1 Training on Retrofitting Techniques and Correction/exceptional Manual 29 May - 01 , June 2017, Kathmandu , Nepal CONFINED MASONRY (CM) Kuber Bogati Structural Engineer

Confined masonry overview

Embed Size (px)

Citation preview

Page 1: Confined masonry   overview

1

Training on

Retrofitting Techniques and

Correction/exceptional Manual

29 May - 01 , June 2017, Kathmandu , Nepal

CONFINED MASONRY (CM)

Kuber Bogati

Structural Engineer

Page 2: Confined masonry   overview

2

ObjectivesAs a result of this session, you should be able to:

β€’ Understand about Confined Masonry Building : Key Concepts

β€’ Know why Confined Masonry in Nepal

β€’ Compare Reinforced Masonry and Confined Masonry

β€’ Compare RC Frame with URM Infill Vs. CM,

β€’ Know Seismic Performance of CM Buildings

β€’ Understand How CM Resists Earthquake Effects

β€’ Damages in Confined Masonry in Past Earthquakes

β€’ Know General Planning and Design Aspects

β€’ Know Guidelines for Non-engineered CM Buildings

β€’ Introduce with Minimum Requirement & Inspection Form of CM

Page 3: Confined masonry   overview

3

What is Confined Masonry (CM) Construction

β€’ CM construction consists of masonry walls and horizontal and vertical RCconfining members built on all four sides of a masonry wall panel.

β€’ Masonry walls : made either of clay brick or concrete block units

β€’ Confining Elements :β€’ Vertical ties : (Tie-columns or Practical columns)β€’ Horizontal ties : (Tie-beams)

Key Components of a Confined Masonry (CM) Building

Page 4: Confined masonry   overview

4

What is Confined Masonry (CM) Construction

β€’ CM construction consists of masonry walls and horizontal and vertical RCconfining members built on all four sides of a masonry wall panel.

β€’ Masonry walls : made either of clay brick or concrete block units

β€’ Confining Elements :β€’ Vertical ties : (Tie-columns or Practical columns)β€’ Horizontal ties : (Tie-beams)

Key Components of a Confined Masonry (CM) Building

Page 5: Confined masonry   overview

5

What is Confined Masonry (CM) Construction

CONFINED MASONRY

Page 6: Confined masonry   overview

6

Confined Masonry Construction

Page 7: Confined masonry   overview

7

What is Confined Masonry (CM) Construction

CONFINED MASONRY

Page 8: Confined masonry   overview

8

Structural Components of a Confined Masonry (CM) Building

β€’ Confining Elements : Provide restraint to masonry walls and protect them fromcomplete disintegration even in major EQs.

β€’ Confining members are effective inβ€’ Enhancing the stability and integrity of masonry walls for IP & OOP EQ

Loadsβ€’ Enhancing the strength (resistance) of masonry walls under EQ loadsβ€’ Reducing the brittleness of masonry walls under EQ loads

β€’ Masonry walls : Transmit the gravity load from the slab(s) above down to thefoundation. The walls act as bracing panels, which resist horizontal EQ. forces.Must be confined by concrete ties

β€’ Floor and Roof Slabs : acts as diaphragms, transmit gravity and lateral loads tothe walls

β€’ Plinth Band : Transmits the load from the walls down to the foundation.

β€’ Foundation : Transmits the loads from the structure to the soils

Page 9: Confined masonry   overview

9

Construction Masonry (CM) – Global Context

β€’ Evolved through informal process based on performance in earthquakeβ€’ Practiced in central and south American countries since as early as 1930’s and

40’sβ€’ Currently practiced in several countries of high seismic risks- Latin, America,

