Yes 是 No 否
1038-TSK-BTN.SRL-TIM-
20087-Apr-08
Reclamation area
填海区回
Reclamation area backfilling material size not
match with technical specification
填海区回填材料尺寸和技术规范要求不符
C
2072-TSK-BTN.SRL-TIM-
20082-May-08 Boiler house 锅炉房 Boiler house backfilling 锅炉房回填 C
3185-TSK-BTN.SRL-TIM-
200822-Jul-08
Main power house
主厂房
Main House Pedestal rebars are not installed
correctly and concrete cover thickness is less than
50mm.
主厂房基座钢筋安装不正确,钢筋保护层厚度小于
50mm
C
4376-TSK-BTN.SRL-TIM-
20082-Dec-08
switchgear area
开关区
CW pipe section 1 backfilling and compaction
一段循环水管回填和压实 C
2008-1~12Quantity
数量Open未闭环 Closed已闭环
TOTAL总计 4 4 0
C---CIVIL土建 4 4 0
M---MECHANICAL机、炉、电、热
0 0 0
Date of
Repair
整改日期
Acceptance 合格
NCR Status (January 2008–December 2008) 不符合项报告状态(2008年1月–2008年12月 )
No.
序号PLN Letter No.函号
Date of issued
提出不合格项报告的日期
Location / Item
地点/项目Description of Defect 缺陷描述
Status of Punch
List尾项清单状态 specialty专业
Remarks
备注
第 1 页,共 8 页
审核:付水聚
编制:王 政
1
594-TSK-
BTN.SRL-TIM-
2009
28-Oct-09
Air Compressor
空气压缩机Air Compressor Installation of Stainless
Steel Pipe to Carbon Steel
空气压缩机不锈钢管和碳钢安装
CNTIC will contact ZEPDI for the design of material
Waiting material: SS Bolt
2
625-TSK-
BTN.SRL-TIM-
2009
3-Nov-09
Chlorination
plant加氯间Sea water supply pump delivered at site
doesn't meet the contract
运到现场的海水供水泵与合同不符
CNTIC should submit
the material compositon of pump shaft to PLN
Under review PLN JMK
3
673-TSK-
BTN.SRL-TIM-
2009
18-Nov-09
Air compressor
area
空气压缩机区
Stainless steel matl shall not connected to
carbon steel matl directly
不锈钢材料不得与碳钢直接连接
CNTIC will contact ZEPDI for the design of material
Waiting material: SS Bolt
4
006-TSK-
BTN.SRL-TIM-
2010
7-Jan-10
Turbine
house(near
main oil tank )
汽机房(主油箱附近 )
Differenct size of pipes directly welded
together doesn’t meet standard
requirement
尺寸不同的管道直接焊接到了一起,不符合标准
pending CNTIC can't close
5
132-TSK-
BTN.SRL-TIM-
2010
2-Mar-10Unit drainage
pit机组排水槽
Acid and Alkali Unload pumps have
different specification between equipment
installed and
drawing卸酸泵和卸碱泵已安装设备和图
纸规格不符
Finished Closed
6
133-TSK-
BTN.SRL-TIM-
2010
2-Mar-10Unit drainage
pit机组排水槽
Safe Shower part installed is difference
from drawing
已安装的安全淋浴器部件和图纸不符
waiting materialWaiting material: Safe shower
7
310-TSK-
BTN.SRL-TIM-
2010
25-Jun-10
Bolier house
and ducting
锅炉房和烟道
Insulation Material which are Oxidized
need to be repalced
氧化的保温材料需要更换
pending CNTIC can't close
8069-121-
SBARU-201026-Oct-10
Front of CW
pump house
循泵房前面
Pipe Installation that Crashed Into Drain
Ditch to be corrected
穿过排水沟的管道需整改
Finished Closed
9095-121-
SBARU-20105-Nov-10
Main power
house 主场房
Leakage at Temporary Pipe line for
Chemical Cleaning of BFP during
Hydrostatic Test
锅炉水压试验期间给水泵化学清洗临时管道泄漏
Finished Closed
CommentDescription Update Status
Status Pending Item "NCR"
No Letter No Date Area
2 of 8
10125-121-
SBARU-20109-Nov-10
Bolier
house锅炉房
28 Location for Burners no access gallery
because of not designed, not supplied , not
installed
燃烧器有28处因未设计、未供货、未安
装而没有通道
CNTIC will reply by letter to close out this NCR
CNTIC will submit engineering justification and vendor statement about this matter
11139-121-
SBARU-201015-Nov-10
Coal mill
conveyor galley
输煤栈桥
Dust Suppression System for Coal
Handling system to be installed
需安装输煤系统除尘设备
pending CNTIC can't close
12140-121-
SBARU-201015-Nov-10
Underground
coal hopper
地下煤斗
Ventilation for Underground Coal
Handling System needs to be installed
地下输煤系统需安装通风系统
pending CNTIC can't close
13167/121/SBARU
/201022-Nov-10
existing and
start up boiler
老厂和启动锅炉房
Calibration Of The Oil Flow Meters
油流量计校验Finished Closed
14212-121-
SBARU-20103-Dec-10
Unit drainage
pit机组排水槽
Leakage at Underground pipe Flange of
