MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
INDEX
1.0 Project Background 2
2.0 Third Party Quality Audit Consultant 3
3.0 Major Activities and Review Meetings of the Month 3
4.0 Status of TPQA Visits 4
5.0 Progress of NCRMP works 5
TPQA Status Report for NCRMP Works To the end of(30-04-2012) 6
6.0 District wise status of tests conducted by TPQA 29
7.0 Details of Audit Reports Submitted during this Month 30
7/31/2019 8.APRIL MPR- 2012
3/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1.0 Project Background
Andhra Pradesh (AP) state has one of the longest coastal belts in India. Out of 67,362 Km of road network in the state, the
nine coastal districts cover 26,000 km of road length. Every year during the period of April-May and September-December,
cyclonic situations set in to the Bay of Bengal. With the recent changes in climatic conditions, the catastrophic events are
increasing resulting in very devastating cyclones like Laila, Jal etc where the loss is enormous. In the 97 years ranging
from 1892 to 1989, there were as many as 67 cyclones within the State.
It is essential to provide safe residential accommodation to the vulnerable population during any eventuality or disaster due
to natural calamities such as cyclones and associated tidal waves and storm surges. The project is formulated based on
experiences of Government of Andhra Pradesh in mitigating such disasters during the past and also keeping in view the
existing facilities available in the project area in Andhra Pradesh.
The Government of India has applied for a credit of US$ 255 Million equivalent from the International Development
Association (IDA) toward the cost of National Cyclone Risk Mitigation Project (NCRMP), and it intends to apply the
proceeds to payments for goods, works, related services and consulting services under this Project.National Cyclone Risk Mitigation Project (NCRMP) Project Implementation Unit (PIU), Andhra Pradesh, headquartered at
Hyderabad has invited the consultants to submit proposals for providing the consultancy services for Third Party Quality
Audit for 9 coastal districts namely Srikakulam, Vijayanagaram, Visakhapatnam, East Godavari, West Godavari, Krishna,
Guntur, Prakasam and Nellore. The project Construction of Multipurpose Cyclone Shelters, Roads to Cyclone
Shelters, and Roads to habitations and Roads & Bridges under NCRMP is funded by International Development
Association and received through Government of India. This consultancy is envisaged to audit the quality of works being
implemented by various line departments working under PIU. The number of works under progress / for whichagreements are concluded in each district is shown in the table below.
7/31/2019 8.APRIL MPR- 2012
4/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
2.0 Third Party Quality Audit Consultant.
To provide Consulting Services of Third Party Quality Auditor for Construction of Multipurpose Cyclone Shelters, Roads to
Cyclone Shelters, Roads to habitations, and Roads and Bridges under NCRMP in 9 coastal districts The Commissioner for
Disaster Management & Project Director, Project Implementation Unit (PIU) NCRMP has selected Egis International in JV
with Egis India Consulting Engineers (I) Pvt. Ltd. On 31 st May2011, the Contract for Consultancy Service was signed
between The Commissioner for Disaster Management & Project Director, Project Implementation Unit (PIU) NCRMP and
the Egis International in JV with Egis India Consulting Engineers (I) Pvt. Ltd.
3.0 Major Activities and Review Meetings of the Month
7/31/2019 8.APRIL MPR- 2012
5/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
4.0 Status of TPQA Visits:
The following table shows the details of TPQA visits to sites in respective districts.
District Total Number of Visits
Up to Mar.'2012 In Apr.'2012 Up to Apr.'2012
Srikakulam 188 24 212
Vizianagaram 66 5 71
Vishakhapatnam 179 29 208
East Godavari 300 64 364
West Godavari 247 39 286
Krishna 166 21 187
Guntur 167 22 189
Prakasam 223 21 244
Nellore 176 17 193
No. of Visits by TPQA
7/31/2019 8.APRIL MPR- 2012
6/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
5.0 Progress of NCRMP works:The district wise progress of works is shown below. The works in the West Godavari are not started and the works in
Krishna District has just started. At many places the first milestone is completed but works are not started. The line
departments are to analyze the reasons for the slow progress and if necessary penalty for the slow progress as per the
agreement conditions should be imposed.
Third Party Quality Audit by Egis India consulting services
Summary of Activities
S.No. District
Agreements for PackagesCommunicated Status of works
PR R&B Progress Not Started
1 Srikakulam 6 5 17 4
2 Vizianagaram - 3 3 0
3 Visakhapatnam 13 0 21 0
4 East Godavari 7 0 12 1
5 West Godavari 3 0 10 0
6 Krishna 4 0 8 0
7/31/2019 8.APRIL MPR- 2012
7/91
MONTHLY REPORT
6 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
TPQA Status Report for NCRMP Works To the end of(30-04-2012)
S.No. District
Packages /Works
entrustedStatus of Works
No.of
Visitsof
TPQA
TotalNo.
of QCtestsdone
NCRsQC
ReportsIssued
Environmentaland Social
ReportsIssued
Issued closed PendingPR R&B Started NotStarted
1 Srikakulam 06_16 5_5 17 4 212 732 10 9 1 13 17
2 Vizianagaram - 3_3 3 0 71 366 2 - 2 9 5
3 Visakhapatnam 13_21 - 21 0 208 1161 9 9 - 23 16
4 East Godavari 07_13 - 12 1 364 666 4 4 - 21 11
5 West Godavari 03_10 - 10 0 286 229 - - - 17 19
6 Krishna 04_08 - 8 0 187 42 3 3 - 8 13
7 Guntur 06_15 2_2 12 5 189 350 10 10 - 14 5
8 Prakasham 12_23 1_1 23 1 244 1874 14 13 1 18 15
9 Nellore 16_24 - 24 0 193 835 8 8 - 16 9
Total 67_130 11_11 130 11 1954 6351 60 56 4 139 110
7/31/2019 8.APRIL MPR- 2012
8/91
MONTHLY REPORT
7 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Srikakulam District up to 30.04.2012
Category Packages allotted under Phase - 1 Names of works under each package Agreement No. / Date DHS DFCProgress up to30.04.2012
RHB
NCRMP/B-W/AP/RHB/PRED/01/Santhabommali/003
Road from DPN R&Broad to Uddandapalem
/2010-11, Dt.30.04.2011 30.04.11 30.04.12 complete Entire work
Road from K. UmiladaJunction to Koduru (LinkRoad)
/2010-11, Dt.30.04.2011 30.04.11 30.04.12 complete Entire work
Road from Borubadra,Malagam to Kollipadu viaSeepuram, Gantapeta
/2010-11, Dt.30.04.2011 30.04.11 30.04.12 complete Entire work
NCRMP/B-W/AP/RHB/PRED/01/Polaki/006
Road from R&B roadMobagam to
Duubakavanipeta viaGajapathinagaram
/2010-11, Dt.
30.04.201130.04.11 30.04.12
First Milestone i.eEarthwork & Cd
works &GSB
Road fromTalasamudram to DolaRegulator
/2010-11, Dt.30.04.2011 30.04.11 30.04.12
First Milestone i.eEarthwork & Cd
works &GSB
NCRMP/B-W/AP/RHB/PRED/01/Polaki/005
Road from R&B roadEdulavalasa - Killam toJonnam viaTalasamudram
/2011-12, Dt.30.04.2011 30.04.11 31.01.12
First Milestone i.eEarthwork & Cd
works &GSB
Bridges
NCRMP/B-W/ AP/Br/R&B/01/Patnavanipeta/001
Construction of bridge atKm 11/6-8 of NH-5 toPatnavanipetaConnectingSundarapalem
46/2011, Dt.17.12.2010 17.12.10 17.06.12
Second Milestone i.eCompletion up to
below the deck slab.
NCRMP/B-W/AP/Br/R&B/01/ Surampeta/003
Construction of Minor Bridge at Km 12/2-4 of NH-5 to SurampetaRoad via Naruva,Mentada
45/2010-2011,Dt17.12.2010 17.12.10 17.03.12
Second Milestone i.eCompletion up to
below the deck slab.
7/31/2019 8.APRIL MPR- 2012
9/91
MONTHLY REPORT
8 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/Br/R&B/01/Bendigadda/004
Construction of Highlevel bridge acrossBendigadda at KM 4/10of Pundi-Parlakimidi roadin Srikakulam Dt, A.P.
1/2010,Dt.11.11.2010 11.11.10 11.05.12First Milestone i.e
Foundation up to wellcaping
Roads NCRMP/B-W/AP/RD/R&B/01/Nowpada/006)Improvements Naupada-Venkatapuram road from0/0to15/0km
43/2010-11,17.12.2010 17.12.10 17.03.12Completion of entire
work
RCS
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturui/002
Road from NP road toURK Puram
G.O.Rt.No.451, Dt.06.04.2011 06.04.11 29.09.12
E/W,pipeculverts,GSB,R/W
Road from Deppuru,Bahadapalli road toOnkuluru to CycloneShelter
G.O.Rt.No.451, Dt.06.04.2011 06.04.11 29.09.12
E/W,pipeculverts,GSB,R/W
Road from R & B Road
to Devunthalada
G.O.Rt.No.451, Dt.
06.04.201106.04.11 29.09.12 E/W,pipe
culverts,GSB,R/WRoad from Pollada toKomarthalada toCyclone Shelter
G.O.Rt.No.451, Dt.06.04.2011 06.04.11 29.09.12
E/W,pipeculverts,GSB,R/W
NCRMP/B-W/AP/RCS/PRED/01/Etcherla/005
Road from Koyyam R &B Road toMoosavanipeta
G.O.Rt.No.451, Dt.06.04.2011 30.04.11 07.05.12
Completion of workup to WBM gr-II, gr-III
Road from Mentada toDovupeta
G.O.Rt.No.451, Dt.06.04.2011 30.04.11 07.05.12
Completion of workup to WBM gr-II, gr-III
Road from Kotcherelaroad to Kollibhemavaram& Cyclone Shelter
G.O.Rt.No.451, Dt.06.04.2011 30.04.11 07.05.12
Completion of workup to WBM gr-II, gr-III
Road from Kotcherlaroad toPathesundrapalem
G.O.Rt.No.451, Dt.06.04.2011 30.04.11 07.05.12
Completion of workup to WBM gr-II, gr-III
7/31/2019 8.APRIL MPR- 2012
10/91
MONTHLY REPORT
9 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
MPCSNCRMP/B_W/AP/MPCS/PRED/01/Sa
nthabommali/005
Construction of Cyclone shelter at Kollipadu
G.o rt No451 dt
06.04.2010
07.01.2013
Completion of Ground floor Plinth level
Completion of Ground floor Plinth level
Construction of Cyclone Shelter at Runku
G.o rt No451 dt
06.04.2010
07.01.2013
Completion of Ground floor Plinth level
Completion of Ground floor Plinth level
Status of works in Vizianagaram District up to 30.04.2012
Category Packages allottedunder Phase - 1Names of works under each
package Agreement No./ Date DHS DFCProgress up to
30.04.2012
Bridges
NCRMP/ B-W/ AP/Br/ R&B/ 02/
Puligadda/ 007
Construction of Minor Bridge atKm. 7/2 near Puligadda of Konada Ramatheertham R&B Road toKonathalapalem via Yerukonda,Pasupam, Kollayavalasa (Z.P.