Mediterranean Europe, Iran, Indonesia, China and in India (late comer)β€’ CM if Properly built, shows satisfactory performance in severe earthquakes in

the past

β€’ 1985 Mexico earthquake (M8.0)β€’ 2001 La paz earthquake (elsalvador) (M7.7)β€’ 2004 Sumtra earthquake (Indonesia) (M9.0)β€’ 2007 Pisco earthquake (Peru) (M8.0)β€’ 2010 Chile earthquake (M8.8) and others

β€’ Confined masonry network established in 2008 under WHE with two objectivesβ€’ To improve design and construction of CM where is currently in useβ€’ To introduce CM in areas where it can reduce seismic risks

Page 10: Confined masonry   overview

10

World Wide Practices

1. Chile2. Colombia3. Mexico4. Peru5. Argentina6. Eurocode7. Algeria8. China9. Iran10.Indonesia11.India

Page 11: Confined masonry   overview

11

Confined Masonry in Nepal - Context

β€’ Construction of reinforced concrete frame and masonry wall is trending in citiesand towns

β€’ Heavy damage observed in those construction in the last earthquake even in lowPGA and spectral acceleration

β€’ Non-ductile RC frame constructionβ€’ Unreinforced masonry walls vulnerable to lateral loading

β€’ The presence of wall is in RC construction is not utilized as well as theconsequence of irregularity is overlooked

Confined masonry construction provides opportunity for improved performance in earthquake utilizing constriction from both RC and masonry components [technologies which require similar (preferably lower) level of construction skills and are economically viable]

Its simple in design and analogues to conventional construction of RC frame with walls (EXTENSIVE ENGINEERING INPUT NOT REQUIRED)

Page 12: Confined masonry   overview

Reinforced Masonry vs. Confined Masonry

β€’ Reinf. Enhance strength, Stability

β€’ Corners, T-junction, additional Location

Page 13: Confined masonry   overview

13

Reinforced Concrete Frame Construction

Page 14: Confined masonry   overview

14

RC frame with URM infill vs. Confined Masonry

Page 15: Confined masonry   overview

15

RC frame with URM infill vs. Confined Masonry

Integrity of wall and frame

Construction sequence

Frame first, Wall later Wall first, Column/Beams later

Source : Tom Schacher

Page 16: Confined masonry   overview

17

Seismic Performance of CM

Confined masonry construction is found in countries/regions with very high seismic risk,

β€’ Latin America (Mexico, Chile, Peru, Argentina),

β€’ Mediterranean Europe (Italy, Slovenia),

β€’ South Asia (Indonesia), and the Far East (China).

β€’ In some countries (e.g. Italy) for almost 100 years

β€’ If properly built, shows satisfactory seismic performance

EXTENSIVE ENGINEERING INPUT NOT REQUIRED!

Page 17: Confined masonry   overview

18

Seismic Performance of CM

Oaxaca quake,September 1999

TecomΓ‘n earthquake,January 2003

Page 18: Confined masonry   overview

19

Seismic Performance of CM

Confined masonry construction has been exposed to several destructive earthquakes:

β€’ 1985 Lloleo, Chile (magnitude 7.8)

β€’ 1985 Mexico City, Mexico (magnitude 8.0)

β€’ 2001 El Salvador (magnitude 7.7)

β€’ 2003 Tecoman, Mexico (magnitude 7.6)

β€’ 2007 Pisco, Peru (magnitude 8.0)

β€’ 2003 Bam, Iran (magnitude 6.6)

β€’ 2004 The Great Sumatra Earthquake and Tsunami, Indonesia (magnitude 9.0)

β€’ 2007 Pisco, Peru (magnitude 8.0)

β€’ 2010 Maule, Chile earthquake (magnitude 8.8)

β€’ 2010 Haiti earthquake (magnitude 7.0)

Confined masonry buildings performed very well in these majorearthquakes – some buildings were damaged, but no humanlosses

Page 19: Confined masonry   overview

20

Seismic Performance of CM

A six-storey confined masonry building remained undamaged in the August 2007 Pisco, Peru earthquake (Magnitude 8.0) while many other masonry buildings experienced severe damage or collapse

