
HOUSTON COMMUNITY COLLEGE
Schedule of Local Government and Private Awards *
as of September 30, 2012
Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts
Mobile Go Center ‐ Valero 1 yr.‐cont. ‐ 494 7,293 until expended 9/1/2007
National Articulation & Transfer Network Council(NATN) 1 yr.‐cont. ‐ 29,273 29,273 until expended 4/1/2005
North Forest GED Preparation 3 mos 241 6,799 25,000 until expended 10/1/2011
St. Luke's Episcopal Health Charities Immunization Fellowship 2 yrs. ‐ 4,178 142,650 until expended 9/10/2008
Susan B Komen Breast Cancer Initiative 1 yr. ‐ 6,610 123,230 until expended 4/1/2010
Texas Pioneer Foundation Grant 1 yr. ‐ 2,851 23,117 12/31/2012 1/26/2012
Vast Job Developer 1 yr. 816 20,299 94,898 until expended 11/1/2009
Verizon Foundation Grant 1 yr. ‐ 510 12,510 until expended 1/1/2010
Walmart ‐ Minority Male Initiative 1 yr. ‐ 25,215 40,000 until expended 9/1/2009
Washington Mutual 1 yr.‐cont. ‐ 16,717 31,700 until expended 9/1/2006Total Private Financial Assistance 110,766$ 2,266,817$ 7,384,069$
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
37
HOUSTON COMMUNITY COLLEGE ‐ Schedule of Local Government and Private Awards *
Schedule of Local Government and Private Awards * continued
as of September 30, 2012
FY12 ‐ 13
CHANCELLOR
1
DEPUTY CHANCELLOR
4
VICE CHANCELLOR INSTRUCTION
‐
VICE CHANCELLOR STUDENT SUCCESS
2
VICE CHANCELLOR INFORMATION TECHNOLOGY
‐
CENTRAL
1
NORTHWEST
5
New Postions
38
‐
NewPosition‐Internal
Replacement‐External ‐
COO
‐
NewPosition‐External ‐
Interim ‐
‐
NewPosition‐External ‐
Sep
Nellie Bradley
‐
Admissions
1
Dir., Outreach & Student Development
Interim
Steven Cohan
Replacement‐Internal
Repl Kimberly Crocker Montgomery‐Hire External‐Temp
NewPosition‐External
‐
‐
NewPosition‐Internal NewPosition‐External‐
‐ Replacement‐Internal InterimReplacement‐ExternalNorthwest NewPosition‐Internal ‐
Repl Joaquin Torres‐Hired External‐Temp Sep Eva Foster English
Sep
5
Repl Manhal Chbat‐Hired External‐Temp
‐
Public Relations
‐
Larke Clishe
Outreach & Student Dev
Replacement‐External ‐
Repl Shantay Grays‐Hired External
2 2 Replacement‐Internal
Paul Donaldson
NewPosition‐Internal
Sep
VC Instr
Interim
Interim ‐ Deputy Chancell
Student Information Svcs Advisor Repl Laura Collins‐Hired External Sep
Interim Dir., Resource & Economic Dev New Position‐Budget 12‐13‐Hired Internal
Houston College Community
2012‐2013 Positions
Employee Name Department Month
SepBarlett Sheinberg Resource & Economic Dev
CommentsJob Title
Interim 1 ‐ NewPosition‐External‐ ‐
Edwin Johnson Police Department
NewPosition‐Internal ‐ Replacement‐InternalChancellor Replacement‐External
Sep
Police Department Corporal Repl Timothy Ramirez‐Hired Internal
Repl Anthony Maxie‐Hired Internal
Sep
Police Department Corporal New Position‐Budger 11‐12‐Hired Internal Sep
Shirley Voisin
Tobin Anderson
Navidad Martinez
Sep
Corporal
Corporal New Position‐Budger 11‐12‐Hired InternalPolice Department
NewPosition‐InternalReplacement‐ExternalVCSS
Sandra Brooks Enrollment Service Assistant Repl Makeba Brown‐Hired External‐Temp
Sep
NewPosition‐External ‐
Instructor
Director of Public Relations
2
Student Services Interim Dean of Student Dev
‐ ‐ Replacement‐Internal
Cashier II
Central NewPosition‐Internal
‐
Anika Chowdhury
Sep
Replacement‐Internal ‐
Sep
Replacement‐External
Biology
‐ VCIT Replacement‐External
Repl Cheryl Johnson‐Hired Internal
Replacement‐Internal NewPosition‐External Interim
Jason Wilson
‐
Repl Stella Villarreal‐Hired External‐Temp
Instructor
‐
NORTHEAST
7
SOUTHWEST
1
SOUTHEAST
‐
COLEMAN
4
EXTENDED LEARNING, DIVISION OF‐