Road)
31/2010-201 Dt.1.12.2010 01.12.10 31.05.12
97.66% of workcompleted
NCRMP/ B-W/ AP/Br/ R&B/ 02/
Chakaligadda / 008
Construction of Minor Bridge atKm 15/2 near Chakaligedda of
Konada Ramatheertham R&B roadto Konatalapalem (via) Yerukonda,
Pasupam, Kollayavalasa (ZPRoad)
34/2010-2011 Dt.8.12.2010 08.12.10 07.06.12
78.99% of workcompleted
Road (R&B)NCRMP/B-
W/AP/RD/R&B/ 02/Konada/009
Improvements to Road fromKonada Ramatheertham (R&B)Road to Konathalapalem (Via)
Pasupam, Yerukonda,Kollayavalasa from Km 12/0 to
16/5 (Km 0/0 to 4/0 i.e. up to NH-5crossing)
33/2010-201 Dt.8.12.2010 08.12.10 07.03.12
100% of workcompleted
7/31/2019 8.APRIL MPR- 2012
11/91
MONTHLY REPORT
10 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 30.04.2012
Category Packages allotted under Phase- 1Names of works
under eachpackage
Agreement
No. / DateDHS DFC Progress up to 30.04.2012
RHB
NCRMP/B-W/AP/RHB/PRED/03/Nakkapalli/001
Road from Vempadu toPatimeeda
/2010-11, Dt.11.01.2011 11.01.11 11.01.12 Milestone is completed
Road from R&B road toMulaparra up to Beach
end
/2010-11, Dt.11.01.2011 11.01.11 27.10.11 Milestone is completed
NCRMP/B-W/AP/RHB/PRED/03/Anandapuram/003
Road from R&B B.PKallalu to
Matchvanipalem
/2010-11, Dt.10.03.2011 10.03.11 09.12.11
Milestone is completed
NCRMP/B-W/AP/RHB/PRED/03/Paravada/004
Road from R & B roadto Pothu Rajannapalem
/2010-11, Dt.28.03.2011 28.03.11 27.12.11 Milestone is completed
Road from R & B roadto Jalaripeta
/2010-11, Dt.28.03.2011 28.03.22 28.12.11 Milestone is completed
NCRMP/B-W/AP/RHB/PRED/03/Rambilli/006 Road from R & B roadto Venkayyapalem/2010-11, Dt.11.01.2011 11.01.11 11.10.11 Milestone is completed
NCRMP/B-W/AP/RHB/PRED/03/Atchutapuram/007
Road from R&B road to Ava- Somavaram
/2011-12, Dt.27.04.2011 27.04.11 26.01.12 Milestone is completed
Road from R&B Roadto Avarajam
/2011-12, Dt.27.04.2011 27.04.11 26.01.12 Milestone is completed
7/31/2019 8.APRIL MPR- 2012
12/91
MONTHLY REPORT
11 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 30.04.2012
Category Packages allotted under
Phase - 1
Names of works under each
package
Agreement No. /
DateDHS DFC
Progress upto
30.04.2012
RCS
NCRMP/B-W/AP/RCS/PRED/03/ Anandapuram/001
Road from NH-5 toRamarayadupalem /2010-11, Dt. 15.09.2011 15.09.11 14.06.12
RoadFurniture &Shoulder work is inprogress
NCRMP/B-W/AP/RCS/PRED/03/Rambilli/002
Road from R&B road toKrishnampalem /2010-11, Dt. 15.09.2011 15.09.11 14.09.12
CD works areProgress &B.T work isCompleted
Road from R & B road toKattubolu to Marripalem /2010-11, Dt. 15.09.2011 15.09.11 14.09.12
CD works arein progress &WBM Grade-3 work is inprogress
Road from R & B road toRajakoduru /2010-11, Dt. 15.09.2011 15.09.11 14.09.12
CD Work iscompleted &B.T work iscompleted
NCRMP/B-W/AP/RCS/PRED/03/
Nakkapalli/003
Road from R & B road toPedateenarla to Chinateenarla /2010-11, Dt. 15.09.2011 15.09.11 14.06.12
B.T & C.Croad worksareCompleted.
Road from Upamaka RajayyapetaR & B road to Janakayyapeta /2010-11, Dt. 15.09.2011 15.09.11 14.06.12
CD works areCompleted &B.T work iscompleted
7/31/2019 8.APRIL MPR- 2012
13/91
MONTHLY REPORT
12 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 30.04.2012
Category Packages allotted under Phase - 1 Names of works under each packageAgreement No.
/ Date
Milestone Completion Dates Progress w.r.t.milestone up to
30.04.2012First Second Third
MPCS
NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cycloneshelter at Gajapathi
Nagaram
/2011-12, Dt.03.10.2011 02.02.12 02.06.12 02.10.12
Earth work is inprogress.
Construction of cycloneshelter at Ratnayampeta
/2011-12, Dt.03.10.2011 02.02.12 02.06.12 02.10.12
Stilt Slab and 1stFloor Columns
work are completed& 1st Floor Slabform work is in
progress.
NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of cycloneshelter at Patimeeda
/2011-12, Dt.03.10.2011 02.03.12 02.08.12 02.01.13
Foundation footing
work is completedand Columns areprogress up tobottom level of
Plinth beam andFoundation
Refilling work is incompleted.
Construction of cycloneshelter at Moolaparra
/2011-12, Dt.03.10.2011 02.03.12 02.08.12 02.01.13
Columns laid up tobottom of plinth
beam or Basementwork is in
completed & Plinthbeam PCC iscompleted.
Construction of cycloneshelter at Bangarampeta
/2011-12, Dt.03.10.2011 02.03.12 02.08.12 02.01.13
Stair case & Rampworks are in
progress, Columnslaid up to Roof
level and Stilt Slabis Completed.
7/31/2019 8.APRIL MPR- 2012
14/91
MONTHLY REPORT
13 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/MPCS/PRED/03/Rambillii/004Construction of cyclone
shelter atVenkayyapalem
/2011-12, Dt.03.10.2011 02.01.12 02.04.12 02.07.12
Earth work inprogress, Workstopped due tofinalization of
foundation designs.
NCRMP/B-W/AP/MPCS/PRED/03/Parawada/001Construction of cyclone
shelter atTikkavanipalem
/2011-12, Dt.07.10.2011 06.01.12 06.04.12 06.07.12
E/W foundationexcavation is
completed & Dueto site problem
work is stopped.
Status of works in East Godavari District up to 30.04.2012
Category Packages allotted under Phase - INames of works
under eachpackage
Agreement
No. / Date
Mile stonesRemarks
First Second Third
RHB (2 )RCS (8)
MPCS (3)
NCRMP/B-W/AP/RHB/PRED/04/Katrenikona/003
Road from PR roadsto Dasarivanipeta and
to Cyclone Shelter
/2011-12Dt:27.04.2011 30-11-2011 30-11-2011 20-01-2012
Completed.
NCRMP/B-W /RCS/PRED/04/Karapa/001 Approach Road tocyclone Shelter at
Adavipudi
2011-12Dt:20.05.2011 30-11-2011 31-10-2011 31-01-2012
Completed.
NCRMP/B-W/AP/RHB/PRED/04/Karapa/001/
Road fromGurajanapalli to
Bandulavaripalem
2011-12Dt:27.04.2011 30-09-2011 31-10-2011 31-01-2012
Completed.
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto P.Chodipallipeta CS
2011-12Dt:07.09.2011 3 months 3 months 3 months
65% completedShoulders Work is in
Progress
7/31/2019 8.APRIL MPR- 2012
15/91
MONTHLY REPORT
14 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto K.Chodipallipeta CS
/2011-12Dt:07.09.2011 3 months 3 months 3 months
65% completedShoulders Work is in
Progress
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Hukumpeta CS
/2011-12Dt:07.09.2011 3 months 3 months 3 months
65% completedShoulders Work is in
Progress
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Gaddipeta CS
/2011-12Dt:07.09.2011 3 months 3 months 3 months
65% completedShoulders Work is in
Progress
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Danavaipeta CS
/2011-12Dt:07.09.2011 3 months 3 months 3 months
65% completedShoulders Work is in
Progress
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004/
Road from R&B Roadto G.MusalayyapetaCS
2011-12Dt:07.09.2011 3 months 3 months 3 months
Not yet Started
NCRMP/B-W/AP/RCS/PRED/04/Uppalaguptam/003
Road from R&B Roadto Chinaraghavulapeta
Cyclone Shelter
/2011-12 Dt:23.09.2011
3 months/22.11.2011
3 months22.06.2011 -----------
Jungle Clarence inProgress
NCRMP/B-W/AP/MPCS/PRED/04/Uppalaguptam/002
Construction of Cyclone Shelter at
Pedaraghavulapeta of Uppalaguptam Mandal
E.G.Dt.
