Upload
canna-fu
View
217
Download
0
Embed Size (px)
Citation preview
深圳市集盛模具有限公司www.juchengmold.com Create the cost-effective for your
marketSincerity, mutual benefit and win-win result!!
专业塑胶产品模具供应 Expert on plastic injection tool
Company history
公司历程
Mr. HwaWong start business focus on transport good quality tool to oversea market.
2005
Knowing well indeed customer demand after 3 years’ business handling , start building a factory to do all manufacturing in house base on original reliable clients support
2008
Setting up an agent plant in Italy, expanding our business and after service in Europe. Getting supplier code of Europe FIAT. 150~200 tools was sold into Europea
2011
Talent is in concentration Sales turnover is double than last year. Except guarantee the tools on time, Quality stable is focus of all job
2014
Quality is on the rise, become more and more stable. Main target is use quality to attract the market . The European tool service is planning setting up in italy and Sweden.
2015
Realize the tool after sale service in italy and Sweden. Return extra valve to our customer on tool quality & service. Enlarge the capacity of inner plant by increase large-scale, precise machine.
Set up a branch tool shop in italy turin.
2016
Company profile
公司规模
• Year of Founded : 2006 • Property Size: 3500 Sq. two floors• Number of Employee: 100 staffs• Working time : 1 shift/10 hours. Busy season Tool shop staff 2 shift/10 hours. • Engineering Software : Pro/E, UG, Catia, Solidwork, Moldflow, AutoCad• Expertise: Reverse engineering, tool design, tool making from Medium-Big size part fo
r automotive/LED-TV/ Air-condition.Home Appliances/Industrial Pipe
• CNC Capacity: Up to 4000*3000*1500 mm• Maxi.Mould Ability : 2500*2500*1800 mm (Up to 3500Ton Clamp Force)• Quality Certificate: ISO 9001:2008 • Annual Turnover: 5 Million euro( 2014), 200 sets of tools each year.• Percentage of Export : Over 95%
What we sell except tool making?
Reversed engineering. Physical sample---part 3D---tool 3D----new tool----part production.
3D scanning device Patch processing Solid modeling
Part 3D analysis----Tool 3D creating --- tool 2D machining drawing & BOM creating----tool manufacturing in Europea
Trouble on the lead time?
Fast & flexible procedure + experienced team exercise
Timing is money, fulfill your idea into product:Tool size under 300~400mm: normal in 25 ~30 days, historical limit in 12 daysTool size 400~800mm: normal in 30 ~45 days, historical limit in 15 daysTool size 800 ~1200mm: normal in 45~60 days, historical limit in 22 daysTool size 1200 ~ 2100mm: normal in 60~80 days, historical limit in 45 days
Product launch Product launch on the market on the market to Grab chance to Grab chance
is making is making more profit for more profit for our customerour customer
Top Top consider consider for our for our
customercustomer Production in Production in the right ,fast the right ,fast and efficient and efficient
way is making way is making more profit for more profit for our customerour customer
Trouble on the lead time?
Tool design 15.05.2015
T1 for serious tools on 20.06.2015
Finish first part assembly & testing in Russia before 10.7.2015
Part modification and T2 before 10.8 2015
Tool shipping on 20.08 2015
Victory meeting 25.09.2015
Advantage: 30 Advantage: 30 days include days include tool design tool design
and and manufacturing manufacturing
for a big for a big projectproject
We were trained and experienced by high standard tool doorsill for over 9 years.
Worry the tool quality?– successful case with Ferrari
Audi opening roof. The tools was built 2010 by JCM, we spent 2 months to stay with customer , got big technical support and guidance
Successful case with Audi
Plastic Parts- Kinds of automotive part for HONDA since 2006 by JCM. We transport always stable high quality to Honda and keeping a stable business so far.
Successful case with HONDA
Kinds of automotive part for IVECO since 2009 by JCM, we accumulated lots of experience on complex structure tool.
Successful case with IVECO
This vent pipe were produced in 2011 by JCM, we overcame the difficult on high fiber part’s filling on the tool, and complex tunnel pipe tool.
Successful case with Nissan
Huge tool (weight 37 ton) , injection machine 3500ton. A big success on tool structure design and tool implement. We got highest praise from T0 from end customer.
Successful case with Coca-cola
Tool weight 22 ton, more than 100 critical dimensions on part, we realized 95% ok dimension at T0, and tool movement 100% approve each trial.
Successful case with whirlpool
Successful case with Ferraris over-mold
Over-mold tool required very high requirement on precision and skillful tool structure, in order to guarantee without problem during overmolding. Plus this part has lots of big difference level ,which increase the tool complexity, but we overcome all difficulty to get success on this kind of tool too.
Successful case on Precise multi cavity tools
Part dimension tolerance 0.01mm, we control the tool precision by using mirror EDM machine
Equipment list
设 备 清 单
A special project team seamless follow project from order—design—purchase—manufacturing—tool trial---tool improvement--- tool shipment
Project management
Engineer Design
Serious tool study
Vacuum packing in house for each tool.
Progressive anti-rust technology, Anti-rust film without corrosiveness and greasy feeling,
Tool shipping packing protection
Quality Control(QC)
Quality control
All machining process to be
inspected during
manufacturing
Seriuos tool
design
All material come back insepction
Samples, tool insert both verify on 3 CMM again
倾听客户要求,做出客户期望。 全流程人员 100%执行作业标准。 一对一项目团队服务,作业严格遵守客户标准。公司全流程进行质量控制,从各个环节确保优良的品质。
Business transaction Customers Partners
Main customer
设计品质管控
Contact Information
联 络 我 们
设计品质管控Add : Building N, Dongbao Indurstrial Zone. Shasi village.Baoan District. Shenzhen. CN
Post code : 518104
Phone : 86-136 5149 7173 0755-8949 1677
Fax : 0755-8949 1700
Skype:cannamould
email: [email protected], [email protected]
www.juchengmold.com
Thank you!