At a Glance: Global Mold Managementat Continental AG
Advanced processing based on SAP best practices
Dr. Ing. Dirk Petermann,Head of Competence Center Supply Chain & Logistics,Continental AG
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
2/21
30.09.2008 J&M Management Consulting www.jnm.com Page 2
Copyright
Benefits and Look Ahead
Lessons Learned
Solutions for Process Efficiency
Characteristics of Global Mold Management1
2
3
4
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
3/21
30.09.2008 J&M Management Consulting www.jnm.com Page 3
Copyright
Benefits and Look Ahead
Lessons Learned
Solutions for Process Efficiency
Characteristics of Global Mold Management1
2
3
4
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
4/21
30.09.2008 J&M Management Consulting www.jnm.com Page 4Copyright
What are the challenges for a global acting tiremanufacturers mold management system?
Worldwide operational availability of mold components among different operative
systems must be guaranteed
Today molds cannot be provided for all plants all over the world anymore
Over the years a heterogeneous IT-system landscape has been established,
which determines a complex process structure with a significant number of
individual steps
Molds and their components can have different assembly status and locations
A central mold master list must specify, which components can be assembled to
produce a distinct tire
Integrated handling of mold related applications should be possible to reduce
redundancy, avoid interfaces and increase process safety...
Source: Scoping Workshop with Continental Mold Management TiresDepartment
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
5/21
30.09.2008 J&M Management Consulting www.jnm.com Page 5Copyright
What are the challenges for a global acting tiremanufacturers mold management system?
Main Characteristics of Mold Management:
1.Cross-System
StockVisibillity
2.Global
Transfer
3.Sophisticated
Data Model
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
6/21
30.09.2008 J&M Management Consulting www.jnm.com Page 6Copyright
What is the challenge when a proprietary softwaresolution is changed to SAP ERP?
Custom made functionality:
Business requirements covered by existing host system
Screen-layout designed to individual needs
Continuous extension and improvement of developments over the years(workflows etc.)
Sophisticated support of communication to external parties (e.g. multipletransfer of tire drawings and specification changes to vendors)
Management of Change:
Current way of working has been engraved in subliminal behavior of people
People and culture have to be addressed to engage the organization for thenew way of working
Compulsory MIS functions have to be established immediately by SAP bestpractice processes and some essential system customizing
Master data clean up is critical for an efficient migration but relevantresources are not available sufficiently prior to system go-live
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
7/21
30.09.2008 J&M Management Consulting www.jnm.com Page 7Copyright
It takes several steps to release an individually developedsystem by means of a standard software
CustomizationStandard SW
MIS
host
system
100 %
S
ystemf
unctionality/coverage
ofbusinessrequirements
2007
Kobalt
Fertigung
klassisch
Customizing,
SystemEnhancements,
Reporting
SAPBest-Practice
for Automotive
Accepted,
temporary Gap
2008
Customizing,System
Enhancements,
Reporting
SAP
Best-Practice
for Automotive
Future
Potential
2010
Missing Function
/ Integration
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
8/21
30.09.2008 J&M Management Consulting www.jnm.com Page 8Copyright
Enabler ValueKPI
Costs
Revenue
Level of integration with
procurement and tire
production processes
Future degree of integration
with shopfloor systems
No. of interfacesWorldwide operationalavailability of molds
Physical stock aligned
with digital inventory data
Stock Visibility across all
plants
Sophisticated Data Model
Integrated process
handling in existing tire
SAP ERP system
Unique organisational
concept across all plants
Reconciliation costs
Time between production
requirement and provision of
mold
Annual spending for system
support
The Enabler-KPI-Value Network illustrates value andfuture benefits of a software substitution
Inventory accuracy /
compliance
Hardware costs (host system)
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
9/21
30.09.2008 J&M Management Consulting www.jnm.com Page 9Copyright
Enabled by SAPTechnology
Identified enablers must be implemented, valid performance indicatorsestablished and values covered by the future system solution
Global Mold Management at Continental, enabled by SAP Technology
Mold
ManagementSystem
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
10/21
30.09.2008 J&M Management Consulting www.jnm.com Page 10Copyright
Benefits and Look Ahead
Lessons Learned
Solutions for Process Efficiency
Characteristics of Global Mold Management1
2
3
4
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
11/21
30.09.2008 J&M Management Consulting www.jnm.com Page 11Copyright
SAP NetWeaver BISAP NetWeaver BI
Worldwide operational availability among 3 operativesystems must be guaranteed
1. Cross-System Stock Visibility
SAP R/3Europe
and South Africa
SAP R/3Europe
and South Africa
SAP R/3Asian Pacific
SAP R/3Asian Pacific
SAP R/3America
SAP R/3America
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
12/21
30.09.2008 J&M Management Consulting www.jnm.com Page 12Copyright
Today mold(parts) cannot be provided for all plants allover the world anymore
2. Global Transfer
Worldwide tire production
Significant acquisition costs for assets
Increasing capital commitment by numerous repeat molds
Unified production technology world wide allows to use
molds across the globe
Building blocks system for mold assembly allows totransfer complete molds as well as single parts
Changes in product allocation and customer demands
require quick and efficient mold transfer process in high
frequency
Molds are stored for actual production only