/2011-12Dt:17.10.2011
3 months16.01.2012
3 months16.04.2012 3 months16.07.2012
Sand filling work is inprogress below plinthbeam
NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/004
Construction of Cyclone Shelter atLaxamanudupadu
inThondangi
/2011-12Dt:07.09.2011
PCC work is inprogress below plinthbeam & RR masonryOuter row
NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/004
Construction of Cyclone Shelter at
Avulamanda
/2011-12Dt:07.09.2011
Sand filling work is inprogress below plinthbeam
7/31/2019 8.APRIL MPR- 2012
16/91
MONTHLY REPORT
15 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in West Godavari District up to 30.04.2012
Category Packages allotted under Phase- 1Names of works under
each packageAgreementNo. / Date
Milestone Completion Dates Progress w.r.t.milestone up to
30.04.2012
RemarksFirst Second Third
RHB
Mogalthuru Mandal NCRMPW.G.Dist
Road from NH 214 A atRanga Statue center to
Harijanawada of Kalipatnam(E) (Mogalthuru Mandal
W.G.Dist.)
16 /2011-12Dt.27.04.2011
27/4/2011to
22/9/2011
23/9/2011to
24/2/2012
25/2/2012to
26/7/2012
65.91%
Gr-III & CC PavementCompleted.
Shoulders work is inProgress.
R&B road at PanchayatOffice to Pulaparthivarithota
via Badava(Mogalthuru Mandal
W.G.Dist.)
68.65%
Gr-III & CC PavementCompleted.
Shoulders work is inProgress.
Mogalthuru Vempa R&BRoad at Uchintha Kalava
Bridge to GogulammaHarijanapeta (Mogalthuru
Mandal W.G.Dist.)
75.34%
Gr-III & CC PavementCompleted.
Shoulders work is inProgress.
From Narsapur Mogalthur R&B road to Dayadaldaspeta
via Venkateswara Swamytemple (Mogalthuru Mandal
W.G.Dist.)
85.79%
CC Pavement Completed.Shoulders work is in
Progress.
Road from NH 214 A road toHarijanapeta of Kothota
(Mogalthuru MandalW.G.Dist.)
27/4/2011to
22/9/2011
23/9/2011to
24/2/2012
25/2/2012to
26/7/201299.20% CC Road Completed.
Narsapur Mandal W.G.Dist.
R&B road to Indira Nagar (via) Pochamma temple
(Narsapur Mandal W.G.Dist.)21 /2011-12Dt.09.05.2011
09/05/2011to
04/09/2011
05/09/2011to
06/01/2012
07/01/2011to
08/5/2012
55.44% Gr-III Completed.
Road from R&B road toPedalanka (Narsapur Mandal
W.G.Dist.)52.70%
Gr-III Completed. CCPavement is in Progress.
7/31/2019 8.APRIL MPR- 2012
17/91
MONTHLY REPORT
16 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Krishna District up to 30.04.2012
Category Packages allotted under Phase - 1 Names of works under eachpackageAgreement No. /
Date DHS DFCProgress up to
30.04.2012
RHB
NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/001
Road connecting R&B roadthrough Gantalammapalem /2011-12Dt.27.4.2011 27.04.11 26.01.2012
CD works,GSB,Gr-II,Gr-III,BT completed
NCRMP/B-
W/AP/RHB/PRED/06/Machipatnam/002
Road from R & B Road to B.VThota
/2011-12
Dt.27.4.201127.04.11 26.01.2012
CD works,GSB,Gr-II,Gr-III,BT completed
Road from Potlapalem Z.P roadto Chikativanipalem
CD works,GSB,Gr-II,Gr-III,BT completed
NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu/003
Road from Intheru R&B Road toRangaraopet
/2011-12Dt.27.4.2011 27.04.11 26.01.2012
CD works,GSB,Gr-II,Gr-III,BT completed
Road from R&B road to CycloneShelter at Chandala CD works,GSB,Gr-II,Gr-III,BT completed
Road from LB Cheria CCroad to Chillapalemm of LBCheria (Narsapur Mandal
W.G.Dist.
75.64%
Gr-III& CC PavementCompleted.
Shoulders work is inProgress.
Kalla Mandal W.G.Dist.
From A-U R&B Road toSatyanarayanapuram (Kalla
Mandal W.G.Dist.)25 /2011-12
Dt.26.05.2011
26/5/2011To
20/8/2011
20/8/2011to
21/11/2011
22/11/2011To
23/2/2012
100% Completed.
From A-U R&B Road toMekaladibba (Kalla Mandal
W.G.Dist.)100% Completed.
7/31/2019 8.APRIL MPR- 2012
18/91
MONTHLY REPORT
17 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Krishna Districts up to 30.04.2012
Category Packages allotted under Phase - 1Names of works
under eachpackage
AgreementNo. / Date
Milestone Completion Dates Progressw.r.t.
milestoneup to
30.04.2012
RemarksFirst Second Third
RCS NCRMP/B-W/AP/RCS/PRED/06/Machipatnam/001
Road fromBhogireddipalli R&B
Road toRamakhandam
/2011-12/Dt.02.09.2011 01.12.2011 01.03.12 01.06.12 13.20% GSB workcompleted
Road from R&BRoad Chinnapuram
to Gundupalem
/2011-12/27.04.2011 01.12.2011 01.03.12 01.06.12
31.68%GSB, GRIIcompleted.
Road fromPotlapalem Z.P
road to Pothepalli.
/2011-12/Dt.02.09.2011 01.12.2011 01.03.12 01.06.12 41.38%
GSB, Gr-II,GR III
completed
7/31/2019 8.APRIL MPR- 2012
19/91
MONTHLY REPORT
18 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in GUNTUR District up to 30.04.2012
Category Packages allotted under
Phase - 1Names of works under each package Agreement No./
DateDHS DFC Progress up to
30.04.2012
RHB
NCRMP/B-W/AP/RHB/PRED/07/KARLAPAL
EM/001
R/f Ganapavaram R&BRoad t o Kesavapuri ST colony 7/2011-2012
27.04.2011 27.04.11 26.01.2012 Completed.
NCRMP/B-W/AP/PRED/07/Nagaram/002
R/f R&B Road to Mohammad Alipalem
8/2011-201227.04.2011 27.04.11 26.4.2012
CC RoadCompleted
R/f R&B Road to Katuivaripalem. CC RoadCompleted
Bridges
NCRMP/B-W/AP/Br/R&B/07/Bapatla/010
Reconstruction of High level Bridge @Km5/2 of Bapatla-Suryalanka Road across Perali drain in
Guntur 79/2010-2011
1.12.2010 01.12.10 31.5.2012 Approaches is in
progress
NCRMP/B-W/AP/Br/R&B/07/Bapatla/011
Reconstruction of High level Bridge @Km2/4 of Bapatla-Pandurangapuram Road across Perali
drain in Guntur 78/2010-20111.12.2010 01.12.10 31.5.2012 Approaches is in
progress
7/31/2019 8.APRIL MPR- 2012
20/91
MONTHLY REPORT
19 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in GUNTUR District up to 30.04.2012
Category Packages allotted under Phase - 1Names of works under each
packageAgreement No. /
DateDHS DFC Progress up to 30.04.2012
RCS
NCRMP/B-W/AP/RCS/PRED/07/PPalem/001
Road from R&B Road toMandevaripalem
/2010-11Dt.01.11.2011
01.11.11 31.07.2012BT completed, Shoulder Work
is in Progress.
Road from R&B Road Alluru toYadavapalem
/2010-11Dt.01.11.2011
01.11.11 31.07.2012Work yet to be started
NCRMP/B-W/AP/RCS/PRED/07/KarlaPalem/002
Road from Ganapavaram R & Broad to Pedamarpuvaripalem
/2010-11Dt.01.11.2011
01.11.11 31.10.2012Work yet to be started
Road from R & B Road to
Chinapuluguvaripalem
/2010-11
Dt.01.11.201101.11.11 31.10.2011
Work yet to be started
Road from R & B road toYaramvaripalem
/2010-11Dt.01.11.2011
01.11.11 31.10.2011 CC Road work is Completed,Shoulders, and GSB is in
progress.
Road from R & B road toPedagollapalem Cyclone Shelter
/2010-11Dt.01.11.2011
01.11.11 31.10.201 CC Road work is Completed,Shoulder work is in progress.
Pedagollapalem PR Road toBonthagorlapalem
/2010-11Dt.01.11.2011
01.11.11 31.10.201Work yet to be started
NCRMP/B-W/AP/RCS/PRED/07/Nizampatnam/003
Road from R&B Road toGurunadhanagar
/2010-11 Dt.17.10.2011
17.10.11 16.07.12 Work yet to be started
Road from R&B Road to AdavalaH/O Bavajipalem
/2010-11 Dt.17.10.2011
17.10.11 16.07.12 CC Road work is Completed,Shoulder work yetobe start.
7/31/2019 8.APRIL MPR- 2012
21/91
MONTHLY REPORT
20 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from R&B Road to Atlavaripalem
/2010-11 Dt.17.10.2011
17.10.11 16.07.12CC Road work is Completed.
NCRMP/B-W/AP/RCS/PRED/07/Bapatla/004
Road from R&B Road to
Hanumanthanagar 2010-11Dt13.10.2011
13.10.11 12.07.2012CC Road work is Completed,Shoulder work is in progress.
Road from R & B road to Adarsanagar CC Road work is Completed,Shoulder work is in progress.
Status of works in Prakasam District up to 30.04.2012
Category Packages allottedunder Phase - 1
Names of worksunder eachpackage
Agreement No. /Date
Milestone completion dates
Progress up to30.04.2012 RemarksFirst Second Third
BRIDGESNCRMP/B-
W/AP/Br/R&B/08/Kanaparthy/012
Construction of High level Bridge at
Km 16/10 of Naguluppalapadu Kanaparthy road inPrakasam District
76/2010-11 Dated1/12/2010
5/31/2011Completion
up to silllevel
12/31/2011Completion upto below deck
slab
5/31/2012Completion of
entire workincluding
approaches
Revitment work,Wearing coat,
Approach road, &Gsb completed.WMM & Aprons
work is in progress
Reached Milestone-III
RHBNCRMP/B-
W/AP/RHB/PRED/08/S.Konda/001
Road from PakalaZP Road to
Aulavaripalem
Cyclone shelter
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001
Dated 25.04.2011 8/24/2011Earth work,
CD work,GSB
12/24/2011WBM, Grade II
& III
4/24/2012 BT,Shoulders &road furniture
CC RoadCompleted.