Confined Masonry Performed Very Well in Past Earthquakes

Page 20: Confined masonry   overview

21

How Confined Masonry Buildings Resist Earthquake Effects

Page 21: Confined masonry   overview

22

How Confined Masonry Buildings Resist Earthquake Effects

Toothing : Monolithic action Horizontal Reinforcement

Page 22: Confined masonry   overview

23

How Confined Masonry Buildings Resist Earthquake Effects

Mechanism of shear resistance for a confined masonry wall panel

Page 23: Confined masonry   overview

24

How Confined Masonry Buildings Resist Earthquake Effects

Confined Masonry Building : Vertical Truss Model (left) and Collapse at theGround Floor Level (right)

Masonry : Diagonal Struts RC : Tension/compression Cracking at G.F. (soft story) : horizontal reinforcement

Page 24: Confined masonry   overview

25

How Confined Masonry Buildings Resist Earthquake Effects

Figure 8. Critical regions in a confined masonry building: a) a general diagram showing critical regions in the RC tie-columns

Masonry : Diagonal Struts RC : Tension/compression Cracking at G.F. (soft story) : horizontal reinforcement

Page 25: Confined masonry   overview

27

How Confined Masonry Buildings Resist Earthquake Effects…

Failure modes characteristic of CM Walls :

β€’ Shear Failure Mode (due to IP Seismic Loads)

β€’ Flexural Failure Mode (due to OOP Loads)

Page 26: Confined masonry   overview

29

How Confined Masonry Buildings Resist Earthquake Effects…

Shear Failure Mode (due to IP Seismic Loads)

Flexural Failure Mode (due to OOP Loads)

Page 27: Confined masonry   overview

30

Key Factors Influencing Seismic Resistance of CM Structures

β€’ Wall Density : Strength

β€’ Masonry Units and Mortar : (Stronger)

β€’ Tie -Columns : (Ductility & Stability)

β€’ Horizontal Wall Reinforcement

β€’ Openings : 10% , Load path,

Page 28: Confined masonry   overview

33

Key Factors Influencing Seismic Resistance of CM Structures…

Horizontal Wall Reinforcement

Failure modes in the confined masonry walls with openings

The walls with largeropenings develop diagonalcracks

Page 29: Confined masonry   overview

34

Damages in Confined Masonry in Past Earthquakes

Page 30: Confined masonry   overview

35

Damage Observation: Topics

1.Masonry damage (in-and out-of-plane)

2.RC tie-columns

3.Tie-beam-to-tie-column joints

4.Confining elements around openings

Page 31: Confined masonry   overview

36

In-plane shear failure of masonry walls at the base level - hollow clay blocks (Cauquenes)

Page 32: Confined masonry   overview

37

In-plane shear failure of masonry walls at the base level - hollow clay blocks (Cauquenes)

