    2010-TE-45Assignment # 2

  • 7/27/2019 2010-TE-45 (2)

    2/19

    Project Layout

  • 7/27/2019 2010-TE-45 (2)

    3/19

    Project Layout

    The Projects window provides option of viewing data in top/bottom layouts

    Choose one of the following to show on top:

    Project Table

    Gantt Chart

    Chart View

  • 7/27/2019 2010-TE-45 (2)

    4/19

    Activity

    Activities are the fundamental work elements of a project.

    Activities represent the work that must take place in a determined amount of

    time.

    They are the lowest level of a WBS and, as such, are the smallest subdivision

    of a project.

  • 7/27/2019 2010-TE-45 (2)

    5/19

    Opening an Existing Layout

    Steps:

    1. In the Layout Options bar, click Layout, Open If you make any modifications

    to the current layout, you will be prompted to save those changes. In mostcases, you will choose No

  • 7/27/2019 2010-TE-45 (2)

    6/19

    Opening an Existing Layout

    2. Select Baseline Schedule Submission or Monthly Progress Schedule. Click open.

  • 7/27/2019 2010-TE-45 (2)

    7/19

    Opening an Existing Layout

    Examine the Gantt Chart. Click the Bars icon to check how the bar coding isdefined.

  • 7/27/2019 2010-TE-45 (2)

    8/19

    Gantt Chart

    Gantt Chart (known as Bar Area) Provides a graphical display of activity progress duration of the project.

  • 7/27/2019 2010-TE-45 (2)

    9/19

    Activity Table

    Steps:

    1. In the Layout Options bar, click Show on Top, Activity Table

  • 7/27/2019 2010-TE-45 (2)

    10/19

    Customizing Column

    1. Click the Layout Options bar, select Columns.

    2. At Columns window, click the Available Options bar and select Hint Help.

    3. Inside the Available Options column, click the + sign next to Percent Completes.

    Activity % Complete and click .

    4. Highlight and click on Activity % Complete.

    5. To move Hint Help dialog box, click icon. It will turn to icon. Drag the box to

    location on the screen.

    6. To disable Hint Help, click icon.

  • 7/27/2019 2010-TE-45 (2)

    11/19

    Customizing Column

    1

    2

    3

    Di l i A i i D il

  • 7/27/2019 2010-TE-45 (2)

    12/19

    Displaying Activity Details

  • 7/27/2019 2010-TE-45 (2)

    13/19

    Selecting Detail Tabs

    Steps:

    1. In the Layout Options bar, click Bottom Layout Options.

    2. In the Available Tabs, select Feedback.

    3. Double-click to move the selected data item into the Display Tabs column.

    4. Click OK.

  • 7/27/2019 2010-TE-45 (2)

    14/19

    Selecting Detail Tabs

    1

    2

    3

    4

  • 7/27/2019 2010-TE-45 (2)

    15/19

    Grouping Data

  • 7/27/2019 2010-TE-45 (2)

    16/19

    Grouping Data

    Steps:

    1. Open your project and go to its activities

    2. In the Layout Options Bar, right-click and select Group and Sort.

  • 7/27/2019 2010-TE-45 (2)

    17/19

    Grouping by Weekly Actual Finish

    Steps:

    1. Open a project. Go to Activities. Click the Layout Bar and select Classic

    Schedule Analysis.

    2. Click the Layout Bar and select Group & Sort.

    3. Click on the first row of the Group By column, select Actual Finish.

    4. In the Group Interval column, select Week.

    5. Click OK

  • 7/27/2019 2010-TE-45 (2)

    18/19

    Grouping by Weekly Actual Finish

    1

    2

  • 7/27/2019 2010-TE-45 (2)

    19/19

    Saving Layouts

    Steps:

    1. In the Layout Options bar, click Layout, Save As.

    2. Type a Layout Name .

    3. Verify Current User is selected in the Available to field.

    4. Click Save.