Adm. Totals Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 7
College Totals Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 18
Grand Total Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 25
Over all Total
New Postions
39
Employee Name Department Job Title Comments
NORTHEAST
Ashley Nichols
Daniel Guzman
Southeast
Southwest
Dean Instruction
William Nicholson
Month
Sep
Interim‐ NewPosition‐External
Sep
Ronald Dewlen
Instructor Repl Homer Stewart‐Hired External‐Temp
Retention Specialist Repl Joseph Willis‐Hired Internal
Instructor
Replacement‐Internal Replacement‐External2
‐ ‐ NewPosition‐External1 NewPosition‐Internal
Repl Adballah Cherif‐Hired External‐TempLorraine Donovan
‐ Replacement‐External
4 15 3 1 2
1 1
NewPosition‐Internal 1 NewPosition‐External
‐ NewPosition‐Internal ‐ NewPosition‐External ‐ Interim ‐
2 1
2 ‐ 1 2
Interim ‐ 2
Ex. Learning
‐
Replacement‐Internal
Replacement‐External
‐
1
Replacement‐External
25
13
Replacement‐InternalColeman
2
Instructor
Interim ‐
SepChlinical Simulation Lab Technician
Caroline Couto‐Ortiz
Charmaine Lewinson‐Evans
‐ Replacement‐Internal
Repl Sharon McCowan‐Hired External
Health Science SepNew Position‐Budget 12‐13‐Hired ExternalDental Hygiene Operations Assistant
Simulation Center
Sep
Sep
‐ ‐ Replacement‐External NewPosition‐Internal
Vocaitonal Nursing
‐
Instructor
New Position‐Budget 12‐13‐Hired Internal
NewPosition‐External
Repl Pearlie Watts‐Hired ExternalVocaitonal Nursing
Instructor
‐ Replacement‐Internal Interim
Academic
5 NewPosition‐Internal ‐
Sep
‐
Betty Keller
Repl John Jagdish‐Hired External‐Temp
Office Manager
Sep
SepInstructor
SepIfeanyi Oramulu
Repl Barbara Smith‐Hired InternalNicki Norman
Electronic Engineering Instructor Repl Nicky Haddock‐Hired External Sep
Repl Pratap Talusani‐Hired External
Student Services
Student Services
Technology
Instructional
Sep
Repl Lois Avery‐Hired External
Khansaa Almansor
Hosein Tahvillian Electronic Engineering
Houston College Community
2012‐2013 Positions
Technology
HOUSTON COMMUNITY COLLEGEFTE Comparison Year‐To‐Date Thru September 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 1,361
2011‐2012 1,451 1,582 1,598 1,564 823 1,530 1,573 1,598 1,576 1,003 1,098 955
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 1,401
2011‐2012 1,429 1,415 1,425 1,327 1,407 1,429 1,396 1,404 1,410 1,397 1,391 1,429
F
T
E
F
T
E
40
‐
200
400
600
800
1,000
1,200
1,400
1,600
1,800
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
200
400
600
800
1,000
1,200
1,400
1,600
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
CENTRAL COLLEGEFTE Comparison Year‐To‐Date Thru September 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 238
2011‐2012 254 293 296 293 159 279 298 300 291 184 204 178
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 155
2011‐2012 161 158 165 145 155 163 157 157 158 156 154 161
41
F
T
E
F
T
E
‐
50
100
150
200
250
300
350
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
COLEMAN COLLEGEFTE Comparison Year‐To‐Date Thru September 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 108
2011‐2012 115 112 113 109 82 109 107 110 110 99 98 84
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 56
2011‐2012 58 58 59 55 56 58 55 55 57 54 54 55
F
T
E
F
T
E
42
‐
20
40
60
80
100
120
140
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
10
20
30
40
50
60
70
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
NORTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru September 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 281
2011‐2012 267 292 293 307 155 323 330 334 335 198 224 190