Shoulders work in
progress
Reached Milestone-III
Road from R&BRoad to
Somarajupalli
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001Dated 25.04.2011
BT, CC road &culverts are
completed from KM0/0 to 2/146.
Reached Milestone-III
7/31/2019 8.APRIL MPR- 2012
22/91
MONTHLY REPORT
21 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from R&Broad to
Narravaripalem
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001Dated 25.04.2011
BT & culverts areCompleted fromKM 0/0 to 0/900.
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002
Road from NH5 toMulaguntapadu
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011 6/9/2011
Earth work,CD work,
GSB
10/9/2011WBM, Grade II
& III
2/9/2012 BT,Shoulders &road furniture
WBM-Grade-IIwork iscompleted.WBMgr-III work to bestarted
Not Reached asper Mile stone-III (Awaiting for EOT Proposal)
Road from R&Broad to
Chalivendradibba
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated -10/02/2011
CC work iscompleted from KM0/0 to KM 0/270
Not Reached asper Mile stone-III (Awaiting for EOT Proposal)
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002
Road from PakalaR&B road to
Mosanaladinne
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002
dated 10/02/2011
6/9/2011Earth work,
CD work,GSB
10/9/2011WBM, Grade II
& III
2/9/2012 BT,Shoulders &road furniture
WBM-Grade-IImaterial collectionis in progress
Not Reached asper Mile stone-III (Awaiting for EOT Proposal)
Road from R&Broad to Binginapalli
HarijanawadaCyclone Shelter
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011
GSB completed
Not Reached asper Mile stone-III (Awaiting for EOT Proposal)
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003
Road from R&BRoad Allur to M T
Raju colony
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003Dated 27/04/2011
8/26/2011Earth work,
CD work,GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &road furniture
BT, CC road &culverts arecompleted from km0/0 to km 3/8.
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
Road from KEMR&B Road to
NCRMP/B-W/AP/RHB/PRED/0
9/26/2011Earth work,
2/26/2012WBM, Grade II
7/26/2012 BT,Shoulders &
BT completed.CDwork completed.CC
Reached Milestone-III
7/31/2019 8.APRIL MPR- 2012
23/91
MONTHLY REPORT
22 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
8/Kothapatnam/004 Sankuvar igunta 8/Kothapatnam/004Dated 27/04/2011
CD work,GSB
& III road furniture road workcompleted from km
0/0 to km 1/430
Road from KEM R& B Road to
Pullareddypalem
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004Dated 27/04/2011
BT completed.CDwork completed.CCroad workcompleted from km0/0 to km 3/900
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/07
Road from MCRoad to
SubbarayaduSatram
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/07dated 27/04/2011
8/26/2011Earth work,
CD work,GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad workcompleted from km0/0 to km 4/4
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/08
Road from R&Broad Tettu to
Ramayapatnam
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/08dated 27/04/2011
8/26/2011Earth work,
CD work,GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &
road furniture
BT completed.CDwork completed.CCroad work
completed from km0/0 to km 5/086
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/09
Road from R&Broad Pellur toVasepallipadu
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/09dated 16/03/2011
7/15/2011Earth work,
CD work,GSB
11/15/2011WBM, Grade II
& III
3/15/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad workcompleted from km0/0 to km 4/5
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/10
Road from R&Broad to Kesupalem
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/10dated 19/04/2011
7/18/2011Earth work,
CD work,GSB
10/18/2011WBM, Grade II
& II
1/18/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad workcompleted from km0/0 to km 2/103
Reached Milestone-III
RCSNCRMP/B-
W/AP/RCS/PRED/08/Vetapalem/001
Road from R&Broad to
Vijayanagaramcolony cyclone
shelter
NCRMP/B-W/AP/RCS/PRED/0
8/Vetapalem/001dated 2011/12
dated 30.09.2011
1/29/2012Earth work,
GSB
5/29/2012shoulders, Gr-
III
9/29/2012 BT,CC pavement
and roadfurniture
cc road completed,BT road
completed&shoulders
progress. Roadfrom km 0/0 to km
0/525
Reached Milestone-III
7/31/2019 8.APRIL MPR- 2012
24/91
MONTHLY REPORT
23 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from NH roadto
Challareddypalem
cc road completed,BT roadcompleted&shouldersprogress. Roadfrom km 0/0 to km1/735
Reached Milestone-III
Road from R&Broad to jeevaraksh
nagar colonycyclone shelter
C.C.completed.Shoulders Progress.
Reached Milestone-III
Road from R&Broad to Ramnagar
colony cycloneshelter
C.C.completedRoad from km 0/0to km0/475.ShouldersProgress.
Reached Milestone-III
Road from R&Broad to cyclone
shelter atMankenavaripalem
Not Grounded
NCRMP/B-W/AP/RCS/PRED/0
8/Chirala/002
Road from R&BRoad to
Keertivaripalemcyclone shelter NCRMP/B-
W/AP/RCS/PRED/08/Chirala/002
dated 27.08.2011
C.C.completedRoad from km 0/0to km 0/265.ShouldersProgress.
Reached Milestone-III
Road from R&BRoad to Devinutulacyclone shelter of
Chirala mandal inPrakasham district.
C.C.completedRoad from km 0/0to km
0/800.ShouldersProgress.
Reached Milestone-III
MPCSNCRMP/B-
W/APMPCS/PRED/08/Ulavapadu/001
Chakicharla cycloneshelter in
Ulavapadu mandalPrakasam district
NCRMP/B-W/AP/MPCS/PRED/08/Ulavapadu/001
24.11.2011 All items upto stilt floor
slabincluding
ramp, stair case
foundations,
24.02.2012 Allitems up to
second floor slab includingfirst floor, and
in 2nd floor including stair case, columns
24.05.2012Head room,plastering,
flooring, water supply
arrangements,sanitary fitting,
electrical
St ilt floor, G.F, &Terrace floor- roof slab completed.Brick workcompleted,Plastering work isin progress, Cattleplatform completed
Reached Milestone-III
7/31/2019 8.APRIL MPR- 2012
25/91
MONTHLY REPORT
24 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
columns,beams,pcc
flooring etc.,
etc., items,compound
wall, ccpavement.
Earthenmounds(raised
portion), water harvesting,septic tank,slump and
soak pit.etc.
revetment work isin progress,flooring work is inprogress,compound wall 120meters lengthcompleted,Electrical work is inprogress.
NCRMP/B-W/APMPCS/PRED/
08/NG Padu/003
Kanaparthy cycloneshelter in
Naguluppapadumandal Prakasam
district
NCRMP/B-W/AP/MPCS/PRED
/08/NG Padu/003
23.11.2011 All items upto stilt floor
slabincluding
ramp, stair case
foundations,columns,bea
ms,pccflooring etc.,
23.02.2012 Allitems up to
first floor slaband head
room slab in 2nd floor
including stair case, columns
etc.,
23.05.2012plastering,
flooring, water supply
arrangements,sanitary fitting,
electricalitems,
compoundwall, cc
pavement.Earthenmounds(raised
portion), water harvesting,septic tank,slump and
soak pit.etc.
Stilt floor, Groundfloor roof slabcompleted. Curingis in progress.
As per Milestone-II, NotCompleted
7/31/2019 8.APRIL MPR- 2012
26/91
MONTHLY REPORT
25 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Nellore District up to 30.04.2012
(RCS)
Package Number Name of Work Milestone1 Milestone2 Milestone3 Remarks
Progress up
to30.04.2012
NCRMP/B-W/AP/09MUTHUKUR/RC
S/002
Road from R&B Roadkappaladoruvu to bandla
palem H.wada
3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII,GrII,CC
Pavement andShoulders
9 Months: BTCC road and
Road Furniturework completed 94% of workcompleted
NCRMP/B-W/AP/09/D.V.SATRAM/R
CS/008
Road from R&B road toSullurpeta Mallam to
berjengalapalli cyclone shelter 3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII, GrII Shouldersand CC Pavement
9 Months: BT,CC Pavement
and RoadFurniture
BT IS Completed,shoulders is in
progress
94 % of workcompleted
NCRMP/B-
W/AP/09T.P.GUDUR/RCS/005
Road from7/2 M.C Road tovenkannapalem pattapupalem work completed
96 % of workcompleted
NCRMP/B-W/AP/09chillakur/RCS/00
4
Road from KatuivaripalemR&B road to vellapalm
3Months: EarthWork,CD
Works,GSB
6 Months: WBMGrII, GrII and
Shoulders
9 Months: BT,CC Pavement
and RoadFurniture
BT is completed 76 % of workcompleted
NCRMP/B-W/AP/09kota/RCS /001
road from R&B road to A.SPURAM 3Months: Earth
Work, PipeCulverts, GSB
6 Months: WBMGrII, GrII and
Shoulders
9 Months: BT,CC Pavement
and RoadFurniture
work completed 97 % of workcompleted
Road from GD Road toVavillapalem
BT IS Completed,shoulders is in
progress
96 % of workcompleted
NCRMP/B-W/AP/RCS/PRED/09/KA
VALI/007
Road from Kotha Satram R&Bto Indiranagar (via)
Thumalapenta palam,Patharavadu palam, Ramudu
palam, Karaduvari palam&Sreeramapuram in SPSR
Nellore District.
4Months: EarthWork, Pipe
Culverts, GSB
4 Months: WBMGrII, GrII ,
Shoulders and CCPavement
4 Months: BT,CC Pavement
and RoadFurniture
BT IS Completed,shoulders is in
progress
78 % of workcompleted
7/31/2019 8.APRIL MPR- 2012
27/91
MONTHLY REPORT
26 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/09/KA
VALI/006
Road Connecting R&B Roadthrough Voter Village in SPSR
Nellore District.