Page 33: Confined masonry   overview

38

Out-of-Plane Wall Damage

Damage at the 2nd floor level

β€’ An example of out-of-plane damage observed in a three-storey building

β€’ The damage concentrated at the upper floor levels

β€’ The building had concrete floors and timber truss roof

β€’ The same building suffered severe in-plane damage

Page 34: Confined masonry   overview

39

Tie-Column Failure

Page 35: Confined masonry   overview

40

Buckling of a Tie-Column due to the Toe Crushing

Page 36: Confined masonry   overview

41

Shear Failure of RC Tie-Columns

Page 37: Confined masonry   overview

42

Inadequate Anchorage of Tie-Beam Reinforcement

Page 38: Confined masonry   overview

43

Deficiencies in Tie-Beam – to - Tie – Column Joint Reinforcement Detailing

Page 39: Confined masonry   overview

44

Absence of Confining Elements at the Openings

Page 40: Confined masonry   overview

45

In-Plane Shear Cracking – the Effect of Confinement

Unconfined openings Confined openings

Page 41: Confined masonry   overview

46

Key Causes of Damage in CM

1.Inadequate wall density

2.Poor quality of masonry materials and construction

3.Inadequate detailing of reinforcement in confining elements

4.Absence of confining elements at openings

5.Geotechnical issues

Page 42: Confined masonry   overview

47

General Planning and Design Aspects

β€’ Architectural Guideline

β€’ Construction Guideline

Page 43: Confined masonry   overview

48

Architectural Guideline

1. Plan Shape : Rectangular

NOYES

IRREGULARSYMMENTRICAL

Page 44: Confined masonry   overview

49

Architectural Guideline

2. Plan Shape : Length-to-width ratio less than 4 times

NOYES

POORLY PROPORTIONED PLAN WELL PROPORTIONED PLAN

Page 45: Confined masonry   overview

50

Architectural Guideline

3. Walls should be in a symmetrical

NO YES

INADEQUATE PLAN : LAYOUT ADEQUATE SHAPE

Page 46: Confined masonry   overview

51

Architectural Guideline

4. Walls should be continuous up the building height

NO YES

LOAD PATH NOT CLEAR LOAD PATH CLEAR

Page 47: Confined masonry   overview

52

Architectural Guideline

5. Opening : same position up the building height#Vertical ties : At both sides ( if opening <1.5 Sq.m.) (Toproduce diagonal Strut Action)

NO YES

POOR LOCATION OF WINDOW AND DOOR OPENING

GOOD LOCATION OF WINDOW AND DOOR OPENING

Page 48: Confined masonry   overview

53

Architectural Guideline

6. Confining Elements : Tie-beams at 3m vertical spacing: Tie-columns at 4m: Wall to wall intersection: Free end of a wall

Page 49: Confined masonry   overview

54

Architectural Guideline

7. Walls : At least three fully confined walls should beprovided in each direction

Inadequate Wall Distribution Adequate Wall Distribution

NOYES

Page 50: Confined masonry   overview

55

Architectural Guideline

8. Walls Density : At least 5 % in each of two orthogonaldirection

𝑾𝒂𝒍𝒍 π‘«π’†π’π’”π’Šπ’•π’š =𝑻𝒐𝒕𝒂𝒍 𝑿 βˆ’ π’”π’†π’„π’•π’Šπ’π’π’‚π’ 𝑨𝒓𝒆𝒂 𝒐𝒇 𝒂𝒍𝒍 π’˜π’‚π’π’π’” π’Šπ’ 𝒐𝒏𝒆 π’…π’Šπ’“π’†π’„π’•π’Šπ’π’

π‘Ίπ’–π’Ž 𝒐𝒇 𝑭𝒍𝒐𝒐𝒓 𝒑𝒍𝒂𝒏 𝒂𝒓𝒆𝒂 𝒇𝒐𝒓 𝒂𝒍𝒍 𝒇𝒍𝒐𝒐𝒓𝒔 π’Šπ’ 𝒂 π’ƒπ’–π’Šπ’π’…π’Šπ’π’ˆ

Eurocode 8 (1996)a) At least 2% for a site with a design ground accln up to

0.2g (corresponding to seismic zone II of Indiab) At least 4% for a site with a design ground accln up to

0.3g (corresponding to seismic zone III of Indiac) At least 5% for a site with a design ground accln up to

0.4g (corresponding to seismic zone IV of India

Page 51: Confined masonry   overview

56

Architectural Guideline

9. Building Height : Low-to medium-rise (Eurocode 8,1996)

Eurocode 8 (1996)a) Up to 4-story high for a site with a design ground

accln up to 0.2g (corresponding to seismic zone II of India

b) Up to 3-story high for a site with a design ground accln up to 0.3g (corresponding to seismic zone III of India

c) Up to 2-story high for a site with a design ground accln up to 0.4g (corresponding to seismic zone IV of India