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 131
2011‐2012 104 106 108 108 129 138 122 129 130 132 131 138
F
T
E
F
T
E
43
‐
50
100
150
200
250
300
350
400
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
NORTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru September 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 187
2011‐2012 200 211 216 207 112 204 212 212 211 129 137 124
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 126
2011‐2012 127 126 128 118 121 128 124 127 126 126 126 128
F
T
E
F
T
E
44
‐
50
100
150
200
250
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
SOUTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru September 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 318
2011‐2012 380 433 435 422 183 377 382 386 382 229 252 217
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 152
2011‐2012 185 184 182 145 146 155 144 150 152 151 147 153
45
F
T
E
F
T
E
‐
50
100
150
200
250
300
350
400
450
500
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
SOUTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru September 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 130
2011‐2012 143 168 173 169 77 161 178 183 179 101 120 95
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 96
2011‐2012 99 96 97 86 94 98 91 95 96 99 96 101
F
T
E
F
T
E
46
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
Division of Extended Learning (DOEL)FTE Comparison Year‐To‐Date Thru September 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 90
2011‐2012 85 69 68 56 55 72 63 67 64 59 57 64
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 79
2011‐2012 78 79 79 75 79 80 77 79 79 79 78 81
F
T
E
F
T
E
47
‐
10
20
30
40
50
60
70
80
90
100
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
10
20
30
40
50
60
70
80
90
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
DISTRICTFTE Comparison Year‐To‐Date Thru September 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 8
2011‐2012 7 4 4 1 ‐ 5 4 5 3 4 4 3
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 606
2011‐2012 616 609 608 595 627 609 625 612 614 601 605 612
F
T
E
F
T
E
48
‐
1
2
3
4
5
6
7
8
9
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
100
200
300
400
500
600
700
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
HOUSTON COMMUNITY COLLEGEDuplicated Headcount Comparison Year‐To‐Date Thru September 30, 2012 by Type
FACULTY HEADCOUNT
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
12‐13 FT 787
12‐13 PT 1,992
12‐13 Total Fac 2,779 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
11‐12 FT 792 797 793 788 793 785 784 782 783 768 757 794
11‐12 PT 1,911 2,334 2,390 2,331 275 2,387 2,391 2,351 2,367 1,075 1,372 679
11‐12 Total Fac 2,703 3,131 3,183 3,119 1,068 3,172 3,175 3,133 3,150 1,843 2,129 1,473
STAFF HEADCOUNT
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
12‐13 FT 1,238
12‐13 PT 840
12‐13 Total Staff 2,078 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
11‐12 FT 1,256 1,256 1,238 1,235 1,253 1,242 1,249 1,235 1,240 1,201 1,240 1,250
11‐12 PT 877 879 883 839 629 822 834 828 846 767 790 790
11‐12 Total Staff 2,133 2,135 2,121 2,074 1,882 2,064 2,083 2,063 2,086 1,968 2,030 2,040
49
S
t
a
f
f
Headcount
F
a
c
u
l
t
y
Headcount
‐
500
1,000
1,500
2,000
2,500
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
200
400
600
800
1,000
1,200
1,400
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
HOUSTON COMMUNITY COLLEGEUnduplicated* Headcount Comparison Year‐To‐Date Thru September 30, 2012 by Type
UNDUPLICATED HEADCOUNT
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
12‐13 Total 4,475