4 Months: EarthWork, Pipe
Culverts,GSB
4 Months: WBMGrII, GrII ,
Shoulders and CCPavement
4 Months: BT,CC Pavement
and RoadFurniture
GSB 2/0 to 2/8 is inprogress, 6nos pipe
culverts is inprogress
16% of workcompleted
Status of works in Nellore District up to 30.04.2012
RHB
NCRMP/B-W/AP/RHB/PRED/09RHB/K
AVALI/004
Road from5/8 of Chennayapalem Road to
Gummadi bandla
5Months:Earthwork, CD
Works,ccpavement and GSB
10 Months: WBMGrII,GrII and
Shoulders
15 Months: BTand RoadFurniture
BT IS completed87 % of work is
completed
Road from PedattapupalemR&B road to Chennayapalem
H.wada
WBM Gr -III isCompleted
73 % of work is
completed
Road from K.T R&B Road to Alliguntapalem
BT IS Completed,
shoulders is inprogress
85 % of
work iscompleted
NCRMP/B-W/AP/RHB/PRED/09BOGOL
U/RHB/002
Road from 1/6 of ZuvvaladinneR&B Road to Tellagunta KM to
2/720
3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII, GrII and
Shoulders
9 Months: BTand RoadFurniture
BT IS Completed,shoulders is in
progress
95 % of work is
completed
NCRMP/B-W/AP/RHB/PRED/09BOGOL
O/RHB/001
1. Road from NH5 toSambasivapuram
5Months: EarthWork, Pipe
Culverts, GSB
10 Months: WBMGrII, GrII and
Shoulders
15 Months: BTand RoadFurniture
BT IS Completed,shoulders is in
progress
94 % of work is
completed
Road from 9/6 of JuvvaladinneR&B Road to 11/0 of
Juvvaladinne R&B Road ViaVekateshpalem
BT IS Completed,shoulders is in
progress
94 % of work is
completed!
7/31/2019 8.APRIL MPR- 2012
28/91
MONTHLY REPORT
27 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RHB/PRED/09/VIDAV
ALURU/005
1)Road from kt R&B ROAD TO ALLAGANIPADU to Vavilla
5Months: EarthWork, Pipe
Culverts, GSB
10 Months: WBMGrII, GrII and
Shoulders
15 Months: BTand RoadFurniture
construction of structures is
completed,ccPavement is
Completed.GSB ISCOMPLETED
42 % of work is
completed!
Road from R&B roadKancharapalem HW to
Alaganipadu.
earth work inembankment is in
progress
18 % of work is
completed
NCRMP/B-W/AP/RHB/PRED/09V.CHAL
EM/RHB/007
ROAD FROM SUVEPALLI-PUDIPARTHI ROAD TO
SRIKANTH COLONY 4Months: EarthWork, Pipe
Culverts, GSB
8 Months: WBMGrII, GrII and
Shoulders
12 Months: BTand RoadFurniture
WorkCOMPLETED,
98 % of work is
completed!
providing BT Surface to the
road from R&B road to EdagaliKandriga
Work COMPLETED
97 % of
work iscompleted
NCRMP/B-W/AP/RHB/PRED/09CHITTA
MURU/003
Road from R&B Road toMuttembake Via Pittuvanipalli 5Months: Earth
Work, PipeCulverts, GSB
10 Months: WBMGrII, GrII and
Shoulders
15 Months: BTand RoadFurniture
WBM Gr -III, IS INPROGRESS
49 % of work is
completed
Road from R&B Chittamur toSoma Samudram
WBM Gr -III, IS INPROGRESS
14 % of work is
completed
NCRMP/B-W/AP/09/MUTHUKUR/RHB/
006
Road from R&B roadtopatuvarikandriga
3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII,GrII,CC
Pavement andShoulders
9 Months: BTand RoadFurniture
Work Completed99 % of work is
completed
7/31/2019 8.APRIL MPR- 2012
29/91
MONTHLY REPORT
28 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/09Allur/RHB/009
Road from R&Broad alluru toGalidibbalu (via)Chukavani
dibba
5Months: EarthWork, Pipe
Culverts, GSB
10 Months: WBMGrII, GrII and
Shoulders
15 Months: BTand RoadFurniture
2 VENT SLABCULVERT IS INPROGRESS, BTKm 3.02 to 0/0 is
completed,remaining is in
progress
62 % of work is
completed
NCRMP/B-W/AP/RHB/PRED/009/T.P.G
UDUR/012
Ring Road to TP Gudur-Salipeta R & B Road via CS
Puram and Mandapam Village3Months: Earth
Work, PipeCulverts, GSB
6 Months: WBMGrII,GrII,CC
Pavement andShoulders
9 Months: BTand RoadFurniture
GSB ,WBM Gr - II &Gr-III is completed
71 % of work is
completed
Road from R & B Road C SPuram to Sivaramapuram
GSB is completedWBM Gr -III is in
progressCCPAVEMENT IS
COMPLETED
73 % of work is
completed
7/31/2019 8.APRIL MPR- 2012
30/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
6.0 District wise status of tests conducted by TPQA:
Apart from monitoring the tests being conducted by the implementation team (contractors & Line department) at various
stages, the Third party Quality Audit team also conducted tests to confirm its compliance with the standards. These tests are
carried out in the site itself and in some cases samples are collected and testing done in outside laboratories. The details of
tests conducted in the field till end of September 2011 are presented.
Summary of QC Tests - Up to 30.4.2012
S.No. District
No. TestsConductedduring the
Month
Total no. of TestsCumulativeTests Done
Total no. of Tests
Passed Failed Passed Failed
1 Srikakulam 220 220 0 732 732 0
2 Vizianagaram 48 48 0 366 366 0
3 Visakhapatnam 117 117 0 1161 1161 0
4 East Godavari 79 79 0 666 666 0
5 West Godavari 52 49 3 229 226 3
7/31/2019 8.APRIL MPR- 2012
31/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7.0 Details of Quality Control Audit Reports Submitted During this Month:
Package Number Name of Work Site Visit Dates District
NCRMP/B-W/AP/RCS/PRED/03/Rambilli/002
PROVIDING BT SURFACETO THE ROAD FROM R&B ROAD TO
RAJAKODURU INRAMBILLI MANDAL
17.12.11, 28.12.11, 10.01.12,09.02.12, 15.02.12, 22.02.12,24.02.12, 29.02.12, 02.03.12,
09.03.12, 12.03.12 &27.03.12
Vishakhapatnam
NCRMP/B Road from Upmaka 16 02 12 24 02 12 29 02 12 Vishakhapatnam
7/31/2019 8.APRIL MPR- 2012
32/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RHB/PRED/04/Katrenikona/003
Road from PR road toDasarivanipeta and to
Cyclone Shelter
09.03.12,13.03.12,14.03.12 & 17.03.12
East Godavari
NCRMP/B-W/AP/RHB/PRED/06/Machilipatnam/002
Road from R&B road toB.V.Thota
05.08.11, 12.08.11,19.08.11, 22.09.11,23.09.11, 10.10.11,03.11.11, 19.11.11,01.01.12, 24.02.12,10.03.12 & 15.03.12
Krishna
NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu/003
Road from R&B road toCyclone shelter at
Chandala
17.09.11, 23.09.11,14.10.11, 03.11.11,
30.12.11, 13.01.12,24.01.12, 02.02.12,11.02.12, 15.02.12,21.02.12, 24.02.12,29.02.12, 06.03.12&15.03.12
Krishna
NCRMP/B-W/AP/RHB/PRED/06/Machilipatnam/002
Road from PotalapalemZ.P road toChikativanipalem
05.08.11, 19.08.11,29.08.11, 2.09.11, 10.09.11,22.09.11, 23.09.11,10.10.11, 12.10.11,15.10.11, 17.10.11, 3.11.11,9.11.11,19.11.11, 15.12.11,16.12.11, 22.12.11,27.12.11, 1.01.12,24.01.12,4.02.12, 8.02.12, 12.02.12,14.02.12, 18.02.12,22.02.12, 24.02.12,
25.02.12 14.03.12 &15.03.12
Krishna
NCRMP/B- Road connecting R&B 05 08 11 12 08 11 Krishna
7/31/2019 8.APRIL MPR- 2012
33/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
01.01.12 24.02.12 &14.03.12
NCRMP/B-W/AP/RCS/PRED/06/Machilipatnam/001 Road from PotalapalemZP road to Potepalli 05.11.2011, 12.11.2011,19.11.2011, 25.11.2011,26.11.2011, 07.12.2011,12.12.2011, 13.12.2011,14.12.2011, 15.12.2011,19.12.2011, 26.12.2011,27.12.2011, 01.01.2012,02.01.2012, 03.01.2012,04.01.2012, 22.02.2012,
24.02.2012 &14.03.2012
Krishna
NCRMP/B-W/AP/RCS/PRED/06/Machilipatnam/001
Road from BhogireddipalliR&B road toRamakhandam
05.11.2011, 12.11.2011,19.11.2011, 01.01.2012,07.01.2012, 09.01.2012,17.01.2012, 24.01.12,24.02.2012 &14.03.2012
Krishna
NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu/003
Road from Intheru ZProad to Rangaraopet
17.09.2011, 23.09.2011,14.10.2011, 3.11.2011,20.12.2012, 22.12.2012,30.12.2011, 13.01.2012,2.02.2012, 11.02.2012,21.02.2012, 24.02.2012,29.02.2012, 5.03.2012 ,9.03.2012 &15.03.2012
Krishna
NCRMP/ B-W/ AP/ Br/ R&B/ 02/Puligadda/ 007
Construction of Minor Bridge at Km. 7/2 near Puligadda of Konada
04.12.11, 13.12.11,10.01.12, 12.01.12,08 02 12 14 02 12
Vizianagaram
7/31/2019 8.APRIL MPR- 2012
34/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
24.02.2012,29.02.2012, 03.03.2012,
05.03.2012,12.03.2012, 15.03.2012,18.03.2012,27.03.2012, 30.03.2012,03.04.2012 &18.04.2012
NCRMP/B-W/AP/MPCS/PRED/04/Uppalaguptam/002
Construction of CycloneShelter atPedaraghavulapeta inUppalaguptam Mandal,E.G.Dt.
05.10.2011, 01.11.2011,02.12.2011,15.12.2012, 22.12.2011,13.01.2012, 31.01.2012,13.02.2012, 19.02.2012,24.02.2012, 29.02.2012,03.03.2012, 05.03.2012,12.03.2012, 15.03.2012,17.03.2012, 27.03.2012,30.03.2012, 02.04.2012 &19.04.2012
East Godavari
NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/001
Construction of CycloneShelter at Avulamanda inThondangi Mandal,E.G.Dt.