Unit drainage pit pump
机组排水槽排水泵地下管道法兰漏水
Finished Closed
15215-121-
SBARU-20103-Dec-10
Boiler area
锅炉区域
Corroded Bolts of Continuous Blowdown
Valve 连排扩容器阀门螺栓锈蚀Finished Closed
16228-121-
SBARU-20106-Dec-10
Junction house
8B
8B转运站
Damaged of Motor Breaking Body for BC
42 BC42遮断电机本体损坏Finished Closed
17255-121-
SBARU-201015-Dec-10
Hydrogen Plant
制氢站
Instrument Equipment without KKS
Number 仪表设备没有KKS编码waiting material Waiting material
18283-121-
SBARU-201023-Dec-10
North side of
main power
house EL. 7.0m
主厂房+7.0m北
侧
Improper Valve Support Installation
阀门支架安装不正确Finished Closed
19296-121-
SBARU-201028-Dec-10
Boiler house
EL. 79.4m
锅炉房+79.4m
Platen Superheater Header Hanger
Support Structure is swaying in operation
过热器联箱支架运行时摇摆
Finished Closed
3 of 8
20314-121-
SBARU-201030-Dec-10
Ash containing
water system
含灰废水处理系统
Nameplates motor sludge A and B not
clear 污泥泵A和B电机铭牌不清楚waiting material
Waiting material: Nameplates
21041-121-PLTU-
SLY-201112-Jan-11
Main power
house 主厂房
Condenser outlet Reinforcing Rib
Leakage & waste water pump broken
凝汽器出口加固筋泄露和废水泵坏
Finished Closed
22042-121-PLTU-
SLY-201112-Jan-11
Chlorination
Plant 加氯间
Acid Cleaning for Chlorination Plant
加氯间酸洗问题reply to PLN by letter
PLN will ensure operation condition of
Chlorination Plant to Operator
23046-121-PLTU-
SLY-201112-Jan-11
Generator EL.
16.00 m
发电机+ 16.00
m
Difference diameter between pipe and its
elbow 管道和弯头直径不同will be replaced in FYI period
CNTIC can't close
24078-121-PLTU-
SLY-201122-Jan-11
Coal bunker
bay 煤仓间
Color painting of coal pipe rejection and
coal feeder to coal mill pipe does not
match with the drawing
卸煤管和给煤机到磨煤机的管道油漆颜色和图纸不符
pendingCNTIC will do if PLN close item no. 7
25079-121-PLTU-
SLY-201122-Jan-11 CWPH 循泵房
'C' CW Pump Impeller Failure
循环水泵C叶轮损坏
CNTIC will provide the
root cause and QA/QC Package to PLN, including FAT report
CNTIC will submit the reason of
Valve can't be closed (including QA/QC and FAT Report)
26118-121-PLTU-
SLY-20117-Feb-11
Laboratory
building
试验楼
Some parts at WWTP Area in Poor
Condition
废水处理区域一些设备部件状况差
waiting material Waiting material: safe shower
27124-121-PLTU-
SLY-20118-Feb-11
Air compressor
house 空压机房
Sewage Pond Pump B Coupling damaged
生活水泵B 联轴器损坏
CNTIC will submit the design modification and justification to PLN
CNTIC will submit the design modification and justification to PLN
28138-121-PLTU-
SLY-20118-Feb-11
Air compressor
house 空压机房
Crack at Flange Welding Joint at Sewage
Pond Discharge Pump
生活水池排水泵法兰焊口裂缝
CNTIC will submit the
design modification and justification to PLN
CNTIC will submit
the design modification and justification to PLN
29161-121-PLTU-
SLY-201114-Feb-11
Turbine house
汽机房
CCCW System Heat Exchanger Tube
Failures
闭式冷却水系统热交换器冷却管失效
CNTIC will act as per NCR
to be solved in FYI period
4 of 8
30167-121-PLTU-
SLY-201116-Feb-11
Chlorination
plant area
加氯间区域
Different value between level indicator
and level transmitter for Sodium
Hypochlorite Tanks and Lack of Valve
Access
次氯酸钠储罐液位计和液位变送器数值不同并且无阀门检修通道
Finished Closed
31169-121-PLTU-
SLY-201116-Feb-11
WWTP
废水处理车间
Piping Corrosion at WWTP Plant
废水处理车间管道腐蚀waiting material
CNTIC will send Painting Data Sheet and Waiting for all Equipment (Pump) Complete
32207-121-PLTU-
SLY-201125-Feb-11
Tubine house
EL. 13.7m
汽机房13.7m
Turning Gear Lubrication Oil Filter
Broken 盘车润滑油滤网坏to be solved in FYI period
to be solved in FYI period
33215-121-PLTU-
SLY-201128-Feb-11
Condensate
pump area/
main power
house
凝结水泵区域/
CCCW Pipe Installation bent and Support
Installation on Grating
闭冷水管安装弯曲,支架安装在格子板上
CNTIC will repair after unit stop
CNTIC will repair after unit stop
34265-121-PLTU-
SLY-20117-Mar-11 CWPH 循泵房