11‐12 Total 4,543 4,902 4,917 4,833 2,891 4,728 4,814 4,805 4,806 3,373 3,575 3,303
* Includes Full‐time and Part‐time Faculties, Librarians, Counselors, and Staffs
50
Unduplicated* Headcount
‐
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
Non‐current assets:
Restricted cash 6,803$
Restricted investment in trust accounts 3,106,007
Lease receivable from HCCS 174,732,013
Deferred charges ‐ bond issuance costs 2,046,534
Capital Assets:
Land ‐
Other Structures ‐
Furniture & equipment ‐
Leasehold improvements ‐
Construction in process 771,976
771,976
TOTAL ASSETS 180,663,332$
Current liabilities:
Accounts payable ‐ HCC 60,979$
Accounts payable 806,799
Accrued liabilities ‐ interest 1,904,022
Current bond payable 3,880,000
Total current liabilities 6,651,800$
Non‐current liabilities:
Deposits 440
Arbitrage payable 8,082
Unearned interest income (23 years) ‐ HCC 70,933,174
Premium on bonds 2,209,548
Bonds payable 105,655,000
Total non‐current liabilities 178,806,244$
TOTAL LIABILITIES 185,458,045
TOTAL NET ASSETS ‐ restricted (4,794,713)$
PFC 1
Houston Community College ‐ Public Facility CorporationStatement of Net Assets
Cash Basis ‐ Interim Period
as of September 30, 2012
ASSETS
LIABILITIES
Cash Flows from Capital Financing Activities
Receipt from HCCS for lease payment ‐$
Purchases of capital assets (8,269)
Payment on capital debt ‐ principal and interest ‐
Net cash provided (used by) in financing activities (8,269)
Cash Flows from Investing Activities
Interest income 366
Increase (decrease) in restricted cash and
restricted investment in trust accounts (7,903)
Restricted cash and restricted investment in
trust accounts ‐ beginning of year 3,120,712
Restricted cash and restricted investment in
trust accounts ‐ end of period 3,112,809$
Houston Community College System Public Facility CorporationStatement of Cash Flows
Cash Basis ‐ Interim Period
One Month Ended as of September 30, 2012
PFC 2
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
To Date Unexpended
Sources of funds:
Proceeds from
2005C Lease Revenue Bond 19,155,000$
Discount (170,064) Land Purchase (4,212,644) Bond Issuance Cost (606,201) Interest Expense (524,785)
13,641,306$ Interest Income 1,003,470 Vendor Contract Refund 102,706 Transfer to Payment Account (1,354,990)
Funds Available 13,392,492$
Uses of funds:4,092$ 4,092$ ‐$ ‐$
11,550,643 11,550,643 ‐ ‐ Maintenance 393,940 141,479 252,461 ‐
6,443 6,443 ‐ 563,928 563,928 ‐
7,200 7,200 ‐ ‐ 27,403 26,326 1,077 ‐ 24,940 24,940 ‐ 44,695 44,695 ‐ ‐
596,787 596,787 ‐ ‐
172,421 8,100 164,321
Grand Total Uses 13,392,492$ 12,974,634$ 253,537$ 164,321$
Net Available ‐$
PFC requires GMP before inception.
Total Proceeds from Bond
Houston Community College ‐ Public Facility CorporationPublic Safety Instituteas of September 30, 2012
PFC 3
Bank Service ChargesConstruction
Waste Water Management *Geo Technical Services*
Survey*Architect
Engineering ServicesFFE
Contingency
* Included in GMP
Site Infrasturcture
Total Budget to
Date
Total Revenues
/ Expenditures
to Date
Encumbrances
to Date Unexpended
Sources of funds:
Proceeds from
2005 A Bonds 11,605,000$
Premium Received 492,931
Accrued Interest Received 53,425
Interest Income 998
Bond Issuance Costs (391,474)
Repayment of Loans (11,392,147)
Funds Available 368,733$
Uses of funds:
Debt Service 53,425$ 53,425$ ‐$ ‐$
Renovation & Construction 169,759 169,759 ‐ ‐
Demolish & Renovate Office 56,244 56,244 ‐ ‐
Furniture & Fixtures 46,857 46,857 ‐ ‐
Legal Fees 42,448 42,448 ‐
Grand Total Uses 368,733$ 368,733$ ‐$ ‐$
Net Available ‐$
Note 1: PFC requires GMP before inception.
