Upload
surf
View
178
Download
0
Embed Size (px)
DESCRIPTION
Citation preview
Mansystems BlueITy
Paul PoetsmaPaul Poetsma
To measure is to know
Copyright © 2010 Mansystems DCE B.V. All Rights Reserved. 2
Agenda
• Introduction• Role based access• Role based access• Demonstration
1/19/2012 3Copyright © 2011 Mansystems B.V. All Rights Reserved.
Mansystems DCE
FinanceEducation Government IT/DC Other
Copyright © 2010 Mansystems DCE B.V. All Rights Reserved. 4
FastTrack to savings …
High Level Rapid Assessment1 To identify areas of improvement and to1. To identify areas of improvement and to
give a estimate of potential cost savingsand risk reduction;
2. To identify the impact of signing theEU Code of Conduct for Data Centres;
3. Based on industry information and Mansystems experience;
4. Combining the customer’s knowledge of their IT environment with Mansystems insights using a proven methodology;
5. Takes limited time from client personnel, but with a i i i hmaximum insight
Copyright © 2010 Mansystems DCE B.V. All Rights Reserved. 5
The three principles of efficiency
1. Do not use resources that you don’t need• Turn off the lights when you leave the roomg y• Turn off the engine when you park your car• Turn off the server that is no longer used
2. Use those resources that you use effectively• Use LED or other energy efficient light bulbs
l k h b• Carpool or take the bus • Increase server/storage/network utilization
3 Use renewable resources3. Use renewable resources• Buy green electricity• Use bio fuel• Use bio fuel• Don’t reinvent what is already on the market
(software, hardware, services)
Copyright © 2010 Mansystems DCE B.V. All Rights Reserved. 6
Introduction I
What have we learned in over 60 assessments of data centers?
• No energy management– Not in control of large and
• Limited IT asset and configurationg
growing costsconfiguration management– Therefore no capacity
• Very low capacity utilization of
p ymanagement
– Datacenter: floor, electrical power
– IT: servers storageIT: servers, storage– Why buy what you do not
use?
1/19/2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 7
Change
Copyright © 2010 Mansystems DCE B.V. All Rights Reserved. 8
End to end approach
Copyright © 2010 Mansystems DCE B.V. All Rights Reserved. 9
GREENGREEN BLUEBLUEGREENGREEN BLUEBLUE
GREEN costs moneyGREEN costs money BLUE saves moneyBLUE saves money1/19/2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 10
GREEN costs moneyGREEN costs moneyand must be doneand must be done
BLUE saves moneyBLUE saves moneyand should be doneand should be done
Introduction II
M Bl IT B d h• Mansystems BlueIT– Scope datacenter and ITO DCME KPI’
• Based on the OpenDCME model
– OpenDCME KPI’s– Energy managementCapacity management– Capacity management
– Benchmarking• InternalInternal• External
• It is not a real‐time monitoring systemg y
1/19/2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 11
Introduction III
• Software supports business processesand you might have to solve other challenges… and you might have to solve other challengesfor it to be successful
1/19/2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 12
Demo: Role based access
• Multi‐tennant• Company• Company
– Administrator• Manages data centers and users
– Read‐only usery• View the KPI resultsRead write user– Read‐write user• Manage the KPI data
1/19/2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 13
Demonstration
• Administrator:– News / Home
• User:– News / Home
– Datacenters and users– KPI configuration
– Manage KPI data– Audit log
– Feedback – Reporting– Benchmarking
1/19/2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 14
Start to improve yourefficiency todayy y
19‐1‐2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 15
Contact
Paul PoetsmaSenior Data Center Consultant
T +31 (0)342 404 800M+ 31(0)6‐3040 4522
19‐1‐2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 16
Home page
19‐1‐2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 17
Data center configuration
1/19/2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 18
KPI accountability and expiration
1/19/2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 19
Edit KPI score, example 1
1/19/2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 20
Edit KPI score, example 2
19‐1‐2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 21
Energy and OpenDCME dashboard
19‐1‐2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 22
DCiE/PUE report
19‐1‐2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 23
Energy report
19‐1‐2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 24
19‐1‐2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 25
OpenDCMEhttp://www.opendcme.orgp // p g
Back to the
19‐1‐2012 Copyright © 2011 Mansystems B.V. All Rights Reserved. 26
introduction