Page 52: Confined masonry   overview

57

Guidelines for Non-Engineered CM Buildings

π‘Ίπ’•π’π’“π’†π’š ∢ 𝑢𝒏𝒆 𝒐𝒓 π‘»π’˜π’

Page 53: Confined masonry   overview

58

Guidelines for Non-Engineered CM Buildings

𝟏.𝑾𝒂𝒍𝒍 π‘«π’†π’π’”π’Šπ’•π’šπ’‚.π‘΄π’‚π’”π’π’π’“π’šπ‘Ύπ’‚π’π’π’”

Walls Density : At least 5 % in each of two orthogonal direction

Page 54: Confined masonry   overview

59

Guidelines for Non-Engineered CM Buildings2. Openings𝒂.π‘΄π’‚π’”π’π’π’“π’šπ‘Ύπ’‚π’π’π’”

Page 55: Confined masonry   overview

60

Guidelines for Non-Engineered CM Buildings

3. Wall Spacing𝒂.π‘΄π’‚π’”π’π’π’“π’šπ‘Ύπ’‚π’π’π’”

β€’ Building with Flexible floor should not exceed4.0 m in high seismic region

Page 56: Confined masonry   overview

61

Guidelines for Non-Engineered CM Buildings

4. Wall Dimensions and H/t ratios Restrictions

𝒂.π‘΄π’‚π’”π’π’π’“π’šπ‘Ύπ’‚π’π’π’”

β€’ Minimum wall thickness 110 mm

β€’ H/t : less than 25, for one or two storey

β€’ H/L : Should not less be than 0.5

β€’ Maximum wall height : 3 m

Page 57: Confined masonry   overview

62

Guidelines for Non-Engineered CM Buildings

5. Parapets and Gable Walls𝒂.π‘΄π’‚π’”π’π’π’“π’šπ‘Ύπ’‚π’π’π’”

β€’ Parapets

β€’ RC tie column should extent to the top : (1.2m)

β€’ Otherwise Parapet height : 0.5m

Page 58: Confined masonry   overview

63

Guidelines for Non-Engineered CM Buildings6. Toothing at the Wall – to – tie-column interface

Toothing in confined masonry walls: a) machine-made hollow units, b) hand-made solidunits, and c) provision of horizontal reinforcement when toothing is not possible.

Page 59: Confined masonry   overview

64

Guidelines for Non-Engineered CM Buildings6. Toothing at the Wall – to – tie-column interface

Toothing applications: a) recommended construction practice (S. Brzev), and b) not recommended - absence of toothing in concrete block construction (C. Meisl).

Page 60: Confined masonry   overview

65

Guidelines for Non-Engineered CM Buildings

𝟏. π‘Ίπ’‘π’‚π’„π’Šπ’π’ˆ

𝒃. Confining Elements (Tie-Columns and Tie-Beams)

Page 61: Confined masonry   overview

66

Guidelines for Non-Engineered CM Buildings

𝟏. π‘Ίπ’‘π’‚π’„π’Šπ’π’ˆ

𝒃. Confining Elements (Tie-Columns and Tie-Beams)

Page 62: Confined masonry   overview

67

Guidelines for Non-Engineered CM Buildings

2. Minimum Dimensions

𝒃. Confining Elements (Tie-Columns and Tie-Beams)

β€’ Tie – column size : (Depth x Width) : 150 mm x t

β€’ Tie-beam Size : same as tie-column size or tx150 mm

Page 63: Confined masonry   overview

68

Guidelines for Non-Engineered CM Buildings

3. Reinforcements

𝒃. Confining Elements (Tie-Columns and Tie-Beams)

β€’ Minimum 4 reinforcing bars for tie - column , 2 tie - beam

β€’ Bar size : 12 mm dia (Fe 500 or Fe 415)

β€’ Stirrups/C-hooks : 6 mm dia @150 mm at center

Page 64: Confined masonry   overview

69

It is preferred to place beam reinforcement outside the column reinforcement cage

