14
The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 1 Shijia Li MEng. Candidate, Department of ECE, McGill University Supervisor: Prof. Geza Joos Email: [email protected] Wind Farm Reactive Power Coordination Scheme Using IEC 61850

OPAL-RT RT14: Wind farm reactive power coordination

Embed Size (px)

DESCRIPTION

Wind Farm Reactive Power Coordination Scheme Using IEC 61850, by McGill and OPAL-RT

Citation preview

Page 1: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

1

Shijia LiMEng. Candidate, Department of ECE, McGill University

Supervisor: Prof. Geza Joos

Email: [email protected]

Wind Farm Reactive Power Coordination Scheme

Using IEC 61850

Page 2: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

Outline

IEC 61850 and GOOSE messaging

Case study – Wind farm controller Configuration

Tools

Results

2

Page 3: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

IEC 61850Overview & Benefits

Substation Automation Systems (SAS) Defines the communication between

intelligent electronic devices (IEDs).

Benefits Multi-vendor interoperability

Low cost (installation and commissioning)

Free configuration

Source: Special report IEC 61850—ABB Group 3

Page 4: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

GOOSE Message

GOOSE message Time-critical activities

communication between IEDs

Multicasting

Publisher/subscriber mechanism

Source: IEC 61850-7-14

Page 5: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

Publisher/Subscriber

SCL file Substation Configuration Language

IED configurations and communications

5

OPAL-RT GOOSE message blocks

Page 6: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

Outline

IEC 61850 and GOOSE messaging

Case study – Wind farm controller Configuration

Tools

Results

6

Page 7: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

System Configuration

Centralized wind farm control Utility grid code:E.12-01

PCC voltage (±6%)

Implement IEC 61850 protocol Communication between WTG and wind

farm controller

7System configuration

Page 8: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

Wind Farm ReactivePower Coordination

Centralized wind farm control Voltage regulation at PCC

Q dispatch based on reactive power capability for each WTG

Send/receive information using IEC 61850 GOOSE Q set points for each WTG

Q capability from each WTG

8Wind farm reactive power coordination scheme

Page 9: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

Tools

Hardware OPAL-RT simulator Network switch, cables Laptop

Software Modeling

• Matlab Simulink, RT-LAB

SCL file configuration• ICD designer, XML marker

Network protocol analyzer• Wireshark

Real-time simulation setup for wind farm reactive power coordination scheme

9

Page 10: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

Real-Time Simulation Model

Network

Console

WTG1

WTG2

WTG3

10

ConsoleWTG1

WTG2

WTG3

Network

Page 11: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

Troubleshooting

Wireshark Packet analyzer

Used to capture and analyze GOOSE packets

Decoding Destination address

Data set

Data attribute

Data value

Data set

Data attributes and values

11

Page 12: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

Simulation Results

100 200 300 400 500 600-0.4

-0.3

-0.2

100 200 300 400 500 600-0.4

-0.3

-0.2

100 200 300 400 500 600-0.4

-0.3

-0.2

Time (s)R

eactive p

ow

er

at

WT

G (

pu)

WTG 1

WTG 2

WTG 3

Control mode Unity power factor Reactive power coordination

100 200 300 400 500 600

1

1.05

1.1

Time (s)

RM

S v

oltage a

t P

CC

(pu)

Unity Power Factor

Voltage Control

12

RMS voltage at PCC (pu)

Reactive power at WTG (pu)

Page 13: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

Conclusion and Future work

Conclusion OPAL-RT simulators allow for the testing of IEC 61850 GOOSE

messaging.

Wind farm control strategy successfully implemented employing IEC 61850 GOOSE messaging.

Future work Agent-based decentralized controller

Other distributed energy resources

13

Page 14: OPAL-RT RT14: Wind farm reactive power coordination

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

Q & A

Thank you!