1
발전 플랜트 사업 Year/Month : 2008/10 Client/Owner : DOOSAN Engineer : ILSHINAUTOCLAVE Location : CHANGWON. REPUBLIC OF KOREA Working Condition Main Heating Capacity Circulation Pump 160㎏/㎠ at 34530kw x 2 set 15LPM, 3-PH, 5HP Control Element Drive Mechanism(CEDM) Performance Test Loop System TITLE PROCESS Hot Test Loop System Main Heater Heating Capacity 30kw x 2 units 500at 200 ㎏/㎠ Heater Exchanger Max. Working Condition Tube Coil Inserted Tank 200 ㎏/㎠ at 350Pressurizer Max. Working Condition 150 x 1 unit 200 ㎏/㎠ at 350Circulation Pump Power Flowrate Electric Motor & Magnetic 5 HP, 220 VAC, 3-PH Max. 15 lpm Pure Water Control & Supply System Demi Water Reservoir Tank D.I.W Feed Pump D.I.W Injection Pump 500 x 2 units 2180 x 1 unit 35 ℓ/min x 1 unit Cooling System & Supply System Air Blower Valve Rack Sensors 2 units 2 units 2 units MAJOR APPLIANCES 구조도 FEATURE 제어봉 구동장치(CEDM) 원자로 운전조건 성능 테스트 설비 다년간의 노하우와 다양한 인증을 통한 반응기 제작 플랜트 설비의 전체 시스템 자동화 구현 고압가스 안전 규정에 의한 허가 및 전문 시공 한국가스안전공사 검사필 두산 중공업 Case Study www,.suflux.com 가압경수형 원자로 핵 연료 제어봉 구동장치(CEDM)의 건전성 및 신뢰성 입증을 위한 성능 테스트 설비

발전 플랜트-두산중공업

Embed Size (px)

DESCRIPTION

ress,sas,생산용 초임계 추출설비,실험실용 초임계 장치,압력용기 플랜트- 엔엘피 case study,양산용 초임계 추출 설비,초임계,초임계 건조,초임계 공정,초임계 나노입자제조,초임계 발포,초임계 수,초임계 유체,초임계 이산화탄소,초임계 입자,초임계 장비,초임계 추출,초임계 탈지,초임계수산화,초임계수열합성,발전플랜트

Citation preview

발전 플랜트 사업

Year/Month : 2008/10

Client/Owner : DOOSAN

Engineer : ILSHINAUTOCLAVE

Location : CHANGWON. REPUBLIC OF KOREA

Working Condition

Main Heating Capacity

Circulation Pump

160㎏/㎠ at 345℃

30kw x 2 set

15LPM, 3-PH, 5HP

Control Element Drive Mechanism(CEDM) Performance Test Loop System

TITLE

PROCESS

Hot Test Loop System

Main Heater

Heating Capacity

30kw x 2 units

500℃ at 200 ㎏/㎠

Heater Exchanger

Max. Working Condition

Tube Coil Inserted Tank

200 ㎏/㎠ at 350℃

Pressurizer

Max. Working Condition

150 ℓ x 1 unit

200 ㎏/㎠ at 350℃

Circulation Pump

Power

Flowrate

Electric Motor & Magnetic

5 HP, 220 VAC, 3-PH

Max. 15 lpm

Pure Water Control & Supply System

Demi Water Reservoir Tank

D.I.W Feed Pump

D.I.W Injection Pump

500 ℓ x 2 units

2180 ℓ x 1 unit

35 ℓ/min x 1 unit

Cooling System & Supply System

Air Blower

Valve Rack

Sensors

2 units

2 units

2 units

MAJOR APPLIANCES

구조도

FEATURE

제어봉 구동장치(CEDM) 원자로 운전조건 성능 테스트 설비

다년간의 노하우와 다양한 인증을 통한 반응기 제작

플랜트 설비의 전체 시스템 자동화 구현

고압가스 안전 규정에 의한 허가 및 전문 시공

한국가스안전공사 검사필

두산 중공업 Case Study

www,.suflux.com

가압경수형 원자로 핵 연료 제어봉 구동장치(CEDM)의 건전성 및 신뢰성 입증을 위한 성능 테스트 설비