Urban development and Environmental sustainability for 10.000 subsidised houses

Preview:

DESCRIPTION

Urban development and Environmental sustainability for 10.000 subsidised houses. Systems for monitoring . Energy Efficiency in Smart Urban Developments CASE: ECOCITY VALDE S PARTERA ZARAGOZA. NOELIA OLONA SOLANO. LOCATION. BILBAO. barcelona. zaragoza. Madrid. 2. - PowerPoint PPT Presentation

Citation preview

22/10/2013

Urban development and Environmental sustainability for 10.000 subsidised houses

Systems for monitoring. Energy Efficiency in Smart Urban Developments

CASE: ECOCITY VALDESPARTERAZARAGOZA

NOELIA OLONA SOLANO

22/10/2013

LOCATION

MADRID

ZARAGOZA BARCELONA

BILBAO

2

ZARAGOZA´S DIGITAL STRATEGY:OPENNESS

MUNICIPAL NETWORK OF WIFI INTERNET ACCESS 462 POINTS.

CITIZEN CARD. 130.000

OPEN DATA & OPEN SOFTWARESERVICE OF DIGITAL PERSONAL FILE BY TWINDOCS 

HTTP://WWW.ZARAGOZA.ES/CIUDAD/SECTORES/TECNOLOGIA/LOCAL NORMATIVE: TRANSPARENCY AND FREE ACCESS TO INFORMATION (LAW 37/2007)

3

ZARAGOZA´S DIGITAL PROJECTS

DIGITAL MILE

VALDESPARTERA

4

22/10/2013

SUSTAINABILITY

ENVIRONMENTAL

ECONOMIC

SOCIAL

PUBLIC INITIATIVE &

SUPPORT: GOVERNANCE

STATE

REGIONAL GOVERNMENT

LOCAL GOVERNMENT

U.E.

ACCUMULATION OF KNOWLEDGE & PARTICIPATION

UNIVERSITY

PRIVATE SECTOR

COMPANIES

CITIZENS

ECOCITY VALDESPARTERA: FOUNDATIONS

5

20022010

6

22/10/2013

PROJECT DESCRIPTION

Building area

Public area

Special installations

DENSITY 40 FLATS/HA

Total surface area 243.2 HaGeneral systems 60.5 HaSurface area of sector 182.7 HaEquipment and infrastructure 40.3 HaOpen space 27.6 HaRoad network 63.5 HaBuilding land 51.3 HaNumber of dwellings 9680

7

ECONOMIC INVESTMENTS

Edification Urbanization Remote Control Network

CUS

1000

135

3 3

SUBSIDIZED DWELLINGS: ≈ 1100 €/M2

LAND´S & BUILDING COST FOR SUBSIDIZED DWELLINGS: ≈950 €/M2.

OVER COST BIOCLIMATIC IMPROVEMENTS IN HOUSING: ≈7.200 €/FLAT

OVER COST REMOTE CONTROL NETWORK: ≈270€ /FLAT

PUBLIC SUBSIDY

22 MILL.

8

PROJECT STAGES

• BASIC CONDITIONS . BIOCLIMATIC COMMITMENT

PHASE 1: PLANNING AGREEMENT. ZARAGOZA CITY COUNCIL AND THE MINISTRY OF DEFENCE

• HOUSING PLANNING• DESIGN• MATERIALS• TECHNICAL BUILDING CODE• UNIVERSITY

PHASE 2: URBAN PLANNING

PHASE 3: DEVELOPMENT OF URBANIZATION

9

22/10/2013

SUSTAINABILITY: PROJECT OF URBAN PLANNING

10

DEVELOPMENT COSTS

4%

76%

8%

2%1%

5%

2%

Urban services (electric-ity, gas ...)Urban developmentRNBControl NetworkMaintenanceTechnical support specialistManagement cost

11

•18 €/T (TRAD. ~50 €/T)MAINTENANCE COST :

•26 € (FLAT/YEAR)MAINTENANCE COST (PRIVATE

PIPES):•0.2 KWH (FLAT/DAY).ENERGY

CONSUMPTION :

COST OF THE INSTALLATION (PUBLIC PIPES) 1357,23 €/flat

COST OF THE INSTALLATION (PRIVATE PIPES) 720 €/flat

VACUUM SYSTEM FOR WASTE

12

22/10/2013

REMOTE CONTROL NETWORK:TARGETS

•OPTIMIZING RESOURCES•DETECTING BREAKDOWN•AUTOMATIC BILLING

TECHNICAL MANAGEMENT

•LEARNING ABOUT THE BEHAVIOUR OF VALDESPARTERA•COMPARING WITH OTHER SIMILAR POPULATION AREAS•CHECKING THE EFFECTIVENESS OF THE BIOCLIMATIC

