Upload
amal-krishna
View
460
Download
4
Embed Size (px)
Citation preview
Sustainable Solution to Municipal Solid Waste (MSW)
MSW & Open Questions
• How do we handle Mixed Nature of Waste?
• What do we do when Plastic is present in the Waste we receive ?
• How to address Environmental Pollution?
• How to manage land for Continuous Waste Dumping?
Can we re-cycle 100% of MSW ?
Do we have a process with no Environment issue ?
MSW Recycling & Challenges
• Segregation of mixed waste
• Ever increasing menace of Leachate
• No More Dump Yards available
• Public Protest against most of the Public dump yards due to environmental issues
• Lack of sustainable technical Know-How
• Poor success rate of multiple projects across the country
• Inadequate research and experiments in waste handling & recycling
∗ Eco-Health Centre (E.H.C )- Concept visualized by Sun Tech Industrial Steel Company (SITSCO) along with its consulting wing, BeStarConsulting, Bangalore.
∗ SITSCO is a high-tech enterprise specializing in engineering research & development , since last two decades.
∗ EHC has been innovated after an extensive research and fine turning since 15 years
About E.H.C
Commercial Concept Plant of EHC is operational since last 3 years and already undertaken the Recycling of1500+ Tone of Mixed Solid Waste
Core Modules
Core Modules consist of :Plastic SeparatorBio-Gas PlantManure processing plant
Scientific Bio-Gas Plant
Bio degradable Slurry will be moved to this module for separating Bio-Methane
This also prevent the foul ordering at site. Bio-Manure for Eco-Farming helps to stay away from Chemical Fertilizer
Optional Modules-Details:
a. Plastic Film Crunching Module: This module is mandatory for processing the waste plastic from MSW. It is used for size reduction of plastic bags separated from the MSW for further processing like using for re-in forcing the Cement & Tar for road tarring.
b. Solid Strip - Casting Module:This module is to convert the separated plastic in to Hard Bars in appropriate size for industrial & Domestic use as per the commercial requirement.
c. Tar- Mixing Module:This is to mix this plastics with Tar for road tarring and the municipality/corporation can use it as much as 30% of plastic (form the waste) and it improves the life of the road.
d. Concrete- Mixing Module: This is to mix this plastics with Concrete for
Flore tiles and the municipality/ corporation can use as much as 20% of plastic in concrete. This will re-in force the tiles by 40% extra strength
Dried Bio-Manure
∗ Bio degradable Slurry is collected at slurry tank of APSM
∗ The slurry is converted into bio manure of industrial standards after aerobic/ anaerobic digestion, fine grinding and cleaning.
Why EHC ?
• Proven Ecofriendly & Sustainable Solution
• 100% Recycling solution for Mixed Waste• Mechanical segregation of Mixed waste into bio degradable
and non- degradable waste• Permanent solution to the menace of leachate
• Highest rate of conversion of fresh MSW into compost
• Complete Operation Success Commitment - 100%inline with MSW Rule 2000 (M&H).
• Value added Eco-friendly Products
Most Cost-effective solution as EHC will provide the Machinery and Operation as part of O&M
contract
How EHC Works
How EHC Works (Cont..)
• 2 Phase Waste Separation
• 3 Stage Processing
• Separated Bio- degradable waste is composting as per Municipal Solid waste Rule 2000 (M&A)
• 99.5 % Certified plastic free Bio-Manure
Certified by Govt: bodies DGS & D and Bureau of Indian Standards
Salient features
• Recycling 99.5 % MSW #
• 100% Natural Solution for “Plastic Waste” – Converts it in to multiple useful products
• NO harmful burning process like Incineration & RDF
• No environmental issues around the plant
# Balance .5 % will be used as fire fuel used for heating
• Bio-Gas (Methane) extraction from waste –Reduce order at site and also insects due to it.
• Protect the environment from greenhouse effect
• This enable to build the plant, even in residential areas
Salient features …
Qualify to achieve carbon Credit and International aids for the project
∗ Started in a Municipality on Public private partnership
∗ Undertaken the MSW recycling contract, since last 3+ years.
∗ Successfully delivered the service of recycling 2000+ Tons of Waste
Case Study
Good Bye to Dumping Yard !! No Landfill !!
EHC- Kodungallur Municipality PlantFirst in the Country with 100% of M.S.W - Mechanically Recycled
Present Model with REEL
Effective conversion rate into compost- 8- 10%Process time- Minimum 22 days- 21 days for decaying
and 1 day for turning in the windrow machine.Addition of EM solution Generates leachate through out the year, causing
high environmental costRequire land filling.
Comparison
Vs
Current Model EHC
Current Model EHC ModelGarbage water Not Treated Gets treated
Addition of process stimulator (EM) yes No
Foul Smell Yes Very Minimal
Land fill YesNo (In case of complete module only)
Eligibility for assistance from CDM No Yes
Leachate generation Yes No
Process Comparison
Investment required-A. Basic Module, without Bio gas
plantsInfrastructure No. of units Amount Rs
4500 sqm.G.I. class Pipe structure fabricated, poly carbonate sheet roofed, concrete floored shed. 1 17000000
MSW Processing Machinery of 3 Ton /Hr. Capacity. The complete unit includes:a. MW Processing machines,b. Compost turning machines,c. Compost sieve machines,d. Hot Water generators,e. Plastic shredding machines,f. Plastic processing machines.g. Water recycling modules.h. Compost loading vehicles. 3 9000000
Total 2,60,00000
Investment required-B. With Bio gas plants
Infrastructure No. of units Amount Rs4500 sqm.G.I. class Pipe structure fabricated, poly carbonate sheet roofed, concrete floored shed. 1 17000000MSW Processing Machinery of 3 Ton /Hr. Capacity, with supportive units 3 90000004000 cubic meter Iron Re-in forced cement concrete Bio gas plants, complying with Euro Standards. (65% finance with I 0% interest can be arranged through CDM protocol)
4,00,00,000
Total 6,60,00000