High frequency of mold transfers must be handled
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
13/21
30.09.2008 J&M Management Consulting www.jnm.com Page 13Copyright
America
Europe
The established system landscape determines a complex processstructure with a significant number of individual steps
Sending PlantPurchasing Plant
Expand PurchaseRequisition
Convert PurchaseRequisition intoPurchase Order
Create PurchaseRequisition
Create Sales Document
Central ServiceDepartment
Receive OrderAcknowledgment
Receive
Shipping notification
Create Goods Movement
/ GR Posting
Process Goods Issue /
Create Invoice
2. Global Transfer
High degree ofProcessAutomation
implemented
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
14/21
30.09.2008 J&M Management Consulting www.jnm.com Page 14Copyright
Mold(parts) can have different assembly statusand locations
3. Sophisticated Data Model
TreadRing
Sidewall Bottom
Sidewall Top
Bead Ring Bottom
Bead Ring Top
Conceptual design of the overall data model includes SAP objects:
Material Master, Equipment, Installed Base, Serial Number
Single, unmountedMold
Component
in storage location in transit
Mounted mold,assembled in a container
in storage location in production
in transit
Mold components, stored
in a box
in storage location
in transit
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
15/21
30.09.2008 J&M Management Consulting www.jnm.com Page 15Copyright
The Mold Master List specifies, which components canbe assembled to produce a distinct tire
3. Sophisticated Data Model
LPN
Container Insert
BR Profile Type
Mold Type
Design Number
MultipleSpecifications
1000005Speed SymbolSide Plate BottomSB
Load IndexMold Part TopMT
1000099
1000004
1000003
1000002
1000001
Physical Equipment
Trademark
Product Name
Size
Article Number
Tire Attributes
Container G40
Mold Part Bottom
Side Plate Top
Bead Ring Bottom
Bead Ring Top
Tread Ring
Description
Container
MB
ST
BB
BT
TR
MML Equipment700100
Tire Article
Mold Master List
Assembled Mold
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
16/21
30.09.2008 J&M Management Consulting www.jnm.com Page 16Copyright
Benefits and Look Ahead
Lessons Learned
Solutions for Process Efficiency
Characteristics of Global Mold Management1
2
3
4
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
17/21
30.09.2008 J&M Management Consulting www.jnm.com Page 17Copyright
First impressions of the implementation project showpotentials for improvement
Organizational learning:
Some organizational functions and
processes are merely driven by
reporting requirements
Some departments work rather
person driven than task driven
Processes are usually triggered in
push-mode
Vendor selection process is unclear
System Experience:
Certain business functions with no
efficient system support which show
potential for optimization have beenidentified
Some key players with intimate
system know-how had huge
influence on original design
Current processes and
organizational set-up was closely
designed to former application logic
During realization stage several work packages with potential for improvement have been
identified.
During realization stage several work packages with potential for improvement have been
identified.
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
18/21
30.09.2008 J&M Management Consulting www.jnm.com Page 18Copyright
Global TireSourcing (Mold
Demand Planning)
Tire & mold design
Set-up of production
process
Documentation
Drawings
Specifications
Maintenance
Definition of quality
regulations
Plant requirements
Eurovents
Rubbering
Container
requirements
Simplification of organizational set-up with small redesigneffort possible
Capacity planning
Mold requirements
identification
Allocation of molds
Release / modification
planning of used molds
Stock visibility
R&D planning
Investment planning
Stock ownership
Potential roles and responsibilities of future mold management processes
Mold Design &Engineering
Strategic MoldProcurement
Operational MoldProcurement
Plant MoldEngineering
Vendor evaluation
Vendor selection
Vendor development
Price negotiations
Definition of central
conventions for
operational procurement
Approval of service level
agreements
Invoice verification
Communication with
vendors
Disposition
Exception
management
Local requirements
Customs
management
Documentation
Detailed stock visibility
Press-dependent
specifications
Budget-, capacity-
and material
requirements
planning
Production planning and
monitoring
Goods receipt / goods
issue
Quality control
Removal / Putaway
Plant maintenance
1 2 3 4 5
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
19/21
30.09.2008 J&M Management Consulting www.jnm.com Page 19Copyright
Benefits and Look Ahead
Lessons Learned
Solutions for Process Efficiency
Characteristics of Global Mold Management1
2
3
4
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
20/21
30.09.2008 J&M Management Consulting www.jnm.com Page 20Copyright
Follow-up Functions
Integration with existing LESsystem
Expansion of implemented
workflow logic
Implementation of preventive
maintenance
Advanced integration of
production systems
Integrated handling reduces redundancy, avoidsinterfaces and increases process safety...
Benefits
All mold-related processes canbe handled in one single software
Full integration of purchasing and
cross plant transfer processes
(inside and cross regional)
Integration of Asset Accounting,Investment Management and
Controlling
Unique data base and search
functionality for all applications
Avoidance of manual input viacontinuous process automation
and cross system integration
Future safety via standard
software application
Benefits and look ahead on further system developments
8/2/2019 2008_10_Fachtag_ProdAutoFertind_V6
21/21
30.09.2008 J&M Management Consulting www.jnm.com Page 21Copyright
Passionate about creating sustainable value
J&M Management Consulting AGWilly-Brandt-Platz 568161 Mannheim
www.jnm.com
Thank you for your attention
Continental AGVahrenwalder Str. 930165 Hannover
www.continental-corporation.com
Arriving safely and comfortably