Upload
masahiro-sawada
View
242
Download
0
Embed Size (px)
Citation preview
TEMPORARY HOUSING SUPPLY IN OFUNATO
ANDREW BENHAM, AUDE CHOPPINET, ALICE LIBURDI, YUYA FUKADA
KOBE TEMPORARY HOUSING 1996
COMMUNITY SPACE FOR RESIDENTS
大船渡市
CITY
•POPULATION: 41,757
•DESNSITY:129 persons per km²
•AREA: 323.28 km²
•MAJOR ACTIVITIES: ”Outside its bay, the warm and cold ocean currents meet, which allow a fishing industry to flourish”
TSUNAMI/EQ DISASTER HISTORY
•1896 MEIJI-SANRIKU: 25 metre tsunami_27,000 people
•1933 SANRIKU: 28 metre tsunami_1522 people
•HIT by VALDIVIA EARTHQUAKE (CHILE) on 22 May 1960
11 March 2011 TOHOKU: 23.6 meters_Of 14,722 houses, 15% were destroyed by the tsunami and 430 lives were confirmed lost.
1
2
3
PROJECT TIMELINE
FIRST PHASE
SECOND PHASE EQ
11 March 2011 May 2011
PR
OJ
EC
T S
TA
RT
August 2011
DE
NS
ER
SIT
E C
ON
ST
RU
CT
ION
CO
MP
LE
TE
HA
ND
OV
ER
TO
TH
E F
AM
ILIE
S
October 2011
AL
L S
ITE
CO
NS
TR
UC
TIO
N C
OM
PL
ET
E
HA
ND
OV
ER
TO
TH
E F
AM
ILIE
S
March 2013
PA
RT
OF
TH
E H
OU
SE
S W
ILL
MO
VE
D T
O T
HE
WA
TE
R-
FR
ON
T,P
AR
T C
AN
BE
SE
ND
TO
OT
HE
R D
ISA
ST
ER
SIT
UA
TIO
NS
STA
RT
UP
GR
AD
ING
OF
TE
MP
OR
AR
Y C
ON
ST
RU
CT
ION
TO
PE
RM
AN
EN
T
March 2014 C
OM
PL
ET
E U
PG
RA
DIN
G
END 2030
INS
UR
ED
DU
RA
TIO
N
MO
NIT
OR
ING
AN
D P
OS
SIB
LE
RE
NO
VA
TIO
N O
F T
HE
ST
RU
CT
UR
E
FIRST PHASE
Multi-stakeholders
•International
organizations
•Governament
•Municipality
•NGOs
•Community
Multi-scalar approach
SECOND PHASE
Self-sustained
process
Mono-scalar approach
TEMPLE TEMPLE
SCHOOL SCHOOL
AFTER 11 March
f o r e st f h i s h
SITE ELECTION
ELECTION CRITERIAS:
•Area surface
•Site altitude
•Proximity to the city_income activities_services
•Proximity to the sea and the mountain and school.
28.800m2
NUMBERS population and temporary housing site
Tot population
Tot households
Average of people/hh
Total ppl in need of shelter
Total of shelters
40.738 ppl 14.722 hh 2.76 ppl (1>6)
15% = 6110 ppl 2000 shelters
Usable area site
Average size shelter
Needed area= +/- 90.000m2
Possible amount of shelters in area
28.800 m2 30 m2 x 2000 = 60.000 m2
60.000m2 shelter + 40% circulation & comm area
500 shelters
Situation Blocks first phase High density, primary housing
Situation Blocks second phase Lower density, permanent and mixed uses
Amount of hh
Average Hh/block
Amount blocks
Semi public semi open
Big comm. areas
500 hh 10 hh 50 blocks 27 spaces 6 areas
Cost of shelters/euro
Extra cost (fac, comm enz)
Total investment cost, stage 1
Possible return Stage 2
12,5 M X 40% =5 M 17,5 M 30 %
MASTERPLAN HOUSING SITE - STAGES
IMAGE: SKETCH OF A BLOCK WITH OPEN SPACE
FLOORPLAN – typical temporary house • Type A: 1-2 people – 20 m2 • Type B: 3 people – 25 m2 • Type C: 4 people – 30 m2 • Type D: 5-6 people – 35 m2
MAINTENANCE PLAN
GOVERNMENT RESIDENTS
URGENT REPAIRS CYCLICAL INSPECTIONS SERVICES
AND INFASTRUCTURE
ROUTINE REPAIRS PREVENTATIVE WORK
MINOR REPAIRS CYCLICAL INSPECTIONS
TRAINING FOR RESIDENTS AS REQUIRED
PUBLIC SPACES AND FACILITIES MAINTENANCE
TEMPORARY HOUSING MAINTENANCE
ROUTINE REPAIRS ROUTINE MAINTENANCE
URGENT REPAIRS CYCLICAL INSPECTIONS
• 2-5 YEAR PLAN • RESIDENTS AND GOVERNMENT PARTNERSHIP • PUBLIC SPACES AND FACILITIES PLAN • TEMPORARY HOUSING PLAN
TRAINING FOR RESIDENTS AS REQUIRED
REGISTRATION
• MAINTAIN NEIGHBOURHOOD GROUPS • PROVIDE FOR SPECIFIC NEEDS • ESTABLISH ECONOMIC LIVELIHOOD OF FAMILIES AND
SINGLES
RESIDENTS SELECTION
ELDERLY SPECIAL NEEDS
FAMILIES
SINGLE
ACCESSIBLE HOUSING & FACILITIES CLOSE TO COMMUNITY CENTRE
CLOSE TO TRANSPORT
INCOME TO SUPPORT FAMILY CLOSE TO NEIGHBOURHOOD GROUP
FOR SUPPORT ACCESS TO SCHOOLS
INCOME FOR FINANCIAL INDEPENDANCE
MAINTAIN NEIGHBOURHOOD
GROUPS
Residential 4 people
Residential 2 people
activity
SITE COMPLEX: SECOND PHASE-PERMANENT mixed use
Farming
Existing fabric
1/3 of the entire complex will became permanent
PLANNING AFTER END OF CONTRACT
Residential module_
FIST PHASE
Economical activities
Module_
SECOND PHASE
PUBLIC_ before EQ it was a parking
PUBLIC/PRIVATE_ Parking for the industry workers?
PRIVATE_ activities
1/3
1/3 Module send to disaster
sitations
Residential module_
Will become permanent 1/3
shops
Entrance
C o n n e c t i o n
between two
existing roads