Poor Quallity of New Impeller Circulating
Water Pump C
循环水泵C新叶轮质量差
CNTIC will provide the root cause and QA/QC Package to PLN, including FAT report
CNTIC will provide the root cause and QA/QC Package to PLN, including FAT report
35267-121-PLTU-
SLY-20117-Mar-11
Chlorination
plant area
加氯间区域
Chlorine Pipe Leakage 氯管泄露 waiting material
Waiting material:
Plastic Lining Pipe
5 of 8
36291-121-PLTU-
SLY-201110-Mar-11
Turbine house
EL.6.4m
汽机房6.4m
Access to be installed for manual valve
operation 手动阀操作需安装通道CNTIC will reply letter
PLN ask to CNTIC
follow the contract (make platform as access)
37295-121-PLTU-
SLY-201111-Mar-11
Chemical
storage area
化学储存区
Safe Shower Corroded and Can't be Used
at Waste at waste water centralized
treatment area
废水处理区安全淋浴器腐蚀并不能使用
waiting materialWaiting material:safe shower
38309-121-PLTU-
SLY-201117-Mar-11
Turbine house
汽机房
Condensate Pump 'A' damaged During
Operation 凝结水泵A运行时损坏
CNTIC will provide the root cause and QA/QC Package to PLN,
including FAT report
CNTIC will provide the root cause and QA/QC Package to
PLN, including FAT report
39373-121-PLTU-
SLY-2011
Turbine house
汽机房
Incomplete painting work for overhead
crane 100/25 T not yet started
汽机房100/25 T行车油漆未完成
pendingCNTIC will do if PLN close item no. 7
40415-121-PLTU-
SLY-201114-Apr-11
Turbine house
汽机房
Damage To Booster Pump of Turbine
FWT Insulation Encapsulation
汽机给水泵前置泵保温保护层损坏
to be solved in FYI period
to be solved in FYI period
41416-121-PLTU-
SLY-201114-Apr-11
Tubine house
EL. 13.7m
汽机房13.7m
Turbine refractory insulation need to
repair
汽机保温需修复
to be solved in FYI period
to be solved in FYI period
42442-121-PLTU-
SLY-201125-Apr-11
Main House
Area
主厂房
Acid Supply Pipe Leakage at Main House
Area 主厂房供酸管泄露to be solved in FYI period
Waiting material: Plastic Lining Pipe
43450-121-PLTU-
SLY-201126-Apr-11
Junction House
8C
8C转运站
Hoist Crane 12Ton Capacity Stuck on
Culvature Rail During Load Test
12吨电动葫芦负荷试验时损坏
CNTIC will recheck again and contact vendor for the solution
CNTIC will repair and do test
44557-121-PLTU-
SLY-201113-May-11
All plant area
全厂Pressure Gaugages Liquid 压力表未充油 pending pending
45564-121-PLTU-
SLY-201113-May-11
CO2 storage
room at CCB
集控楼CO2储
存间
Improper Instalation of Dry Batteries and
Miniature Circuit Breaker
干电池和小型断路器安装不正确
Finished Closed
6 of 8
46585-121-PLTU-
SLY-201124-May-11
Chlorination
area 加氯间
Material Installed not Conform to
Drawing 材料安装和图纸不符Finished Closed
7 of 8
47586-121-PLTU-
SLY-201124-May-11
Turbine house
汽机房
Pressure Indicators was Damaged at Lube
Oil Tank 润滑油箱压力表坏Finished Closed
48
437-TSK-
BTN.SRL-TIM-
2009
23-Jun-09Mainly Condensor material is not conform
to contract requirement
cntic will submit a
vendor's statement of the material to PLN
Closed
49
467-TSK-
BTN.SRL-TIM-
2009
23-Jul-09Installed the centrifugal water pump for
oil pumpFinished Closed
50
689-TSK-
BTN.SRL-TIM-
2009
24-Nov-09CW open Cycle Cooling Butterfly Valves
do not meet contract requirment
cntic will submit a vendor's statement to prove the type of the
pump
cntic will submit a vendor's statement to prove
the type of the pump
51
576-TSK-
BTN.SRL-TIM-
2009
handrail of ESP required to be galvanized Pending CNTIC can't close
52
707-TSK-
BTN.SRL-TIM-
2009
generator excitation sytem cubicle rusted
and corrosion cntic will check the inspection records
to be solved in FYI period
53
505-TSK-
BTN.SRL-TIM-
2009
Improper modified flange at unit drainage
pit pumpFinished Closed
54054/121/SBARU
/2010
Desalination Plant Steam Line
ModificationFinished Closed
55221/121/SBARU
/2010
Boiler Chemical Cleaning Effluent
LeakageFinished Closed
19
36
Total Closed
Remaining NCR
8 of 8