Upload
ionela-truica
View
289
Download
5
Embed Size (px)
Citation preview
Welcome!
Delegatia AHK "Energii regenerabile si eficienta energetica in sere solarii si zootehnie"24 -28 noiembrie 2014
From hops to high tech
• 1963: Wolf GmbH founded• 1970: Wolf becomes subsidiary of Salzgitter AG• 1973: First air handling units developed and produced• 1981: Wolf starts manufacturing heating equipment
Wolf continues to grow
• 1986: Opening of the first training centre in Mainburg• 1989: Wolf becomes a part of Preussag/TUI AG, Hanover• 1996: Solar thermal systems added to product range• 1997: Condensing technology introduced
Systematic success• 2002: Wolf redefines itself as a system supplier• 2006: Wolf becomes a subsidiary of Centrotec Sustainable AG, Brilon• 2014: Wolf is the European market leader for modular air handling systems
European leader for heating, ventilation and solar thermal systemsOne of the largest employers in the Kelheim district
WOLF TRAINING
PROGRAMME
People at Wolf
employees worldwide. 1449 employees throughout Germany.
1243 at the single production site in Mainburg
1750 trainees in 15 trades/professions
94
WOLF TRAINING
PROGRAMME
employees in 15 German subsidiaries. Plus up to 80 seasonal staff from employment agencies.
206
Turnover developmentStaff numbers
€1291
13501307
14081459
1245 12441230 1230
12521295
1301
Centrotec Sustainable AG
Centrotec Sustainable AG
Flue Systems Med. Tec. & Eng. Plastics Climate Systems
Turnover by segment
73%19%
8%Total €525.4 million
Wolf Group
• France / Paris • Spain / Madrid • Poland / Warsaw • Netherlands / Kampen• Russia / Moscow • Italy / Milan
• Founded 1978, 60 employees• a member of the Wolf Group since 2008• CHP units for natural gas, biogas
and sewer gas• Continuous electrical output 7 - 400 kW• Thermal output 18 - 513 kW
• Founded 1997, 100 employees • a member of the Wolf Group since 2011• CHP units for biogas and natural gas• Continuous electrical output 75 - 2000 kW• Thermal output 91 - 1970 kW
Kuntschar + Schlüter Dreyer & Bosse
Combined heat and power systemsCHP6 International
subsidiaries
Wolf international
More than 60 partner companies in Europe, Asia, South America,
Africa and Oceania
Europe
Asia
South America
OceaniaAfrica
Brazil ׀ Chile ׀ Colombia ׀ Mexico
China ׀ Bahrain ׀ Jordan ׀ KazakhstanLebanon ׀ Syria ׀ Uzbekistan ׀ United Arab EmiratesEgypt ׀ Tunisia
New Zealand ׀ Australia
Armenia ׀ Azerbaijan ׀ Belgium ׀ Bosnia-HerzegovinaBulgaria ׀ Denmark ׀ Estonia ׀ Finland ׀ Georgia Great Britain ׀ Republic of Ireland ׀ Iceland ׀ Italy ׀ Croatia ׀ LatviaLithuania ׀ Luxembourg ׀ Macedonia ׀ Moldavia ׀ NetherlandsNorway ׀ Austria ׀ Portugal ׀ Poland ׀ Romania ׀ Russia ׀ Sweden ׀ Switzerland ׀ Serbia & Montenegro ׀ Slovak Republic ׀ Slovenia ׀ Spain ׀ Czech Republic ׀ Turkey ׀ Ukraine ׀ Hungary Belarus ׀
Brand positioning
Wolf offers innovative, top quality system design from a single source – energy saving and climate protection as standard.
SystemsDetached house/apartment building
Heating systems• Gas and oil condensing• Heat pumps• Biomass boilers• Micro CHP units
DHW cylinder systems• Stratification cylinders• Solar cylinders• Buffer cylinders
Solar thermal systems• Flat-plate collectors• Tube collectors• Solar centres• Wolf solar heating
Ventilation systems• Comfort mechanical ventilation
Control systems• Programming units with
intuitive operation• "Smartset"
Wolf operating app
SystemsIndustry/commerce
Combined heat and power systems (CHP)• Electrical output
from 7 - 2000 kW• Thermal output
from 18 - 1970 kW
Heating systems• Gas condensing
industrial/commercial boilers• Oil and gas
industrial/commercial boilers
Air handling systems• Heat recovery• Integrated chiller• Hygiene version• Dehumidification• Slimline units
Ventilation systems• Comfort ventilation units - Compact units - Slimline units - Large area units• Air heaters • Roof extract fans• Space heaters• Warm air curtains
• 5 star Schlosshotel Lerbach, Bergisch Gladbach, Germany• Environmentally responsible heat and power from Wolf CHP and gas condensing units in a cascade• Wolf system replaces two old boilers with output of 330 kW each
Investment: €250,000 Payback time: 4 years
System examplesHotel: Schlosshotel LerbachModernisation – CHP and gas condensing
Appliances - 2 x MGK gas condensing industrial/commercial boilers
- 1 x GTK 35M CHP unit- LS 210 cylinder loading system with
SEL 800 DHW loading cylinder
Continuous thermal output 60 kW
Continuous electrical output 35 kW