05.10.2011, 01.11.2011,02.12.2011,15.12.2011,22.12.2011,13.01.2012, 31.01.2012,13.02.2012, 19.02.2012,24.02.2012, 29.02.2012,03.03.2012, 05.03.2012,12.03.2012, 15.03.2012,
18.03.2012, 27.03.2012,30.03.2012, 03.04.2012,08.04.2012, 12.04.2012,
East Godavari
7/31/2019 8.APRIL MPR- 2012
35/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
8.0 Details of Environmental and Social Reports Submitted During this Month:
Package Number Name of Work DistrictNCRMP/B-W/AP/MPCS/PRED/04/Thondangi/003
Construction of cyclone shelter at Avulamanda in East Godavari District
East Godavari
NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/003
Construction of cyclone shelter atLakshmanudipeta in East Godavari
District
East Godavari
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Road to Danavaipeta CS East Godavari
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Road to G.Musalayyapeta CS
East Godavari
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Road to Gaddipeta CS East Godavari
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Road to Hukumpeta CS East Godavari
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Road to K.Chodipallipeta CS
East Godavari
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Road to P.Chodipallipeta CS
East Godavari
9.0 Observations in the submitted reports:
Name of
Work:
PROVIDING BT SURFACE TO THE ROAD FROM R &B ROAD TO RAJAKODURU IN
RAMBILLI MANDAL1. Three works are there in this package:1) Road from R & B road to Rajakoduru and2) R d f R & B d K b l M i l d
7/31/2019 8.APRIL MPR- 2012
36/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
table 500.1310 Aggregate for Seal Coat: The gradation of seal coat chips was verified and the observed values are fairly
satisfying the requirements of MORD Para 510.2.211 During execution, The rate of spraying of prime coat is verified and found within the specified limits as per
Clause 502 and Table 500.1 of MORD. The spraying temperatures are also observed during executionand found varying from 300C to 340 C, which is within the specified limits as per MORD specification.
12 During execution, the rate of spreading of tack coat is verified and found within the specified limits as per Clause 503 and Table 500.2 of MORD. The spraying temperatures are also observed during executionand found varying from 31C to 36C, which are within the specified limits as per MORD specifications.
13 During execution, Temperature at mixing, laying and at compaction are verified and found to be within thespecified temperature range as per MORD Para 508.1.3.4
14 The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat in % from KM 0/00 andKm 3/531 are verified and found tallying with the requirement as per IRC:SP:20 and IRC:SP:11. Thedetails are given in Annexure - 4.
15 The measurements like width and thickness of the OGPC & Seal coat from Km 0/0 to Km 2/274, Km2/319 to Km 2/795 and Km 2/860 to Km 3/531 are verified and found fairly tallying with the requiredmeasurements. The details are given in Annexure-5.
16 The measurements like width and thickness of the WBM Layers from Km 0/0 to Km 2/274, Km 2/319 toKm 2/795 and Km 2/860 to Km 3/531 are verified and found fairly tallying with the requiredmeasurements. The details are given in Annexure-2.
17 Volumetric analysis tests conducted for WBM layers from Km 0/0 to Km 3/531. It is fairly tallying to thespecfication of MORD.
18 Sand: a) Sieve Analysis tests are conducted. Sand is confirming to Zone II of MORD Para 1501.2.4.2.
The results are found satisfactory.19 Graded Aggregates: Sieve analysis for 20mm graded metal is conducted and observed values are withinthe specified range as per MORD Para 802.3.1.
20 At the time of laying C.C Road We have checked the physical properties, Gradation and proportioning of various ingredients.
21 The C.C road contraction joints are provided, but the joints are not properly sealed. The field officers arerequested to take necessary action to seal the same as per MORD Sub clause 1501.22.
22 The measurements like width and length of parapets and pipes of all the culverts are verified and foundtallying with the estimate.
23 The approved letters of quarries like earth and aggregates have not been produced by field officers for
verification.24 Pre-levels of earth work are not submitted for verification. Requested to furnish the pre-levels to the TPQAfor verification.
7/31/2019 8.APRIL MPR- 2012
37/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
same shall be furnished to the TPQA staff for verification.
5 The field officers have furnished the test results for Soil, GSB and WBM obtained from Department of CivilEngineering, Gitam University and Sheladia Associates, VisakhapatnamMaterials.
6 Sand: a) Sieve Analysis tests conducted for Sand. The Fine aggregate s found to confirm to Zone II of MORD Clause 1202. Fineness modulus is varying from 2.50 -2.53 as against the allowable limit 2.0 to3.50. The results are tabulated in Annexure
7 Graded Aggregates : Sieve analysis for 20mm graded metal are conducted and observed values arewithin the specified range as per MORD Clause 1202
8 Cement: Cement is tested for all the required tests on cement such as fineness, initial setting time, finalsetting time, consistency etc and the values observed within the specified range as per MORD Clause1202
9 C.C Cubes : M20 grade C.C Cubes are tested for body wall concrete and the results are satisfying therequirements and M30 Cube Compressive strength results are found satisfactory.
10 Construction of 2no.s of slab culverts are completed, During execution checked the placement of reinforcement as per SP -20, unit weight of steel, Workability test & pH value..etc.
11 The formation width and shoulder widths are verified from KM 0/00 to KM 2/550 & KM 0/0 to KM 0/248mand at some locations the width of formation is less. The field officers are requested to furnish thereasons. (Avg. road widths from Km: 0/00 to KM 0/130 and 0/198 to KM 0/248 is 6.5 to 7.0m)
12 Aggregate for OGPC and Seal Coat: The gradation and other physical tests are conducted for Coarseaggregate and the observed values are satisfied the requirements of MORD Para 508.1.2.1 and MORDtable 500.13
13 Aggregate for Seal Coat: The gradation of seal coat chips was conducted and the observed values are
fairly satisfying the requirements of MORD Para 510.2.214 During execution, The rate of spraying of prime coat is verified and found within the specified limits as per
Clause 502 and Table 500.1 of MORD. The spraying temperatures are also observed during executionand found varying from 270C to 320 C, which is within the specified limits as per MORD specification.
15 During execution, the rate of spreading of tack coat is verified and found within the specified limits as per Clause 503 and Table 500.2 of MORD. The spraying temperatures are also observed during executionand found varying from 30C to 36C, which are within the specified limits as per MORD specifications.
16 During execution, Temperature at mixing, laying and at compaction are verified and found fairly satisfyingthe specified temperature range as per MORD Para 508.1.3.4
17 The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat in % from KM 0/00 and
Km 2/550 & KM 0/0 to KM 0/248 (Bit-II) are verified and found tallying with the requirement as per IRC:SP:20 and IRC:SP:11. The details are given in Annexure - 3.18 The measurements like width and thickness of the OGPC & Seal coat from KM 0/00 and Km 2/550 & KM
7/31/2019 8.APRIL MPR- 2012
38/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1) Road from R & B road to Rajakoduru and2) Road from R & B road to Kattubolu to Marripalem and3) Road from R & B road to Krishnampalem in Rambilli MandalThe individual progress of this work is 91.05% value of work is completed.The combined progress of this package is 68.19%.
2 91.05 % value of the work is completed. Shoulder work is in progress.3 Works to be done as per Milestone:
Mile stone 1 to the end of Dt: 14.01.12- Earthwork, CD Works and GSB.Mile stone 2 to the end of Dt: 14.05.12- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 14.09.12- BT and Road furniture.
4 The material registers are maintained at site and same shall be shown to the TPQA for verification.
5 The field officers have not furnished the bills and MTC's for cement and bitumen used for the road work.The same shall be furnished to the TPQA staff during the inspection for verification.6 The field officers are requested to test the samples of cement from every consignment and water before
proceeding with the concrete work.7 The field officers have furnished the test results for Soil, GSB, WBM and Mix Designs obtained from
Department of Civil Engineering, Gitam University, and Visakhapatnam.8 It is observed that obstruction of trees, electrical poles, Houses and building compound wall are inside the
road width from Km 0/790 to Km 0/870.9 The formation width and earthen shoulder widths are verified from Km 0/0 to Km 0/870 and at some
locations shoulders are slipped and requires rectified.10 The shoulder material of sand and gravel is not mixed properly. It shall be scarified, suitably remixed,
watered to OMC and compacted to achieve the required relative compaction of min.98% of lab MDD as
per the agreement clause.11 Aggregate for OGPC and Seal Coat: The gradation and other physical tests are conducted for Coarse
aggregate and the observed values are satisfying the requirements of MORD Para 508.1.2.1 and MORDtable 500.13
12 Aggregate for Seal Coat: The gradation seal coat chips conducted and the observed values are fairlysatisfying the requirements of MORD Para 510.2.2
13 During execution, The rate of spraying of prime coat is verified and found within the specified limits as per Clause 502 and Table 500.1 of MORD. The spraying temperatures are also observed during executionand found varying from 270C to 300 C fairly satisfying specified limits as per MORD specification.
14 During execution, the rate of spreading of tack coat is verified and found within the specified limits as per
Clause 503 and Table 500.2 of MORD. The spraying temperatures are also observed during executionand found varying from 30C to 37C, which are within the specified limits as per MORD specifications.15 During execution, Temperature at mixing, laying and at compaction are verified and found to be within the
7/31/2019 8.APRIL MPR- 2012
39/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
route for easy passage of water.26 White washing is observed to parapet walls of the newly constructed culvert for the clear visibility of
vehicular traffic.27 The test reports for water utilized in the construction of C.C Road are not shown to the TPQA staff for
verification.28 The approved letters of quarries like earth and aggregates have not been produced by field officers for
verification.29 Village name boards, cautionary and mandatory signboards at necessary points all along the outer edge
of sharp curves and at school locations shall be erected.30 The Project informatory boards with all details is provided in site as per the guide lines by PIU, NCRMP.31 Para wise compliance report shall be furnished duly attending to the above remarks.
Name of Work:
PROVIDING BT SURFACE TO THE ROAD FROM R &B ROAD TO KATTUBOLU TOMARRIPALEM IN RAMBILLI MANDAL
1. Three works are there in this package:1) Road from R & B road to Rajakoduru and2) Road from R & B road to Kattubolu to Marripalem and3) Road from R & B road to Krishnampalem in Rambilli MandalThe individual progress of this work is 17.71% value of work is completed.The combined progress of this package is 68.19%.