YESNO

Page 65: Confined masonry   overview

70

Guidelines for Non-Engineered CM Buildings

3. Reinforcements

𝒃. Confining Elements (Tie-Columns and Tie-Beams)

Page 66: Confined masonry   overview

71

Guidelines for Non-Engineered CM Buildings

3. Reinforcements

𝒃. Confining Elements (Tie-Columns and Tie-Beams)

Page 67: Confined masonry   overview

72

Guidelines for Non-Engineered CM Buildings

4. Construction issues

𝒃. Confining Elements (Tie-Columns and Tie-Beams)

β€’ Confining elements must be carefully constructed

β€’ Slump : 125 mm recommended

β€’ Concrete can be cast in three lifts when continuous is not possible

β€’ RC tie-columns should not be cast above the completed portion of the wall

Page 68: Confined masonry   overview

73

Guidelines for Non-Engineered CM Buildings5. Foundation and Plinth Constructionβ€’ Similar as traditional masonry construction

Page 69: Confined masonry   overview

74

Guidelines for Non-Engineered CM Buildings5. Foundation and Plinth Constructionβ€’ Similar as traditional masonry construction

Page 70: Confined masonry   overview

75

Guidelines for Non-Engineered CM Buildings

𝒄. Additional Requirements for Building with Flexible Diaphragms

Page 71: Confined masonry   overview

76

Guidelines for Non-Engineered CM Buildings

𝒅. π‘ͺπ’π’π’”π’•π’“π’–π’„π’•π’Šπ’π’ π‘Έπ’–π’‚π’π’Šπ’•π’š

β€’ Construction quality has a significant bearing in seismic performance of CM building

β€’ Properly designed and built CM buildings performed well in past earthquakes in most cases

β€’ Poorly built ones experienced damage

Page 72: Confined masonry   overview

77

An Example Illustrating Wall Density Calculation

Page 73: Confined masonry   overview

78

An Example Illustrating Wall Density Calculation

Storey : twoSeismic Zone : VWall thickness : 110 mm

Typical Floor Plan of a Confined Masonry Building

Page 74: Confined masonry   overview

79

An Example Illustrating Wall Density Calculation

1. Floor area per floor = 4*9.2 = 36.8 m^2Total floor area for 2 floorsTOTAL FLOOR AREA = 2*36.8 = 73.6 m^2

2. Wall density in the longitudinal directionWall area ( walls 1 & 2 only) :

Wall Area = [9.2+(9.2-1.2)]*(0.11) = 1.9 m^2

𝑾𝒂𝒍𝒍 π‘«π’†π’π’”π’Šπ’•π’š =𝑾𝒂𝒍𝒍 𝑨𝒓𝒆𝒂

𝑻𝒐𝒕𝒂𝒍 𝑭𝒍𝒐𝒐𝒓 𝑨𝒓𝒆𝒂

=𝟏. πŸ—

πŸ•πŸ‘. πŸ”= 𝟎. πŸŽπŸπŸ” = 2.6 %

Page 75: Confined masonry   overview

80

An Example Illustrating Wall Density Calculation

3. Wall density in the Transverse directionWall area ( walls A, B & C) :

Wall Area=[4.0+(4.0-1.2)+4.0-1.2]*(0.11) = 1.1 m^2

𝑾𝒂𝒍𝒍 π‘«π’†π’π’”π’Šπ’•π’š =𝑾𝒂𝒍𝒍 𝑨𝒓𝒆𝒂

𝑻𝒐𝒕𝒂𝒍 𝑭𝒍𝒐𝒐𝒓 𝑨𝒓𝒆𝒂=

𝟏. 𝟏

πŸ•πŸ‘. πŸ”= 𝟎. πŸŽπŸπŸ“ = 1.50 %

Page 76: Confined masonry   overview

81