CO2 reduction 220 t/year
48 %SAVINGS
Jetrun SRL is offering complete solutions for biogas production, storage,
treatment and utilization:
• Cogeneration and biogas boilers from Wolf GmbH Mainburg
• Digester agitators, mixers, domes, accessories from Progeco, Stamo,
Suma, Ecoplants;
• Filters, blowers, torches from Progeco
• Storage solutions from Sattler and Ecomembrane
• H2S removal from Progeco and BioGasclean
• Siloxane removal from Progeco
Full service company: design, specification and sizing, installation, maintenance
Our solutions for biogas and WWTPs
We have been supplied biogas solutions for a number of WWTP projects
(year, project, equipment):
• 2012, WWTP Giurgiu, CHP module GTK 150 K
• 2012, WWTP Calarasi, CHP module GTK 150 K
• 2012 WWTP Slatina, CHP module GTK 120 K, 2 x biogas boilers
• 2013 WWTP Poarta Alba, GTK 150 K, flare
• 2014 WWTP Medgidia, 2 x GTK 50 K, 1 x biogas boiler
• 2014 WWTP Rm Valcea, 2 x GTK 120 K, 2 x biogas boiler, 2 x digester agitator + dome, biological
desulphuration, 2 x gas holders, torch, filters, blowers
• 2014 WWTP Alba Iulia, GTK 150 K
• 2014 WWTP Alexandria, filters, H2S removal, blowers, torch
• 2014 WWTP Falticeni and Rm. Sarat, digester accessories, blowers
• 2015 WWTP Sf. Gheorghe, GTK 150 K
• 2015 WWTP Dorohoi, Erbasu, digester agitator
Biogas Projects Romania
Between 7th and 11th May 2012, a team of engineers and specialists from Jetrun EnergoEco successfully completed the training program held at Wolf K&S plant in Wolfhagen / Hessen
Wolf’s CHP equipment is now serviced by a local professional team. Because reliability and safety are essential!
Maintenance training for Wolf BHKW, May 2012.
Wolf Air handling units at Lufkin Industries Ploiesti – 26 units x 21,000 to 37,000 m3/h, plate heat recovery, fans with FC, indirect modular gas heaters.
Wolf Air handling units at Bucharest National Arena – 2x40,000 m3/h, 2x16,000 mc/h, incorporated dehumidifier, external humidifier, heat recovery, fans with FC
Hygromatik steam humidifiers at Bucharest National Arena – 4x160 kg/h
Projects all (I)
Wolf Air Handling Units with heat recovery and frequency inverter direct driven fans, air flows of up to 40,000 m3/h per unit.
Compact de-humidification AHUs with heat recovery for Gaia Office Building.
Biogas cogeneration Wolf Kuntshar und Schlueter for water treatment pants
Projects all (II)
Projects all (III)ecoBiblioteca – The project that changes ourselves
• EcoBiblioteca presupune o renovare sustenabilă la nivel înalt a unei biblioteci
din judetul Suceava, comuna Cacica;
• Această clădire va fi o clădire verde certificată utilizând sistemul de certificare
voluntară “Living Building Challenge”
• Sistemul folosit pentru certificarea clădirii este foarte ambitios, în momentul
de faţă doar 4 clădiri în lume sunt certificate conform acestui sistem.
• Jetrun furnizeaza pompa de caldura Wolf BWS-1-16 si unitatea de ventilatie
cu recuperare de caldura Wolf CWL 400 Excellent certificata Passiv Haus.
Projects all (IV) – Artifex FocsaniIndustrial geothermal HVAC • Optimal microclimate with low energy
consumption;
• Four Wolf AHUs of up to 40,000 m3/h with heat and moisture recovery;
• Four geothermal reversible heat pumps HiRef LEW 214HS of 250 kW;
• Energy savings through heat recovery, air re-circulation function, lower humidification demand, geothermal energy use and free cooling system
Wolf around the worldWolf offers innovative, top quality system design From a single source – energy saving and climate protection as standard.
Allianz Arena, MunichKremlin, Moscow
Parliament, Berlin
Techn. Univ., Istanbul Limbecker Platz, Essen
Hotel Lago Vista, Dubai
O2 World, Berlin
Space observatory, Chile Hospital, Belgrade Ernst-Happel Stadion, Vienna
Exhibition centre, Abu Dhabi
Kulturzentrum, Linz
Dt. Bank, Frankfurt
Viertel Zwei, Vienna
Hotel Diagonal, Barcelona
National Stadium, Warsaw
Wolf around the worldWolf offers innovative, top quality system design From a single source – energy saving and climate protection as standard.
Praterstern train station, Vienna
Lüders-Haus, Berlin
National Stadium, Romania
Atlas-Centar, Montenegro
Gletschergarten, Zugspitze Airport, Kiev
Meyer Werft (AIDA), Papenburg
Airport, MunichHelios Klinikum, Krefeld Exhibition Centre, Vienna
Airport, MoscowDiakonie Klinikum, Hamburg
Tempelhof Airport, Berlin
Lighthouse, Düsseldorf
Haus der Andacht, Hofheim Hafen City, Hamburg
Thank you for your attention!Adrian MoisăJetrun EnergoEco0722 427 [email protected] / www.jetrun.ro