2 18.00 % value of the work is completed. WBM Grade-II is completed. WBM Grade-III is to be
taken up.3 Works to be done as per Milestone:Mile stone 1 to the end of Dt: 14.01.12- Earthwork, CD Works and GSB.Mile stone 2 to the end of Dt: 14.05.12- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 14.09.12- BT and Road furniture.
4 The material registers should be provided at site and same shall be furnished to the TPQA for verification.
5 The field officers are requested to test the samples of cement from every consignment and water beforeproceeding with the concrete work.6 The field officers have furnished the test results for Soil, GSB, WBM and Mix Designs obtained from
Department of Civil Engineering, Gitam University, and Visakhapatnam.7 The formed width is varying from 6.0 to 7.0m from Km 0/0 to Km 0/390 and Km 0/597 to Km 0/707.The
reasons has to be furnished for the same.8 The formation slopes are slipped at some locations between Km 0/0 to Km 0/390 and Km 0/597 to Km
0/707 same shall be rectified
7/31/2019 8.APRIL MPR- 2012
40/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
19 The Project informatory boards with all details shall be provided in site as per the guide lines by PIU,NCRMP.
20 The Project informatory boards with all details shall be provided in site as per the guide lines by PIU,NCRMP.
Name of Work: Providing B.T to the Road from NH-5 to Ramarayadupalem.
1. 95.59 % value of the work is completed.2 Works to be done as per Milestone:
Mile stone 1 to the end of Dt: 14.12.11- Earthwork, CD Works and GSB.Mile stone 2 to the end of Dt: 14.03.12- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 14.06.12- BT and Road furniture.
3 The field officers have not furnished the bills and MTC's for cement and bitumen used for the road work.The same shall be furnished to the TPQA staff for verification.
4 The field officers have furnished the test results for Soil, GSB, WBM and Mix Design obtained fromDepartment of Civil Engineering, Gitam University, and Visakhapatnam.
5The formation width is less than the approved drawing width of 7.5m. The formed width is varying from6.0 to 7.0m. It is observed that hand pump and electrical poles are inside the road width on both sidesfrom Km 0/30 to Km 0/200m.
6 The formation width and earthen shoulder widths are verified from Km 0/0 to Km 0/391 and at somelocations shoulders have slipped and the same shall be rectified.
7 The shoulder material of sand and gravel shall be mixed properly. It shall be scarified, suitably remixed,watered to OMC and compacted to achieve the required relative compaction of min.98% of lab MDD asper the agreement clause.
8 Aggregate for OGPC and Seal Coat: The gradation and other physical tests are conducted for Coarseaggregate and the observed values are satisfying the requirements of MORD Para 508.1.2.1 and MORDtable 500.13
9 Aggregate for Seal Coat: The gradation seal coat chips conducted and the observed values are fairlysatisfying the requirements of MORD Para 510.2.2
10 During execution, The rate of spraying of prime coat is verified and found within the specified limits as per Clause 502 and Table 500.1 of MORD. The spraying temperatures are also observed during executionand found varying from 270C to 300 C, fairly satisfying the specified limits as per MORD specification.
11 During execution, the rate of spreading of tack coat is verified and found within the specified limits as per
7/31/2019 8.APRIL MPR- 2012
41/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
specification.20 During execution of C.C Road TPQA conducted sieve analysis and physical properties of Aggregates,
Workability test, pH value.etc.21 Contraction joints are provided but the joints are not sealed. The field officers are requested to take
necessary action to improve the same as per MORD Sub clause 1501.22.22 The test reports are not shown for water utilized in the construction of C.C Road to the TPQA staff for
verification.23 The approved letters of quarries like earth and aggregates have not been produced by field officers for
verification.24 Village name boards, cautionary and mandatory signboards at necessary points all along the outer edge
of sharp curves and at school locations shall be erected.25 The Project informatory boards with all details is provided in site as per aggrement.The same may be
provided immediately at site as per the guide lines by PIU, NCRMP.
Name of Work: Road from PR road to Dasarivanipeta and to Cyclone Shelter
1. 100% value of the work is completed
2. As per the Agreement the Mile stones fixed are as follows.Milestone 1 to the end of Dt.26.07.2011, Earth work, CD Works, GSBMilestone 2 to the end of Dt.26.10.2011, WBM Gr II , Gr III and Shoulders
Milestone 3 to the end of Dt.26.01.2012, BT and Road Furniture3. The measurements like width and thickness of the OGPC + Seal Coat Layer from Km 0.000 to Km 2.280is verified and found to be fairly tallying with the required measurements, Primer Coat,Bitminius extractiontests conducted for OGPC + Seal Coat layer and Tack Coat in the same reach and they are tallying withthe agreement requirements. The details are given in Annexure-1 and in QC test summary from km 0.000to km.2.280
4. Widening of earthwork formation is to be done prior to taking up BT layers5. Widening of the formation is not done as per requirement and it is less than 7.5M at almost all the
locations. The formation width is varying from 5.00m to 6.50m at Km 0.470 of temple L/S, Km 0.650 of built-up area L/S, Km 0.790, in between Km 1.435 to Km 1.475 and from Km 2.114 to Km 2.165 of and
built-up area R/S. Lateral support to the road crest is very important.6. Guard stones shall be fixed at Curved areas and canal side berg portion from Km 0.500 to Km 2.040 andL/S from Km 2.075 to Km 2.280. Painting as Black & White Strips is to be done to stones for clear visibility
7/31/2019 8.APRIL MPR- 2012
42/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
summary. They are fairly tallying with the specfication requirements of clause 405.13 of MORD.6. The 600mm dia single row pipe culvert 1 No. is completed in Km 0/47. While laying WBM simultaneously shoulders shall be also compacted.8 The project informatory boards with all details, Cautionary sign boards at necessary points and Village
name boards are not provided as per aggregement.The same shall be provided as per the guidelinesgiven by PIU,NCRMP.
9 Parawise compliance report shall be furnished duly attending to the above remarks.
Name of Work: Road from R&B road to Cyclone shelter at Chandala
1. 60.48 % value of the work is completed. Total stretch of road is 625 mts. GSB for length of 625mts; WBMGr-II & Gr-III for length of 575mts is completed.2. Works to be done as per Milestone:
Mile stone 1 to the end of Dt: 26.07.2011 - Earthwork, Pipe Culverts, GSB - 3 MonthsMile stone 2 to the end of Dt: 26.10.2011 - WBM Gr-II, Gr-III and Shoulders - 3 MonthsMile stone 3 to the end of Dt: 26.01.2012 - BT and Road furniture - 3 Months
3. 3rd Milestone Completed but BT and Road Furniture Works are not yet Completed. Progress needs to beimproved
4. The measurements like width and thickness of the GSB, WBM Gr-II & Gr-III Layers from Km 0.000 to Km0.575 are verified and found to be fairly tallying with the required measurements. The details are given in
Annexure - 1.5. Volumetric analysis tests were conducted for WBM Gr-II & Gr-III layers from Km 0/0 to Km 0/575. QC tests
were conducted for WBM Gr-II & Gr-III (field & Lab) i.e., Gradation, The Details are givenin QC testsummary. They are fairly tallying with the specfication requirements of clause 405.13 of MORD.
6. The 600mm dia single row pipe culvert (1 No's) completed in 0/4.7. While laying WBM simultaneously shoulders shall be also compacted.8. The project informatory boards with all details, Cautionary sign boards at necessary points and Village
name boards are not provided as per aggregement.The same shall be provided as per the guidelinesgiven by PIU,NCRMP.
9. Parawise compliance report shall be furnished duly attending to the above remarks.
Name of
7/31/2019 8.APRIL MPR- 2012
43/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Name of Work: Road connecting R&B road through Gantalammapalem
1. 53.47 % value of the work is completed. Total stretch of road is 2.0450 mts. GSB, WBM Gr-II & Gr-IIIfor length of 2045 mts is completed.
2 Works to be done as per Milestone:Mile stone 1 to the end of Dt: 26.07.2011 - Earthwork, Pipe Culverts, GSB - 3 MonthsMile stone 2 to the end of Dt: 26.10.2011 - WBM Gr-II, Gr-III and Shoulders - 3 MonthsMile stone 3 to the end of Dt: 26.01.2012 - BT and Road furniture - 3 Months
3 3rd Milestone Completed but BT and Road Furniture Works are not yet Completed. Progress needs to beimproved
4 The measurements like width and thickness of the GSB, WBM Gr-II % Gr-III Layers from Km 0.000 toKm2.350 are verified and found to be fairly tallying with the required measurements. The details are givenin Annexure - 1.
5 Volumetric analysis tests were conducted for WBM Gr-II & Gr-III layers from Km 0/0 to Km 2.350. QC testswere conducted for WBM Gr-II & Gr-III (field & Lab) i.e., Gradation. The Details are givenin QC testsummary. They are fairly tallying with the specfication requirements of clause 405.13 of MORD.
6 The 600mm dia single row pipe culverts (3 Nos.) completed in 1/2, 3/0 & 3/4.7 While laying WBM simultaneously shoulders shall be also compacted.8 The project informatory boards with all details, Cautionary sign boards at necessary points and Village
name boards are not provided as per aggregement.The same shall be provided as per the guidelines
given by PIU,NCRMP.9 Parawise compliance report shall be furnished duly attending to the above remarks.
Name of Work: Road from Chinnapuram R&B road to Gundupalem
1. 12.14 % value of the work is completed. Total stretch of road is 0.485 mts. GSB is completed for length of 0.435mts against length of 0.485 mts
2 Works to be done as per Milestone:Mile stone 1 to the end of Dt: 01.12.2011 - Earthwork, Pipe Culverts, GSB - 3 MonthsMile stone 2 to the end of Dt: 01.03.2012 - WBM Gr-II, Gr-III and Shoulders - 3 MonthsMile stone 3 to the end of Dt: 01.06.2012 - BT and Road furniture - 3 Months
7/31/2019 8.APRIL MPR- 2012
44/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
are verified and found to be fairly tallying with the required measurements. The details are given in Annexure - 1.