MEASURES TAKENCREATING THE ‘’KNOWLEDGE

DATEBASE”

•SPREADING RESULTS TO TECHNICAL SECTORS •ENCOURAGING CITIZEN TO PROPERLY USE OF RESOURCES /

TRAINING•IMPROVING FUTURE PLANNING AND DESIGNSHARING

KNOWLEDGE WITH CITIZENS

13

22/10/2013

NETWORK

DRINKING WATER.

IRRIGATION

RNB

PUBLIC LIGHTNING

METEO DATA

WATER METERS

ENERGY EFFIC. IN

BUILDINGS

SEWAGE

RAIN WATER

CONTROLLED NETWORKS

(300 KM)

FIELDBUS (30 KM, OPTICAL FIBER)

DATA INTERPRETATION

CENTRE

REMOTE CONTROL NETWORK: STRUCTURE

14

22/10/2013

ILLUSTRATION:DRINKING WATER SUPPLY NETWORK

WATER TANKS

• WATER QUALITY• CHLORINE• WATER LEVELS• WATER CONSUMPTION• VALVES, PUMPS• INTRUSION DETECT, ETC

PUMP PLANT

• AUTOMATION PROCESS• FLOW MEASURES

DISTRIBUTION PIPES

• FLOW METER (15)• VALVES CONTROL(31)• PRESSURE METER (21)

ENDING-PIPE SECTOR

• WATER QUALITY: TURBIDITY, CHLORINE(9)

HOMES

• WATER CONSUMPTION IN HOMES( 9.680)

Drinking Water

15

22/10/2013

TECHNOLOGICAL INFRAESTRUCTURE

¿¿¿ WHERE IS IT ???

16

22/10/2013

Drinking

Water

Flow meter

Water sampling

Motorized valveElectric cabinet

17

22/10/2013

Power Supply

Monitoring System

Drinking

Water

18

22/10/2013

Quality of Water Turbidity Chlorine Presure

Water quality sensors

Drinking

Water

Ending-pipe sector Purge-valve Control Flow meter

TECHNOLOGICAL INFRAESTRUCTURE

19

22/10/2013

REMOTE CONTROL NETWORK

P3

Comunication infrastructure

- 196 CONTROL POINT - 30 KM OPTICA FIBER

USING A UNIQUE COMMUNICATION INFRASTRUCTURE, THE SYSTEM COLLECT

DATA FROM ALL THE DIFFERENT NETWORKS AND STORE IT IN A MAIN-SERVER-

COMPUTER

20

SUSTAINABLE URBAN CENTER

21

22

• MONITORING OF HOUSING• WATER METERS• PNEUMATIC WASTE COLLECTION

23

LIVING LAB: CITIZENS

24

22/10/2013

Very efficie

nt: 5kW

h/m2/yr

Efficie

nt: 13 kW

h/m2/yr

According t

o estimate

s: 27 kW

h/m2/yr

High: 3

9 kWh/m

2/yr

Very High

: 59 kW

h/m2/yr

6%

22% 25%17% 14%

PERCENTAGE OF HOUSING

ENERGY CONSUMPTION IN HEATING

NATIONAL AVERAGE: 70 KWH/M2/YEAR

VALDESPARTERA: 27 KWH/M2/YEAR

SAVING 185€/YEAR1600 HOUSING ANALYSIS

25

22/10/2013

H1 H2 H3 H4 H5 H6 H7 H8 H9 H10 H11

0.10 0.10

0.04

0.06

0.05

0.04

0.07

0.04

0.05

0.04

0.06

kWh/m2/year

NATIONAL AVERAGE: 0,11

VALDESPARTERA AVERAGE: 0,06

ELECTRICITY CONSUMPTION IN HOMES

SAVING 228€/YEAR

26

CHECK, DISSEMINATE AND PROMOTE SUSTAINABLE HABITS

27

SHOWCASE: SEMINARS, COURSES, PANEL DISCUSSIONS…

28

SMART CITIES NEED SMART CITIZENS

2929

22/10/2013

2004 GOOD2006 GOOD2012 BEST

HARVARD,LA SAPIENZA.

2005 CONCERTO.2007

PARLAM.

THANK YOU FOR YOUR ATTENTION.