Upload
mines-and-money
View
563
Download
3
Embed Size (px)
Citation preview
TAJIKISTANThe Colossal Untapped Mineral
Resource of Central Asia
Kaisun Energy Group Ltd (HKEx: 8203)Presentation ByAlastair Ralston‐SaulDirector of Investor Relations
THE CENTRAL ASIA COUNTRIES KAISUN ENERGY GROUP LTD凱順能源集團有限公司
TAJIKISTAN KAISUN ENERGY GROUP LTD凱順能源集團有限公司
• Southernmost country of the former USSR
• Independence from the Soviet Union in 1991
• Area 143,100 Km² (UK 244,880 Km²)
• 90% mountainous
• Population approximately 7.3 million
• Modern highway system throughout
• Water shed of Central Asia
• Agriculture – high quality cotton and fruit
• The largest aluminium plant in Central Asia
TAJIKISTAN – "The Colossal Untapped MineralResource of Central Asia”
KAISUN ENERGY GROUP LTD凱順能源集團有限公司
• World class coal deposits
• Large gold deposits
• Potential world class gas reserves
• Oil in the North and South• One of the world’s largest undeveloped silver resource
• Uranium deposits
• World class antimony reserves
• Precious stones and lapis lazuli
• Lead, Iron Ore, Nickel, Zinc
The Tien Shan Fold
TAJIKISTAN – WORLD CLASS COAL RESERVES
KAISUN ENERGY GROUP LTD凱順能源集團有限公司
ANTHRACITE – Kafta Hona DepositA Kaisun Project158 Million Tonne Resource.Outcropping Parallel Seams Running 4km.One Of The World’s Richest Anthracite Deposits ‐ 8000+ Kcal/kg.2012 Drill Programme to be JORC compliant. Product Required Locally and for Export to China and India.Aim to Reach 1 Million Tonnes Production Per Year.
BITUMINOUS COAL – Zeddi DepositA Kaisun Project17.7 Million Tonne ResourceFurther 100 Million Tonnes in Adjoining ValleyHigh Grade Bituminous Coal ‐ 6900 Kcal/kgProduction Commenced 2008 – Sales Target 800,000 Tonnes/yEntire Production Sold in TajikistanEconomic Trucking Distance from Capital CityNew Coal Powered Power Plant and Cement Plants Being Built
TAJIKISTAN – ROAD INFRASTRUCTUREKAISUN ENERGY GROUP LTD凱順能源集團有限公司
• New Chinese Built Highways Running East to West and North to South
• Connecting Urumqi with Dushanbe and Dushanbe with Khujand in the North
• Trucking – Now Commercially Viable
CENTRAL ASIA’S NEW RAIL INFRASTRUCTURE
KAISUN ENERGY GROUP LTD凱順能源集團有限公司
To Urumqi
• Dushanbe to Iran: Under Construction – to be completed in 2015• Dushanbe to India: Feasibility Study and construction underway – estimated completion 2017/2018• Dushanbe to Urumqi: Construction in Tajikistan set to commence in 2013 Diagrammatic representation of rail line positions
Diagrammatic representation of rail line positions
XINJIANG KAISUN ENERGY GROUP LTD凱順能源集團有限公司
Diagrammatic representation of rail line positions
• Kaisun Energy Identified Tajik Opportunity
• New Road Link Infrastructure
• New Rail Link Infrastructure
• Xinjiang’s Need for Metallurgical Coal (anthracite and coking coal)
• East West Trade for all ConsumerGoods
• Tajikistan is Part of the Gateway tothe East
“AN INTERLOCKED FUTURE WITH TAJIKISTAN”
KAISUN ENERGY GROUP LTD凱順能源集團有限公司
HKEx: 8203