5 Volumetric analysis tests were conducted for WBM Gr-II layer from Km 0/0 to Km 0/595. QC tests wereconducted for WBM Gr-II (field & Lab) i.e., Gradation. The Details are givenin QC test summary. They arefairly tallying with the specfication requirements of clause 405.13 of MORD.
6 The project informatory boards with all details, Cautionary sign boards at necessary points and Villagename boards are not provided as per aggregement.The same shall be provided as per the guidelinesgiven by SPIU, NCRMP.
7 Parawise compliance report shall be furnished duly attending to the above remarks.
Name of Work: Road from Bhogireddipalli R&B road to Ramakhandam
1. 13.20 % value of the work is completed. Total stretch of road is 1.470 mts. GSB is completed for length of 1420mts...
2 Works to be done as per Milestone:Mile stone 1 to the end of Dt: 01.12.2011 - Earthwork, Pipe Culverts, GSB - 3 MonthsMile stone 2 to the end of Dt: 01.03.2012 - WBM Gr-II, Gr-III and Shoulders - 3 MonthsMile stone 3 to the end of Dt: 01.06.2012 - BT and Road furniture - 3 Months
3 2nd Milestone Completed but WBM Gr-II & Gr-III Works are not yet Completed. 1st Milestone works likeEarthwork and Pipe Culverts are also still in balance. Progress needs to be improved.
4 The measurements like width and thickness of the GSB Layers from Km 0.000 to Km 1.420 are verified andfound to be fairly tallying with the required measurements. The details are given in Annexure - 1.
5 The 600mm dia single row pipe culverts (3 No's) are not completed in 0/2, 0/4 & 1/4.6 While laying WBM simultaneously shoulders shall be also compacted.7 The project informatory boards with all details, Cautionary sign boards at necessary points and Village
name boards are not provided as per aggregement.The same shall be provided as per the guidelines givenby SPIU, NCRMP.
8 Parawise compliance report shall be furnished duly attending to the above remarks.
Name of Work: Road from Intheru ZP road to Rangaraopeta
1. 59.34 % value of the work is completed. Total stretch of road is 635 mts. GSB, WBM Gr-II & Gr-III iscompleted for length of 635mts.
2 Works to be done as per Milestone:
7/31/2019 8.APRIL MPR- 2012
45/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1. Bridge Work and approach work is completed except for Quadrants, shoulders and fixing strip real joints.2 Works to be done as per Milestone:
Mile stone 1 to the end of Dt: 30.06.2011- Earthwork for foundation, PCC for Foundation, Footings.Mile stone 2 to the end of Dt: 31.01.2012- Substructure for abutments and wing walls,Supply and fixing of elastomeric neoprene bearings, Super structure and 300mm thick Grouted roughstone revetment, Earth work for approaches etc.,.Mile stone 3 to the end of Dt: 30.05.2012- Super structure and construction of precast RCC railing, Stripseal expansion joints, Completion of SDBC etc.
3 The field officers have furnished the test results for Soil, GSB, WMM and SDBC obtained from Departmentof Civil Engineering, Andhra University & Gitam College, and Visakhapatnam.
4 Quality control lab is available at site and material registers are shown to TPQA for verification.Materials
5 Sand: a) Sieve Analysis tests are conducted. Sand is confirming to Zone II as per MORT & H Table 1000-2.
Fineness modulus is varying from 2.57 -3.07 as against the allowable limits of. 2.0 to 3.50. The results arefound satisfactory.
6 Graded Aggregates : Sieve analysis for 20mm graded metal are conducted and observed values are withinthe specified range as per MORT&H table 1000-1
7 Water: Sample is collected and sent to Gitam University for testing of Physical properties and the obtainedresults are within the specified range as per IS: 456-2000 & IS: 3025-1986.
8 Cement: cement Samples are collected and tested for Fineness, Standard consistancy,Initial and finalsetting times and the obtained results are within the specified range as per MORT & H Clause 1006
9 Steel: Steel samples are collected and tested for mechanical properties and the obtained results are withinthe specified range as per IS 1786. The steel samples are randomly collected and tested for verification of
Mass per Meter Run, the results are given in annexure-I10 Cement slurry coating for Steel: The protection of reinforcement against corrosion prior to the concretingwas done by applying a Cement slurry coating on the steel.
11 The diameter of piers is verified and the values are fairly tallying as per drawings. The dimensions of pedestal over pier P1 and P2 are verified and found 2.00m x 2.01m x 0.5m and 2.01 x 2.015m x 0.5mrespectively as against of 2.0m x 2.0m x 0.5m.The Measurement Books are not produced for verification.
12 The dimensions of the hammer head bed block over pier P1,P2 are verified and the same are fairly tallyingas per drawing
13 The dimensions of Elastomeric bearings are verified and found fairly satisfying the requirements Table2000-2 of MORT & H the result are given in Annexure 2
14 The finished levels of slabs are verified and fairly tallying with the drawing. Plumb is verified for the sides of the girders and the same is observed to be fair and within tolerance limits as per cl. 2208 of MORT&Hspecifications. The levels are tabulated in Annexure-8
7/31/2019 8.APRIL MPR- 2012
46/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
23 During execution of Bridge Approaches, Gradation, Physical properties like AIV, FI & EI etc and Relativecompaction tests are conducted for embankment, GSB and WMM layers and the test results are foundwithin the specified limits as per Agreement condition.
24 The measurements like width and thickness of the GSB and WMM layers from Km 6/841 to Km 6/945 andKm 6/996 to Km 7/083m are verified and found to be tallying with the required measurements. The detailsare given in Annexure - 2 & 3.
25 During execution,Temparature at mixing, laying and at compaction are verified and found to be within thespecified temperature range as per MORT & H Para's 508.4.6, 508.4.7 & 508.4.8.
26 The measurement like width and thickness of the SDBC layer from Km 6/841 to Km 6/945 and Km 6/996 toKm 7/083m is verified and found to be tallying with the required approved drawing.
27 The obtained values of Bitumen Extraction Test Results for SDBC from Km: 6/841 to Km 6/945 and Km:6/996 to Km 7/083m are verified and found tallying with the requirement as per MORT &H Cl: 508. Thedetails are given in Annexure - 5.
28 The embankment formation requires trimming of side slopes as specified in MORT & H sections 301 & 305.29 The stone samples using for protection of slope are collected for testing the size and weight. The result of
Some samples are not satisfying the requirements as per MORT & H Para 2504.1. NCR is issued for thesame.
30 SBC required as per designs is 26T/m2 for Piers and 21 T/m2 for Abutments. As per the soil test resultsobtained from the Andhra University , Visakhapatnam for piers P1, P2, the values of SBC are 38 T/m2and 40.80T/m2 respectively and for Abutment A1 is 30.9 T/m2 ,A2 is 34.1T/m2.The confirmatory SBC testconducted by TPQA and the value is 28T/m2 for pier foundation.
31 TPQA staff regularly inspecting the site and gives the OK card by conducting the tests on input material.32 The approved letters of quarries like earth and aggregates have not been produced by field officers for
verification33 The Project informatory board is erected with all details at site.34 Para wise compliance report shall be furnished for this and previous QCR's duly attending to the remarks.
Name of Work:
Construction of Minor Bridge at Km. 15/2 near Chakaligadda of Konada RamatheerthamR&B Road to Konathalapalem (via) Yerukonda, Pasupam, Kollayavalsa (Z.P. Road) inVizianagaram District.
1. Progress: About 78.76% of work is completed as against of 82.07%.The progress of work is slightly slow.
Awaiting for approval of Working estimate for retaining wall2 works to be done as per milestone:
Milestone:1 to the end of date 07-07-2011-Foundation Up to sill level
7/31/2019 8.APRIL MPR- 2012
47/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Drg. No.SD/114. Necessary cover blocks, chairs, spacers are provided to fix the reinforcement firmly in itscorrect position
12 During execution, tests are conducted for Water pH value, temperature and workability of concrete andfound within the specified limits as per MORT& H.
13 C.C Cubes : M30 grade C.C Cubes Compressive strength results are satisfactory as per MORT&Hsection 1700. The result are given in the Annexure-2
14 During execution of Bridge Approaches, Relative compaction tests are conducted for embankment layersand the test results are found within the specified limits as per Agreement conditions.
15 The tie rods and steel rods used for supporting the centering are to be cut and removed immediately andsurface finished neatly as per MORT&H Cl: 1714.
16 Non destructive test conducted with rebound hammer on Abutment, bed block over abutment,Hammerhead bed block, and deck slab and the results are tabulated in the Annexure-3
17 The weep holes in abutment are blocked at some places. The field officers are instructed to get them
cleared immediately. Dead mortar is observed on Abutment and the surface finishing appears to be rough.The field officers are requested to clear the dead mortar immediately.
18 Rough stone collected for protection works are examined. Some stones are weighing less than 40 Kgs andmeasuring less than 300mm which are specified as per MORT&H cl: 2504. NCR was issued in this regard.
19 TPQA staff regularly visits the site and gives the OK card by conducting the tests on input material.20 The approved letters of quarries like earth and aggregates have not been produced by field officers for
verification21 The Project informatory board is erected with all details at site.22 The Contractor shall take necessary precautions for safety of the workers and preserving their health while
working in such jobs, which require special protection and precaution.
23 Para wise compliance report shall be furnished for this and previous QCR's duly attending to the remarks.
Name of Work: Construction of cyclone shelter at Lakshmanudipeta in Thondangi Mandal, E.G.Dt.
1. Two works are there in this package:1) Construction of cyclone shelter at Lakshmanudipeta in Thondangi Mandal Type -A and2) Construction of cyclone shelter at Avulamanda in Thondangi Mandal Type -BThe individual progress of this work is 17.36% value of work is completed.
2 17.36 % value of the work is completed. Sand Filling work is in progress.
3 Works to be done as per Combined Milestone:Mile stone 1 to the end of Dt: 16.02.2012- Ground Floor and Plinth Level.Mile stone 2 to the end of Dt: 16.06.2012- First Floor Roof Slab Cast.
7/31/2019 8.APRIL MPR- 2012
48/91
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
15 Alkali Aggregate Reactivity Tests: Samples are collected and sent to Civil Aid for testing of Alkali Aggregatereactivity test for Fine