Houston Community College ‐ Public Facility CorporationWestgate (Katy)
as of September 30, 2012
PFC 4
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
To Date Unexpended
Sources of funds:
Principal Amount on Bonds 36,950,000$
Discount on Bonds (546,238)
Underwriter's Discount (209,273)
Accrued Interest on Bonds 98,080
Amount Available 36,292,569$
Issuance Costs (490,131)
Accrued and Capitalized Interest (1,449,023)
Repair and Replacement (1,000,000)
Title Fees Capitalized (81,379)
Amount Available for Project 33,272,036$
Repayment to HCC (188,006)
Project Account Balance 33,084,030$
Administrative & Legal Fees (29,486)
Interest Income 836,221
Transfer Cost Issuance 85,509
Interest Expense on Notes (135,299)
Funds Available 33,840,975$
Uses of funds:
Land & Building 17,807,972$ 17,807,972$ ‐$ ‐$
Maintenance Rehabilitation &
Deferred Maintenance
12,856,469 12,856,469 ‐
CPMS PGAL 211,959 211,959 ‐
Facilities Space Programming 214,620 214,620 ‐
Furniture, Fixtures & Equipment 1,040,112 1,006,277 14,273 19,562
Site Infrastructure 971,369 854,984 4,859 111,526
Architect and Engineering 517,509 428,355 4,632 84,522
Repair & Maintenance Contingency ‐
per bond requirement
220,965 83,089 2,000 135,876
Grand Total Uses 33,840,975$ 33,463,726$ 25,764$ 351,486$
Net Available ‐$
PFC requires GMP before inception.
Houston Community College ‐ Public Facility CorporationHayes Road ‐ Alief Projectas of September 30, 2012
PFC 5
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
To Date Unexpended
Sources of funds:
Principal Amount of 2007 Series Bonds 58,885,000$
Premium on Bonds 3,094,498
Underwriter's Discount (346,244)
Accrued Interest Income‐ Bonds 173,733
Total Amount Available 61,806,987$
Issuance Cost (839,837)
Accrued and Capitalized Interest (4,632,122)
Repair and Maintenance Account ‐
Amount Available for Project 56,335,028$
Interest Income on Trust Account 2,496,540
Interest Expense on Notes (414,601)
Transfer to Trustee Payment Account (4,712,985)
Vendor Contract Refunds 230,035
Sale of Land 569,890
Funds Available 54,503,907$
Uses of funds:
Land & Building 10,671,234$ 10,671,234$ ‐$ ‐$
Construction Cost‐ Building 18,200,000 18,200,000 ‐ ‐
Construction‐Demolition 494,972 ‐ ‐ 494,972
Constuction‐ Site 640,988 610,812 30,175 ‐
Site Improvement 14,221,039 13,035,230 1,185,809 ‐
Site Demolition & Abatement 791,298 791,298 ‐
CPMS PGAL 1,391,958 1,391,958 ‐ ‐
Site and Infrastructure Design 2,334,840 2,334,840 ‐ ‐
Facilities Space Programming 29,274 29,274 ‐ ‐
Architect and Engineering 1,256,727 1,256,727 ‐
Furniture, Fixtures & Equipment 1,828,332 1,818,281 10,051 ‐
Library 66,564 66,182 382 ‐
Inspections 214,981 214,981 ‐ ‐
Design Geotech 17,500 17,500 ‐ ‐
Material Testing 24,503 24,503 ‐ ‐
Communications IT‐ PGAL 253,614 253,614 ‐
IT Telephone & Communications 790,467 790,467 ‐
Surveying 62,398 59,124 3,274 ‐
Administrative Expenses 34,505 34,505 ‐
Preconstruction Costs 886,377 886,377 ‐
Contingency 292,338 186 ‐ 292,154
Grand Total Uses 54,503,907$ 52,487,092$ 1,229,690$ 787,126$
PFC requires GMP before inception.
as of September 30, 2012
PFC 6
Houston Community College ‐ Public Facility CorporationNorthline Mall Project